Loading...
HomeMy WebLinkAbout7507 JEREZ CT; ; AS140110; Permit9/14/22, 10:25 AM AS140110 Permit Data City of Carlsbad Sprinkler Permit Permit No: ASI40II0 Job Address: 7507 JEREZ CT Permit Type: SPRINK Parcel No: 2162900900 Lot #: 0 Reference No.: Status: ISSUED Applied 5/2/2014 Approved: 5/2/2014 Issued: 5/2/2014 PC #: Inspector: Project Title: LA COSTA VISTA MFD MULTI FAMILY CONDO AUTOMATIC FIRE SPRINKLER SYSTEM [13D] Applicant: SYMONS FIRE PROTECTION SUITE R 1050 PIONEER WAY EL CAJON, CA 619-588-6364 Owner: D S PRODUCTS INC C/O R L SFREDDO 24 AMBERLEAF IRVINE CA Fees ($) f Add'I Fees ($) Total ($) Balance ($) 402 0 402 0 about:blank 1/1 Oct-15-2012 06:56 AM CityofCar'lsbad Fire Prevention 6028561 2/3 CARLSBAD FIRE DEPARTMENT PREVENTION DIVISION 1635 FARADAY AVENUE CARLSBAD CA 92008 760-302-4665 Construction Permit Application Form Name of Pr ect: LIk ZAR... 1~ &If~ 7PcMQ Building Permit No: CB or Project l.D: - Contractor information Company Name G~90\6 c' Q-c&,flc*i Address \b17301 N2__..City L-CPb1_ —State (fr zip 2Q2 Phone: LlcJ _292tk.E-Mail:* . Contractor License Class and Number 'L_Lp_ Exp. Date: 2-I_i I_IüO1V. Do you currently have a business license on file with the City of Car bad? or No No: Name: NaLk 1z Ptrsignature U)7Tft'-11Date:___q Submit plans and completed permit application to: CARLSBAD FIRE PREVENTION 1635 FARADAY AVENUE CARLSBAD, CA 92008-7314 (760) 602-4665 Fax: (760) 602-8561 firemall@)carlsbadca.gov Office Hours are: M-TH 7:30 a.m. - 5:30 p.m. PST FRI 8:00 a.m. - 5:00 p.m. PSI To Schedule an Inspection: Ior inspections ONLY, please call (760) 602-4660, a minimum of two day. in advance. Calls will be returned by the end of the next business day. Inspection Hours are: 6:30 AM - 5:00 PM Re-inspection fees and Hydrant Flow Test fees must be paid at the above address prior to receiving an inspection. Inspection Pcrsonnel are prohibited by law from accepting payments In the field. All payments must be made at the address above. Plan Check status Inquiries: Allow at least 10 business days for plan review comments and/or approval. This office will contact you when the plans are approved I disapproved. Please include a self-addressed stamped envelope for mail return of plans. If after 10 business days you have not received a communication from our office, you my Contact us at 750.602-4655, by FAX to 760- 602-8561 or e-mail us at: flremaiIcarlsbadca,gov Revised 9/21/2012 A. C. Parsley Consulting 350 West 9' Avenue, Suite 206 RECEIVED Escondido, California 92025-5053 Phone (760) 745-6181 eMail: prsIeyco:muking(cox.net MAY 0 t 7,014 1 Welsic: Iip://www.parsleyconsultingeom Ai1 2014 p10 DrMItNL FWe Code Official City of Carlsbad Fire Department Office of Fire Protection Services 1635 Faraday Avenue Carlsbad, California 92008 Subject: Fire Sprinkler Review for La costa Vista, Plans 1-7, 7500 Jerez Court, Carlsbad, CA Dear Sir: We have reviewed the submittal as prepared by Symons Fire. Based on our review it is our opinion that the submittal isin substantial conformance with the applicable codes and standards in force at this time, including local adopted ordinances. Further