Loading...
HomeMy WebLinkAbout2282 FARADAY AVE; ; AS020072; Permit9/30/2020 AS020072 Permit Data City of Carlsbad Sprinkler Permit Job Address: 2282 FARADAY AV Permit Type: SPRINK Parcel No: 2120613300 Lot #: 0 Reference No.: PC #: Project Title: ISIS Permit No: AS020072 Status: ISSUED Applied 5/30/2002 Approved: 6/24/2002 Issued: 6/24/2002 Inspector: Applicant: Owner: ISIS PHARMACEUTICALS INC 2280 FARADAY AV CARLSBAD CA Fees ($) Add'I Fees ($) Total ($) Balance ($) 4685 _i0liI111J 0_ 1/1 ASC)2-00'i7, WEST COAST FIRE PROTECTION 512 . CALIFORNIA AVE #105 I VISTA, CA 92083 }1JLIC CALCULATIONS FOR SIS LAB GM? LAB 'CARLSBAD, CA, DATE:6-18-02 -DESIGN DATA- OCCUPANCY CLASSIFICATION: EXTRA HAZARD GP-2 DENSITY: .40 GPM AREA OF APPLICATION: RMS. 133, 133C, 132 COVERAGE PER SPRINKLER: 81.25 SQ. FT. NUMBER OF SPRINKLERS CALCULATED: 15 Sprinklers TOTAL SPRINKLER WATER FLOW REQUIRED: 527.5 GPM FLOW AND PRESSURE (@BOR): 527.4 Gpm @ 69.2 psi SPRINKLER ORIFICE SIZE: 1/2" NAME OF CONTRACTOR: WEST. COAST FIRE PROTECTION DESIGN/LAYOUT BY: DAN AMTO AUTHORITY HAVING JURISDICTION: CARLSBAD FIRE DEPARTMENT CONTRACTOR CERTIFICATION NUMBER: C16-763542 CALCULATIONS BY BASS COMPUTER PROGRAM HRS SYSTEMS, INC. TUCKER, GA 30084 SPRINKLER SYSTEM HYDRAULIC ANALYSIS Date: 03/19/2000 JOB TITLE: ISIS GMP LAB - EXTRA HAZARD CALC WATER SUPPLY DATA SOURCE STATIC RESID. FLOW AVAIL. TOTAL NODE PRESS. PRESS. @ PRESS. @ DEMAND TAG (PSI) (PSI) (GPM) (PSI) (GPM) 64 95.0 85.0 1479.0 89.9 1027.5 Page 1 GMPLAB. SDF REQ'D PRESS. (PSI) 80.7c??OL.. AGGREGATE FLOW ANALYSIS: TOTAL FLOW AT SOURCE 1027.5 GPM TOTAL HOSE STREAM ALLOWANCE AT SOURCE 500.0 GPM OTHER HOSE STREAM ALLOWANCES 0.0 GPM TOTAL DISCHARGE FROM ACTIVE SPRINKLERS 527.5 GPM NODE ANALYSIS DATA NODE TAG ELEVATION NODE TYPE PRESSURE DISCHARGE (FT) (PSI) (GPM) A 9.5 K= 5.60 34.5 32.9 B 9.5 K= 5.60 35.2 33.2 C 9.5 K= 5.60 37.2 34.2 D 9.5 - - - - 38.8 - - - B 9.5 K= 5.60 34.3 32.8 F 9.5 K= 5.60 35.1 33.2 G 9.5 K= 5.60 37.0 34.1 H 9.5 - - - - 38.6 - - - I 9.5 K= 5.60 33.7 32.5 J 9.5 K= 5.60 34.4 32.9 K 9.5 K= 5.6:0 37.2 34.2 L 9.5 - - - - 38.8 - - - M 9.5 K= 5.60 50.9 40.0 N 9.5 K= 5.60 47.1 38.4 0 9.5 K= 5.60 44.6 37.4 P 9.5 K= 5.60 45.6 37.8 Q 9.5 - - - - 47.1 - - - R 9.5 K= 5.60 43.1 36.8 S 9.5 K= 5.60 44.1 37.2 T 9.5 ---- 46.6 1 16.0 - - - - 56.0 - - - 2 16.0 - - - - 56.2 - - - 3 16.0 - - - - 56.3 - - - 4 16.0 - - - - 56.5 - - - 5 16.0 - - - - 56.6 - - - 6 16.0 - - - - 56.9 - - - 7 16.0 - - - - 57.1 - - - 8 16.0 - - - - 57.3 - - - 9 16.0 - - - - 57.4 - - - 10 16.0 - - - - 57.5 - - - 11 16.0 - - - - 57.5 - - - 12 16.0 - - - - 57.5 - - - 13 17.0 - - - - 53.1 - - - 14 17.0 - - - - 55.9 - - - SPRINKLER SYSTEM HYDRAULIC ANALYSIS Date: 03/19/2000 JOB TITLE: ISIS GMP LAB - EXTRA HAZARD CALC NODE TAG ELEVATION NODE TYPE PRESSURE DISCHARGE (FT) (PSI) (GPM) 15 17.0 - - - - 55.9 - - - 16 17.0 - - - - 56.1 - - - 17 17.0 - - - - 55.2 - - - 18 17.0 - - - - 56.5 - - - 19 17.0 - - - - 56.8 - - - 20 17.0 - - - - 56.9 - - - 21 17.0 - - - - 57.1 - - - 22 17.0 - - - - 57.2 - - - 23 17.0 - - - - 57.2 - - - 24 17.0 - - - - 57.2 - - - 25 16.0 - - - - 57.6 - - - 26 16.0 - - - - 57.6 - - - 27 16.0 - - - - 57.7 - - - 28 16.0 - - - - 57.8 - - - 29 16.0 - - - - 57.8 - - - 30 16.0 - - - - 58.0 - - - 31 16.0 - - - - 58.2 - - - 32 16.0 - - - - 58.5 - - - 33 16.0 - - - - 58.7 - - - 34 16.0 - - - - 59.0 - - - 35 16.0 - - - - 59.2 - - - 36 1.0 - - - - 59.2 - - - 37 17.0 - - - - 55.3 - - - 38 17.0 - - - - 57.1 - - - 39 17.0 - - - - 57.1 - - - 40 17.0 - - - - 57.2 - - - 41 17.0 - - - - 56.6 - - - 42 17.0 - - - - 57.5 - - - 43 17.0 - - - - 57.7 - - - 44 17.0 - - - 57.9 - - - 45 17.0 - - - - 58.2 - - - 46 17.0 - - - - 58.5 - - - 47 17.0 - - - - 58.6 - - - 48 17.0 - - - - 58.6 - - - 49 17.0 - - - - 42.7 - - - 50 17.0 - - - - 42.5. - - - 51 17.0 - - - - 42.6 - - - 52 17.0 - - - - 55.9 - - - 53 17.0 - - - - 51.1 - - - 54 17.0 - - - - 50.9 - - - 55 17.0 - - - - 50.9 - - - 56 16.0 - - - - 59.2 - - - 57 16.0 - - - - 62.3 - - - 58 0.5 - - - - 69.2 - - - 59 -3.0 - - - - 70.9 - - - 60 6.0 - - - - 67.2 - - - 61 6.0 - - - - 75.2 - - - 62 -3.0 - - - - 79.4 - - - 63 -3.0 - - - - 80.0 - - - 64 -3.0 SOURCE 80.7 527.5 Page 2 GMPLAB . SDF SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 3 Date: 03/19/2000 GMPLAB.SDF JOB TITLE: ISIS GMP LAB - EXTRA HAZARD CALC PIPE DATA PIPE TAG Q(GPM) DIA(IN) LENGTH PRESS. END ELEV. NOZ. PT DISC. VEL(FPS) HW(C) (FT) SUM. NODES (FT) (K) (PSI) (GPM) F.L./FT (PSI) Pipe: 1 -32.9 1.408 PL 10.00 PF 0.8 A 9.5 5.6 34.5 32.9 6.8 120 FTG ---- PE 0.0 B 9.5 5.6 35.2 33.2 0.078 TL 10.00 PV 0.3 Pipe: 2 -66.1 1.408 PL 7.00 PF 2.0 9.5 5.6 35.2 33.2 13.6 120 FTG ---- PE 0.0 9.5 5.6 37.2 34.2 0.284 TL 7.00 PV 1.2 Pipe: 3 -100.3 1.639 PL 1.00 PF 1.6 9.5 5.6 37.2 34.2 15.3 120 FTG K PE 0.0 9.5 0.0 38.8 0.0 0.292 TL 5.36 PV 1.6 Pipe: 4 -32.8 1.408 PL 10.00 PF 0.8 9.5 5.6 34.3 32.8 6.8 120 FTG ---- PE 0.0 9.5 5.6 35.1 33.2 0.077 TL 10.00 PV 0.3 Pipe: 5 -66.0 1.408 PL 7.00 PF 2.0 9.5 5.6 35.1 33.2 13.6 120 FTG ---- PE 0.0 