HomeMy WebLinkAbout6269 EL FUERTE ST; ; AS110134; PermitCity of Carlsbad Sprinkler Permit Permit No: AS110134 Job Address: 6269 EL FUERTE ST Permit Type: SPRINK Parcel No: 2131221400 Lot #: 0 Reference No.: PC #: Status: ISSUED Applied 9/14/2011 Approved: 9/13/2011 Issued: 9/13/2011 Inspector: Project Title: PACIFIC RIDGE H.S. - GYMNASIUM FIRE SPRINKLER SYSTEM FOR NEW GYMNASIUM Applicant: EPIC FIRE PROTECTION, INC. 765 TURTLE POINT WY SAN MARCOS, CA 760-310-6122 Owner: P R S ACQUISITION&CONSTRUCTION L LC 6269 EL FUERTE ST CARLSBAD CA Fees ($) Add'I Fees ($) Total ($) Balance ($) 1,408 0 1,408 0 Pacific Ridge Gymnasium Review Comments. Page 2 Review Comments Pacific Ridge Gymnasium, 6269 El Fuerte Street, Carlsbad, CA I. Our only comment is that the underground entrance to the building may not be in conformance with the Carlsbad policy regarding entrance to the building above grade. The underground installation is done by others, and was not a part of this review. This can be field verified to conform, and may result in revisions being required. No resubmittal should be required. -- Carlsbad Municipal Water District Potab!e Water Discharge LE C Ü PY Event Report Date: Location: V Reason for Discharge Event: L ftw flof\J Type of Event: Initial Dewatering Water Mains IA- Estimated Discharge Flow: Note: Includes flow testing and flushing Dewatering Reservoirs Start Time 2 Unscheduled Water Discharge )A- End Time Pre-Dechlorination Residual: O. 1 Clear flow path of debris, surface contaminants and/or hazardous Post-Dechlorination Residual: 0. I materials. Do not remove native (less than 0.1 mg/L) vegetation. _____ pH within limits of 6.0 and 9.0 Erosion control, i.e. sandbags, silt fencing, hay bales, gravel bags, decreasing the velocity of discharge water. Upon completion of dewatering, ensure that the flow path is free of all temporary erosion prevention materials. Upon completion completion of dewatering, ensure that any sediment or silted areas are cleared. Water Sampling Performed by: Comments: Submitted by: Reviewd by: (Name & Date) me & Date) Flow Test Record Test Hydrant Location 2.Qf'i. L_ / Hydrant ID No. Size Main Static............... Residual.......... Pressure Drop.. 4-. (PDI 1).....K factor for PDI 1 Z.\ Flow Hydrant(s) Hydrant 1 location 42i Hydrant 2 location Hydrant 3 location Hydrant I Pitot\A. PSI GPM: 144,g Size of Orifice__________ Hydrant 2 Pitot PSI GPM: Size of Orifice___________ Hydrant 3 Pitot PSI GPM: Size of Orifice.__________ Total: Calculated test and flow data - p x PD2 k =Q2 PDI*k Static: .................... I'm Desired Residual.......20 Pressure Drop (PD 2) K factor PD 2:\2. 0'2- - 144c.7 x \2 .02_- divided b 1Z. k equals 2$? GPM at 20 psi residual Q PD2k PD1k Q2 Comments: Test conducted for: Conducted by:L'C- fljZ. fl2CT t1OI / fr, Date: 44-1 Time:__________ Flow Test Record Formulas GPM-Flow 2V" 4" PSI GPM PSI GPM PSI GPM PSI GPM 1 170 16 670 1 430 16 1720 2 240 17 690 2 610 17 1770 3 290 18 710 3 740 18 1820 4 340 19 730 4 860 19 1870 5 380 20 750 5 960 20 1920 6 410 22 790 6 1050 22 2020 7 440 24 820 7 1140 24 2110 8 480 26 860 8 1220 26 2190 9 500 28 890 9 1290 28 2280 10 530 30 920 10 1360 30 2330 11 560 33 950 11 1430 32 2430 12 580 34 980 12 1490 34 2510 13 610 36 1010 13 1550 36 2580 14 630 38 1040 14 1610 38 2650 15 650 40 1060 15 1660 40 2720 K Factor Formula PD K PD K PD K PD K PD K 1= 1.0 21= 5.18 41= 7.43 61= 9.21 81= 10.73 2= 1.45 22= 5.31 42= 7.53 62= 9.29 82= 10.80 3= 1.81 23= 5.44 43= 7.62 63= 9.37 83= 10.87 4= 2.11 24= 5.56 44= 7.72 64= 9.45 84= 10.94 5= 2.39 25= 5.69 . 45= 7.81 65= 9.53 85= 11.01 6= 2.63 26= 5.81 46= 7.91 66= 9.61 86= 11.08 7= 2.86 27= 5.93 47= 8.00 67= 9.69 87= 11.15 8= 3.07 28= 6.05 48= 8.09 68= 9.76 88= 11.22 9= 3.28 29= 6.16 49= 8.18 69= 9.84 89= 11.29 10= 3.47 30= 6.28 50= 8.27 70= 9.92 90= 11.36 11= 3.65 31= 6.39 51= 8.36 71= 9.99 91= 11.43 12= 3.83 32= 6.50 52= 8.44 72= 10.07 92= 11.49 13= 4.00 33= 6.61 53= 8.53 73= 10.14 93= 11.56 14= 4.16 34= 6.71 54= 8.64 74= 10.22 94= 11.63 15= 4.32 35= 6.82 55= 8.71 75= 10.29 95 11.69 16= 4.48 36= 6.93 56= 8.79 76 10.37 96= 11.76 17= 4.72 37= 7.03 57= 8.88 77= 10.44 97= 11.83 18= 4.76 38= 7.13 58= 8.96 78= 10.51 ,98= 11.89 19= 4.90 39= 7.23 59= 9.04 79= 10.59 99= 11.96 20= 5.04 40= 7.33 60= 9.12 . 