submittal should not be required. Sincerely, PA EY Kenne~WagoneET Office Manager End (1) Working Drawings - 2 sets Hydraulic Calculations - 2 sets Review Comments Note: A copy of this letter has been transmitted via e-mail to Symons Fire on April 29, 2014 File I:\Plan Reviews\Rev2 14202.1 .Docx Parsley Consulting Plan Review Comments for La Costa Vista, Plans 1-7 page 2 of 2 1) The units must be separated by rated construction in order to be regarded as one or two family dwellings, as covered by NFPA 13D. This can be field verified. The following comments are for your information and will appear on every residential sprinkler review. The alarm bell must be capable of being heard, above background noise, with doors closed, in all living areas of the residence. This will be checked at final acceptance. Pressure required at base of riser will be verified to be available at time of final acceptance. Sprinkler heads are omitted from bathroom areas under 55 SF in area with noncombustible plumbing fixtures. Fixtures will be verified at final acceptance. Sprinkler head blockage or pattern disruption caused by beams or other obstructions will be verified to not exist at final acceptance inspection. Sprinkler heads should be located the proper distance from heat sources (stoves, kitchen ranges, fireplaces, heat diffusers, etc.) This will be checked at final acceptance inspection. Sprinkler heads located in an unconditioned space (garage, water heater closet, etc.) should be fast response type with an appropriate temperature rating, commercial heads are acceptable in these areas. All exposed piping shall be black steel or copper. Concealed piping can be CPVC plastic. File: I:\Plan Reviews\Rev214202.1.Docx 0,? Gregory Ryan From: Gregory Ryan Sent: - 26 Augusf2014'4:55 PM To: Robed Slempa; 'Tony Sfreddo' 150 Cc: Mike Lopez Subject: FD Access Spoke to Mr. Sfreddo this afternoon regarding his request to use Class 2 base for the interim access paving. I am OK with his proposal for foundations only and propose to re-evaluate prior to lumber-drop. If you are OK with this arrangement no need to respond to this e-mail. If you have any reservations, please let me know and we can discuss them off-line. Gregory L Ryan Deputy Fire Marshal 1635 Faraday Avenue Carlsbad CA 92009 Gregory. Ryan@carlsbadca.gov 01 760.602.4665 Dl 760.602.4663 Fl 760.602.8561 1 February 6, 2014 Greg Ryan City of Carlsbad Fire Department Dear Greg, I am proposing to use class II base rock as a temporary all weather surface on my project at 7500 Jerez Court, known as La Costa Vista, This would be the all weather surface provided for the Fire Department access to the project. I understand that it is my responsibility to maintain this surface to the fire departments satisfaction and sole discretion. I appreciate your consideration of this matter and look forward to your reply. Sincerely, Tony Sfreddo DS Products, inc. 24 Amberleaf, Irvine, CA 92614 9514101-0888 SYMONS FIRE PROTECTION, INC. 1050 PIONEER WAY, SUITE R EL CAJON, CA 92020 LICENSE C16-682025 HYDRAULIC CALCULATIONS FOR LA COSTA VISTA UNIT #1 *** 7'07 je7jM7_ C-i REMOTE AREA 