Loading...
HomeMy WebLinkAboutSDP 2021-0003; RACEWAY INDUSTRIAL; GEOTECHNICAL ENGINEERING REPORT; 2021-04-16( GEOTECHNICAL ENGINEERING REPORT ( C for Proposed Warehouse Development SEC Melrose Drive and Lionshead Ave, Carlsbad, CA Prepared For: Hines 444 South Flower Street Los Angeles, California 90071 Prepared By: Langan Engineering and Environmental Services, Inc. 18575 Jamboree Road, Suite 150 Irvine, California 92612 16 April 2021 Langan Project No.: 700086702 LANliAN ~ity of Carlsbacf MAY 1 0 2021 ~fanning Division 18575 Jamboree Road, Suite 150 Irvine, CA 92612 T: 949.561.9200 F: 949.561.9201 www.langan.com New Jersey • New York • Connecticut • Massachusetts • Pennsylvania • Washington, DC • Ohio • Florida • Texas • Colorado • Arizona • Washington • California Athens • Calgary • Dubai • London • Panama GEOTECHNICAL ENGINEERING REPORT for Proposed Warehouse Development SEC Melrose Drive and Lionshead Ave, Carlsbad, CA Prepared For: Hines 444 South Flower Street Los Angeles, California 90071 Prepared By: Langan Engineering & Environmental Services, Inc. 18575 Jamboree Road, Suite 150 J Irvin alifornia 92612 Enrique A. Riutort, PE, GE Senior Project Manager GE#2683 1orelli, PE, GE Principal GE#3042 16 April 2021 700086702 LANliAN 18575 Jamboree Road. Suite 150 Irvine, CA 92612 T: 949.561. 9200 F: 949.561.9201 www.langan.com ") New Jel'lley • New York• Connecticut• Massachusetts• Pennsylvania • Washington. DC • Oh,o • Florida • Texa§ • Colorado• Arizona • Washington • Cal,tornil! Athens • Calgary • Dubai • London • Panama ( Geotechnical Engineering Report Proposed Warehouse Development Carlsbad, California 16 April 2021 Page i Langan Project No: 700086702 TABLE OF CONTENT 1.0 INTRODUCTION ............................................................................................................. 1 2.0 PROJECT OVERVIEW .................................................................................................... 1 2.1 Existing Site Conditions ............................................................................................... 1 2.2 Proposed Development ............................................................................................... 1 3.0 REVIEW OF AVAILABLE INFORMATION ...................................................................... 2 3.1 Document Review ....................................................................................................... 2 3.2 Site Development History ............................................................................................ 2 3.3 Regional and Local Geologic Setting ............................................................................ 3 3.4 Geologic Hazard Review .............................................................................................. 3 4.0 GEOTECHNICAL EXPLORATION .................................................................................. 5 4.1 Field Percolation Testing .............................................................................................. 6 4.2 Laboratory Testing ....................................................................................................... 6 4.3 Geophysical Testing .................................................................................................... 7 5.0 SUBSURFACE CONDITIONS ......................................................................................... 7 6.0 GEOTECHNICAL EVALUATION AND DESIGN RECOMMENDATION ......................... 8 6.1 Evaluation of Fill ........................................................................................................... 8 6.2 Seismic Design Criteria ................................................................................................ 8 6.3 Expansive Soil .............................................................................................................. 9 6.4 Building Foundations .................................................................................................... 9 6. 5 Proposed Site Retaining Walls .................................................................................... 10 6. 6 Existing Fill Slope Stability Analysis ............................................................................. 10 6. 6. 1 General Conditions ...................................................................................................... 10 6. 6.2 Material Properties ...................................................................................................... 10 6.6.3 Static Gross and Seismic Slope Stability ..................................................................... 17 6.7 Pavement Sections ..................................................................................................... 11 6.8 Corrosion Considerations ............................................................................................ 12 6.9 Floor Slabs .................................................................................................................. 13 6.10 Utility Support ............................................................................................................. 13 7.0 BUILDING AND SITE PREPARATION ........................................................................... 13 7 .1 Excavation and Grading ............................................................................................... 13 7.2 Fill Material and Compaction Criteria ........................................................................... 14 Geotechnical Engineering Report Proposed Warehouse Development Carlsbad, California Langan Project No: 700086702 16 April 2021 Page ii 7 .3 Site Drainage .............................................................................................................. 14 7.4 Hardscape Elements ................................................................................................... 15 8.0 PROTECTION OF NEIGHBORING STRUCTURES ........................................................ 15 9.0 RECOMMENDED FUTURE TASKS AND INTERACTION ............................................. 15 10.0 SERVICES DURING DESIGN, CONSTRUCTION DOCUMENTS AND CONSTRUCTION QUALITY ASSURANCE ........................................................................................................... 15 11.0 OWNER AND CONTRACTOR RESPONSIBILITIES ...................................................... 16 12.0 LIMITATIONS ................................................................................................................ 16 13.0 REFERENCES ................................................................................................................ 17 13.1 Publications ................................................................................................................. 17 13.2 Plans ........................................................................................................................... 17 13.3 Reports ....................................................................................................................... 17 REFERENCES FIGURES Figure 1 -Site Vicinity Map Figure 2 -Regional Geologic Map Figure 3 -Regional Seismicity Map Figure 4 -Fault Map Figure 5 -Liquefaction Hazard Zone Map Figure 6 -Flood Hazard Zone Map Figure 7 -FEMA Flood Insurance Rate Map Figure 8 -Dam Inundation Hazard Map Figure 9 -Boring Location Plan Figure 1 0A -Generalized Subsurface Cross Section A-A' Figure 1 OB -Generalized Subsurface Cross Section B-B' APPENDICES A Historic Earthquake Search B Boring Logs C Field Percolation Results D Laboratory Test Results E Field Shear Wave Testing Results F Slope/W Stability Graphical Outputs ( Geotechnical Engineering Report Proposed Warehouse Development Carlsbad, California Langan Project No: 700086702 1.0 INTRODUCTION 16 April 2021 Page 1 As requested and in accordance with our Proposal for Design Level Geotechnical Exploration Services, dated 2 September 2020 and revised 11 December 2020, and following subsequent authorization by Hines Conceptual Construction and Ware Malcomb, Langan Engineering and Environmental Services, Inc. (LANGAN) has prepared this geotechnical exploration report for the proposed warehouse building (Project) located on South East Corner of Melrose Drive & Lionshead Avenue, Carlsbad, California (Site). This report updates and supersedes our report titled "Limited Geotechnical Exploration & Report ", dated 21 October 2020 and revised 28 October 2020. Provided herein is a summary of LANGAN's understanding of the geotechnical and geological aspects of the Site, including the existing site conditions and proposed improvements; a description of the subsurface investigations that have been performed at the Site to date; and geotechnical and construction related recommendations pertaining to foundations, retaining walls, site grading, and utility support. Recommendations provided herein are in accordance with the 2019 California Building Code (2019 CBC) and the City of Carlsbad Municipal Code. 2.0 PROJECT OVERVIEW 2.1 Existing Site Conditions The proposed Project is located on an approximate 840,000-square-foot vacant parcel in Carlsbad, California. The Site is bounded by Lionshead Avenue to the north, Eagle Drive to the east, commercial development to the south, and Melrose Drive to the west. Refer to Figure 1 for a site vicinity map. Most of the Site has generally flat to gently sloping terrain that ascends from north to south and west to east, with 2H: 1 V (horizontal to vertical) slopes,up to approximatey 6 feet high, along the perimeter that descend from the Site to Lionshead Avenue and Eagle Drive (north and northeast limits) and ascend up to approximately 50 feet from the parcel to the streets and neighboring development (east, west, and southern limits). Concrete v-ditches are installed along the slope and direct water onto this Site at various locations. Burrow holes up to 4-inch diameter are present at the surface of the slopes. Site elevations vary from approximately el 375 on the western portion of the Site to approximately el 382 on the eastern portion. Elevations referenced herein are in feet and are above mean sea level (MSU, unless indicated otherwise. Aerial photographs from Google Earth indicates that the Site appears was previously mass graded (cut/fill) to a relatively flat parcel between the years 2004 and 2006. Two storm drain basins are located adjacent to Lionshead Avenue. These basins capture storm water on the Site, which is discharged into the City's storm drain. Landscape features such trees and vegetation occupy the east, northern, and western Site limits adjacent to Eagle Drive, Lionshead Avenue, and Melrose Drive. 2.2 Proposed Development We understand the proposed development consists of an approximately 250,000-square-feet warehouse building and new retaining wall. Based on the plans titled "Conceptual Grading Plans" by Thienes Engineering the pad elevation for the warehouse is approximately el. 382 • Geotechnical Engineering Report Proposed Warehouse Development Carlsbad, California Langan Project No: 700086702 16 April 2021 Page2 which would require 4 to 5 feet of cut and fill across the building footprint. A new retaining wall will need to be built within the limits of the existing slope on the southern part of the property. We have assumed that the tallest portion of the wall will be in the southeast corner of the Site and will have a height of up to 25 feet; full design recommendations for the retaining wall will be included in a separate addendum to this geotechnical investigation report when final wall plans are available. The remainder of the site improvements include new pavement, truck and trailer parking areas and new detention ponds adjacent to Lionshead Avenue. 3.0 REVIEW OF AVAILABLE INFORMATION 3.1 Document Review Information that LANGAN reviewed included reports, maps, and other publically available information from the United States Geological Survey (USGS), California Geological Survey (CGS), California Department of Conservation -Division of Mines and Geology (DMG), City of Carlsbad (City), County of San Diego (County), Federal Emergency Management Agency (FEMA), California Geologic Energy Management Division (CalGEM), land title surveys, and a Phase I ESA dated October 12, 2020. 3.2 Site Development History Based on our review of provided documents and aerial imagery on Google Earth for the Site, the Site was initially occupied by Carlsbad Raceway consisting of asphalt dragstrip, dirt tracks, bleachers, and one-story wooden structures. This raceway occupied the Site until approximately 2004 to 2006 when the Site and surrounding area were mass graded for future developments. Three natural canyons crossed the Site, two smaller canyons on the western half and one larger canyon on the eastern half of the Site. After mass grading occurred these canyons were no longer visible. Based on documents reviewed the western half of the Site was generally in a cut condition during grading with the eastern half having cut and fill areas. LANGAN was provided copies of two ALTA surveys, one Environmental Site Assessment Phase 1, and a copy of a report titled "Final Report of Testing and Observation Services During Site Grading" from a public records request from the City of Carlsbad. Brief summaries of geotechnical information from the referenced documents are provided below. O'Day Consultants. "ATLA Survey of Carlsbad Raceway" dated June 2004 In 2004, O'Day consultants prepared an ALTA Survey of Carlsbad Raceway. This survey identifies the following: existing ground elevations at the time of the survey, the raceway had concrete pad areas with the raceway constructed out of asphalt, various one-story wooden sheds, bleachers, fencing, easements, and identifies sewer lift station and sewer pipelines controlled by the City of Vista. Geocon, Inc .. "Final Report of Testing and Observation Services During Site Grading". dated 5 June 2006 The site is identified as Lots 1 (adjacent to Melrose Drive) through Lot 4 (adjacent to Eagle Dr) on the grading plans prepared by O'Day Consultants. The report documents the installation of canyon subdrains in "Lot 4" and the placement of up to 45 feet of compacted fill at the site. The canyon subdrains in Lot 4 are reported to connect to the Carlsbad Raceway Business Park subdrain system. Expansion Index testing performed on compacted fills range from 18 to 130. ( C Geotechnical Engineering Report Proposed Warehouse Development Carlsbad, California Langan Project No: 700086702 16 April 2021 Page3 Based on the report, density testing performed on compacted fills indicated fills were placed at a minimum compaction of 90 percent based on ASTM D1557. Thienes Engineering. Inc. "ALT A/NSPS Land Title Survey -Southeast corner of S Melrose Drive and Lionshead Avenue" dated October 2020. In October 2020, Thienes Engineering, Inc. prepared an ALTNNSPS Land Title Survey at the Southeast corner of Melrose Drive and Lionshead Avenue. The survey identifies existing features, utilities, and easements. The southern limits of the subject property is an ascending graded slope with concrete v-ditches and discharge outlets at various locations along the toe of the slope. Two locations are mapped as storm drain collection inlets that are connected to the existing city storm water infrastructure. 3.3 Regional and Local Geologic Setting The Site is located within the north-central coastal plain of San Diego County, which is part of the Peninsular Ranges Geomorphic Province of Southern California. This Province consists of a series of mountain ranges separated by northwest trending valleys sub-parallel to faults that branch from the San Andreas Fault and is characterized by erosional processes (i.e., gully erosion and washing). Bedrock typically consists of a small volume of high-grade metamorphic rocks intruded by Mesozoic-age igneous plutons, overlain by Cenozoic-age sedimentary rocks. According to the CGS Geologic Map of the Oceanside 30' by 60' Quadrangle (2007), the Site is underlain by the middle Eocene Santiago Formation (map symbol Tsa), characterized by moderately sorted arkosic sandstone, with vertical and lateral interbeds, tongues, and lens of claystone and siltstones. The Santiago Formation is underlain at depth by middle Cretaceous tonalite. This igneous bedrock is described as massive, coarse-grained, light gray, hornblende- biotite tonalite. See Figure 2. 3.4 Geologic Hazard Review Our geologic hazard review was performed in general accordance with CGS Special Publication 117 A, "Guidelines for Evaluating and Mitigating Seismic Hazards in California," dated 2008. The following subsections present the results of our hazard review. • Regional Faulting -Recognized and mapped faults that are located within a 1 GO-kilometer (km) radius of the Site based on the "2014 USGS National Seismic Hazards Maps" are shown on Figure 3. Based on our review, the closest known fault to the Site is the Rose Canyon Fault located approximately 8.2 miles (13.6 kilometers (km)) west of the Site. The next closest faults are the Oceanside alt1 Fault located approximately 12.1 miles (20.4 km) south of the west and Elsinore (Temecula) Fault located approximately 19.8 miles (31.8 km) east of the Site. • The Site is located in an active seismic area that has historically been affected by generally moderate to occasionally high levels of ground motion. Therefore, the proposed development will probably experience moderate to occasionally high levels of ground motion from nearby faults as well as ground motions from other active seismic areas of the southern California region. • Regional Seismicity -A search of the Uniform California Earthquake Rupture Forecast (UCERF3), accessed on 12 October 2020, using a web-based Earthquake Archive Search and URL Builder tool, found that 28 earthquakes with magnitudes greater than 5.0 have Geotechnical Engineering Report Proposed Warehouse Development Carlsbad, California Langan Project No: 700086702 16 April 2021 Page4 occurred within a 100-km radius of the Site since 1800. A summary of the UCERF3 reported earthquake events are provided in Appendix A. • Surface Rupture -Earthquake Fault Zones are regulatory zones delineated by CGS around active faults with the potentials to cause surface rupture. The zones average approximately ¼-mile in width. A review of the Earthquake Faults within the City of Carlsbad General Plan (Figure 3.5-2 indicates that the site is not within a mapped, currently established Alquist-Priolo Special Study Zone or a Fault Rupture Study Area (Figure 4). • Liquefaction -Liquefaction is a transformation of soil from a solid to a liquefied state during which saturated soil temporarily loses strength resulting from the buildup of excess pore water pressure, especially during earthquake-induced cyclic loading. Soil susceptible to liquefaction includes loose to medium-dense sand and gravel, and low- plasticity silts below the groundwater table. Based on a review of the General Plan Chapter 6 Public Safety, the Site is not located within a mapped, currently established liquefaction-potential investigation zone. Based on our review of available soil and geological conditions, the Site generally consists artificial fills of sandy clays and clayey sands, underlain by silty and clayey sandstones and sandy claystones and siltstones. Due to the presence of fine-grained materials at the Site, liquefaction potential is anticipated to be low. See Figure 5. • Historical High Groundwater -As noted above, the presence of groundwater may increase the susceptibility to liquefaction for loose to medium granular soils and low- plasticity silts at the Site when subjected to sufficient ground shaking. Based on our ::) limited geotechnical field exploration at the Site, groundwater was not encountered to the maximum explored depth of 26.5 feet. A review of the Department of Water Resources also does not indicate the presence of monitoring wells with groundwater measurements within or adjacent to the Site. • Landslides -A review of the City's Public Safety indicates that the Site is not located within a mapped area, currently established zone of landslide susceptibility. • Seismically-Induced Ground Deformations -Seismically-induced ground deformations include ground-surface settlement and differential settlement resulting from liquefaction- induced ground deformation and cyclic densification of unsaturated sands and gravels from earthquakes. As discussed above, the Site is not within a mapped liquefaction- hazard investigation zone. Therefore, liquefaction-induced settlement of soils below the groundwater table and cyclic densification of dry sand and gravels is not an anticipated hazard at the Site. • Lateral Spreading -Lateral spreading is a phenomenon in which surficial soil displaces along a shear zone that has formed within an underlying liquefied layer. The surficial blocks are transported downslope or in the direction of a free face, such as a slope, by earthquake and gravitational forces. The Site is not located within a currently established liquefaction hazard zone; therefore, lateral spreading is not anticipated within the Site. • Flood Mapping -According to the San Diego Geographic Information Source Interactive Map and the City of Carlsbad General Plan, the Site is not located within a mapped 100- year floodway or 100-year floodplain, as shown in Figure 6. Additionally, based on the FEMA Flood Insurance Rate Map Number 06073C0788J, dated 16 May 2012, the Site is not located within a determined flood hazards area, as shown in Figure 7. C Geotechnical Engineering Report Proposed Warehouse Development Carlsbad, California Langan Project No: 700086702 16 April 2021 Page 5 • Tsunami and Seiche and Inundation -A tsunami is a long, high sea wave based by an earthquake, submarine landslide, or other disturbances. A seiche is an oscillation of surface water in an enclosed or semi-enclosed basin such as a lake, bay, or harbor. According to information and maps