HomeMy WebLinkAboutMS 04-06; MAY MINOR SUBDIVISION; RESPONSE TO REVIEW OF GEOTECHNICAL REPORT; 2020-01-08I
HTHOb%IGTO INC.
SOIL & FOUNDATION ENGINEERING • ENGINEERING GEOLOGY a HYDROGEOLOGY
January 8, 2020
Project 8994.1
Log No. 20823
Ms. Mary May
5258 Silkwood Drive
Oceanside, California 92056
Subject: RESPONSE TO REVIEW OF GEOTECHNICAL REPORT
El Camino Real, A.P.N. 167-080-36
Carlsbad, California
References: 1. "Preliminary Geotechni cal Investigation, Proposed Two-Lot
Development, El Camino Real, Carlsbad, California, A.P.N. I167-080-
36", by Vinje & Middleton Engineering, Inc., dated October 17, 2003.
"Improvement Plans for: Private Joint Access Road, A.P.N. 167-080-
36, Carlsbad, California", by The Sea Bright Company, undated.
"Improvement Plans Review, El Camino Real, A.P.N. 167-080-36,
Carlsbad, California", by Hetherington Engineering, Inc., dated
November 11.2019.
"Review of Geotectinical Report, May Minor Subdivision, El Camino
Real, Carlsbad, California", by NVS, dated December 13, 2019.
Dear Ms. May:
In accordance with the request of Mr. Robert Sukup, we have prepared this response to the
"Review of Geotechnical Report..." (Reference 4). Our response corresponds to the order
utilized by the reviewer.
o No slab-on-grade floors are included as part of the proposed improvements. Only the
private joint access road is proposed.
Updated seismic parameters are not necessary at this time since no structures are
proposed.
A copy of our review of the project improvemnts plans (Reference 3) is attached,
JAN 282020
LAND DEVELOPMENT
ENGINEERING
5365 Avenida Encinas, Suite A • Carlsbad, CA 92008-4369 (760) 931-1917 Fax (760) 931-0545
333 Third Street, Suite 2 G Laguna Beach, CA 92651-2306 • (949) 715-5440 • Fax (760) 931-0545
www.hetheringtonengineering.com
0
HETT EEE
SOIL & FOUNDATION ENGINEERING ENGINEERING GEOLOGY o HYDROGEOLOGY
November 11, 2019
Project 8994.1
L
Ms. Mary May
Log No. 20752
5258 Silkwood Drive
Oceanside, California 92056
Subject: IMPROVEMENT PLANS REVIEW
El Camino Real, A.P.N. 167-080-36
Carlsbad, California
References: 1. "Preliminary Geotechnical Investigation, Proposed Two-Lot
Development, El Camino Real, Carlsbad, California, A.P.N. #167-080-
36", by Vinje & Middleton Engineering, Inc., dated October 17, 2003.
2. "Improvement Plans for: Private Joint Access Road, A.P.N. 167-080-
36, Carlsbad, California", by The Sea Bright Company, undated.
Dear Ms. May:
In accordance with the request of Mr. Robert Sukup, we have reviewed the referenced
report and plans. Based on our review, it appears that the plans (Reference 2) generally
conform to the recommendations contained in the geotechnical report (Reference 1).
This opportunity to be of service is appreciated. If you have any questions, please contact
our office.
Sincerely,
IN
:Ma~rlc ~DHet Wierm on
Civil Engineer 30488
Geotechnical Engineer 397
(expires 3/31/20)
Distribution: 2-Addressee
1-via e-mail (Sulcup@roadrunner.com)
5365 Avenida Encinas, Suite A • Carlsbad, CA 92008-4369 • (760) 931-1917 Fax (760) 931-0545
333 Third Street, Suite 2 ' Laguna Beach, CA 92651-2306 (949) 715-5440 Fax (760) 931-0545
www.hetheringtonengineering.com
9 0 RESPONSE TO REVIEW OF GEOTECHNICAL REPORT
Project No. 8994.1
Log No. 20823
January 8, 2020
Page
This opportunity to be of service is appreciated. If you have any questions, please contact
our office. -
Sincerely,
HETHER
Mir1. 6iito( / 1 .
Civil Engineer 30488 V Uat?l
Geotechnical Engineer 397
OTC
(expires 3/31/20)
Attachment: "Improvement Plans Review, El Camino Real, A.P.N. 167-080-36,
Carlsbad, California", by Hetherington Engineering; Inc. dated November
11,2019
Distribution: 2-Addressee
1-via e-mail (Sulcup@roadri.rnner.com)
ITHRNGTON ENGINEERING, INC