Loading...
HomeMy WebLinkAboutDWG 544-2A; PD 2023-0021; THE BLUFFS SLOPE REPAIR; 01-062207/38380 3/31/2025 10/9/202310/9/2023 10/9/2023 ESFSIOORNPALDEE NR GETINSIEGEERR ERICK J.ALDRICH No. 57827 CIVIL 10/9/2023 GRADING NOTES (IN ADDITION TO THE REQUIREMENTS OF CHAPTER 15.16 OF THE CARLSBAD MUNICIPAL CODE.) 1. THIS PLAN SUPERSEDES ALL OTHER PLANS PREVIOUSLY APPROVED BY THE CITY OF CARLSBAD REGARDING GRADING SHOWN ON THIS SET OF PLANS. 2. APPROVAL OF THIS PLAN DOES NOT LESSEN OR WAIVE ANY PORTION OF THE CARLSBAD MUNICIPAL CODE, RESOLUTION OF CONDITIONAL APPROVAL, CITY STANDARDS OR OTHER ADDITIONAL DOCUMENTS LISTED HEREON AS THEY MAY PERTAIN TO THIS PROJECT. THE ENGINEER IN RESPONSIBLE CHARGE SHALL REVISE THESE PLANS WHEN NON-CONFORMANCE IS DISCOVERED. 3. CITY APPROVAL OF PLANS DOES NOT RELIEVE THE DEVELOPER OR ENGINEER-OF- WORK FROM RESPONSIBILITY FOR THE CORRECTION OF ERRORS AND OMISSIONS DISCOVERED DURING CONSTRUCTION. ALL PLAN REVISIONS SHALL BE PROMPTLY SUBMITTED TO THE CITY ENGINEER FOR APPROVAL. 4. A RIGHT-OF-WAY PERMIT FROM THE CITY ENGINEER WILL BE REQUIRED FOR ANY WORK IN THE PUBLIC RIGHT OF WAY. PRIOR TO PERMIT ISSUANCE, A CERT/FICA TE OF INSURANCE AS WELL AS ADDITIONAL INSURED ENDORSEMENT MUST BE FILED NAMING THE CITY OF CARLSBAD AS AN ADDITIONAL INSURED ON THE PERMITTEE'S POLICY IN THE MINIMUM AMOUNT OF $1,000,000.00 FOR EACH OCCURRANCE OF LIABILITY. THE INSURANCE COMPANY WRITING THE POLICY MUST HAVE A RATING OF "A-" OR BETTER AND A SIZE CATEGORY OF CLASS \/ff OR BETTER AS ESTABLISHED BY "BESTS" KEY RA TING GUIDE. 5. NO WORK SHALL BE COMMENCED UNTIL ALL PERMITS HA VE BEEN OBTAINED FROM THE CITY AND OTHER APPROPRIATE AGENCIES. 6. REVISION OF THESE PLANS MAY BE REQUIRED IF THE PROPOSED IMPROVEMENTS ARE NOT CONSTRUCTED PRIOR TO THE DEADLINE DA TE OF THE IMPROVEMENT AGREEMENT. 7. APPROVAL OF THESE PLANS BY THE CITY ENGINEER DOES NOT AUTHORIZE ANY WORK OR GRADING TO BE PERFORMED UNTIL THE PROPERTY OWNER'S PERMISSION HAS BEEN OBTAINED AND A VALID GRADING PERMIT HAS BEEN ISSUED. 8. NO REVISIONS WILL BE MADE TO THESE PLANS WITHOUT THE WRITTEN APPROVAL OF THE CITY ENGINEER, NOTED WITHIN THE REVISION BLOCK, ON THE APPROPRIATE SHEET OF THE PLANS AND THE TITLE SHEET. 9. ORIGINAL ORA WINGS SHALL BECOME THE PROPERTY OF THE CITY UPON BEING SIGNED BY THE CITY ENGINEER. 10. THE ORIGINAL DRAWING SHALL BE REVISED TO REFLECT AS-BUILT CONDITIONS BY THE ENGINEER-OF-WORK PRIOR TO FINAL ACCEPTANCE OF THE WORK BY THE CITY. 11. ACCESS FOR FIRE AND OTHER EMERGENCY VEHICLES SHALL BE MAINTAINED TO THE PROJECT SITE AT ALL TIMES DURING CONSTRUCT/ON. 12. WHERE TRENCHES ARE WITHIN CITY EASEMENTS, A SOILS REPORT COMPRISED OF: (A) SUMMARY SHEET, (B) LABORATORY WORK SHEETS AND (C) COMPACTION CURVES, SHALL BE SUBMITTED BY A PROFESSIONAL ENGINEER OF THE STA TE OF CALIFORNIA, PR/NC/PALLY DOING BUSINESS IN THE FIELD OF APPLIED SOILS MECHANICS. THE SOILS REPORT WILL BE SUBMITTED TO THE CITY ENGINEERING INSPECTOR WITHIN TWO WORKING DAYS OF THE COMPLETION OF FIELD TESTS. 13. A SOILS COMPACTION REPORT AND COMPLIANCE VER/FICA TION REGARDING ADHERENCE TO RECOMMENDATIONS OUTLINED IN THE SOILS REPORT IS REQUIRED PRIOR TO THE ISSUANCE OF A BUILDING PERMIT. ALL CONTROLLED GRADING SHALL BE DONE UNDER THE DIRECTION OF A PROFESSIONAL ENGINEER OF THE STA TE OF CALIFORNIA PR/NC/PALLY DOING BUSINESS IN THE FIELD OF APPLIED SOILS MECHANICS. ALL FILL OR FUTURE FILL AREAS SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE CITY OF CARLSBAD STANDARD SPECIF/CA TfONS AND THE " EARTHWORK SPECIF/CA TfONS • ATTACHED TO THE PRELIMINARY SOILS INVEST/GA TfON. DAILY FIELD COMPACTION REPORTS WILL BE SUBMITTED TO THE PROJECT INSPECTOR. 14. A PRECONSTRUCTION MEETING SHALL BE HELD PRIOR TO THE BEGINNING OF WORK AND SHAii BE ATTENDm BY All REPRESENTATIVES RESPONSIBLE FOR CONSTRUCTION, INSPECTION, SUPERVISION, TESTING AND ALL OTHER ASPECTS OF THE WORK. THE CONTRACTOR WILL BE CONTACTED BY THE PROJECT INSPECTOR TO COORDINATE A DA TE AND TIME FOR THE PRECONSTRUCTION MEETING. APPROVED DRAWINGS MUST BE AVAILABLE PRIOR TO SCHEDULING. THE GRADING PERMIT WILL BE PROVIDED BY THE PROJECT INSPECTOR AT THE MEETING. 15. All INSPfGTJON REQUESTS OTHER THAN WR PRECONSTRUCTJON MEETING WIii BE MADE BY CAIi ING THE ENGINEFRING 24 HOIIR INSPECTION REQUEST I/NE AT (760) 438 3891 IN5PECTION REQUEST MUST BE RECEIVED PRIOR TO 2: 00 PM. ON THE WORKING DAY BEFORE THE INSPECTION IS NEEDED INSPECTIONS WILL BE MADE THE NEXT WORK DAY UNLESS YOU REQUEST OTHERWISE. REQUESTS MADE AFTER 2: 00 P.M. WILL BE SCHEDULED FOR TWO FULL WORK DAYS LATER. 16. THE OWNER AND/OR APPLICANT THROUGH THE DEVELOPER AND/OR CONTRACTOR SHALL DESIGN, CONSTRUCT AND MAINTAIN ALL SAFETY DEVICES, INCLUDING SHORING, AND SHALL BE SOLELY RESPONSIBLE FOR CONFORMING TO ALL LOCAL, STATE AND FEDERAL SAFETY AND HEALTH STANDARDS, LAWS AND REGULATIONS. 17. THE CONTRACTOR SHALL CONFORM TO LABOR CODE SECTION 6705 BY SUBMITTING A DETAIL PLAN TO THE CITY ENGINEER AND/OR CONCERNED AGENCY SHOWING THE DESIGN OF SHORING, BRACING SLOPING OR OTHER PROVISIONS TO BE MADE OF WORKER PROTECTION FROM THE HAZARD OF CA \/ING GROUND DURING THE EXCAVATION OF SUCH TRENCH OR TRENCHES OR DURING THE PIPE fNSTALLA TION THEREIN. THIS PLAN MUST BE PREPARED FOR ALL TRENCHES FIVE FEET (5') OR MORE IN DEPTH AND APPROVED BY THE CITY ENGINEER AND/OR CONCERNED AGENCY PRIOR TO EXCAVATION. IF THE PLAN VARIES FROM THE SHORING SYSTEM STANDARDS ESTABLISHED BY THE CONSTRUCTION SAFETY ORDERS, TITLE 8 CALIFoRNIA ADMINISTRATIVE CODE, THE PLAN SHALL BE PREPARED BY A REGISTERED ENGINEER AT THE CONTRACTORS EXPENSE. A COPY OF THE OSHA EXCAVATION PERMIT MUST BE SUBMITTED TO THE INSPECTOR PRIOR TO EXCAVATION. 18. NO BLASTING SHALL BE PERFORMED UNTIL A VALID BLASTING PERMIT HAS BEEN OBTAINED FROM THE CITY OF CARLSBAD. SUBMIT APPL/CATION FOR BLASTING PERMIT WELL IN ADVANCE OF THE SCHEDULING OF BLASTING OPERA TfONS. 19. IF ANY ARCHAEOLOGICAL RESOURCES ARE DISCOVERED WITHIN ANY WORK AREA DURING CONSTRUCTION, OPERATIONS WILL CEASE fMMEDfA TEL Y, AND THE PERMITTEE WILL NOTIFY THE CITY ENGINEER. OPERA TfONS WILL NOT RESTART UNTIL THE PERMITTEE HAS RECEIVED WRITTEN AUTHORITY FROM THE CITY ENGINEER TO DO SO. 20. ALL OPERATIONS CONDUCTED ON THE SITE OR ADJACENT THERETO, INCLUDING WARMING UP, REPAIR, ARRIVAL, DEPARTURE OR OPERATION OF TRUCKS, EARTHMOVING EQUIPMENT, CONSTRUCTION EQUIPMENT AND ANY OTHER ASSOC/A TED GRADING EQUIPMENT SHALL BE LIMITED TO THE PERIOD BETWEEN 7: 00 A.M. AND 6: 00 P.M. EACH DAY, MONDAY THRU FRIDAY AND NO EARTHMOVING OR GRADING OPERATIONS SHALL BE CONDUCTED ON WEEKENDS OR HOLIDAYS. (A LIST OF CITY HOLIDAYS IS AVAILABLE AT THE ENGINEERING DEPARTMENT COUNTER.) 21. ALL OFF-SITE HAUL ROUTES SHALL BE SUBMITTED BY THE CONTRACTOR TO THE CITY INSPECTOR FOR APPROVAL TWO FULL WORKING DAYS PRIOR TO BEGINNING OF WORK. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DEBRIS OR DAMAGE OCCURRING ALONG THE HAUL ROUTE OR ADJACENT STREETS AS A RESULT OF THE GRADING OPERATION. 22. IMPORT MATERIAL SHALL BE OBTAINED FROM, AND WASTE MATERIAL SHALL BE DEPOSITED AT, A SITE APPROVED BY THE CITY ENGINEER. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DEBRIS OR DAMAGE OCCURRING ALONG THE HAUL ROUTES OR ADJACENT STREETS AS A RESULT OF THE GRADING OPERATION. 23. BRUSH SHALL BE REMOVED ONLY WITHIN THE AREA TO BE GRADED. NO TREES ARE TO BE REMOVED UNLESS SPECIF/CALLY NOTED ON THE PLAN. 24. ALL AREAS SHALL BE GRADED TO DRAIN. GRADING RESULTING IN THE PONDING OF WATER IS NOT PERMITTED. ALL EARTHEN SWALES AND DITCHES SHALL HAVE A MINIMUM ONE PERCENT SLOPE. 25. THESE PLANS ARE SUBJECT TO A SIGNED AND APPROVED SWPPP AND/OR SET OF EROSION CONTROL PLANS. EROSION CONTROL SHALL BE AS SHOWN AND AS APPROVED BY THE CITY ENGINEER OR AS DIRECTED BY THE PROJECT INSPECTOR. 