available from the California Department of Conservation and the City of Carlsbad General Plan Chapter 6, the Site is not within a mapped tsunami inundation hazard zone, as shown. The closest mapped Dam is the Bressi Dam which according to the city does not have inundation zones associated with it. The second closest Dam is the Maerkle Dam and Reservoir which have mapped inundation zones and the Site is not mapped within this zone. The Site is not within close proximity to adjacent water bodies; therefore, site inundations from a tsunami, seiche, and dam failure are not anticipated (Figure 8). • Subsidence -Land subsidence may be induced from withdrawal of oil, gas, or water from wells or from settlement of the landfill. According to a search on the CalGEM Well Finder online tool, there are no oil, gas, or geothermal wells within or immediately adjacent to the Site. Therefore, the Site is not considered to be subject to land subsidence from oil, gas, or water withdrawal from oil wells. • Expansive Soils -Expansive soils can result in differential movement of structures, including slab heave and cracking, differential movement between foundations, and cracking of pavements and sidewalks. Potentially expansive soils are defined by the 2019 California Building Code (CBC) as soils with expansion indices (El) greater than 20. Based on our geotechnical exploration, and review of the reported Geocon, Inc., "Final Report of Testing and Observation Services During Site Grading", existing fill at the Site exhibited a "medium to very high" expansion potential. SUBSURFACE INVESTIGATION 4.0 GEOTECHNICAL EXPLORATION Our geotechnical subsurface exploration program consisted of nineteen hollow stem auger (HSA) borings, identified as LB-1 and LB-19, drilled to approximately 9 feet and 51.5 feet below ground surface (bgs), respectively. Prior to drilling, the boring location was marked out on site by a LANGAN field engineer. Underground Service Alert of Southern California (USA/DigAlert) was contacted to locate and mark known public underground utilities present within the public rights- of-way. A private utility-locating subcontractor also performed underground utility check at the boring location to confirm the location was clear of subsurface utilities and obstructions. Refer to Figure 9 for approximate boring locations. Borings LB-1 through LB-4 was drilled by Yellow Jacket Drilling on 8 October 2021 using a truck- mounted drill rig under the full-time observation of a LANGAN field engineer. The borings were advanced with the drill rig using conventional drilling techniques. Standard Penetration Tests (SPT)1 and California Modified Ring sampling were generally performed at 5-foot intervals until boring termination depth, following the guidelines of ASTM D1586 and ASTM D3550. California Modified Ring samples were collected at select locations using a 3.0-inch-outer-diameter split- barrel California sampler lined with 2.42-inch-inner-diameter brass rings. SPT N-values were 1 The Standard Penetration Test is a measure of the soil density and consistency. The SPT N-value is defined as the number of blows required to drive a 2-inch outer diameter split-barrel sampler 12-inches, after an initial penetration of 6 inches, using a 140-pound automatic hammer free falling of a height of 30 inches (ASTM D1586) Geotechnical Engineering Report Proposed Warehouse Development Carlsbad, California Langan Project No: 700086702 16 April 2021 Page 6 recorded to identify the relative density and stiffness of the cohesionless and cohesive soils, respectively. Upon completion, the borings were backfilled with soil cuttings to near ground surface and excess auger cuttings were dispersed on-site around the borehole location. Borings LB-5 through LB-17 and LB-19 were drilled by Yellow Jacket Drilling between 8 and 10 March 2021 and on 15 March 2021 using a truck-mounted drill rig under the full-time observation of a LANGAN field engineer. Boring LB-18 was drilled by Yellow Jacket Drilling on 10 March 2021 using a limited access track-mounted rig. The borings were advanced using conventional drilling techniques. Standard Penetration Tests (SPT)1 and California Modified Ring sampling were generally performed semi-continuously within the upper 10-feet and at 5-foot intervals until boring termination depth, following the guidelines of ASTM D1586 and ASTM D3550. California Modified Ring samples were collected at select locations using a 3.0-inch-outer-diameter split-barrel California sampler lined with 2.42-inch-inner-diameter brass rings. SPT N-values were recorded to identify the relative density and stiffness of the cohesionless and cohesive soils, respectively. Upon completion, the borings were backfilled via tremie method with cement-grout slurry to near ground surface. Excess soil cuttings generated during drilling were temporarily stored on-site in Department of Transportation (DOT) approved 55-gallon drums soil and disposed by Belshire Environmental Services, Inc. Retrieved soil samples were visually examined and classified in the field following the Unified Soil Classification System (USCS) and confirmed by re-examination in our office. A copy of the boring logs are provided in Appendix B. 4.1 Field Percolation Testing The field investigation for the percolation testing program consisted of drilling two (2) borings, identified as LP-1 and LP-2, and within two (2) soil borings, identified as LB-5 and LB-6, to depths of approximately 5 and 9 feet below existing grade (el 368 and 363), respectively. The borings were drilled and percolation tests were performed between 8 and 10 March 2021 by Yellow Jacket Drilling under the full-time engineering observation of a field engineer from our office. Percolation testing was performed in accordance with the City of Carlsbad "Carlsbad BMP Design Manual". Results of the percolation testing are provided in Appendix C. 4.2 Laboratory Testing Select representative soil samples retrieved from the borings were delivered to a geotechnical laboratory to determine the physical and engineering index properties of the samples. Our laboratory testing program included the following analyses: • Dry Density & Moisture Content • Expansion Index (ASTM D4829) (ASTM D7263) • Consolidation (ASTM D2435) Modified Proctor (ASTM D1557) • Electrical Resistivity -CTM 643 • Direct Shear (ASTM D3080) • Chloride Content -CTM 422 • Sieve Analysis (ASTM D422) • Sulfate Content -CTM 417 • R-Value (ASTM D2844) • Soil pH -CTM 643 • ' . ( Geotechnical Engineering Report Proposed Warehouse Development Carlsbad, California Langan Project No: 700086702 Copies of the laboratory test results are provided in Appendix D. 4.3 Geophysical Testing 16 April 2021 Page 7 Shear wave velocity profiling was performed by Atlas Technical Consultants (Atlas) using surface geophysical testing method to obtain estimates of the average shear wave velocity within 100 feet bgs. Atlas performed the refraction microtremor (ReMi) technique to estimate in-situ Rayleigh-wave (shear-wave) velocities. Atlas summarized the results of their testing in a report dated 17 March 2021 that is presented in Appendix E for reference. Based on the results of two field refraction microtremor profiles SL-1 and SL-2, average shear wave velocities to 100 feet bgs were 1,094 feet-per-second and 1,316 feet-per-second. 5.0 SUBSURFACE CONDITIONS Based on our field exploration and interpretation of laboratory testing, the Site is generally underlain by existing fill underlain by either alluvium or bedrock. Alluvial deposits were encountered where previously drainage channels existed. Details of the subsurface conditions encountered in our borings are summarized below. See Figure 1 Oa and 1 Ob for a generalized graphical representation of the subsurface conditions. • Existing Documented Fill: We encountered existing fill within all borings. In borings LB- 1, LB-2, LB-5, LB-7, LB-17, and LB-19 existing fill ranges from approximately 1 feet to 3 feet below ground surface and in borings LB-3, LB-4, LB-6, LB-8 through LB-16, and LB- 18 existing fill ranges from approximately 10 feet to 45 feet. Existing Fill consists of clayey sands and sands with varying amounts of gravel. SPT N-values generally ranged from 11 blows per foot to 28 blows per foot. Laboratory testing performed on select samples measured dry densities ranging from 98.4 to 126 pounds per cubic foot (pcf), moisture contents ranging from 2.5 to 23.8 percent. Near surface soil collected measured fine content of 57 percent, and an expansion indices of 54, 63, 66, and 78. Atterberg Limits testing was performed on select soil samples which measured Liquid Limits ranging from 32 to 49, Plastic Limits ranging from 20 to 24, and Plastic Indices ranging from 8 to 26. Direct shear testing was performed on select samples within the proposed building footprint measured ultimate cohesion ranging from 300 to 700 pound per square foot (psf) and internal friction angles ranging from 23.5 to 30 degrees. Direct shear testing was performed on select samples for the proposed site retaining wall measured ultimate cohesion ranging from 300 to 800 psf and internal friction angles ranging from 25 to 28 degrees. • Alluvial Deposits: An approximately 3 feet thick layer of Alluvial deposits were encountered in boring LB-4 and LB-9 at approximately 13 and 23 feet below ground surface, respectively. The alluvial soils were observed to consist of stiff clay with trace rootlets consistent with bottom of drainage channels. • Santiago Formation (Tsa): Santiago formation deposits were encountered in all borings to the maximum explored depth of 51 .5 feet, consisting of claystones and sandstones. SPT N-values generally ranged from 13 blows per foot to 50 blows per foot to sampler refusal (i.e. sampler did not penetrate the full 12 inches) where Santiago Formation was encountered. Geotechnical Engineering Report Proposed Warehouse Development Carlsbad, California Langan Project No: 700086702 16 April 2021 Page 8 Laboratory testing performed on select samples measured dry densities ranging from 106.8 to 111 pounds per cubic foot (pcf), moisture contents ranging from 6.9 to 19.4 percent. Direct shear testing was performed on select samples within the proposed building footprint measured ultimate cohesion ranging from 0 to 400 psf and internal friction angles ranging from 25.5 to 28 degrees. • Groundwater: Groundwater was not encountered to the maximum depth explored of 51 .5feet. 6.0 GEOTECHNICAL EVALUATION AND DESIGN RECOMMENDATION 6.1 Evaluation of Fill Settlement potential of the existing fill soils were evaluated by analyzing the in-place relative compaction. Using the in-place dry densities obtained from the California Modified sampler and the maximum densities obtained in the laboratory, we calculated relative at or greater than 90 % relative compaction . . 6.2 Seismic Design Criteria Seismic design of structures can be designed in accordance with the provisions of American Society of Civil Engineers (ASCE) 7-16 and 2019 CBC. Specific seismic site class information can be developed with site specific testing and measurement. Based on the available subsurface information at the site and the seismic provisions of these codes and the two field refraction micro-tremor tests and the proposed subsurface under the building, the following seismic design parameters are recommended for the proposed development: Type Value Desaiplion Ss 0.925 MCE R mapped spectral response acceleration at short period s, 0.34 MCfa mapped spectral response acceleration at one-second period Fa 1.0 Site Amplification Factor at 0.2 second Fv 1.7 Site Amplification Factor at 1.0 second SMs 1.045 Site-modified spectral acceleration at short period SM, 0.578 Site-modified spectral acceleration at one-second period Sos .697 Design earthquake spectral response acceleration at short period So, 0.385 Design earthquake spectral response acceleration at one-second period PGAM 0.481 MCE geometric mean peak ground acceleration adjusted for site class effects Notes: 1. Values based on Site Class D. 2. MCE = Maximum Considered Earthquake 3. MCER = Risked-Targeted Maximum Considered Earthquake Based on deaggregation of the probabilistic seismic hazard spectrum from the USGS Unified Hazard Tool, the mean and modal earthquakes for the 2 percent probability of exceedance in 50 years (2,475-year return period) event are 6.63 and 6.89 moment magnitudes, respectively. Seismic design parameters were determined for a Site Class D, assuming that the proposed structures have fundamental periods of vibration equal to or less than 0.5 seconds. The structural , . r--l C Geotechnical Engineering Report Proposed Warehouse Development Carlsbad, California Langan Project No: 700086702 16 April 2021 Page 9 engineer should confirm the structural fundamental period of vibration and the seismic design approach. The structural engineer should provide the fundamental period of vibration to LANGAN and confirm if Exception No. 2 of Section 11.4.8 of ASCE 7-16 and if simplified design procedures in accordance with Section 12.14 of ASCE 7-16 will be utilized for seismic design. If the exception is not being used a site specific seismic site response analysis may be required for final design. 6.3 Expansive Soil Potentially expansive soils are defined by the 2019 CBC as soils with El greater than 20. Based on laboratory test results and the previous grading report, the on-site existing fill soils generally exhibit medium to very high expansion potential (El range 54 to 130). Expansive soils swell or shrink when the moisture content of the soil changes. A soil's moisture content can change through cyclic wet/dry weather cycles, variations in the groundwater level, installation of irrigation systems, change in landscape plantings, and changes in site grading. Leaking utilities can also drastically change soil moisture content. Methods commonly used to reduce the effects of expansive soils include controlling the moisture content of the soils prior to placement of surface finishes, use of impermeable barriers around foundations, confinement of expansive soils through the use of non-expansive soil caps, and chemical stabilization. The Site should be designed to promote positive drainage away from the pavements and landscaping should consist of mainly drought tolerant native planting that requires limited irrigation. Confirmatory expansion index testing should be performed on the actual subgrade material during grading. 6.4 Building Foundations The existing fill soils within the proposed building footprint are suitable for support of the proposed warehouse building. Provided grading is performed as recommended herein, a bearing value of 3,500 pounds per square foot (psf) may be used for continuous and isolated footings founded at a minimum depth of 24 inches below the lowest adjacent grade and having a minimum width of 24 inches. Recommended allowable bearing values include both dead and live loads, and may be increased by one-third for wind and seismic forces. The proposed warehouse building excavation will result in a cut/fill transition between existing fill soils and bedrock as a result of the previous mass grading. The proposed building pad should be over-excavated so that the footings are bearing on a minimum of 4 feet of recompacted fill. and the recompacted fill limits should extend at least 4 feet beyond the lateral limits of the largest footing in the area. Footing total settlement of less than 1 inch and total differential settlements of less than ½-inch over 50 feet is anticipated with foundations bearing on controlled compacted fill soil. Since the entire building will be sitting on engineered fill over rock, seismic settlement of less than ½ inch is anticipated under the design earthquake ground shaking. Footing excavations should be performed using a backhoe bucket fitted with a smooth steel plate welded across the bucket teeth to reduce the potential for disturbance during excavation and to provide a smooth bearing surface. The footing subgrades should be firm and unyielding inspected and approved by a qualified geotechnical engineer prior to steel placement and/or concrete placement. Geotechnical Engineering Report Proposed Warehouse Development Carlsbad, California Langan Project No: 700086702 7 6 April 2021 Page 10 Foundations should be constructed as soon as possible following subgrade approval. The contractor shall be responsible for maintaining the subgrade in its as approved condition (i.e. free of water, debris, etc.) until the footing is constructed. Foundations may be designed to resist lateral loads with an allowable passive pressure of 100 psf/ft. Footing's lateral sliding resistance can be designed using an ultimate coefficient of friction equal to 0.30. The use of full passive pressure should be used with caution as significant movement is necessary to mobilize the allowable resisting passive pressure. Any excavations for permanent utility installations performed in front of footings would prevent the use of passive pressures as utility damage could occur with excessive movement. Additionally, the use of sliding resistance, sliding friction alone or in combination with passive resistance, should be based upon the conditions at the building foundation location. Should additional lateral resistance be required, Langan should be notified so we can perform additional analyses and develop supplemental recommendations. Should higher bearing capacities be requested, the fill could be improved with ground improvement methods such as rammed aggregate piers that extended 5 feet into the Santiago Formation. Typically this type of ground improvement method can achieve bearing capacities of 6,000 psf or higher. If this ground improvement technique or an alternate method is proposed, we can provide a supplemental memorandum to address the proposed method. 6.5 Proposed Site Retaining Walls Site retaining walls of the proposed development are on the southern limits of the Site. The retaining wall system is anticipated to be a two to three-tier system. These retaining walls are presumed to be free to rotate. Retaining wall recommendations will be provided in a separate addendum to this geotechnical report once final wall plans are available. 6.6 Existing Fill Slope Stability Analysis 6.6.1 General Conditions A two-dimensional (2D) slope stability evaluation was performed using the "SLOPE/W" computer modeling software. "SLOPE/W" is a limit equilibrium analysis package capable of modeling soil and rock conditions to assess stability for a variety of slope and potential slide surface configurations. Based on the ALTNNSPS Survey plans provided by the Client, the slope at Section B-B' was evaluated for static and pseudostatic stabilities. 6.6.2 Material Properties Based on our interpretation of the subsurface conditions at the site, a generalized two- dimensional (2D) subsurface profile was developed and used in our analysis. The 2D models and plane-strain analyses were developed to approximate the actual three-dimensional (3D) conditions of the slopes, taking into consideration that 2D models are generally considered to result in lower factor of safety for slope stability than 3D models. The subsurface is generally underlain by Documented Fill underlain by the Santiago Formation, with properties based on laboratory testing performed on samples collected during our March 2021 subsurface exploration. The engineering properties of subsurface materials are shown in Table 1. I • ' Geotechnical Engineering Report Proposed Warehouse Development Carlsbad, California Langan Project No: 700086702 Table 1 -Properties of Subsurface Materials Total Unit Weight. Mohr-Coulomb H■tuhl1 Peak Callesion, T (pcfJ C (psf) Sandy CLAY (CU [FILL] 115 400 Silty CLAY (CL) [FILL] 120 300 Silty CLAY (CU [FILL] 125 800 SantiagoFormation (Tsa) 127 400 Assumed MSE Wall Backfill2 125 0 Notes: 1. Material properties for this layer are based on laboratory test results (Appendix C). 16 April 2021 Page 11 Mohr-Coulomb Peak Friction Angle,. (clegraas) 28 25 26.5 25.5 30 2. Assumed MSE Wall Backfill parameters used based on previous projects were Segmented Block Walls were designed. 6.6.3 Static Gross and Seismic Slope Stability Under static loading, the slope configuration at Section B-B ' is considered stable with a factor of safety greater than 1.5. Under pseudostatic loading, the slope is also considered stable with a factor of safety greater or equal to 1 .1 . The results of our analyses for the proposed slope configurations are summarized below. Outputs from SLOPE/W for the slope configuration are included in Appendix F. Notes: Table 2 -Static Loading Global Slope Stability Analysis Results Section B-B' Factor al Safety Stade Collditian 2.1 Factor al Safety Pseudostatic Collldition , 1.5 1. Maximum horizontal seismic coefficient kh = 0.15 under pseudostatic condition. 6. 7 Pavement Sections The appropriate pavement section depends on the type and strength of subgrade soil at final subgrade, traffic load, and planned pavement life. Recommendations provided herein are in accordance with the 2017 California Department of Transportation Highway Design Manual (HDM) and American Concrete Institute Guide for Design and Construction of Concrete Parking Lots (ACl-330R). Preliminary pavement recommendations are provided herein to support the anticipated traffic loads for the proposed pavement uses. Traffic indices were assumed based on similar projects and should be confirmed for the final pavement design. Parameters for the flexi ble and rigid pavement designs, using a laboratory R-value of 6 are summarized in Table 3. Table 3 -Pavement Recommendations Section Thickness PauemelllType Traffic Portland Index Asphalt Cement Class2 Concrete Concrete Aggregate Base 5.0 4 inches -10 inches Asphaltic Concrete 6.0 4 inches -12 inches Geotechnical Engineering Report Proposed Warehouse Development Carlsbad, California Langan Project No.