80= 10.66' 100= 12.02 *PD = Pressure drop K = K factor Mea of Spiin1c1e Operation 1950 SQ FT System Type Density .10 Z Wet LI Dry LI] Deluge LI Pre-Action Area Per Sprinkler. 20x20 MAX Sprinkler or Nozzle Hose Allowance GPM: Inside 0 Make TYCO Model EC-1 1 Hose Allowance GPM: Outside 100 Size %" K-Factor: 11.2 Rack Sprinkler Allowance Temperature Rating 200 a., .2 CALCULATION SUMMARY A EPIC FIRE PROTECTION, INC. 765 TURTLE POINT WAY SAN MARCOS, CA 92069 (760) 310-6122 FAX (760) 798-0556 ASuot&1- Hydraulic Design information Sheet Name: PACIFIC RIDGE GYMNASIUM - GYM AREA Date: 6-27-11 Location: 6269 EL FUERTE, CARLSBAD Building: NEW System No. Contractor: EPIC FIRE PROTECTION, INC. Contract No. Calculated By: RAE Drawing No. Construction: [] Combustible Non-Combustible Ceiling Height SYSTEM DESIGN NFPA 13: M Light Hazard Ordinary Hazard Group I 2Li3 [Ii] NFPA 231 -LI NFPA 231C: Figure: Curve: [] Other (Specify) ESpecific Ruling Made By 1 OF 1 2 OF 2 25' Ft. Extra Hazard Date GPM Required 283.02 PSI Required 72.07 At Base of Riser "C" Factor Used: Overhead 120 Underground 150 WATER SUPPLY Water Flow Test Pump Data Tank or Reservoir Date & Time 4-4-11 Rated Capacity Capacity Static PSI 128 At PSI Elevation Residual PSI 124 Elevation GPM Flowing 1440 Well Elevation 0 Proof Flow GPM Location SITE Source of Information FLOW TEST BY EPIC FIRE AND CARLSBAD WATER DEPT. COMMODITY STOKAUE Commodity GYM Class Location Storage Height Area Aisle Width Storage Method: Solid Piled % Palletized % Rack Rack LI Single Row LI Conventional Pallet LI Double Row LI Slave Pallet Li Multiple Row Li Open Flue Spacing In Inches Longitudinal Transverse - Horizontal Barriers Provided LI Automatic Storage LI Encapsulated LI Solid Shelving LI Non-Encapsulated Clearance From Top of Storage to Ceiling Ft. In. 2 2 2: 2: 2 2 1 1 1 1 1 1 1: I 1 I PACIFIC RIDGE GYMNASIUM - GYM .10/1950 Sigma Dynamics Corporation 7700 Supply I Demand Graph 40 30 - Margin Pressure 33.93 PSI Flow 4477.04 GPM - ____ _____ _____ _____ ______ ______ _______ _______ _J 10 DO 90 80 70 60 50 40 30 20 10 00 90 80 Hi 70 60 50 -1 An ., 30 2 D 10 0 N185 200 400 600 800 1000 1200 1400 1600 1800 20 Water. Flow (GPM) System Demand.. Sprinkler Demand 80.78 PSI @ 283.02 GPM Additional Flows 100.00 GPM Hose at Source 0.00 GPM Total Demand 80.95 PSI @ 383.02 GPM Water Supply.. Static 115.20 PSI Residual 111.60 PSI @ 1440.00 GPM Elevation 0.00 PSI 00 SUBMITTAL SERIAL NO:2932HY7 PACIFIC RIDGE GYMNASIUM - GYM .10/1950 FLOW TEST RESULTS Water Supply STATIC 115.20 PSI RESIDUAL 111.60 PSI @ 1440.00 GPM CITY PRESSURE AVAILABLE AT 383.0 GPM 06-30-2011 PAGE 1 114.89 PSI SUMMARY OF SPRINKLER OUTFLOWS ACTUAL MINIMUM SPR FI,OW FLOW K-FACTOR PRESSURE 100 40.62 33.00 11.20 13.15 101 40.53 33.00 11.20 13.10 102 34.79 33.00 11.20 9.65 103 34.71 33.00 11.20 9.61 104 33.07 33.00 11.20 8.72 105 33.00 33.00 11.20 8.68 106 66.31 33.00 11.20 35.05 TOTAL WATER REQUIRED FOR SYSTEM 283.02 GPM OUTFLOWS AT 1 100.00 GPM TOTAL WATER REQUIREMENT 383.02 GPM PRESSURE REQUIRED AT 0 80.95 PSI MAXIMUM PRESSURE UNBALANCE IN LOOPS 0.00 PSI MAXIMUM VELOCITY FROM 10 TO 15 18.78 FPS SUBMITTAL SERIAL NO :293 2HY7 PACIFIC RIDGE GYMNASIUM - GYM .10/1950 Location Flow Pipe Fittings in Size From To GPM IN Devices 103 105 1.536 L Q 33.00 F=0 F EN T 101 103DQ 34.71 1.536 L Q 67.71 F=0 F EN T 16 101DQ 40.53 1.536 L Q 108.24 F=E F EN T 11 16 1.536 L Q 108.24 F=T F NR T 14 106 - 1.536 L Q 66.31 F=E F EN T 9 14 1.536 L Q €6.31 F=T F NR T 102 ------------------ 104 1.536 L Q 33.07 F=0 F EN T 100 1021JQ 34.79 1.536 L Q 67.86 F=0 F EN T 15 100DQ 40.62 1.536 L