Loading...
HomeMy WebLinkAboutCDP 2019-0032; TELESCOPE HOUSE: BUILD NEW SFR; REVIEW OF GEOTECHNICAL REPORT; 2020-08-14City of Carlsbad 1635 Faraday Avenue Carlsbad, California 92008 Attention: Ms. Kyrenne Chua Subject: Review of Geotechnical Report Project: Love Residence 4615 Telescope Avenue Carlsbad, California City Project ID: CDP2019-0032 City GR No.: 2020-0019 August 14, 2020 Project No.: 226816-00101.73 RECKffVE AUG 252020 LAND DEVELOPMENT ENGI NEERING References: 1) "Geotechnical Investigation, Proposed Single-Family Residence 4615 Telescope Avenue, Carlsbad, California," prepared by Hetherington Engineering, Inc., Project No. 8787.1, dated March 11, 2019. "Grading Plans for: Love Residence, APN: 207-385-20 (4615 Telescope Avenue)", Sheet 2 of 4 sheets, prepared by Sampo Engineering, Inc., Job Number 19-110, dated May 28, 2020. "Technical Guidelines for Geotechnical Reports", issued by the City of Carlsbad, dated January 1993. "CGS Note 41, Guidelines for Reviewing Geologic Reports", prepared by the State of California, Department of Conservation, California Geological Survey, dated 2017. Dear Ms. Chua: As requested, NV5, West Inc. (NV5) has conducted a geotechnical review of the above-referenced geotechnical report and grading plan for the proposed project located in Carlsbad, California. The purpose of the review was to provide an opinion on whether the geotechnical aspects of the project have been identified and appropriately addressed in the project geotechnical report. NV5's geotechnical review is based on geotechnical information presented in the referenced geotechnical report and experience with the geotechnical conditions in the general site area. NV5 has not performed an independent geotechnical investigation at the project site,and therefore does not offer or imply any guarantee or warranty as to future site performance. The opinions presented below are limited. Other consultants could arrive at different conclusions. This report presents a summary of the review. Review Summary Based on our review, the referenced geotechnical report for the proposed project has generally identified and addressed the significant geotechnical factors affecting the site development as currently proposed, and the report is approved. Note that acceptance or approval of the report does not guarantee or constitute approval for grading or building permits. Although the report is approved the following comments are provided for consideration: 5092 AvuE OF SCIENCE, SLIfTE 200 SAN DIEGO. CA 92 128 vv N15.COFI I OFFICE 858.850500 F 858.385000 Cc rc:;crO.tQijar - F- Review of Geotechnical Report City Project ID: CDP2019-0032 Love Residence 4615 Telescope Avenue Carlsbad, California Project No.: 226816-00101.73 On page 8 in Section 5 titled, "Foundations and Slab Recommendations", the referenced geotechnical report (reference 1) recommends that slab-on-grade floors should be underlain by a 10-mil polyethylene moisture vapor retarder, and that 2 inches of sand be placed below the vapor retarder and 2 inches of sand should be placed above the vapor retarder. Current ACI standards no longer recommend the use of sand over a moisture barrier, but recommend that the concrete be placed directly on the moisture barrier, and to compensate a lower water cement ratio and improved curing methods are suggested. It is also noted that the use of thicker moisture barrier products such as Stego WraplM, Moistop PIusTM (not excluding other products) have been shown to provide superior performance related to reduced moisture infiltration and increased tear resistance during slab construction. It is recommended that the project geotechnical consultant review and approve the grading, shoring and building foundation plans prior to construction. NV5 appreciates the opportunity to be of service to you on this project. If you have any questions regarding this report, please do not hesitate to contact our office. Respectfully submitted, NV5 