· 700086702 7.0 8.0 Portland Cement 5.0 -8.0 Concrete (4,000psi) 4 in ches - 4 inches - -6.5 inches 16 April 2021 Page 12 16 inches 20 inches 6 inches Pavements are presumed to be underlain by subgrade soils consisting of compacted fill or competent alluvium . The subgrade within the upper 24 inches of the pavement section should be moisture conditioned to within 2 percent of optimum moisture content and compacted to a minimum of 95 percent of the laboratory maximum dry density, as determined by ASTM D1557 (Modified Proctor). Following subgrade preparation and compaction, Class 11 aggregate base should be moisture conditioned to within 2 percent of optimum moisture content and compacted to a minimum of 95 percent of the laboratory maximum dry density, as determined by ASTM D1557 (Modified Proctor). The concrete should have a minimum 28-day compressive strength of 4,000 psi . Rigid concrete pavement sections should be sufficiently reinforced to resist the intended loading conditions and designed for soils with medium to high expansion potential. Jointing details should follow American Concrete Institute (ACI) recommendations. Final structural pavement section design should be based on the traffic indices provided by the project's traffic engineer and the R-value test results of the subgrade soils upon completion of site grading. Due to the extensive grading that will be required to develop the Project, we recommend performing post-grading confirmatory laboratory testing to confirm the applicability of geotechnical recommendations on the future subgrade soils after mass grading. 6.8 Corrosion Considerations Chemical analyses performed on select samples obtained in the upper 5-feet across the site are summarized in Table 4. Table 4 -Chemical Analytical Results Solllble Dllleaf Depth Ra . IMtt allolide Sample pH Sulfate lnW!II~ (feet) (otvn-cm) (ppm) (ppm) October 2020 LB-4 / B-1 0-5 710 7.1 395 110 March 2021 LB-10 / B-1 0 -5 720 7.6 2921 418 March 2021 LB-16 / B-1 0-5 <500 7.2 1794 252 Notes: 1. ppm = parts per million 2. NT = not tested for the select sample Based on our review of the minimum resistivity, pH, soluble sulfate, and chloride contents on the select soil samples, the surficial soil at the site is considered corrosive to concrete and ferrous metals (ANSI/AWWA Standard C105/A21 .5, ACI 318-14, and ASTM A674). All subsurface structures and utilities in contact w ith the existing fill should be protected against corrosion. Based on the samples co llected to date, ACI 318-14 classified the soil as Exposure Class S1 for sulfate and Exposure Class C1 for chloride . A corrosion expert should be consulted , I Geotechnical Engineering Report Proposed Warehouse Development Carlsbad, California Langan Project No: 700086702 16 April 2021 Page 13 if metal pipe is proposed to be in contact with soil. Based on the laboratory data summarized herein, ACI 318-14 requires that concrete should be designed using Type II cement (ASTM C150), a maximum water-to-cement ratio of 0.5, and a minimum specified compressive strength (f' c) of 4,000 pounds per square inch (psi). A copy of the corrosion results is provided in Appendix D. 6.9 Floor Slabs The floor slab for the proposed warehouse is anticipated to be four feet above the adjacent ground to allow for dock high loading docks. Therefore, saturation of the soils immediately beneath the slab is unlikely. However, if existing onsite soils are to be used immediately below the slab, the upper three feet should consist of onsite soils with lower clay content, or the soils should be mixed with nonexpansive imported fill to reduce expansion potential. Expansion testing should be performed on the soil mix used beneath the slab to confirm that the soils are low to medium expansion. The following parameters are recommended for design: • Subgrade modulus, k, equal to 80 pounds per cubic inch (pci); • 4-inch minimum thickness; • A minimum slab underlayment consisting of 4 inches of coarse aggregate or 2 inches of clean sand, with a 15-mil moisture barrier properly lapped at joints. Steel reinforcing should be designed by the project's Structural Engineer presuming low to medium expansive soil potential conditions and sufficient to meet shrinkage reinforcement limits. T ('" 6.10 Utility Support C Utilities can be supported on grade, bearing on compacted fill or approved native soils. In areas where utility inverts are within the fill material, we recommend that these utility trenches extend a minimum of 1 foot below the design invert and that backfill material consist of material similar to a Caltrans Class 2 Base or clean sand with a sand equivalent (S.E.) value of 30 or greater, or as approved by the utility owner. The gradation of the proposed fill should be compared with the gradation of the native soils to determine if a separation fabric, such as Mirafi 140N or equivalent, is required between the two materials. The bedding material should extend at least 12-inches over the top of the utility, unless otherwise required by the utility owner. Utility subgrade should be confirmed to be free of standing water, firm and unyielding prior to placement of bedding material. Utility trenches above pipe bedding should be backfilled in accordance with the recommendations provided herein for fill compaction requirements using either previously excavated soil (if suitable), or with approved imported material. All utility trench backfill should be compacted to 90 percent of the maximum dry density and moisture conditioned to within 3 percent of the optimum moisture content, as determined by ASTM Test Method D1557 (Modified Proctor). Jetting should not be used as a method to compact the soil or bedding and shading materials. 7.0 BUILDING AND SITE PREPARATION 7.1 Excavation and Grading Prior to the commencement of excavation and grading, a meeting should be held at the site with the owner, city inspector, excavation/grading contractor, civil engineer, and Geotechnical Engineer to discuss the work schedule and geotechnical aspects of the grading. Geotechnical Engineering Report Proposed Warehouse Development Carlsbad, California Langan Project No: 700086702 16 April 202 7 Page 74 All pavement, vegetation, and deleterious materials should be disposed of off-site prior to initiation of grading operations. Any foundation and abandoned utility remnants or construction debris associated with former site structures encountered within excavations should be fully removed, where practical, and any void spaces that may be created should be backfilled with approved compacted structural fill. If utility pipes are too deep to be removed economically in proposed pavement areas, they should be filled with cement and sand grout or equivalent material that will prevent future collapse of the pipe. After completion of excavation, including removal of all below grade remnants, stripping, grubbing, removal of asphalt, base course material, the soil subgrade should be compacted in- place by proofrolling with at least 6 passes of a roller compactor having a minimum static drum weight of 5 tons. Due to the high clay content of existing soils, vibratory roller is not recommended. Any areas exhibiting rutting or pumping should be removed and replaced with approved compacted secondary structural fill. Any soft, loose, or unsuitable soils identified by the geotechnical engineer during subgrade preparation should be removed and replaced with approved compacted secondary structural fill. Any environmentally unsuitable soils encountered during the excavation process should be removed and properly disposed of off-site in accordance with all state and local regulations. 7 .2 Fill Material and Compaction Criteria Fill material (imported or re-used) should be free of organic and other deleterious materials and should have a maximum particle size no greater than 3 inches. All fills should be placed in accordance with the placement and compaction criteria discussed in this report. Imported fill should contain no more than 12 percent passing the #200 sieve by dry weight and have a plasticity index less than 7. Grain size distributions, maximum dry density, and optimum water content determinations should be made on representative samples of the proposed fill material. All structural fill beneath building foundations should be placed in uniform lifts (maximum 8-inches thick prior to compaction) and compacted to a minimum of 90 percent of the maximum dry density at a moisture content within 3 percent of optimum moisture content, as determined by ASTM D1557 (Modified Proctor compaction). All non-structural fill should be placed in uniform lifts (maximum 8-inches thick prior to compaction) and compacted to at least 90 percent of its maximum dry density at a moisture content within 3 percent of optimum moisture content, as determined by the ASTM D1557 (Modified Proctor compaction). All structural and non-structural fill placement should be subject to controlled engineering observation by the geotechnical engineer. No fill material should be placed on areas where free water is standing or on surfaces which have not been approved by the geotechnical engineer. 7.3 Site Drainage Proper drainage should be maintained at all times. Ponding or trapping of water in localized areas can cause differing moisture levels in the subsurface soil. Drainage should be directed away from the tops of excavations and existing foundations. Erosion protection and drainage control measures should be implemented during periods of inclement weather. During rainfall events, , I 7 C r \. Geotechnical Engineering Report Proposed Warehouse Development Carlsbad, California Langan Project No: 700086702 16 April 202 7 Page 75 backfill operations may need to be restricted to allow for proper moisture control during fill placement. The Project Site should be graded to ensure positive drainage away from the locations of the proposed development. 7.4 Hardscape Elements Site pavers and walkways can be supported on compacted fill or native soils after excavating to the required subgrade level, then proof-rolled using an approved compactor such as a 5-ton (static drum weight) vibratory roller compactor, or equivalent. Any soft, loose or unsuitable soils identified by the geotechnical engineer during proof-rolling should be removed and replaced with approved structural fill. 8.0 PROTECTION OF NEIGHBORING STRUCTURES All new construction work should be performed so as not to adversely impact or cause loss of support to neighboring structures, hardscape and landscape elements, paving, or utilities to remain. Special care will be required during grading and construction activities to ensure adverse vibrations or movements are not induced in these structures, and site activities do not result in their loss of support or instability. We recommend, at a minimum, a pre-construction condition documentation comprised of photographic and videographic documentation of accessible and visible areas of neighboring landscaped, and hardscaped areas including pavements and sidewalks be performed prior to initiating construction activities at the site. 9.0 RECOMMENDED FUTURE TASKS AND INTERACTION At this time, we recommend performing the following supplemental tasks: • Review civil and grading plans, structural plans and loads as they become available and throughout the design phase. To maintain our continuity of responsibility on this project, we recommend the above work be performed by LANGAN. 10.0 SERVICES DURING DESIGN, CONSTRUCTION DOCUMENTS AND CONSTRUCTION QUALITY ASSURANCE During final design, we should be retained to consult with the design team as geotechnical questions arise. Technical specifications and design drawings should incorporate Langan's recommendations. When authorized, Langan will assist the design team in preparing specification sections related to geotechnical issues such as earthwork, ground improvement, shallow foundations, backfill and excavation support. Langan should also, when authorized, review the project plans , as well as Contractor submittals relating to materials and construction procedures for geotechnical work, to confirm the designs incorporate the intent of our recommendations. Langan has investigated and interpreted the site subsurface conditions and developed the foundation design recommendations contained herein, and is therefore best suited to perform r· quality assurance observation and testing of geotechnical-related work during construction. The \... work requiring quality assurance confirmation and/or special inspections per the Building Code includes, but is not limited to, earthwork, backfill, ground improvement, shallow and deep foundations, and excavation support. Geotechnical Engineering Report Proposed Warehouse Development Carlsbad, California Langan Project No: 700086702 16 April 2021 Page 16 Recognizing that construction observation is the final stage of geotechnical design, quality assurance observation during construction by Langan is necessary to confirm the design assumptions and design elements, to maintain our continuity of responsibility on this project, and allow us to make changes to our recommendations, as necessary .. The foundation system and general geotechnical construction methods recommended herein are predicated upon Langan assisting with the final design and providing construction observation services for the Owner. Should Langan not be retained for these services, we cannot assume the role of geotechnical engineer of record, and the entity providing the final design and construction observation services must serve as the engineer of record. 11.0 OWNER AND CONTRACTOR RESPONSIBILITIES The Contractor is responsible for construction quality control, which includes satisfactorily constructing the foundation system and any associated temporary works to achieve the design intent while not adversely impacting or causing loss of support to neighboring property, structures, utilities, roadways, etc. Construction activities that can alter the existing ground conditions such as excavation, fill placement, foundation construction, ground improvement, pile driving/drilling, dewatering, etc. can also induce stresses, vibrations, and movements in nearby structures and utilities, and disturb occupants. Contractors are solely responsible to ensure that their activities will not adversely affect the structures and utilities, and will not disturb occupants. Contractors must also take all necessary measures to protect the existing structures, utilities, etc during construction. By using this report, the Owner agrees that Langan will not be held responsible for any damage to adjacent structures, utilities, etc. The preparation and use of this report is based on the condition that the project construction contract between the Owner and their Contractor(s) will include: 1) Langan being added to the Project Wrap and/or Contractor's General Liability insurance as an additional insured, and 2) language specifically stating the Foundation Contractor will defend, indemnify, and hold harmless the Owner and Langan against all claims related to disturbance or damage to adjacent structures, utilities, etc or properties. 12.0 LIMITATIONS The conclusions and recommendations provided in this report result from our interpretation of the geotechnical conditions existing at the site inferred from a limited number of borings as well as architectural information. Actual subsurface conditions may vary. Recommendations provided are dependent upon one another and no recommendation should be followed independent of the others. Any proposed changes in structures or their locations should be brought to Langan's attention as soon as possible so that we can determine whether such changes affect our recommendations. Information on subsurface strata and groundwater levels shown on the logs represent conditions encountered only at the locations indicated and at the time of investigation. If different conditions are encountered during construction, they should immediately be brought to Langan's attention for evaluation, as they may affect our recommendations. This report has been prepared to assist the Owner, architect, and structural engineer in the design process and is only applicable to the design of the specific project identified. The information in . , this 1 ret~ort canndot ~e utilizfedf o: 1 _~epen(_ de 1 d d~n by edngin~er_s or contr~ctors wbhl? ar_e involve)d in ~ eva ua ions or es1gns o ac1 1t1es inc u ing un erp1nning, grouting, sta 1 1zat1on, etc. on adjacent properties which are beyond the limits of that which is the specific subject of this report. C- Geotechnical Engineering Report Proposed Warehouse Development Carlsbad, California Langan Project No: 700086702 16 April 2021 Page 17 Environmental issues (such as permitting or potentially contaminated soil and groundwater) are outside the scope of this study and should be addressed in a separate evaluation. 13.0 REFERENCES 13.1 Publications American Society of Civil Engineers (2016), Minimum Design Loads for Buildings and Other Structures, ASCE/SEI 7-16. California Building Standards Commission (2019), California Building Code, California Code of Regulations, Title 24. California Department of Conservation, California Geological Survey (2002), Geologic Map of the Oceanside 30' by 60' Quadrangle, California, A Digital Database, prepared by Siang S. Tan and Michael P. Kennedy, dated 2007. California Department of Transportation (2012), Corrosion Guidelines. California Department of Transportation (2017), Highway Design Manual. City of Carlsbad (1993), "Technical Guidelines for Geotechnical Reports," dated January 1993. City of Carlsbad, "General Plan -Chapter 6 Public Safety" dated September 2015. c•· County of San Diego (2004), "San Diego County Grading, Clearing and Watercourses Ordinance," effective 23 April 2004. County of San Diego (2011 ), "General Plan -Safety Element," dated August 2011. County of San Diego, Planning & Development Services (2017), "Expansive Soil Foundation Design -Building Division," dated 1 January 2017. Federal Emergency Management Agency (2012), National Flood Insurance Map Program, Flood Insurance Rate Map (FIRM) Map Number 06073C0788J, Panel 788, dated 16 May 2012. 13.2 Plans O'Day Consultants, "ATLA Survery of Carlsbad Raceway" dated June 2004 Thienes Engineering, Inc. "ALT NNSPS Land Title Survey -Southeast corner of S Melrose Drive and Lionshead Avenue" dated October 2020. Ware Malcomb (2020), "Conceptual Site Plan -Phase I," dated 23 August 2020. 13.3 Reports Vinje & Middleton Engineering, Inc. " Grading Plan Review" dated 12 February 2003 Geocon, Inc., "Final Report of Testing and Observation Services During Site Grading", dated 5 June 2006 SCS Engineers (SCS), "Phase 1 Environmental Site Assessment" dated 12 October 2020. Geotechnical Engineering Report Proposed Warehouse Development Carlsbad, California Langan Project No: 700086702 FIGURES J 16 April 2021 LEGEND: APPROXI MATE LIMITS REFERENCE: BING MAPS, ACCESSED 10/12/2020. LANEiAN 18575 Jamboree Road. Suite 150, Irvine. CA 92612 r· 949.561 9200 F· 949 561.9201 wwwJangan.com NEW JERSEY NEW YORK CONNECTICUT PCNNSYLVANIA WASHINGTON DC VIRGINIA WESl VIRGINIA OHIO FLORIOA T£XAS ARIZONA CAUf="ORNIA Project PROPOSED WAREHOUSE BUILDING 2000 1000 0 2000 SCALE IN FEET Figure Title Projoct No. flvureNo. 700088701 Dot• SITE VICINITY MAP APRIL 2021 1 -AS SHO. j OUIW .. ,......... LONDON ......... CARLSBAD -._ __ ._. __ 6_ ... _.__..,_~_ .. _ ...... _,,,_..,_ ... _-__ lnc. __ ... s_A_N_o_1E .. co_,,.c_ou_N_TY ___ ..;c_A;;;;LI;:,;F.;;OR;;,:;,;N:.;IA.._ _____________ _. ______ ....1 .... _____ ..... f A8U OHASl ATHENS DOHA. Drown By MAG Filenam•· \\langan com\data\lRV\data7\700086701\Project Oata\CAD\01\20-0es.gnFiles\GEOTECHNICAl FIGURES.ttwg Date 4nl2021 Time 18·05 User s.aong Style Table· langan stb Layout 1 • SVM LEGEND: Alluvium -Upper Cretaceous marine -Cretaceous marine undivided Mesozoic volcanic and mecavolcan Eocene marine -Pliocene m.irine -Mesozoic granitic rocks Water REFERENCE: 'GEOLOGIC MAP OF THE OCEANSIDE QUADRANGLE', FIGURE 3.5-1 - CITY OF CARLSBAD PROPOSED GENERAL PLAN. LANEiAN Project Figure TIiie 2000 City of Vista 1000 0 SCALE IN FEET Pn>jact No. 7000118701 Date 18575 Jamboree Road, Suite 150, Irvine, CA 92612 T· 949.561 9200 F· 949 561.9201 www.langan.oom NEW JCRS£V N(W YORK CONNECTICUT PENNSYLVANIA WASHIN(:TON 0C v,R.GINlA WEST VIRGINIA 0HID FLORJOA TEXAS A.RJZON>. CALIFOR.MA PROPOSED WAREHOUSE BUILDING REGIONAL GEOLOGIC MAP APRI. 2021 Scale AS SHOWN DUBAI ISTAN8UL LONOON Po\NAMA Lmgcs, ~ • ~tCII S,arw:., Inc. CARLSBAD SAN DIEGO COUNTY CALIFORNIA 0,-,By MAG f f s 2000 ~No. 2 Filename \\langan com\data\lRV\data7\700086701\Pt0ject Dala\CA0\01\2O-0esignF►les\GEOTECHNICAL FIGURES dwg Date· 4fl/2021 Time 18:05 User &song Style Table· Langan stb layoul 2 • GEO LEGEND: Magnitude 0 0000000() 7+ NOTES: 1. THE FIGURE DISPLAYS EARTHQUAKE EPICENTERS OF MAGNITUDE 5.0 OR GREATER SINCE JANUARY 1, 1900 AND WITHIN 100 KILOMETERS OF THE SITE REFERENCE: USGS ONLINE EARTHQUAKE DATABASE ACCESSED 10/12/2020. LANEiAN 18575 Jamboree Road, Suite 150, Irvine, CA 92612 r· 949.561 9200 F· 949.561.9201 www.langan.com NEW JE.RSEY NEW YORK CONNECTICUT PENNSYLVANIA Project F"igure Tltle ~ i Ensen:ida 25 0 SCALE IN MILES Pn>joct No. 7000IIS701 Dote APRIL 2021 Scale ~ J,. ~ 25 l'i9u<9No. 3 WASHINGTON DC VIRGINIA WEST VIRGINIA OHKl FlOf\lOA PROPOSED WAREHOUSE BUILDING REGIONAL SEISMICITY MAP AS SHOWN ii { TEXAS AA.IZONA CAtlf'"ORNIA MU OHABl ATHENS OOt-lA CARLSBAD Drown By -~---~ i .__.,"""""_,;,;"iiii""•-•""'•'"•"•"'~ii,i"'".,~,_"'iii,,iiii-iiiiiiii.,""-,...