9.5 5.6 37.0 34.1 0.282 TL 7.00 PV 1.2 Pipe: 6 -100.0 1.639 PL 1.00 PF 1.6 9.5 5.6 37.0 34.1 15.2 120 FTG K PE 0.0 9.5 0.0 38.6 0.0 0.291 TL 5.36 PV 1.6 Pipe: 7 -32.5 1.408 PL 10.00 PF 0.8 9.5 5.6 33.7 32.5 6.7 120 FTG ---- PE 0.0 9.5 5.6 34.4 32.9 0.076 TL 10.00 PV 0.3 Pipe: 8 -65.4 1.408 PL 10.00 PF 2.8 9.5 5.6 34.4 32.9 13.5 120 FTG ---- PE 0.0 9.5 5.6 37.2 34.2 0.278 TL 10.00 PV 1.2 Pipe: 9 -99.5 1.639 PL 1.00 PF 1.5 9.5 5.6 37.2 34.2 15.1 120 FTG K PE 0.0 9.5 0.0 38.8 0.0 0.288 TL 5.36 PV 1.5 Pipe: 10 . -37.4 1.408 PL 10.00 PF 1.0 9.5 5.6 44.6 37.4 7.7 120 FTG ---- PE 0.0 9.5 5.6 45.6 37.8 0.099 TL 10.00 PV 0.4 Pipe: 11 -75.2 1.408 PL 1.00 PF 1.5 9.5 5.6 45.6 37.8 15.5 120 FTG E PE 0.0 9.5 0.0 47.1 0.0 0.360 TL 4.31 PV 1.6 Pipe: 12 -36.8 1.408 PL 10.00 PF 1.0 9.5 5.6 43.1 36.8 7.6 120 FTG ---- PE 0.0 9.5 5.6 44.1 37.2 0.096 TL 10.00 PV 0.4 Pipe: 13 -74.0 1.408 PL 4.00 PF 2.5 9.5 5.6 44.1 37.2 15.2 120 FTG E PE 0.0 9.5 0.0 46.6 0.0 0.349 TL 7.31 PV 1.6 C D E F F G G H I J J K K L 0 R S S T SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 4 Date: 03/19/2000 GMPLAB.SDF JOB TITLE: ISIS GMP LAB - EXTRA HAZARD CALC PIPE DATA (cont.) PIPE TAG Q(GPM) DIA(IN) LENGTH PRESS. END ELEV. NOZ. PT DISC. VEL(FPS) HW(C) (FT) SUM. NODES (FT) (K) (PSI) (GPM) F.L./FT (PSI) Pipe: 14 -100.3 1.639 PL 11.50 PF 7.2 D 9.5 0.0 38.8 0.0 15.3 120 FTG ET PE -3.2 49 17.0 0.0 42.7 0.0 0.292 TL 24.59 PV 1.6 Pipe: 15 -100.0 1.639 PL 11.50 PF 7.2 H 9.5 0.0 38.6 0.0 15. 120 FTG ET PE -3.2 50 17.0 0.0 42.5 0.0 0.291 TL 24.59 PV 1.6 Pipe: 16 -99.5 1.639 PL 11.50 PF 7.1 L 9.5 0.0 38.8 0.0 15.1 120 FTG ET PE -3.2 51 17.0 0.0 42.6 0.0 0.288 TL 24.59 PV 1.5 Pipe: 17 -40.0 1.049 PL 10.50 PF 8.2 M 9.5 5.6 50.9 40.0 14.8 120 FTG ET PE -3.2 52 17.0 0.0 55.9 0.0 0.468 TL 17.50 PV 1.5 Pipe: 18 -38.4 1.049 PL 9.50 PF 7.2 N 9.5 5.6 47.1 38.4 14.3 120 FTG ET PE -3.2 53 17.0 0.0 51.1 0.0 0.436 TL 16.50 PV 1.4 Pipe: 19 -75.2 1.408 PL 9.50 PF 7.0 Q 9.5 0.0 47.1 0.0 15.5 120 FTG ET PE -3.2 54 17.0 0.0 50.9 0.0 0.360 TL 19.42 PV 1.6 Pipe: 20 -74.0 1.408 PL 11.50 PF 7.5 T 9.5 0.0 46.6 0.0 15.2 120 FTG ET PE -3.2 55 17.0 0.0 50.9 0.0 0.349 TL 21.42 PV 1.6 Pipe: 21 -162.9 3.314 PL 8.00 PF 0.2 1 16.0 0.0 56.0 0.0 6.1 120 FTG ---- PE 0.0 2 16.0 0.0 56.2 0.0 0.023 TL 8.00 PV 0.2 Pipe: 22 -134.5 3.314 PL 8.00 PF 0.1 2 16.0 0.0 56.2 0.0 5.0 120 FTG ---- PE 0.0 3 16.0 0.0 56.3 0.0 0.016 TL 8.00 PV 0.2 Pipe:. 