Loading...
HomeMy WebLinkAboutMS 2020-0003; HEMLOCK COAST HOMES; FINAL SOILS REPORT; 2023-03-28 21 March 2023 (Revised 28 March 2023) Mr. John Norum Job No. 20-12842 KMJ REAL ESTATE 1446 Front Street, Suite 300 San Diego, CA 92101 Subject: Report of Final Observations and Soil Testing Hemlock Coastal Home Residential Project 320 Hemlock Avenue Carlsbad, California Dear Mr. Norum: Per your request and as required by the City of Carlsbad, Geotechnical Exploration, Inc. hereby presents this report of our final observations and soil testing performed for the subject site. For the project location, refer to the Vicinity Map, Figure No. I. The work reported herein was performed between January 24, 2022, and February 15, 2023. Our firm previously performed a geotechnical investigation of the property, the results of which were presented in our Report of Preliminary Geotechnical Investigation dated August 24, 2020. We also issued a Report of Rough Grading Observation and Testing dated December 22, 2021 (revised on January 4, 2022), which presented earthwork observed and tested between November 10 and December 20, 2021, and included the 4-foot overexcavation removal in building pad areas and the remediation observations for an unearthed septic tank and a deep vertical seepage pit that was located north of Unit 4 building pad. -~&i1 Geotechnical Exploration, Inc. SOIL AND FOUNDATION ENGINEERING • GROUNDWATER • ENGINEERING GEOLOGY 7420 TRADE STREET• SAN DIEGO, CA. 92121 • (858) 549-7222 • FAX: (858) 549-1604 • EMAIL: geotech@gei-sd.com Hemlock Coastal Homes Job No. 20-12842 Carlsbad, California Page 2 For the septic tank pit, the grading contractor removed all soft and loose soils in the pit and placed recompacted backfill on top of the suitable bottom soils. The suitable bottom was encountered at about 7 feet below the finished ground floor elevation of Unit 4. For the deep vertical seepage pit, a suitable bottom was encountered by the compaction grouting contractor, Geotechnical Stabilization Inc. (GSI), at a depth of 15 feet below pad elevation. The grouting was extended to the top of the pit, which was approximately 8 feet below the ground surface. A concrete slab was placed on top of the remaining circular pit at about 7 feet below finish building pad grade and extended at least 1 foot outside the 4-foot-diameter of the pit. The concrete slab was at least 8 inches thick and reinforced with No. 5 steel grid reinforcing. Compacted fill soils were placed on top of the concrete slab to the finish pad grade elevation. The vertical seepage pit was backfilled in accordance to the recommenda- tions presented in our November 12, 2021, Vertical Seepage Pit Backfill Recommendations letter. FIELD OBSERVATIONS 1. Our representative was requested by the contractor to observe the bearing soils for the footing excavations of Building A (Units 1 and 2), which were found to be founded in suitable recompacted fill soils on top of dense formational soils. The bearing soils for the footing excavations of Building B (Units 3 and 4) were also observed to be founded in recompacted fill soils and a footing memo was issued to the contractor/contractor’s representative for the observed and approved footing excavations. 2. Utility trench backfill placement for the sewer trench between the middle of the building under the driveway area was observed on February 25, 2022. i i Hemlock Coastal Homes Job No. 20-12842 Carlsbad, California Page 3 Backfill placement for the for the electrical trenches located on the northeast side of each building was also observed and both were tested for compaction. 3. Utility trench backfill placement for a joint trench located perpendicular to Hemlock Avenue was observed and tested on March 7, 2022. 4. Utility trench backfill for the gas line was observed at the northeast corner area of the site. Pipe bedding sand was used to backfill the utility trench on March 24, 2022. The backfill material probed dense. 