Loading...
HomeMy WebLinkAboutPD 2020-0036; PLAZA BONITA SLOPE REMEDIATION; THIRD PARTY GEOTECHNICAL REVIEW (FIRST); 2020-10-29HETHERINGTON ENGINEERING, INC. SOIL & FOUNDATION ENGINEERING • ENGINEERING GEOLOGY • HYDROGEOLOGY October 29, 2020 Project No. 923€. I Log No. 21138 City of Carlsbad Lanl Development Engineering 1635 Faraday Avenue Carsbad, California 92008 Attertion: Mr. David Rick .<1c Açs)fl)) (MMAT ) Subject: THIRD-PARTY GEOTECUNTCAL REVIEW (FIRST) Slope Failure 2210 Plaza Bonita Carlsbad, California Project ID: PD2020-0036 References: 1. "Geotechnical Inspection of Slope Failure, 2210 Plaza Bonita, Carlsbad, CA 92009", by Martin R. Owen PE, GE, dated June 1, 202G. 2. "Grading Plans For: Slope Rpair, 2210 Plaza Bonita", by The Sea Bright Company, dated October 5, 2020 (Sheets. through 4). Dear Mr. Rick: In accordance with your request, Hetherington E:gineering, Inc. has provided third-party geotechnical review of Reference I. The followi:ig comments are provided for analyses and/or respOne by the Geotechnical Consultant. REVIEW CF GEOTECHNICAL REPORT I. The Consultant should review the project grading plan, provide any addition--II geotechnical recommendations considered necessary, and confirm that the plans have been prepared in accordance with the geotecrinical recomm.en:lations provided in the referenced report. The Co:isultant should provide an updated 2eotechnical map/plot plan utilizing the latest grading plan for the project to clearly show (at a rninirnim), a) existing site topography, b) proposed finished grades, c) locations of the subsurface exploration, ci) geologic contacts, and e) remedial grading limits, etc. The consultant should provide geologic cross-sections utliz.rg the current grading plan to clearly show (at a minimum), a) existing site topography, b) proposed finished 5365 Avenida Encinas, Suite A • Carlsbad, CA 92008-4369 • (760) 93t-1c17 • Fax (760) 931-0545 333 Third Stree • Laguna Beach, CA 9265 • (949) 715-5440 • Fax (949) 715-5442 www.hetheringtonengineering.com THIRD-PARTY GEOTECHN ICAL REVIEW (FIRST) Project No. 9236.1 Log No, 21 188 October 29, 2020 Page 2 grades, c) geologic contacts, d) geologic structure, e) locations of the subsurface exploration, f temporary construction slopes, and g) remedial grading, etc. The Consiiftant should perform field exploration, laboratory testing, and analyses to provide a basis for the slope repair recommendations. The Consul Can should provide recommendations for temporary excavations. The. Consultant should address the sLilficial stability of the proposed repaired slope. The Consultant should provide a statement regarding the impact of the proposed grading cii adacent properties and improvements, The Consultant should provide a list of recommended observation and testing during site grading and constriction. The Consultant should provide a list of published maps/reports used in the preparation of the report. The opportunity to be of service is sincerely appreciated. If you have any questions regarding this review, please contact this office at your convenience. Sincerely. II ETi IRINCTON ENGINEERING, INC. Mark D. Hetherin klivil Engineer 3 o.397 expires 3/3 1,12 . FAMI~120000 Paul A. Bogseth Professional Geologist 3772 Certified Engineering Geologist 1153 Certified Hydrogeologist 591 (expires 3/31/22) PAULA. \1 E.G. 1153 ) Ep; 25 Distribution: I -via e-mail (David.RickcarLbadca.gov) 1-via e-mail 1Brige.t. BokacarIsbadca.gov) HETHERINGTON ENGINEERING, INC.