Loading...
HomeMy WebLinkAboutDWG 488-2SW; MS 12-03; BMP SITE PLAN - FLORAL TRADE CENTER; 01I I I \ \ \ SWMP NO. _SW_M_P_1_5-_12 __ _ PARTY RESPONSIBLE FOR MAINTENANCE: NAME CARLSBAD RANCH COMPANY, LP CONTACT CHRISTOPHER CALKINS ADDRESS TT20 AVENIDA ENCINAS SUITE204 CARLSBAD CA 92011 PHONE NO. 760.431.5500 PLAN PREPARED BY: NAME BRYAND. SMITH P.E. COMPANY FUSCOE ENGINEERING INC. ADDRESS 6390 GREENWICH DRIVE SUITE 170 SAN DIEGO, CA 92122 PHONE NO. 858.554.1500 CERTIFICATION RCE 75822 I. A-1 A=4.69 AC (EXISTING SE_LF MITIGATING AREA, TO BYPASS) \ • OFFSITE AREA (BASIN A-1) A=4.69 . • Q100=3.67 CFS SEE OFFSITE AREA MAP A-1 \ B-1 A=3.70 AC (EXISTING SELF MITIGATING AREA, TO IMP-2) -- CAR COUNTRY DRIVE BMPNOTES: 1. THESE BMPS ARE MANDATORY TO BE INSTALLED PER MANUFACTURER'S RECOMMENDATIONS OR THESE PLANS. 2. NO CHANGES TO THE PROPOSED BMPS ON THIS SHEET WITHOUT PRIOR APPROVAL FROM THE CITY ENGINEER. 3. NO SUBSTITUTIONS TO THE MATERIAL OR TYPES OR PLANTING TYPES WITHOUT PRIOR APPROVAL FROM THE CITY ENGINEER. 4. NO OCCUPANCY WILL BE GRANTED UNTIL THE CITY INSPECTION STAFF HAS INSPECTED THIS PROJECT FOR APPROPRIATE BMP CONSTRUCTION AND INSTALLATION. 5. REFER TO MAINTENANCE AGREEMENT DOCUMENT 6. SEE PROJECT SPECIFIC SWMP FOR ADDITIONAL INFORMATION I LEGEND GRADING LIMIT/PROJECT BOUNDARY GRADING LIMIT/PROJECT BOUNDARY PROPOSED CONTOUR PROPOSED STORM DRAIN BASIN LIMITS BROW DITCH FLOW ARROW DECOMPOSED GRANITE ASPHALT CONCRETE CONCRETE \ -- ---------~--~-----~--------- I I ____ I ,---; IMP 4 I I -- 8-2 A=4.17 AC (EXISTING SELF MITIGATING AREA, TO BYPASS) IMP 5 MITIGATION FOR DMA 8-5 BMPID# BMPTYPE SYMBOL CASQA NO. QUANTITY HYDROMODIFICATION & TREATMENT CONTROL IMP-1 -IMP-5 BIORETENTION AREA TREATMENT CONTROL TC-1 BIOFILTRATION DEVICE SOURCE CONTROL CD PERMEABLE PAVERS STORM DRAIN SYSTEM SIGNS LANDSCAPE DESIGN EFFICIENT IRRIGATION TRASH ENCLOSURES INTERIOR FLOOR DRAINS INTEGRATED PEST MANAGEMENT TC-32 Iii SD-20 SD-13 SD-10 SD-12 LJ SD-32 NIA N/A IMPLEMENTED LOW IMPACT DESIGN (L.1.D.) CONSERVE NATURAL AREAS MINIMIZE IMP. SURFACES DETAIN AND RETA! RUNOFF PERMEABLE PAVEMENTS DRAIN IMP. TO PERVIOUS AREAS DESIGN PERVIOUS AREAS TO RECEIVE RUNOFF FROM IMP. NIA NIA NIA SEE ABOVE NIA N/A 5 1 6,935 SF 32 2 • 8-1, 8-3 (MITIGATED), B-6 PRE-DETENTION Qi 00=35.52CFS -, 2 BMP TABLE DRAWING NO. SHEET NO.(S) 488-2A 14 488-2A 15 488-2A 15 488-2A 5,7 INSPECTION FREQUENCY MONTHLY/ RAIN EVENT MONTHLY/ RAIN EVENT MONTHLY/ RAIN EVENT ANNUALLY NIA MAINTENANCE FREQUENCY SEMI ANNUALLY SEMI ANNUALLY SEMI ANNUALLY AS NEEDED N/A CONSTRUCTION SIGN OFF CONTINUOUSLY CONTINUOUSLY I' l ! t ! ,! V 11 N/A N/A N/A N/A QUARTERLY QUARTERLY --. ~-PRE ~DETENTION 0, ~;,.;42.S:lGFS • POST-DETETNION 0too"'191.92CFS \ ~~======-----=-=--==--~=P=OS=T=-D=ET=E=NT=IO=N~Ot---□=:o==:1:_1_:.8~4C=:FS-!=~=~ __ • ~----1 TC 1 _ _ •• c·:.;;,, ----.: ··-·:Ejl .>~--.;~~'-%-.:,;~~~~,-~ -----~. ~ ~~~~~--=--~ =-~:.ea: ~ c=.-:.-~ , -'.~~~-~:-= ~ _, , ~~-,~= -:·_ .... _ ~ ~-:~~~-= ~_:·; ~~ .. -.. __ --, -·_·-·> ---~.:'t~i • ""~~~:,::L.;,;;-~ _.~ .. -==~--~-::._:~.=:;. ;ft :....__:: I TOTAL A=3:T.:, AC ---··-··"--·--· •• ----11---- -SD-~- -> • 1 ----C-2~_ --~rn--rn .. _ _ __ A=1:57 AC ~IGH RAIE 810-=FIL~IE~R~- --------------·----. -.. "' ------··•·"·----. 2r. FROM OMA 8-7 -TOJMR-2 • RECEIVED JAN 2 0 2016 VERIFIED BY: INSPECTOR DATE CITY OF CARLSBAD ENGINEERING DEPARTMENT BMP SITE PLAN _.-.. .. .. ,, ~,~ FUSCOE I N e I N I I R I N I 6390 Greenwich Drive, Suite 170 San Diego, California 92122 DA TE INlllAL DATE INITIAL DATE INITIAL NORTH 40 URBAN FARM CARLSBAD, CA SEPTEMBER 2015 RECORD COPY }'&L 1/22/16 PROJECT NO. MS 12-03 DRAWING NO. FUTURE IMPERVIOUS AREA (FUTURE PHASE),""'!~•·---=·~-~~=· --~---~-~<-•·=> / tel 858.554.1500 ° fax 858.597 .0335 www.fuscoe.com ENGINEER Of WORK REVISION DESCRIPTION OTHER APPROVAL CITY APPROVAL INITIAL olrE 1 488-2SW