23 -139.2 3.314 PL 8.00 PF 0.1 3 16.0 0.0 56.3 0.0 5.2 120 FTG ---- PE 0.0 4 16.0 0.0 56.5 0.0 0.017 TL 8.00 PV 0.2 Pipe: 24 -112.4 3.314 PL 8.00 PF 0.1 4 16.0 0.0 56.5 0.0 4.2 120 FTG ---- PE 0.0 5 16.0 0.0 56.6 0.0 0.012 TL 8.00 PV 0.1 Pipe: 25 -211.0 3.314 PL 8.00 PF 0.3 5 16.0 0.0 56.6 0.0 7.8 120 FTG ---- PE 0.0 6 16.0 0.0 56.9 0.0 0.038 TL 8.00 PV 0.4 Pipe: 26 -183.6 3.314 PL 8.00 PF 0.2 6 16.0 0.0 56.9 0.0 6.8 120 FTG ---- PE 0.0 7 16.0 0.0 57.1 0.0 0.029 TL 8.00 PV 0.3 SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 6 Date: 03/19/2000 GMPLABSDF JOB TITLE: ISIS GMP LAB - EXTRA HAZARD CALC PIPE DATA (cont.) PIPE TAG Q(GPM) DIA(IN) LENGTH PRESS. END ELEV. NOZ. PT DISC. VEL(FPS) HW(C) (FT) SUM. NODES (FT) (K) (PSI) (GPM) F.L./FT (PSI) Pipe: 40 -428.5 4.310 PL 8.00 PF 0.3 33 16.0 0.0 58.7 0.0 9.4 120 FTG ---- PE 0.0 34 16.0 0.0 59.0 0.0 0.039 TL 8.00 PV 0.6 Pipe: 41 -460.9 4.310 PL 2.67 PF 0.1 34 16.0 0.0 59.0 0.0 10.1 120 FTG ---- PE 0.0 56 16.0 0.0 59.2 0.0 0.044 TL 2.67 PV 0.7 Pipe: 41A 66.5 4.310 PL 5.33 PF 0.0 56 16.0 0.0 59.2 0.0 1.5 120 FTG ---- PE 0.0 35 16.0 0.0 59.2 0.0 0.001 TL 5.33 PV 0.0 Pipe: 42 33.2 4.310 PL 8.00 PF 0.0 35 16.0 0.0 59.2 0.0 0.7 120 FTG ---- PE 0.0 36 16.0 0.0 59.2 0.0 0.000 TL 8.00 PV 0.0 Pipe: 43 162.9 2.203 PL 1.00 PF 2.5 1 16.0 0.0 56.0 0.0 13.7 120 FTG T PE -0.4 13 17.0 0.0 53.1 0.0 0.170 TL 14.64 PV 1.3 Pipe: 44 162.9 2.203 PL 47.40 PF 10.4 13 17.0 0.0 53.1 0.0 13.7 120 FTG T PE 0.0 49 17.0 0.0 42.7 0.0 0.170 TL 61.04 PV 1.3 Pipe: 45 62.6 2.203 PL 8.00 PF 0.2 49 17.0 0.0 42.7 0.0 5.3 120 FTG ---- PE 0.0 50 17.0 0.0 42.5 0.0 0.029 TL 8.00 PV 0.2 Pipe: 46 -37.4 2.203 PL 8.20 PF 0.1 50 17.0 0.0 42.5 0.0 3.2 120 FTG ---- PE 0.0 51 17.0 0.0 42.6 0.0 0.011 TL 8.20 PV 0.1 Pipe: 47 -137.0 2.203 PL 89.75 PF 12.7 51 17.0 0.0 42.6 0.0 11.5 120 FTG T PE 0.0 37 17.0 0.0 55.3 0.0 0.123 TL 103.39 PV 0.9 Pipe: 48 -137.0 2.203 PL 1.00 PF 1.8 37 17.0 0.0 55.3 0.0 11.5 120 FTG T PE 0.4 25 16.0 0.0 57.6 0.0 0.123 TL 14.64 PV 0.9 Pipe: 49 -28.4 2.203 PL 1.00 PF 0.1 2 16.0 0.0 56.2 0.0 2.4 120 FTG T PE -0.4 14 17.0 0.0 55.9 0.0 0.007 TL 14.64 PV 0.0 Pipe: 50 -28.4 2.203 PL 153.35 PF 1.2 14 17.0 0.0 55.9 0.0 2.4 120 FTG 2T PE 0.0 38 17.0 0.0 57.1 0.0 0.007 TL 180.63 PV 0.0 Pipe: 51 -28.4 2.203 PL 1.00 PF 0.1 38 17.0 0.0 57.1 0.0 2.4 120 FTG T PE 0.4 26 16.0 0.0 57.6 0.0 0.007 TL 14.64 PV 0.0 SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 5 Date: 03/19/2000 GMPLAB.SDF JOB TITLE: ISIS GMP LAB - EXTRA HAZARD CALC PIPE DATA (cont.) PIPE TAG Q(GPM) DIA(IN) LENGTH PRESS. END ELEV. NOZ. PT DISC. VEL(FPS) HW(C) (FT) SUM. NODES (FT) (K) (PSI) (GPM) F.L./FT (PSI) Pipe: 27 -156.6 3.314 PL 8.00 PF 0.2 7 16.0 0.0 57.1 0.0 5.8 120 FTG ---- PR 0.0 8 16.0 0.0 57.3 0.0 0.022 TL 8.00 PV 0.2 Pipe: 28 -128.7 3.314 PL 8.00 PF 0.1 8 16.0 0.0 57.3 0.0 4.8 120 FTG ---- PE 0.0 9 16.0 0.0 57.4 0.0 0.015 TL 8.00 PV 0.2 Pipe: 29 -99.0 3.314 PL 8.00 PF 0.1 9 16.0 0.0 57.4 0.0 3.7 120 FTG ---- PR 0.0 10 16.0 0.0 57.5 0.0 0.009 TL 8.00 PV 0.1 Pipe: 30 -66.5 3.314 PL 8.00 PF 0.0 10 16.0 0.0 57.5 0.0 2.5 120 FTG ---- PR 0.0 11 16.0 0.0 57.5 0.0 0.004 TL 8.00 PV 0.0 Pipe: 31 -33.2 3.314 PL 8.00 PP 0.0 11 16.0 0.0 57.5 0.0 1.2 120 FTG ---- PR 0.0 12 16.0 0.0 57.5 0.0 0.001 TL 8.00 PV 0.0 Pipe: 32 -137.0 4.310 PL 8.00 PF 0.0 25 16.0 0.0 57.6 0.0 3.0 120 FTG ---- PE 0.0 26 16.0 0.0 57.6 0.0 0.005 TL 8.00 PV 0.1 Pipe: 33 -165.4 4.310 PL 8.00 PF 0.1 26 16.0 0.0 57.6 0.0 3.6 120 FTG ---- PE 0.0 27 16.0 0.0 57.7 0.0 0.007 TL 8.00 PV 0.1 Pipe: 34 -200.7 4.310 PL 8.00 PP 0.1 27 16.0 0.0 57.7 0.0 4.4 120 FTG ---- PE 0.0 28 16.0 0.0 57.8 0.0 0.010 TL 8.00 PV 0.1 Pipe: 35 -227.5 4.310 PL 8.00 PF 0.1 28 16.0 0.0 57.8 0.0 5.0 120 FTG ---- PE 0.0 29 16.0 0.0 57.8 0.0 0.012 TL 8.00 PV 0.2 Pipe: 36 -316.4 4.310 PL 8.00 PF 0.2 29 16.0 0.0 57.8 0.0 7.0 120 FTG ---- PE 0.0 30 16.0 0.0 58.0 0.0 0.022 TL 8.00 PV 0.3 Pipe: 37 -343.8 4.310 PL 8.00 PF 0.2 30 16.0 0.0 58.0 0.0 7.6 120 FTG ---- PE 0.0 31 16.0 0.0 58.2 0.0 0.026 TL 8.00 PV 0.4 Pipe: 38 -370.9 4.310 PL 8.00 PP 0.2 31 16.0 0.0 58.2 0.0 8.2 120 FTG ---- PE 0.0 32 16.0 0.0 58.5 0.0 0.030 TL 8.00 PV 0.4 Pipe: 39 -398.7 4.310 PL 8.00 PF 0.3 32 16.0 0.0 58.5 0.0 8.8 120 FTG ---- PE 0.0 33 16.0 0.0 58.7 0.0 0.034 TL 8.00 PV 0.5 SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 7 Date: 03/19/2000 GMPI1AB.SDF JOB TITLE: ISIS GMP LAB - EXTRA HAZARD CALC PIPE DATA (cont.) PIPE TAG Q(GPM) DIA(IN) LENGTH PRESS. END ELEV. NOZ. PT DISC. VEL(FPS) HW(C) (PT) SUM. NODES (FT) (K) (PSI) (GPM) F.L./FT (PSI) Pipe: 52 4.7 2.203 PL 1.00 PP 0.0 3 16.0 0.0 56.3 0.0 0.4 120 FTG T PE -0.4 15 17.0 0.0 55.9 0.0 0.000 TL 14.64 PV 0.0 Pipe: 53 -26.8 2.203 PL 1.00 PP 0.1 4 16.0 0.0 56.5 0.0 2.3 120 FTG T PE -0.4 16 17.0 0.0 56.1 0.0 0.006 TL 14.64 PV 0.0 Pipe: 54 98.6 2.203 PL 1.00 PP 1.0 5 16.0 0.0 56.6 0.0 8.3 120 FTG T PE -0.4 17 17.0 0.0 55.2 0.0 0.067 TL 14.64 PV 0.5 Pipe: 55 -27.4 2.203 PL 1.00 PF 0.1 16.0 0.0 56.9 0.0 2.3 120 FTG T PE -0.4 18 17.0 0.0 56.5 0.0 0.006 TL 14.64 PV 0.0 Pipe: 56 -27.0 2.203 PL 1.00 PF 0.1 7 16.0 0.0 57.1 0.0 2.3 120 FTG T PE -0.4 19 17.0 0.0 56.8 