-liSii,AiiiiN.iDiiiilE;;;;GO .... CiiiOU_,.N.,TY...,_...,;C;.A,_LI;;.F",_OR;,;;N,_IA_., ___________ _. _______ .._ _____ .o F"!MlnatM: \\langan com\dc1ta\lRV\data1\700086701\Pro;ect oa,a\CA0\01\20-0e$,gt'1Files\GEOTECHNICAL FIGURES dwg Date 4f7/2021 Time 18·06 User ssong Sty¼t Table. Langan stb Layout 3 • ea CATALOG Oceanside CARLSBAD LEGEND: --Earthquake Fault Lines --Passenger Rail Lines -F~ --County Lines --Major Highway Minor Highway/Major SO'l!et ii Coty of Carlsbad UrtanAreas REFERENCE: 'EARTHQUAKE FAUL TS', FIGURE 3 5-2 -CITY OF CARLSBAD PROPOSED GENERAL PLAN. LANEiAN Project F1gure TIiie 10 18575 Jamboree Road, Suite 150. Irvine. CA 92612 T: 949.561 9200 F· 949 561.9201 www.langan.com NEW JERs(V NCW YORK CON~ECTICUT PCNNSYI..VANIA PROPOSED WAREHOUSE BUILDING FAULT MAP WASHINGTON DC VlRGINlA WEST VIRGINIA OHIO FLORIDA T£XAS ARIZONA CAUFOANIA ABU DHABI A THENS DOHA DUeAl ISTAN8Ul LONDON PANAMA CARLSBAD 5 0 10 SCALE IN MILES Projoct No. ~ No. 7000116701 Dote APRIL 2021 4 Scole j AS SHOWN Drown By ~ ._ ______ " ..... -.. -.. -~ .. -.. " .. ·~ .. "-.. ··-·"'------""---.. s-A,.N.,D_1_EGO ___ c_ou_N_TY _____ c_A_u_r_OR_N_1A_. ____________ ... ____________ .. o MAG Filenam•· \\langan com\data\lRV\date,7\700066701\Pro;.<:c Oala\CA0\01\20-Des.gnFilas\GEOTECHNICAL FIGURES ctwg Date· 4ll/2021 rime· 18 06 User ssong Sty~ Tab18:· Langan slb Layou1· 4 -FAM t Reservoir I ; L-----~ LEGEND: ~ Riverwash 9 Tidal flats ~ Tujunga sand, 0 to 5 percent slopes ~ Other Hazard -Hlghw.iys -==-Major Street 2.:1uurac Planned Street --Rollro>d C l City Umits REFERENCE: 'LIQUEFACTION HAZARDS', FIG URE 3.5-3 -CITY OF CARLSBAD PROPOSED GENERAL PLAN. I : I • I Project Figure Title City of Vista 2000 1000 0 SCALE IN FEET Project No. 700088701 LANEiAN PROPOSED LIQUEFACTION Date 18575 Jamboree Road, Suite 150, Irvine, CA 92612 WAREHOUSE APR1l.2021 r: 949.5619200 F: 949.561.9201 www.langan.com HAZARD ZONE NEWJERSEY NEWYORI< CONNECTICUT PENNSVLVAAIA BUILDING Scale W"5HINGTON DC VIRGINIA WEST V1ROJNIA OHtO FLORIDA MAP TEXAS ARJZONA CAl..1f:ORNtA AS SHOWN A8U DHABI "TIE.NS OOH,. CARLSBAD Drown By OU8AI 1$TAN8UL LONDON PANAMA MAG ~ Englr-1ng • ~ Sr.4cM. tnc. SAN DIEGO COUNTY CALIFORNIA I I I s I I I i i I I 2000 F'lgl.nNo. 5 FIiename· \\langan com\d.at•\IRV\data7\700086701\Pro)eci Dat,i\CAD\01'.2O-Des~nFdes\GEOTECHNICAL FIGURES d'Ng Date 4ll/2021 Time· 18:06 User ssong Style Table' Langan slb Layoul· S • LIQ :i ! ~ Q LEGEND: L 11'.Annu•l Chance Coastal Flood Zone ( IOOY .. r Flood. High Risk CoaStal Areas) ~ l"Annual Chance Rood Zone (IOOYear Flood -High Rlsk)lreu ) I I L ·wwwwww .. I : ' • i ~ I I REFERENCE: "POTENTIAL FLOOD HAZARDS", FIGURE 6-1 -CITY OF CARLSBAD PROPOSED GENERAL PLAN. City of Vista 2000 1000 0 SCALE IN FEET LANEiAN Project Figure ntle Pro)lct No. PROPOSED 7000l!8701 Dote 18575 Jamboree Road, Suite 150, Irvine, CA 92612 WAREHOUSE FLOOD HAZARD T: 949.561 9200 F· 949 561.9201 www.langan.com APRIL 2021 NEW JE:R$EY NEW YORK CONNECTICUT PENNSYlVANIA BUILDING ZONE MAP Scole WASHINCTON 0C VIRGINIA WEST VlROINIA OHIO FLORIDA. TEXAS ARIZ~ CALIFORNIA AS SHOWN ABU DHABI ATHENS DOHA CARLSBAD Orawn By 0V8AI ISTAN6Ul lONOON PA.MAMA MAG ~ ~ "' ~ SrAca Inc. SAN DIEGO COUNTY CALIFORNIA I -,_, I C San 2000 Figure No. 6 FIiename· \\langan.com\data\lRV\da1a7\700066701\Prqect 0ata\CA0\01\2D-0.stgnFilts\GEOTECHNICAL FIGURES dwg Date 4/712021 Time 18 07 Uset'· ,song Style Table· LangM stb Layoul 6 • FLOOD t ~ ; -.I :i ~ j ~ I> LEGEND: :. ... ..:...-..:.::.~..,.. ...... ,-;,_,_ ... -2:!l.-3'1:.... ~ ... .:o.-7.::. __ , .. _ .. -··•·---.. -----. .. _'(_,._,.._,.(..;: __ - ~--== .. =:-:-.. e-.,...!:"' --:-.::...="'!!.."'::'.t,......:;.::"- _,. ----------- -... ~ .... _, ---~-.. --.. --c::3: ..... 11 __ ____ ,,':l.::a.:::.:::· ··--- c:. ~.._ __ :;-.::;;::_- rs::s. ........ ""'--'-"'•P""'- C at-•.,...,.--..... -- ~ --·-----~ -==:.~--r~= ·-·----·----~--'- •· 8--=====-=-=· ~~;.._ ____ , REFERENCE: FEMA FLOOD INSURANCE RATE MAP FOR THE COUNTY OF SAN DIEGO (MAP NUMBER 06073C0788J, 2012). Project Figure TIiie 1000 LAN&AN PROPOSED 18575 Jamboree Road, Suite 150, Irvine, CA 92612 FEMAFLOOD 500 0 SCALE IN FEET PToject No. 7000ll8701 Dot• r: 9•9.ss,.9200 F· 949 561.9201 www.langan.com WAREHOUSE INSURANCE RATE APl!tt.2021 NEW JERSEY NEW YORK CONNECTICUT PCNNSYL\/ANlA BUILDING -WASHINGTON 0C VIRGIN A WEST VIRGINIA OHIO FLORIDA MAP TEXAS AAIZONA CAUFORNIA AS SHOWN ABU DHABI ATHENS DOHA CARLSBAD OruwnBy OU(W ISTAN8UL lONOON PANAMA WAG l6'QO'l~.lr:~ds..'4ca.Jnc. SAN DIEGO COUNTY CAUF'ORNIA 1000 R9uraNo. 7 Filename: \\langan.oom\data\lRV\clata7\700086701\Prqect Oala\CA0\01\20-DesignFifes\GEOTECHNICAL FIGURES dwg Dale 4nJ2021 Time 18·07 User ssong Slyl,e Table· Langan stb Layov1· 7 • FEMA ii g> j ij 0 undation Zone -- LEGEND: ,f) O.m, & Reservoirs * O.m lnundition Points W o.m lnoodation Areas --Highways = Major Street ====: Planned Street ---lbilroad r.:=-.J City Llmlu : L---. --------. ! I I ~ ~ Bressi Dam * City of Vista l i .. ~. I ... NOTES: ~ -, .--•·THERE IS NO INUNDATION ZONE ASSOCIATED WITH BRESSI DAM 2000 1000 0 _____ 2~000 . SCALE IN FEET REFERENCE: "DAM INUNDATION AREA', FIGURE 6-2 · CITY OF CARLSBAD PROPOSED GENERAL PLAN. i LANEiAN 18575 Jamboree Road. Suite 150. livine. CA 92612 T· 949.561 9200 F· 949.561.9201 www.langan.com NEW JERSEY NEW YORI( CONNECTICUT PENNsY1.W1NIA WASHNOTON DC VIROIN!A WEST \IIRGINIA OHIO Fle>RI™. Project Figure Title Proi-ct No. 700081S701 Dote APftll2021 Scale f'1gure No. 8 -.I f£XA5 ARIZONA CALIFORNIA PROPOSED WAREHOUSE BUILDING DAM INUNDATION HAZARD MAP AS SHOWN ii ABUOHA81 ATHENS DOHA ~ CARLSBAD Drown By - ---.... 0 """ .. "-~ .. :: .. >:_·~-L ..... ~~-"--·-"'-=---"" .. ..,, __ ...... s.AN .... D,_IE_,GO .... c_ou_N_TY ______ c_A_u_F'OR--N_,IA._ _____________ ,._ __ .. _,.G _________ .. ! Filen&me· \\langan com\data\lRV\data7\700086701\Pro;.ct Oala\CA0\01\20-0esignFilff\GEOTECHNICAL FIGURES dwg Date 4/7/2021 Time 18 07 User saong Style Table· Langan &lb Layout 8 . DAM r 150 75 0 150 I ~ I SCALE IN F'EET LAN6AN 18575 Jllr'r1bclrM Roed Suilit 150. INN. CA 92612 T: 949.581.9200 F: 949.561.9201 -Jangan.com NtW.lfJtln ,,.,.YOllllk 00NH!CTlCUT ~'t'I..YNM WJ$,W,IQTQNOC WllllNA WfST YlilQf,M CHO A.ON>,l --~ Project PROPOSED WAREHOUSE BUILDING 1Figure Title LEGEND: ---P... ....fil;;L LB-4~ LB-19~ LP-2~ APPROXJMATE S:TE U'-'tlTS APPROXIMATE BOUNDARY CUT/ FILL U"IE APPROXIMATE SEIS~•C LINE LOCATION APPROXIMATE BORING LOCATION (LANGAN, OCTOBER 20201 APPROXIMATE BORING LOCAliON (LANGAN. MARCH 2021) APPROXIMATE PEACOlATlON TEST LOCAflON APPROXIMATE FOOTMINl OF PROPOSED WAREHOUSE Af AATIFICIAl fill Tsa SANTIAGO FORMATION tC.ACLED WHERE BUAIEDI L_J' APPROXIMATE LOCAl'ON OF CROSS SECTION NOTES: 1 BACKGROUND SITE Pl.A~ REFERENCED FROM "CONCEPTUAL SITE PlAN", PREPARED BY WM[ MAI.COYD. DATED 08/23/2020 2 LANGAN 80Alt-JGS LS.1 THROUGH LB...d VVEf1E DRILLED SY YELLOW JACKET DRILLING ON 1°"'8/1020. U~DER THE FULL-TIME OBSERVATtON OF A LANGAN FIELD ENGINEER 2 LANGAN BORINGS LB-5 THROUGH l8-l9WERE DRILLED BY YELLO\N JACKET DRILLING BETWEEN 8 AND 10 MARCH 2021. U\iDER THE FULL-TIME OBSERVATION OF A LANGAN FIELD ENGINEER 3 AEFRACTtON MICROTREMOR FIELD TESTING WAS PERFORMED BY ATLAS TECHNtcALON 15 MARCH 2021, UNDER FULL·T!~E OBSERVATK)N OF A LANGAN FIELD ENG!NEER 4 PREVIOUS CARLSBAD RACEWAY LIMllS ARE REFERENCED FROM "ALTA SURVEY OF CARLSBAD RACEWAY' DATED JUNE 2004 PREPARED BY O'OAY CO"ISUL T ANTS 5. BEDROCK/ FIU LINE JS A?PAOX-MATF ANO BASED ON BORlt,;GS PERFORMED AT THE SllE WHERE fill WAS ENCOUNTERED 6. SITE LIMITS ANO BORING LOCAT10NS ARE APPROM~ATE 7. PEACOl.ATION TESTING WAS PERFORMED WITHIN BORING LB 5 AND LB-<!. IPro]ect No. I 1oooes101 igure No. I Oote UARCH 2021 IScole AS SHOIIN 9 ~ i ~ BORING LOCATION PLAN MUDHMI •~ DOHA C\ILSIAO Drown By t 01.eAi •r,..._ U)J,l0(JIN ~-- I Ol"qc>" [.1,9'"_1", Ji, '"H-:G ._"'... ... SAN OIECi() CX>IJNTY ~ OJJS = Flel'llfflll•~.c:orffldalaURV\daai7\10008810flPn:,jactOata\CAD'Ct1~TNkftPnip(..t8oringPlli,,dwg 0.:4N2021 r-1808 Useruong S~T.,._ lal"f99'\.stb la)'OUL FG9 .... A 395 ~t 385 \ 380 gjl 375 _j afu §! "' ~J 370 "' il: ,,-1 365 0 i 1 360 "' .... "'I 355 350 345 340 335 LEGEND: -1-LB-15 -----------APPROXIMATE LIMITS OF PROPOSED WAREHOUSE BUILDIN;1.r-------------- APPROXIMATE PROPOSED BUILDING / GROUND SURFACE PAD GRADE =1 ,--EXISTING LB-3 LB-4 --l..B-2 ----/---·mva-,:rn, --i.e,9-----,t~~mir 1uc .. .,,, '"' m1;.~·::~,,s; :ffiELEv.,m _ afu ~ / -----;;;; ~= DSTONC--L!a'u! __ ) --JJ(R OSTONE -__ CLAYSTONE 571A -:: 53 ~ml8.:'t = =i SANDSTONE YSTCt\E : :: -:-681A ELEV~.t.376 1cuatu) 24,f '~''' 14 22lR) SClalul 561R Tsa CL afu ) LB-15 ELEV~t 382 17~CUa!ul 25fR ~ltafuJ fl I SA~NI: ]- 33: Clfotul 50(4'(RI' Tsa ~10~1/ -SANDSTONE NOTES: LB-15 BORING IDENTIFICATION AND APPROXIMATE ELEVATION A' 390 390 385 380 ~ 375 § 370 ::! 0 :e 365 :li n, -; 360 ~ a 355 " !,! 350 345 340 335 INFERRED GEOLOGIC CONTACT ELEV,.i,•• ELEV .. tU# IFEET.MSL) 1. THE FIGURE SHOWS GENERALIZED SUBSURFACE CONDITIONS AT THE RESPECTIVE BORINGS VARIATIONS IN CONDITIONS SHOULD BE EXPECTED BETWEEN BORINGS FOR A DETAILED DESCRIPTION OF CONDITIONS ENCOUNTERED REFER TO BORING LOGS m laful UNDOCUMENTED ARTIFICIAL FILL -ICLI CLAY ~ !SCI CLAYEY SAND D . SANDSTONE ~ CLAYSTONE afu UNDOCUMENTED ARTIFICIAL FILL Oya YOUNG ALLUVIAL DEPOSITS Tsa BEDROCK SANTIAGO FORMATION 150 75 0 150 I t.i!! I HORIZONTAL SCALE IN FEET "~ N NIRI STANDARD PENETRATION TEST BLOWCOUNT NUMBER OF BLOWS OF A 140-LB AUTOMATIC HAMMER FREE FALLING 30 INCHES TO DRIVE A 2-INCH O.D SPLIT SPOON SAMPLER 12 INCHES AFTER 6 INCHES OF INITIAL PENETRATION STANDARD PENETRATION TEST BLOWCOUNT NUMBER OF BLOWS OF A 140-LB AUTOMATIC HAMMER FREE FALLING 30 INCHES TO DRIVE A 2.5-INCH I D CALIFORNIA MODIFIED SAMPLER 12 INCHES AFTER 6 INCHES OF INITIAL PENETRATION LANEiAN 18575.JamborM Road. Suite 150 T 9'49.561 9200 F 9<19 561 9201 www.langan com Ntw..ERSEY llltWYOIOI ~ Pl._.5'1'1.V._'«A 15 0 15 W~OHOC IM.OINl,I, W(SYVIFlOINIA 0"1IO flOl'IICA fflCAS ~ CALlf'ORHA I ~!! I 1/ERTICAL SCALE IN FEET ,#JIJOH/,81 ATHE"'9 DOHA ~!SU._•IA.l(IN()Oo,IP~ ~ (np,-"'1 ll (11...,._,totil ,....._, Ire. LANGAN BORINGS LB-1 THROUGH LB-4 WERE DRILLED ON 8 OCTOBER 2020 UNDER FULL-TIME OBSERVATION BY A LANGAN FIELD ENGINEER LANGAN BORINGS LB-5 THROUGH LB-19 WERE DRILLED BETWEEN 8 MARCH 2021 AND 15 MARCH 2021 UNDER FULL-TIME OBSERVATION BY A LANGAN FIELD ENGINEER 3 PROPOSED BUILDING LIMITS ARE APPROXIMATE AND INFERRED FROM 'CONCEPTUAL GRADING PLAN' BY THIENES ENGINEERING. DATED 15APRIL 2021 4 SEE FIGURE 9 FOR LOCATION OF CROSS-SECTION WITH RESPECT TO BORING LOCATION PLAN 5 BORING AND GROUND SURf ACE ELEVATION REFERENCED FROM SURVEY OF 'CONCEPTUAL GRADING PLAN' BY THIENES ENGINEERING. DATED 15 APRIL 2021 , •roject Figure Title !Project No. !Figure No. PROPOSED GENERALIZED Dole WAREHOUSE SUBSURFACE APRIL 2021 10A BUILDING CROSS-SECTION Scale AS SHOWN CARLSBAD A-A' Drown By SAN DIEGO COUNTY CALIFORNIA MAG i .~ H nen-ne \\a1191"con'l'da!alJRV\data7\700086701\P-o,eelo.ta'ICAD\01\20-0estgnFtiff\f'SI 10CostS«br;,nA.-A'~A72021 dwg Dale 4/'15/2021 rime 15'9 Vsor ~Style,..,.., ~Ith layout Crola-Seclot'IA•A.' B B' -----------APPROXIMATE LIMITS OF SITE:-----1•_, 425 425 420 EXISTING RETAINING WALL 420 415 PROPOSED RETAINING WALL 415 410 410 EXISTING GROUND SURF ACE 405 405 LB-18 400 ELEV=±397 400 ,...._ 395 a, N SM(afu) 395 a," N ~ 390 c., z 45(R) 14(R) SC(afu) 390 ~ c., z ,-: 385 L,J L,J ~ 22 22 ,-: 385 L,J L,J ~ z 380 0 I= < CL(afu) 29(R) 39(R) 380 z 0 I= < > > L,J 375 ...J L,J afu 20 21 375 L,J ...J L,J 370 365 360 355 350 345 340 ~ -?-INFERRED GEOLOGIC CONTACT ~ laful UNOOCUMENTEO ARTIFICIAL FILL ~ ICU CLAY EZ?ZZl <SCI CLAYEY SANO ~ SANDSTONE ~ CLAYSTONE afu UNDOCUMENTED ARTIFICIAL FILL Oya YOUNG ALLUVIAL DEPOSITS Tsa BEDROCK. SANTIAGO FORMATION LAN&AN Project 7- LB-15 ELEVa:tlf## ~D 31IRI 31(R) 24 25 SC(afu) 33(RI 60 CLAYSTONE " 22 SANDSTONE "-1 9719· ""-44(R) Tsa SCALE: HORIZONTAL: 1" = 30' VERTICAL: 1" = 15' lB-15 BORING IDENTIFICATION ANO ELEV,,### APPROXIMATE ELEVATION IrEET,MSLI STANDARD PENETRATION TEST BLOWCOUNT NUMBER OF BLOWS OF N A 140-LB AUTOMATIC HAMMER FREE FALLING 30 INCHES -o DRIVE A 2-INCH 0 D s~ur SPOON SAMPLER 12 INCHES ArTER 6 INCHES OF l~ITIAL PENETRAT ON STANDARD PENETRATION TEST BLOWCOUNT NUMBER OF BLOWS OF NIRI A 140-LB AUTOMATIC HAMMER FREE FALLING 30 INCHES TO DRIVE A 2 5-INCH I D CALIFORNIA MODIFIED SAMPLER 12 INCHES AFTER 6 I1\CHES OF INITIAL PENETRATION Figure Title 370 CL(aful 365 360 355 350 345 340 ~ T!-tE FIGURE SHOWS GENEF\AUZED SU8SURFAC~ CONDIT ONS AT THE RESPECTIVE BORINGS VARIATIONS N CONDITIONS SHOULD BE EXPECTED BETWEEN BORINGS FOR A DETA,LED OESCRIPT!ON OF CONDITIONS ENCOUNTERED REFER TO BORING LOGS ANGAN BORINGS LB-12 AND LB-i8 WERE DRILLED ON 8 AND 10 MARCH 2021, RESPECTIVELY UNDER FULL-TIME OBSERVATION BY A LANGAN FIELD ENGINEER J PROPOSED BUILDING LIMITS ARE APPROXIMATE ANO INFERRED FROM "CONCEP>UAL SITE PLA~" SY WARE MALCOL8. DATED 73 AUGUST 2020 a SEE FIGURE 9 FOR LOCATION OF CROSS-SECTION WITH RESPECT TO BORING LOCAT,ON PLAN 5 BORING ANO GROUND SURFACE ELEVATION REFERENCED FROM SURVEY OF "SOUTHEAST CORNER OF S MELROSE DRIVE A~D LIONSHEAD AVENUE', PREPARED BY THIENES ENGINEERING, NC, DATED OCTOBER 2020 Projoct No. f'9,,. No. PROPOSED GENERALIZED 7000lll5701 Date 18575 Jamboree Road, Sui1e 150, Irvine, CA 92612 WAREHOUSE SUBSURFACE T. 949.561 9200 F: 949.561.9201 www langan.com APR1t. 2021 10B NEW JEFtSfV NEWYORI< ~ECTICU1' PE:NNSVLVAl•IIA BUILDING CROSS-SECTION Seal• WASHINGTON 0C \llkGINl,I, WEST I/IRGINIA OHIO FLORJO,I, AS SHOWN TEXAS ARIZONA CALl,.()RNtA. A.8UOHA8t A.T'H(NS DOHA CARLSBAD B-B' D<awnBy DUBAI ISTANBUl LONDON PANAMA ss SAN DIEGO COUNTY CALIFORNIA l..alQCl'I ~ ti: ~td s.rw:.. Inc. Filename· \\langan com\da1a\lR\/\data7\70008670t\Project Data\CAO\Ot\20-0esignFiles\Ftg tO Cross Section A-A' revised, 7 2021 dwg Date 4/9/2021 Tff'fl6 11-57 User-ssoog Style Table: Langan stb Layout· Cross.-Se<:bO<l e.e· ~ ; c! -..: .... ! .; ~ 0 Geotechnical Engineering Report Proposed Warehouse Development Carlsbad, California Langan Project No: 700086702 APPENDIX A HISTORIC EARTHQUAKE SEARCH 16 April 2021 I L'imited Geotechnical Investigation Report SECS Melrose Dr Lionshead Ave Carlsbad, California Langan Project No .. 700086701 TABLE A.1 -SUMMARY OF USGS 2014 CALIFORNIA SEISMIC SOURCES '" .,..,.~:-!>'.:;'· i''¼'ll-•'f5,><"· ,-,, 1' ,. , ~l~ • ' ·• ' , , • •:: ·--: ; ~~;r,: i;,~-t· , ~:11.ri :,~mi·'.~~-.~~ ·:•·'t I~ ~ 1' •• t,-"'''.~; ,. :Jt-.1:-i Rose Canyon 13.34 Newport-Inglewood (Offshore) 17.54 Carlsbad 23.37 Elsinore (Julian) 31 .76 Elsinore (Temecula) rev 31 .76 Oceanside alt1 35.68 Oceanside alt2 35.75 Coronado Bank alt2 38.59 Coronado Bank alt1 38.59 Earthquake Valley (No Extension) 45.27 Elsinore (Stepovers Combined) 53.15 San Diego Trough north alt2 53.67 San Diego Trough north alt1 53.90 Elsinore (Glen Ivy) rev 54.77 Palos Verdes 58.34 Peralta Hills 60.58 Earthquake Valley 61.53 San Joaquin Hills 63.09 Whittier alt 2 63.58 Whittier alt 1 63.58 Newport-Inglewood alt 2 63.74 Newport-Inglewood alt 1 63.81 Thirty Mile Bank 65.57 Chino alt 1 67.90 Chino alt 2 67.95 San Jacinto (Anza) rev 72.24 San Jacinto (Stepovers Combined) 73.57 San Jacinto (Coyote Creek) 75.07 San Jacinto (San Jacinto Valley) rev 75.92 Earthquake Valley (So Extension) 77 .85 San Diego Trough south 78.03 San Jacinto (Clark) rev 78.61 San Gorgonio Pass 93.50 San Jacinto (San Bernardino) 98.02 Notes: 1. Sources are within a 100-kilometer (62-mile) search radius . October 2020 700086701 Limited Geotechnical Investigation Report SEC S Melrose Or Lionshead Ave Carlsbad, California Langan Project No.: 700086701 TABLE A.2-UCERF3 CATALOG SEARCH RESULTS -' ------------u • -~ 7/7/2010 33.4205 -116.489 5.54 Mw 6/12/2005 33.5288 -116.573 5.21 Mw 10/31/2001 33.5083 -116.514 5.02 Mw 7/13/1986 32.971 -117.874 5.81 Mw 2/25/1980 33.4753 -116.5 5.34 ML 4/28/1969 33.2592 -116.361 5.46 ML 9/23/1963 33.7037 -116.938 5.29 ML 5/31/1938 33.6993 -117.511 5.23 ML 3/11/1933 33.6238 -118.001 5.29 Mh 3/11/1933 33.6308 -117.999 6.40 Mw 10/2/1928 33.6 -116.7 5.50 Unk 7/23/1923 34 -117.25 6.20 Unk 1/1/1920 33.2 -116.7 5.00 Unk 6/6/1918 33.6 -116.7 5.50 Unk 4/21/1918 33.75 -117 6.80 Unk 4/11/1910 33.5 -116.5 5.80 Unk 5/13/1910 33.7 -117.4 5.00 Unk 5/15/1910 33.7 -117 .4 6.00 Unk 12/25/1899 33.8 -117 6.70 Unk 10/23/1894 32.8 -116.8 6.10 Unk 9/13/1885 33 -117.9 5.80 Unk 11/22/1880 34 -117 5.50 Unk 12/19/1880 34 -117 5.90 Unk 6/25/1863 32.4 -117.1 5.80 Unk 5/27/1862 32.55 -117.15 6.20 Unk 9/21/1 856 33.1 -116.7 5.50 Unk 5/25/1803 32 .8 -117.1 5.50 Unk 11/22/1 800 32 .9 -117.8 6.30 Unk -------- ,, October 2020 700086701 --_._.u 77 76 79 62 79 83 69 68 89 89 72 96 51 72 72 80 65 65 78 55 63 99 99 82 65 51 39 58 1. The listed Earthquake Catalog Search results were obtained from Uniform California Earthquake Rupture Forecast (UCERF3) Catalog on 12 October 2020. 2. Refer to Appendix K of the Uniform California Earthquake Rupture Forcast, Version 3 for additional information on magnitude types. 3. Earthquake Cata log search results include earthquake events within 100 km of the Site with magnitudes of 5.0 or greater since 1800. LAN6AN Geotechnical Engineering Report Proposed Warehouse Development Carlsbad, California Langan Project No: 700086702 APPENDIX B Boring Logs 16 April 2021 LAN6AN L og o fB onng LB 1 -Sh ee 0 Project Project No. Prooosed Warehouse Buildinq 700086701 Location Elevation and Datum SEC S Melrose Dr & Lionshead Ave, Carlsbad, CA Anorox. 377 feet NAVO 88 Drilling Company Date Started Date Finished Yellow Jacket DrillinQ 10/8/20 10/8/20 Drilling Equipment Completion Depth Rock Depth CME 85 Truck Mounted Riq 16.5 ft N/A Size and Type of Bit Number of Samples Disturbed Undisturbed Core 6-inch OD Hollow Stem AuQer 3 N/A N/A Casing Diameter (in) I Casing Depth (ft) Water Level (ft.) First Completion 24 HR. N/A N/A 'Sl N/A y N/A '5l_ N/A Casing HammeN/A J Weight (lbs) N/A JDrop (in)N/A Drilling Foreman Sampler N/A 2-inch OD Spilt Sooon & 3-inch OD Cal. Mod. Field Engineer z Sampler Hammer I Weight (lbs) I Drop (in) < Automatic 140 30 Daniel J Judqe Serrano Cl z Samole Data :"i "i~ g -o Elev. Depth > .!::oo .!= Remarks O:a, Sample Description Q) W:::, (ft) Scale 0. o-~ "iii :3 (Drilling Fluid, Depth of Casing, ...J ~>->, oC Q);=, Fluid Loss, Drilling Resistance, etc.) t' :::;(/) ..... er ~ ~(D 0 0 0. ., ~◊ :> ::; V' -1 -Bulk sample collected from 0 Cl. y Brown-gray, fine to medium SAND, moist. [SP] [FILL] "' ~ to 5 feet. a, .., i'\ t'-. -2 -;.:. ~~~ ~ ;:: ~---------------------------;, 3 --~ -; . . . . . . Cl. Cl "f CD ...J ..... z Cl 0 ,._ <O co 0 g ,._ 1n Cl 0 r= z g < () z I () w ..... 0 w Cl w z ::; Cl. u en 0 ~ ..... () w 0 er 9, 0 ,._ <O co 0 0 0 ~ ,._ ~ □ ~ ! < □ ~ 0 () z < Cl z :"i ~ I .. .. ... .. .. ... .. .. .. ..... ..... .... .... .... ·.·.·.·. . . . . ..... ..... ..... ..... ..... .... .... .... . . . . ..... ..... ..... ..... ..... ~ ~ ~ SANTIAGOFORMATION >-4 - -5 Medium dense, orange-dark brown-gray, SANDSTONE, dry. 6 ..... 00 ch Cl. ~ 5 -6 -en 6 >-7 - ----------------------------8 - >-9 - >-10 Medium dense, orange-brown-gray, CLAYSTONE, dry . 5 N er 00 ch 7 () ~ -11 -16 -12 - -13 - -14 - -15 Medium dense, orange-dark brown-gray, CLAYSTONE, trace 6 gypsum, dry. C') ..... 00 ch Cl. ~ 11 -16 -en 16 Bottom of boring at 16.5 feet. Groundwater was not encountered. >-17 - Borehole backfilled with auger cuttings. >-18 - >-19 - 20 1;--,,i ....._, C ) LAN6AN Log of Boring LB-2 Sheet of 2 Project Project No. Prooosed Warehouse Building 700086701 Location Elevation and Datum SEC S Melrose Dr & Lionshead Ave, Carlsbad, CA Approx. 374 feet NAVO 88 Drilling Company Date Started Date Finished Yellow Jacket Drilling 10/8/20 10/8/20 Dril ling Equipment Completion Depth Rock Depth CME 85 Truck Mounted Rig 26.5 ft N/A Siz e and Type of Bit Number of Samples Disturbed Undisturbed Core 6-inch OD Hollow Stem Auger 5 N/A N/A Ca sing Diameter (in) I Casing Depth (ft) Water Level (ft.) First Completion 24 HR. N/A N/A 'Sl N/A I N/A 7. N/A Ca sing HammeN/A I Weight (lbs) N/A I Drop (in) NIA Drilling Foreman Sampler l-------=2=--.::.in.:.::c::ch--=0=-D:::.....::S::.c;p:.:.:1il.:...t .=.Sc..::cooo:.:.1n.:,..&=,..,::.3c..-i::,:n.=.ch:,:,...::O:.c:D=--=C=a::.:.l...cM:.:.:od::.=._r=-_-,,--,---~ Field Engineer N/A ~ Sampler Hammer !Weight (lbs) I Drop (in) 30 ~ Automatic 140 Daniel J Judge Serrano 5 ----r---r------------------------~--,---..------,S:,-a-m-lp""'l-e""'D-a-,-ta-----,--------------i ~5 Remarks S' ffi ~ E(lfte)v. Sample Description DSeptl h ] 1l. ~ -.g '"~ (Drilling Fluid, Depth of Casing, ~ i ~ ca e ~ ~ ~ ~ ~ -~ iiJ Fluid Loss, Drilling Resistance, etc.) g_~QS;~r--r-------------------------,=-~~ ',I' 0 ~',/' "" <D ~)< ¼ 0, ~ .... ;;; 0 ~ t:: v -, a.. (!) v al ....I I-z (!) 0 .... <D <X) 0 0 0 ~ en (!) 0 ....I I-z g <( u z J: u w I-0 w (!) w z :::i a.. u en ci <( I I-<( 0 I-u w 0 a:: g;, 0 .... <D <X) 0 0 0 ~ .... <( I-<( 0 s a:: <( I-<( 0 :E 0 u z <( (!) z ~ } , V' .. .-.. .... .... '. .... ... .... • ... ♦ ....... .... ..... • • • ♦ • ... ..... .... .... .... .,. Brown-gray, fine sandy CLAY, trace claystone fragments, moist. [CL] [FILL) -1 - ~---------------------------3- SANTIAGO FORMATION Dense, orange-brown-light gray, SANDSTONE, dry. I--5 -6 - I--7 - I--8 - -9 - Very dense, orange brown-gray, SANDSTONE, dry. -10 ,_ 11 - ,___ 12 - ----------------------------13- -14 - Dense, orange brown-gray, CLA YSTONE, dry. ,___ 15 ,___ 16 - -17 - ----------------------------18- ,___ 19 - ~ a:: N ch u ~ N en co ch en ~ C'? a:: co ch u ~ 10 22 35 8 33 50/2" 10 18 38 Bulk sample collected from 0 to 5feet. ::i "" .. ~S;i::3......J. _________________ ___L20.....___..____.____._....._ __ ___. _________ _ LAN6AN Logo fB onng Project Project No. Prooosed Warehouse Buildinq Location Elevation and Datum SEC S Melrose Dr & Lionshead Ave, Carlsbad, CA ~5 Elev. Depth iii O:a, Sample Description " w::; (ft) Scale .0 a. \c>-E >, ::;"' :, ,_ z .. Dense, light gray, SANDSTONE, dry. 20 .. "SI" (/) .. Dense, orange-brown-gray, SANDSTONE, dry. -21 -ch (/) .. -22 -.. .. z ----------------------------23 -<( ••••• (.') ..... z ::i •••• :.:.: 0 ••••• __.J •••• i::' .... Q ·.·.· .. ·. Q) •••• ": .·.·.·.·. i5: ••••••••• ,-.. ..... "<I: "' "<I: ,._ " 0 ~ ;, ii (.') --r CD _J ..:. z 13 0 ,._ "' 00 0 0 0 !::: (/) (.') 0 _J ,_ ~ (.') :::i <( (.) z I w ,_ w (.) 0 (.') [ij z ::::; a. (.) (/) - 0 ;;:' ,_ <( 0 ,_ (.) w 0 er: g, 0 ,._ "' 00 0 0 0 !::: ,._ ~ 0 s er: ~ 0 Si 0 (.) z <( (.') z ::i "" Dense, brown-gray, CLAYSTONE, dry. Bottom of boring at 26.5 feet. Groundwater was not encountered. Borehole backfilled with auger cuttings. ._ 24 - ._ 25 U"l er: ch (.) -26 - >-27 - >-28 - -29 - >-30 - -31 - -32 - -33 - ..... 