26. ALL SLOPES SHALL BE TRIMMED TO A FINISH GRADE TO PRODUCE A UNIFORM SURFACE AND CROSS SECTION. THE SITE SHALL BE LEFT IN A NEAT AND ORDERLY CONDITION. ALL STONES, ROOTS OR OTHER DEBRIS SHALL BE REMOVED AND DISPOSED OF AT A SITE APPROVED OF BY THE CITY ENGINEER. 27. ALL SLOPES SHALL BE fRRfGA TED, STABILIZED, PLANTED AND/OR HYDROSEEDED WITHIN TEN (10) DAYS OF THE TIME WHEN EACH SLOPE IS BROUGHT TO GRADE AS SHOWN ON THE APPROVED GRADING PLANS. 28. LANDSCAPING SHALL BE ACCOMPLISHED ON ALL SLOPES AND PADS AS REQUIRED BY THE CITY OF CARLSBAD LANDSCAPE MANUAL, THE LANDSCAPING PLANS FOR THIS PROJECT, DRAWING NO. N/A , AND/OR AS DIRECTED BY THE CITY ENGINEER OR PLANNING DIRECTOR. 29. THE OWNER/APPLICANT SHALL INSURE THAT ALL CONTRACTORS SHALL COORDINATE THE WORK OF THESE GRADING PLANS WITH THAT SHOWN ON BOTH THE LANDSCAPE AND fRRfGA TION PLANS AND THE IMPROVEMENT PLANS AS REQUIRED FOR THIS WORK IN ACCORDANCE WITH THE LANDSCAPE MANUAL TIME REQUIREMENTS. 30. WHERE AN EXISTING Pf PE LINE IS TO BE ABANDONED AS A RESULT OF THE GRADING OPERATION, IT SHALL BE REMOVED WITHIN TWENTY FEET OF BUILDING OR STREET AREAS AND REPLACED WITH PROPERLY COMPACTED SOILS. IN OTHER AREAS THE PIPE WILL BE PLUGGED WITH CONCRETE OR REMOVED AS APPROVED BY THE CITY ENGINEER. 31. THE EXISTENCE AND LOCATION OF UTILITY STRUCTURES AND FACILITIES SHOWN ON THE CONSTRUCT/ON PLANS WERE OBTAINED BY A SEARCH OF THE AVAILABLE RECORDS. ATTENTION IS CALLED TO THE POSSIBLE EXISTENCE OF OTHER UTILITY FACILITIES OR STRUCTURES NOT SHOWN OR IN A LOCATION DIFFERENT FROM THAT SHOWN ON THE PLANS. THE CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY MEASURES TO PROTECT THE UTILITIES SHOWN ON THE PLANS AND ANY OTHER EXISTING FACILITIES OR STRUCTURES NOT SHOWN. 32. THE CONTRACTOR SHALL VERIFY THE LOCA TfON OF ALL EXISTING FACILITIES ( ABOVE GROUND AND UNDER GROUND ) WITHIN THE PROJECT SITE SUFFICIENTLY AHEAD OF GRADING TO PERMIT THE REVISION OF THE GRADING PLANS IF IT IS FOUND THAT THE ACTUAL LOCATIONS ARE IN CONFLICT 'MTH THE PROPOSED WORK. 33. THE CONTRACTOR SHALL NOTIFY AFFECTED UTILITY COMPANIES (SEE BELOW) AT LEAST 2 FULL WORKING DAYS PRIOR TO STARTING GRADING NEAR THEIR FACILITIES AND SHALL COORDINATE THE WORK WITH A COMPANY REPRESENTA TfVE. UNDERGROUND SERVICE ALERT (800)422-4133 SDG&E (800)411-7343 AT&T (800)892-0123 TIME WARNER CABLE (760)438-7741 COX COMMUN/CATIONS (619)262-1122 CITY OF CARLSBAD(STREETS & STORM DRAIN) (760)434-2980 *CITY OF CARLSBAD(SEWER, WATER & RECLAIMED WATER) (760)438-2722 *SAN DIEGU/TO WATER DISTRICT (760)633-2650 *LEUCADIA WASTEWATER DISTRICT (760)753-0155 *VALLECITOS WATER DISTRICT (760)744-0460 *OLIVENHAIN WATER DISTRICT (760)753-6466 *BUENA SANITATION DISTRICT (760)726-1340 x1330 • AS APPROPRIATE 34. PERMIT COMPLIANCE REQUIREMENTS: A. FOR CONTROLLED GRADING -THE APPLICANT HIRES A CIVIL ENGINEER, SOILS ENGINEER, AND /OR GEOLOGIST TO GIVE TECHNICAL ADVICE, OBSERVE AND CONTROL THE WORK IN PROGRESS [15.16.120 A.BJ CARLSBAD MUNICIPAL CODE. B. PRIOR TO FINAL APPROVAL OF A GRADING PERMIT -THE FOLLO'MNG REPORTS MUST BE SUBMITTED TO THE CITY ENGINEER VIA THE PROJECT INSPECTOR {15.16.120 A. 10} CARLSBAD MUNICIPAL CODE: (1) FINAL REPORT BY SUPERVISING GRADING ENGINEER STA TING ALL GRADING IS COMPLETE. ALL EROSION CONTROL, SLOPE PLANTING AND /RR/GA TfON ARE INSTALLED IN CONFORMANCE WITH CITY CODE AND THE APPROVED PLANS ( OBTAIN SAMPLE OF COMPLIANCE LETTER FROM CITY ENGINEERING DEPARTMENT). (2) AS-BUILT GRADING PLAN. (3) REPORT FROM THE SOILS ENGINEER, WHICH INCLUDES RECOMMENDED SOIL BEARING CAPACITIES, A STATEMENT AS TO THE EXPANSIVE QUALITY OF THE SOIL, AND SUMMARIES OF FIELD AND LABORATORY TESTS AND PLOTTED TEST POINTS THE REPORT SHALL ALSO INCLUDE A STATEMENT BY THE SOILS ENGINEER THAT THE GRADING WAS DONE IN ACCORDANCE 'MTH THE REQUIREMENTS AND RECOMMENDATIONS OUTLINED IN THE PRELIMINARY SOILS REPORT AND ANY SUPPLEMENTS THERETO. (4) REPORT WITH AS-BUILT GEOLOGIC PLAN, IF REQUIRED BY THE CITY. 35. UNLESS A GRADING PERMIT FOR THIS PROJECT JS ISSUED 'MTHIN ONE (1) YEAR AFTER THE CITY ENGINEER'S APPROVAL, THESE PLANS MAY BE REQUIRED TO BE RESUBMITTED FOR PLANCHECK. PLANCHECK FEES WILL BE REQUIRED FOR ANY SUCH RECHECK. 35. IN ACCORDANCE WITH THE CITY STORM WATER STANDARDS, ALL STORM DRAIN INLETS CONSTRUCTED BY THIS PLAN SHALL INCLUDE "STENCILS" BE ADDED TO PROHIBIT WASTEWATER DISCHARGE DOWNSTREAM. STENCILS SHALL BE ADDED TO THE SATISFACTION OF THE CITY ENGINEER. "DECLARATION OF RESPONSIBLE CHARGE" f HEREBY DECLARE THAT f AM THE ENGINEER OF WORK FOR THIS PROJECT, THAT f HA VE EXERCISED RESPONSIBLE CHARGE OVER THE DESIGN OF THE PROJECT AS DEFINED IN SECTION 6 703 OF THE BUSINESS AND PROFESSIONS CODE, AND THAT THE DESIGN IS CONSISTENT WITH CURRENT STANDARDS. f UNDERSTAND THAT THE CHECK OF PROJECT DRAWINGS AND SPECIF/CATIONS BY THE EROSION CONTROL NOTES 1. IN CASE EMERGENCY WORK IS REQUIRED, CONTACT DAVID M. PAGE AT 310-625-5335 (PHONE NUMBER) 2. EQUIPMENT AND WORKERS FOR EMERGENCY WORK SHALL BE MADE AVAILABLE AT ALL TIMES DURING THE RAINY SEASON. ALL NECESSARY MATERIALS SHALL BE STOCKPILED ON SITE AT CONVENIENT LOCATIONS TO FAG/LITA TE RAPID CONSTRUCTION OF TEMPORARY DEVICES WHEN RAIN IS EMINENT. 3. FOR PROJECTS COVERED BY STA TE SWPPP /WDID, IN ACCORDANCE WITH THE CONSTRUCTION ORDER ISSUED BY THE CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD, THE CONTRACTOR'S QUALIFIED SWPPP PRACTITIONER (QSP) SHALL UPDATE AND MAINTAIN THE WATER POLLUTION CONTROL (WPC) PLAN TO ADDRESS UPDATED SITE CONDITIONS OF THE PROJECT. THE UPDATED WPC PLAN AND UPDATED SWPPP SHALL BE KEPT AT THE PROJECT SITE AND MADE AVAILABLE TO THE CITY INSPECTOR. ADDITIONAL CONSTRUCTION BMP'S BEYOND THE ORIGINAL APPROVED SWPPP SHALL BE PROVIDED TO ADDRESS SITE CONDITIONS NOT ANTIC/PA TED. THE QSP SHALL REPORT BMP DEFICIENCIES TO THE CITY INSPECTOR. THE QSP SHALL OBTAIN APPROVAL FROM THE CONTRACTOR'S QUALIFIED SWPPP DEVELOPER AND THE CITY INSPECTOR REGARDING ANY SIGNIFICANT CHANGES TO BMP DEPLOYMENT. 4. THE CONTRACTOR SHALL RESTORE ALL EROSION CONTROL DEVICES TO WORKING ORDER TO THE SATISFACTION OF THE CITY ENGINEER AFTER EACH RUN-OFF PRODUCING RAINFALL. 5. THE CONTRACTOR SHALL INSTALL ADDITIONAL EROSION CONTROL MEASURES AS MAY BE REQUIRED BY THE CITY ENGINEER AND/OR CITY INSPECTOR DUE TO UNCOMPLETED GRADING OPERATIONS OR UNFORESEEN CIRCUMSTANCES WHICH MAY ARISE. 6. THE CONTRACTOR SHALL BE RESPONSIBLE AND SHALL TAKE NECESSARY PRECAUTIONS TO PREVENT PUBLIC TRESPASS ONTO AREAS WHERE IMPOUNDED WATERS CREA TE A HAZARDOUS CONDITION. 7. ALL EROSION CONTROL MEASURES PROVIDED PER THE APPROVED SWPPP AND/OR EROSION CONTROL PLAN SHALL BE JNCORPORA TED HEREON. 8. GRADED AREAS AROUND THE PROJECT PERIMETER MUST DRAIN AWAY FROM THE FACE OF SLOPE AT THE CONCLUSION OF EACH WORKING DAY. 9. ALL REMOVABLE PROTECTIVE DEVICES SHOWN SHALL BE IN PLACE AT THE END OF EACH WORKING DAY WHEN THE FIVE (5) DAY RAIN PROBABILITY FORECAST EXCEEDS FORTY PERCENT (40%). SILT AND OTHER DEBRIS SHALL BE REMOVED AFTER EACH RAINFALL. 10. ALL GRAVEL BAGS SHALL BE BURLAP TYPE WITH 3/4 INCH MINIMUM AGGREGRA TE. 11. SHOULD GERM/NATION OF HYDROSEEDED SLOPES FAIL TO PROVIDE EFFECTIVE COVERAGE OF GRADED SLOPES (90% COVERAGE) PRIOR TO NOVEMBER 15, THE SLOPES SHALL BE STABILIZED BY PUNCH STRAW INSTALLED IN ACCORDANCE WITH SECTION 35.023 OF THE EROSION ANO SEDIMENT CONTROL HANDBOOK OF THE DEPARTMENT OF CONSERVATION, STA TE OF CALIFORNIA. TEMPORARY EROSION CONTROL PLANTING AND IRRIGATION ALL PERMANENT AND TEMPORARY EROSION CONTROL PLANTING AND /RR/GA TION SHALL BE INSTALLED AND MAINTAINED AS REQUIRED IN SECTION 212 OF THE STANDARD SPEC/FICA TIONS AND THE FOLLOWING: A. HYDROSEEDING SHALL BE APPLIED TO: 1. ALL SLOPES THAT ARE GRADED 6: 1 (HORIZONTAL TO VERTICAL) OR STEEPER WHEN THEY ARE: a. THREE FEET OR MORE IN HEIGHT AND ADJACENT TO A PUBLIC WALL OR STREET. b. ALL SLOPES 4 FEET OR MORE IN HEIGHT. 