Loading...
HomeMy WebLinkAboutCT 11-01; ROBERTSON RANCH WEST VILLAGE; SEWER SYSTEM ANALYSIS; 2011-05-1341, SEWER SYSTEM ANALYSIS FOR ROBERTSON RANCH WEST May 13, 2011 M. Uj CO No. 61070 *\, Exp.W30111 1* OF C Prepared by: Dexter Wilson Engineering, Inc. 2234 Faraday Avenue Carlsbad, CA 92008 Job No.: 936-001 DEXTER WILSON ENGINEERING, INC. DEXTER S. WILSON, P.E. ANDREW M. OVEN, P.E. STEPHEN M. NIELSEN, P.E. DIANE H. SHAUGHNESSY, P.E. May 13, 2011 936-001 Shapell Homes, Inc. 8383 Wilshire Blvd., Suite 700 Beverly Hills, CA 90211 Attention: Erik Pfahler, Vice President Subject: Robertson Ranch West Sewer System Analysis Introduction This letter-report summarizes our evaluation of the sewer system that will serve the western portion (Planning Areas 1 through 11) of the Robertson Ranch project. The project is located along the north side of El Camino Real, just east of Tamarack Avenue. Figure 1 provides a location map for the project. The proposed land use plan for the site includes single family and multi-family residential, commercial, park, and open space areas. The onsite sewer system for the site is proposed to be public to be operated and maintained by the City of Carlsbad. 2234 FARADAY AVENUE • CARLSBAD, CA 92008 • (760) 438-4422 • FAX (760)43&0173 p Erik Pfahler May 13. 2011 Sewer Service Design Criteria Unless otherwise noted, the sewer system planning criteria used in this study are in accordance with the City of Carlsbad Engineering Standards, Design Criteria for Gravity Sewer Lines and Appurtenances, last revised June 30, 2008. The criteria pertinent to this study are summarized below: Manning's Equation Friction Coefficient, n = 0.011 Commercial Sewer Generation Factor = 1 EDU per 1,800 SF Bldg. Area Raw land to Commercial SF Conversion = Assume 30% coverage Generation Factor = 220 gpdIEDU Average Flow . SF Residential Generation Factor = 220 gpd/unit MF Residential Generation Factor = 160 gpd/unit (per Sewer Master Plan) Peak Flow Factor = 2.5 x Average Day Demand Minimum Pipeline Velocity at Peak Flow = 2.0 ft./s Maximum dID, new12" and smaller pipes - 0.50 Maximum dID, new 15" and larger pipes - 0.75 Where there is not adequate flow to provide a minimum velocity of 2.0 feet per second, a minimum pipe slope of 1.0 percent is recommended. Projected Sewage Flows Based on the factors presented above, Table 1 summarizes the projected sewer flows for the project. For non-residential acreage, the assumption of 30 percent building coverage and a generation rate of 220 gpd per 1,800 square feet result in a generation factor of 1,597 gpd per gross acre. DEXTER WILSON ENGINEERING, INC. PAGE 3 Erik Pfahler May 13, 2011 TABLE 1 ROBERTSON RANCH WEST PROJECTED SEWAGE FLOWS Planning Gross Maximum Generation Average Land Use Area Acres Dwelling Units Factor Flow, gpd 1 SF Residential 8.3 32 220 gpdlunit 7,040 2 RV Storage 0.5 --- 1,597 gpd/ac 800 3 SF Residential 17.7 89 220 gpd/unit 19,580 4 Recreation 1.4 --- 1,597 gpd/ac 2,240 5 SF Residential 7.6 24 220 gpd/unit 5,280 r 1'cesictential 14.8 65 220 gpd/unit 14,300 7 MF Residential 7.3 110 160 gpd/unit 17,600 8 MF Residential 16.4 260 160 gpd/unit 41,600 9/10 SF Residential 21.9 78 220 gpd/unit 17,160 11 Commercial 14.9 --- 1,597 gpd/ac 23,800 TOTAL - - ________ 658 - --- As shown the projected average daily flow is 149,400 gpd and the projected peak flow is 373,500 gpd (Peak Factor = 2.5) Existing SewerSystem There are several existing sewer lines in the vicinity of the Robertson Ranch West project. Figure 2 provides the location of existing facilities in the vicinity of the project. The North