5. Finished subgrade tests for the paver driveway located in the middle of both residential buildings as well as the subgrade for the curb adjacent to Hemlock Avenue were observed and tested on December 21, 2022. 6. Observation and compaction of the paver base was done between January 16 and January 31, 2023. The contractor placed ¾-inch-diameter rock underneath the paver section followed by No. 57 rock and then No. 8 sand per the paver details in the project plans. The material probed suitable and dense. 7. The base for the curb and sidewalk was observed and tested on February 6 and 9, 2023. 8. The finished base for the right-of-way apron and the street improvements were observed and tested between February 10 and 15, 2023. SOIL TESTING Representative soil and base layer samples were collected during the grading to determine laboratory maximum dry density of the soils per ASTM D1557-12e1. Field density tests were performed at approximate locations shown on Figure No. II, Plot i i Hemlock Coastal Homes Job No. 20-12842 Carlsbad, California Page 4 Plan in accordance with ASTM D6938-17a. The complete list of field density tests results is shown as Table A on Figure No. IIIa, and laboratory soil compaction test results are shown as Table B on Figure No. IIIb. Grain size analysis tests were performed for the base layer, for the No. 57 gravel material, and for the No. 8 sand layer. The base, gravel, and sand sieve tests yielded results that complied with the specifications. Grading equipment used for compaction consisted of pneumatic hand tampers, and vibratory plates; ride on roller, a Bobcat and a backhoe. Water was added, when needed to increase the soil moisture. Field density tests yielded a relative compaction of at least 90 percent (95 percent at recommended locations) of the maximum dry density at the tested locations with the soils properly moisture conditioned. On-site soils were used during the observed backfill and field density testing. In general, the on-site soils consisted of brown to reddish brown, silty sand and the import consisted of gray decomposed granite sand material. The compacted imported soils were visually observed to have an expansion index (E.I) less than 50 based on our experience with similar soils consisting of a low fines content. Proper finish drainage for the site is to be implemented by the general contractor prior to completing construction. The graded areas are shown on the attached Plot Plan, Figure No. II. Any pending grading and earthwork should be observed by our field representative prior to form, steel reinforcing placement, and just prior to concrete placement. Any future utility or drainage trench backfill, or retaining wall backfill should also be performed under the observation and testing of our firm as should any finished subgrade testing for pending exterior flatwork or driveway. A report of additional observations will be provided issued after additional soil-related work is performed under our observation and testing i i Hemlock Coastal Homes Job No. 20-12842 Carlsbad, California Page 5 SITE SUITABILITY AND COMPLIANCE The observed and tested areas of the project site are, in our professional opinion, suitable for their intended use. The underlying formational soils are, in our professional opinion, suitable to support the recompacted fill, building structures, and new exterior improvements. We certify that the geotechnical engineering aspects of the grading are in compliance with the approved geotechnical reports and grading plans, current standards, and the city grading ordinance. LIMITATIONS The findings and opinions presented herein have been made in accordance with currently accepted principles and practice in the field of geotechnical engineering in the City of Carlsbad. No warranty, either expressed or implied, is made. All statements in this grading report are applicable only for the grading operation observed and tested by our firm. The firm Geotechnical Exploration, Inc. shall not be held responsible for fill