2 HEAD CALC TYCO LF II CONC/FLAT These plans have heels es less ed fr iiiipalrii cs nipliance W1111 the eurrelil applicable codes an(i sa:ida:'d in folce Ill OIL: Jul'isdieiisin lile 5555 IlCI of Cislul Itclor lIla) 511111/c Ills 10 leo in suppoit sf an IppIleallorl jol if hulldulu pcI 0111 ssilh 111C explcss under lnldlll still 1111, es less of ISIS \5\ relics es Ille slis Ile'. Ill' ('ollllaclor or Owl' pRllessoilil ellellleer of ilhIIect lor sole respsslisihllu) lor 1,111i clslll[)llaI1cC 555111 salsl Codes ansi sl511da1'd srscludns he hulldlnC code sr ft), ally respssnsihillv 'or sleliciencies errors. 000sslosis or ncgligence in lhese l_H115 'slleilles' Or 11511 IlIllesi ill 11115 i'esiess Dil IL T1 i q evIess'er: Rl'('( >isl\IFNI I At'l'ROV,sl D b('I )l\lI NI) \l'l'kIl\ Al,, AS FILE NUMBER: 14-090 DATE: 4-7-14 -DESIGN DATA- OCCUPANCY CLASSIFICATION: R3 .05 gpm/256 sq. ft. 512 sq. ft. 2 sprinklers 28.3 gpm 33.3 gpm (5 gpm Hose STREAM) 28.3 gpm @ 35.9 psi 4.9 CANDI CAUDILLO CARLSBAD FIRE DEPT. 119 psi(-10% 107PSI) 118 psi 500 gpm CARLSBAD WATER DIST. 3-11-14 DENSITY: AREA OF APPLICATION: NUMBER OF SPRINKLERS CALCULATED: TOTAL SPRINKLER WATER FLOW REQUIRED TOTAL WATER REQUIRED (including hose) FLOW AND PRESSURE (@ NODE 5 BOR): SPRINKLER K-FACTOR (ORIFICE SIZE) DESIGN/LAYOUT BY: AUTHORITY HAVING JURISDICTION: WATER FLOW AVAILABILITY DATA: STATIC: RESIDUAL: FLOW: WATER DEPARTMENT: CALCULATIONS BY HASS COMPUTER PROGRAM HRS SYSTEMS, INC. ATLANTA, GA SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 1 DATE: 4/7/2014 C:\PROGRAM FILES\HRS SYSTEMS\HASS\14-090.SDF JOB TITLE: UNIT #1 - 2 HEAD CALC WATER SUPPLY DATA SOURCE STATIC RESID. FLOW AVAIL. TOTAL REQ'D NODE PRESS. PRESS. @ PRESS. @ DEMAND PRESS. TAG (PSI) (PSI) (GPM) (PSI) (GPM) (PSI) 1 107.0 106.0 500.0 107.0 33.3 64.8 AGGREGATE FLOW ANALYSIS: TOTAL FLOW AT SOURCE 33.3 GPM TOTAL HOSE STREAM ALLOWANCE AT SOURCE 0.0 GPM OTHER HOSE STREAM ALLOWANCES 5.0 GPM TOTAL DISCHARGE FROM ACTIVE SPRINKLERS 28.3 GPM NODE ANALYSIS DATA NODE TAG ELEVATION NODE TYPE PRESSURE DISCHARGE (FT) (PSI) (GPM) 1 0.0 SOURCE 64.8 33.3 2 3.0 - - - - 55.2 - - - 3 3.0 - - - - 51.2 4 5.0 - - - - 43.6 - - - 5 9.0 HOSE STREAM 35.9 5.0 6 15.0 - - - - 30.8 7 15.0 - - - - 24.8 8 15.0 - - - - 20.2 9 25.0 K= 4.90 9.8 15.3 10 25.0 - - - - 9.7 - - - 11 25.0 K= 4.90 7.0 13.0 SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 2 DATE: 4/7/2014 C:\PROGRAM FILES\HRS SYSTEMS\HASS\14-090.SDF JOB TITLE: UNIT #1 - 2 HEAD CALC PIPE DATA PIPE TAG Q(GPM) DIA(IN) LENGTH PRESS. END ELEV. NOZ. PT DISC. VEL(FPS) HW(C) (FT) SUM. NODES (FT) (K) (PSI) (GPM) FL/FT (PSI) Pipe: 1 33.3 0.995 FL 20.00 PF 8.3 1 0.0 SRCE 64.8 (N/A) 13.7 150 FTG TG FE -1.3 2 3.0 0.0 55.2 0.0 0.286 TL 29.00 PV Pipe: 2 FIXED PRESSURE LOSS DEVICE 2 3.0 0.0 55.2 0.0 4.0 psi, 33.3 gpm 3 3.0 0.0 51.2 0.0 Pipe: 3 33.3 1.054 PL 30.00 PF 6.7 3 3.0 0.0 51.2 0.0 12.3 150 FTG 1.0 FE -0.9 4 5.0 0.0 43.6 0.0 0.216 TL 31.00 PV Pipe: 4 33.3 1.025 PL 5.00 PF 5.9 4 5.0 0.0 43.6 0.0 13.0 150 FTG 19.0 FE -1.7 5 9.0 H.S. 35.9 5.0 0.248 TL 24.00 PV Pipe: 5 28.3 1.101 FL 6.00 PF 2.5 5 9.0 H.S. 35.9 5.0 9.5 120 FTG 7.0 PE -2.6 6 15.0 