2. AREAS GRADED FLATTER THAN 6: 1 WHEN ANY OF THE FOLLOWING CONDITIONS EXIST: a. NOT SCHEDULED FOR fMPROVEMENTS(CONSTRUCTION OR GENERAL LANDSCAPING) WITHIN 60 DAYS OF ROUGH GRADING. b. IDENTIFIED BY THE PARKS AND RECREA TfON DIRECTOR AS HfGHL Y VISIBLE TO THE PUBLIC. c. HA VE ANY SPECIAL CONDITION IDENTIFIED BY THE CITY ENGINEER THAT WARRANTS IMMEDIATE TREATMENT. B. HYDROSEEDED AREAS SHALL BE /RR/GA TED IN ACCORDANCE WITH THE FOLLOWING CRITERIA: 1. ALL SLOPES THAT ARE GRADED 6: 1 OR STEEPER AND THAT ARE: a. THREE TO EIGHT FEET IN HEIGHT SHALL BE /RR/GA TED BY HAND WATERING FROM QUICK COUPLERS/HOSE BIBS OR A CONVENTIONAL SYSTEM OF LOW PRECIP/TA TION SPRINKLER HEADS PROVIDING 100% COVERAGE. b. GREATER THAN 8 FEET IN HEIGHT SHALL BE WATERED BY A CONVENTIONAL SYSTEM OF LOW PREC/PfTA TfON SPRINKLER HEADS PROVIDING 100% COVERAGE. 2. AREAS SLOPED LESS THAN 6: 1 SHALL BE /RR/GA TED AS APPROVED BY THE CITY ENGINEER, PRIOR TO HYDROSEEDING. THE DEVELOPER SHALL SUBMIT A PROPOSED SCHEME TO PROVIDE fRRfGA TION TO THE CITY ENGINEER. THE PROPOSAL SHALL BE SPECIFIC REGARDING THE NUMBERS, TYPES AND COSTS OF THE ELEMENTS OF THE THE PROPOSED SYSTEM. 3. fRRfGA TION SHALL MAINTAIN THE MOISTURE LEVEL OF THE SOIL AT THE OPTIMUM LEVEL FOR THE GROWTH OF THE HYDROSEEDED GROWTH. C. HYDROSEEDING MIX SHALL CONSIST OF ALL OF THE FOLLOWING: 1. SEED MIX SHALL CONSIST OF NO LESS THAN: a. 20 lbs. PER ACRE OF ROSE CLOVER b. 20 lbs. PER ACRE OF ZORRO FESCUE c. 3 lbs. PER ACRE OF E SCHOOL CIA CALIFORNICA d. 4 lbs. PER ACRE OF ACHILLEA MILLEFOLIA e. 3 lbs. PER ACRE OF AL YSSUM (CARPET OF SNOW) CITY OF CARLSBAD DOES NOT RELIEVE ME, AS ENGINEER OF WORK, OF M'J.l'-----f. 1 /2 lb. PER ACRE OF DIMORPHOLECA g. ITEMS c,d,e, AND f OF THIS SUBSECTION MAY BE OMITTED ON LOCA TfONS WHERE THE AREA BEING HYDROSEEDED IS NOT VISIBLE FROM EITHER A PUBLIC STREET OR RESIDENTIAL STRUCTURES. RESPONS/BfL/TfES FOR PROJECT DESIGN. FIRM: ALDRICH CONSUL TING ENGINEERS ADDRESS: --=~4~1:6:S:H:A=D=O:W:=:TR:E:E:D:R~I_VE~=========== ~•£ __ -~ CITY, STA TE: OCEANSIDE. CA 92058 h. ITEM a OF THIS SUBSECTION MUST BE INOCULATED WITH A NITROGEN FIXING BACTERIA AND APPLIED DRY EITHER BY DRILLING OR BROADCASTING BEFORE H YDROSEEDING. TELEPHONE: 760-783-6222 \ BY: ERICK J. ALDRICH DATE: _______ ,"'«i ;::----:: ~,-. (NAME OF ENGINEER) '"oFcALlfrfl' i. ALL SEED MATERIALS SHALL BE TRANSPORTED TO THE JOBS/TE IN UNOPENED CONTAINERS 'MTH THE CALIFORNIA DEPARTMENT OF FOOD AND AGRICULTURE CERT/FICA TION TAG A TT ACHED TO, OR PRINTED ON SAID CONTAINERS. R.C.E. N0.:_~5=7~8=2~7 ____________ _ REGISTRA TfON EXP/RATION DA TE: _ _.6.,I_..J"'0,_.(2..,4'------ SOILS ENGINEER'S CERTIFICATE f, RUSSELL C. LAMB . A REGISTERED (CIVIL/ GEO TECHNICAL) ENGINEER OF THE STA TE OF CALIFORNIA, PRING/PALLY DOING BUSINESS IN fHE FIELD OF APPLIED SOILS MECHANICS, HEREBY CERTIFY THAT A SAMPLING AND STUDY OF THE SOIL CONDITIONS PREVALENT WITHIN THIS SITE WAS MADE BY ME OR UNDER MY DIRECTION BETWEEN THE DA TES OF APRIL 07 , 20 23 AND MAY 21 , 20 _ll_. TWO COPIES OF THE SOILS REPORT COMPILED FROM THIS STUDY, WITH MY RECOMMENDATIONS, HAS BEEN SUBMITTED TO THE OFFICE OF THE CITY ENGINEER. 2_ SIGNED: <'f =~ C fo-.&- G.E./P.E. NO.: DATE: LICENSE EXP/RA TfON DA TE: OWNER'S CERTIFICATE f ( WE ) HEREBY CERTIFY THAT A REG/STEREO SOILS ENGINEER OR GEOLOGIST HAS BEEN OR 'MLL BE RETAINED TO SUPERVISE OVER-ALL GRADING ACTIVITY AND ADVISE ON THE COMPACTION AND STABILITY OF THIS SITE. IF THIS PROJECT/DEVELOPMENT IS SUBJECT TO A STATE-REGULATED SWPPP, f (WE) ALSO AGREE A QUALIFIED SWPPP PRACTITIONER (QSP) HAS BEEN OR 'MLL BE RETAINED TO SUPERVISE fMPLEMENTA TION OF THE SWPPP IN ACCORDANCE WITH THE CALIFORNIA CONSTRUCTION ORDER AND MUNICIPAL PERMIT, LA TEST VERSION. STEVEN FEDER, MANAGER, TRIUMPH PROPERTIES GROUP DATE j. NON-PHYTO-TOXIC WEmNG AGENTS MAY BE ADDED TO THE HYDROSEED SLURRY AT THE DISCRETION OF THE CONTRACTOR. 2. TYPE 1 MULCH APPLIED AT THE RA TE OF NO LESS THAN 2000 lbs PER ACRE. TYPE 6 MULCH {STRAW) MAY BE SUBSTITUTED, ALL OR PART, FOR HYDRAULICALLY APPLIED FIBER MATERIAL. WHEN STRAW IS USED IT MUST BE ANCHORED TO THE SLOPE BY MEGHAN/CALLY PUNCHING NO LESS THAN 50% OF THE STRAW INTO THE SOIL. 3. FERTILIZER CONSISTING OF AMMONIUM PHOSPHATE SULFATE, 16-20-0, WITH 15% SULPHUR APPLIED AT THE RA TE OF 500 lbs. PER ACRE. D. AREAS TO BE HYDROSEEDED SHALL BE PREPARED PRIOR TO HYDROSEEDING BY: 1. ROUGHENING THE SURFACE TO BE PLANTED BY ANY OR A COMBINATION OF: a. TRACK WALKING SLOPES STEEPER THAN 6: 1 b. HARROWING AREAS 6: 1 OR FLATTER THAT ARE SUFFICIENTLY FRIABLE. c. RIPPING AREAS THAT WILL NOT BREAK UP USING ITEMS a OR b ABOVE. 2. CONDITIONING THE SOILS SO THAT IT JS SUITABLE FOR PLANTING BY: a. ADJUSTING THE SURFACE SOIL MOISTURE TO PROVIDE A DAMP BUT NOT SATURATED SEED BED. b. THE ADDITION OF SOIL AMENDMENTS, PH ADJUSTMENT, LEACHING COVERING SALINE SOILS TO PROV/OED VIABLE CONDITIONS FOR GROWTH. E. HYDROSEEDED AREAS SHALL BE MAINTAINED TO PROVIDE A VIGOROUS GROWTH UNTIL THE THE PROJECT IS PERMANENTLY LANDSCAPED OR, FOR AREAS WHERE HYDROSEEDING IS THE THE PERMANENT LANDSCAPING, UNTIL THE PROJECT IS COMPLETED AND ALL BONDS RELEASED. SOURCE OF TOPOGRAPHY TOPOGRAPHY SHOWN ON THESE PLANS WAS GENERA TED BY AERIAL .LJQAB METHODS FROM JNFORMA TION GATHERED ON APRIi 7 2Q.2J.._ BY APM ENGINEERING TOPOGRAPHY SHOWN HEREON CONFORMS TO NATIONAL MAP ACCURACY STANDARDS. PROJECT LOCATION THIS PROJECT IS LOCATED WITHIN ASSESSORS PARCEL NUMBER(S) 1670306400 SITE VICINITY MAP CITY WORK TO BE DONE THE GRADING WORK SHALL CONSIST OF RE-GRADING OF TWO EXISTING SURFICIAL SLOPE FAILURES AND REPAIR OF EXISTING DAMAGED DRAINING SWALES, AS-BUILT GEOLOGIC MAPS AND REPORTS, ALL AS SHOWN OR REQUIRED ON THIS SET OF PLANS AND THE CITY STANDARDS, SPECIF/CA TfONS, REQUIREMENTS, RESOLUTIONS AND ORDINANCES Cf TEO ON THESE PLANS. THE GRADING WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE FOLLOWING DOCUMENTS, CURRENT AT THE TIME OF CONSTRUCTION, AS DIRECTED BY THE CITY ENGINEER. 1. CARLSBAD MUNICIPAL CODE 2. CITY OF CARLSBAD ENGINEERING STANDARDS 3. THIS SET OF PLANS 4. THE STANDARD SPECIF/CATIONS FOR PUBLIC WORKS CONSTRUCTION (GREEN BOOK). CITY or VISTA 5. SOILS REPORT AND RECOMMENDA T/ONS BY GEOSITE ENGINEERING PACIFIC OCEAN INDEX OF SHEETS 1. TITLE SHEET 2. TOPOGRAPHIC MAP 3. GRADING REPAIR PLAN 4. TIER 2 SWPPP 5. EROSION CONTROL PLAN 6. SOILS REPORT RECOMMENDA TfONS LEGAL DESCRIPTION SEC 32-11-4W*LOTS 3-5*PAR B PER DOC93-285936\ PROJECT ADDRESS 2701 AVENIDA DE ANITA, CARLSBAD, CA 92010-8353 DEVELOPER NAME: TRIUMPH MANAGEMENT COMPANY 9454 WILSHIRE BL VD. SUITE 800 ADDRESS: BEVERLY HILLS, CA 90212 PHONE NO.: 310-625-5335 REFERENCE DRAWINGS DWG 168-4 EARTHWORK QUANTITIES CUT: 200 CY FILL: 240 CY IMPORT: _4-0 ____ cy EXPORT: n CY REMEDIAL: 240 CY BENCH MARK DESCRIPTION: CITY OF CARLSBAD BENCHMARK CLSB-087 LOCA TfON: mllNQ IN 2 5• DISK IN WE:SI CURB OPPOSITE 2906 A VEN/DA DE ANITA 190 FT. NORTH OF CALLE SUSANA RECORDED: __________________ _ ELEVATION: 165.36 DA TUM: NGVD 29 _____ DATED MAY 21, 2023 6. THE SAN DIEGO REGIONAL STANDARD DRAWINGS AND AS MAY BE MODIFIED BY THE CITY OF CARLSBAD STANDARDS. 