Q 108.47 F=E F BN T 10 15 1.536 L Q 108.47 F=T F NR T 10 ------------------ 11 3.314 L Q 108.24 F=0 F FM T 06-30-2011 PAGE 2 Equiv Friction Pressure Length Loss Summary Ft PSI/Ft PSI 18.00 C120 PT 8.68 (105) 0.00 PE 0.00 18.00 0.0513 PF 0.92 18.00 C=120 PT 9.60 (103) 0.00 PE 0.00 18.00 0.1939 PF 3.49 58.00 C=120 PT 13.09 (101) 3.60 PE 0.00 61.60 0.4619 PF 28.45 6.00 C=120 PT 41.54 ( 16) 8.90 PE 2.60 14.90 0.4619 PF 6.88 PT 51.02 ( 11) 58.00 C=120 PT 35.05 (106) 3.60 PE 0.00 61.60 0.1866 PF 11.49 6.00 C=120 PT 46.54 ( 14) 8.90 PE 2.60 14.90 0.1866 PF 2.78 PT 51.92 ( 9) 18.00 C=120 PT 8.72 (104) 0.00 PE 0.00 18.00 0.0515 PF 0.93 18.00 C=120 PT 9.65 (102) 0.00 PE 0.00 18.00 0.1947 PF 3.50 58.00 C=120 PT 13.15 (100) 3.60 PE 0.00 61.60 0.4637 PF 28.56 6.00 C=120 PT 41.71 ( 15) 8.90 PE 2.60 14.90 0.4637 PF 6.91 PT 51.22 ( 10) 17.67 Cr120 PT 51.03 ( 11) 0.00 PE 0.00 17.67 0.0109 PF 0.19 SUBMITTAL SERIAL NO:2932HY7 06-30-2011 PAGE 3 PACIFIC ,RIDGE GYMNASIUM - GYM .10/1950 Location Flow Pipe Fittings Equiv Friction Pressure in Size & Length Loss Summary From To GPM IN Devices Ft PSI/Ft PSI 9 10DQ 108.47 3.314 L 17.67 C=120 PT 51.22 ( 10) Q 216.71 F=0 F 0.00 PE 0.00 FM T 17.67 0.0394 PF 0.70 3 9DQ 66.31 3.314 L 135.50 C=120 PT 51.92 ( 9) Q 283.02 F=E F 7.30 PE 0.00 FM T 142.80 0.0646 PF 9.22 2 3 3.314 L 21.00 C=120 PT 61.14 ( 3) Q 2,83.02 F=E F 7.30 PE 9.10 FR T 28.30 0.0646 PF 1.83 1 2 5.914 L 25.00 C=150 PT 72.07 ( 2) Q 283.02 F=T,3E/DDC F 110.93 PE 0.00 UN T 135.93 0.0025 PF 0.34 6" AMES C500 RPDA 8.11 0 1DQ 100.00 7.758 L 290.00 C=150 PT 80.53 ( 1) Q 383.02 F=T,GV F 58.94 PE 0.00 UN T 348.94 0.0012 PF 0.42 PT 80.95 ( 0) -; EPIC FIRE PROTECTION, INC. As U 765 TURTLE POINT WAY SAN MARCOS, CA 92069 (760) 310-6122 FAX (760) 798-0556 Hydraulic Design information Sheet Name: PACIFIC RIDGE GYMNASIUM - 1ST FLOOR Date: 6-27-11 Location: 6269 EL FUERTE, CARLSBAD Building: NEW System No. 1 OF 1 Contractor: EPIC FIRE PROTECTION, INC. Contract No. Calculated By. RAE Drawing No. 1 OF 2 Construction: LI Combustible Non-Combustible Ceiling Height 9' Ft. NFPA 13: LI NFPA 231 [I Other (Specify) LI Specific Ruling SYSTEM DESIGN Light Hazard Ordinary Hazard Group -[I NFPA 231C: Figure: Made By 1 [1] 2 Li 3 Li Extra Hazard Curve: Date Area of Sprinldei Operation Density Area Per Sprinider Hose Allowance GPM: Inside Hose Allowance GPM: Outside Rack Surinkler Allowance 1500 SQ FT System Type .1.0 E Wet LI Dry LI Deluge LI Pre-Action 20x20 MAX Sprinkler or Nozzle 0 Make TYCO Model EC-8 100 Size %" K-Factor: 8.0 Temperature Rating 135 CALCULATION SUMMARY GPM Required 411.99 PSI Required 93.98 At Base of Riser "C" Factor Used: Overhead 120 Underground 150 WATFP SITPPT,Y Water Flow Test Pump Data Tank or Reservoir Date & Time 4-4-11 Rated Capacity Capacity Static PSI 128 At PSI Elevation Residual PSI 124 Elevation GPM Flowing 1440 Well Elevation 0 Proof Flow GPM Location SITE Source of Information FLOW TEST BY EPIC FIRE AND CARLSBAD WATER DEPT. COMMODITY S1OEAUL Commodity OFFICE/GYM AREAS Class Location - Storage Height Area Aisle Width Storage Method: Solid Piled % Palletized % Rack Rack LI Single Row LI Conventional Pallet LI Double Row LI Slave Pallet Lit Multiple Row Lit Open Flue Spacing In Inches Longitudinal __ Transverse - Horizontal Barriers Provided LI Automatic Storage LI Encapsulated LI Solid Shelving LI Non-Encapsulated Clearance From Top of Storage to Ceiling Ft. In. 250 240 240 230 220 210 200 190 180 170 C/) 160 150 140 130 120 110 100 90 80 70 60 50 40 30 20 IC C PACIFIC RIDGE GYMNASIUM 1ST FLOOR .10/1500 Sigma Dynamics Corporation 7700 Supply / Demand Graph - Margin Pressure 11.64 PSI J Flow 2268.55 GPM os ______________ W1.85 '200 400 600 800 1000 1200 1400 1600 1800 20 00 Water Flow (GPM) System Demand.. Sprinkler Demand 102.79 PSI @ 411.99 GPM Additional Flows 100.00 GPM Hose at Source 0.00 GPM Total Demand 103.02 PSI @ 511.99 GPM Water Supply.. Static 115.20 PSI Residual 111.60 PSI @ 1440.00 GPM Elevation 0.00 PSI SUBMITTAL SERIAL NO:232H?7 PACIFIC RIDGE GYMNASIUM 1ST FLOOR .10/1500 FLOW TEST RESULTS Water Supply STATIC 115.20 PSI RESIDUAL 111.60 PSI @ 1440.00 GPM CITY PRESSURE AVAILABLE AT 512.0 GPM 06-30-2011 PAGE 1 114.67 PSI SUMMARY OF SPRINKLER OUTFLOWS ACTUAL FLOW - r - - 39.33 36.32 37 .92 35.66 38,59 .11 35.38 33.00 23.81 33.12 31.19 32.57 MINIMUM FLOW 33.00 33.00 33.00 33.00 33.00 33.00 33.00 33.00 14 .83 33 .00 26.00 22.00 8.00 8.00 8.00 8.00 8.00 8 .00 8 .00 8.00 5.60 8.00 8 .00 8.00 24 .17 20.62 22.47 19.86 23.27 19.26 19.55 17 .02 18.08 17 .14 15.20 16.58 S PR 150 151 152 153 154 155 156 157 158 159 160 161 K- FACTOR PRESSURE TOTAL WATER REQUIRED FOR SYSTEM OUTFLOWS AT 1 TOTAL WATER REQUIREMENT PRESSURE REQUIRED AT 0 411.99 GPM 100.00 GPM 511.99 GPM 103.02 PSI MAXIMUM PRESSURE UNBALANCE IN LOOPS 0.00 PSI MAXIMUM VELOCITY FROM 54 TO 85 18.87 FPS LUI1PIII1LC LL tic c m ti ut011 Ic I" Iml,Thc'" MI. ,t%U %C\SW tY JIil I p le,I\\ it at. 1t\' \' 11.I i 1 tILU II C V. id 1id 11,c iite e.pl 11ihd iii di 111iiill 11,1 c Ill I IIO 1' Cd II I) I V IC iV. NF'fl) AP'R )\A 0 R ) ND AvI AS SUBMITTAL SERIAL NO :2932HY7 06-30-2011 PAGE 2 PACIFIC RIDGE GYMNASIUM 1ST FLOOR .10/1500 Location Flow Pipe Fittings Equiv Friction Pressure in Size & Length Loss Summary From To GPM IN Devices Ft PSI/Ft PSI 87 157 1.080 L 3.75 C=120 PT 17.02 (157) Q 33.00 F=T,E F 8.10 PE -0.65 AO T 11.85 0.2852 PF 3.38 PT 19.75 ( 87) 91 161 1.080 L 3.75 C=120 PT 16.58 (161) Q 32.57 F=2E F 4.60 PE -0.65 AO T 8.35 0.2784 PF 2.32 90 91 2.203 L 5.50 C=120 PT 18.25 ( 91) Q 32.57 F=0 F 0.00 PE 0.00 BN T 5.50 0.0086 PF 0.05 PT 18.30 ( 90) 90 ------------------ 160 1.080 L 6.50 C=120 PT 15.20 (160) Q 31.19 F=T,E F 8.10 PE -0.65 AO T 14.60 0.2569 PF 3.75 89 90DQ 32.57 2.203 L 9.50 C=120 PT 18.30 ( 90) Q £3.76 F=0 F 0.00 PE 0.00 BN T 9.50 0.0300 PF 0.28 PT 18.58 ( 89) 89 ------------------ 159 1.080 L 1.50 C=120 PT 17.14 (159) Q 33.12 F=T F 5.80 PE -0.65 AO T 7.30 0.2871 PF 2.10 88 89DQ 63.76 2.203 L 16.00 C=120 PT 18.59 C 89) Q 96.88 F=0 F 0.00 PE 0.00 BN T 16.00 0.0650 PF 1.04 PT 19.63 ( 88) 88 ------------------ 158 1.080 L 6.00 C=120 PT 18.08 (158) Q 23.81 F=T,E F 8.10 PE -0.65 AO T 14.10 0.1559 PF 2.20 87 88DQ 96.88 2.203 L 1.25 C=120 PT 19.63 ( 88) Q 120.69 F=0 F 0.00 PE 0.00 BN T 1.25 0.0976 PF 0.12 86 87DQ 33.00 2.203 L 10.00 C=120 PT 19.75 ( 87) Q 153.69 F=0 F 0.00 PE 0.00 EN T 10.00 0.1526 PF 1.53 PT 21.28 ( 86) 86 ------------------ 156 1.080 L 1.50 C=120 PT 19.55 (156) Q 35.38 F=T F 5.80 PE -0.65 AO T 7.30 0.3243 PF 2.37 SUBMITTAL SERIAL NO:2932HY7 06-30-2011 PAGE 3 PACIFIC RIDGE GYMNASIUM 1ST FLOOR .10/1500 Location Flow Pipe Fittings Equiv Friction Pressure in Size & Length Loss Summary From To GPM IN Devices Ft PSI/Ft PSI 85 86DQ 153.69 2.203 L 9.00 C=120 PT 21.27 ( 86) Q 129.06 F=0 F 0.00 PE 0.00 EN T 9.00 0.2238 PF 2.01 PT 23.28 ( 85) 85 155 1.080 L 6.50 C=120 PT 19.26 (155) Q 35.11 F=T,E F 8.10 PE -0.65 AO T 14.60 0.3199 PF 4.67 54 85DQ 189.06 2.203 L 19.50 C=120 PT 23.28 ( 85) Q 224.18 F=T F 11.60 PE 0.00 BN T 31.10 0.3067 PF 9.54 PT 32.82 ( 54) 84 ------------------ 154 1.080 L 1.50 C=120 PT 23.27 (154) Q 38.59 F=E F 2.30 PE -0.65 AO T 3.80 0.3810 PF 1.45 83 84 2.203 L 9.75 C=120 PT 24.07 ( 84) Q 38.59 F=0 F 0.00 PE 0.00 BN T 9.75 0.0118 PF 0.12 PT 24.19 ( 83) 83 ------------------ 153 1.080 L 7.00 C=120 PT 19.86 (153) Q 35.66 F=T;E F 8.10 PE -0.65 AO T 15.10 0.3291 PF 4.97 82 83DQ 38.59 2.203 L 8.25 C=120 PT 24.18 ( 83) Q 74.25 F=0 F 0.00 PE 0.00 EN T 8.25 0.0397 PF 0.33 PT 24.51 ( 82) 82 ------------------ 152 1.080 L 1.50 C=120 PT 22.47 (152) Q 37.92 F=T F 5.80 PE -0.65 AO T 7.30 0.3688 PF 2.69 81 82DQ 74.25 2.203 L 7.00 C=120 PT 24.51 ( 82) Q 112.17 F=0 F 0.00 PE 0.00 BN T 7.00 0.0852 PF 0.60 PT 25.11 ( 81) 81 ------------------ 151 1.080 L 7.00 C=120 PT 20.62 (151) Q 36.32 F=T,E F 8.10 PE -0.65 AO T 15.10 0.3406 PF 5.14 80 81DQ 112.17 2.203 L 9.00 C=120 PT 25.11 ( 