0.0 30.8 0.0 0.196 TL 13.00 PV Pipe: 6 28.3 1.101 FL 17.00 PF 6.0 6 15.0 0.0 30.8 0.0 9.5 150 FTG 29.0 PE 0.0 7 15.0 0.0 24.8 0.0 0.129 TL 46.00 PV Pipe: 7 10.9 0.874 PL 43.00 PF 4.6 7 15.0 0.0 24.8 0.0 5.8 150 FTG 25.0 PE 0.0 8 15.0 0.0 20.2 0.0 0.068 TL 68.00 PV Pipe: 8 10.9 0.874 FL 49.00 PF 6.2 8 15.0 0.0 20.2 0.0 5.8 150 FTG 42.0 FE -4.3 10 25.0 0.0 9.7 0.0 0.068 TL 91.00 PV Pipe: 9 17.4 0.874 FL 30.00 PF 10.7 7 15.0 0.0 24.8 0.0 9.3 150 FTG 36.0 FE -4.3 9 25.0 4.9 9.8 15.3 0.162 TL 66.00 PV Pipe: 10 2.1 0.874 FL 13.00 PF 0.1 9 25.0 4.9 9.8 15.3 1.1 150 FTG 14.0 FE 0.0 10 25.0 0.0 9.7 0.0 0.003 TL 27.00 PV Pipe: 11 13.0 0.874 FL 12.00 PF 2.6 10 25.0 0.0 9.7 0.0 7.0 150 FTG 16.0 FE 0.0 11 25.0 4.9 7.0 13.0 0.094 TL 28.00 PV SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 3 DATE: 4/7/2014 C:\PROGRAM FILES\HRS SYSTEMS\HASS\14-090.SDF JOB TITLE: UNIT #1 - 2 HEAD CALC NOTES (HASS) Calculations were performed by the HASS 8.4 computer program under license no. 38071930 granted by HRS Systems, Inc. 208 Southside Square Petersburg, TN 37144 (931) 659-9760 The system has been calculated to provide an average imbalance at each node of 0.003 gpm and a maximum imbalance at any node of 0.032 gpm. Total pressure at each node is used in balancing the system. Maximum water velocity is 13.7 ft/sec at pipe 1. Items listed in bold print on the cover sheet are automatically transferred from the calculation report. Available pressure at source node 1 under full flow conditions is 106.99 psi compared to the minimum required pressure of 20.00 psi. PIPE FITTINGS TABLE Pipe Table Name: FSS.PIP PAGE: * MATERIAL: S40 HWC: 120 Diameter Equivalent Fitting Lengths in Feet (in) E T L C B G A D N Ell Tee LngEll ChkVlv BfyVlv GatVlv AlmChk DPVlv NPTee 1.054 2.05 5.12 2.05 5.12 6.14 1.02 10.23 10.23 5.12 PAGE: H MATERIAL: CPVC HWC: 150 Diameter Equivalent Fitting Lengths in Feet (in) E T R K C L B L Ell Tee TEERUN COUPLG EL45 0.874 5.00 3.00 1.00 0.00 1.00 1.00 0.00 1.00 1.101 7.00 5.00 1.00 0.00 1.00 1.00 0.00 1.00 PAGE: I MATERIAL: CPPR-L HWC: 150 Diameter Equivalent Fitting Lengths in Feet (in) E T L C B G A D Ell Tee 1.025 3.00 8.00 2.00 8.00 2.00 2.00 0.00 0.00 SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 4 DATE: 4/7/2014 C:\PROGRAM FILES\HRS SYSTEMS\HASS\14-090.SDF JOB T±TLE: UNIT #1 - 2 HEAD CALC PAGE: K MATERIAL: CPPR-K HWC: 150 Diameter Equivalent Fitting Lengths in Feet (in) E T L C B G A D Eli Tee L 0.995 2.00 6.00 1.50 0.00 0.00 3.00 0.00 0.00 U)U) a Ci U) aoo o CiC) U) • • 0 CUc) o U) c) CUCfl Q4 (0 Lfl Cia)) U) W a H a a)a) HU) o ( a Q) -C) ,-HO Ci Ci - Hr--O>, (_ -H • ir-C/)U) (ULO 04 CD 7/71 0 H H -C H Cl) a) I H co CD 04 CD -1 H I) ( C --C C C C- 0 0 0 SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 5 DATE: 4/7/2014 C:\PROGRAM FILES\HRS SYSTEMS\HASS\14-090.SDF JOE TITLE: UNIT #1 — 2 HEAD CALC 0 0 0 0 0 0 0 H 0 0 0 0 0 0• 0 0 co CD C') H H SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 6 DATE: 4/7/2014 C:\PROGRAM FILES\HRS SYSTEMS\HASS\14-090.SDF TOB TITLE: UNIT #1 - 2 HEAD CALC WATER SUPPLY CURVE * <-106.0 Psi @.500 gpm Flow Test Point 99+ 90+ 81+ P 72+ R I S S X 5 