Permit No: AS120144
Job Address: 2081 FARADAY AV Status: APPROVED
Permit Type: SPRINK Applied 11/7/2012
Parcel No: 21 2 1202600 Approved: 11 /16/2012
Lot#: 0
Reference No.: Issued: 11 /16/2012
PC#: Inspector:
Project Title: SKLZ FIRE SPRINKLER T.1.-FIRST FLOOR
Applicant:
M J FIRE PROTECTION
17130 VAN BUREN
RIVERSIDE, CA
951 -789-9360
[_
Fees ($) -l
268
about:blank
Add'I Fees ($)
0
Owner:
BIODEC LL C
PO BOX 230931
ENCINITAS CA
~-
Total($)_I
268
Balance($)
0
1 /1
r
Contractor's Material and Test Certificate for Aboveground Piping
PROCEDURE
Upon completion of work, Inspection and tests shall be made by the contractor's representative and witnessed by an owner's
representative. All defects shall be corrected and system left In service before contractor's personnel finally leave the Job.
A certttlcate shall be fllled out and signed by both representatives. Coples shall be prepared for approving authorities, owners, and
conlrector. It Is understood the owner's representative's signature In no way prejudices any claim against contractor tor taulty material, poor
workmanship, or failure to comply with approving authority's requirements or local ordinances.
Property name ..SK.L 7-I Date 2 -& -13
Property address 1-DB I FAEADAY AVE , L.ft~Af} c..A ~2 O{)~
Accepted by approving authorltles (names) llTY t)f Clle.t.SL3AD Fl/<£ f'RD VENnlJIJ
Address / I,, 2:, r;. r:AR..ADA '( Al/£ t: ~ ,el,S.£3:,,4.D CA
Plans
lnstalletlon conforms to accepted plans ~ Yes □ No
Equipment used Is approved ~Yes D No
If no, explain deviations
Has person In charge of fire equipment been Instructed as ~ Yes 0 No
to location of control valves and care and maintenance
of this new equipment?
If no, explain
Instructions Have copies of the following been left on the premises? 5s,Yes □ No
1. System components Instructions GZ1 Yes □ No
2. Care and maintenance Instructions [2J. Yes □ No
3. NFPA25 D Yes D No
Location of Supplies buildings ENTIR.£ BL.DC;· system
Year of Orifice Temperature
Make Model manufacture size Quantltv rating
V IKllV: vr "J...f'l 'J ? n/ 2-.. , "L BLf I !:)_'.:)II
Sprinklers
Pipe and Type of pipe BLA C.,/<L .STEEL
fittings Type of fittings C:>L BC.K-t'..,.&.~1 lf!..D.!J.
Maximum time to operate
Alarm Alarm device through te~t connection
valve or Type Make Model Minutes Seconds flow
Indicator N/A
Orv valve Q.O.D.
Make Model I Serlal no. Make I Model Serial no.
N/A-I I
Dry pipe Time to trip Time water Alarm
operating through test Water Air Trip point reached operated
test connection 1,2 pressure pressure air pressure test outlet1 ,2 properly
Minutes Seconds psi psi psi Minutes Seconds Yes No
Without
Q.O.D.
n~A1~
If no, explain
~
I Measured from time Inspector's test connection Is opened
2 NFPA 13 only requires the SO-second 11":ltayon In specific sections
Operation □ D Electric Pneumatic D Hydraulics
Piping supervised □ Yes □ No j Detecting media supervised □ Yes □ No
Does valve operate from the manual trip, remote, or both □ Yes □ No control stations? ~
Deluge and Is there an accessible facility in each circuit If no, explain preaction
valves for testing?
D Yes 0 No NIA Does each circuit operate Does each circuit operate Maximum time to
Make Model supervision loss alarm? valve release? operate release
Yes I No Yes I No Minutes J Seconds
I I l
Location Make and Setting Static pressure Residual pressure Flow rate
Pressure and floor model (flowing)
reducing Inlet (psi) I Outiet (psi) Inlet (psi) I Outlet (psi) Flow (gpm) valve test
N/A I I
Hydrostatjc· Hydrostatic tests shall be made at not less than 200 psi (13.6 bar) for 2 hours or 50 psi (3.4 bar)
above static pressure in excess of 150 psi (10.2 bar) for 2 hours. Differential dry-pipe valve clappers shall be left
Test open during the test to prevent damage. All aboveground piping leakage shall be stopped.
descriptiqn Pneumatic· Establish 40 psi (2. 7 bar) air pressure and measure drop, which shall not exceed 1 ½ psi (0.1 bar)
in 24 hours. Test pressure tanks at normal water level and air pressure and measure air pressure drop, which shall
not exceed 1 ½ psi (0.1 bar) in 24 hours.
All piping hydrostatically tested at jJ)_Q_ psi (-bar) for '2... hours If no, state reason
Dry piping pneumatically tasted D Yes 0 No
Equipment operates property D Yes 0 No
Do you certify as the sprinkler contractor that additives and corrosive chemicals, sodium silicate or derivatives
of sodium silicate, brine, or other corrosive chemicals were not used for testing systems or stopping leaks?
~ Yes 0 No
Drain I Reading of gauge located near water I Residual pressure with valve in test
Tests test supply test connection: psi ( bar) connection open wide: psi ( bar)
Underground mains and lead-in connections to system risers flushed before connection made to
sprinkler piping
Verified by copy of the Contractor's Material and Test □ Yes □ No Other Explain
Certificate for Underground Piping.
Flushed by Installer of underground sprinkler piping □ Yes □ No
If powder-driven fasteners are used In concrete, □ Yes □ No If no, explain
has representative sample testing been
satisfactorily completed? ~DNE
Blank testing Number used Locations Number removed
gaskets WHH::
Welding piping D Yes ~ No
If yes ...
Do you certify as the sprinkler contractor that welding procedures comply 0 Yes 0 No
with the requirements of at least AWS 82.1?
Welding Do you certify that the welding was performed by welders qualified In D Yes 0 No
compliance with the requirements of at least AWS 82.1?
Do you certify that the welding was carried out in oompliance with a
documented quality control procedure to ensure that all discs are retrieved, that
D Yes D No
openings in piping are smooth, that slag and other welding residue are
removed, and that the Internal diameters of piping are not penetrated?
Cutouts Do you certify that you have a control feature to ensure that 0 Yes 0 No
(discs) all cutouts (discs) are retrieved? Mt> NE_
Hydraulic
data
nameplate
Nameplate provided If no, explain
~ Yes O No
Date left In service with all control valves open OA I LY Remarks
Name of sprinkler contractor
V\, "T , F I R.£. P R1J 1 £ l, Tl D Al
Tests witnessed by
Signatures
PA /c.TNE/c..
Additional explanations and notes
Date
Date
2 -lo -13