0.0 0.006 TL 14.64 PV 0.0 Pipe: 57 -27.9 2.203 PL 1.00 PF 0.1 8 16.0 0.0 57.3 0.0 2.3 120 FTG T PE -0.4 20 17.0 0.0 56.9 0.0 0.006 TL 14.64 PV 0.0 Pipe: 58 -29.7 2.203 PL 1.00 PF 0.1 9 16.0 0.0 57.4 0.0 2.5 120 FTG T PE -0.4 21 17.0 0.0 57.1 0.0 0.007 TL 14.64 PV 0.0 Pipe: 59 -32.5 2.203 PL 1.00 PP 0.1 10 16.0 0.0 57.5 0.0 2.7 120 FTG T PE -0.4 22 17.0 0.0 57.2 0.0 0.009 TL 14.64 PV 0.1 Pipe: 60 -33.3 2.203 PL 1.00 PF 0.1 11 16.0 0.0 57.5 0.0 2.8 120 FTG T PE -0.4 23 17.0 0.0 57.2 0.0 0.009 TL 14.64 PV 0.1 Pipe: 61 -33.2 2.203 PL 1.00 PF 0.1 12 16.0 0.0 57.5 0.0 2.8 120 FTG T PE -0.4 24 17.0 0.0 57.2 0.0 0.009 TL 14.64 PV 0.1 Pipe: 62 35.3 2.203 PL 1.00 PF 0.1 27 16.0 0.0 57.7 0.0 3.0 120 FTG T PE -0.4 39 17.0 0.0 57.1 0.0 0.010 TL 14.64 PV 0.1 Pipe: 63 26.8 2.203 PL 1.00 PF 0.1 28 16.0 0.0 57.8 0.0 2.3 120 FTG T PE -0.4 40 17.0 0.0 57.2 0.0 0.006 TL 14.64 PV 0.0 Pipe: 64 89.0 2.203 PL 1.00 PF 0.8 29 16.0 0.0 57.8 0.0 7.5 120 FTG T PE -0.4 41 17.0 0.0 56.6 0.0 0.055 TL 14.64 PV 0.4 SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 8 Date: 03/19/2000 GMPLAB.SDF JOB TITLE ISIS GMP LAB - EXTRA HAZARD CALC PIPE DATA (cont.) PIPE TAG Q(GPM) DIA(IN) LENGTH PRESS. END ELEV. NOZ. PT DISC. VEL(FPS) HW(C) (FT) SUM. NODES (FT) (K) (PSI) (GPM) F.L./FT (PSI) Pipe: 65 27.4 2.203 PL 1.00 PF 0.1 30 16.0 0.0 58.0 0.0 2.3 120 FTG T PE -0.4 42 17.0 0.0 57.5 0.0 0.006 TL 14.64 PV 0.0 Pipe: 66 27.0 2.203 PL 1.00 PF 0.1 31 16.0 0.0 58.2 0.0 2.3 120 FTG T PE -0.4 43 17.0 0.0 57.7 0.0 0.006 TL 14.64 PV 0.0 Pipe: 67 27.9 2.203 PL 1.00 PF 0.1 32 16.0 0.0 58.5 0.0 2.3 120 FTG T PE -0.4 44 17.0 0.0 57.9 0.0 0.006 TL 14.64 PV 0.0 Pipe: 68 29.7 2.203 PL 1.00 PF 0.1 33 16.0 0.0 58.7 0.0 2.5 120 FTG T PH -0.4 45 17.0 0.0 58.2 0.0 0.007 TL 14.64 PV 0.0 Pipe: 69 32.5 2.203 PL 1.00 PF 0.1 34. 16.0 0.0 59.0 0.0 2.7 120 FTG T PH -0.4 46 17.0 0.0 58.5 0.0 0.009 TL 14.64 PV 0.1 Pipe: 70 33.3 2.203 PL 1.00 PF 0.1 35 16.0 0.0 59.2 0.0 2.8 120 FTG T PH -0.4 47 17.0 0.0 58.6 0.0 0.009 TL 14.64 PV 0.1 Pipe: 71 33.2 2.203 PL 1.00 PP 0.1 36 16.0 0.0 59.2 0.0 2.8 120 FTG T PH -0.4 48 17.0 0.0 58.6 0.0 0.009 TL 14.64 PV 0.1 Pipe: 72 4.7 2.203 PL 47.40 PF 0.0 15 17.0 0.0 55.9 0.0 0.4 120 FTG T PH 0.0 52 17.0 0.0 55.9 0.0 0.000 TL 61.04 PV 0.0 Pipe: 73 -35.3 2.203 PL 105.95 PP 1.2 52 17.0 0.0 55.9 0.0 3.0 120 FTG T PH 0.0 39 17.0 0.0 57.1 0.0 0.010 TL 119.59 PV 0.1 Pipe: 74 -26.8 2.203 PL 153.25 PP 1.1 16 17.0 0.0 56.1 0.0 2.3 120 FTG 2T PE 0.0 40 3.7.0 0.0 57.2 0.0 0.006 TL 180.53 PV 0.0 Pipe: 