7. CALIFORNIA STORM WATER QUALITY ASSOC/A TION BMP CONSTRUCTION HANDBOOK AND CAL TRANS CONSTRUCTION SITE BMP MANUAL. LEGEND -#- E--------3 R.O.W. BOUNDARY TOPO CONTOUR (E) V-DfTCH W/ 12" FREEBOARD PER PLAN (E) 6" CURB AND SIDEWALK ABANDONMENT NOTES PART/ALLY COMPLETED PROJECTS SEEKING TO INDEFINITELY STOP WORK AND CLOSE THE GRADING PERMIT MUST IMPLEMENT APPROPRIATE ACCESS RESTRICTION AND EROSION AND SEDIMENT CONTROL MEASURES TO THE SA TfSFACTfON OF THE CITY, INCLUDING BUT NOT LIMITED TO THE FOLLOWING: 1) PERMANENTLY STABILIZE ALL SLOPES (>5%) -70% COVER WITH WELL-ESTABLISHED, SUSTAINABLE, NON-WEED VEGETA TfON (SEE CITY LANDSCAPE MANUAL FOR GUIDELINES) JS CONSIDERED ADEQUATE. 2) PERMANENTLY STABILIZE FLAT AREAS (,<;;5%) -70% COVER WITH WELL-ESTABLISHED, SUSTAINABLE, NON-WEED VEGETA TfON (SEE CITY LANDSCAPE MANUAL FOR GUIDELINES) OR 2 INCHES (MINIMUM) OF PERMEABLE COVER (E.G., GRAVEL) IS CONSIDERED ADEQUATE. 3) RESTRICT ACCESS TO SITE -COORDINATE WITH CITY STAFF TO DETERMINE APPROPRIATE FENCING TYPE. 4) SfGNAGE ALONG FRONTAGE ROAD(S) POSTING THAT DUMPING, LITTERING, AND TRESPASS/NG ARE PROHIBITED. 5) TRESPASS ENFORCEMENT AUTHORJZA TION LETTER MUST BE SENT FROM THE OWNER TO THE CITY OF CARLSBAD POLICE DEPARTMENT. 6) NOTARIZE AND RECORD AGAINST THE PROPERTY AN AGREEMENT STATING THAT OWNER IS RESPONSIBLE FOR MAINTAINING FENCING AND SfGNAGE, ADHERING TO THE FIRE PREVENTION ORD/NATION, KEEPING THE SITE FREE FROM LITTER ACCUMULA TfON AND VEGETATION GROWTH, AND REMOVING ANY fLLEGALL Y DUMPED MATERIALS AT THE SITE UNTIL THE PROPERTY IS DEVELOPED IN THE FUTURE. ALL STANDARD DRAWINGS ARE SAN DIEGO REGIONAL STANDARD DRAWINGS (SDRSD) UNLESS NOTED OTHER'MSE: * CITY OF CARLSBAD STANDARD ** CARLSBAD MUNICIPAL WATER DISTRICT STANDARD ORA WING ••• SDRSD AS MODIFIED BY CITY OF CARLSBAD POST-CONSTRUCTION BMP TABLE STORM WATER REQUIREMENTS THAT APPLY: ~ STANDARD STORMWA TER REQUIREMENTS □ PRIORITY PROJECT REQUIREMENTS TYPE DESCRIPTION OWNERSHIP EXEMPT FROM TRASH CAPTURE? ~ YES D NO MAINTENANCE AGREEMENT EXEMPT FROM HYDROMODIFICA TfON? ~ YES □ NO SHEET NO. MAINTENANCE FREQUENCY 11 AS BUIL T 11 RCE ___ EXP, ___ _ DATE REVIE\JED BY: INSPECTOR DATE t--+---+-------------+----+--+--t--t lsHE1ETI. _c_rT_Y __ o_F_c_A_R_L_s_B_A_D~lsH~Tsl _ ENGINEERING DEPARTMENT DATE INITIAL DATE INITIAL DATE INITIAL ENGINEER OF WORK REVISION DESCRIPTION OTHER APPROVAL CITY APPROVAL GRADING PLANS FOR: THE BLUFFS SLOPE REPAIR -SOUTH SIDE OF MARRON ROAD GR2023-0032 TITLE SHEET APPROVED: JASON S. GELDERT ENGINEERING MANAGER RCE 63912 EXPIRES 9/30/24 DATE DWN BY: CHKD BY:...,.....,.....,...._ RVWD BY: / ,f h< PROJECT NO. PD2023-0021 DRAWING NO. 544-2A DocuSign Envelope ID: 206C0002-5897-442A-B69A-C97BAF435BA4 10/24/2023 E ERICK J. ALDRICH No. 57827 CIVIL SSFIOORNPADL EE NR GTE ISNIEGEERR S T TA EO OFFCA ARLINI Aldrich Consulting Engineers 0 ll o' SLOPE REPAIR AREA 1 PREPARED BY: ERICK J. ALDRICH PE ALDRICH CONSUL TING ENGINEERS 416 SHADOW TREE DRIVE OCEANSIDE, CA 92058 RCE 57827 EXPIRES 6/30/24 /----- SLOPE REPAIR AREA 2 I C I I I I I '1 I \ I I I I ----1 -_J ___ _ I I I I -- / C \ i \ I I \I I I I 7 I I I 7 / / ~THE BLUFFS APARTMENTS 2701 AVENIDA DE ANITA CARSLBAD, CA 92010 BENCH MARK DESCRI PT/ON: CITY OF CARLSBAD BENCHMARK CLSB-087 LOCATION: mt INQ IN 2 5• Q/5/< IN WE5I CURB QPPQ51TE 2906 AVENIDA DE ANITA 190 FT. NORTH OF CALLE SUSANA RECORDED: ___________________ _ 1 DATE INITIAL T I ELEVATION: 165.36 DA TUM: NGVD 29 ENGINEER OF WORK REVISION DESCRIPTION 11 AS BUIL T11 RCE EXP, DATE SCALE: 1· = 50•-o· REVIE\JED BY1 0 50' 100' INSPECTOR DATE I SH~ET I CITY OF CARLSBAD I SH~ETS I ENGINEERING DEPARTMENT GRADING PLANS FOR: THE BLUFFS SLOPE REPAIR -SOUTH SIDE OF MARRON ROAD GR2023-0032 TOPOGRAPHIC MAP APPROVED: JASON s. GELDERT ENGINEERING MANAGER RCE 63912 EXPIRES 9/30/24 DATE DATE INITIAL DATE INITIAL OTHER APPROVAL CITY APPROVAL DWN BY: PROJECT NO. DRAWING NO. CHKD BY:f.< RVWD BY: I Jt PD2023-0021 544-2A DocuSign Envelope ID: 206C0002-5897-442A-B69A-C97BAF435BA4 10/24/2023 E ERICK J. ALDRICH No. 57827 CIVIL SSFIOORNPADL EE NR GTE ISNIEGEERR S T TA EO OFFCA ARLINI Aldrich Consulting Engineers CE) CURB AND APPROXIMATE LIMIT □F 5' KEY ~\ ) \ ·,.,~ 10' TD PER RD\./ ---- SHEET 6 / I • CE) CONCRETE V-DITCH 0 ll o' PREPARED BY: ERICK J. ALDRICH P.E. ALDRICH CONSUL TING ENGINEERS 416 SHADOW TREE DRIVE OCEANSIDE, CA 92058 RCE 57827 EXPIRES 6/30/24 SIDE\./ ALK RON ROAD MAR /,,,.,✓----·/ ----· ------- /_/ WEST SLOPE REPAIR AREA 1 SCALE 1" = 10' NOTES: 1. REMOVE LOOSE SOIL WITHIN SLOPE FAILURE AREA PER GEOTECHNICAL REPORT RECOMMENDAllONS (SEE SHEET 6) AND PER GEOTECHNICAL ENGINEER DURING GRADING. 2. REPLACE/RECOMPACT SOIL TO ORIGINAL SLOPE GRADES. 3. FILL PLACEMENT AND COMPACllON TO BE OBSERVED AND TESTED BY THE GEOTECHNICAL ENGINEER. 4. REPAIR CONCRETE V-DITCH TO MATCH EXISllNG. 5. OTHER DRAINAGE RECOMMENDA llONS PER SOILS ENGINEER, SEE SHEET 6. CE) CURB AND APPROXIMATE LIMIT □F 5' KEY PER SHEET 6 10' TD RD\./ -- APPROXIMATE LIMITS □ F GRADING REPAIR CE) CONCRETE V-DITCH SIDE\./ ALK ) ' ) ·::-\1:- ,;--\-- • . . . . . j . . •.•.•.• .... ·.·.·.·.·.·.·.·.·.·.·.1·.· ,+' . . • __ _I,.-- < \ __ j -. -, .. , ___ _,, __ • )- \ \'1 ,_--k .. -------\ ), ) \--r' • '\ • ) . . '·--. ~ --" ) \"• . .) I \"• ) / ! '""'---------"-APPROXIMATE LIMIT □F FAILURE AREA ADD NE\./ AND 12" FREEB □ARD TD TOP CSEE DETAIL DITCH BY 18" \ \ \ V-DITCH \./IDEN V □F Al) ~ APPROXIMATE LIMIT FAILURE AREA ~ APPROXIMATE LIMITS □F GRADING REPAIR 12" INCREASE FREE BOARD 12" PER PLAN BY PLACE CONCRETE MONOLITHICALLY \./ITH NE\./ V DITCH MIN.t t=-=-===== INCREASE S\./ALE \./IDTH BY 18" f-18" -j DETAIL A1 NO SCALE ~ CE) V DITCH TD BE REPLACED BENCH MARK DESCRIPTION: CITY OF CARLSBAD BENCHMARK CLSB-087 LOCATION: mt INQ IN 2 5• Q/5/< IN WF5I CURB QPPQ51TE 2906 AVENIDA DE ANITA 190 FT. NORTH OF CALLE SUSANA RECORDED: ___________________ _ ELEVA 770N: 165.36 DA TUM: NGVD 29 EAST SLOPE REPAIR AREA 2 SCALE 1" = 10' NOTES: 1. REMOVE LOOSE SOIL WITHIN SLOPE FAILURE AREA PER GEOTECHNICAL REPORT RECOMMENDAllONS (SEE SHEET 6) AND PER GEOTECHNICAL ENGINEER DURING GRADING. 2. REPLACE/RECOMPACT SOIL TO ORIGINAL SLOPE GRADES. RESTORE LANDSCAPE /RR/GA 770N, IF PRESENT. 3. FILL PLACEMENT AND COMPACTION TO BE OBSERVED AND TESTED BY THE GEOTECHNICAL ENGINEER. 4. REPAIR CONCRETE V-DITCH TO MATCH EXISllNG, INCREASE FREE-BOARD HEIGHT AT CURVE OF V-DITCH BY 12 INCHES. AT LOCA 770N SHOWN ON PLAN. 5. OTHER DRAINAGE RECOMMENDA llONS PER SOILS ENGINEER. SEE SHEET 6. 6. PERMANENT LANDSCAPING. HYDROSEED EFFECTED AREAS. "AS BUILT" RCE __ _ EXP, ____ _ DATE REVIE\JED BY: INSPECTOR DATE 1---+-+--------------t----t---t----t-~ I SH3EET I CITY OF CARLSBAD I SH~ETS I ENGINEERING DEPARTMENT ~~==;=~~:::::::::::::::::::::::::::=:=======-=====; 1 DATE INITIAL DATE INITIAL DATE INITIAL ENGINEER OF WORK REVISION DESCRIPTION OTHER APPROVAL CITY APPROVAL GRADING PLANS FOR: THE BLUFFS SLOPE REPAIR -SOUTH SIDE OF MARRON ROAD GR2023-032 APPROVED: ENGINEERING MANAGER DWN BY: CHKD BY: __ _ RVWD BY: GRADING REPAIR PLAN JASON S. GELDERT RCE 63912 EXPIRES 9 30 PROJECT NO. PD2023-0021 24 DATE DRAWING NO. 544-2A DocuSign Envelope ID: 206C0002-5897-442A-B69A-C97BAF435BA4 10/24/2023 E ERICK J. ALDRICH No. 57827 CIVIL SSFIOORNPADL EE NR GTE ISNIEGEERR S T TA EO OFFCA ARLINI Aldrich Consulting Engineers STORM WATER POLLUTION PREVENTION NOTES APN : TIER 2 CITY STORM WATER POLLUTION PREVENTION PLAN (TIER 2 SWPPP) AREA OF DISTURBANCE CONSTRUCTION THREAT: OWNER/APPLICANT: SITE ADDRESS: EMERGENCY CONTACT : SHEET INDEX: OWNER'S CERTIFICATION: WEATHER TRIGGERED ACTION PLAN VICINITY MAP LEGEND CASQA Designation Construction Activity (BMP) Description Best Management Practice* Erosion Control Sediment Control BMPsBMPs Tracking Control BMPs Non-Storm Water Management BMPs Waste Management and Materials Pollution Control BMPs BEST MANAGEMENT PRACTICES (BMP) SELECTION TABLE 10/9/2023 10/9/2023Steven Feder GENERAL SITE MANAGEMENT REQUIREMENTS THE FOLLOWING GENERAL SITE MANAGEMENT REQUIREMENTS SHALL BE ADHERED TO THROUGHOUT THE DURATION OF THE CONSTRUCTION WORK (YEAR ROUND}. TRIUMPH 1. IN CASE EMERGENCY WORK IS REQUIRED, CONTACT:DA V/D M PAGE FROM: MANAGEMENT AT (TEL.NO.) 310-625-5335 2. DEVICES SHOWN ON CITY APPROVED PLANS SHALL NOT BE MOVED OR MODIFIED WITHOUT THE APPROVAL OF THE ENGINEERING INSPECTOR. 