HomeMy WebLinkAboutCT 13-05; 2531-2589 STATE STREET; STRUCTURAL CALCULATIONS; 2014-10-22S D.J. SCHEFFLER, INC. General E:gineering Contractor 7 2500 W. Pomona Blvd. Pomona, CA 91768-3218 Phone: (909) 595-2924 License No; 582912 Fax: (909) 598-8639 Structural Calculations Job No. 14529 October 22, 2014 Project: State Street Townhoines City of Carlsbad Caisson Plans Client: Taylor Morrison, Contact: April Tornillo 8105 Irvine Center Drive., Suite 1450 Irvine, CA 92618 Phone: 949-341-1200 Engineer: Marshall Mead, PE for DJ Scheffler, Inc. 2500 W Pomona Blvd, Pomona CA 91768 Ph. 909-595-2974 R.C.E. 58574, Exp. 12/31/14 Description of Services: Structural calculations and plans for the installation of caissons supporting the post-tensioned foundations of tract homes (three-story wood dwelling structures) to bring the gravity loads below an existing sewer RCP line (where occurs). Design Criteria: 2013 C.B.C. and applicable reference codes Soils Information: LGC Geotechnical Inc. 131 Calle Iglesia, Suite 200, San Clemente CA Project No: 13200-01, Report date July 3, 2014 Addendum letter for deepened caissons dated October 15, 2014 Design Values: 3500 PSF End Bearing, 500 PSF Skin Friction pace Calculation Index: Design Requirements (LGC Inc.) 2-7 Caisson Design 8-13 REVISIONS: October 15, 2014 Project No. 13200-01 Ms. April Tornillo Taylor Morrison 8105 Irvine Center Drive, Suite 1450 Irvine, CA 92618 Subject: Geotecimical Recommendations for Proposed Deepened Caisson Footings Adjacent to the Existing 66-inch Storm Drain Easement, State Street Townhomes, 2531 through 2589 State Street, City of Carlsbad, California Introduction In accordance with your request, LGC Geotechnical, Inc. has prepared this report to provide recommendations for the proposed deepened caisson footings for building foundations adjacent to the existing storm drain easement for the proposed State Street Townhoines between 2531 and 2589 State Street, in the city of Carlsbad, California. BaekRround An existing 66-inch storm drain transects the proposed residential development site at a depth of approximately 9 feet below ground surface to top-of-pipe. Following development, homes will be located approximately 7.5 feet horizontally from the edge of the buried storm drain. As noted by the City Engineer, building foundations adjacent to the storm drain easement are not to induce horizontal or vertical loading of any kind onto the existing storm drain line. As a result, deepened caisson footings are required to satisfy the said requirements imposed by the City. Deep Foundation Recommendations We recommend the proposed deepened footings be designed utilizing support from Cast-In-Drilled Hole (CIDH) piles. These piles may be designed to resist axial dead and live loads using an allowable skin friction of 500 psf from the top of the existing storm drain elevation to the tip elevation of the proposed caisson. Per time City Engineer, the designed caissons must extend below the bottom elevation of the existing