West, Inc. Gene Custenborder, CEG 1319 Carl Henderson, PhD, GE 2886 Senior Engineering Geologist CDO / SoCal CQA Group Director GC/CH Attachment: Geotechnical Review Checklis a ESSI SCOk Distribution: (1) Addressee, via email QtMTY TLCtE GN M . E otjt I GEOTECHNICAL REPORT REVIEW CHECKLIST Plan Check Number: CDP20190032/GR20200019 Location I Address: 4615 Telescope Avenue City Plan Checker: Date: August 14, 2020 GEOTECHNICAL REPORT - GENERAL OK NOT MET N/A Signed by RCEIGE P1 LI LI Signed by CEG (Required for Hillside Area) Z LI LI Project Address LI El Location Index Map with reference north, scale, etc. LI LI Site Description (topography, vegetation, existing structures/improvements, drainage) Z LI LI Description of Proposed Development (grading, structures/improvements, drainage, use, foundation type, estimated structural loads) ie LI LI GEOTECHNICAL REPORT - FIELD INVESTIGATION OK NOT MET N/A Site Specific Subsurface Investigation JA LI 0 Description of Investigative and Sampling Methods LI LI Boring/Test Pit Logs (Soil/Bedrock descriptions with depth, type and depth indicated for sampling, real assumed _or_ _elevation _indicated, _groundwater _conditions)JZ LI LI Sampling performed to anticipated depth of foundations and/or deepest excavation LI LI Boring/Test Pits located on Geotechnical Map/Plot Plan LI LI Revised 5/10/2018 1 of 7 GEOTECHNICAL REPORT - LAB TESTING OK NOT MET N/A Description of lab test performed with referenced test method (ASTM, EPA, etc) / El 0 Soil Strength (Shear) El El Expansion El El Sulfate ' El 0 Gradation 0 El Classification of soil in accordance with ASTM D 2487 (when using California Building Code values for lateral load) El El Moisture/Density El El Consolidation El El Atterberg Limits El El Maximum Dry Density/Optimum Moisture Content El 0 GEOTECHNICAL REPORT - EARTH MATERIALS OK NOT MET N/A Description and designation of geologic units (surficial soils and bedrock, including depth, thickness) z El El Geologic structure (bedding, fracturing, faulting of bedrock material) 14 El El Description of regional geologic conditions (including reported regional trends of bedding and faulting) El El GEOTECHNICAL REPORT - SEISMICITY OK NOT MET N/A General description of regional and local faulting Ill El El Site Class El El Mapped Spectral Acceleration Parameters (Se, Si) Li El El Site Coefficients (Fa, F) El El Design Spectral Acceleration Parameters (Sos, SD1) ie 0 0 Geotechnical Report Checklist Revised 5/10/2018 Page 2 of 7 Seismic Design Category LI LI GEOTECHNICAL REPORT - GEOLOGIC HAZARDS OK NOT MET N/A Landslide LI LI Expansive Soils LI LI Surficial Slope Instability LI LI I Slope Creep C] LI / Groundwater 0 LI Total and Differential Settlement LI LI Sulfate LI LI Liquefaction LI LI Affect of liquefiable soils on utilities and lifeline services outside of structural mitigation LI LI Seismic Induced Landsliding LI LI I Tsunami Potential I LI LI GEOTECHNICAL REPORT - ILLUSTRATIONS OK NOT MET N/A Geotechnical Map I Plot Plan LI LI Existing topography / improvements LI LI Proposed topography I improvements LI LI Location of subsurface exploration (borings, test pits, etc.) E/ LI LI Geologic Contacts LI LI Geologic Structure LI LI Location of fill key I buttress LI LI 49 Geologic Cross-Section / LI LI Existing topography I improvements JZ LI LI Geotechnical Report Checklist Revised 5/10/2018 Page 3 of 7 Proposed topography / improvements El El Location of subsurface exploration (borings, test pits, etc.) El El Geologic Contacts El El Geologic Structure El El Slope setbacks El El Temporary cuts / shoring El El Fill Key / buttress El El I Slope benching El El GEOTECHNICAL REPORT - CONCLUSIONS I RECOMMENDATIONS OK NOT MET N/A Statement as to feasibility of project El El Statement as to impact on adjacent properties / El El Statement of the condition of slopes with respect to stability W1 El El Slope stability analysis provided to support conclusion/recommendations