Agua Heclionda Interceptor system has trunk sewer lines west and south of the project. There is an existing 12-inch sewer line in Kelly Drive that conveys flow south from El Camino Real. From this line in Kelly Drive, an 8-inch sewer line has been extended approximately 2,000 feet easterly in El Camino Real. There are also existing 8-inch sewer lines in Eucalyptus Lane and Crestview Drive, south of El Camino Real. These sewer lines tie into the North Agua Hedionda sewer line which is located in a canyon south of El Camino Real. DEXTER WILSON ENGINEERING, INC. PAGE 4 I Erik Pfahler May 13, 2011 To the east of the project there are gravity sewer lines at the intersection of Cannon Road and El Camino Real that convey flow to the North Agua Hedionda sewer system. To the north of the project, the Gateshead Sewer Lift Station was constructed to serve 24 residential lots along Gateshead Road. At the time this lift station was constructed, a dry sewer line was also installed to allow this lift station to be abandoned in the future. This sewer line was installed in an easement south of Gateshead Road and terminates at a manhole in Edinburgh Drive. Sewer System Analysis Manning's equation was used to analyze the onsite sewer system to the point of connection to the existing sewer system. Appendix A provides the hydraulic analysis results and Exhibit A provides the corresponding node diagram. All onsite sewer lines were analyzed as 8-inch in diameter. Figure 3 provides the recommended sewer system for the project. Offsite Sewer Alternatives The western portion of the project will convey flow by gravity to El Camino Real where it will be connected to the existing system and conveyed to the Kelly Drive sewer line. Three alternatives were evaluated for serving the eastern portion of the project as described below. The first alternative considered was identified in the November 2006 Robertson Ranch Master Plan and involves constructing an 8-inch sewer line in El Camino Real to convey flow easterly to the existing sewer at Cannon Road. While this alternative is possible, it would involve difficult design and construction to make the connection at Cannon Road. This intersection is crowded with utilities, including a gas line, and the existing sewer line is deep at this location. I DEXTER WILSON ENGINEERING, INC. PAGE 5 r Erik Pfahler May 13, 2011 The second alternative considered was to convey sewer across El Camino Real to connect into the sewer lines in Eucalyptus Lane or Crestview Drive. A review of these as-built drawings revealed that it would not be possible to stay in the public right-of-way and connect to these sewer lines by gravity flow. It would be possible to connect to the North Agua Hedionda sewer in this area, but only by acquiring an easement, installing a sewer line down a slope, and connecting to a sewer line in a canyon which would involve disturbing the natural vegetation. This alternative is not considered feasible. The third alternative considered was to convey this sewer westerly in El Camino Real with the remainder of the project. The primary consideration for this alternative was the available capacity in the existing 8-inch line in El Camino Real. As indicated by the hydraulic analysis in Appendix A, the critical section of this line is the last section of line prior to the connection to the 12-inch line in Kelly Drive. This section of line is approximately 300 feet in length and was installed at a slope of 0.40 percent with a drop manhole at the upstream end to allow the sewer line to be installed below a gas line and box