storm drain line. An allowable end bearing of 3,500 psf may be utilized in the design of these piles. Piles should he spaced at a minimum on-center spacing of three times the pile diameter. For short duration seismic londiii, pile capacities may be increased by 1/3• The pile capacities are based on soil resistance only, and m: further limited by the pile-head connection details and structural material strength. Total soil settlement e to structural foundation loads is estimated to be less than '/2 of an inch or less. Differential settlement InY I taken as '/2 of the total (i.e., ¼ of an inch over 40 horizontal feet). The attributed loading applied to the proposed deepened caisson footings is to be taken as the structural loads within a one to one projection from the bottom of the existing storm drain through to the adjacent building slab-on-grade. Pile borings should be plumb and free of loose or softened material. Extreme care in drilling, placement of reinforcement steel and the pouring of concrete will be essential to avoid excessive disturbance of pile boring walls. The pile reinforcing cage should be installed and the concrete pumped immediately after drilling is completed. Concrete mix design should include provisions to minimize shrinkage which can reduce frictional resistance of the pile shaft. A representative from LGC Geotechnical should be onsite full time during the drilling of piles to verify the assumptions made during the design stages. Pile holes must not be left open overnight. Geotechnical Observation/Testing During Grading and Construction The recommendations provided in this report are based on limited subsurface evaluation, field observations, and geotechnical analysis. The interpolated subsurface conditions should be checked in the field during grading and construction by a representative of LGC Geotechnical. Geotechnical observation and/or testing should be performed by a field representative from our office at the following stages: During drilling and installation of Cast-In Drilled Hole (CIDI-l) foundations; and When any unusual soil conditions are encountered during any construction operation subsequent to issuance of this report. Limitations Our services were performed using the degree of care and skill ordinarily exercised, under similar circumstances, by reputable soils engineers and geologists practicing in this or similar localities. No other warranty, expressed or implied, is made as to the conclusions and professional advice included in this report. Project No. 13200-01 Page 2 October 15, 2014 We appreciate this opportunity to be of service. Should you have any questions or concerns regarding this letter, please do not hesitate to contact our office. Sincerely, LGC Geotecluzical, Inc \ONAL N 0 No, 1821 CL CERTIFIED ! . ENGINEERING OEOLOG,81 EXR 2/29/16 CAt2'" NO. 2826 l EXR 6/30/15 Tim Lawson, CEO 1821, GE 2626 Geotechnical Engineer/Geologist TJLfASRJkmb Attachments: References Oeotechnical Map and Cross Sections Distribution: (3) Addressee (3 wet-signed copies, I via email) (I) Adams Streeter Civil Engineers, Inc. (via email) Attention: Mr. Mohammad Adabadi (1) Amid Engineering Group, Inc. (via email) Attention: Mr. Mansour Amid (1) Mr. Marshal Mead (via email) Project No. 13200-01 Page 3 October 15, 2014 I . .1 References Adams Streeter Civil Engineers, Inc., 2014, Precise Grading Plan, State Street Townhomes, Carlsbad, California, date plotted October 14, 2014. Lew, et at, 2010, Seismic Earth Pressures on Deep Basements, Structural Engineers Association of California (SEAOC) Convention Proceedings. LGC Geotechnical, Inc., 2014a, Preliminary Geotechnical Evaluation for the Proposed State Street Townhornes, 2531 through 2589 State Street, City of Carlsbad, California, Project No. 13200-01, dated July 3, 2014. _______ 2014b, Geotechnical Recommendations for Trench Excavation to Expose Existing 66-inch Storm Drain after Construction of the Proposed Development, State Street Townhomes, 2531 through 2589 State Street, City of Carlsbad, California, Project No. 13200-01, dated October 9, 2014. Project No. 13200-01 References October 15, 2014 34 UNIT B3 FF40.Q4J PAD=39.10 33 6. UNIT 63 fi—PAD~39.10 32 FF40.O'2 UNIT 83 PAD39.10 Ff=4000 ADA (W)- - - -- (W)- ___ W - (")— _ StatStreet —E-------------E ---------E---------------------E------- E---------E-------------------- S11 SD —I ea I lj UN IT FF142AD UNIff C 2W /Womd-1w J41 fi~.'A r-. L411'i ii.;r' Fm .70 3970 CF CF mJi i\pproxh i te Lim tLD ee CDC .•%sç.-_ —lf-- - %acrisYirFoc gs7c ual Locatoris 0 tenin d bvSt.r 91 L - - A L - L I I P. 30 UNIT 81 a-t tI I i UHII 84 FF40.30 UNIT 84 FF40.30 PAD3A.4 FF40.D3 I1II j J ADA 'AD39.10 ADA _ - - - SD SCALE: 120' 20 0 20' 40' Geo technical Map of Caisson Supported Footings CcotochnwiI, Inc CLIENT: Taylor Morrison 8105 Irvine Center Drive, Irvine, CA 92618 - - -rCATV = T - 0- FI4O.00 FF40.30 STOW 0 EASE tNt I. .i —J (I) 0 0 0 30 Desin Profile UNIT 31 UNIT 30 Qt ---I. 5011 . OFCNSSOII N 20 20 40 20 Horizontal Distance (Feel) 2 (0 ----- N S to N N 4 5) Horizontal Distance (Feet) UNIT 9 ____ - Desi9l ProfiI9 I I UNIT 10 FF42.40 MOT" rtNEER Af ST Qt - -. etEV.2&5 2T91F1V. O1OM OF cNSSON SCALE: I"=20' 20' 0 20' 40' Legend: Approximate Limits of Deepened Caisson Footings. Actual Caisson Locations to be Determined by Structural Engineer f) 2 Approximate Location of Geotechnical Cross Section .i"I' Approximate Report Limits A 1 Engineered Fill Material - (::0 :) Quaternary Terrace Deposits, circled where buried CIVIL ENGINEER: Adams Streeter 1450 15 Corporate Park Irvine, CA 92606 PROJECT NAME State Street - Carlsbad PROJECTNO. 