Loading...
HomeMy WebLinkAboutMS 04-06; MAY MINOR SUBDIVISION; RESPONSE TO REVIEW OF GEOTECHNICAL REPORT; 2020-01-08I HTHOb%IGTO INC. SOIL & FOUNDATION ENGINEERING • ENGINEERING GEOLOGY a HYDROGEOLOGY January 8, 2020 Project 8994.1 Log No. 20823 Ms. Mary May 5258 Silkwood Drive Oceanside, California 92056 Subject: RESPONSE TO REVIEW OF GEOTECHNICAL REPORT El Camino Real, A.P.N. 167-080-36 Carlsbad, California References: 1. "Preliminary Geotechni cal Investigation, Proposed Two-Lot Development, El Camino Real, Carlsbad, California, A.P.N. I167-080- 36", by Vinje & Middleton Engineering, Inc., dated October 17, 2003. "Improvement Plans for: Private Joint Access Road, A.P.N. 167-080- 36, Carlsbad, California", by The Sea Bright Company, undated. "Improvement Plans Review, El Camino Real, A.P.N. 167-080-36, Carlsbad, California", by Hetherington Engineering, Inc., dated November 11.2019. "Review of Geotectinical Report, May Minor Subdivision, El Camino Real, Carlsbad, California", by NVS, dated December 13, 2019. Dear Ms. May: In accordance with the request of Mr. Robert Sukup, we have prepared this response to the "Review of Geotechnical Report..." (Reference 4). Our response corresponds to the order utilized by the reviewer. o No slab-on-grade floors are included as part of the proposed improvements. Only the private joint access road is proposed. Updated seismic parameters are not necessary at this time since no structures are proposed. A copy of our review of the project improvemnts plans (Reference 3) is attached, JAN 282020 LAND DEVELOPMENT ENGINEERING 5365 Avenida Encinas, Suite A • Carlsbad, CA 92008-4369 (760) 931-1917 Fax (760) 931-0545 333 Third Street, Suite 2 G Laguna Beach, CA 92651-2306 • (949) 715-5440 • Fax (760) 931-0545 www.hetheringtonengineering.com 0 HETT EEE SOIL & FOUNDATION ENGINEERING ENGINEERING GEOLOGY o HYDROGEOLOGY November 11, 2019 Project 8994.1 L Ms. Mary May Log No. 20752 5258 Silkwood Drive Oceanside, California 92056 Subject: IMPROVEMENT PLANS REVIEW El Camino Real, A.P.N. 167-080-36 Carlsbad, California References: 1. "Preliminary Geotechnical Investigation, Proposed Two-Lot Development, El Camino Real, Carlsbad, California, A.P.N. #167-080- 36", by Vinje & Middleton Engineering, Inc., dated October 17, 2003. 2. "Improvement Plans for: Private Joint Access Road, A.P.N. 167-080- 36, Carlsbad, California", by The Sea Bright Company, undated. Dear Ms. May: In accordance with the request of Mr. Robert Sukup, we have reviewed the referenced report and plans. Based on our review, it appears that the plans (Reference 2) generally conform to the recommendations contained in the geotechnical report (Reference 1). This opportunity to be of service is appreciated. If you have any questions, please contact our office. Sincerely, IN :Ma~rlc ~DHet Wierm on Civil Engineer 30488 Geotechnical Engineer 397 (expires 3/31/20) Distribution: 2-Addressee 1-via e-mail (Sulcup@roadrunner.com) 5365 Avenida Encinas, Suite A • Carlsbad, CA 92008-4369 • (760) 931-1917 Fax (760) 931-0545 333 Third Street, Suite 2 ' Laguna Beach, CA 92651-2306 (949) 715-5440 Fax (760) 931-0545 www.hetheringtonengineering.com 9 0 RESPONSE TO REVIEW OF GEOTECHNICAL REPORT Project No. 8994.1 Log No. 20823 January 8, 2020 Page This opportunity to be of service is appreciated. If you have any questions, please contact our office. - Sincerely, HETHER Mir1. 6iito( / 1 . Civil Engineer 30488 V Uat?l Geotechnical Engineer 397 OTC (expires 3/31/20) Attachment: "Improvement Plans Review, El Camino Real, A.P.N. 167-080-36, Carlsbad, California", by Hetherington Engineering; Inc. dated November 11,2019 Distribution: 2-Addressee 1-via e-mail (Sulcup@roadri.rnner.com) ITHRNGTON ENGINEERING, INC