63+ U I R E I 54+ P S I I 45+ 36+ 27+ 18+ LEGEND IT I if X = Required Water Supply IT I 64.77 psi @ 33.3 gpm VT 9+ if I 0 = Available Water Supply if 106.99 psi @ 33.3 gpm It IT +------+--------+--------+---------+-----------+ 200 300 400 500 600 700 800 900 1000 FLOW (GPM) SYMONS FIRE PROTECTION, INC. 1050 PIONEER WAY, SUITE R EL CAJON, CA 92020 LICENSE C16-682025 HYDRAULIC CALCULATIONS FOR LA COSTA VISTA *** UNIT #2 7O7 1 c ez &f REMOTE AREA 2 HEAD CALC TYCO LF II CONC/FLAT FILE NUMBER: 14-090 DATE: 4-7-14 -DESIGN DATA- OCCUPANCY CLASSIFICATION: DENSITY: AREA OF APPLICATION: NUMBER OF SPRINKLERS CALCULATED: TOTAL SPRINKLER WATER FLOW REQUIRED: TOTAL WATER REQUIRED (including hose) FLOW AND PRESSURE (@ NODE 5 BOR): SPRINKLER K-FACTOR (ORIFICE SIZE): DESIGN/LAYOUT BY: AUTHORITY HAVING JURISDICTION: WATER FLOW AVAILABILITY DATA: STATIC: RESIDUAL: FLOW: WATER DEPARTMENT: R3 .05 gpm/256 sq. ft. 512 sq. ft. 2 sprinklers 28.4 gpm 33.4 gpm (5 gpm Hose STREAM) 28.4 gpm @ 36.8 psi 4.9 CANDI CAUDILLO CARLSBAD FIRE DEPT. 119 psi(-10% 107PSI) 118 psi 500 gpm CARLSBAD WATER DIST. 3-11-14 CALCULATIONS BY HASS COMPUTER PROGRAM HRS SYSTEMS, INC. ATLANTA, GA SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 1 DATE: (4/7/2014 C:\PROGRAM FILES\HRS SYSTEMS\HASS\14-090--1.SDF JOE TITLE: UNIT #2 - 2 HEAD CALC WATER SUPPLY DATA SOURCE STATIC RESID. FLOW AVAIL. TOTAL REQ'D NODE PRESS. PRESS. @ PRESS. .@ DEMAND PRESS. TAG (PSI) (PSI) (GPM) (PSI) (GPM) (PSI) 1 107.0 106.0 500.0 107.0 33.4 70.1 AGGREGATE FLOW ANALYSIS: TOTAL FLOW AT SOURCE 33.4 GPM TOTAL HOSE STREAM ALLOWANCE AT SOURCE 0.0 GPM OTHER HOSE STREAM ALLOWANCES 5.0 GPM TOTAL DISCHARGE FROM ACTIVE SPRINKLERS 28.4 GPM NODE ANALYSIS DATA NODE TAG ELEVATION NODE TYPE PRESSURE DISCHARGE (FT) (PSI) (GPM) 1 0.0 SOURCE 70.1 33.4 2 3.0 - - - - 60.4 3 3.0 - - - - 56.4 - - - 4 5.0 - - - - 44.5 - - - 5 9.0 HOSE STREAM 36.8 5.0 6 15.0 - - - - 31.7 - - - 7 15.0 - - - - 27.9 - - - 8 15.0 - - - - 22.2 - - - 9 25.0 K= 4.90 9.8 15.3 10 25.0 - - - - 12.1 - - - 11 25.0 - - - - 9.7 - - - 12 25.0 K= 4.90 7.0 13.0 SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 2 DATE: 4/7/2014 C:\PROGRAM FILES\HRS SYSTEMS\HASS\14-090-1.SDF 30B TITLE: UNIT #2 - 2 HEAD CALC PIPE DATA PIPE TAG Q(GPM) DIA(IN) LENGTH PRESS. END ELEV. NOZ. PT DISC. VEL(FPS) HW(C) (FT) SUM. NODES (FT) (K) (PSI) (GPM) FL/FT (PSI) Pipe: 1 33.4 0.995 PL 20.00 PF 8.3 1 0.0 SRCE 70.1 (N/A) 13.8 150 FTG TG PE -1.3 2 3.0 0.0 60.4 0.0 0.287 TL 29.00 PV Pipe: 2 FIXED PRESSURE LOSS DEVICE 2 3.0 0.0 60.4 0.0 4.0 psi, 33.3 gpm 3 3.0 0.0 56.4 0.0 Pipe: 3 33.3 1.054 PL 50.00 FE' 11.0 3 3.0 0.0 56.4 0.0 12.3 150 FTG 1.0 FE -0.9 4 5.0 0.0 44.5 0.0 0.217 TL 51.00 PV Pipe: 4 33.3 1.025 FL 5.00 FE' 6.0 4 5.0 0.0 44.5 0.0 13.0 150 FTG 19.0 FE -1.7 5 9.0 H.S. 36.8 5.0 0.248 TL 24.00 PV Pipe: 5 28.3 1.101 PL 6.00 FE' 2.5 5 9.0 H.S. 36.8 5.0 9.6 120 FTG 7.0 PE -2.6 6 15.0 0.0 31.7 0.0 0.196 TL 13.00 PV Pipe: 6 28.3 1.101 PL 7.00 PF 3.8 6 15.0 0.0 31.7 0.0 9.6 150 FTG 22.0 PE 0.0 7 15.0 0.0 27.9 0.0 0.130 TL 29.00 PV Pipe: 7 10.3 0.874 PL 54.00 PF 5.7 7 15.0 0.0 27.9 0.0 5.5 150 FTG 38.0 PE 0.0 8 15.0 0.0 22.2 0.0 0.062 TL 