75 98.6 2.203 PL 47.40 PP 4.1 17 17.0 0.0 55.2 0.0 8.3 120 FTG T PE 0.0 53 17.0 0.0 51.1 0.0 0.067 TL 61.04 PV 0.5 Pipe: 76 60.2 2.203 PL 8.00 PP 0.2 53 17.0 0.0 51.1 0.0 5.1 120 FTG ---- PE 0.0 54 17.0 0.0 50.9 0.0 0.027 TL 8.00 PV 0.2 Pipe: 77 -15.0 2.203 PL 8.20 PP 0.0 54 17.0 0.0 50.9 0.0 1.3 120 PTG ---- PE 0.0 55 17.0 0.0 50.9 0.0 0.002 TL 8.20 PV 0.0 SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 9 Date: 03/19/2000 •GMPLAB . SDF JOB TITLE: ISIS GMP LAB - EXTRA HAZARD CALC PIPE DATA (cont.) PIPE TAG END ELEV. NOZ. NODES (FT) (K) Pipe: 78 55 17.0 0.0 41 17.0 0.0 Pipe: 79 18 17.0 42 17.0 Pipe: 80 19 17.0 43 17.0 Pipe: 81 20 17.0 44 17.0 Pipe: 82 21 17.0 45 17.0 Pipe: 83 22 17.0 46 17.0 Pipe: 84 23 17.0 47 17.0 Pipe: 85 24 17.0 48 17.0 Pipe: 86 56 16.0 57 16.0 Pipe: 87 57 16.0 58 0.5 Pipe: 88 58 0.5 59 -3.0 Pipe: 89 59 -3.0 60 6.0 Pipe: 90 61 6.0 60 6.0 Q(GPM) DIA(IN) LENGTH PRESS. PT DISC. VEL(FPS) HW(C) (FT) SUM. (PSI) (GPM) F.L./FT (PSI) -89.0 2.203 PL 89.75 PF 5.7 50.9 0.0 7.5 120 FTG T PH 0.0 56.6 0.0 0.055 TL 103.39 PV 0.4 -27.4 2.203 PL 153.25 PP 1.0 56.5 0.0 2.3 120 FTG ---- PR 0.0 57.5 0.0 0.006 TL 153.25 PV 0.0 -27.0 2.203 PL 153.25 PF 0.9 56.8 0.0 2.3 120 FTG ---- PR 0.0 57.7 0.0 0.006 TL 153.25 PV 0.0 -27.9 2.203 PL 153.25 PP 1.0 56.9 0.0 2.3 120 FTG ---- PR 0.0 57.9 0.0 0.006 TL 153.25 PV 0.0 -29.7 2.203 PL 153.25 PP 1.1 57.1 0.0 2,5 120 FTG ---- PE 0.0 58.2 0.0 0.007 TL 153.25 PV 0.0 -32.5 2.203 PL 153.25 PP 1.3 57.2 0.0 2.7 120 FTG ---- PR 0.0 58.5 0.0 0.009 TL 153.25 PV 0.1 -33.3 2.203 PL 153.25 PP 1.4 57.2 0.0 2.8 120 F ---- PE 0.0 58.6 0.0 0.009 TL 153.25 PV 0.1 -33.2 2.203 PL 153.25 PF 1.4 57.2 0.0 2.8 120 FTG ---- PE 0.0 58.6 0.0 0.009 TL 153.25 PV 0.1 -527.4 4.310 PL 14.00 PP 3.2 59.2 0.0 11.6 120 FTG ET PR 0.0 62.3 0.0 0.057 TL 55.81 P11 0.9 -527.4 6.357 PL 16.50 PF 0.1 62.3 0.0 5.3 120 FTG ---- PR 6.7 69.2 0.0 0.009 TL 16.50 PV 0.2 -527.4 6.134 PL 30.00 PP 0.2 69.2 0.0 5.7 150 FTG ---- PE 1.5 70.9 0.0 0.007 TL 30.00 PV 0,2 -527.4 6.160 PL 6.00 PP 0.2 70.9 0.0 5.7 150 FTG EG PH -3.9 67.2 0.0 0.007 TL 33.71 PV 0.2 FIXED PRESSURE LOSS DEVICE 75.2 0.0 8.0 psi, 527.4 gpm 67.2 0.0 4 'I I I 'I 0.0 0.0 4 4 4 SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 10 Date: 03/19/2000 GMPLAB.SDF JOB TITLE: ISIS GMP LAB - EXTRA HAZARD CALC PIPE DATA (cont.) PIPE TAG Q(GPM) DIA(IN) LENGTH PRESS. END ELEV. NOZ. PT DISC. VEL(FPS) HY(C) (FT) SUM. NODES (PT) (K) (PSI) (GPM) F.L./FT (PSI) Pipe: 91 -527.4 6,160 PL 6.00 PP 0.2 61 60 