3. THE CONTRACTOR SHALL RESTORE ALL EROSION CONTROL DEVICES TO WORKING ORDER TO THE SATISFACTION OF THE CITY ENGINEER AFTER EACH RUN-OFF PRODUCING RAINFALL. 4. THE CONTRACTOR SHALL INSTALL ADDITIONAL EROSION CONTROL MEASURES AS MAY BE REQUIRED BY THE CITY ENGINEER DUE TO UNCOMPLETED GRADING OPERA 7/0NS OR UNFORSEEN CIRCUMSTANCES WHICH MAY ARISE. 5. THE CONTRACTOR SHALL BE RESPONSIBLE AND SHALL TAKE NECESSARY PRECAUTIONS TO PREVENT PUBLIC TRESPASS ONTO AREAS WHERE IMPOUNDED WATERS CREA TE A HAZARDOUS CONDITION. 6. GRADING AREAS AROUND THE PROJECT PERIMETER MUST DRAIN AWAY FROM THE FACE OF SLOPE AT THE CONCLUSION OF EACH WORKING DAY. 7. ALL REMOVABLE PROTECTIVE DEVICES SHALL BE IN PLACE AT THE END OF EACH WORKING DAY WHEN FIVE (5) DAY RAIN PROBABILITY FORECAST EXCEEDS FORTY PERCENT (40%). SILT AND OTHER DEBRIS SHALL BE REMOVED AFTER EACH RAINFALL. 8. ALL GRAVEL BAGS SHALL CONTAIN 3/4 INCH MINIMUM AGGREGATE. 9. ALL EXPOSED DISTURBED AREAS MUST HA VE EROSION PROTECTION BMPs PROPERLY INSTALLED. THIS INCLUDES ALL BUILDING PADS, UNFINISHED ROADS, AND SLOPES. 10. ADEQUATE PERIMETER PROTECl/ON BMPs MUST BE INSTALLED AND MAINTAINED AND WILL BE UPGRADED, IF NECESSARY, TO PROVIDE SUFFICIENT PROTECTION FROM RUNOFF DURING RAIN EVENTS. II. ADEQUATE SEDIMENT CONTROL BMPs MUST BE INSTALLED AND MAINTAINED. 12. ADEQUATE BMPs TO CONTROL OFFS/TE SEDIMENT TRACKING MUST BE INSTALLED AND MAINTAINED. 13. A MINIMUM OF 125% OF THE MATERIAL NEEDED TOO INSTALL STANDBY BMPs TO PROTECT THE EXPOSED AREAS FROM EROSION AND PREVENT SEDIMENT DISCHARGES, MUST BE STORED ONSITE. AREAS ALREADY PROTECTED FROM EROSION USING PHYSICAL STAB/LIZA TION OR ESTABLISHED VEGETATION STAB/LIZA TION BMPs ARE NOT CONSIDERED TO BE "EXPOSED" FOR PURPOSES OF THIS REQUIREMENT. 14. THE OWNER/DEVELOPER/CONTRACTOR MUST FOLLOW "WEATHER TRIGGERED" ACTION PLAN AND BE ABLE TO DEPLOY STANDBY BMPs TO PROTECT THE EXPOSED PORl/ONS OF THE SITE WITHIN 48 HOURS OF A PREDICTED STORM EVENT (A PREDICTED STORM EVENT IS DEFINED AS A 40% CHANCE OF RAIN WITHIN A 5-DA Y NA 7/0NAL M'A THER SERVICE FORECAST). ON REQUEST, THE OWNER/DEVELOPER/CONTRACTOR MUST PROVIDE PROOF OF THIS CAPABILITY. 15. DEPLOYMENT OF PHYSICAL OR VEGETATION EROSION CONTROL BMPs MUST COMMENCE AS SOON AS SLOPES ARE COMPLETED. THE OWNER/DEVELOPER/CONTRACTOR MAY NOT RELY ON THE ABILITY TO DEPLOY STANDBY BMP MATERIALS TO PREVENT EROSION OF SLOPES THAT HA VE BEEN COMPLETED. 16. THE AREA THAT CAN BE CLEARED, GRADED, AND LEFT EXPOSED AT ONE TIME IS LIMITED TO THE AMOUNT OF ACREAGE THAT THE CONTRACTOR CAN ADEQUATELY PROTECT PRIOR TO A PREDICTED RAIN EVENT. FOR LARGER SITES, GRADING SHOULD BE PHASED. IT MAY BE NECESSARY TO DEPLOY EROSION AND SEDIMENT CONTROL BMPs IN AREAS THAT ARE NOT COMPLETED, BUT ARE NOT ACTIVELY BEING WORKED BEFORE ADDITIONAL GRADING IS ALLOM'D TO PROCEED, AT THE DISCRETION OF THE CITY INSPECTOR. 17. ALL DISTURBED AREAS THAT ARE NOT COMPLETED AND/OR NOT BEING ACTIVELY GRADED MUST BE FULLY PROTECTED FROM EROSION IF LEFT FOR 14 OR MORE DAYS. THE ABILITY TO INSTALL BMP MATERIALS IN A PROMPT MANNER IS l:1f)I SUFFICIENT. BMPs NEED TO BE INSTALLED IN THESE AREAS. 18. BMPs MUST BE STOCKPILED AT VARIOUS LOCATION THROUGHOUT THE PROJECT SITE THROUGHOUT THE YEAR. WHENEVER THERE IS A 40% CHANCE OR CREA TER OF A RAIN WITHIN A THREE (3) DAY FORECAST, THE INSPECTOR WILL VERIFY THAT BMPs ARE ADEQUATELY STOCKPILED. BMPs MUST BE STOCKPILED AND READY FOR DEPLOYMENT WHEN THERE IS 50% CHANCE OF RAIN WITHIN A 48 HOUR FORECAST. FAILURE TO COMPLY WITH THIS REQUIREMENT COULD RESULT IN THE ISSUANCE OF A STOP WORK NOTICE OR OTHER ENFORCEMENT ACl/ON. 19. ALL TREATMENT AND EROSION CONTROL BMPs MUST BE INSPECTED M'EKL Y AND PRIOR TO A FORECASTED RAIN EVENT OF CREA TER THAN 50%, AND AFTER A RAIN EVENT. IN ADDITION, TREATMENT CONTROL BMPs MUST BE SERVICED AS NEEDED THROUGHOUT THE YEAR. 20. IF SELECTED BMP FAILS DURING A RAIN EVENT, IT MUST BE REPAIRED OR IMPROVED OR REPLACED WITH AN ACCEPTABLE AL TERNA TE AS SOON AS IT IS SAFE TO DO SO. THE FAILURE OF A BMP IND/CA TES IT WAS NOT ADEQUATE FOR THE CIRCUMSTANCES IN WHICH IT WAS USED. REPAIRS AND REPLACEMENT MUST THEREFORE PUT A MORE ROBUST BMP MEASURE IN PLACE. 21. ALL CONSTRUCTION EMPLOYEES MUST BE TRAINED ON THE IMPORTANCE OF STORM WATER POLLUTION PREVENTION AND BMP MAINTENANCE. 0 C o' PREPARED BY: ERICK J. ALDRICH PE ALDRICH CONSUL TING ENGINEERS 416 SHADOW TREE DRIVE OCEANSIDE, CA 92058 RC£ 57827 EXPIRES 6/30/24 EROSION CONTROL HYDROSEEDING, PLANTING AND /RR/GA TION 1. ALL PERMANENT AND TEMPORARY EROSION CONTROL PLANTING AND /RR/GA TION SHALL BE INSTALLED AND MAINTAINED AS REQUIRED IN SECTION 212 OF THE STANDARD SPECIF/CATIONS AND THE FOLLOWING: A HYDROSEEDING SHALL BE APPLIED TO: 1 ALL SLOPES THAT ARE GRADED 6: 1 {HORIZONTAL TO VERTICAL} OR STEEPER WHEN THEY ARE: a. THREE FEET OR MORE IN HEIGHT AND ADJACENT TO PUBLIC WALL OR STREET. b. ALL SLOPES 4 FEET OR MORE IN HEIGHT. 2 AREAS GRADED FLATTER THAN 6: 1 WHEN ANY OF THE FOLLOWING CONDITIONS EXIST: a. NOT SCHEDULED FOR IMPROVEMENTS (CONSTRUCTION OR GENERAL LANDSCAPING} WITHIN 60 DAYS OF ROUGH GRADING. b. IDENTIFIED BY THE PARKS AND RECREATION DIRECTOR AS HIGHL Y VISIBLE TO THE PUBLIC. c. HA VE ANY SPECIAL CONDITION IDENTIFIED BY THE CITY ENGINEER THAT WARRANTS IMMEDIATE TREATMENT. B HYDROSEEDING AREAS SHALL BE /RR/GA TED IN ACCORDANCE WITH THE FOLLOWING CRITERIA: 1 ALL SLOPES THAT ARE GRADED 6: 1 OR STEEPER AND THAT ARE.· a. THREE TO EIGHT FEET IN HEIGHT SHALL BE /RR/GA TED BY HAND WATERING FROM QUICK COUPLERS/HOSE BIBS OR A CONVENTIONAL SYSTEM OF LOW PRECIP/TA TION SPRINKLER HEADS PROVIDING 100% COVERAGE. b. CREA TER THAN 8 FEET IN HEIGHT SHALL BE WATERED BY A CONVENTIONAL SYSTEM OF LOW PRECIPITATION SPRINKLER HEADS PRO VIDING 100% CO VERA GE. 2 AREAS SLOPED LESS THAN 6: 1 SHALL BE /RR/GA TED AS APPROVED BY THE CITY ENGINEER, PRIOR TO HYDROSEEDING. THE DEVELOPER SHALL SUBMIT A PROPOSED SCHEME TO PROVIDE /RR/GA TION TO THE CITY ENGINEER. THE PROPOSAL SHALL BE SPECIFIC REGARDING THE NUMBERS, TYPE, AND COSTS OF THE ELEMENTS OF THE PROPOSED SYSTEM. 3 /RR/GA TION SHALL MAINTAIN THE MOISTURE LEVEL OF THE SOIL AT THE OPTIMUM LEVEL FOR THE GRADING OF THE HYDROSEEDED GROWTH. C HYDROSEEDING MIX SHALL CONSIST OF ALL OF THE FOLLOWING: 1 SEED MIX SHALL CONSIST OF NO LESS THAN: a. 20 lbs. PER ACRE OF ROSE CLOVER b. 20 lbs PER ACRE OF ZORRO FESCUE c. Jibs PER ACRE OF E SCHOOL CIA CALIFORNICA d. 4 lbs PER ACRE OF ACHILLEA MILLEFOLIA e. Jibs PER ACRE OF AL YSSUM (CARPET OF SNOW) f. 1/2 lb. PER ACRE IF DIMORPHOLECA g. ITEMS c, d, e, AND f OF THIS SUBSECTION MAY BE OMITTED ON VISIBLE FROM EITHER A PUBLIC STREET OR RESIDENTIAL STRUCTURES. h. ITEM a OF THIS SUBSECTION MUST BE INOCULATED WITH A NITROGEN FIXING BACTERIA AND APPLIED DRY EITHER BY DRILLING OR BROADCASING BEFORE HYDROSEEDING. i ALL SEED MATERIALS SHALL BE TRANSPORTED TO THE JOBS/TE IN UNOPENED CONTAINERS WITH THE CALIFORNIA DEPARTMENT OF FOOD AND AGR/CUL TUR£ CERT/FICA TION TAG ATTACHED TO, OR PRINTED ON SAID CONTAINERS. j NON-PHYTO-TOX/C WETTING AGENTS MAY BE ADDED TO THE HYDROSEED SLURRY AT THE DISCRETION OF THE CONTRACTOR. 