92.00 PV Pipe: 8 10.3 0.874 FL 51.00 FE' 5.8 8 15.0 0.0 22.2 0.0 5.5 150 FTG 43.0 PE -4.3 10 25.0 0.0 12.1 0.0 0.062 TL 94.00 PV Pipe: 9 10.3 0.874 PL 22.00 FE' 2.4 10 25.0 0.0 12.1 0.0 5.5 150 FTG 17.0 PR 0.0 11 25.0 0.0 9.7 0.0 0.062 TL 39.00 PV Pipe: 10 18.0 0.874 FL 38.00 FE' 13.8 7 15.0 0.0 27.9 0.0 9.6 150 FTG 42.0 PE -4.3 9 25.0 4.9 9.8 15.3 0.172 TL 80.00 PV Pipe: 11 2.7 0.874 PL 10.00 PE' 0.1 9 25.0 4.9 9.8 15.3 1.4 150 FTG 14.0 PE 0.0 11 25.0 0.0 9.7 0.0 0.005 TL 24.00 PV Pipe: 12 13.0 0.874 PL 13.00 FE' 2.6 11 25.0 0.0 9.7 0.0 7.0 150 FTG 15.0 FE 0.0 12 25.0 4.9 7.0 13.0 0.094 TL 28.00 PV SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 3 DATE: 4/7/2014 C:\PROGRAM FILES\HRS SYSTEMS\HASS\14-090-l.SDF JOB TITLE: UNIT #2 - 2 HEAD CALC NOTES (HASS) Calculations were performed by the HASS 8.4 computer program under license no. 38071930 granted by HRS Systems, Inc. 208 Southside Square Petersburg, TN 37144 (931) 659-9760 The system has been calculated to provide an average imbalance at each node of 0.006 gpm and a maximum imbalance at any node of 0.064 gpm. Total pressure at each node is used in balancing the system. Maximum water velocity is 13.8 ft/sec at pipe 1. Items listed in bold print on the cover sheet are automatically transferred from the calculation report. Available pressure at source node 1 under full flow conditions is 106.99 psi compared to the minimum required pressure of 20.00 psi. PIPE FITTINGS TABLE Pipe Table Name: FSS.PIP PAGE: * MATERIAL: S40 HWC: 120 Diameter Equivalent Fitting Lengths in Feet (in) E T L C B G A D N Ell Tee LngEll ChkVlv BfyVlv GatVlv AlmChk DPVlv NPTee 1.054 2.05 5.12 2.05 5.12 6.14 1.02 10.23 10.23 5.12 PAGE: H MATERIAL: CPVC HWC: 150 Diameter Equivalent Fitting Lengths in Feet (in) E 1 R K C L B L Ell Tee TEERUN COUPLG EL45 0.874 5.00 3.00 1.00 0.00 1.00 1.00 0.00 1.00 1.101 7.00 5.00 1.00 0.00 1.00 1.00 0.00 1.00 PAGE: I MATERIAL: CPPR-L HWC: 150 Diameter Equivalent Fitting Lengths in Feet (in) E T L C B G A D Eli Tee 1.025 3.00 8.00 2.00 8.00 2.00 2.00 0.00 0.00 SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 4 DATE: ,4/7/2014 C:\PROGRAM FILES\HRS SYSTEMS\HASS\14-090-l.SDF JOB TITLE: UNIT #2 - 2 HEAD CALC PAGE: K MATERIAL: CPPR-K HWC: 150 Diameter Equivalent Fitting Lengths in Feet (in) E T L C B G A D Eli Tee L 0.995 2.00 6.00 1.50 0.00 0.00 3.00 0.00 0.00 SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 5 DATE: 4/7/2014 C:\PROGRAM FILES\HRS SYSTEMS\HASS\14-090-1.SDF JOB TtTLE: UNIT #2 - 2 HEAD CALC UJG) Q C/ U) O- CJU J • • (ocn U)c' U)c/)QU) C) C)co m ) Q)Q - 'm co -H /) C)(I) -'-lC)E -. HZ U) RIO 0 > CD -H • DU)U) (UD )J'• cPQ•• 04 ) I I) C) I r) ) I ) I --C - -c --C H (Ni o 0 o 0 0 0 cC H 0 C) 0 0 0 0 0 C-N 0 0 (N H CD CUU) 00 J)U)C)U) —QU)-H---- I SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 6 DATE: 4/7/2014 C:\PROGRAM FILES\HRS SYSTEMS\HASS\14-090-1.SDF JOB TiTLE: UNIT #2 - 2 HEAD CALC WATER SUPPLY CURVE * <-106.0 psi @ 500 gpm Flow Test Point 99+ 90+ 81+ P 72+ R X E I S S 63+ U I R I El 54+ P I S I I 45+ 36+ 27+ 18+ LEGEND I X = Required Water Supply 70.05 psi @ 33.4 gpm 9+ I 0 = Available Water