soils placed without our observations and testing at any other time, or subsequent changes to the site by others, which directly or indirectly cause poor surface or subsurface drainage, water erosion, and/or alteration of the strength of the compacted fill soils. It is not within the scope of our services to provide quality control oversight for surface or subsurface drainage construction or retaining wall sealing and base of wall drain construction. It is the responsibility of the contractor to verify proper wall i i Hemlock Coastal Homes Job No. 20-12842 Carlsbad, California Page 6 sealing, geofabric installation, protection board installation (if needed), drain depth below interior floor or yard surfaces, pipe percent slope to the outlet, etc. In the event that any changes in the nature, design, or location of the building or improvements are planned, the conclusions and recommendations contained in this report should not be considered valid unless the changes are reviewed and the conclusions of this report modified or verified in writing. This opportunity to be of service is sincerely appreciated. If you have any questions regarding this letter, please contact our office. Reference to our Job No. 20-12842 will help expedite a response to your inquiry. Respectfully submitted, GEOTECHNICAL EXPLORATION, INC. _______________________________ Jaime A. Cerros, P.E. R.C.E. 34422/G.E. 2007 Senior Geotechnical Engineer _______________________________ Richard A. Cerros, P.E. R.C.E. 94223 ichard A. Cerros, P. E. R.C.E. 94223 D VICINITY MAP Hemlock Coast Homes 320 Hemlock Avenue Carlsbad, CA. Figure No. I Job No. 20-12842 SITE Thomas Guide San Diego County Edition pg 1106-E7 I '9 tr}e~L "~ RTSCENTER Carlsbad Hs AQUA HEDIONDA LAGOON Geotechnical Exploration, Inc. Approximate Limits ofObserved Grading and Testing.Areas to Be Over-Excavated Area of 5” A/C Placement Gas Trench Location Joint Trench Location Electrical Trench Location Sewer Trench Location Water Trench Location 44 Approximate Location of Field Density Test 1 3 4 5 7 6 8 9 10 13 12 11 2 14 15 1617 18 19 20 21 22 23 24 25 2636 34 27 28 29 30 31 32 333537 38 39 40 41 42 43 44 45 46 4748 49 50 51 52 53 54 55 56 57 58 60 59 61 62 63 64 65 66 67 80 69 70 71 72 Bottom of Excavation Elevation (feet)55’ 53’ 55’ 53’ 55’ 54’ 53.5’ 53.5’ 53’ 53’ 53’ 53’ 52’ 54’ 53’ 20-12842-p3.ai Hemlock Coast Homes 320 Hemlock Avenue Carlsbad, CA. Figure No. II Job No. 20-12842 PLOT PLAN LegendREFERENCE: This Plot Plan was prepared from an existing undated GRADING PLAN by PASCO LARET SUITER & ASSOCIATES and from on-site field reconnaissance performed by GEI. NOTE: This Plot Plan is not to be used for legalpurposes. Locations and dimensions are approximate.Actual property dimensions and locations of utilitiesmay be obtained from the Approved Building Plansor the “As-Built” Grading Plans. March 2023 HEMLOCK AVENUE GRAPHIC SCALE( feet) SeepagePit SepticPit 53’ EXJSTINGJ STRUCTURE TO REMAIN ~~x PORLOT2 BLOCKR PALISADES#2 MAP 1803 ' .~----,<'-----, ' "AS BUILT' PADr 57.1 I I b .------.--- I • I I ~T~ -urJir3 FFi 57.8 PADf 57.1 I I I e PORLOT3 ~~~~: BLOCK R • • EX/SnNG RETAININGWAU TOBE REMOVED --:.~-:--1 -;----------t-• i' I I UNIT2 FF=57.8 PAD=57.1 U'llU.1 • ~ I I I OHEJ EX~ I RESl~E I ~ffPE I FOOFN<l I I I ------~~-'.---'-~=-- UNIT1 FF=57.8 • PAD=57.1 ------ .., 4.0 . I I : ,i '1• I. : . I , . 15' • I , I. . I -,· -- . , ~-w -w-,-'\;-w w-w-w-• 11)-w-~ 11 PERSDRSDG-1« N I I ~m i disT1HGPOIWl I POLE TO REMAIN EXISTING 12" RCP STORM DR.'