culvert. There are only a few existing connections to this line and with the addition of flows from the Robertson Ranch West project, including 24 units from Gateshead Road to the north, the maximum depth-to-diameter (d/D) ratio in this section of line during peak flows is 0.58. While new 8-inch sewer lines are to be designed for a maximum d/D ratio of 0.5, it is reasonable to allow an existing gravity sewer to flow at a d/D ratio of up to 0.75 during ultimate peak flows before recommending replacement. This is the recommended offsite alternative and is shown graphically on Figure 3. Recommendations Sewer service can be provided to the Robertson Ranch West property by the City of Carlsbad. All onsite sewer lines are recommended as 8-inch with connections to the existing sewer line in El Camino Real. The existing 8-inch sewer line in El Camino Real will convey flow westerly to the 12-inch line in Kelly Drive and will experience d/D ratios of 0.35 to 0.58 during ultimate peak flows, including flow from 24 units along Gateshead Road to the north of the project. DEXTER WILSON ENGINEERING, INC. PAGE 7 L Erik Pfahler May 13. 2011 If you have any questions on the information contained herein, please let us know. Dexter Wilson Engineering, Inc. Stephen M. Nielsen SMN:ck I DEXTER WILSON ENGINEERING, INC. PAGE 8 EL CAMINO REAL '. CONNECT TO EXISTING SEWER 7 1; "-CONNECT TO LEGEND EXISTING 80 SEWER — EXISTING GRAVITY SEWER NOTE: ALL PROPOSED GRAVITY SEWER -+'- PROPOSED GRAVITY SEWER UNES ARE RECOMMENDED AS 8-IN0i. A; I // / - 00000, \/XI ; riURE 3 PROPOSED SEWER SYSTEM a APPENDIX A HYDRAULIC ANALYSIS SEWER STUDY SUMMARY DATE: 5/3/2011 FOR: Robertson Ranch West Sewer Study JOB NUMBER: 936-001 BY: Dexter Wilson Engineering FROM TO IN-LINE FLOW (gpd) AVG. DRY WE FLOW gp PEAKING DESIGNLINE PEAK WET WEATHER FLOW (DESIGNFACTOR_______ LINE SLOPE (%) DEPTH K. (1) dn (feet) dnlD(2) ve? VELOCITY Remarks M.G.D. C.F.S. 34 32 11,440 11,440 2.50 0.03 0.04 8 2.00 0.010148 0.07333 0.11 0.05 2.11848 PA 5 + Part PA 6 (28 units) 32 30 13,420 24,860 2.50 0.06 0.10 8 4.00 0.015594 0.08667 0.13 0.06 3.73053 Part PA 3(61 units) 30 16 31,840 56,700 2.50 0.14 0.22 8 4.00 0.035566 0.12667 0.19 0.10 4.79118 PA 4 + 1/2 PA 7 + 1/2 PA 8 24 22 16,280 16,280 2.50 0.04 0.06 8 4.00 0.010212 0.07333 0.11 0.05 3.01477 PA 9 + 24 units (Gateshead Road) PA 10 Part PA6(37 units)+ 1/2 PA 22 20 6,160 22,440 2.50 0.06 0.09 8 0.40 0.044512 0.14000 0.21 0.12 1.62892 20 18 28,940 51,380 2.50 0.13 0.20 8 1.90 0.046763 0.14000 0.21 0.12 3.72658 18 16 22,350 73,730 2.50 0.18 0.29 8 1.00 0.092497 0.20000 0.30 0.20 3.22469 PA 11 16 14 65,500 139,230 2.50 0.35 0.54 8 1.00 0.174669 0.28667 0.43 0.32 3.75286 1/2 PA 7 + flow from MH 30 14 12 3,360 142,590 2.50 0.36 0.55 8 1.40 0.151185 0.26000 0.39 0.28 4.36065 Existing Trailer Park (21 units) 12 10 6,160 148,750 2.50 0.37 0.58 8 2.40 0.120458 0.23333 0.35 0.25 5.28431 Portion PA 3 (21 Units) 10 8 1,830 150,580 2.50 0.38 0.58 8 2.00 0.133578 0.24667 0.37 0.26 4.96057 Existing Commercial (15,000 SF) 8 6 0 150,580 2.50 0.38 0.58 8 0.80 0.211206 0.31333 0.47 0.37 3.58083 6 4 0 150,580 2.50 0.38 0.58 8 0.80 0.211206 0.31333 0.47 0.37 3.58083 4 2 0 150,580 2.50 0.38 0.58 8 0.40 0.298690 0.38667 0.58 0.48 2.74755 'K' based on n = 0.011 2dn/D using Win Brater King Table 7-14 3 From Brater King Table 7-4 based on dn/D 11 CONNECT TO EXIS11NG SEVER i SCALE 1 a - 400' PROPOSED GRAVITY SEER LINES ARE RECOMMENDED AS 8—INCH. ç NODE AND PIPE DIAGRAM CA) COMPUTER MODEL NODE NUMBER EXIS11NG 8 SEWER 'a EXH1131T A - EXIS11NG GRAVITY SEWER 4..,.) NOTE: ALL PROPOSED GRAVITY SEWER