0.0 15.2 0.0 5.7 150 FTG EG PE 3.9 62 -3.0 0.0 79.4 0.0 0.007 TL 33.71 PV 0.2 Pipe: 92 -527.4 6.134 PL 15.00 PF 0.6 62 -3.0 0.0 79.4 0.0 5.7 150 FTG ETG PE 0.0 63 -3.0 0.0 80.0 0.0 0.007 TL 90.04 PV 0.2 Pipe: 93 -527.5 8.044 PL 250.00 PF 0.7 63 -3.0 0.0 80.0 0.0 3.3 150 FTG 4ETG PE 0.0 64 -3.0 SRCE 80.7 (N/A) 0.002 TL 415.01 PV 0.1 NOTES: Calculations were performed by the HASS 6.4.0 computer program under license no. 126F611 granted by HRS Systems, Inc. 4792 LaVista Road Tucker, GA 30084 The system has been balanced to provide an average imbalance at each node of 0.001 gpm and a maximum imbalance at any node of 0.059 gpm. Velocity pressures are printed for information only, and are not used in balancing the system. Maximum water velocity is 15.5 ft/sec at pipe 19. PIPE FITTINGS TABLE Pipe Table Name: ST.ANDARD.PIP PAGE: A MATERIAL: S40 HWC: 120 Diameter Equivalent Fitting Lengths in Feet (in) T L C B G A D Eli Tee LngEl]. chkVlv BfyVlv GatVlv A].mChk DPV1v --------------------------------------------------------- NPTee 1.049 2.00 5.00 2.00 5.00 6.00 1.00 10.00 10.00 5.00 PAGE: * MATERIAL: 840 HWC: 120 Diameter Equivalent Pitting Lengths in Feet (in) B T L C B G A D Ell Tee Ln9Ell ChkVlv BfyVlv GatVlv AlmChk DPV1v -------------------------------------------------------- N NPTee SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 11 Date: 03/19/2000 GMPLAB . SDF JOB TITLE: ISIS GMP LAB - EXTRA HAZARD CALC 1.10 11.03 11.03 1.09 10.91. 10.91 1.36 13.64 13.64 1.46 18.93 14.56 2.79 27.87 13.94 3.17 29.59 20.08 3.24 30.20 20.49 3.77 35.21 23.89 3.94 34.43 26.56 1.408 3.31 6.62 2.21 7.72 6.62 6.62 1.639 4.36 8.73 2.18 9.82 6.54 8.73 2.203 6.82 13.64 4.09 15.00 8.18 13.64 3.314 10.19 21.84 7.28 23.29 14.56 21.84 4.310 13.94 27.87 8.36 30.66 16.72 27.87 6.134 14.79 31.70 9.51 33.81 10.57 31.70 6.160 15.10 32.36 9.71 34.52 10.79 32.36 6.357 17.60 37.72 11.32 40.23 12.57 37.72 8.044 17.71 34.43 12.79 44.27 11.81 34.43 SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 12 Date: 03/19/2000 GMPLAB.SDF JOB TITLE: ISIS GMP LAB - EXTRA HAZARD CALC WATER SUPPLY CURVE \\\\\\\ \\\\\\\\ 0 \\\\\\\ 88+ \\\\\\\ * <-85.0 psi @ 1479 gpm Flow Test Point 80+ X 72+ P 64+ R E S S 56+ U R E 48+ ( P S I 40+ ) 32+ 24+ === == = ======== == = ========== = = 16+ LEGEND H X = Required Water Supply 8072 psi @ 1027.5 gpm " 8+ 0 = Available Water Supply " 89.90 psi @ 1027.5 gpm + ------+ --------+ --------+ ---------+ -----------+ 400 600 800 1000 1200 1400 1600 1800 2000 FLOW (GPM)