.IN PER 3: D00139-l I EXISTING~ ACP J: RW\INPER I ~ I (54.8RIMJ , 41.3 IE IN NOR1H (47.1/EIN~ST) h (47.0IEOUT),:: 1 e,rrorc ----___ J ~ l/MfTOFFUI.L•WIOTHT 2" AC GRIND AND OYE'RLAY(TYP.) TABLE A SUMMARY OF FIELD DENSITY TEST RESULTS (ASTM D1556 and/or ASTM D6938) Approximate Water Dry Degree of Test Elevation Content Density Compaction Compaction ~ Dit!il QfTHt T!illt LQ~ltiQ[! (Fggt} (0/g} (R!;f} (0/g} tYrv!il NQ. Rgm1rk1 1 11/10/21 GRADING 54 5.3 117.7 91 2 2 11/10/21 GRADING (PCC PATIO) 55 7.5 116.8 90 2 3 11/12/21 GRADING (UNIT 3) 54 7.2 117.0 90 2 4 11/12/21 GRADING (UNIT 3) 55 8.1 117.6 91 2 5 11/15/21 GRADING (PAVER AREA) 53 8.0 118.4 91 2 6 11/15/21 GRADING (PAVER AREA) 55 7.4 117.6 91 2 7 11/15/21 GRADING (UNIT 3) 56 7.0 118.1 91 2 8 11/15/21 GRADING (UNIT 3) 57 6.5 119.8 92 2 9 11/15/21 GRADING (UNIT 1) 55 10.0 117.5 91 2 10 11/15/21 GRADING (UNIT 2) 57 7.9 117.9 91 2 11 11/15/21 GRADING (PAVER AREA) 55 8.2 120.6 93 2 12 11/15/21 GRADING (UNIT 2) 57 8.7 118.5 91 2 13 11/16/21 BOTTOM OF OVERX 53.5 4.3 120.0 92 2 14 11/16/21 BOTTOM OF OVERX 53.5 3.1 116.8 90 2 15 11/16/21 SEPTIC TANK (UNIT 4) 52 6.6 120.2 93 2 16 11/16/21 GRADING (UNIT 2) 55 6.0 122.7 95 2 17 11/16/21 SEPTIC TANK (UNIT 4) 54 8.1 120.3 93 2 18 11/16/21 SEPTIC TANK (UNIT 4) 56 6.1 117.3 90 2 19 11/16/21 GRADING (UNIT 1) FSG 6.4 122.2 94 2 20 11/16/21 GRADING (UNIT 2) FSG 6.1 122.4 94 2 21 11/23/21 HEMLOCK AV FG-20 4.9 130.5 100 3 @95%. Water Trench Backfill 22 11/23/21 HEMLOCK AV FBG 9.8 120.3 96 4 @95%. Sewer Trench Backfill 23 11/24/21 HEMLOCK AV -SEWER FSG-4 10.5 120.7 97 4 @90%. Water Trench Backfill 24 11/24/21 HEMLOCK AV -H2O TRENCH FG-2 5.3 130.5 100 3 @95%. Water Drain Backfill 25 11/24/21 HEMLOCK AV -SEWER FG 9.0 119.9 96 4 @95%. Sewer Backfill 26 11/24/21 HEMLOCK AV -H2O TRENCH FG 11.8 123.4 99 4 @95%. Water Trench Backfill 27 11/30/21 NORTHEAST SEWER CAP FSG-5' 7.6 118.5 90 1 Job No. 20-12842 Figure No. Illa Notes: 1) Curve number refers to Table B :• 2) FSG denotes finish subgrade elevation 3) FBG denotes finish base grade elevation 4) FPG denotes finish pavement grade ~ TABLE A SUMMARY OF FIELD DENSITY TEST RESULTS (ASTM D1556 and/or ASTM D6938) Approximate Water Dry Degree of Test Elevation Content Density Compaction Compaction ~ Dit!il QfTHt T!illt LQ~ltiQ[! (Fggt} (0/g} (R!;f} (0/g} tYrv!il NQ. Rgm1rk1 28 11/30/21 NORTHEAST SEWER CAP FSG-3' 8.2 126.5 97 2 29 11/30/21 NORTHEAST SEWER CAP FSG-1.5' 10.9 122.1 98 4 @95%. 30 11/30/21 NORTHEAST SEWER CAP FSG 8.8 121.1 97 4 @95%. 31 12/1/21 E-W WATER LINE (S END OF STREET) FSG-1' 10.4 118.2 95 4 32 12/1/21 E-W WATER LINE (S END OF STREET) FSG-1' 9.2 124.2 99 4 33 12/1/21 E-W WATER LINE (S END OF STREET) FSG 9.1 118.6 95 4 34 12/2/21 AC PLACEMENT HEMLOCK AV FG 0.0 143.7 96 5 35 12/2/21 AC PLACEMENT HEMLOCK AV FG 0.0 144.2 96 5 36 12/3/21 AC PLACEMENT HEMLOCK AV FG 0.0 145.7 97 5 37 12/3/21 AC PLACEMENT HEMLOCK AV FG 0.0 144.8 97 5 38 12/17/21 UNIT 2 -PAD FG 9.1 121.7 94 2 39 12/17/21 SEEPAGE PIT (UNIT 4) 50' (FG-5') 7.4 126.2 96 3 40 12/17/21 SEEPAGE PIT (UNIT 4) 52' (FG-3') 4.3 106.3 82 2 test failed, see #41 41 12/17/21 SEEPAGE PIT (UNIT 4) 52' (FG-3') 6.1 118.8 92 2 retest of #40 42 12/17/21 SEEPAGE PIT (UNIT 4) 54 (FG-1') 7.2 126.4 97 2 43 12/17/21 UNIT 1 56' (FG-1') 8.2 116.5 90 2 44 12/17/21 UNIT 1 57' (FSG) 7.0 125.1 95 1 45 12/20/21 UNIT 2 -PAD 56.5-57' 6.0 116.4 90 2 46 12/20/21 UNIT 2 -PAD 56.5-57' 6.0 125.0 96 2 47 2/25/22 SEWER TRENCH 53 7.8 113.6 88 2 test failed, see #48 48 2/25/22 SEWER TRENCH 53 8.6 119.3 92 2 retest of #47 49 2/25/22 SEWER TRENCH 54 9.6 117.1 90 2 50 2/25/22 SEWER TRENCH 53 8.4 116.3 90 2 51 2/25/22 SEWER TRENCH 55.5 9.1 116.8 90 2 52 2/25/22 WATER AND ELECTRICAL TRENCH 56 8.0 118.4 91 2 53 2/25/22 ELECTRICAL TRENCH 56 7.4 116.8 90 2 54 2/25/22 ELECTRICAL TRENCH 56 7.1 116.3 90 2 Job No. 20-12842 Figure No. Illb Notes: 1) Curve number refers to Table B :• 2) FSG denotes finish subgrade elevation 3) FBG denotes finish base grade elevation 4) FPG denotes finish pavement grade ~ Job No. 20-12842 Figure No. IIId TABLE B LABORATORY COMPACTION TEST RESULTS (ASTM D1557) Compaction Maximum Optimum Test Source of Dry Density Water Content Curve No. Description of Material Material (pcf) % C-1 SILTY SAND (SM) Brn to Red Brn On-Site 131.5 8.6 C-2 SILTY SAND (SM) Red Brn On-Site 129.8 8.6 C-3 GREY DG-SAND (Shade H2O) Import 131.0 7.7 C-4 CLASS II RECYCLED BASE Import 125.0 8.2 C-5 TYPE III B2 1/2 AC Import (SRM) 150.0 +2.9 N.A. C-6 CLASS II BASE Import 137.9 5.2