34 - -35 - ._ 36 - >-37 - ._ 38 - -39 - >-40 - >-41 - -42 - -43 - -44 - 45 -eet 2 0 2~ '--I LB 2 Sh f 700086701 Approx. 374 feet NAVD 88 Samole Data ~-!::-;;.!: Remarks ~ ·u; :3 (Drilling Fluid, Depth of Casing, uC w-=-Fluid Loss, Drilling Resistance, etc.) er: ~ ~ aJ 12 co 19 ~ 25 N 12 50/4" ~ z <( (!) z 5 _§' i::: 0 a. Q) ex: :::. 0.. "' .., .. "' .., .... °' 0 N § LAN6AN Log of Boring LB-3 Sheet of Project Project No. Prooosed Warehouse Buildinq 700086701 Location Elevation and Datum SEC S Melrose Dr & Lionshead Ave, Carlsbad, CA Approx. 378 feet NAVO 88 Drilling Company Date Started Date Finished Yellow Jacket Drillinq 10/8/20 10/8/20 Drilling Equipment Completion Depth Rock Depth CME 85 Truck Mounted Ria 16.5 ft N/A Size and Type of Bit Number of Samples Disturbed Undisturbed Core 6-inch OD Hollow Stem Auoer 3 N/A N/A Casing Diameter (in) I Casing Depth (ft) Water Level (ft.) First Completion 24 HR. N/A N/A 'SL N/A y N/A 7. N/A Casing HammeN/A 'Weight (lbs) N/A j Drop (in)N/A Drilling Foreman Sampler N/A 2-inch OD Spilt Sooon & 3-inch OD Cal. Mod. Field Engineer Sampler Hammer I Weight (lbs) I Drop (in) 30 Automatic 140 Daniel J Judqe Serrano Sample Data ~5 Elev. Depth .!= <ii .S Remarks O::a, Sample Description Q) > w:; (ft) Scale a. o-~ "iii :3 (Drilling Fluid, Depth of Casing, i~ >-~§, I-ex: ~ ~Ill Fluid Loss, Drilling Resistance, etc.) 0 1V N' >Q9 Brown, fine to medium sandy CLAY, trace fine gravel, moist. -1 -Bulk sample collected from 0 X Xt [CL] [FILL]. to 5 feet. xx:) -2 - ¢9' ) -3 - ·~~~ -, 0.. (!) .., "' ...J 1-z (!) 0 .... "' "' 0 g .... en (!) 0 ...J ~ ~ z I u w l-o w (!) w z :::; 0.. u (/) i5 i 1-u w 0 ex: 9, 0 .... "' "' g 0 !::: .... ~ 0 s ex: ~ :::. 0 u z <( (!) z 5 "" I O;? ◊ X,?,,, --.. h ,/' 'V ,/' X. \l "-"" 'V ,/' 'V \l' .. . .. .. .. .. ... .. .. .. . . .. .. .. .. .. -4 - -5 Stiff, brown-gray, fine to coarse sandy CLAY, trace sandstone 2 fragments, moist. [CL] [FILL] ~ (/) a:, (I) (/) ~ 3 -6 - 8 -7 - ---------------------------~ 8 - SANTIAGO FORMATION -9 - Medium dense, brown-gray, SANDSTONE, trace rootlets, -10 5 moist. N ex: (I) a:, 11 u ~ -11 -17 -12 - -13 - -14 - Dense, light gray, SANDSTONE, dry. -15 10 (") (/) a:, (I) (/) ~ 17 Dense, brown-gray, SANDSTONE, dry . -16 -25 Bottom of boring at 16.5 feet. -17 -Groundwater was not encountered. Borehole backfilled with auger cuttings. -18 - -19 - 20 LAN6AN L fB . LB-4 Sh og o onng ee 1 0 2.,..-... Pro ject Project No. ,.__1 Prooosed Warehouse Building 700086701 Loe ation Elevation and Datum SEC S Melrose Dr & Lionshead Ave, Carlsbad, CA Approx. 380 feet NAVO 88 Ori lling Company Date Started Date Finished Yellow Jacket Drillinq 1018120 1018120 Ori lling Equipment Completion Depth Rock Depth CME 85 Truck Mounted Rig 26.5 ft NIA Siz e and Type of Bit Disturbed Undisturbed Core 6-inch OD Hollow Stem Auger Number of Samples 5 NIA NIA Ca sing Diameter (in) I Casing Depth (ft) First Completion 24 HR. NIA NIA Water Level (ft.) 'SL NIA I NIA 7 NIA Ca sing HammeNIA I Weight (lbs) NIA I Drop (in)NIA Drilling Foreman (:> Sa mpler NIA 2-inch OD Spilt Sooon & 3-inch OD Cal. Mod. Field Engineer z Sa mpler Hammer I Weight (lbs) I Drop (in) 30 < Automatic 140 Daniel J Judge Serrano ...J z Sample Data < :;;'~ -0 Elev. Depth :;; ,; ~~~ Remarks g O:a, Sample Description ., w::, (ft) Scale .c C. o-(Drilling Fluid, Depth of Casing, ~~ E >, g& C "':::J :, f-~ ~ (D Fluid Loss, Drilling Resistance, etc.) t z Cl'. 0 0 C. ., Cl'. ::; 0.. 0 "' "' ... N'-r-. Yellow-brown, fine to coarse sandy CLAY, claystone t-1 -Bulk sample collected from 0 ,._ N 0 N ;:: ;, f-z ci 0 ,._ <O 00 0 0 0 r:, <J) (:> 0 ~ z g c) z I (.) w f-0 w (:> w z ...J 0.. (.) <J) 0 ~ ;§ f-(.) w 0 Cl'. 9- 0 ,._ <O 00 0 0 R ;::: ~ 0 s !!:: ~ < 0 I "" r-. "" V' V' r-. 'V y V' I<., r-. XX XX xy ~~ ~ ~x X V'Y . . . . r-. V' ~ >< ?¢< \I ",. ~ >< XX x" '.)c ~ 0 (.) z < (:> z ·XX XX y V' ::i "" fragments, dry. [CL] [FILL] t-2 - t-3 - t-4 - Stiff, brown, fine to coarse sandy CLAY, claystone fragments, -5 dry. [CL] [FILL] -6 - -7 - ----------------------------8 - -9 - Medium dense, brown-gray, clayey fine to medium SAND, -10 trace fine gravel, moist. [SC] [FILL] -11 - -12 - ,-13 - -14 - Medium dense, brown-gray, clayey fine to medium SAND, ,-15 trace fine gravel, moist. [SC] [FILL] ,-16 - -17 - -18 - -19 - 20 to 5 feet. C 8 ~ Cl'. CX) ch (.) ~ 13 11 "° 4 N <J) I= CX) 6 ch <J) >-~ ~ 8 4 C') Cl'. CX) ch (.) ~ 9 13 r ....._ LAN6AN Log of Boring LB-4 Sheet 2 of 2 Project Project No. Prooosed Warehouse Buildina 700086701 Location Elevation and Datum SEC S Melrose Dr & Lionshead Ave, Carlsbad, CA Approx. 380 feet NAVD 88 :;g5 Samele Data Elev. Depth ~ ,,; .::i ui -~ Remarks °'"' Sample Description " w::; (ft) Scale Q. o-~ 'iii :3 (Drilling Fluid, Depth of Casing, i~ E >, ~.§. Fluid Loss, Drilling Resistance, etc.) ::, I-~ !!m z Ct'. Medium dense, brown-gray, clayey fine to medium SAND, 20 JV-"-3 trace fine gravel, trace twig fragments moist. (SC] [FILL] ,. (/) CX) 9 -21 -Cf) (/) ~ :>< X 11 "v :>< X -22 - X ,( z <{ ----------------------------23 - C, z s ALLUVIAL DEPOSITS -24 - .3 i:: 8. Very stiff, black, CLAY, trace rootlets, moist. [CL] -25 " 8 Ct'. "' Ct'. CX) (/) u ~ 13 ::; 26 -a. SANTIAGO FORMATION 26 0 "' I\ Medium dense, brown-gray, SANDSTONE, moist. r ai ~ Bottom of boring at 26. 5 feet. -27 -r-;;; Groundwater was not encountered. 0 ~ ;; Borehole backfilled with auger cuttings. -28 - .., a. -29 -C, 1 "' -; -30 - I-z 5 0 -31 - r-<O "' 0 0 0 -32 - !::: (/) C, 0 -33 -..J I-z 3 <{ -34 -u z r u -35 -w I-0 w Sl w z :::; a. 1--36 - u >-37 -(/) 0 <{ I-<{ -38 -0 I-u w .., -39 -0 Ct'. ~ 0 r-<O -40 - "' g ;:: -41 - <{ ~ 0 s -42 -Ct'. ;.= I-<{ -43 -~ 0 u i <{ -44- C, z s "' 45 LAN6AN og o L fB onng LB 5 -Sh eel 1 0 Project Project No. Prooosed Warehouse Development 700086702 Location Elevation and Datum Lots 1-4 SECS. Melrose Dr. & Lionshead Avenue, Aoorox. 375 ft NAVO 88 Drilling Compa~arlsbad, (.;A Date Started Date Finished Yellow Jacket Drilling 3/8/21 3/8/21 Drilling Equipment Completion Depth Rock Depth CME 95 Truck-mounted Drill Riq 9 ft 0 Size and Type of Bit Disturbed Undisturbed Core 8-inch 0.0. Hollow-stem-auqer Number of Samples 3 -- Casing Diameter (in) J Casing Depth (ft: First Completion 24 HR. -Water Level (ft.) 'Sl -y -7 - Casing Hamme~ I Weight (lbs) I Drop (in) Drilling Foreman -- Sampler lszzv z 2-inch 0 .0. SPT Split-Barrel; 2.5-inch 1.0. Cal Mod Solit Spoon Field Engineer < Sampler Hammer I Weight (lbs) I Drop (in) 30 C, Automatic 140 Daniel J. Judoe Serrano z :5 ;;/_ _, Sample Data 8' Remarks ii:~ Elev. Sample Description Depth ;;; " > .s iii .s N-Value _, ~~ .Q C. o -(Drilling Fluid, Depth of Casing. (ft) Scale ~·;;;~ (Blows/ft) E >-~:§. i:: ~"' :, t-O'. l~a:i Fluid Loss. Drilling Resistance, etc.) 0 z 10 20 30 40 C. Q) ~ ~~ ::; ..... a.~ ~ ·.·.·.·.· " .... .;; .... " 0 (',I ••••• i:::: •••• V • • • • • : .. . . -, .... -. a. C, • ♦ •• c,i ••••••••• "' a, _, t-z 15 ' N i2 "' :g 8 ~ C, 0 ;= z ~ z I () w t-o w ~ z ::::; a. G Cl) 0 < ~ t w ~ g, 0 ,-. "' 00 g 0 ;2 ~ ~ ~ i 8 z ~ z j .... .. E .. .. .. .. ... SANTIAGO FORMA TlON 0 -1 - -2 - Red-brown, CLAYSTONE, moderately weathered. -3 - ,_ 4 ~--------------------------~ Tan to gray, fine SANDSTONE, moderately weathered. 5 '-6 - I-7 - Gray, fine SANDSTONE, moderately weathered. '-8 - 9 Boring completed at 9 feet bgs. Groundwater not encountered. -10 -Borehole converted to percolation well for testing then backfilled with five feet of open-graded sand and four feet of soil cuttings. ,_ 11 - '-12 - ,_ 13 - -14 - ,_ 15 - '-16 - ,_ 17 - I-18 - ,_ 19 - 20 8 ~ t-(X) ch a. ~ 11 Cl) !9• 18 \ 12 \ N t-(X) ch a. ~ 23 Cl) ~3 30 I/ 11 C") t-ch a. (X) 16 Cl) ~ ~ 24 I 1 ) LAN6AN Log of Boring LB-6 Sheet of Project Project No. Pronnsed Warehouse Develooment 700086702 Location Elevation and Datum Lots 1-4 SECS. Melrose Dr. & Lionshead Avenue, Approx. 371 ft NAVO 88 Drilling Compar{)larlsbad, CA Date Started Date Finished Yellow Jacket Drillina 3/8/21 3/8/21 Drilling Equipment Completion Depth Rock Depth CME 95 Truck-mounted Drill Ria 9 ft 7.5 ft Size and Type of Bit 8-inch O.D. Hollow-stem-auaer Number of Samples Disturbed Undisturbed Core 3 . . Casing Diameter (in) Casing Hamme~ I Weight (lbs) I Casing Depth (fl~ _ I Drop (in) _ Sampler z 2-inch O.D. SPT SPiit-Barrel; 2.5-inch I.D. Cal Mod Split Sooon c3 Sampler Hammer !Weight (lbs) 140 IDrop (in) z Mom* ~ :'.5 Elev. (ft) Sample Description Water Level (fl.) Drilling Foreman Field Engineer Depth ~ Scale E :, z t: g_ ~-""~""'":x."""+--+-------------------------t-0 N 0 Y', y !g ! : (/) C, ••••• Stiff, brown to tan, sandy CLAY, trace sandstone fragments, trace claystone fragments, (CL), moist. [FILL] '- '- 2 - 3 - ----------------------------4 Dense, brown gray, clayey SAND, (SC), moist. [FILL] '-5 -7 - -SANTIAGO FORMATION --------------- ~ ch I-Cl. (/) 0 . ••••••• ~ Black, CLA YSTONE, moderately weathered, trace sandstone -8 -"" ,.. fragments. 00 e; z •••• ~ --~~ z I u w ... 0 w C, w z :::; Cl. ~ 0 I ... u w 3 (,: g; 0 ,-.. <O 8 ~ ;::: i i 0 u ----------------------------9 Boring completed at 9 feet bgs. Groundwater not encountered. Borehole converted to percolation test then backfilled with two feet of sand and seven feet of soil cuttings. -10 - -11 - -12 - -13 - -14 - -15 - -16 - -17 - -18 - -19 - First Completion 24 HR. 7 'S:l . I lszzv Daniel J. Jurin,, Serrano Samele Data 4 a:, ~ 6 4 a:, ~ 20 6 a:, ~ , , N-Value (Blows/ft) 10 20 30 40 6 12 \ \ 11 I 7 . . Remarks (Drilling Fluid, Depth of Casing, Fluid Loss, Drilling Resistance, etc.) z <( !L--.....ll.---"-----------------------_._20 ...... _ ..... _.__..____ ...... ~I_,_ ...... _ ..... ___________ ..., LAN6AN f B L og o onng LB 7 -Sh ee 1 0 Project Project No. Prooosed Warehouse Development 700086702 Location Elevation and Datum Lots 1-4 SECS. Melrose Dr. & Lionshead Avenue, Approx. 376 ft NAVO 88 Drilling Compafi\larlsbad, l-A Date Started Date Finished Yellow Jacket Drilling 3/9/21 3/9/21 Drilling Equipment Completion Depth Rock Depth CME 95 Truck-mounted Drill Rig 11.5 ft 1 ft Size and Type of Bit Number of Samples Disturbed Undisturbed Core 8-inch 0 .0 . Hollow-stem-auger 2 -- Casing Diameter (in) I Casing Depth (ft~ Water Level (ft.) First Completion 24 HR. -.sz -y -~ - Casing Hamme~ I Weight (lbs) I Drop (in) Drilling Foreman -- Sampler lszzv z 2-inch 0.0. SPT Split-Barrel; 2.5-inch 1.0. Cal Mod Split Spoon Field Engineer (3 Sampler Hammer Automatic I Weight (lbs) 140 I Drop (in) 30 Daniel J. Judoe Serrano z :3 ~ .... Sample Data ~ ocg Elev. Depth ,; ~-!::U).S: N-Value Remarks w:,; Sample Description .0 8-(Drilling Fluid, Depth of Casing. " 8. i~ (ft) Scale E ~ ::, z ~·u;~ (Blows/ft) ~:§. l ~CD Fluid Loss, Drilling Resistance, etc.) c,: 10 20 30 40 ., C,: X ; '""-' v". ~~ >O N ~ N <Xi .. ;:; 0 .. ~ .. ~~ C!) ~ ,;, >-z C!) N [;; a, i C!) 0 ..J >-z ~ z r (.) I:! 0 w C!) w z ::::; a. c3 Cl) 0 ~ >-(.) w 0 c,: g, 0 ,-.. :g 8 ~ i s 0:: I :i 0 (.) z <( C!) z ~ .. .. .. .. .. ..... .. .. . . . . . .. ••• ♦ ... ........ . . . . . ..... ... ~ ~ - Red brown, clayey SAND, (SC), moist. [FILL] ---------------------------SANTIAGO FORMATION Red brown, fine to medium SANDSTONE, moderately weathered. ~--------------------------Gray, CLA YSTONE, moderately weathered. -Red brown, moderately hard, SANDSTONE, moderately weathered. Gray, CLA YSTONE, moderately weathered. Boring completed at 11 .5 feet bgs. Groundwater not encountered. Borehole backfilled with soil cuttings. 0 ... 1 - -2 - -3 - -4 - -5 9 ~ c,: 00 29 Cl) (.) ~ •4 -6 -45 -7 - ... 8 - ... 9 - >-10 27 N >-00 Cl) a. ~ 21 '"" 11 -Cl) 53 32 -12 - -13 - -14 - -15 - -16 - '"" 17 - -18 - '"" 19 -I 20 I I I 1,r,,,i LAN6AN Log of Boring LB-8 Sheet of Project Project No. Prnnnsed Warehouse Develnnment 700086702 Location Elevation and Datum Lots 1-4 SECS. Melrose Dr. & Lionshead Avenue, Anorox. 378 ft NAVO 88 Drilling Compar(jlarlsoaa, l-A Date Started Date Finished Yellow Jacket DrillinQ 3/9/21 3/9/21 Drilling Equipment Completion Depth Rock Depth CME 95 Truck-mounted Drill Ria 11.5 ft 5 ft Size and Type of Bit Number of Samples Disturbed Undisturbed Core 8-inch 0.0. Hollow-stem-auger 2 -- Casing Diameter (in) I Casing Depth (ft~ Water Level (ft.) First Completion 24 HR. -.sz -I -7-- Casing Hamme~ I Weight (lbs) I Drop (in) Drilling Foreman -- Sampler lsnv z 2-inch 0.0. SPT SDfit-Barrel; 2.5-inch 1.0. Cal Mod SDlit Snnon Field Engineer <( Sampler Hammer I Weight (lbs) I Drop (in) 30 Cl Automatic 140 Daniel J. Jud= Serrano z :'S ;t~ Samele Data 3 -o Elev. Depth :;; t-~iii.S N-Value Remarks 0: .. Sample Description ~ w::, (ft) Scale -" ~·;;;~ (Blows/ft) (Drilling Fluid, Depth of Casing, i~ E g:§. i:: :, I-~ !en Fluid Loss. Drilling Resistance. etc.) 0 z a:: 10 20 30 40 0. 0 ., Brown, fine sandy CLAY, trace coarse sand, trace claystone a:: 1\ 'V\ V : fragments, (CL), moist. [FILL) ::. ,/'V <') CL ..,,... _; -1 -M >< :x ;;, <:'! ;;; '>( «i I-2 -;;; " 0 £:! r, '>< .... ~ ) X -3 - -, CL ~ ~ ,;, CD ....I I-z <5 "' 0 .... "' "' 0 0 0 !:: (f) Cl 0 ....I I-z ~ z :c (.) (.) ~ 0 w Cl w -z ....I -a. (.) (f) B <{ I-<( 0 I-(.) w 3 a:: g; 0 <( <( 0 s a:: I- ~ <( 0 ~ 0 (.) z <( Cl z :'S "" X'. :x '.) 'V' ') ""-V ~2X .. . . .. '• .. .. .. .. .. -4 - ----------------------------5 SANTIAGO FORMATION Brown gray, fine to medium SANDSTONE, moderately weathered. -6 - -7 - -8 - -9 - -10 Tan to gray, fine to medium SANDSTONE, moderately weathered. L-11 - Boring completed at 11.5 feet bgs. I-12 - Groundwater not encountered. Borehole backfilled with soil cuttings. -13 - I-14 - -15 - ,_ 16 - -17 - ,_ 18 - -19 - 20 4 ~ a:: a:, 10 ch (.) ~ 21 \ 13 9 I N I-a:, ch a. ~ 10 (f) 4,. 33 I I I LAN6AN og o onng -ee 0 :") Pro ject Project No. - L f B . LB 9 Sh 2 Prooosed Warehouse Development 700086702 Loe ation Elevation and Datum Lots 1-4 SECS. Melrose Dr. & Lionshead Avenue, Approx. 375 ft NAVO 88 Ori lling Compan\)arlsbad, CA Date Started Date Finished Yellow Jacket Drillina 3/9/21 3/9/21 Ori lling Equipment Completion Depth Rock Depth CME 95 Truck-mounted Drill RiQ 21.5 ft 16 ft Siz e and Type of Bit Number of Samples Disturbed Undisturbed Core 8-inch O.D. Hollow-stem-auQer 4 -- Ca sing Diameter (in) I Casing Depth (ft~ Water Level (ft.) First Completion 24 HR. -.sz -I -7 - Ca sing Hamme! I Weight (lbs) I Drop (in) Drilling Foreman -- Sa mpler lszzv z 2-inch O.D. SPT Split-Barrel Field Engineer <( Sa mpler Hammer IWeight(lbs) I Drop (in) 30 (!) Automatic 140 Daniel J. Judae Serrano z :3 ~cS Sample Data i Elev. Depth > .!:u,.!: N-Value Remarks O:a, Sample Description " w:, (ft) Scale Q. ~& ~ '0 :3 (Blows/ft) (Drilling Fluid, Depth of Casing, i~ >, i: ... &:'. ~CD Fluid Loss, Drilling Resistance, etc.) 0 er: 10 20 30 40 C. 0 .. ~r: I er: ::. ;x~ ~ -1 - N .; N 0 g ..,. -, ... z i:i N 0 ,-.. !8 8 ~ (!) g ... z g <( u z I l) ~ w Sl w z ::::; 0.. [j (J) a ~ t; w ~ 9, ;; ,-.. !8 g ;: ~ ~ er: ~ ~ 0 l) z <( (!) z ~ ~~ ~g§ XO X >( :x :> 'Y N1'- )() :>< x O("" X ,( VA ,0:)< x .., ">::> ::> X X X " :1 X x ~ x x ~_,._ ,. .. .. ·- .. '. Very stiff, brown gray, fine sandy CLAY, trace claystone fragments, trace sandstone fragments, (CL), moist. [FILL] Very stiff, dark brown, fine sandy CLAY, trace claystone fragments, trace sandstone fragments, (CL), moist. [FILL] ~-------------------------- ALLlMAL DEPOSITS Hard, dark brown, CLAY, trace rootlets, (CL), moist. -SANTIAGOFORMATION _______________ Red brown, fine to medium SANDSTONE, moderately weathered. -2 - -3 - -4 - -5 7 ~ er: a) 12 -6 -ch l) ~ 3, r 21 >-7 - >-8 - >-9 -I -10 3 N ... a) ch 0.. ~ 6 >-11 -(J) 8 12 >-12 -~ -13 - I\ -14 -\ -15 2 C") er: a) ch l) ~ 18 -16 -?8 50 -17 - .,-, -18 - >-19 -I 20 LAN6AN Log of Boring Project Project No. Prooosed Warehouse Develooment Location Elevation and Datum Lots 1-4 SECS. Melrose Dr. & Lionshead Avenue, -~ ~5 Elev. Depth Ii; c,: <D Sample Description 8. w::i; (ft) Scale .D i~ E ;>: :, z Tan to gray, fine SANDSTONE, moderately weathered, trace 20 z <( (!) z s .3 i:: 0 0. " a:: ::; Q. "' ~ ;;; ,;; ;;; 0 ~ ~ -, Q. (!) ~ J, ~ ..:. z 15 N 0 ,._ <O "' 0 12 ui (!) 0 _, ,_ z § _, <( u z I u w ,_ 0 w (!) (ij z :::; ~ u (/) -D < ~ I ti w -, 0 a:: Q. ~ :2 <O "' 0 0 0 ;::: <( ,_ <( D s a:: <( z ·-clay. Boring completed at 21.5 feet bgs. Groundwater not encountered. Borehole backfilled with bentonite grout. ..,. ,_ ch Q. -21 -(/) -22 - -23 - >-24 - >-25 - -26 - -27 - -28 - -29 - -30 - -31 - -32 - -33 - -34 - >-35 - >-36 - -37 - >-38 - -39 - -40 - >-41 - >-42 - -43 - -44 - 45 LB-9 Sheet 2 of 2 700086702 Approx. 375 ft NAVO 88 Samnle Data ,; .::i1;;.5 N-Value Remarks o-~ u;:J (Blows/ft) (Drilling Fluid, Depth of Casing, ~:§. l ~CD Fluid Loss. Drilling Resistance. etc.) a:: 10 20 30 40 10 (X) ~ 22 ;o, 28 ' ,,,,L,....,.....,..A ___ N __ f __ .. _1_4 __ N ________ L_og::....,of,,...B..,..o...,nn..;g;....::====L=B=-=1=0=====----S-h_ee _____ o_f __ 1~ Project Project No. Pronosed Warehouse Develooment Location Lots 1-4 SECS. Melrose Dr. & Lionshead Avenue, Drilling Compar{¥arlsbad, CA Yellow Jacket Drilling Drilling Equipment CME 95 Truck-mounted Drill Ria Size and Type of Bit 8-inch O.D. Hollow-stem-auaer Casing Diameter (in) J Casing Depth {ft~ Casing Hamme! I Weight (lbs) _ I Drop (in) _ Sampler z 2-inch O.D. SPT Split-Barrel; 2.5-inch 1.0. Cal Mod Split Spoon ;; Sampler Hammer I Weight {lbs) 140 I Drop (in) z Automatic 30 s ' ~15 .5 ~! Elev . (ft) Sample Description -700086702 Elevation and Datum Aoorox. 376 ft NAVO 88 Date Started Date Finished 3/9/21 3/9/21 Completion Depth Rock Depth 20.7 ft 15 ft Disturbed Undisturbed Core Number of Samples 4 -- First Completion 24 HR. Water Level (ft.) .sz -.Y -:l. - Drilling Foreman lszzv Field Engineer Daniel J. Judoe Serrano Sample Data Remarks ~epth .8 ~ ~ "2 ~ ~ ~ (~jValu~) (Dnlling Fluid, Depth of Casing, "t: ~en J·k;,,;,..,._,"""''><">*-+----=B-row_n_, ""fi-ne-sa_n_dy.,.......,C"'LA-,-,Y7,...,.tr_a_ce_c.,...la-'fS"""'t,-on-e--;-fr-agem--e-n-:t-s.-("'Cc:-L7),---t- l ~~:XX~X~><l moist. [FILL] cale ~ ~ ~:.:;. &_ ~ ~ owS/ Fluid Loss, Drilling Resistance, etc.) O --+-z--+-+--;--+-'r0_20r-30,.....,• 1 0--+--------------1 Bulk sample collected from 0-5 feet. ~ V "',I.A ..; :;:: >< >? ~--------------------------~ A J' "' 0 £:! X. I\. t: .., Medium dense, clayey fine to medium SAND, trace claystone t- l•!1 4 fragments, (SC), moist. [FILL] ~ >-co ch Q. 8 -6 -(/) ~ 15 -- - t-8 - t-- ~--------------------------~ 10 Very stiff, fine to medium sandy CLAY, trace sandstone t lJ 3 fragments, (CL), moist. [FILL] N co 13 t--ch ~ 25 ,-12 - -- I ,-14 - ----------------------------SANTIAGO FORMATION (") ~§ a, 17 Red brown, fine SANDSTONE, slightly weathered, trace ch 5013" cemented lens. -16 -50/3" -- -18 - -- Red brown, fine to medium SANDSTONE, slightly weathered. -20 -+=--tc::T"t--t----1 ~ 10:: ~ a:, 15 CIJ I <ll t: 50/'Z' t-- ~ t3 Boring completed at 21.5 feet bgs. U ~z Groundwater not encountered. ,_ _ J Borehole backfilled with bentonite grout. ~ 22 -) ;; t-~-~,....__.___.__ _______________ _,__25 --------1 .... ,_..___ _______ __, LANliAN Log of Boring LB-11 Sheet of Project Prooosed Warehouse Develooment Location Lots 1-4 SECS. Melrose Or. & Lionshead Avenue, Drilling Comparljlarlsbad, CA Yellow Jacket Drillinq Drilling Equipment CME 95 Truck-mounted Drill Riq Size and Type of Bit 8-inch 0 .0. Hollow-stem-auoer Casing Diameter (in) I Casing Depth (ft~ Casing Hamme~ J Weight {lbs) _ J Drop (in) _ Sampler z 2-inch 0.0. SPT Split-Barrel; 2.5-inch 1.0. Cal Mod Split Sooon ~z Sampler Hammer !Weight {lbs) I Drop (in) 30 Automatic 140 3 Project No. 700086702 Elevation and Datum Anorox. 372 ft NAVO 88 Date Started 3/9/21 Completion Depth 26.5 ft Disturbed Number of Samples Water Level (ft.) First 'SL Drilling Foreman lszzv Field Engineer Date Finished Rock Depth Undisturbed 5 Completion ~ Daniel J. Judoe Serrano Sample Data 3/9121 18 ft Core - 24 HR. -'5l Remarks Depth (Dnlling Fluid, Depth of Casing. 2 - - t Elev. (ft) Sample Description Scale g_ ~·~~~-,--------------------7::- N-Value (Blows/ft) 10 20 30 40 Fluid Loss. Drilling Resistance, etc.) 0 .,,, "I< ::;; Q. "' ,I -1 -:::: "}('") ;.; .;<... ,I ~ "' >< :x :> N 0 >< :x :> ~ -2 - :;, ,( :x :> -3 - ..., Q. (!) cri >( :x :>c -4 - J, V "}(' "> "' ...J ..:. ,( O< z "" (!) .,,,,,..,,, -5 Stiff, brown gray, fine sandy CLAY, trace claystone fragments, 2 trace rootlets {CL}, moist. [FILL) ~ ... co ch Q. ~ 7 -6 -(/) 1 \ 7 t-7 - t-8 - t-9 -\ Very stiff, brown gray, fine to medium sandy CLAY {CL), trace ,-10 8 sandstone fragments, (CL}, moist. [FILL) N a: N 15 ..... 11 -ch u ~ 321 17 t-12 - t-13 - ..... 14 - ..... 15 Very stiff, brown to black, fine sandy CLAY, trace sandstone 6 fragments, trace wood chips, (CL), moist. [FILL] ('") ... co ch Q. ~ 10 t-16 -(/) :s 18 ..... 17 - t-SAHTIAGO FORMATION -18 -\ -19 - 20 I I LAN6AN Project Location Sa <x:a, w::, i~ .. .. .. z <( r., .. .. z :5 .. . . ~~ 8. . . . . " .. a: ::; a. ,-. ~ -... ~ r., ~ "' (D ..J f-z <3 "' 0 ,-. "' § iii r., 0 ..J f-z ~ <'i z I u w b w Q w z :::; a. u (/) ci ~ f-t) w ~ 9, ;; ,-. :g ~ ~ I ! i 0 () z ;; z i I Prooosed Warehouse Develooment Lots 1-4 SEC S. Melrose Dr. & Lionshead Avenue, -('. Elev. Sample Description (ft) Brown gray, fine to medium SANDSTONE, moderately weathered. Red brown, fine to medium SANDSTONE, moderately weathered. Boring completed at 26.5 feet bgs. Groundwater not encountered. Borehole backfilled with bentonite grout. Log of Boring Project No. Elevation and Datum Depth ,; ., Scale .0 C. E ~ :, z 20 "I' a: -21 -Cl) () -22 - -23 - -24 - -25 "' f-ch a. ._ 26 -(/) -27 - -28 - ,... 29 - -30 - ,-31 - -32 - ,... 33 - -34 - ,... 35 - -36 - ,... 37 - -38 - -39 - -40 - -41 - -42 - -43 - -44 - 45 LB 11 -Sh eet 2 0 2.,-.,,, 700086702 Approx. 372 ft NAVO 88 Samole Data ~-.::i u,.S N-Value Remarks ~ ·u; :J (Blows/ft) (Drilling Fluid. Depth or Casing, o.~ .,_ ~ !!.cri Fluid Loss, Drilling Resistance. etc.) a: 10 20 30 40 I J 6 N 18 ~ 30 16 co 40 ~ ~5 45 I I I I ) I LAN6AN Log of Boring LB-12 Sheet of 2 Pro ject Prooosed Warehouse Develooment Loe ation Lots 1-4 SECS. Melrose Dr. & Lionshead Avenue, Dril ling Compa~rtsbad, LA Yellow Jacket Drilling Dril ling Equipment CME 95 Truck-mounted Drill Rici Siz e and Type of Bit 8-inch 0 .0. Hollow-stem-auoer Cas ing Diameter (in) I Casing Depth (ft~ - Cas ing Hamme~ I Weight (lbs) I Drop (in) -- Sa mpler z 2-inch 0.0. SPT Split-Barrel; 2.5-inch 1.0. Cal Mod Split Sooon ~ Sa mpler Hammer Automatic I Weight (lbs) 140 I Drop (in) 30 z :3 <i!