Supply 106.99 psi @ 33.4 gpm 0++-+---+----+-----+------+--------+--------+---------+-----------+ 200 300 400 500 600 700 800 900 1000 FLOW (GPM) SYMONS FIRE PROTECTION, INC. 1050 PIONEER WAY, SUITE R EL CAJON, CA 92020 LICENSE C16-682025 HYDRAULIC CALCULATIONS FOR LA COSTA VISTA UNIT #3 757 4z REMOTE AREA 2 HEAD CALC TYCO LF II CONC/FLAT FILE NUMBER: 14-090 DATE: 4-23-14 -DESIGN DATA- OCCUPANCY CLASSIFICATION: DENSITY: AREA OF APPLICATION: NUMBER OF SPRINKLERS CALCULATED TOTAL SPRINKLER WATER FLOW REQUIRED: TOTAL WATER REQUIRED (including hose) FLOW AND PRESSURE (@ NODE 5 BOR): SPRINKLER K-FACTOR (ORIFICE SIZE): DESIGN/LAYOUT BY: AUTHORITY HAVING JURISDICTION: WATER FLOW AVAILABILITY DATA: STATIC: RESIDUAL: FLOW: WATER DEPARTMENT: R3 .05 gpm/256 sq. ft. 512 sq. ft. 2 sprinklers 28.4 gpm 33.4 gpm (5 gpm Hose STREAM) 28.4 gpm @ 36.4 psi 4.9 CANDI CAUDILLO CARLSBAD FIRE DEPT. 119 psi(-10% 107PSI) 118 psi 500 gpm CARLSBAD WATER 3-11-14 CALCULATIONS BY HASS COMPUTER PROGRAM HRS SYSTEMS, INC. ATLANTA, GA SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 1 DATE: 4/23/2014 C:\PROGRAM FILES\HRS SYSTEMS\HASS\14-090--2.SDF JOB TITLE: UNIT #3 - 2 HEAD CALC WATER SUPPLY DATA SOURCE STATIC RESID. FLOW AVAIL. TOTAL REQ'D NODE PRESS. PRESS. @ PRESS. @ DEMAND PRESS. TAG (PSI) (PSI) (GPM) (PSI) (GPM) (PSI) 1 107.0 106.0 500.0 107.0 33.4 80.5 AGGREGATE FLOW ANALYSIS: TOTAL FLOW AT SOURCE 33.4 GPM TOTAL HOSE STREAM ALLOWANCE AT SOURCE 0.0 GPM OTHER HOSE STREAM ALLOWANCES 5.0 GPM TOTAL DISCHARGE FROM ACTIVE SPRINKLERS 28.4 GPM NODE ANALYSIS DATA NODE TAG ELEVATION NODE TYPE PRESSURE DISCHARGE (PT) (PSI) (GPM) 1 0.0 SOURCE 80.5 33.4 2 3.0 - - - - 70.8 - - - 3 3.0 - - - - 66.8 - - - 4 5.0 - - - - 44.1 - - - 5 9.0 HOSE STREAM 36.4 5.0 6 15.0 - - - - 31.3 7 15.0 ---- 27.5 8 15.0 - - - - 21.9 - - - 9 25.0 - - - - 12.0 - - - 10 25.0 - - - - 9.7 - - - 11 25.0 K= 4.90 9.8 15.4 12 25.0 K= 4.90 7.0 13.0 SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 2 DATE: 4/23/2014 C:\FROGRAM FILES\HRS SYSTEMS\HASS\14-090-2.SDF JOB TITTLE: UNIT #3 - 2 HEAD CALC PIPE DATA PIPE TAG Q(GPM) DIA(IN) LENGTH PRESS. END ELEV. NOZ. PT DISC. VEL(FPS) HW(C) (FT) SUM. NODES (FT) (K) (PSI) (GPM) FL/FT (PSI) Pipe: 1 33.4 0.995 PL 20.00 PF 8.3 1 0.0 SRCE 80.5 (N/A) 13.8 150 FTG TG PE -1.3 2 3.0 0.0 70.8 0.0 0.287 TL 29.00 PV Pipe: 2 FIXED PRESSURE LOSS DEVICE 2 3.0 0.0 70.8 0.0 4.0 psi, 33.3 gpm 3 3.0 0.0 66.8 0.0 Pipe: 3 33.4 1.054 PL 100.00 PF 21.9 3 3.0 0.0 66.8 0.0 12.3 150 FTG 1.0 PS -0.9 4 5.0 0.0 44.1 0.0 0.217 TL 101.00 PV Pipe: 4 33.4 1.025 FL 5.00 PF 6.0 4 5.0 0.0 44.1 0.0 13.0 150 FTG 19.0 PE -1.7 5 9.0 H.S. 36.4 5.0 0.248 TL 24.00 PV Pipe: 5 28.4 1.101 PL 6.00 PF 2.5 5 9.0 H.S. 36.4 5.0 9.6 120 FTG 7.0 PE -2.6 6 15.0 0.0 31.3 0.0 0.196 TL 13.00 PV Pipe: 6 28.4 1.101 PL 7.00 PF 3.8 6 15.0 0.0 31.3 0.0 9.6 150 FTG 22.0 PE 0.0 7 15.0 0.0 27.5 0.0 0.130 TL 29.00 PV Pipe: 7 10.2 0.874 PL 55.00 PF 5.6 7 15.0 0.0 27.5 0.0 5.4 150 FTG 38.0 PE 0.0 8 15.0 0.0 21.9 0.0 0.060 TL 93.00 PV Pipe: 8 10.2 0.874 PL 50.00 PF 5.6 8 15.0 0.0 21.9 0.0 5.4 150 FTG 43.0 PE -4.3 9 25.0 0.0 12.0 0.0 0.060 TL 93.00 PV Pipe: 9 10.2 0.874 PL 22.00 PF 