13200.01 ENG. / GEOL. TJL SCALE 1 inch = 20 feet DATE I October 2014 J D.J. SHEFFLER, IN. General Engineering Contractor 2500W. Pomona Blvd Pomona, CA 91768-3218 Phone 909) 595-2924 CA License No: 582912 Fax: (909) 598-8639 L\ REV. DATE: REV. DATE: SHEET NO: PROJECT NO-' - 2 DATE: - 02. DESC. 4_/,J 2/1/ I7~'1eyiJ ENGINEER: MJMEAD l/ .1_i /,\( 7(12 //12'W />' *v5 //Vt"/ oil "rc ,72v: .1 I • 1 I it I Jill Zr4p c,1LP/ . f I ( . I I I lip I i iii I It I. I ii II I I I fI. 1 ./Vj I 1 I 11,14: I II I ii I I I II I pIp I I I I 11,11 I' II1IIiI 1 iI II I I P I i I Ii Ii III I I I II 1111 Ii II ii II Ii I! LI II I till I I I I I I I I I I fLJ' III (111111 ;M ill I I I I I III D.J. SCHEFFLER, INWF General Engineering Contractor 2500W. Pomona Blvd. Pomona, CA 91768-3218 REV. DATE: REV. DATE: PROJECT NO: DATE: 10 -22 — Zol -/ ,~VCA License No: 582912 Fax: (909) 598-8639 ON P5-- ENGINEER: tAJMEAb TI itJ•- c4Icc7N . . xi4oAV Zf> f7 Z/j 0 //Ps I 50 I I V A Ij yçt,Ai q211SA( /'1PO,' I I I I I 772P le felt— I I / I I f)/4Øt ) I il . . •l 1 :1!. . I iI Ii 1: 1 I;! Iii I I' II Ii I I I I' I'll II I I I ill I I ii I I I II II Ii Ii I I I I I I II 1111 I I I I I I i I II I I 1 1111 1 I I Ii ' I I I I I ill I I' I I i I I I i i I I II II D.J. SCHEFFLBR, INC. General Engineering Contractor Pomona, CA 91768-3218 2500 W. Pomona Blvd. Phone: 909) 595-2924 ese No: 582912 Fax: (909) 598-8639 Sheet: Project: State Street Townhomes City: Carlsbad DSJ Bid No: 14529 Date: 10/17/2014 Caisson Design values based on Letter by LGC Geotechnical Inc, Project No. 13200-01, October 15, 2014 Allowable Design Values End Bearing: 3,500 PSF per LGC Inc. Skin Friction: 500 PSF per LGC Inc. Use actual loads and assume Allowable Stress Design with Full End Bearing and Skin Friction Caisson Number No. Total Est. Load (kips) Caisson Dia. (in) End Br'g Reaction: (kips) Remain'g Load (kips) Use Skin Friction Add'l Feet Round Up to nrst Foot Top of Caisson (Per Civil) Top of Pipe (RCP) (Per Civil) Bot. of Caisson (Fl) Caisson Length (Fl) Cl 48.0 24 11.0 37.0 11.78 12.00 39.30 30.60 18.6 20.7 C2 48.0 24 11.0 37.0 11.78 12.00 39.30 30.70 18.7 20.6 C3 48.0 24 11.0 37,0 11.78 12.00 39.30 30.70 18.7 20.6 C4 48.0 24 11.0 37.0 11.78 12.00 37.53 30.80 18.8 18.7 C5 48.0 24 11.0 37.0 11.78 12.00 37.53 30.80 18.8 18.7 C6 48.0 24 11.0 37.0 11.78 12.00 37.53 30.80 18.8 18.7 C7 48.0 24 11.0 37.0 11.78 12.00 37.33 31.00 19.0 18.3 C8 48.0 24 11.0 37.0 11.78 12.00 37.33 31.00 19.0 18.3 C9 48.0 24 11.0 37.0 11.78 12.00 37.33 31.00 19.0 18.3 C10 48.0 24 11.0 37.0 11.78 12.00 37.33 31.10 19.1 18.2 Cli 48.0 24 11.0 37.0 11.78 12.00 37.33 31.10 19.1 18.2 C12 48.0 24 11.0 37.0 11.78 12.00 37.33 31.10 19.1 18.2 C13 48.0 24 11.0 37.0 11.78 12.00 37.33 31.20 19.2 18.1 Caissons 1-13 Total Length 245.9 I D.J. SCHEFFLER, INC. General Engineering Contractor P 2500 W. Pomona Blvd. omona, CA 91768-3218 Phone: 969) 595-2924 PCA: No: 582912 Fax; (909) 598-8639 I Sheet: /1 Project: State Street Townhomes City: Carlsbad DSJ Bid No: 14529 Date: 10/17/2014 Caisson Design values based on Letter by LGC Geotechnical Inc, Project No. 13200-01, October 15, 2014 Allowable Design Values End Bearing: 3,500 PSF per LGC Inc. Skin Friction: 500 PSF per LGC Inc. Use actual loads and assume Allowable Stress Design with Full End Bearing and Skin Friction Caisson Number No. Total Est, Load (kips) Caisson Dia. (in) End Br'g Reaction: (kips) Remaing Load (kips) Use Skin Friction Add'I Feet Round Up to nrst Foot Top of Caisson (Per Civil) Top of Pipe (RCP) (Per Civil) Bot. of Caisson (Fl) Caisson Length (Fl) C14 48.0 24 11.0 37.0 11.78 12.00 39.40 30.60 18.6 20.8 C15 48.0 24 11.0 37.0 11.78 12.00 39.40 30.70 18.7 20.7 C16 48.0 24 11.0 37.0 11.78 12.00 39.40 30.70 18.7 20.7 C17 48.0 24 11.0 37.0 11.78 12.00 37.73 30.80 18.8 18.9 C18 48.0 24 11.0 37.0 11.78 12.00 37.73 30.80 18.8 18.9 C19 48.0 24 11.0 37.0 11.78 12.00 37.73 30.80 18.8 18.9 C20 48.0 24 11.0 37.0 11.78 12.00 37.63 31.00 19.0 18.6 C21 48.0 24 11.0 37.0 11.78 12.00 37.63 31.00 19.0 18.6 C22 48.0 24 11.0 37.0 11.78 12.00 37.63 31.00 19.0 18.6 C23 48.0 24 11.0 37.0 11.78 12.00 37.30 31.10 19.1 18.2 C24 48.0 24 11.0 37.0 11.78 12.00 37.30 31.10 19.1 18.2 C25 48.0 24 11.0 37.0 11.78 12.00 37.30 31.10 19.1 18.2 Caissons 14-25 Total Length 229.5 Caissons 1-13 Total Length 245.9 Total Length 475.4 D.J. SCHEFFLBR, I• CA 2500W. Pomona Blvd. General Engineering Con IracTur Pomona, CA 91768-3218 Phono: (909) 595-2924 582912 Fax: (909) 598-8639 Concrete Column Description: Typical Caisson -Ignore lateral soil support for upper 9f1 (nirsI Infnrmsfinn f c : Concrete 28 day strength = 2.50 ksi E= 3,122.0 ksi Density = 145.0 pcI = 0.850 fy - Main Rebar = 60.0 ksi E - Main Rebar = 29,000.0 ksi Allow, Reinforcing Limits ASTMA6I5 Bars Used Min.Reinf. 1.0% Max. Reinf. = 8.0% Load Combination .2006 IBC & ASCE 7-05 Title: State Street To es Job# 14529 17, Engineer: M MeadW Project Desc.: Caissons at PT Slabs /f//1/ /'Z I"!S Prined220Cfl014,11:57p,1 Fe s \enercac pnectsU 4529 ec6 ENERcALc.• INC. .1983-2011. Build 6A2.3 td. VerR200fl Catculatlons per, ASCE 7-05 Overall Column Height = 14.0 it End Fixity Top Free, Bottom Fixed Brace condition for deflection (buckling) along columns: X-X (width) axis : Unbraced Length for X-X Axis buckling = 10 ft, K = 2.10 Y-Y (depth) axis :Unbraced Length for Y-Y Axis buckling = 10 It, 1< = 2.10 Column cross Section Column Dimensions 24.01n Diameter, Column Edge to Rebar Edge Cover = 3.0in T'N .fr Column Reinforcing :8.0 -#7 bars X 1 . .. ..,#7 Applied Loads.......................... . . Entered loads are factored per load combinations specified by user. Column self weight Included : 61377.43 lbs * Dead Load Factor AXIAL LOADS... Worst Case Axial: Axial Load at 14.0 It above base, Xecc = 4.0in, 0 = 40.0, L = 15.0k / "3Z-. .. /, .7 •14./ BENDING LOADS... -• VI Soil Loss: Lat. Uniform Load from 5.0-->14.0 It creating Mx-x, H = 0.180 k/ft DESIGN SUMMARY................. Load Combination +1.20D+0.50Lr+1 .60L+1.60H 1 Location of max.above base 13.906 ft Maximum Stress Ratio t0183:11 Ratio = (PuA24MuA2)l,5 I (PhiPn2+PhiMnA2)5 Pu = 79.653 k (p * Pn = 448.901 k Mu-x = -24.624 k-ft (p * Mn-x = 0.0 k-It Mu-y = -24.0 k-ft * Mn-y = 0.0 k-ft Mu Angle = 44.0 deg Mu at Angle = 34.385 k-ft (pMn at Angle = 192.811k-ft Pn & Mn values located at Pu-Mu vector mtersection with capacity curve Column Capacities. -. Pnrnax: Nominal Max. Compressive Axial Capacity 1,239.13k