2 TYPE 1 MULCH APPLIED AT THE RA TE OF NO LESS HAN 2000 lbs PER ACRE. TYPE 6 MULCH (STRAW} MAY BE SUBSTITUTED, WHEN STRAW IS USED, IT MUST BE ANCHORED TO THE SLOPE BY MEGHAN/CALLY PUNCHING NO LESS THAN 50% IF THE STRAW INTO THE SOIL. 3 FERTILIZER CONSISTING OF AMMONIUM PHOSPHATE SULFA TE. 16-20-0 WITH 15% SULPHUR APPLIED AT THE RA TE OF 500 lbs. PER ACRE. D AREAS TO BE HYDROSEEDED SHALL BE PREPARED PRIOR TO HYDROSEEDING: 1 ROUGHENING THE SURFACE TO BE PLANTED BY ANY OR A COMB/NA TION OF: a. TRACK WALKING SLOPES STEEPER THAN 6: 1. b. HARROWING AREAS 6: 1 OR FLATTER THAT ARE SUFFICIENTLY FRIABLE. 2 AREAS GRADED FLATTER THAN 6: 1 WHEN ANY OF THE FOLLOWING CONDITIONS EXIST: a. ADJUSl/NG THE SURFACE SOIL MOISTURE TO PROVIDE A DAMP BIT NOT SATURATED SEED 8£0. b. THE ADDITION OF SOIL AMENDMENTS, PH ADJUSTMENT, LEACHING COVERING SALINE SOILS TO PROVIDED VIABLE CONDITIONS FOR GROWTH. E HYDROSEEDING AREAS SHALL BE MAINTAINED TO PROVIDE A VIGOROUS GROWTH UNTIL THE PROJECT IS PERMANENTLY LANDSCAPED OR, FOR AREAS WHERE HYDROSEEDING IS THE PERMANENT LANDSCAPING, UNTIL THE PROJECT IS COMPLETED AND ALL BONDS RELEASED. 2. ALL SLOPES SHALL HA VE /RR/GA 7/0N INSTALLED AND BE STABILIZED, PLANTED AND/OR HYDROSEEDED WITHIN TEN (10} DAYS OF THE 7/ME WHEN EACH SLOPE IS BROUGHT TO GRADE AS SHOWN ON THE APPROVED GRADING PLANS. 3. SHOULD GERM/NATION OF HYDROSEEDED SLOPES FAIL TO PROVIDE EFFICIENT COVERAGE OF GRADING SLOPES {90% COVERAGE} PRIOR TO OCTOBER 1, THE SLOPES SHALL BE STABILIZED BY AN APPROPRIATE EROSION CONTROL MATTING MATERIAL APPROVED BY THE PUBLIC WORKS INSPECTOR. 4. LANDSCAPING SHALL BE ACCOMPLISHED ON ALL SLOPES AND PADS AS REQUIRED BY THE CITY OF CARLSBAD LANDSCAPE MANUAL, THE LANDSCAPING PLANS FOR THIS PROJECT OR AS DIRECTED BY THE CITY ENGINEER OF PLANNING DIRECTOR. 5. THE OWNER/APPLICANT SHALL ENSURE THAT All CONTRACTORS SHALL COORDINATE THE WORK OF THIS CONSTRUCTION SWPPP SHOWN ON ANY GRADING PLANS, LANDSCAPE AND /RR/GA TION PLANS, AND IMPROVEMENT PLANS AS REQUIRED FOR THIS PROJECT WORK. THE DEVELOPER SHALL DEPLOY STANDBY BEST MANAGEMENT PRACTICE MEASURES TO COMPLETELY PROTECT THE EXPOSED PORTIONS OF THE SITE WITHIN 48 HOURS OF A PREDICTED STORM EVENT ( A PREDICTED STORM EVENT IS DEFINED AS A FORECASTED, 40% CHANCE OF RAIN BY THE NATIONAL WEATHER SERVICE), IN ADDITION TO BMPs IMPLEMENTED YEAR-ROUND INCLUDING PERIMETER CONTROL, WIND EROSION CONTROL, TRACKING, NON-STORM WATER CONTROL, WASTE MANAGEMENT, AND MATERIALS POLLUTION CONTROL. THE NATIONAL WEATHER SERVICE FORECAST SHALL BE MONITORED AND USED BY THE DEVELOPER ON A DAILY BASIS. IF PRECIPITATION IS PREDICTED (40% CHANCE OF RAIN), THEN THE NECESSARY WATER POLLUTION CONTROL PRACTICES SHALL BE DEPLOYED WITHIN 48 HOURS AND PRIOR TO THE ONSET OF THE PRECIPITATION. THE DEPLOYMENT OF THE BMPS SHALL INCLUDE BUT NOT BE LIMITED TO GRAVEL BAGS AND SILT FENCES. A MINIMUM OF 125% OF THE MATERIAL NEEDED TO INSTALL STANDBY BEST MANAGEMENT PRACTICES MEASURES TO PROTECT THE EXPOSED AREAS FORM EROSION AND PREVENT SEDIMENT DISCHARGES MUST BE STORED ON-SITE. AREAS THAT HAVE ALREADY BEEN PROTECTED FROM EROSION USING PHYSICAL STAB/LIZA TION OR ESTABLISHED VEGETATION STAB/LIZA TION BMPS AS DETERMINED BY THE CITY OF CARLSBAD ARE NOT CONSIDERED TO BE "EXPOSED" FOR THE PURPOSES OF "WEATHER TRIGGERED ACTION PLAN~ AN ADEQUATE SOURCE OF EQUIPMENT AND WORKERS SHALL BE AVAILABLE FOR DEPLOYMENT OF "WEATHER TRIGGERED BMPS~ .§ ., -0 -::!; 1;:, ., ~o o-0, C: " ~ " g. ., ~ .s Oo Cll C: 0, 0, ., " ., >!:: ➔ ➔ Grading/Soil Disturbance Trenchinn !Excavation Stockvifino Oriflinn /Rorina Concrete/ Asvhalt Sawcuttina Concrete Flotwork Pavina Conduit IPioe lnstaffation Stucco/Mortar Work Waste Disoosal Staainn ILav Down Area Eauioment Maintenance and Fuelina Hazardous Substance Use/Storoae Dewaterina Site Access Across Dirt Other Oist): Instructions: -2~ .s 1;:, -., §! 0, " a; .s; ., i ., -Ill-~ ct~ ('J .... I I ::.3 ::.3 .c .s ~ ., -'2 "V) " ~ 0, " :, ~Q.) e 0 -0 "' C: c:, 0 Cll -::!; c:, 0, c:, C: ., a:: "' :S-~ ~ " ~ ti '!< 1;:, ., .... -0 g. ., 0 .... 0 -., & ., ~ ~tS Vi ~ c'l 6 ~ "' " o:i 0, ---,.., .... LC') "' I I I I ~ ~ ~ ~ I ::.3 ::.3 ::.3 ::.3 t:J C: C: 1;:, .2 .2 C: --0 0 0 2 2 -0, .... ., --:s .s -~ ., ., ., Ii} t: C: ., C: 0 ., 0 0 .s c., " 0, c., .... Cll ea 0, "' C: ""2¼:z 1;:, ,._ V) ·-0, c:,._ _E 0 -" 0 E~ ..... ., ~:ii: " :, '§ ~ (/) ·-1;:, ., :, " --g ~ il 0 .... 0 ~ 00 en g _..., -0, -o V) Cl.. V) ..s V) a:: " c:, "' --('J I ~ ~ I I t:J f):: f):: J~ ---~ 1;:, ~ 0, ·r §. § 1;:, C: .s ~ C: .2 1;:, 0 -~ ~ ~ c 0, §! -~ 0 .§ .... t;; § ., ., --1;:, ., 1;:, ., ~ ., ., ::!; C: C: C: c:, ::, '!< 0 ., §_§ 0 0, c., " ., ., ~ :-§ ~ -~ "' ct e 0 o,~ ~ .£; ~ L. ~ .0 C: 0 0 <:: ~ e ., 0 ·s ~ 0 i; g 0 ~c: ~o -~o -0 i ct cf& 0 ~D 0 -0 -S½-8 Cl.. '.:!; V) ::!; V) ,.., " "' -('J ,.., .... -I I I I I I I I V) V) V) V) i i i i < < < < ' " -., ., -~-., -i] " C: <:: -" ., " i~ " E " E .g " -" ., 0, 0, .... 0, 1;:, 0 oO tJ 0 :.:::: § " <:: <:: <:: c5: ::!; oo 0 0 :i: ::!; c., ::!; LC') "' o:i I I I i i i CITY OF OCEANSIDE HIGHWAY, -7B - PACIFIC OCEAN CITY OF VISTA -f' q_..O CITY OF ' SAN MARCOS SHEET 1: TITLE SHEET SHEET 2: EROSION CONmOL PLANS 1670306400 2701 A VEN/DA DE ANITA, CARLSBAD, CA 92010-8353 AREA OF DISTURBANCE _ _,2c...:,:40,,,0,...__ S.F. (THIS AREA INCLUDES BUT IS NOT LIMITED TO OFF-SITE WORK INCLUDING PUBLIC IMPROVEMENTS AND TEMPORARY DISTURBANCE SUCH AS VEHICLE AND EQUIPMENT STAGING AREAS, CONSTRUCTION WORKER FOOT mAFFIC, SOIL/GRAVEL PILES, UTILITY mENCHES, BACKFILL CUTS AND SLOPE KEYWA YS) 1. Check the box to the left of off applicable construction activity (first column) expected to occur during construction. CONSTRUCTION THREAT TO STORM WATER QUALITY (CHECK BOX): 181 HIGH □ MEDIUM 2. Located along the top of the BMP Table is a fist of BMP's with it's corresponding California Stormwater Quality Association (CASOA) designation number. Choose one or more BMPs you intend to use during construction from the list. Check the box where the chosen activity row intersects with the BMP column. 3. Refer to the CASOA construction handbook for information and details of the chosen BMPs and how to apply them to the project. {DELETE ITEMS NOT USED ON THE SITE MAP) (ADD CASQA DETAILS FOR EROSION AND SEDIMENT CONTROL UTILIZED ON SITE) DESCRIPTION EC-10, VELOCITY DISS/PA TION 5£-1, SILT FENCE SE-5, FIBER ROLL 5£-6, GRAVEL BAG TR-1, STABILIZED CONSmUCTION ENTRANCE NS-8, VEHICLE AND EQUIPMENT CLEANING NS-9, VEHICLE AND EQUIPMENT FUELING NS-10, VEHICLE AND EQUIPMENT MAINTENANCE W,\,/-1, MATERIAL DELIVERY AND STORAGE W,\,/-2, MATERIAL USE W,\,/-5, SOLID WASTE MANAGEMENT W,\,/-9, SANITARY/SEPTIC WASTE MANAGEMENT SYMBOL ... ... --...---...,- -" __ ,. - = m11111111111111111• NS-8 NS-9 NS-10 W,\,/-1 W,\,/-2 W,\,/-5 WM-9 I UNDERSTAND AND ACKNOWLEDGE THAT I MUST.· (1) IMPLEMENT BEST MANAGEMENT PRACTICES (BMPs} DURING CONSTRUCTION ACTIVITIES TO THE MAXIMUM EXTENT PRACTICABLE TO A VOID THE MOB/LIZA TION OF POLLUTANTS SUCH AS SEDIMENT AND TO AVOID THE EXPOSURE OF STORM WATER TO CONSTRUCTION RELATED POLLUTANTS; AND (2) ADHERE TO, AND AT ALL TIMES, COMPLY WITH THIS CITY APPROVED TIER 2 CONSTRUCTION SWPPP THROUGHOUT THE DURA TIDN OF THE CONSTRUCTION ACT/Vil/ES UNTIL THE CONSTRUCl/ON WORK IS COMPLETE AND SIGNED OFF BY THE CITY OF CARLSBAD. OWNFR(S)/ OWNFR'S AGFNT NAMF (PRINT) DATE ~6)Q~A- OWNER{S}/ OWNER'S AGENT NAME (SIGNA TUR£) DATE NAME: TRIUMPH MANAGEMENT COMPANY ADDRESS.