El El Statement regarding liquefaction potential , El El Liquefaction analysis provided to support conclusion/recommedations El El f Grading Recommendations El El Remedial grading El El Compaction standards 4C El El Groundwater Mitigation El El Temporary excavation (backcuts, slopes) with time limit recommendations El El Shoring El El Benching El El I Keys / buttresses El El Canyon/Key Subdrains El El d] Foundation Recommendations Z El El Geotechnical Report Checklist Revised 5/10/2018 Page 4 of 7 Expansive soil mitigation (CBC 1805) Z LI LI Description of approved embedment material (i.e. compacted fill, terrace deposits, etc) Vt LI LI Minimum depth of embedment (into approved material) for foundations I LI LI Minimum width of footings LI LI Minimum diameter of caissons LI LI Bearing capacity (end bearing for caissons) LI LI Coefficient of friction (caisson skin friction) ie LI LI Lateral bearing [' LI LI Down drag forces (liquefiable soils,) LI LI [1' Lateral Spread forces (liquefiable soils) LI LI Foundation slope/trench setback P1 0 LI Minimum reinforcement requirements LI LI Minimum slab thickness and reinforcement , LI LI Slab underlayment LI LI Soluable Sulfate exposure mitigation (typically cement type) LI 0 Conventional Retaining Wall Recommendations LI LI Active pressures (level, sloping) LI LI Retaining wall backdrain or recommendation of additional hydrostatic pressure LI LI Backfill 4e LI LI Surcharges I LI LI MSE Wall Recommendations (facing material, grid, backfill, stability analysis) LI LI /1 Flatwork / Hardscape recommendations including driveways (subgrade preparation, minimum slab thickness, reinforcement and joint spacing) LI LI Roadway Pavement recommendations (section design, subgrade preparation) LI LI Swimming Pool recommendations 0 LI GEOTECHNICAL REPORT - OBSERVATION/TESTING DURING CONSTRUCTION Geotechnical Report Checklist Revised 5/10/2018 Page 5 of 7 OK NOT MET N/A Footing Excavations El El ! Subdrains El El Caisson / Drilled Pier excavations (CBC Table 1704.9) LII El I Pool Excavations El El , Benching El El Keyways El El Temporary excavations El El Geologic mapping of bedrock excavations El El Retaining wall backfill El El Utility trench backfill El El Engineered fill El El Hardscape subgrade (driveways, patios, walkways, etc.) El El Import soils El El GEOTECHNICAL REPORT - REFERENCES OK NOT MET N/A Current / City adopted Building Code El El Grading Code El El Geotechnical reports I publications I geologic maps El El Ariel photographs El El Websites El El GEOTECHNICAL REPORT - COASTAL BLUFF OK NOT MET N/A Top of bluff designation (presented on geologic map and cross-sections) U El Ceotechnical Report Checklist Revised 5/10/2018 Page 6 of 7 Anal photograph of site showing top of bluff U LI Bluff retreat rate and total estimated retreat for a 50 year period U U / Codified Bluff top setback (presented on geologic map and cross-sections) U U Slope stability analysis U El References for bluff retreat rate LI U Slope Stability Setback presented on geologic map (surface expression of 1.5 FS) U U Total Setback presented on geologic map (greater of A: Slope Stability Setback + 50 yr bluff retreat or B: 10-feet buffer + 50 yr bluff retreat) U U Explanation and justification of 40-feet setback deviation U U Geotechnical Report Checklist Revised 5/10/2018 Page 7 of 7 Ismael Quero From: pbogseth@hetheringtonengineering.com Sent: Friday, August 21, 2020 3:03 PM To: Ismael Quero Cc: Zarel Lomeli; Vince Sampo; elitehomeconstruction@yahoo.com Subject: RE: Love Residence Follow Up Flag: Follow up Flag Status: Flagged Ismael, We agree with the first item. A 15 mil vapor barrier is a better product and suggested. Based on the plan and our prior work, it appears shoring is not needed. There is room for the temporary excavations. Paul Oogseth PG, CEG, CHG Principal Engineering Geologist Hetherington Engineering, Inc. Carlsbad, California 760-931-1917 Laguna Beach, California 949-715-5440