Pnmin: Nominal Mm. Tension Axial Capacity -288.0 k (p Pn, max: Usable Compressive Axial Capacity 737.28 k (P Pn, min: Usable Tension Axial Capacity -201.60 k Governing Load Combination Results Maximum SERVICE Load Reactions.. Top along Y-Y k Bottom along Y-Y k Top along X-X k Bottom along X-X k Maximum SERVICE Load Deflections Along Y-Y 0.02763in at 14.0 ft above base for load combination: H Only Along X-X 0.060651n at 14.0f1 abovebase for load combination: D+L General Section Information - (p 0.70 3 0.850 0 0.850 p : % Reinforcing 1.061 % Rebar % Ok Reinforcing Area 4.80 inA2 Concrete Area 452.389 inA2 Governing Factored Dist from Axial Load k Bending Analysis k ft Utilizatior e ft ba . Pu .(. • .. . 6yMuy Alpha deg) Mu Mn Ratio 04.3i 006.Vb 1.UUU 1.000 -16b1 270,000 18.67 163.95 0.114 +1.20D-t.50Lr+1.60L+1.60H 13.91 79.65 448.90 1.000 -24.62 1.000 -24.00 44.000 34.39 192.81 0.178 i-1,20D+1.60L+0,505+1,60H 13.91 79.65 448.90 1.000 -24.62 1.000 -24.00 44,000 34.39 192.81 0.178 D.J. SCHEFFLER, Job# 14529 / 6 General Engineering Conira Project Desc.: Caissons at PT Slabs 2500W. Pomona Bhd. Pomona, CA 91768-3218 Phonc: (909) 595-2924 CA License No: 582912 Fax: (909) 598-8639 Printed: 2200T 2014, 1l5IM Concrete Column NRCALC INC 1983.2o1i6uud6iA4ver62000j II11HaVIPf'N..tr Description: Typical Caisson - Ignore lateral soil support for upper 9ft Governing Load Combination Results Governing Factored Dist from Axial Load k Bending Analysis k ft Utilizatic Load Combination base ft Pu p * PA 8X Sx*Mux 3Y 6y * Muy Alpha (deg) 3 Mu (p Mn Ratio +1.20D+1.6OLr+50L 13.91 63.15 564.64 1.000 1.000 -18.50 270.000 18.50 165.31 0.11: -s-1,2OD40.501-+1.605 13.91 63,15 564.64 1.000 1,000 -18,50 270.000 18.50 165.31 0.112 +1.20D*.5QLr+0.50L+1.60W 13.91 63.15 564.64 1.000 1.000 -18.50 270.000 18.50 165.31 0.112 +1.20D+O.50L40.50S+1.60W 13.91 63.15 564.64 1.000 1.000 -18.50 270.000 18.50 165.31 0.112 +1,20D+0.50L'0,20S+E 13.91 63.15 564.64 1.000 1.000 -18.50 270.000 450 165.31 0.112 +0.90D+1.60W+1.601-1 13,91 41.74 320.02 1.000 -24.62 1.000 -12.00 26.000 27.39 208.65 0.131 40.90D+E+1,60F1 13.91 41.74 320.02 1.000 -24.62 1.000 -12.00 26.000 27.39 208.65 0.131 Maximum Reactions Unfactored Note Only non zero reactions are listed Reaction along X-X Axis Reaction alone V-V Ads Axial Reaction Load Combination @Base @Top Base - @Top @Base DOnly k k 46.377k LOfty k k 15.000k D+L k k 61.377k HOnly 1.620 k k k Maximum Deflections for Load Combinations Unfactored Loads Load Combination Max. X-X Deflection Distance Max. V-V Deflection Distance DOnly 0.0441 in •14.000 it 0.000 in 0.000 it L Only 0.0165 in 14.000 It 0.000 In 0.000 It D-iL 0.0607 in 14,000 ft 0.000 in 0.000 It H Only 0.0000 in 0.000 it 0.027 in 13.906 It :.Sketóhes . :•.... .......... off L,arflXA. Interaction_Diagrams Concrete Cotmrin P.M Interaction Diagram Concrete Coiumn P-ti Interaction Diagram ......... . 8030 - PhiMnJpha (k-ft) 720.0 560,13 4800 I . TTTT ..I 0. _.. .\ vi .j •. .1 .1 It I 32 4t,4 .8 921 11.ti1a9116Z3 bn.52t.72,,,9