· 9454 WILSHIRE BL IIV. SUI TE 800, BEVERL Y HILLS, CA 90212 TELEPHONE NO.: 310-625-5335 NAME: DA V/0 PA GE ADDRESS: 9454 WILSHIRE Bl IIV. SUITE 800, BEVERLY HILLS, CA 90212: TELEPHONE NO.: 310-625-5335 11 AS BUIL T 11 RCE___ EXP, ___ _ DATE REVIE\JED BY: INSPECTOR DATE f--+---+-----------+--+--+--1--------llsH!ETl.c----'rT=Y=o=F-=--=c=A~R~L~s=B~A-D~lsH~Tsl _ ENGINEERING DEPARTMENT 1------1--------1------------------l----l---l----l-----l GRADING PLANS FOR: THE BLUFFS SLOPE REPAIR -SOUTH SIDE OF MARRON ROAD STORMWATER POLLUTION PREVEmION PLAN (SWPPP) TIER 2 GR2023-0032 EROSION CONTROL TITLE SHEET APPROVED: JASON S. GELDERT 1------l--------l~-----------------l----l---l----l-----l ENGINEERING MANAGER RCE 63912 EXPIRES 9/30/24 DATE /1\ DATE INITIAL ENGINEER OF WORK REVISION DESCRIPTION DA TE INITIAL OTHER APPROVAL DWN BY: ---PROJECT NO. DRAWING NO. CHKD BY: 'n RVWD BY: /Jt 1-:s. PD2023-0021 544-2A DATE INITIAL CITY APPROVAL DocuSign Envelope ID: 206C0002-5897-442A-B69A-C97BAF435BA4 10/24/2023 E ERICK J. ALDRICH No. 57827 CIVIL SSFIOORNPADL EE NR GTE ISNIEGEERR S T TA EO OFFCA ARLINI Aldrich Consulting Engineers Fiber Rolls SE-5 INST ALL SILT FENCE PER DETAIL El APPROXIMATE\ LIMIT CSE -1) BELO'w' / I ' \ OF 5' KEY \ PER SHEET '~ l. 0 ll o' // _,/ __ .,,,-..... PREPARED BY: ERICK J. ALDRICH PE ALDRICH CONSUL TING ENGINEERS 416 SHADOW TREE DRIVE OCEANSIDE, CA 92058 RC£ 57827 EXPIRES 6/30/24 \~'·,, / SLOPE REPAIR AREA SCALE 1" 10' 1 2. APPROXIMATE LIMIT OF 5' KEY I (' ' I I ; _,,// /' ( ' I /; APPROXIMATE LIMIT OF REPAIR GRADING '---FIBER ROLLS 15' APART PER ATTACH THE FILTER FABRIC AND EXTEND IT TO THE TRENCH 1. SET POSTS AND EXCAVATE A 4• X 4• TRENCH UPSLOPE FROM AND ALONG THE LINE POSTS. 1/ 4'X4' TRENCH SLOPE PE 3. BACKFILL AND COMPACT THE EXCAVATED SOIL. DETAIL SE-5 \/,er .ICCll ~f"lClrl'.I ·-1ea~ureJ c orq L-1~ l<J•. H u li1H ,; '.JfJ<-c vurie~ belw~c;r I U _ ·1c '.:'(·' PER SHEET 6 J ,, I -~:y ml~ ::Le 11,;:nll -n,P.-c·I 8lcr·g e-/e cc11~0_11·. ·,,i:o I c t1Je1· r::ill 1·ecr ·, vpc •:,l·::·c • rrm~sil'c I'' ·,lo ·1 >:IRH'.1flr slClf'H I ! \ ,- (:'("• . -· ' • ' .,----l'i- ·-,\-.1 ,·--\-- ~:-:: _j-~~ ==-~~-=--/- / .+. ' ' ' _ _\,.-- ' ) C• ' ., ' , __ _,,_ ' ) . \ \'1 SLOPE REPAIR AREA 2 SCALE 1" = 10' f-l:2~ 'DII ,5" ~-ii- j '>V:Jc,,j S~·:J<ES )) h 4' _.1--, ' . , ___ \.---' .--\- ' ., ' '. ' ' ' ' / ! ' ' ' ' ' APPROXIMATE LIMIT OF REPAIR GRADING ----FIBER ROLLS PER DETAIL 15' SE-5 APART "AS BUILT" RCE __ _ EXP, ____ _ REVIE\JED BY, INSPECTOR DATE DATE i---t-----t------------l---l--l---L-_JI SH~ET I CITY OF CARLSBAD I SHE6ETS I ENGINEERING DEPARTMENT ~G;R~AD~I;;:N;;;G,=;P;::LAN~S~F~O~R:::: =:=:::::::::::::::::::::::::::::=::::::::::==::_::::==:: -~-} ~-0 T_SCA-~-=[ __ N-=-C-=['--------"@ BENCH MARK DESCRI P Tl ON: _.,,,c1':':T'c-Y ~O'-,F::-'Ce:,Ae1RL~S~B,iA!LD .1.Bti;.EwNCi,!H!!!M!!!Ac!1RKCL..!,C,1,.LS;iiB2=.10!Q8L7 __ _ LOCA Tf ON:==-:SF~n,,11'.'!N~D.f°"N~2-51'"~Q'!'I 5uK~INc"-eW~Ec.5iI~Ce,f y,fRctB!.,.!,D11:.P'.!=PccQ1:.5iLITfLt_,=~- 2906 AVENIDA DE ANITA 190 FT. NORTH OF CALLE SUSANA RECORDED: ELEVATION: =,1~6:::5,,,~.3:::6,,,_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-~-DA_TU_M_: ==~N-G::vo:~=2-9~=== DATE INITIAL ENGINEER OF WORK 1 DA TE INITIAL DATE INITIAL REVISION DESCRIPTION OTHER APPROVAL CITY APPROVAL THE BLUFFS SLOPE REPAIR -SOUTH SIDE OF MARRON ROAD GR2023-0032 EROSION CONTROL PLAN APPROVED: ENGINEERING MANAGER DWN BY: ~~~~~TEA JASON RCE 63912 EXPIRES 9 30 24 PROJECT NO. PD2023-0021 S. GELDERT DATE DRAWING NO. 544-2A DocuSign Envelope ID: 206C0002-5897-442A-B69A-C97BAF435BA4 10/24/2023 E ERICK J. ALDRICH No. 57827 CIVIL SSFIOORNPADL EE NR GTE ISNIEGEERR S T TA EO OFFCA ARLINI Aldrich Consulting Engineers ’ ’ ’’ ’ ’ May 21, 2023 GeoSite Engineering, Inc. 27068 La Paz Road, #571, Aliso Vieja, CA 92656 949-940-6828 Triumph Property Management 9454 Wilshire Blvd., Suite 800 Beverly Hills, California 90212 Attention: Mr. David M. Page Subject: Preliminary Geotechnicaf Investigation Surficial Washout Erosion on Northern Slope 2701 Avenida de Anita Along Marron Road Carlsbad, California References: See Appendix A Dear Mr. Page: Project No: Report No: 23004 2J-D02 Geosite Engineering Inc. is presenting herein the results of our geotechnicaf investigation of the surficia/ washout erosion on the north facing slope located above Marron Road at the subject site. The slope washouts happened in two areas on the northern slope on January 1, 2023. The cause of the washouts were surface drainage waters that overflowed a slope v-ditch that drains east to west at the upper to mid-portion of the northern slope. The purpose of this study was to obtain surface and subsurface information within the area of the surficia/ washout erosion to determine soil and geologic conditions and to provide recommendations pertaining to remediation of the slope. SCOPE OF SERVICES The scope of our investigation consisted of the following; 1. A site reconnaissance and geologic mapping of the slope areas. 2. Research and review of reports and literature concerning soil and geologic conditions within and adjacent to the site. J. Collection of representative bulk soil samples for laboratory identification. 4. Assessing the probable cause of the washout. 5. Performing an engineering evaluation of all information obtained. 6. Preparation of this report presenting the results of our investigation and providing recommendations for remediation of the surficiaf slope erasion. May 21, 2023 ILLUSffiA TIONS AND APPENDICES Figure 1, Site Mop Figure 2, Geologic Map Figure J, Geotechnica/ Map Figure 4, Cross Section A-A Figure 5, Cross Section 8-8 Figure 6, Grading Details Appendix A, List of References Appendix B, Site Photographs Plate 1, Topographic Survey Map LOCATION AND SITE DESCRIPTION Project No: Report No: Page No: 23004 23-002 2 The subject site is located on the northern slope of The Bluffs at Carlsbad apartment complex. The general location of the site is shown on Figure 1. The northern slope area in the vicinity of the washouts has a total relief of JO to 50 feet and has an existing slope ratio ranging from 1.7 to 1.8 to 1 (horizontal to vertical) as shown in Figure J. The base map for Figure J is a portion of a topographic survey prepared in 2012 during remodeling of the property. Figure J shows the approximate locations of the slope washouts defined in a west area and east area. The overall slope is covered by a moderate to heavy growth of grass materials. BACKGROUND INFORMATION The following background information was obtained during our review of letters, reports and literature available to us at the time of our evaluation (see Appendix A). The apartment site was developed during the fate 1980 s to early 1990 s based on our review of property records and aerial photography. The site is reported to be underlain at depth by bedrock of the Santiago Formation (see Reference J and Reference 4). The Santiago Formation (map symbol Tso) is predominantly described as sandstone materials. The geologic map indicates bedding strikes northwest to northeast and dips 5 degrees east and west, respectively. Vertically and laterally throughout the formation there exists greenish-brown, clays/one interbeds, and tongues and lenses of often fossiliferous, fagoonaf clays/one and siltstone. A comparison of ground elevation from the 2012 Site Topography Map (see Plate 1) and a historical topographic map (Reference 5) shown in Figure 1, indicates that the property was developed by site grading that included placement of various depths of fill soil above the original grade contours. Original ground elevations in the vicinity of the northern slope ranged from about 50 to 80 feet above mean sea level. Current site topography shows elevations in the vicinity of the washout ranges from about 60 to 100 feet above mean sea level. May 21, 2023 Project No: Report No: Poge No: 23004 23-002 J A brief review of the 2012 Site Topographic Map indicates that a significant