2.3 9 25.0 0.0 12.0 0.0 5.4 150 FTG 17.0 PE 0.0 10 25.0 0.0 9.7 0.0 0.060 TL 39.00 PV Pipe: 10 18.2 0.874 PL 39.00 PF 13.3 7 15.0 0.0 27.5 0.0 9.7 150 FTG 37.0 PE -4.3 11 25.0 4.9 9.8 15.4 0.176 TL 76.00 PV Pipe: 11 -2.8 0.874 FL 10.00 PF 0.1 10 25.0 0.0 9.7 0.0 1.5 150 FTG 14.0 PE 0.0 11 25.0 4.9 9.8 15.4 0.006 TL 24.00 PV Pipe: 12 13.0 0.874 PL 13.00 PF 2.6 10 25.0 0.0 9.7 0.0 7.0 150 FTG 15.0 PE 0.0 12 25.0 4.9 7.0 13.0 0.094 TL 28.00 PV SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 3 DATE: 4/23/2014 C:\PROGRAM FILES\HRS SYSTEMS\HASS\14-090-2.SDF JOB TITLE: UNIT #3 - 2 HEAD CALC NOTES (HASS) Calculations were performed by the HASS 8.4 computer program under license no. 38071930 granted by HRS Systems, Inc. 208 Southside Square Petersburg, TN 37144 (931) 659-9760 The system has been calculated to provide an average imbalance at each node of 0.013 gpm and a maximum imbalance at any node of 0.145 gpm. Total pressure at each node is used in balancing the system. Maximum water velocity is 13.8 ft/sec at pipe 1. Items listed in bold print on the cover sheet are automatically transferred from the calculation report. Available pressure at source node 1 under full flow conditio n s i s 106.99 psi compared to the minimum required pressure of 20.00 ps i . PIPE FITTINGS TABLE Pipe Table Name: FSS.PIP PAGE: * MATERIAL: S40 HWC: 120 Diameter Equivalent Fitting Lengths in Feet (in) E T L C B G A D N Eli Tee LngEll ChkVlv BfyVlv GatVlv AlmChk DPVlv NPTee 1.054 2.05 5.12 2.05 5.12 6.14 1.02 10.23 10.23 5.12 PAGE: H MATERIAL: CPVC HWC: 150 Diameter Equivalent Fitting Lengths in Feet (in) E T R K C L B L Eli Tee TEERUN COUPLG EL45 0.874 5.00 3.00 1.00 0.00 1.00 1.00 0.00 1.00 1.101 7.00 5.00 1.00 0.00 1.00 1.00 0.00 1.00 PAGE: I MATERIAL: CPPR-L HWC: 150 Diameter Equivalent Fitting Lengths in Feet (in) E T L C B G A D Eli Tee 1.025 3.00 8.00 2.00 8.00 2.00 2.00 0.00 0.00 SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 4 DATE: 4/23/2014 C:\PROGRAM FILES\HRS SYSTEMS\HASS\14-090-2.SDF JOE TITLE: UNIT #3 - 2 HEAD CALC PAGE: K MATERIAL: CPPR-K HWC: 150 Diameter Equivalent Fitting Lengths in Feet (in) E T L C B G A D Ell Tee L 0.995 2.00 6.00 1.50 0.00 0.00 3.00 0.00 0.00 E a U) u U) • • U)() (n( (-) 04 (0 I) U) u)coa U) U) a (n )0 H a o H a - U) U U) HZ IUO -1I U) --1cOO> (_9 ,-1 Ct)Cf) HE U)D L . Y aiD.. CD 0 H 0 H Cl) a) I H U) j D H C-) H I-) 1) 0 0 0 05 SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 5 DATE: ,4/23/2014 C:\PROGRAM FILES\HRS SYSTEMS\HASS\14-090-2.SDF 3OB TITLE: UNIT #3 - 2 HEAD CALC 0) 0 0 0 0 0 c 0) 0 co vH o 0 . . • CD 0 0 0 CC) C') a:1U)wa:1) -QU)-H---- SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 6 DATE: .4/23/2014 C:\PROGRAM FILES\HRS SYSTEMS\HASS\14-090--2.SDF JOB TITLE: UNIT #3 - 2 HEAD CALC WATER SUPPLY CURVE * <-106.0 psi @.500 gpm Flow Test Point 99+ 90+ 81X P 72+ R E I S I 5 63+ U I R I E I 54+ P I S I 45+ 36+ 27+ 18+ LEGEND I I, I X = Required Water Supply 80.48 psi @ 33.4 gpm 9+ I 0 = Available Water Supply 106.99 psi @ 33.4 gpm 0++-+---+----+-----+------+--------+--------+---------+-----------+ 200 300 400 500 600 700 800 900 1000 FLOW (GPM)