81) Q 148.49 F=0 F 0.00 PE 0.00 EN T 9.00 0.1432 PF 1.29 PT 26.40 ( 80) SUBMITTAL SERIAL NO:2932HY7 06-30-2011 PAGE 4 PACIFIC RIDGE GYMNASIUM 1ST FLOOR .10/1500 Location Flow Pipe Fittings Equiv Friction Pressure in Size & Length Loss Summary From To GPM IN Devices Ft PSI/Ft PSI 80 150 ------------------ 1.080 L 1.50 C=120 PT 24.17 (150) 39.33 F=T F 5.80 PE -0.65 AO T 7.30 0.3945 PF 2.88 53 80DQ 148.49 2.203 L 26.00 C=120 PT 26.40 ( 80) Q 187.82 F=T F 11.60 PE 0.00 BN T 37.60 0.2211 PF 8.31 52 53 2.703 L 0.50 C=120 PT 34.71 ( 53) Q 187.82 F=0 F 0.00 PE 0.00 FM T 0.50 0.0817 PF 0.04 51 52DQ 224.18 3.314 L 50.75 C=120 PT 34.75 ( 52) Q 411.99 F=T,E F 26.20 PE 0.00 FM T 76.95 0.1294 PF 9.96 50 51 3.314 L 7.50 C=120 PT 44.71 ( 51) Q 411.99 F=T,E F 26.20 PE 0.00 FM T 33.70 0.1294 PF 4.36 49 50 3.314 L 22.00 C=120 PT 49.07 ( 50) Q 411.99 F=T,E F 26.20 PE -5.20 FM T 48.20 0.1294 PF 6.24 12 49 3.314 L 33.00 C=120 PT 50.11 ( 49) Q 411.99 F=2E F 14.60 PE -1.42 FM T 47.60 0.1294 PF 6.16 11 12 3.314 L 11.00 C=120 PT 54.85 ( 12) Q 411.99 F=2E F 14.60 PE 0.00 FM T 25.60 0.1294 PF 3.31 10 11 3.314 L 17.67 C=120 PT 58.16 ( 11) Q 411.99 F=0 F 0.00 PE 0.00 FM T 17.67 0.1294 PF 2.29 9 10 3.314 L 17.67 C=120 PT 60.45 ( 10) Q 411.99 F=0 F 0.00 PE 0.00 FM T 17.67 0.1294 PF 2.29 3 9 3.314 L 135.50 C=120 PT 62.74 ( 9) Q 411.99 F=E F 7.30 PE 0.00 FM T 142.80 0.1294 PF 18.48 2 3 3.314 L 21.00 C=120 PT 81.22 ( 3) Q 411.99 F=E F 7.30 PE 9.10 FR T 28.30 0.1294 PF 3.66 SUBMITTAL SERIAL NO :2932HY7 06-30-2011 PAGE 5 PACIFIC RIDGE GYMNASIUM 1ST FLOOR .10/1500 Location Flow Pipe Fittings Equiv Friction Pressure in Size & Length Loss Summary From To GPM IN Devices Ft PSI/Ft PSI 1 2 5.914 L 25.00 C=150 PT 93.98 ( 2) Q 411.99 F=T,3E/DDC F 110.93 PE 0.00 UN T 135.93 0.0051 PF 0.69 6" AMES C500 RPDA 7.63 0 1DQ 100.00 7.758 L 290.00 C=150 PT 102.29 ( 1) Q 511.99 F=T,GV F 58.94 PE 0.00 UN T 348.94 0.0020 PF 0.70 PT 95.37 ( 0) ------------------ 52 54 2.703 L 17.00 C=120 PT 32.82 ( 54) Q 224.18 F=0 F 0.00 PE 0.00 FM T 17.00 0.1133 PF 1.93 PT 34.75 ( 52) EPIC FIRE PROTECTION, INC. 765 TURTLE PONT WAY SAN MARCOS, CA 92069 (760)310-6 122 FAX (760) 798-0556 Hydraulic Design information Sheet Asucs4 Name: PACIFIC RIDGE GYMNASIUM - 2ND FLOOR Date: 6-27-11 Location: 6269 EL FUIERTE, CARLSBAD Building: NEW System No. 1 OF 1 Contractor: EPIC FIRE PROTECTION, INC. Contract No. Calculated By. RAE Drawing No. 2 OF 2 Construction: LI Combustible Non-Combustible Ceiling Height 9' Ft. SYSTEM DESIGN NFPAI3: Light Hazard Ordinary Hazard Group 1 LI 2 [] 3 LI Extra Hazard [II NFPA 231 III] NFPA23IC: Figure: Curve: LI Other (Specify) LI Specific Ruling Made By Date Area of Spin1der Operation 1500 SQ FT System Type Density .10 Z Wet LI Dry LI Deluge LI Pre-Action Area Per Sprinkler 20x20 MAX Sprinkler or Nozzle Hose Allowance GPM: Inside 0 Make TYCO Model EC-8 Hose Allowance GPM: Outside 100 Size %" K-Factor: 8.0 Rack Sprinkler Allowance Temperature Rating 135 CALCULATION SUMMARY GPM Required 367.70 PSI Required 98.75 At Base of Riser "C" Factor Used: Overhead 120 Underground 150 WATER SUPPLY IL Water Flow Test Pump Data Tank or Reservoir Date & Time 4-4-11 Rated Capacity Capacity Static PSI 128 At PSI Elevation Residual PSI 124 Elevation GPM Flowing 1440 Well Elevation 0 Proof Flow GPM Location SITE Source of Information FLOW TEST BY EPIC FIRE AND CARLSBAD WATER DEPT. COMMODITY STORAGE Commodity OFFICE/GYM AREAS Class Location - Storage Height Area Aisle Width Storage Method: Solid Piled % Palletized % Rack Rack LI Single Row LI Conventional Pallet LI Double Row LI Slave Pallet L! Multiple Row EL Open Flue Spacing In Inches Longitudinal Transverse - Horizontal Barriers Provided LI Automatic Storage LI Encapsulated LI Solid Shelving LI Non-Encapsulated Clearance From Top of Storage to Ceiling Ft. In. PACIFIC RIDGE GYMNASIUM 2ND FLOOR .10/1500 Slgma Dynamics Corporation 7700 Supply / Demand Graph Margin Pressure 7.07 PSI Flow 167S.97 GPM - V1 I I _____ _____ ______ ______ _______ _______ N1 200 400 600 800 1000 1200 1400 1600 1800 2000 Water Flow (GPM) System Demand.. Water Supply.. Sprinkler Demand 107.46 PSI @ 367.70 GPM Static 115.20 PSI Additional Flows 100.00 GPM Residual 111.60 PSI @ 1440.00 GPM Hose at Source 0.00 GPM Elevation 0.00 PSI Total Demand 107.68 PSI @ 467.70 GPM 250 240 230 220 21t 200 190 180 170 160 150 140 130 120 110 100 90 80 70 60 50 40 30 20 10 SUBMITTAL SERIAL NO:2932HY7 PACIFIC RIDGE GYMNASIUM 2ND FLOOR .10/1500 FLOW TEST RESULTS Water Supply STATIC 115.20 PSI RESIDUAL 111.60 PSI @ 1440.00 GPM CITY PRESSURE AVAILABLE AT 467.7 GPM 06-30-2011 PAGE 1 114.75 PSI SUMMARY OF SPRINKLER OUTFLOWS ACTUAL MINIMUM SPR FLOW FLOW K-FACTOR PRESSURE 210 46.72 40.00 8.00 34.11 211 33.36 14.83 5.60 35.49 212 45.30 40.00 8.00 32.07 213 41.91 40.00 8.00 27.45 214 41.40 40.00 8.00 26.78 215 40.00 40.00 8.00 25.00 216 43.39 40.00 8.00 29.42 217 43.36 40.00 8.00 29.37 218 32.25 19.60 5.60 33.17 TOTAL WATER REQUIRED FOR SYSTEM 367.70 GPM OUTFLOWS AT 1 100.00 GPM TOTAL WATER REQUIREMENT 467.70 GPM PRESSURE REQUIRED AT 0 107.68 PSI MAXIMUM PRESSURE UNBALANCE IN LOOPS 0.00 PSI MAXIMUM VELOCITY FROM 22 TO 33 21.35 FPS SUBMITTAL SERIAL NO:2932HY7 06-30-2011 PAGE 2 PACIFIC RIDGE GYMNASIUM 2ND FLOOR .10/1500 Location Flow Pipe Fittings Equiv Friction Pressure in Size & Length Loss Summary From To GPM IN Devices Ft PSI/Ft PSI 35 215 1.080 L 1.75 C=120 PT 25.00 (215) Q 40.00 F=0 F 0.00 PE -0.76 AO T 1.75 0.4071 PF 0.71 34 35 1.536 L 16.00 C=120 PT 2495 ( 35) Q 40.00 F=T V 8.90 PE 0.00 BN T 24.90 0.0732 PF 1.82 PT 26.77 ( 34) 38 218 1.080 L 1.75 Cr120 PT 33.17 (218) Q 32.25 F=0 F 0.00 PE -0.76 AO T 1.75 0.2733 PF 0.48 37 38 1.536 L 16.00 C=120 PT 32.89 ( 38) Q 32.25 F=0 F 0.00 PE 0.00 BN T 16.00 0.0492 PF 0.79 PT 33.68 ( 37) 36 216 ------------------ 1.080 L 1.75 C=120 PT 29.42 (216) Q 43.39 F=0 F 0.00 PE -0.76 AO T 1.75 0.4732 PF 0.83 23 36 1.080 L 13.25 C=120 PT 29.49 ( 36) Q 43.39 F=T,E F 8.10 PE 0.00 AO T 21.35 0.4732 PF 10.10 PT 39.59 ( 23) 34 214 ------------------ 1.080 L 1.75 C=120 PT 26.78 (214) Q 41.40 F=0 F 0.00 PE -0.76 AO T 1.75 0.4338 PF 0.76 33 34DQ 40.00 1.536 L 12.50 C=120 PT 26.78 ( 34) Q 81.40 F=T F 8.90 PE 0.00 BN T 21.40 0.2726 PF 5.83 PT 32.61 ( 33) 202 213 ------------------ 1.080 L 1.75 C=12.0 PT 27.45 (213) Q 41.91 F=0 F 0.00 PE -0.76 AO T 1.75 0.4438 PF 0.78 33 202 1.080 L 3.50 C=120 PT 27.47 (202) Q 41.91 F=T,E F 8.10 PE 0.00 AO T 11.60 0.4438 PF 5.15 22 33DQ 81.40 1.536 L 3.50 C=120 PT 32.62 ( 33) Q 123.31 F=T F 8.90 PE 0.00 BN T 12.40 0.5878 PF 7.29 PT 39.91 ( 22) SUBMITTAL SERIAL NO:2932HY7 06-30-2011 PAGE 3 PACIFIC RIDGE GYMNASIUM 2ND FLOOR .10/1500 Location Flow Pipe Fittings Equiv Friction Pressure in Size & Length Loss Summary From To GPM IN Devices Ft PSI/Ft PSI 32 ------------------ 212 1.080 L 1.75 C=120 PT 32.07 (212) Q 45.30 F=0 F 0.00 PE -0.76 AO T 1.75 0.5125 PF 0.90 21 32 1.080 L 11.00 C=120 PT 32.21 ( 32) Q 45.30 F=T F 5.80 PE 0.00 AO T 16.80 0.5125 PF 8.61 PT 40.82 ( 21) 201 ------------------ 211 1.080 L 1.75 C=120 PT 35.49 (211) Q 33.36 F=0 F 0.00 PE -0.76 AO T 1.75 0.2910 PF 0.51 31 201 1.080 L 3.75 C=120 PT 35.24 (201) Q 33.36 F=T,E F 8.10 PE 0.00 AO T 11.85 0.2910 PF 3.45 30 31 1.536 L 10.50 C=120 PT 38.69 ( 31) Q 33.36 F=0 F 0.00 PE 0.00 BN T 10.50 0.0524 PF 0.55 PT 39.24 ( 30) 200 ------------------ 210 1.080 L 1.75 C=120 PT 34.11 (210) Q 46.72 F=0 F 0.00 PE -0.76 AO T 1.75 0.5427 PF 0.95 30 200 1.080 L 1.00 C=120 PT 34.30 (200) Q 46.72 F=T,E F 8.10 PE 0.00 AO T 9.10 0.5427 PF 4.94 20 30DQ 33.36 1.536 L 3.50 C=120 PT 39.24 ( 30) Q 80.09 F=T F 8.90 PE 0.00 BN T 12.40 0.2646 PF 3.28 PT 42.52 ( 20) 37 ------------------ 217 1.080 L 1.00 C=120 PT 29.37 (217) Q 43.36 F=T,E F 8.10 PE 0.00 AO T 9.10 0.4725 PF 4.30 23 37DQ 32.25 1.536 L 16.00 C=120 PT 33.67 ( 37) Q 75.61 F=T F 8.90 PE 0.00 BN T 24.90 0.2378 PF 5.92 22 23DQ 43.39 2.703 L 8.75 C=120 PT 39.59 ( 23) Q 