Loading...
HomeMy WebLinkAboutCDP 2017-0001; PRITCHARD RESIDENCE; 2ND RESPONSE TO CITY COMMENTS; 2018-01-09I SHORING DESIGN GROUP January 9, 2018 Mr. Brian Church Office (858) 793-3437 Brian Church Architecture JR I 330 South Cedros Avenue Solana Beach, CA 92075 JAN 17 2018 Re: Pritchard Residence LAND D E - -y'iiNT Carlsbad, California L N \ ( Subject: 2 nd Response to City Comments, on Plans Dated 10/13/2017 Dear Mr. Church: Shoring Design Group is in receipt of the 2 nd plan review comments prepared by the City of Carlsbad, regarding the above referenced project. In response, Shoring Design Group (SDG) offers the following responses: Response to "Redline" Comments Sheet SH3 Drawing Redlines: The back-lagged shoring alignment was offset against the existing PL, for installation of water proofing & drainage against the exterior light well block face. Upon discussion with the project's architect & structural engineer, it was decided that the back-wall form alternate provided a more suitable means of construction, given the proximity of the existing property line wall. Please see the revised soldier beam layout & structural details for the shoring back-wall form, against the light-well cast in place concrete. Please see the update title-block for the corrected "GR 2017-0048" & "DWN BY" reference, as requested (Typical, all sheets). The line type in question is the proposed setback as provided by the civil engineer. For reference, please see updated call out to sheet SH3. Sheet SH4 Drawing Redlines: The dashed lines between beams #1-2 & #7-8 represents the temporary 1-1 daylight slope. Please see the updated profile view for the corresponding call out. Please see the updated profile view for the anticipated footing extents of the adjacent wall. Please see call out identifying the proposed slab on grade, wall & footing. The legend on sheet SH3 & SH4, is designated for temporary shoring improvements only. Please see the updated profile view for more legible lagging lines & call out for the pressure treated lagging. Sheet SHS Drawing Redlines: Please see revised detail 1/SH5. The shoring wall alignment has been revised to back-wall form & will not require backfill between the lightwell structure. Additionally, the depressed area between the pad & bottom of shoring wall is the cut required for the proposed footing. Please see structural light well detail 2/SD7 for the proposed footing dimensions. The shoring alignment has been revised to back-wall form the proposed light well (see updated detail 2/SH5) & should clear the existing wall footing during installation. As a precaution, detail 4/SH5 has also been added to provide further offset (if required) from the existing wall, in the unlikely event of conflict in the field. Sheet SH6 Drawing Redlines 1. Please seethe updated title-block for the requested information. Should you have any additional questions or comments regarding this matter, please advise. Sincerely, SHORING DESIGN GROUP, OESSfo, C 80503 -Exp. 3/31/19 J Ct\L\' Roy P. Reed, P.E. Project Engineer Enclosed: City of Carlsbad Temporary Shoring Redlines (Plans Dated 10-13-17) Delta 2 Temporary Shoring Plans, Dated 1-9-17