-' i erg W::,; i ~ " 0 0. "' a:: :0 >0:X ~" v-,,V .. X>x N ~::xx >O :.;1\.v ""' §<o :)c ~ '.>X :)c .. ii'.>< <.? C') ~ .......... J, 1\. ..A "' ...,..,. .... z "' ci 5 N 0 ~ ,._ (0 00 ~ ~ y <.? (.) !::, I ;;:; :::; 'Y <( z J' I (.) ~ 0 w IB z ..., Q. ~ 0 ~ 0 .... (.) w - <( -, 0 a:: ~ 0 ,._ (0 00 8 0 ;:: <( .... <( 0 s ex: ~ <( ~ 0 1'-., X " >< "' ) ", ()"' ,I z" <( 'V ~ "VV ~.,,..,,..,. ~ ~ >< "' ~ ~ ", ,I ">< Elev. Sample Description (ft) Yellow brown, CLAY, trace coarse sand, (CL), moist. [FILL] Stiff, dark brown, CLAY, trace coarse sand, (CL), moist. [FILL) Very stiff, dark brown, CLAY, trace coarse sand, trace sandstone fragments, (CL), moist. [FILL] Very stiff, dark brown, CLAY, trace coarse sand, trace sandstone fragments, (CL), moist. [FILL] Project No. 700086702 Elevation and Datum Approx. 395 ft NAVO 88 Date Started Date Finished 3/8/21 3/8/21 Completion Depth Rock Depth 41.3 ft 35 ft Number of Samples Disturbed Undisturbed Core 8 -- First Completion 24 HR. Water Level (ft.) 'Sl -y -:L - Drilling Foreman ls:nv Field Engineer Daniel J. Judae Serrano Sample Data Remarks Depth "' > !:0.= N-Value Scale Q. o ~ ~-w:3 (Blows/ft) (Dnlling Fluid, Depth of Casing, >, "i:: .... a,;.;:, ~ ~CD Fluid Loss, Drilling Resistance, etc.) ex: 10 20 30 40 0 Bulk sample collected from 0-5 feet. -1 - -2 - -3 - -4 - -5 4 ~ ex: co 6 -6 -ch (.) ~ 1• 8 I -7 - -8 - ._ 9 - ._ 10 5 N .... co ch Q. ~ 11 >-11 -(/) 22 11 \ I >-12 - I ._ 13 - ._ 14 - \ >-15 5 C') ch ex: co 17 -16 -(.) ~ 9 22 I ._ 17 - -18 - >-19 - I/ 20 LANliAN LogofBonng LB-12 Shee 2 o 2.......,.. ,..,P""r"'oj'"ec_t _________________________ ..::...T:e:CPr_o.,..je_c.,..t;N:..o_-==========-------------- Location Elev. (ft) Prooosed Warehouse Development Lots 1-4 SECS. Melrose Dr. & Lionshead Avenue, f"'I'- Sample Description Elevation and Datum Depth Scale 1i E ::, z 700086702 Approx. 395 ft NAVO 88 Samele Data N-Value (Blows/ft) Remarks (Drilling Fluid, Depth of Casing, Fluid Loss, Drilling Resistance, etc.) - 10 20 30 40 ""·3<~~~~t-1"""iTe~~~:brciwn":-w~ooi"roarse"sarid.ti1ice---~ 20 -+---+---,-+---+--+-.,.......,..r-T"""-.---+----------'°""" c, Very stiff, dark brown, CLAY, trace coarse sand, trace 4 v v sandstone fragments, (CL), moist. (FILL) "'f t -21 -(/) (/) 7 'V ~-v >O~ ~R83 N 0 j;~g§§§ w z ~~·t·: ~~ :-'·'. ~5§·:::.-· t~/\ a~·-·· il?f. ;;· .'.·. ~11-'-..:.L~ ~ a: ~ ~ 8 z ..: (!) 14 ..,. 22 - -23 - ..,. 24 - Very stiff, dark brown gray, CLAY, trace sandstone fragments, (CL), moist. [FILL) ..,. 25 -+--+---nwf---+-----1 1/) a: ..,. 26 -J:, u -27 - -----------------------------28- ,-. 29 - a:, ~ 2 11 20 Medium dense, tan to brown, clayey SAND, trace sandstone fragments, (SC), dry. (FILL) -30 -+-+--...+----lf-----i -31 - -32 - -33 - -34 - ..,. SANTIAGO FORMATION ----------------35 Gray, CLA YSTONE, moderately weathered. -36 - ~-------------------------- -37 - ..,. 38 - -39 - <.O ... ch fu r--t J:, (/) 6 a:, 10 15 a:, ~ 15 45 Light tan to gray, SANDSTONE, moderately weathered, trace clay. ..,. 40 -+--+--.-if---+-----1 Boring completed at 41.3 feet bgs. Groundwater not encountered. Borehole backfilled with bentonite grout. ..,. 41 - -42 - ,-. 43 - ... 44 - a:, ... J:, e, 21 47 50/3" 21 31 so ~...__......__.._ __________________ ~45 ~-----........ 1 __ 1 _ ....... _________ _. LANliAN Log of Boring LB-13 Sheet of 2 Pro ject Project No. Prooosed Warehouse Development 700086702 Loe ation Elevation and Datum Lots 1-4 SEC S. Melrose Dr. & Lionshead Avenue, Aoorox. 379 ft NAVO 88 Dril ling Comparfjlarlsbad, CA Date Started Date Finished Yellow Jacket Drilling 3/9/21 3/9/21 Dril ling Equipment Completion Depth Rock Depth CME 95 Truck-mounted Drill Rig 26.5 ft 20 ft Siz e and Type of Bit Disturbed Undisturbed Core 8-inch 0 .0. Hollow-stem-auaer Number of Samples 5 -- Cas ing Diameter (in) I Casing Depth (ft~ Water Level (ft.) First Completion 24 HR. -'SL -.Y -:I. - Cas ing Hamme~ I Weight {lbs) I Drop (in) Drilling Foreman -- Sa mpler lszzv z 2-inch 0.0. SPT Split-Barrel; 2.5-inch 1.0. Cal Mod Split Spoon Field Engineer ~ Sa mpler Hammer Automatic IWeight{lbs) 140 I Drop (in) 30 Daniel J. Judae Serrano z ~ ~5 Samele Data § Elev. Depth > .!:iu,.S N-Value Remarks It:"' Sample Description " w:,; (ft) Scale Q. o-:¥ ·a, :3 (Blows/ft) (Drilling Fluid, Depth of Casing, i~ >, ~& i:' t-~ !co Fluid Loss. Drilling Resistance, etc.) 0 a: 10 20 30 40 Q. 0 " Brown, fine sandy CLAY, trace coarse SAND, (CL), moist. a: N ..?-..✓ ::;; ,0 :x '.) (FILL) a. -1 -~ ~ ✓ M "' '( :x co ~ 2 -°' y 'Y 0 ~ . ~ 3 - ii'. V C, 1'., ~ 4 -"' .;, :>-) "' ...J ~--------------------------~ 5 ..:. :x :>-Sitff, brown gray, clayey medim to coarse SAND, (SC), moist. 3 z C, ) 0 '( [FILL) ch a: '<t 10 ~ 6 -u ~ 22 "' V", 0 12 .... ~~ J\ ✓ 8 >O:X ~ 7 -~I\./",.. "' ~:;,><,; 0 ...J ~ 8 -t-z § '\ .,/' ...J ~ 9 -~~3 3 z i3 Y'O 0 w -Very stiff, brown to dark brown, medium sandy CLAY, (CL), -10 t-..,. .,/' 3 0 w 'Y ", moist. [FILL) N t-CX) C, ch a. ~ 7 (ij ~ 11 -(/) 0 z .,/' 13 ~ I\ "' \ ~:;, ><; :;,. -12 -i5 '\ ✓ I ~><:> :;, c§ ~ 13 - t-X: :>-:>-u w o x:;, :> ~ 14 -a: ~ ~ tP \ 0 I'- -Medium dense, brown to dark brown, clayey medium to coarse >-15 <O '\ ✓ a) 6 8 "" SAND, trace claystone fragments, (SC), moist. [FILL) M a: 0 0 ch 15 I ;:: (X ◊~ -16 -u ~ 9 ~)O X :;, 24 < ~ :x 0..,. ~ 17 -a: "' ~ t-< v 'V -18 -9 l > ~ )< ~ ><' "" < '\ 'V ~ 19 - C, ~IQ >Q :>< :i ./" 20 z <{ C) z ~ .3 i:: 0 0. "' (l'. ' ::;; 0.. N ':-! <') N <O " 0 ~ ;; ~ 0.. (!) "' :;;; co ...J l-z a N 0 .... :g 8 ~ C) 0 ...J 1-z § ...J <{ u z J: u I:! 0 w C) w z :::; 0.. u (/) 0 ~ t-u w 0 (l'. ~ i2 I !:: .... ~ Cl ~ ~ ~ 8 z <{ C) z ~ I LANliAN Project Prooosed Warehouse Development Location Lots 1-4 SECS. Melrose Dr. & Lionshead Avenue, r'h ~5 Elev. O:a, Sample Description W::, (ft) i~ SANTIAGO FORMATION .. Light gray, fine to medium SANDSTONE, moderately weathered. .. .. .. .. .. . . .. .. .. Light gray, fine to medium SANDSTONE, moderately weathered. ... Boring completed at 26.5 feet bgs. Groundwater not encountered. Borehole backfilled with bentonite grout. L fB og o onng Project No. Elevation and Datum Depth ~ "' Scale .0 0. E >, ::, I-z 20 'i I-0.. >-21 -en (/) -22 - >-23 - -24 - >-25 lO I- ch 0.. (/) -26 - -27 - -28 - -29 - -30 - -31 - -32 - -33 - -34 - -35 - >-36 - >-37 - >-38 - -39 - >-40 - >-41 - -42 - >-43 - ,-44 - 45 LB 13 -Sh ee 700086702 2 0 . . 2~ - Approx. 379 ft NAVO 88 Samole Data > ,::; <ii .S N-Value Remarks o-~·u,~ (Blows/fl) (Drilling Fluid, Depth of Casing, u C: a,.:. ~~al Fluid Loss, Drilling Resistance, etc.} (l'. ~o 20 JO 40 7 00 12 -~ 17 \ \ 12 00 27 -!4 37 I I I I LANliAN Log of Boring LB-14 Sheet of 2 Pro ject Project No. Prooosed Warehouse Develooment 700086702 ation Loe Elevation and Datum Lots 1-4 SECS. Melrose Dr. & Lionshead Avenue, Annrox. 382 ft NAVO 88 Dril ling Compa~artsbad, CA Date Started Date Finished Yellow Jacket Drilling 3/8/21 3/8/21 Dril ling Equipment Completion Depth Rock Depth CME 95 Truck-mounted Drill Rio 31 .5 ft 25.5 ft Siz e and Type of Bit Number of Samples Disturbed Undisturbed Core 8-inch O.D. Hollow-stem-auaer 6 -- Gas ing Diameter (in) I Casing Depth (ft~ Water Level (ft.) First Completion 24 HR. -.sz -I -Sl - Gas ing Hamme~ IWeight (lbs) I Drop (in) Drilling Foreman -- Sa mpler lszzv z 2-inch 0.0. SPT Split-Barrel; 2.5-inch 1.0. Cal Mod Split Sooon Field Engineer <( Sa mpler Hammer I Weight (lbs) I Drop (in) 30 Cl Automatic 140 Daniel J. Judae Serrano z s ;;1_~ Sample Data .3 a:~ Elev. Depth ~ ,; .:::~.!: N-Value Remarks Sample Description (I) w::; (ft) Scale .0 a. o-~ ·;;; :3 (Blows/ft) (Dnlling Fluid. Depth of Casing. i~ E >, UC t' :, I-Q,):.::, ~!CD Fluid Loss, Drilling Resistance. elc.) 8. z ex: 10 20 30 40 ., ~ X 0 ex: :~ ~x ::; 0.. " """" -1 -~ >< :.>><; ~ >O )( :> "' t-2 -;;:;K> >< :> ~ .;<; ~ )( )( ✓ -3 - ~,ex :> Minor glass debris. & ,( X :X t-4 -~;? 'V >( ~'Sc x~ ~ ~ v'\. .., Stiff, brown, fine sandy CLAY, trace sandstone fragments, -5 ~ V 'V ", 3 15 (CL), dry. [FILL] ~ I-co ' 0.. 5 C-:,t'>,<> >(_ t-6 -Cf) "' ~ 1'1\ R\I "v 8 "' ..I\. "' §"'"' t-7 - ~ "' .... \ Cl 0 t-8 -..J < I-z "' g J< ) <( -9 -\ () ~ z r () -10 UJ -Medium dense, brown gray, clayey fine to medium SAND (SC), I-5 0 UJ trace sandstone fragments, (SC), moist. [FILL] N ex: <O Sl rJ, () ~ 18 46, UJ ) -11 -z ) 28 ::::; 0.. u ) -12 -i] ) ~ -13 -I ~ y () ) ) UJ .., -14 - CX: ~ I ~ 0 -15 .... )( )( "' Medium dense, brown gray, clayey fine to medium SAND, "' ) ✓ 5 8 trace sandstone fragments, (SC), moist. [FILL] "' I-"<t 0 .... rJ, 0.. 6 ;:: ,-16 -"' ~ 117, ~ 11 I a I s t-17 -I ex: ~ "'..,. \ I I- <( ")(' 'V ,-18 -~~ ~ ~ () ..I\. >(_ z ,-19 - I <( y ", Cl z s "'..,. I "' 20 0 ..,,,....,.._1_4 __ N ___ f __ i_1_4 __ N _________ L..:..og:::....;.o.,..f B....,o_n.,.,n;g--===L=B=-1=4===---S_h_e_e __ 2 ___ 0 __ 2"\ ~~ ~~~ a'.. Location '< '.'X ,e,y <:XO >(,0C: A x:: :>< ~>◊< V . . . . . . . <.? ...... . . C> -:-. . . . "' . . . . CD . . ..., I-z <.? .. N 0 ... <O "' 0 8 !:: C/) (!) 0 ..., I-z § ..., <( u z I u w I-0 w <.? w z :::; a. u C/) i5 ~ I-<( 0 I-u w 0 0: ~ 0 ... <O "' 0 0 :,2 ,:: <( I-<( 0 s 0: ~ I-<( 0 :i 0 u z <( <.? z <( ..., "' Prooosed Warehouse Development Lots 1-4 SECS. Melrose Dr. & Lionshead Avenue, Sample Description Very stiff, fine to medium sandy CLAY, trace sandstone fragments, trace claystone fragments, (CL), moist. [FILL] Elevation and Datum Depth ~ " Scale .D 0. E ::, ~ z 20 ,. 0: 1---21 -(/) u -22 - -ALLUVIAL DEPOSITS --------,___ 23 - - Black, CLAY, with rootlets, (CL). SANTIAGO FORMA T10N Brown, CLAYSTONE, deeply weathered. Light brown to gray, SANDSTONE, moderately weathered, trace clay. Boring completed at 31. 5 feet bgs. Groundwater not encountered. Birehole backfilled with bentonite grout. 1---24 - ,___ 25 l() I-ch a. 1---26 -C/) -27 - -28 - -29 - -30 c.o 0: -31 -ch u -32 - -33 - -34 - -35 - -36 - -37 - ,___ 38 - -39 - ,___ 40 - -41 - ,___ 42 - -43 - -44 - 45 700086702 Approx. 382 ft NAVO 88 Samole Data ~-b 0 £ N-Value Remarks ~ ·;;;:3 (Blows/ft) (Drilling Fluid, Depth of Casing, g§. ~ ~cc Fluid Loss, Drilling Resistance, etc.) 0: 10 20 30 40 8 st 19 ~ 9 20 4 co ~ 9 2 ◄ 15 \ \ I 6 co 18 ~ ;a 40 I I I I LAN6AN Log of Boring LB-15 Sheet of 2 Project Project No. Prooosed Warehouse Development 700086702 Location Elevation and Datum Lots 1-4 SECS. Melrose Dr. & Lionshead Avenue, Annrox. 381 ft NA VD 88 Drilling Comparijlarlsoao, CA Date Started Date Finished Yellow Jacket Drillino 3/8/21 3/8/21 Drilling Equipment Completion Depth Rock Depth CME 95 Truck-mounted Drill Rig 36.3 ft 35 ft Size and Type of Bit 8-inch O.D. Hollow-stern-auoer Number of Samples Disturbed Undisturbed Core 7 -- Casing Diameter (in) J Casing Depth (ft~ Water Level (ft.) First Completion 24 HR. .sz -y -7.. - Casing Hamme~ Iweight(lbs) _ I Drop (in) _ Drilling Foreman Sampler z 2-inch O.D. SPT Split-Barrel; 2.5-inch I.D. Cal Mod Split Sooon Field Engineer Z c3 Sampler Hammer I Weight {lbs) 140 I Drop (in) 30 Automatic Daniel J. Jur!nP. Serrano ~ .;, "' ...J ... ~o-""oo✓<J ~ >< :> (!) ..., Elev. (ft) Sample Description Very stiff, brown gray, fine sandy CLAY, trace sandstone fragments, (CL), moist. (FILL] Stiff, brown gray, fine sandy CLAY, trace sandstone fragments, (CL), moist. [FILL] Depth ] Scale E :, z 0 I-2 - ~ 3 - I-4 - I-5 ~ ~ 6 -d, I-7 - I-8 - I-9 - ~ 10 I-11 - N d, I-12 - I-13 - I-14 - ... 0.. "' oc u Samnle Data 4 co ~ 6 11 2 N ~ 11 14 N-Value (Blows/ft) 10 20 JO 40 117 2 ,-,_ 15 _..._...,__,.__,_ _ __, Medium dense, brown to tan, clayey fine to coarse SAND, trace sandstone fragments,(SC), moist. [FILL] (") ii: ,_ 16 -d, "' I-17 - ~ 18 - ,_ 19 - co ~ 4 9 I \ Remarks (Drilling Fluid. Depth of Casing, Fluid Loss, Drilling Resistance. etc.) ~~:2·88..._JL _______________ ___t_20 --'-......1.........1...__,_ _ _.__...__........._ _______ __. LAN6AN Log of Boring Project Location ~5 a:a, W:,; ii;; 1<, "' :) >( :>c "> ✓ ">, 1<, .J<.. >( :) >( >( z 'V :x <[ :8~ Cl z ~ ~~ § t: X:>c 8. ., oc >( :x :) ~~ ::;; 0.. "' "' ✓ ">, ,,.,, ,;; "' (0 ;:; 01<, g v" .., 'X)c ~ ., 0.. Cl m .;, ~ .... z Cl g .... :,g g ~ Cl 0 ..J ~ ~ z I (.) ~ UJ ~ z ..J 0.. u "' i5 ~ .... (.) w 0 oc ~ 0 i 12 ;::: ~ <[ 0 s oc I 8 z i3 z ~ I "'3 :»o ><. .J<.. >< ~ 'V >( O<X )(0< ><:: ,A/',, ,)' >(✓ 'V :s; ◊ >( >( >( :x ~ V 'V' "> V 'V ~ ~ )( .. Elev. (ft) Project No. Prooosed Warehouse Develooment Elevation and Datum Lots 1-4 SECS. Melrose Dr. & Lionshead Avenue, I"/\ Depth ij Sample Description ~ Scale .0 E :, z .... Medium dense, clayey medium to coarse SAND, trace 20 sandstone fragments, (SC), moist. [FILL] "I' oc -21 -Cl) (.) -22 - -23 - >--24 - .,... Very stiff, brown gray, medium to coarse sandy CLAY, trace -25 claystone fragments, trace sandstone fragments, (CL), moist. lO .... ch 0.. [FILL] >--26 -"' -27 - -28 - .,... 29 - Very stiff, brown gray, medium to coarse sandy CLAY, trace .,... 30 claystone fragments, trace sandstone fragments, (CL), moist. <O oc [FILL] ch (.) -31 - -32 - -33 - -34 - .,... SANTIAGO FORMATION ----------------35 Tan to gray, SANDSTONE, moderately weathered, trace clay. ..... .... ch 0.. "' -36 - Boring completed at 36.3 feet bgs. -37 -Groundwater not encountered. Borehole backfilled with soil cuttings. .,... 38 - >--39 - -40 - >--41 - -42 - -43 - -44 - 45 LB 15 -Sheet 2 of 2 ... . 700086702 Approx. 381 ft NAVO 88 Samole Data ~-..s U) .£ N-Value Remarks ~ ·v; :3 (Blows/ft) (Drilling Fluid, Depth of Casing, ~:.§. oc ~ ~CD Fluid Loss. Drilling Resistance. etc.) 10 20 30 40 3 ► I 4 a) 14 ~ 21 6 a) ~ 10 2 15 -) 5 a) 13 ~ 3 \ 20 \ I 17 <O ~ 39 50/4" ~/4" I I \.._ I I I , LAN6AN Log of Boring LB-16 Sheet of 2 Pro ject Prooosed Warehouse Development ation Loe Lots 1-4 SECS. Melrose Dr. & Lionshead Avenue, Dril ling Compa~arlsbad, CA Yellow Jacket Drillina Dril ling Equipment CME 95 Truck-mounted Drill Ria Siz e and Type of Bit 8-inch O.D. Hollow-stem-auoer Ca sing Diameter (in) I Casing Depth (ft~ - Ca sing Hamme~ I Weight (lbs) I Drop (in) -- (!) Sa mpler z 2-inch O.D. SPT Solit-Barrel; 2.5-inch I.D. Cal Mod Solit Sooon -,; Sa mpler Hammer I Weight (lbs) I Drop (in) 30 z Automatic 140 :3 ;t~ 3 ii:~ Elev. Sample Description W::, (ft) ~ §iii ~<~ ~) ::; "-"' a. ,v "' ,._ N .., N 00 .. .. N 0 N t: -., ~ a. (!) a, ":" "' a, ...J .... z (!) "' i -,; (!) z ~ 1'-...,,. >( ;x >< :>c ~ " >< :>c >< :>c V ,,,,. -,("' .,,.,._ ,,,,. >< :x :> )(_ :x '.) >< O< '.) 'V "> ><. 'V "> 'V ~ :x ✓ V >( :>c ) >( :>c ) -,(V "' ,..,,. m y y 1'-.. 1\, "' "' Very stiff, red brown, fine sandy CLAY, trace sandstone fragments, trace sandstone fragments, (CL), moist. (FILL] ,_ Medium dense, red brown, clayey medium to coarse SAND, trace sandstone fragments, trace claystone fragments, (SC), moist. [FILL] Medium dense, red brown, clayey medium to coarse SAND, trace claystone fragments, trace sandstone fragments, (SC), moist. [FILL] Project No. 700086702 Elevation and Datum Annrox. 378 ft NAVO 88 Date Started Date Finished 3/8/21 3/8/21 Completion Depth Rock Depth 36.5 ft 30 ft Number of Samples Disturbed Undisturbed Core 7 -- First Completion 24 HR. Water Level (ft.) sz -I -:l_ - Drilling Foreman Is= Field Engineer Daniel J. JudOP. Serrano Sample Data Remarks Depth 4) ~-~(n.~ N-Value Scale ~ ~ <i; :3 (Blows/ft) (Drilling Fluid, Depth of Casing, ,-~& ~ ~al Fluid Loss, Drilling Resistance, etc.) oc: 0 10 20 JO 40 Bulk sample co11ec1eo trom o-o feet. -1 - -2 - -3 - -4 - -5 6 ~ oc: 00 12 ch (,) ~ -6 -t9 17 -7 - -8 - ,_ 9 - -10 4 N ,-00 ch a. 6 >-11 -(/) ~ 1 ;, 9 -12 - -13 - -14 - -15 3 <'1 oc: .... 11 ch (,) ~ -16 -r 18 -17 -I -18 - -19 - 20 z <( (!) z '.5 _g· ~ ., a: :::; a. r--.. N "' N "" N ~ 0 ,, ii: (!) ~ "' <D ...J f-z (!) N 0 r--<O "" g iii (!) 0 ~ 3 15 z I t.) ~ (!) w z ::; a. u (/) i5 I f- t.) w a a: ~ R <O 8 R I ~ ~ 0 t.) ~ (!) z ~ LAN6AN L fB og o onng Project Project No. Prooosed Warehouse Development Location Elevation and Datum Lots 1-4 SECS. Melrose Dr. & Lionshead Avenue, r'--1 .L-..1 /""'/\ -.t.~ ir~ Elev. Depth ,; Sample Description " W:, (ft) Scale .0 Q. i~ E ::, ~ z oco Medium dense, red brovvn, clayey medium to coarse SAND, 20 trace claystone fragments, trace sandstone fragments, (SC), 'i f-a. moist. [FILL] .--21 -(/) (/) ~ ~ -22 - ~ I ..... 23 - ~ .--24 - ~§ ~ -Very stiff, brovvn gray, sandy CLAY, trace sandstone -25 fragments, (CL), moist. [FILL] lO a: ch t.) ~ -26 - :> "' "" -27 - )\ ,., ~ -28 -•,('>''>! ",ht'> -""--29 - :>-,(_ ',( :> ~---------------------------30 ~ SANTIAGO FORMATION .. Red brovvn, fine to medium SANDSTONE, moderately <D >-I= ch a. .... . weathered. -31 -(/) .. .. -32 - .. .. -33 -.. -34 -.. .. .. ..... 35 .. Brown gray, fine to medium SANDSTONE, moderately . weathered, some clay. r---a: -36 -ch t.) Boring completed at 36.5 feet bgs. -37 - Groundwater not encountered. Borehole backfillled with soil cuttings. ..... 38 - -39 - -40 - 1-41 - -42 - -43 - -44 - 45 LB 16 -Sh ee 2 0 2 .......... -700086702 Approx. 378 ft NAVO 88 Samele Data ,; :; 0 .!:: N-Value Remarks o-~·u;3 (Blows/ft) (Drilling Fluid. Depth of Casing. u C: Q):.;.. ~ ~Cl] Fluid Loss, Drilling Resistance, etc.) a: 10 20 30 40 4 (X) 8 ~ 22 14 2 0 11 ~ 2a 15 4 (X) 7 ~ '8 11 3 (X) 12 ~ ~-17 I I I LAN6AN Log of Boring LB-17 Sheet Project Prooosed Warehouse Develooment Location Lots 1-4 SECS. Melrose Dr. & Lionshead Avenue, Drilling Companirarlsoaa, L-A Yellow Jacket Drillinq Drilling Equipment CME 95 Truck-mounted Drill Ria Size and Type of Bit 8-inch O.D. Hollow-stem-aunPr Casing Diameter (in) I Casing Depth (ft~ Casing Hamme! I Weight (lbs) _ I Drop (in) _ Sampler z 2-inch O.D. SPT Sclit-Barrel; 2.5-inch I.D. Cal Mod Solit Snnnn ~ Sampler Hammer !Weight (lbs) 140 I Drop (in) z Automatic 30 :3 Project No. 700086702 Elevation and Datum Aoorox. 385 ft NAVO 88 Date Started Date Finished 3/10/21 Completion Depth 11.5 ft Disturbed Number of Samples Water Level (ft.) First sz Drilling Foreman lszzv Field Engineer Rock Depth Undisturbed 2 Completion I Daniel J. J ur1n<> Serrano Samole Data of 3/10/21 5 ft Core -- 24 HR. -'51.. - Remarks Elev. (ft) Sample Description Depth Scale N-Value (Blows/fl) (Drilling Fluid, Depth of Casing, Fluid Loss. Drilling Resistance. etc.) ) ) -, a. <!) a, ';' "' "' ....I ... z <!) .. N 0 .... . . <O "' .. 8 .. ~ <!) 0 .. .. ....I I-z .. ~ u z .. I .. u w . . ... ... 0 .. . . w ~ . . .. z ....I . . ... a. u rn 0 ~ Q ... u w 0 "' 9, 0 .... <O "' 8 0 .... ,:: <( ... <( Q s Q'. ~ ... <( 9 ::; 0 u z <( <!) z :3 "" Brown gray, fine to medium sandy CLAY, (CL), moist. [FILL] 0 c.. 1 - ~ 2 - -3 - -4 - ----------------------------5 SANTIAGO FORMATION Brown gray, SANDSTONE, moderately weathered. -6 - -7 - -8 - -9 - ~--------------------------~ Yellow brown gray, CLAYSTONE, moderately weathered. 10 Boring completed at 11 .5 feet bgs. Groundwater not encountered. Borehole backfilled with soil cuttings. ~ 11 - c.. 12 - ~ 13 - ,___ 14 - ~ 15 - ,___ 16 - ,___ 17 - ,___ 18 - ~ 19 - 20 10 20 30 40 I 10 ~ Q'. <D 30 Cl) u ~ 2 42 I 5 N ... co Cl) a. ~ 11 rn I/ ll1 20 LAN6AN Log of Boring LB-18 Shee 0 3 Project Project No. Pr=ed Warehouse Develooment 700086702 Location Elevation and Datum Lots 1-4 SECS. Melrose Dr. & Lionshead Avenue, Approx. 397 ft NAVO 88 Drilling Compal\jlarlsbad, c;,A Date Started Date Finished Yellow Jacket Drilling 3/10/21 3/10/21 Drilling Equipment Completion Depth Rock Depth Limited Access Track-mounted Drill Rio 51.5 ft 50 ft Size and Type of Bit 8-inch O.D. Hollow-stem-auaer Disturbed Undisturbed Core Number of Samples 10 -- Casing Diameter (in) I Casing Depth (ft~ First Completion 24 HR. Water Level (ft.) .sz -.Y -7 - Casing Hamme~ I Weight (lbs) _ I Drop (in) _ Drilling Foreman Sampler z 2-inch 0.0. SPT Solit-Barrel; 2.5-inch 1.0. Cal Mod Solit Sooon Field Engineer ;; Sampler Hammer !Weight {lbs) 140 I Drop (in) z Automatic 30 :s Daniel J. JudoA Serrano Samole Data Elev. (ft) Sample Description Depth .8 Scale E ::, z 3 i ~·~~~-IEB~row~n~.ssiliilcy~S~A~N~D~.trtriac:ee~fi~1n~e~g~raa1vffle[l,(:(SSIMW,),nmn<~i·sJt.7[FFi1LILf]---~o >( :><)0 ~ 'x 'V'I"> ~ ~ 56-~ l:i .;,... io & 'x > oi J' > .;, > :>c > ~ .... §IX)>O<>OI >-Medium dense, brown gray, clayey fine SAND, trace claystone -5 fragments, trace sandstone fragments, (SC), moist. [FILL] ..... 8 - -9 - ,.... Very stiff, brown gray, fine sandy CLAY, trace seashell ,.... 10 fragments, (CL), moist. [FILL] N >-- -11 -ch fu Very stiff, brown gray, fine sandy CLAY, trace claystone fragments, (CL), moist. [FILL] -12 - -13 - -14 - -15 ,.... 16 - -17 - "' 0:: ch u 13 17 28 7 10 12 11 co ~ 14 15 N-Value (Blows/ft) 10 20 30 40 I I ;z2 I I 19 Remarks (Drilling Fluid, Depth of Casing, Fluid Loss, Drilling Resistance, etc.) , • ' LAN6AN Project Prooosed Warehouse Development Location Lots 1-4 SECS. Melrose Dr. & Lionshead Avenue, I"'/\ Log of Boring LB-18 Sheet 2 Project No. 700086702 Elevation and Datum Approx. 397 ft NAVO 88 Samole Data ;1_., Remarks of 3 ii: fl: Elev. Depth ] .,; ..: c: N-Value ~:, (ft) Sample Description Scale E ~ O c ., ]l <D (Blows/fl) (Drilling Fluid, Depth of Casing, ~ ~ ~ ~ ~:.::. i ~ ~ Fluid Loss, Drilling Resistance, etc.) ~~~r-,v.~~~~::;:~~-;;;;-;;-;;;:;-;:;;;;:;◄;;-;~;;;;:~:-ri-;.;;;;--;~~--7t-20-+-z--+~+---+--+-'~o~~,;-...;,~~•o--+-------------4 ~ ,.,, ,r, Very stiff, brown gray, fine to medium sandy CLAY, trace 5 1 K O< ,o claystone fragments, (CL), moist. [FILL] "'I' t ~ 7 I 0 K ::X ,o '-21 -C/) (/) 13 b( :'X ,0 8 ~ I-22 - ~~ ~ (!) z ...... v .; ~K-0 ::, ~~~8 8. \( "" &. ::; 0.. ;:; V ~~~ ~,,... .; ~ t) X: ><. ~" : ~ >O §r.>><:> ~I"\. ")i ,;, \( "" ><" a, ...J .... z ..,<.. ,l' i3 X '.) Very stiff, brown gray, fine to medium sandy CLAY, trace claystone fragments, trace sandstone fragments, (CL), moist. [FILL] Very stiff, brown gray, fine sandy CLAY, trace coarse sand, trace claystone fragments, (CL), moist. [FILL] Very stiff, dark brown, fine to coarse sandy CLAY, trace rootlets, (CL), moist. [FILL] Very stiff, dark brown gray, fine to coarse sandy CLAY, trace claystone fragments, trace sandstone fragments, (CL), moist. [FILL] '-23 - 1-24 - 1-25 --1--+-~-4----1 6 LO a: 1-26 -ch u '-27 - 1-28 - ~ 29 - CX) ~ 14 17 1-30 --l--+-..