119.00 F=0 F 0.00 PE 0.00 FM T 8.75 0.0351 PF 0.31 SUBMITTAL SERIAL NO:2932HY7 06-30-2011 PAGE 4 PACIFIC RIDGE GYMNASIUM 2ND FLOOR .10/1500 Location Flow Pipe Fittings Equiv Friction Pressure in Size & Length Loss Summary From To GPM IN Devices Ft PSI/Ft PSI 21 22DQ 123.31 2.703 L 7.00 C=120 PT 39.90 ( 22) Q 242.31 F=0 F 0.00 PE 0.00 FM T 7.00 0.1308 PF 0.92 20 21DQ 45.30 2.703 L 9.50 C=120 PT 40.82 ( 21) Q 287.61 F=0 F 0.00 PE 0.00 FM T 9.50 0.1796 PF 1.71 13 20DQ 80.09 2.703 L 63.50 C=120 PT 42.53 ( 20) Q 367.70 F=0 F 0.00 PE 0.00 FM T 63.50 0.2830 PF 17.97 49 13 3.314 L 20.00 C=120 PT 60.50 ( 13) Q 367.70 F=0 F 0.00 PE -0.86 FM T 20.00 0.1049 PF 2.10 12 49 3.314 L 33.00 C=120 PT 61.74 ( 49) Q 367.70 F=2E F 14.60 PE -1.42 FM T 47.60 0.1049 PF 4.99 11 12 3.314 L 11.00 C=120 PT 65.31 ( 12) Q 367.70 F=2E F 14.60 PE 0.00 FM T 25.60 0.1049 PF 2.69 10 11 3.314 L 17.67 C=120 PT 68.00 C 11) Q 367.70 F=0 F 0.00 PE 0.00 FM T 17.67 0.1049 PF 1.85 9 10 3.314 L 17.67 C=120 PT 69.85 ( 10) Q 367.70 F=0 F 0.00 PE 0.00 FM T 17.67 0.1049 PF 1.85 3 9 3.314 L 135.50 C=120 PT 71.70 C 9) Q 367.70 F=E F 7.30 PE 0.00 FM T 142.80 0.1049 PF 14.98 2 3 3.314 L 21.00 C=120 PT 86.68 ( 3) Q 367.70 F=E F 7.30 PE 9.10 FR T 28.30 0.1049 PF 2.97 1 2 5.914 L 25.00 C=150 PT 98.75 C 2) Q 3-67.70 F=T,3E/DDC F 110.93 PE 0.00 UN T 135.93 0.0041 PF 0.56 6" AMES C500 RPDA 7.77 0 1DQ 100.00 7.758 L 290.00 C=150 PT 107.09 C 1) Q 467.70 F=T,GV F 58.94 PE 0.00 UN T 348.94 0.0017 PF 0.59 PT 107.68 ( 0) ,LfPh? 74*5L- CHoOl!YL( - -• - Gregory Ryan LoZ#7 From: Epic Fire Protection, Inc. <epicfire@coxnet> Sent: Tuesday, January 03, 2012 9:39 AM To: Gregory Ryan Subject: Fw: hangers Attachments: HANGER.pdf Greg, Here is the email I sent to Dominic. See you tomorrow. Adam From: Epic Fire Protection, Inc. Sent: Thursday, December 22, 20119:03 AM To: dominic.fieri@carlsbadca.gov Subject: hangers Dominic, Here is a sketch of the hanger detail at Pac Ridge Gym that we talked about yesterday. There really is no way to install a secondary hanger or splay wire due to the other z-purlins being over 5' away so we ran the lines tight to the I-beams and stiff-rodded the all thread. This installation does not allow the line to move either up or down or side to side since the line is tight to the I-beam. Please discuss it with Greg in your Tuesday meeting as we talked about and let us know if this installation is acceptable to Carlsbad. We also added the secondary hangers at all the office areas as we discussed. Adam Boisvert Epic Fire Protection, Inc. 765 Turtle Point Way San Marcos, CA 92069 760-310-6122 Fax 760-798-0556 epicfire@cox.net 1 FftcL_jJ ;fl LI!IE Tk*tT T r LJfI T 1 04/25/2012 10:16 FAX 17607980556 EPIC FIRE PROTECTION INC 002/004 Contractor's Material and Test Certificate for Abovegro3lng PROCEDURE . Upon compM' All deface aba 1 of work, Inspection and tests shall be made by the contractor's representative and witnessed by an owner's representative. be corrected and eyétem left In service before contractors personnel finally leave thO job. A certificate eli contractor. It Ii H be filled out and signed by both representatives. Copies shall be prepared for approving authôrltIee owners, and understood the owner's representative's signature In no way prejudices any claim against Contractor for faulty material, poor worlunanshlp, i r failure to comply with approving authority's requirements or local ordinances. Property nam, .0 12 — ° 4. Property addra s LC) Accepted by approving authorities $) iPtT~. 0 Address. Plans . • . Installation conforms to accepted plane . 0 0 fJ Yes D No EquIpment used Is approved . 0 . Yes No •. . Ifflo, explain deviations .. :. . . . 0 .• Has person In charge of fire equipment been instructed as . Yes E] No to location of control valves and care and maintenance . ... . ofthlsnewequlprnenl? . •0 If no, InstructIons . 