portion of the stormwater drainage from the site is directed to the northern slope where it drains into a v-ditch on the northern slope. This v-ditch carries surface water to the west and then south into a drainage structure located on the western slope. Stormwater drainage from areas located adjacent buildings 8 through 1J in the western portion of the site appears to be collected in an area drain system that drains to the western slope and the northern slope (western portion only). The City of Carlsbad indicates that the northern slope washouts occurred during heavy rains on January 1, 2023. The slope washouts are indicated to have occurred due to high water drainage volumes in conjunction with sediment and debris build-up in the v-ditch. A review of the site (see photographs in Appendix B) shows that the eastern slope washout occurred right after the curved transition from the north flowing drainage swafe to the western flowing v-ditch ( see Appendix B, Figures 8-J and 8-4). The downslope splash block on the v-ditch was sufficient to contain the stormwoter flow at the transition. The washout at the western area was located at a location where an area drain outlet was directing stormwater in a northerly direction (see Appendix B, Figure 8-7) across the width of the v-ditch. FIELD EXPLORATION Our field exploration was performed on April 7, 2023 and consisted of mapping the slope washout areas and the collection of surface and subsurface soil samples from the washout areas. Soil materials predominantly consisted of silty fine sand, but also included soil materials comprised of a varied mixture of silt, lean clays, and sand. FINDINGS AND CONCLUSIONS The findings and conclusions presented below are based on our site reconnaissance, mapping of the subject slope, previous subsurface investigation and laboratory testing, and review of the 2012 topographic map and the referenced reports. The approximate gross limits of the slope washout areas are shown on our Geotechnical Map (Figure J). The width of the erosion areas ranges from J to 6 feet (east area) and J to 9 feet (west area). The depth of the washout areas is estimated to range from 2 to J feet in depth. Cross section views of the washout areas showing the approximate subsurface geologic conditions are presented on our Cross Section A-A and 8-8 (Figures 4 and 5). Based on the overall good performance of other areas of the northern slope, it is concluded that the overall slope is grossly and surficially stable and needs no overall remedial action. ft is our opinion that the slope erosion that occurred was solely caused by storm waters that overflowed the northern v-ditch. Drainage improvements should as a minimum include placement of a 6- inch concrete splash block (curb) along the outer edge (downslope side) of the northern v-ditch and a 90-degree elbow on the end of all drainage pipes that direct stormwaters along the flow fine of the v-ditch. A WEST AREA 1 B EAST AREA 2 B' -MARRON RD -V-DITCH -MARRON RD -V-DITCH -SIDEl,/ALK -SIDEl,/ALK PRE -ER□SI □N 110 --110 PRE -ER□SI□N GRADE 110 --11D -FILL SLOPE GRADE --ORIGINAL -GRADE - ORIGINAL -- ELEVATION (FEET GRADE AF FILL ABOVE MEDIAN -80 SEA LEVEL) 80 -/( --V ? ------ ? V ?~ ? ------BENCHING FDR I ----? SLOPE REPAIR ELEVATION (FEET ABOVE MEDIAN 5'-D' DR SEA LEVEL) -AF FILL -GREATER ~ ----- [ NATURAL 80 - ,<' f ? -80 ~ ------- SLOPE ' ? -----? -I ? BENCHING FDR -I ! -SLOPE REPAIR --I ------50 50 -ER□SI□N SURFACE TSA BEDROCK -I ER□SI□ N -KEY 2' MIN, J 50 -SURFACE 50 -t --~5'~ TSA BEDROCK ------s: 5 SCALE 1" = 20' VERTICAL AND HORIZONTAL SCALE 1" = 20' VERTICAL AND HORIZONTAL May 21, 2023 Project No: 23004 23-002 4 Report No: Page No: Locally eroded areas in the west and east areas will require remedial surficia/ grading to replace the slope to near the original conditions. This will include soil removal and replacement for a typical width of 10 feet in the eroded areas, exposure of competent fill soil beneath the eroded areas, and standard keying and benching into the slope to establish competent support prior to placement of compacted fill (see Figure 6). Re-landscaping of the eroded and covered areas of the slope will be needed to provide for long-term good performance. Landscaping of slope areas should include placement of grasses and deep-rooted, drought-resistant plants. A landscape architect could be consulted if desired to determine the most suitable groundcover for the slope. Jute netting or equal materials should be placed over the repaired slope areas to protect the slope un ti/ vegetation is re-established. RECOMMENDATIONS Based on our understanding of site conditions and the recent washouts, we propose the following scope of repair for restoration of the slope as follows: 1. Remove all irrigation fines, vegetation and other debris from the planned work area. 2. Implement measures to enhance the future performance of the northern v-ditch. Drainage improvements should as a minimum include placement of a 6-inch concrete splash block J. 4. 5. 6. -- \. I '\ ( curb) along the outer edge ( downslope side) of the northern v-ditch and a 90-degree elbow on the end of all drainage pipes that direct stormwaters along the flow line of the v-ditch. Corrective measures should be recommended by the project Civil Engineer. Construct a stabilization fill in the western and eastern repair areas. A key should be established at the toe of the erosion surface ( see Figure 4 and 5) that is at feast five feet wide and two feet deep and founded in competent fill soil material (see Figure 6). Removal benches should be at feast 4-feet wide. Alf grading should be reviewed, tested and approved by the geotechnica/ consultant during grading. Removal bottoms will be scarified and recompacted to achieve at feast 90 percent relative compaction at a moisture content of 110 percent of optimum moisture content per ASTM D1557. Engineered fill soil is to be placed in 4 to 6-inch loose lifts and be compacted to at feast 90 percent relative compaction at a moisture content of 110 percent of optimum moisture content per ASTM D 1557. Consult a landscape architect as-desired to design plantings consistent with the soil conditions, climate, and that are similar and equivalent to the previous conditions. Place jute netting or equal over the graded slope areas and other slope areas scheduled for new vegetation. Jute netting should be stapled or otherwise affixed to the slope so that it will remain in-place during the rainy season. ----- I REMOVE UNSUITABLE MATERIAL 11 AS BUIL T 11 CROSS SECTION A-A' FIGURE 4 CROSS SECTION B-B' FIGURE 5 GRADING DETAILS FIGURE 6 RCE __ _ EXP, ____ _ DATE 0 ll o' PREPARED BY: ERICK J. ALDRICH P.E. ALDRICH CONSUL TING ENGINEERS 416 SHADOW ffiEE DRIVE OCEANSIDE, CA 92058 RCE 57827 EXPIRES 6/J0/24 BENCH MARK DESCRI PT/ON: CITY OF CARLSBAD BENCHMARK CLSB-087 LOCATION: mt INQ IN 2 5• Q/5/< IN WF5I CURB OPPOSITE 2906 AVENIDA DE ANITA 190 FT. NORTH OF CALLE SUSANA RECORDED: ___________________ _ ELEVATION: 165.36 DA TUM: NGVO 29 REVIEl,/ED BY: INSPECTOR DATE l---j------j--------------r-----r---t--.-----.lsHE5ETl~c_rT_Y __ o_F_c_A_R_1_s_B_A_D~lsH~Tsl _ ENGINEERING DEPARTMENT DATE INITIAL DATE INITIAL DATE INITIAL ENGINEER OF WORK REVISION DESCRIPTION OTHER APPROVAL CITY APPROVAL GRADING PLANS FOR: THE BLUFFS SLOPE REPAIR -SOUTH SIDE OF MARRON ROAD GR202J-OOJ2 SOILS REPORT RECOMMENDATIONS APPROVED: JASON S. GELDERT ENGINEERING MANAGER RCE 63912 EXPIRES 9/30/24 DWN BY: ~~ ~~~ (f k PROJECT NO. PD2023-0021 DATE DRAWING NO. 544-2A DocuSign Envelope ID: 206C0002-5897-442A-B69A-C97BAF435BA4 10/24/2023