-4--4----1 7 <O .... ~ 31 -ch ~ 1-32 - ~ 33 - I-34 - 1-37 - '-38 - '-39 - CX) ~ CX) ~ 9 15 16 17 1-40 --1--4-..4-4----1 ~ 41 - 1-42 - ~ 43 - I-44 - CX) t ch (/) CX) ~ 6 11 11 131 \ 45....1._,.__...,___. _ ___.....___._.__.__._,.__ __________ __, LAN6AN Log of Boring Project Project No. Prooosed Warehouse Development Location Elevation and Datum Lots 1-4 SECS. Melrose Dr. & Lionshead Avenue, ,...,.. ~J -0 Elev. Depth :;; 0:"' Sample Description 8. W:,; (ft) Scale .D i1n E ,.. ::, I-z Very stiff, dark brown gray, fine to medium sandy CLAY, trace 45 8S8S :x><:i :> >00< >O X):>( )0:) 'x-" ✓ z < (!) Zl'V ~~ ~ i:' ,0 g_ .A ., a:: ::; 0.. .., i? N .; ;;; 0 ~ I::: ,. ~ (!) ~ .;, ~ ,.:. z c3 N 0 .... "' § !:: "' (!) 0 ..J I-z 3 < u z I () w I- - 0 w (!) w z ::::; 0.. G "' i5 ~ 0 I-C) w a a:: ~ 0 ,._ ~ 8 0 ;: ~ ~ ~ ~ ::; 0 () ~ (!) z s "' V "'> A ✓ ~~ XO< A, ,. .. claystone fragments, (CL), dry. [FILL] a, a:: -46 -ch (.) -47 - 1--48 - 1--49 - -SANTIAGO FORMATK>N 1--50 Brown, SANDSTONE, moderately weathered. 0 ~ I-0.. 1--51 -ch "' Boring completed at 51.5 feet bgs. 1--52 - Groundwater not encountered. Borehole backfilled with bentonite grout. 1--53 - 1--54 - 1--55 - -56 - -57 - -58 - -59 - -60 - -61 - -62 - -63 - -64 - -65 - 1--66 - 1--67 - 1--68 - 1--69 - 70 LB 18 -Sheet 3 of 3 '- 700086702 Approx. 397 ft NAVD 88 Samole Data ~-.!:: iii .5 N-Value Remarks ~ ·;;; :3 (Blows/fl) (Drilling Fluid, Depth of Casing, o .5 .,_ ~ !!al Fluid Loss, Drilling Resistance, etc.) a:: 10 20 30 40 114 10 a:, 20 ~ 24 15 a:, 20 ~ 4) 25 z < . ' LAN6AN Log of Boring Project Project No. Prooosed Warehouse Develooment Location Elevation and Datum Lots 1-4 SECS. Melrose Dr. & Lionshead Avenue, Drilling Comparii)arlsoaa, CA Date Started Yellow Jacket Drillina Drilling Equipment Completion Depth Limited Access Track-mounted Drill Rio Size and Type of Bit 8-inch O.D. Hollow-stem-auoer Number of Samples Casing Diameter (in) I Casing Depth (ft~ Water Level (ft.) - Casing Hamme~ I Weight (lbs) I Drop (in) Drilling Foreman -- Sampler - 2-inch O.D. SPT Split-Barrel; 2.5-inch 1.0. Cal Mod Split Sooon Field Engineer LB-19 Sheet of 3 700086702 Approx. 384 ft NAVO 88 Date Finished 3/15/21 3/15/21 Rock Depth 51 .5 ft 5 ft Disturbed Undisturbed Core 10 -- First Completion 24 HR. .sz. -I -7. - (!) z Sampler Hammer Automatic I Weight (lbs) 140 I Drop (in) 30 Daniel J. Judae Serrano s ~5 ~ 0: ID w::,; i ~ i::: 0 C. " :>¢¢ :x Q'. "''V .,/', ~" _,.,v ::l )( :X-" ;.; N 00 ~ N 0 N t2 x'" .,)' " --, 0.. (!) ~ .;, a, ...J ,.:. ~ ~ to ., 0 8 ~ (/) (!) 0 r= z ...J < z Sl (J :c (J ~ w (!) ui z ...J a.. (J (/) Q i ,_ (J w ~ 9, 0 .... I f:'. < < ~ ,_ < Q ::;; 0 (J z < ',/ "" ,1<...,)' V "- 'V"' A •__.._•. . ii .. ~ .........,:.._, .... .,...:...;,.i;, .. .. .. .. .. .. .. ... .. .. .. .. .. .. . . L.:...:...:..L: .. .. .. ... Elev. Depth Sample Description (ft) Scale Brown, fine sandy CLAY, trace claystone fragments, (CL), 0 moist. (FILL] >-1 - -2 - >-3 - -4 - -SANTIAGO FROMA TION -5 Light gray orange, fine to medium SANDSTONE, moderately weathered, trace clay. >-6 - -7 - >-8 - >-9 - Light gray yellow, fine to medium SANDSTONE, moderately >-10 weathered, trace clay. -11 - >-12 - -13 - >-14 - Light gray yellow, fine to medium SANDSTONE, moderately >-15 weathered, trace clay. >-16 - -17 - >-18 - >-19 - 20 Sample Data .8 ~-.::i jjj.S N-Value Remarks " C. ~ ·;; :3 (Blows/ft) (Dnlling Fluid, Depth of Casing, E :: :rl:§. :, ~~CD Fluid Loss, Drilling Resistance, etc.) z Q'. 10 20 30 40 Ground cover: Grass. Bulk sample collected from 0-5 feet. 12 ~ ,_ ch 0.. co 21 (/) ~ 41i 25 14 N ,_ co ch a.. 21 (/) ~ 41i 25 15 (") ,_ co 26 ch a.. (/) ~ 57 31 I I LAN6AN Log of Boring LB 19 . Sh eet 2 0 3~ Project Project No. ,.. Prooosed Warehouse Develonment 700086702 Location Elevation and Datum Lots 1-4 SECS. Melrose Dr. & Lionshead Avenue, Approx. 384 ft NAVO 88 f"'A .t~ Samele Data Remarks a:g Elev. Sample Description Depth :;; ., ,; .::i 00 .S N-Value W:,; (ft) Scale .0 C. ~g ~ ·;; :3 (Blows/ft) (Dnlling Fluid, Depth of Casing, i ~ E >-:, .... n:: ~ ~CD Fluid Loss. Drilling Resistance, etc.) z 10 20 30 40 ..... Gray orange, CLA YSTONE, slightly weathered. 20 I ..... 29 ~ .... <Xl 0.. 20 .... -21 -Cl) (/) ~ 42 22 .... ........ . . . >-22 -. . . . . z <3 ••••••••• -23 -z ...... '.5 : : : : : g ••••• >-24 - ...J t:: ••••••••• 0 C. -Light gray orange, fine to medium SANDSTONE, slightly -25 ., n:: 13 ' weathered, trace clay. l{) .... <Xl ::; .. ch 0.. ~ 20 0.. >-26 -(/) 141 M 24 M .. ;,; .. "' 00 -27 -:;; 0 ~ ~ .. .. -28 - -, 0.. (!) >-29 -~ ,;, .. a:J •••• ..J -----:-:---30 ..: Gray brown, fine to medium SANDSTONE, slightly weathered. 19 z c3 <D .... <Xl ch 0.. ~ 25 >-31 -(/) )2 "' 0 37 ... co ., 0 .. -32 -8 !:::: (/) (!) .. 0 .. ...J >-33 -.... z § ;;! .. -34 -0 z I ~ !~· -35 .... Light gray, fine to medium SANDSTONE, fresh, trace clay . 18 o · ,.._ .... ~ w ~ ch 0.. ~ (!) ••• (/) 50/5" w .... -36 -,0/5" z .. :J • 0.. 0 (/) -37 -0 ~ii I <( • •• • -38 -0 • .... 0 w •.• ~ _.:__:: -39 - 9', ·~ ;; ... -40 co Gray brown, medium to coarse SANDSTONE, fresh, trace ., .. <Xl .... ~ 29 8 clay. ch 0.. ~ 0 (/) 5015" !:::: ;()/$" ... -41 -<( .... <( 0 .. s n:: .. -42 - < .. ~ 9 -43 -~~ (.) .. z -44 -<( .. I (!) I z ~ ~ '.5 -.. 45 LANliAN Log of Boring LB-19 S heet 3 of 3 Project Project No. Prooosed Warehouse Develnnment 700086702 Location Elevation and Datum Lots 1-4 SECS. Melrose Dr. & Lionshead Avenue. Approx. 384 ft NAVO 88 f' ~5 Samnle Data Elev. Depth 2i ~-.::i""u;.£ N-Value Remarks a: a, Sample Description " w::, (Blows/ft) (Drilling Fluid, Depth of Casing, i~ (ft) Scale E C. 0" ~ ·oo :3 ::, ?:' 41:.:. ~ ~en Fluid Loss, Drilling Resistance, etc.) z a: 10 20 30 40 Gray, medium to coarse SANDSTONE. fresh, trace clay. 45 I J. 0) .... ~ 25 U') a.. .. (/) ~ 5/J/5" -46 -.. .. ~ -47 - z <( .. .. -48 -(!) ~~ 1-49 - ~~ 2 . . . . 1-50 Q) Gray orange, medium to coarse SANDSTONE, fresh. .,.,_ .... ., ~..-,· ~/3" a: .. ::; a.. 1-51 -.., "' ;.; N 00 Boring completed at 51.5 feet bgs. -52 -;;:; 0 Groundwater not encountered. ~ Borehole backfilled with bentonite grout . ... -53 -" -, a.. (!) -54 -~ .;, in ..J -55 -.... z Ei N -56 - 0 ... "' ., 0 0 0 -57 - !::, (/) (!) 0 -58 -..J .... z 3 <( u z J: -59 - u w .... 0 w 1-60 - (!) w -61 -z :::; a.. ti 1-62 -(/) □ ;;: .... -63 -<( 0 .... u w 0 I-64 - a: 9, 0 ... "' ., -65 - 8 0 !::, -66 -... <( ~ ~ a: -67 - ~ .... <( -68 -0 ~ 0 ~ z -69 - I <( (!) z ~ 70 Geotechnical Engineering Report Proposed Warehouse Development Carlsbad, California Langan Project No: 700086702 APPENDIX C Field Percolation Test Results 16 April 2021 Geotechnica l Exploration Report Proposed Warehouse Building Carlbad, California Langan Project No.: 700086701 Project: Test Hole No.: Depth ofTest Hole (ft): Casing Depth (ft): Trial No. PRESOAK # 1 PRESOAK # 2 1 2 3 4 5 6 7 8 9 10 11 12 BMF Design Rate Comm1nt1: ,_ 4/8/2021 PERCOLATION TEST DATA SHEET LANliAN Proposed Warehouse Building Project No.: 700086702 Date ofTest: 3/10/2021 LP-1 Tested Bv: DJJS 5 Soll Classification: Sandstone 5' PVC Pipe; Screened entire length of pipe Test Hole Diameter (In): 8 Date Time of Initial Depth to Time of Final Depth to Time Interval Chan1e in Water > than 6-inch drop? Infiltration Rate Measurement Water (Feet) Measurement Water (Feet) (min) Level (Feet) (In/hr) 3/9/2021 2:00 PM 2.00 2:25 PM 2.60 25 0.60 Yes 3/9/2021 2:25 PM 2.00 2:50 PM 2.30 25 0.30 NO 3/10/2021 7:00 AM 3.00 7:30 AM 3.20 30 0.20 0.08 0.19 3/10/2021 7:30 AM 3.00 8:00 AM 3.20 30 0.20 0.08 0.19 3/10/2021 8:00 AM 3.00 8:30 AM 3.15 30 0.15 0.06 0.19 3/10/2021 8:30 AM 3.00 9:00 AM 3.10 30 0.10 0.04 0.19 3/10/2021 9:00 AM 3.00 9:30 AM 3.15 30 0.15 0.06 0.19 3/10/2021 9:30 AM 3.00 10:00 AM 3.10 30 0.10 0.04 0.19 3/10/2021 10:00AM 3.00 10:30 AM 3.15 30 0.15 0.06 0.19 3/10/2021 10:30AM 3.00 11:00 AM 3.10 30 0.10 0.04 0.19 3/10/2021 11:00 AM 3.00 11:30 AM 3.05 30 0.05 0.02 0.19 3/10/2021 11:30 AM 3.00 12:00 PM 3.10 30 0.10 0.04 0.19 3/10/2021 12:00 PM 3.00 12:30 PM 3.10 30 0.10 0.04 0.19 3/10/2021 12:30 PM 3.00 1:00 PM 3.10 30 0.10 0.04 0.19 2.00 0.09 1. Percolation test was performed in accordance wth City of Carlsbad BMP Design Manual, Appendix D: Approved Infiltration Rate Assessment Methods, Effective February 2016 2. Infiltration Rate was calculated using Porchet Method. 3. Per the procedures for shallow percolation tests in non-sandy soils, a minimum of twelve measurements were taken in 30-minute intervals for six ho urs after sandy 4. Weather: Partly Cloudy/Sunny: 55-65 degrees F 5. Measurements were collected from the Top of PVC Pipe \';eotechnical Expl• . Report Proposed Wareholb~ J'uilding Carlbad, California .,!::angan Project No.: 700086701 Project: Test Hole No.: Depth of Test Hole (ft): Casini Depth (ft): Trial No. PRESOAK # 1 PRESOAK # 2 1 2 3 4 5 6 7 8 9 10 11 12 BMF Design Rate Comments: 4/8/2021 PERCOLATION TEST DATA SHEET LANliAN Proposed Warehouse Building Project No,: 700086702 Date of Test: 3/10/2021 LP-2 Tested Bv: DJJS 5 Soll Classification: fine sandy CLAY (CL) 5' PVC Pipe; Screened entire length of pipe Test Hole Diameter (In): 8 Date Time of Initial Depth to Time of Final Depth to Time Interval Chanse In Water > than 6-lnch drop? Infiltration Rate Me11urement Water (Feet) Measurement Water (Feet) (min) Level (Feet) (In/hr) 3/9/2021 2:00 PM 1.00 2:25 PM 1.20 25 0.20 NO 3/9/2021 2:25 PM 1.00 2:50 PM 1.20 25 0.20 NO 3/10/2021 7:00 AM 1.00 7:30 AM 1.05 30 0.05 0.02 0.05 3/10/2021 7:30 AM 1.00 8:00 AM 1.10 30 0.10 0.04 0.05 3/10/2021 8:00 AM 1.00 8:30 AM 1.10 30 0.10 0.04 0.05 3/10/2021 8:30 AM 1.00 9:00 AM 1.10 30 0.10 0.04 0.05 3/10/2021 9:00 AM 1.00 9:30 AM 1.05 30 0.05 0.02 0.05 3/10/2021 9:30AM 1.00 10:00 AM 1.05 30 0.05 0.02 0.05 3/10/2021 10:00AM 1.00 10:30 AM 1.05 30 0.05 0.02 0.05 3/10/2021 10:30 AM 1.00 11:00AM 1.05 30 0.05 0.02 0.05 3/10/2021 11:00 AM 1.00 11:30 AM 1.05 30 0.05 0.02 0.05 3/10/2021 11:30 AM 1.00 12:00 PM 1.05 30 0.05 0.02 0.05 3/10/2021 12:00 PM 1.00 12:30 PM 1.05 30 0.05 0.02 0.05 3/10/2021 12:30 PM 1.00 1:00 PM 1.05 30 0.05 0.02 0.05 2.00 0.02 l. Percolation test was performed in accorda nce wth City of Carlsbad BMP Design Manual, Appendix D: Approved Infiltration Rate Assessment Met hods, Effective February 2016 2. Infiltration Rate was calculated using Porchet Method. 3. Per the procedures for shallow percolation tests in non-sandy soils, a minimum of twelve measurements were taken in 30-minute intervals for six hours after sandy 4. Weather: Partly Cloudy/Sunny: 55-65 degrees F 5. Measurements were collected from the Top of PVC Pipe Geotechnical Exploration Report Proposed Warehouse Building Carlbad, California Langan Project No.: 700086701 Project: Test Hole No.: Depth of Test Holt (ft): Casini Depth (ft): Trial No. PRESOAK # 1 PRESOAK # 2 1 2 3 4 5 6 7 8 9 10 11 12 BMF Design Rate comments: 4/8/2021 PERCOLATION TEST DATA SHEET LANliAN Proposed Warehouse Building Project No.: 700086702 Date ofTest: 3/9/2021 LB-5 Tested Bv: DJJS 9 Soll Cla11lflcatlon: Sandstone 9' PVC Pipe; Screened entire length of pipe Test Holt Diameter (In): 8 Date Tlmtof Initial Depth to Tlmtof Final Depth to Time Interval Chanae In Water > 6-lnch drop ? Infiltration Rate M111ur1m1nt Water (Feet) Measurement Water (Feet) {min) Level (Feet) (In/hr) 3/8/2021 2:00 PM 4.50 2:25 PM 4.80 25 0.30 NO 3/8/2021 2:25 PM 4.50 2:50 PM 4.75 25 0.25 NO 3/9/2021 7:00 AM 4.50 7:30AM 4.80 30 0.30 0.12 0.18 3/9/2021 7:30 AM 4.50 8:00 AM 4.80 30 0.30 0.12 0.18 3/9/2021 8:00 AM 4.50 8:30 AM 4.75 30 0.25 0.10 0.18 3/9/2021 8:30AM 4.50 9:00 AM 4.75 30 0.25 0.10 0.18 3/9/2021 9:00 AM 4.50 9:30AM 4.75 30 0.25 0.10 0.18 3/9/2021 9:30 AM 4.50 10:00 AM 4.75 30 0.25 0.10 0.18 3/9/2021 10:00AM 4.50 10:30 AM 4.75 30 0.25 0.10 0.18 3/9/2021 10:30 AM 4.50 11:00 AM 4.70 30 0.20 0.08 0.18 3/9/2021 11:00 AM 4.50 11:30AM 4.70 30 0.20 0.08 0.18 3/9/2021 11:30 AM 4.50 12:00 PM 4.70 30 0.20 0.08 0.18 3/9/2021 12:00 PM 4.50 12:30 PM 4.70 30 0.20 0.08 0.18 3/9/2021 12:30 PM 4.50 1:00 PM 4.70 30 0.20 0.08 0.18 2.00 0.09 1. Percolation test was performed in accordance wth City of Carlsbad BMP Design Manual, Appendix D: Approved Infiltration Rate Assessment Methods, Effective February 2016 2. Infiltration Rate was calculated using Porchet Method. 3. Per the procedures for shallow percolation tests in non-sandy soils, a minimum of twelve measurements were taken in 30-minute intervals for six hours after sandy 4. Weather: Partly Cloudy/Sunny: 55-65 degrees F 5. Measurements were collected from the Top of PVC Pipe G eotechnical Expl ) Report Proposed WarehoU!>~ ouilding Carlbad, California ~tangan Project No.: 700086701 Project: Test Hole No.: Depth ofTest Hole (ft): Casln11 Depth (ft): Trial No. PRESOAK # 1 PRESOAK # 2 1 2 3 4 5 6 7 8 9 10 11 12 BMF Design Rate Comments: 4/8/2021 PERCOLATION TEST DATA SHEET LANliAN Proposed Warehouse Building Prolect No.: 700086702 Date ofTest: 3/9/2021 LB-6 Tested Bv: DJJS 9 Soll Classlflcatlon: fine sandy CLAY (CL) 9' PVC Pipe; Screened entire length of pipe Test Hole Diameter (in): 8 Date Time of Initial Depth to Time of Final Depth to Time Interval Chan1e In Water > 6-lnch drop ? lnflltratlon Rate Measurement Water (Feet) Measurement Water (Feet) (min) Level (Feet) (In/hr) 3/8/2021 6:00 AM 2.00 6:25 AM 2.10 25 0.10 NO 3/8/2021 6:25 AM 2.00 6:50 AM 2.05 25 0.05 NO 3/9/2021 7:00 AM 2.00 7:30 AM 2.10 30 0.10 0 .04 0.03 3/9/2021 7:30AM 2.00 8:00 AM 2.10 30 0.10 0.04 0.03 3/9/2021 8:00 AM 2.00 8:30 AM 2.10 30 0.10 0.04 0.03 3/9/2021 8:30 AM 2.00 9:00 AM 2.10 30 0.10 0.04 0.03 3/9/2021 9:00 AM 2.00 9:30AM 2.05 30 0.05 0.02 0.03 3/9/2021 9:30AM 2.00 10:00 AM 2.05 30 0.05 0.02 0.03 3/9/2021 10:00 AM 2.00 10:30AM 2.05 30 0.05 0.02 0.03 3/9/2021 10:30AM 2.00 11:00 AM 2.05 30 0.05 0.02 0.03 3/9/2021 11:00 AM 2.00 11:30 AM 2.05 30 0.05 0.02 0.03 3/9/2021 11:30 AM 2.00 12:00 PM 2.05 30 0.05 0.02 0.03 3/9/2021 12:00 PM 2.00 12:30 PM 2.05 30 0.05 0.02 0.03 3/9/2021 12:30 PM 2.00 1:00 PM 2.05 30 0.05 0.02 0.03 2.00 0.01 l. Percolation test was performed in accordance wth City of Carlsbad BMP Design Manual, Appendix D: Approved Infiltration Rate Assessment Methods, Effective February 2016 2. Infiltration Rate was calculated using Porchet Method. 3. Per the procedures for shallow percolation tests in non-sandy soils, a minimum of twelve measurements were taken in 30-minute intervals for six hours after sandy 4. Weather: Partly Cloudy/Sunny: 55-65 degrees F 5. Measurements were collected from the Top of PVC Pipe PROJECT Langan # 700086702 JOB NO. 2012-0057 BY LD DATE 03/17/21 Sample No. LB-7 / S-1 LB-9 / S-1 LB-13 / S-1 LB-14 / S-2 LB-15 / S-2 LB-15 / S-4 LB-15 / S-6 LB-16 / S-1 Depth (ft) 5.0 5.0 5.0 10.0 10.0 20.0 30.0 5.0 Testing Capistrano FILL FILL FILL FILL FILL FILL FILL Soil Type Brown, Sandy Brown, Sandy Brown, Silty Clay Brown, Sandy Brown, Silty Clay Brown, Clayey Brown, Silty Clay Brown, Silty Clay Clay Clay w. Sand Clay Sand Wet+Tare 563.8 1002.7 567.3 402.0 932.1 959.5 1148.9 937.5 No. Ring 3 5 3 2 5 5 6 5 Wet Weight 126.3 118.8 126.0 95.1 98.9 110.8 112.1 105.8 Dry Weight 118.2 115.9 114.4 85.4 91.7 102.4 106.5 99.7 Wet density 118.6 129.1 119.6 129.5 117.3 121 .9 121 .6 118.2 % Water 6.9 2.5 10.1 11.4 7.9 8.2 5.3 6.1 Dry Density 111 .0 126.0 108.6 116.3 108.8 112.7 115.5 111 .4 0.8.Press(psf) Sample No. LB-16 / S-3 LB-16 / S-5 LB-17 / S-1 LB-18 / S-1 LB-18 / S-3 LB-18 / S-7 Depth (ft) 15.0 25.0 5.0 5.0 15.0 35.0 Testing FILL FILL Capistrano FILL FILL FILL Soll Type Brown, Sandy Brown, Silty Clay Brown, Silty Clay Brown, Sandy Brown, Silty Clay Brown, Silty Clay Clay Clay Wet+Tare 974.5 970.7 595.6 939.3 959.2 598.6 No. Ring 5 5 3 5 5 3 Wet Weight 308.9 66.3 84.4 100.5 94.7 136.3 Dry Weight 259.7 54.9 70.7 87.2 76.5 116.5 Wet density 124.4 123.8 127.4 118.5 121.8 128.3 % Water 18.9 20.8 19.4 15.3 23.8 17.0 Dry Density 104.6 102.5 106.8 102.8 98.4 109.6 O.B.Press(psf) ")_ ~ .. ~ ~ 9ic Geotechnical Engineering Report Proposed Warehouse Development Carlsbad, California Langan Project No: 700086702 APPENDIX D Laboratory Test Results 16 April 2021 . ) ' )( Cl) 'tJ E ~ :§ iii ro ~ PLASTICITY INDEX ASTM 04318 60 50 ::te LB-16 / S-1 e LB-16/S-2 40 .A LB-16 / S-3 30 ■LB-16 / S-4 20 10 A Cl~l / 0 I/ 0 10 20 30 Sample Depth (ft) LB-16 / S-1 5 LB-16 / S-2 10 LB-16 / S-3 15 LB-16 / S-4 20 Job Name Langan # 700086702 Job No.: 2012-0057 LL 49 37 40 32 CL ,v- It. / • / / M ... and OL 40 50 Liquid Limit PL Pl 23 26 21 16 20 20 24 8 60 "A"I ne / CH / / / / OH , nd MH 70 80 90 100 uses Material Description CL CL CL ML Date: 3/17/21 Project: Sample: Description: COMPACTION TEST REPORT Langan# 700086702 LB-10 @ 0 -5' Brown, Silty Clay w. Gravel GLA No. 2012-0057 Date: 03/17 /21 By: LO ASTM D1557 I Method C Volume (cf): 0.075 # Blows: 56 # Layers: 5 -u Cl. > .... Specimen Wet Weight (lbs) Wet Density (pct) Moisture Content(%) Dry Density (pct) 140 135 130 125 -~ 120 cu 0 ~ 0 115 110 105 100 ◄ 0 5 \ \ \ \ ,.. ~ / A B C 10.05 10.02 9.54 134.0 133.6 127.1 12.8 10.6 7.7 118.8 120.8 118.1 Max. Dry Density : 121.0 pd Opt. Water Content: 10.5% \ \ \ \ ' \ \ ' \ \ ' \ \ \ ' \ \ \ ' \ \ ' \ \ \ ' ' \ \ '\ \ \ \ \ \ \ \ ' ' ' / ...... ......... \ \ \ / " \ \ ' • \ \ \ \ \ \ '\ '\ \ \ \ '\ \ \ \ \ I\ \. \. ' II. '\ \ \ II. \. \ ' ' r -... \. -s -· \" I\. ' I\. ' \ (. \. 10 15 20 Moisture Content(%) D 9.17 122.3 5.9 115.5 \ ' \. I\. \. ' :0 'O \. \ G -= '.80 " '\ \. 1"- 25 30 ' C Project: Sample: COMPACTION TEST REPORT Langan # 700086702 LB-16@ 0 -5' Description: Brown, Silty Clay Job No. 2012-0057 Date: 3/17/2021 By: LP ASTM D1557 I Method A Volume (cf): 0.03333 # Blows: 25 # Layers: S Specimen Wet Weight (grs) Wet Density (pd) Moisture Content (%) Dry Density (pd) 135 ' 130 125 120 J 1• 110 105 100 95 0 5 A B C 2032 1994 1880 134.4 131.9 124.3 12.1 10.0 7.4 119.9 119.9 115.8 Max. Dry Density : 120.5 pcf Opt. Water Content: 11.0 % ' \ \ \ \ \ ' \ \ \ ' \ \ ' \ \ I\ ' ' \ \ '\ I\ \ \ \ ' '\ \ \ I\ ' ' ' I\ I\ I\. I/ r,.. ' ' ' ~ I\. \ I\ ~ .I ' \ \ ' 19 I\ ' \ \ \. ' I\ \ \ \. \. \ ' \. \. ' ' '\. \ I\ \. ' \. , -~ s ,- 10 15 20 Moisture Content(%) D 2016 133.3 14.2 116.8 \. ' I\. " \. \. ' ' I\. \. " \. \. \. ' ' \.. \. I\. \ ' l'I. \. \ ,..,. \. '1'. I\. G = 2 '0 ,-G = .80 25 30 Project: Sample: COMPACTION TEST REPORT Langan # 700086702 LB-13@ 0-5' Description: Brown, Silty Clay Job No. 2012-0057 Date: 3/17/2021 By: LP ASTM D1557 I Method A Volume (cf): 0.03333 # Blows: 25 # Layers: 5 :s E: > .. Specimen Wet Weight (grs) Wet Density (pd) Moisture Content (%) Dry Density (pd) 135 130 125 120 ~ 115 CII C i!" C 110 105 100 95 0 5 1 / ' A B C 2048 2043 1969 135.4 135.1 130.2 11.8 13.9 9.3 121.2 118.6 119.1 Max. Dry Density : 121.0 pcf Opt. Water Content: 11.5 % ' \ \ ' \ \ \ ' \ \ \ ' \ \ ' \ \ \ ' ' \ I\ \ " \ \ \ ' ' \ \ \ -' ' ' V ,\ \ \. .,/ ~ ' \ ~ 4\ \ I\ / \. \. \ \ \ \. \. \ 11. " \. \. ' ' II. I\ \. \. ' ,.__ \. \ 11. -..;;: II.. ' , -.,. s 10 15 20 Moisture Content{%) D 1873 123.9 7.1 115.7 I\. ' I\ ' l\ \. ' II.. I\. \. 7li I\ K '\. ' ' I\ '\. I'\. " 1'. -. I\ '\ "' ,.,. '\. "' I'\. r. :I, rn G = l>.8 25 30 Langan # 700086702 SOIL TEST RESULTS Job No. 2005-011 SAMPLE NO.: LB-10@ 0 -5' LB-16@0-5' DESCRIPTION Silty Clay Silty Clay DIRECT SHEAR TEST Ctvoel Initial Moisture Content % Dry Density (pcf) Normal Stress (psf) Peak Shear Stress (psf) Ultimate Shear Stress (psf) Cohesion (psf) Internal Friction Anqle (degrees) IXPAN810N TIST uae ITD 18-2 Initial Dry Density (pcf) Initial Moisture Content % Final Moisture Content % Pressure (psf) Expansion Index lswell % ]'·' . --......... '; .. ~ ... ' ..... Resistivity (CTM643) (ohm-cm) 720 <500 pH (CTM643) 7.6 7.2 -.... ~ ··-.. ,{ ~-, -....... , .. .. Soluble Sulfate (CTM 417) (ppm) 2921 1794 Chloride Content (CTM 422) (ppm) 418 252 ~ ~ Geologic Associates Client: Langan Client's Job No.: 700086702 2001-034 GLA Reference: TEST SPECIMEN Compactor Air Pressure Initial Moisture Content Water Added Moisture at Compaction Sample & Mold Weight Mold Weight Net Sample Weight Sample Height Dry Density Pressure Exudation Pressure Expansion Dial Expansion Pressure Ph at 1 000lbs Ph at 2000Ibs Displacement R' Value Corrected 'R' Value 'R' VALUE CA301 Date: 3/17/21 Sample: LB-12@ 0 -5' Soil Type: Brown, Silty Clay A B C psi 150 100 70 % 5.6 5.6 5.6 ml 100 120 140 % 14.4 16.2 17.9 gms 3180 3182 3189 gms 2098 2102 2114 gms 1082 1080 1075 in. 2.51 2.54 2.54 pct 114.2 110.9 108.8 lbs 9045 5670 2880 psi 720 451 229 X 0.0001 117 64 41 psf 507 277 178 psi 28 50 58 psi 80 115 132 turns 3.11 3.87 4.76 45 20 10 45 20 10 FINAL 'R' VALUE By Exudation Pressure(@ 300 psi): 12 By Epansion Pressure 6 Tl= 5 By: LD J D Langan # 700086702 CONSOLIDATION TEST -ASTM D2435 Job No. 2012-0057 Boring / Sample No. LB-15 / S-4 Depth: 20' Date 03-11 -21 0.00 -' _,_ ,_ 0.50 - ~ -n --■ Natural ,v .,v 1.00 ..... ..... ..... o Submerged " ' . ' 1.50 T I i'+ I r, 't:::"7 ' ' 2.00 " '\ '\ 2.50 '\ '\ t\ 'I -, I'\ -'\ 3.00 ......... '\ .... ......... r--.. ' ..... 3.50 ....... ...... ..... r-.. 4.00 ...... ...... ...... A \ C --~4.50 -...... U) \ ..... ~ ...... 0 5.00 i:: 1 .,. Clayey Sand -· 5.50 D~ Densit 112. 7 ~cf lnitia Water ontent: .2 % Final Water Content: 10.0 % 6.00 H20 @ 2400 PSF 6.50 7.00 7.50 8.00 8.50 9.00 9.50 1 Ill [II 00 10.00 Vertical Pressure (psf) Langan# 700086702 CONSOLIDATION TEST-ASTM D2435 Job No. 2012-0057 Boring / Sample No. LB-15 / S-2 Depth: 1 O' Date 03-11 -21 0.00 I 0.50 ~ ~ . - ,,.~ ■ Natural 1.00 ..... ...... , ....... o Submerged ' l .a.a 1.50 -.. -, ,. u ' ' ' 2.00 ' ' ' ' 2.50 ' ' '\ ' 3.00 ,.., ') 1 -· 3.50 I I Silty Cl~ I D~ Densit 1 8.8 yet I 4.00 lnitia Water ontent: .9 % I Final Water Content: 9.3 % I C H2O @ 1200 PSF ·~4.50 cl5 ~ I 0 5.00 I I I 5.50 I I 6.00 I n L " ...... 6.50 i-.. " "" I ...... ...... 7.00 rs.. i-.. "" ..... I ...... I 7.50 ...... I ...... ...... -. 