0 Have copies of the following been left on the premises? LJ Yes D No System components instructIons .' Yes LJ No Care and maintenance. Instructions ,. . . YeS 0 0 No NFPA25 . . . Yes . [J No Location of:Supplies 0 0 buildingssystem • Spniniders - Make • Model Year of manufacture . Orifice size QuantIty •. Temperature rating 0 4.. 3 _____________ Pipe and - Type of pipe Stings Type of linings t"to 0 0 •.• •, . . 0 Medmum time 0 operate Alarm 0 Alarm device •.• 0 0 throughtost connection __0 VaW or ______________ -Make Model Mlnutós. Seconds Indicator .••• • :. Dry 0 40.0, Make Model Serial no.Make Model no - ,0 . 00 0 .• .• ..•• - • Dry *0 test . roung ... _ Time through test oUon1 --_w_ater 0 Air ressure . It a nt ir pressure __ 'Time water reached __ _____ . Alarm operated property __ Minutes Seconds . psi psi Minutes Seconds YO No No 0 ____. ,. • With 222 pe 04/25/2012 10:17 FAX 17607980556 EPIC FIRE PROTECTION INC 003/004 'Z " Operation 1J Electric Hydraulics PJpiogsupervised 0 ye. 0 NO Detecting mdlaeupeMsed 0 No Does valve porate from the manual trip, remote, or both Yes No Deluge and valves Make Model Does each ckult to supelyfelo alarm? Does each drcutt operate valve releaso? Ma,dmum time to operate release J No Yee—, NO Minutes Seconds Pressure Location an r akeand modal Setting Static pressure Rd" pcauro (fiowIn. Pow rate 0 lnlet(pel) Oullet(psl) Ir11óteI) Outlet(psl) (gprn) Test Hydflc Hydroetatictestsehaflbomadeatnotleaathan200pei(la6bar)tor2hoursor5opsl(a4bw) above static pressure In excess of 150 pel (10.2 bar) for 2)'cws. Dltferpnflal drypipe Valve dappers shall be left Opefl duringihe tost to prevent damage All aboveground piping leakage shall be stopped description Pnuc Establish 40 psi (27 bar) air pressure and measure drop, which shall not exceed 1½ pal (0.1 bar) In 24betir Test pressure tanks at normal Vater lovol and air pressure and measure air pressure drop, which shall notexceodl½pel(O,1 bar) In24hours Ati piping hydràetatiàallyteted at2OC?psl(_ forhorn Drypiping pneumatIcally tested [J Yes No WA Eqpment operates PrOPertY Yes 0 No if no, atate.reaecn -. Do you certify as the apdnkle( cOntractor that additives and corrosive Chemicals, aodkim silicate or derivatives of sodium silicate, brine, or other corrosive chemicals were not used for testing systems or stopping leaks? Yes No ,..• . ...... 0 S Teats Drain. test Isupplytestconnectlon Reading of gauge located near water 11(. bat) jconnectlonopenwide Reakival pressure with valve inteet 6 pel(_ bar) Underground maIns and load In connectIoie to system risers flushed before connection made to Sprinkler piping Vortflød by Copy of the U Form No.855. I) Yes •0 No Other. . Explain flUshed by Installer of underground . . . . . . sprinkler piping . .. Yes • No . . . . If POwderdlfVefl fastenem are used fri concrete, has 0 Yes 0 No If no, explain representative sample testing be satisfactorily Blank testing gaskets Number used . .. . . Number removed Walding piping Yes 0 No Ifyas... Do you ertIf -as the .apn)dor contractor that weklIngprc9edures.00mply .• ... Yes 0 No wIth the requIrements of at leastAWS B2 1? 'Welding Do you certify that the weldlngwas performed .by.weidsrsquallfled In . .. •. Yes 0 No Do with the requirements of at ISast AWS B2M Doyoucerllfy.thatth Id ardedon with documented . . . yQ 0 No quality conttol procedure to ensure that all discs are .1 that openings In piping are atnooth, that slag andothar welding residue ate removed, and that the internal diameters of pIping are not penetrated? Cutouts (discs) Do you certify that you havo a control feature to ensure that . . Yes [J No -all cut U. (discs) are retrieved? . 0 0 - 0•• 0 0 0 0 . 04/25/2012 10:17 FAX 17607980556 EPIC FIRE PROTECTION INC 004/004 Hydraulic Nameplate piv1ded if no, explain data fl5lfleplStO [Yes : No Date left In service with all control valves open 4 T%5p. (2.. Remerm Name of aFdfllder ContrUor iEP&- lFi me ?t. (- C Tesbwith.isdby Signatum For piperty owner (signed) Title Date spdnldor- .0on"r (6icae bgfn