8.00 -~ --8.50 ' ' 0 co -·-- 9.00 9.50 1 II ! Ill 00 10.00 Vertical Pressure (psf) C Langan # 700086702 DIRECT SHEAR TEST -ASTM D-3080 GLA No. 2012-0057 • peak shear strength • strength at 1/4" displacement 4000 3000 C (/) a. -.c -0) C <llWOO L.. -Cl) L.. ro (I) .c Cl) 7 / / .,,,,v / _,,/ / ..,,v V .,/ I/ / ./., I/,.,. / V ,.,v _,,/ V 1000 ./ V, / / / /,,. / ,,, ..,/ / / / I/ 0 ,., V 0 Sample Im!t LB-7/S-1 Undisturbed & Saturated Normal Pressure (psf) 1000 2000 4000 Date: 03-17-2021 v ..... / ,., 7 .,/ 1000 2000 Normal Pressure (psf) Strain Rate: 0.0042 in./ min. Descrjptioo Sandy Clay Pry Density (pct.) 111.0 Peak Shear Strength (psf) 960@ 0.0350" 1780 @ 0.0850" 3220 @ 0.0500" C = 300 psf <I>= 35.5 deg. V /' / ./ ., / / ,,/' I/ , / .-""l• ,.,v __ ..,, .,v .,/ V .,,,.,,,. 3000 4000 loitial w,c, (%) 6.9 Eioal w,c, (%) 28.4 Ultimate Shear Strength (psf) 500 1300 2240 C = 0 psf <I>= 28 deg. GeoLogic Associates Langan # 700086702 DIRECT SHEAR TEST -ASTM D-3080 GLA No. 2012-0057 • peak shear strength ... strength at 1/4" displacement 4000 .--,---.-~.--,---.-~.--.---.-~.--.----,--r--.--.----,--r--.---.----,---,--..----,-.....,...--,--..---,----.--.--..---,----,--.--...---.---,--r--, ,;'v 3000 ....-+--4--1--+--f.--4--l--+--f---4--1--+--f---4--+-+-+--+--+-+-+--+--+-+-+--+--+-+-+--+--+-+-+--+--+-+-+/....,..."+-I, V -1n a. -L/V ~v .c V e> , V v ... C V.., /V ~000 ....-+--4--1--+--f.--4--l--+--f---4--1--+--f---4--+-+-+--+--+--+-.,,,v.-F--+-+--+--+-+-+--+-v"""""+-+--+--+-+-+--+--+-+-+--I +-' Cl) ~/ .... ro Q) .c Cl) l/v V V l/v V v"' V .,,,v 1000 .....-.---1-__.,,..:i--+--+--+--+---+--+---.---+--+-+-+--+--+-+-+--+--+-+-+--+--+-+--1--+-+-+--1--+-+-+--f--+-+-i ~v I/ vv I/ v 0 '---'---'---'--'---'---'---'--'--'---'---'--'--'---'--'--.L......L---'----'---.,____._---'---_.__"--'----'----'---.L......L--'--'---.L......L--'--L--'----L---L-_,__, 0 Sample Ill.Wt LB-9/S-1 Undisturbed & Saturated Normal Pressure (psf) 1000 2000 4000 Date: 03-17-2021 1000 2000 Normal Pressure (psf) Strain Rate: 0.0042 in. / min. Pescrjptioo Sandy Clay Pry Density (pcO 126.0 Peak Shear Strength (psf) 1380 @ 0 .1100" 2120@ 0.0850" 2940 @ 0.0500" C = 800 psf <l> = 30 deg. 3000 Initial w,c, (%) 2.5 4000 Eioal w,c, (%) 22.0 Ultimate Shear Strength (psf) 860 1330 2640 C = 300 psf <l>= 30 deg. GeoLogic Associates C C. • Langan # 700086702 DIRECT SHEAR TEST -ASTM D-3080 GLA No. 2012-0057 • peak shear strength • strength at 1/4" displacement 4000 3000 --en a. -.c. ... C) C <ll2000 L.. ... Cl) L.. ro Q) .c. Cl) 1000 0 / ~/ / .,/ 0 sample Im!t --/ ........ -✓ ........ - LB-13/S-1 Undisturbed & Saturated Normal Pressure (psf) 1000 2000 4000 Date: 03-17-2021 .v .,/ v--- _.,,,,, .... / V _.,,. V ~/ v. .... ., ..... ~/ ./ ., _.,,. . / 1 ........ --- / H 1000 2000 Normal Pressure (psf) Strain Rate: 0.0042 in. / min. Description Silty Clay Pry Density (ocO 108.6 Peak Shear Strength (psf) 710@ 0.1750" 1670@ 0.1650" 2540@ 0.1750" C = 800 psf $ = 23.5 deg. ....... _,..-j ~ v V" -v v""' --./ v v""' _ _.,,,,, 1 ............... 3000 4000 Initial w,c, (%) Eioal w,c, (%) 10.1 25.8 Ultimate Shear Strength (psf) 680 1520 2450 C = 700 psf $ = 23.5 deg. GeoLogic Associates Langan # 700086702 DIRECT SHEAR TEST -ASTM D-3080 GLA No. 2012-0057 • peak shear strength • strength at 1/4" displacement 4000 .---..----,--.--.---r---,--.--r--r---,---.--r--r---,---.--r--r---,---.--.---,----,---.--,---,----,---.--,---,----.---.-.,.....,----.---.-.,.....,-----r---,---, 3000 1---+--+--+-+-+--+--+-+-+--+--+-+-+--+--+-+-+--+--+-+-+--+--+-+-+--+--+-+-+--+--+-+-+--+--+-+-t--+---+--,,1. ,,,v .,v --Cl) a. ...,..v -.c _.. C) c , ~V V Ql1000 l---+----+---+--i----l----+---+--i----l----+---+--i----l----+--l--l----l----l---l---,~---l---l--+--l----l---l---!----+-+---l---i----4...-;:;...--1---1----+---1--+--1 .::. ,,,v ~/ Cl) .... ro Q) .c Cl) ...,..v .,,-' _,,,,.v 1000 i,,:::.+-+-+-1-+-+-+-1-+-+-+-+,,,,"F-+--+-+-+-+--+-+-+-+--+-+-+-+--+-+-+-+--+-+-+--+--+-+-+--+--+---1 V .,,v 0 0 Sample ~ LB-17/S-1 Undisturbed & Saturated Normal Pressure (psO 1000 2000 4000 Date: 03-17-2021 1000 2000 Normal Pressure (psf) Strain Rate: 0.0042 in. / min. Description Silty Clay Pry Density (pcO 106.8 Peak Shear Strength (psf) 1500@ 0.0800" 2040 @ 0.0950" 2980 @ 0.1000" C = 1000 psf (j> = 26.5 deg. 3000 Initial w.c. (%) 19.4 4000 Eioal w.c. (%) 23.3 Ultimate Shear Strength (psf) 740 1320 2270 C = 400 psf (j> = 25.5 deg. GeoLogic Associates t C Langan # 700086702 DIRECT SHEAR TEST -ASTM D-3080 GLA No. 2012-0057 • peak shear strength • strength at 1/4" displacement 4000 3000 --(/) c.. -.c ....... O> C: <ll1000 .... ....... Cl) .... co (1) .c Cl) 1000 0 V v' / ,,,,. / .... _,,," ,,,,, 0 Sample ~ .,v / ,v V LB-18/S-1 Undisturbed & Saturated Normal Pressure (psf) 1000 2000 4000 Date: 03-17-2021 / ,,,,. / / .,v V / ,,,,,., v .... v' .,,,,., / / .,,, ...... ,,,,v .,, / V V ·~ v ...... ..,....., / V ,v 1000 2000 Normal Pressure (psf) Strain Rate: 0.0042 in. / min. Descrjptjon Sandy Clay Pry Density (pcQ 102.8 Peak Shear Strength (psf) 1320@ 0.2400" 1490@ 0.1700" 2960 @ 0.1655" C = 800 psf ~ = 28 deg. ..) ,,,,v ,/ ,v V V v"" / 1/V" I/..-,,,,.,, ,,,,v V v 3000 4000 Initial w,c, (%) 15.3 Eioal w.c, (%) 20.4 Ultimate Shear Strength (psf) 1320 1380 2620 C = 400 psf ~= 28 deg. GeoLogic Associates Langan # 700086702 DIRECT SHEAR TEST -ASTM D-3080 GLA No. 2012-0057 • peak shear strength • strength at 1/4" displacement 4000 ,......,..---,---.--...--,----,---.--........,.---.---.--........,. ......... --.--........,. ......... --.--..---,----,---.---r-T--r---r-T""""""T----r---r-T""""""T----r-"""T"""-r--,----r---r--, 3000 .....-l---4---1--1---1---4---l--i------.---4---l--i------.---4--------+--+--+--+-+--+--+-+--+--+-+-+--+---+--t -..... (fJ a. -.c ...... C) C <mooo .... ...... (./) .... ro Q) .c (./) V vv v,,.. ...... ..,,,,.v 1000 t--t---t---t-t-t---t---t-t-t---t---t-t-t--t:::..,....t-t---t---t-t"-t---t---t-t-t---t---t-t-t----r--t--t-t----r--r--t-t---r-r---1 I/,.. 0 sample bWt LB-18/S-3 Undisturbed & Saturated Normal Pressure (psf) 1000 2000 4000 Date: 03-17-2021 •• 1000 2000 Normal Pressure (psf) Strain Rate: 0.0042 in./ min. Description Silty Clay Pry Density (pct) 98.4 Peak Shear Strength (psf) 790 @ 0.0800" 1250@ 0.1500" 2160@ 0.2450" C = 300 psf <j> = 25 deg. 3000 Initial w.c, (%) 23.8 4000 Eioal w.c, (%) 27.1 Ultimate Shear Strength (psf) 680 1210 2160 C = 300 psf <I>= 25 deg. Geologic Associates , f ! • Langan # 700086702 DIRECT SHEAR TEST -ASTM D-3080 GLA No. 2012-0057 • peak shear strength • strength at 1/4" displacement 6000 5000 4000 --(f) a. -..c ...... en C: Q.BOOO .... ...... (/) .... al (l) ..c (/) 2000 1000 0 ,,. , , .... , .... ...... ,,. 0 1000 sample ~ LB-18/S-7 Undisturbed & Saturated , .... Normal Pressure (psf) 2000 4000 6000 Date: 03-17-2021 I,,' I..,, I..,, ·~ ..., , ,,,,. L...- I..,, , ., ., .... .... , .... ., ., .... .... ., ., , , .... .... ,..., ...... • 2000 3000 4000 Normal Pressure (psf) Strain Rate: 0.0042 in. / min. Description Silty Clay Pry Density (pcfJ 109.6 Peak Shear Strength (psf) 2090 @ 0.0950" 3200 @ 0.1500" 4140@ 0.1550" C = 1100 psf <I>= 26.5 deg. , ;' ,..., I,,' ,..., I,,' , I,,' ,..., , , .... I,,' 5000 Initial w.c, (%) 17.0 ,,,,. , ,,. ,,,,. ·~ ,,,,. L;' 6000 Eioal w,c, (%) 20.6 Ultimate Shear Strength (psf) 1540 2950 3880 C = 800 psf <I>= 26.5 deg. GeoLogic Associates ! I \ EXPANSION INDEX-UBC 18-2 & ASTM D 4829-88 PROJECT Langan Engineering # 700086702 JOB NO. 2012-0057 Sample LB-12 / Bulk@ 0 -5' By LO Sample LB-13 / Bulk@ 0 -5' By LO Sta. No. Sta. No. Soil Type Brown, Silty Clay Soil Type Brown, Silty Clay Date Time Dial Reading Wet+Tare 600.6 Date Time Dial Reading Wet+Tare 605.8 3/17/2021 16:20 0.2679 Tare 214.8 3/17/2021 16:20 0.3383 Tare 219.9 H2O Net Weight 385.8 H2O Net Weiqht 385.9 3/18/2021 10:00 0.2139 % Water 11 3/18/2021 10:00 0.2724 % Water 11 Dry Dens. 105.3 Dry Dens. 105.3 %Max %Max Wet+Tare 643.3 Wet+Tare 651.4 Tare 214.8 Tare 219.9 Net Weight 428.5 Net Weight 431 _5:::) INDEX 54 5.4% % Water 23.3 INDEX 66 6.6% % Water 24.1 Sample LB-16 / Bulk@ 0 -5' By LO Sample By Sta. No. Sta. No. Soil Type Brown, Silty Clay Soil Type Date Time Dial Reading Wet+ Tare 604.4 Date Dial Reading Wet+ Tare 3/17/2021 16:20 0.329 Tare 217.8 Tare H2O Net Weiaht 386.6 Net Weiaht 3/18/2021 10:00 0.2659 % Water 11 % Water Dry Dens. 105.5 Dry Dens. %Max %Max Wet+Tare 652.5 Wet+Tare Tare 217.8 Tare Net Weight 434.7 Net Weight ~ INDEX 63 6.3% % Water 24.8 INDEX % Water PROJECT Langan # 700086701 JOB NO. 2012-0057 BY LD DATE 10/14/20 Sample No. LB-2/S-1 LB-3/S-2 LB-4/S-1 LB-4/S-3 LB-4/S-5A LB-4/S-5B Depth (ft) 5.0 10.0 5.0 15.0 20.0 20.0 Testing Soll Type L. Brown, Sandy Brown, Sandy L. Brown, Silty Orange Brown, Orange L. Brown, D. Brown, Silty Clay Clay Clay Sandy Clay Sandy Clay Clay Wet+Tare 1189.0 1172.6 556.3 1013.0 381.3 590.2 No. Ring 6 6 3 5 2 3 Wet Weight 154.4 136.1 189.6 140.1 142.8 150.8 Dry Weight 125.2 116.2 166.9 120.5 124.0 128.5 Wet density 133.8 131.5 123.2 137.5 127.5 132.6 % Water 23.3 17.1 13.6 16.3 15.2 17.4 Dry Density 108.5 112.3 108.4 118.3 110.7 113.0 O.B.Press(psf) Sample No. Depth (ft) Testing Soil Type Wet+Tare No. Ring Wet Weight Dry Weight Wet density % Water Dry Density O.B.Press(psf) l,_; .',.JI.· ~LJ~gic Job Name Job No. Sample Soil Type % water Wet weight Dry weight + 200 sieve % Retained %Pass. #200 Sample Soil Type % water Wetweioht Dry weight + 200 sieve % Retained %Pass. #200 Sample Soil Type % water Wetweiqht Dry weiqht + 200 sieve % Retained %Pass. #200 Sample Soil Type % water Wet weight Dry weioht + 200 sieve % Retained %Pass. #200 WASH #200 SIEVE -ASTM D 1140-92 Langan# 700086701 2012-0057 LB-4 / B-1 Sample Soil Type 9.8 % water 265.7 Wet weight 242.0 Dry weioht 103.8 + 200 sieve 42.9 % Retained 57 %Pass. #200 Sample Soil Type % water Wet weight Dryweioht + 200 sieve % Retained %Pass. #200 Sample Soil Type % water Wet weight Drvweight + 200 sieve % Retained %Pass. #200 Sample Soil Type % water Wet weight Dry weight + 200 sieve % Retained %Pass. #200 Sample Soil Type % water Wet weight Dry weiqht + 200 sieve % Retained %Pass. #200 Sample Soil Type % water Wet weight Dry weight + 200 sieve % Retained %Pass. #200 Sample Soil Type % water Wet weight Dry weight + 200 sieve % Retained %Pass. #200 Sample Soil Type % water Wet weight Dry weight + 200 sieve % Retained %Pass. #200 Date By 10-14-20 LO I II 'I. Langan Engineering# 700086701 SOIL TEST RESULTS Job No . 2012-0057 SAMPLE NO.: LB-4 / B-1 DESCRIPTION Sandy Clay DIRECT SHEAR TEST ltvoe\ Initial Moisture Content % Dry Density (pcf) Normal Stress (psf) Peak Shear Stress (psf) Ultimate Shear Stress (psf) Cohesion (psf) Internal Friction Anqle (deqrees) EXPANSION TEST uac STD 11·2 Initial Dry Density (pcf) Initial Moisture Content % Final Moisture Content % Pressure (psf) Expansion Index lswell % OOAROSIVITY TIIT Resistivity (CTM643) (ohm-cm) 710 pH (CTM643) 7.1 OHEMIOAL TESTS Soluble Sulfate (CTM 417) (oom) 395 Chloride Content (CTM 422) (ppm) 111 Wuh ftOO .aa.v. iu ,-U.11.&&11' Sandi"'' . "(AITM 0M1t) ~~"~~.':~~ic ·- EXPANSION INDEX -USC 18-2 & ASTM D 4829-88 PROJECT Langan # 700086701 JOB NO. 2012-0057 Sample LB-4 / B-1 By LD Sample By Sta. No. Sta. No. Soil Type Brown, Sandy Clay Soil Type Date Time Dial Reading Wet+Tare 600 Date Dial Reading Wet+Tare 10/13/2020 15:30 0.2958 Tare 219.7 Tare H2O Net Weiaht 380.3 Net Weiaht 10/14/2020 12:00 0.2174 % Water 11.5 % Water Drv Dens. 103.3 Drv Dens. %Max %Max Wet+Tare 651.2 Wet+Tare Tare 219.7 Tare Net Weight 431.5 Net Weight INDEX 78 7.8% % Water 26.5 INDEX % Water -J Sample By Sample By Sta. No. Sta. No. Soil Type Soil Type Date Dial Reading Wet+Tare Date Dial Reading Wet+Tare Tare Tare Net Weight Net Weiaht % Water % Water Dry Dens. Dry Dens. %Max %Max Wet+Tare Wet+Tare Tare Tare Net Weight Net Weight INDEX % Water INDEX % Water . J ' • J . Langan # 700086701 DIRECT SHEAR TEST -ASTM D-3080 GLA No. 2012-0057 • peak shear strength ... strength at 1/4" displacement 4000 3000 --Cl) a. -..c ..... C) C ~000 L-..... (/) L-eo Q) ..c (/) 1000 0 _,,,, ... / ~/ 0 Sample Ila2e. LB-4/S-1 Undisturbed & Saturated __,,,,,,,... Normal Pressure (psf) 1000 2000 4000 Date: 10-14-2020 v V -(...," / / __,,,,,--- v,,. -v J -v __,.,,... __,,,,, ...... V ./ _/ ..... I" H 1000 2000 3000 4000 Normal Pressure (psf) Strain Rate: 0.0042 in. / min. Pescciptioo Silty Clay Pry Density (pcQ 108.4 Peak Shear Strength (psf) 830@ 0.0700" 1450@ 0.1500" 2200@ 0.2400" C = 400 psf ~ = 24 deg. Initial W,C, (%) Eioal W,C, (%) 13.6 24.6 Ultimate Shear Strength (psf) 740 1430 2200 C = 400 psf ~= 24 deg. GeoLogic Associates Geotechnical Engineering Report Proposed Warehouse Development Carlsbad, California Langan Project No: 700086702 APPENDIX E Field Shear Wave Testing Results 16 April 2021 ,• • ' • 9 A..,. A e ____..,-, I L )T.::» .__ 6280 Riverdale Street San Otego, CA 92120 (877) 215-4321 I oneatlas.com March 17, 2021 MR. DANIEL JUDGE SERRANO LANGAN 18575 JAMBOREE ROAD, SUITE 150 IRVINE, CALIFORNIA 92612 Subject: Geophysical Evaluation South Melrose Drive & Lionshead Avenue Carlsbad, California Dear Mr. Judge Serrano: Atlas No. 121097SWG Report No. 1 In accordance with your authorization, Atlas Technical Consultants has performed a geophysical evaluation pertaining to the project located in the vacant lot at the intersection of South Melrose Drive and Lionshead Avenue, in San Marcos, California (Figure 1 ). The purpose of our study was to develop one-dimensional (1-0) Shear-wave velocity profiles to be used for design and construction at the study site. This letter report presents our methodology, equipment used, analysis, and findings. Our services were conducted on March 15, 2021 . Our scope of services for the project included performance of two 1-0 refraction microtremor (ReMi) profiles (RL-1 and RL-2) at preselected areas of the site (Figure 2). The ReMi technique uses recorded surface waves (specifically Rayleigh waves) that are contained in background noise to develop a Shear-wave velocity profile of the study area down to a depth, in this case, of approximately 100 feet. The depth of exploration is dependent on the length of the line and the frequency content of the background noise. The results of the ReMi method are displayed as a one-dimensional profile which represents the average condition across the length of the line. The ReMi method does not require an increase of material velocity with depth; therefore, low velocity zones (velocity inversions) are detectable with ReMi. Our ReMi evaluation included the use of a 24-channel Geometrics Geode seismograph and 24, 4.5-Hz vertical component geophones. Geophones were spaced 10 feet apart for a total line length of 230 feet. Fifteen records, each 32 seconds long, were recorded and then downloaded to a computer. The data was later processed using Surface Plus 9.1 -Advanced Surface Wave Processing Software (Geogiga Technology Corp., 2020), which uses the refraction microtremor method (Louie, 2001) and other surface wave analysis methods. The program generates phase- velocity dispersion curves for each record and provides an interactive dispersion modeling tool where the users determine the best fitting model. The result is a one-dimensional shear-wave velocity model of the site with roughly 85 to 95 percent accuracy. Figure 3 depicts the general site conditions in the study area. Page 1 A..-, A ~ .---r, I C )T':1---- Figures 4a, 4b and Table 1 present the results from our evaluations for RL-1 and RL-2. Based on our analysis of the collected data, the average Shear-wave velocities down to a depth of 100 feet are 1094 (ft/s) for RL-1 and 1316 (ft/s) for RL-2. These values all correspond to a site classification of D for RL-1 and C for RL-2. Based on our discussions with your representative at the site, it is our understanding that the drilling results indicate a thicker sequence of fill material beneath the subsurface where RL-1 was performed. The differing results between RL-1 and RL-2 are likely due to this change in fill thickness. It should be noted the ReMi results represent the average condition across the length of the line. Table 1 -ReMi Results Line No. Depth Shear Wave Velocity (feet) (feet/second) 0-17 627 17-19 641 19-26 729 26-33 741 RL-1 33-39 803 (N-S) 39-47 857 47-57 1674 57-67 1762 67-86 2380 86-100 2394 0-7 585 7-19 868 19-28 1011 28-35 1129 RL-2 35-42 1263 (E-W) 42-51 1610 51-61 1618 61-68 1639 68-93 2356 93-1 00 2400 The field evaluation and geophysical analyses presented in this report have been conducted in general accordance with current practice and the standard of care exercised by consultants performing similar tasks in the project area. No warranty, express or implied, is made regarding the conclusions and opinions presented in this report. There is no evaluation detailed enough to reveal every subsurface condition. Variations may exist and conditions not observed or described in this report may be present. Uncertainties relative to subsurface conditions can be reduced through additional subsurface exploration. Additional subsurface evaluating will be performed upon request. Atlas No Report No. Page 2 t • '• ' / ,•, • . , A .... A~ ___,.., I Ci~ This document is intended to be used only in its entirety. No portions of the document, by itself, is designed to completely represent any aspect of the project described herein. Atlas should be contacted if the reader requires additional information or has questions regarding the content, interpretations presented, or completeness of this document. This report is intended exclusively for use by the client. Any use of or reuse of the findings, conclusions, and/or recommendations of this report by parties other than the client is undertaken at said parties' sole risk. We appreciate the opportunity to be of service on this project. Should you have questions related to this report, please call us at (858) 527-0849. Respectfully submitted, Atlas Technical Consultants LLC Thomas M. Bouleanu Senior Staff Geophysicist TMB:PFL:ds Attachments: Figure 1 -Site Location Map Figure 2 -Seismic Line Location Map Figure 3 -Site Photographs Figure 4a -ReMi Results, RL-1 Figure 4b -ReMi Results, RL-2 ~ Patrick F. Lehrmann, P.G., P.Gp. Principal Geologist/Geophysicist Distribution: Mr. Daniel Judge Serrano at djudge@langan.com Atlas No. I ')J7 Report No. Page 3 _,. ' 0:-------';. , @ , "''a SITE LOCATION MAP A OC(.\11 ltll I !HlE~SI J1Jl!ICH South Melrose Drive & Lionshead Avenue Carlsbad, California Project No.: 121097SWG Date: 03121 Rll:t-tl AUil '~ .. ~ ... (q, San Ma1CQs .~ ~1 Figure 1 SEISMIC LINE LOCAJION MAP South Melrose Drive & Lionshead Avenue Carlsbad, California Project No.: 121097SWG Date: 03 I A-•-~ I .---r-t I L iT"::r-- F1gure 2 0 100 200 approximate scale in.,•~,t South East Elevation o 333°NW (T) • 33.131753, -117.240109 ±3 m • 81 m East Elevation o 284°W (T) • 33.132235, -117.242056 ±4 m • 87 m SITE PHOTOGRAPHS South Melrose Drive & Lionshead Avenue Carlsbad, California Project No.: 121097SWG Date: 03/21 A-• a e .---r, I C, ~ Figure 3 ' . LJ,--------------- ~ Q) ~ -._;.. <!: 0 i::: ~ LU ,_ ...J LU ',.;; ~ i::: c:( Lit a: Vs Model 0 500 1000 1500 2000 2500 0 -Vs100'= 1094 ft/s -10 ,-------t---t--+---+----+--~ -20 ,----t-+--+------+-----1---_J -30 Ill -40 .. -50 ... -60 -70 -80 ,-------t---+---+----+---L -9o 1 --7 ----+---+----l----U -100 ....____ __ ___J ___ _L ___ _j_ ___ _L_ __ LJ ReMiRESULTS RL-1 SHEAR-WAVE VELOCITY (feet per second) South Melrose Drive & Lionshead Avenue Carlsbad, California Project No.: 121097SWG I Date: 03/21 Figure 4a I I ' - )-,- Vs Model 0 500 1000 1500 2000 2500 0 -Vs100'= 1316 ft/s -10 --20 ... -30 -:;::- C1) ~ -..._. ~ -40 0 .::: § LU uj -50 ,'- ~ ,_ .::: c::c -60 -.I LU a: -70 -80 -90 -100 SHEAR-WAVE VELOCITY (feet per second) -I - ReMiRESULTS South Melrose Drive & Lionshead Avenue ._ ... I -- Carlsbad, California -.... ~,,_,..- RL-2 Project No.: 121097SWG I Date: 03/21 Figure 4b Geotechnical Engineering Report Proposed Warehouse Development Carlsbad, California Langan Project No: 700086702 APPENDIX F Slope/W Stability Graphical Outputs 16 April 2021 .> -· " ' ' Color I Name I Model I Unit Cohesion' Phi' Phl-8 I I Weight (paf) (·) (°) Proposed Warehouse Building (pcf) O I Santiago Mohr-Coulomb 127 400 25.5 0 Formation 1.5 Method: Bishop .-■ MSE Backfill Mohr-Coulomb 125 0 30 0 Horz Seismic Coef.: 0.15 □ RTW High Strength 150 Vert Seismic Coef.: 0 □ Sandy CLAY Mohr-Coulomb I 115 I 400 I 28 10 (S-1) ■ silty CLAY I Mohr-Coulomb I 120 I 300 I 25 10 (S-3) ■ silty CLAY I Mohr-Coulomb I 125 I 800 I 265 Io (S-7) Stability Analysis performed on Cross-Section B-B'. See Figure 9 for approximate location of Cross-Section B-B' Subsurface Conditions Developed from Langan Borings LB-18 and LB-12 Material Strength Parameters selected from Laboratory Test Results or Assumed Lot 4 Fill Slope Stability Analysis Langan Project No.: 700086702 Santiago Fonnatlon Model Developed from Plans Titted, "ALTAINSPS LAND TITLE SURVEY -SOUTHEAST CORNER OF S. tvELROSE DRIVE AND LIONSHEAD AVENUE" prepared byTHIENES ENGINEERING, INC. dated OCTOBER 2020. Directory: \llangan.comldata\lRV\data?\700086701\Project Datal_Discipline\Geotechnical\Analyses\RTW Global Stability\; Last Edited By: Daniel Judge; Date: 03/25/2021; Time: 12:07:40 PM IAN~AN .. ' .. Color I Name I Model I Unit Cohesion' Phi' Phi.a Weight (psf) c·) (.) (pct) [] \ Santiago Mohr-Coulomb 127 400 25.5 0 Formation 2.1 Method: Bishop .-■ MSE Backfill Mohr-Coulomb 125 0 30 0 □ RTW High Strength 150 □ Sandy CLAY Mohr-Coulomb 115 I 400 I 28 10 (S-1) ■ silty CLAY I Mohr-Coulomb I 120 I 300 I 25 10 (S-3) ■ silty CLAY I Mohr-Coulomb I 125 I 800 I 26.5 IO (S-7) Stability Analysis performed on Cross-Section B-B'. See Figure 9 for approximate location of Cross-Section B-B' Subsurface Conditions Developed from Langan Borings LB-18 and LB-12 Material Strength Parameters selected from Laboratory Test Results or Assumed Proposed Warehouse Building Lot 4 Fill Slope Stability Analysis Langan Project No.: 700086702 Santiago Fonnation Model Developed from Plans Titled, "ALTA/NSPS LAND TITLE SURVEY -SOUTHEAST CORNER OF S. l,,ELROSE DRIVE AND LIONSHEAD AVENUE" prepared byTHIENES ENGINEERING, INC. dated OCTOBER 2020. Directory:/ -'\Jan.com\data\lRV\data?\700086701\Project Data\_Discipline\Geotechnical\Anal 1TW Global Stability\; Last Edited By: Daniel Judge; Date: 03/25/2021; Time: 12; . ' I A,