Loading...
HomeMy WebLinkAbout2023-11-15; Planning Commission; ; Carlsbad Boulevard Restriping Project: A request to approve a Coastal Development Permit for previous work to relocate existing roadway space with restriping for bicyclisMeeting Date: Nov. 15, 2023 1 To: Planning Commission Staff Contact: Izzak Mireles, Associate Planner, 442-339-2693, izzak.mireles@carlsbadca.gov Subject: Carlsbad Boulevard Restriping Project: A request to approve a Coastal Development Permit for previous work to relocate existing roadway space with restriping for bicyclist and pedestrian improvements along Carlsbad Boulevard between Solamar Drive and Island Way. Location: Multiple Locations: Carlsbad Boulevard, between Solamar Drive and Island Way/District 3 Case Numbers: CDP 2023-0036 (CIP No. 6096) Applicant/Representative: Miriam Jim, Senior Engineer, Public Works, City of Carlsbad, 442-339-5796, miriam.jim.miles@carlsbadca.gov CEQA Determination: ☐Not a Project ☒ Exempt ☐ IS/ND or IS/MND ☐ EIR Permit Type(s): ☐SDP ☐ CUP ☒ CDP ☐ TM/TPM ☐ GPA ☐ REZ ☐ LCPA CEQA Status: ☐The environmental assessment IS on the Agenda for discussion ☒A CEQA determination was already issued. That decision is final and IS NOT on the Agenda Commission Action: ☒Decision ☐ Recommendation to City Council ☐ Informational (No Action) Recommended Actions That the Planning Commission Resolution ADOPT Planning Commission Resolution (Exhibit 1) APPROVING a Coastal Development Permit CDP 2023-0036, based upon the findings and subject to the conditions contained therein. Existing Conditions & Project Description Site Map The project reconfigured the segment of Carlsbad Boulevard between Solamar Drive and Island Way from two southbound vehicle lanes with unprotected shoulder buffers to a reconfigured roadway space that includes; one southbound vehicle lane, an enlarged buffer for Class II bike lanes, and six new parking spaces along Carlsbad Boulevard. This area, heavily trafficked by pedestrians and bicyclists, lacked protective measures for non-motorized travelers. The reconfigured roadway space was done to improve safety, calm traffic, support safer speeds, provide more space for pedestrians/bicyclists, and provide better beach access. Nov. 15, 2023 Item #1 Page 1 of 159 0 Table “A” below includes the General Plan designations, zoning, and current land uses of the project site. TABLE A – SITE AND SURROUNDING LAND USE Location General Plan Designation Zoning Designation Current Land Use Site N/A (Public Right of Way) N/A (Public Right of Way) Carlsbad Boulevard North Visitor Commercial (VC), Commercial Tourist (C-T-Q) Palomar Airport Road, Carlsbad Boulevard, Hilton Garden Inn Carlsbad Beach South Open Space (OS), Residential 4-8 du/ac (R-8) Residential Mobile Home Park (RMHP), Planned Community (P-C) Lake Shore Gardens Mobile Home Park, Single-Family Residential Homes East Visitor Commercial (VC), Residential 8-15 (R-15), Open Space (OS), Transportation Corridor (T-C), Planned Industrial (PI), Public (P), Planned Industrial/Office (PI/O) Commercial Tourist (C-T-Q), Residential Mobile Home Park (RMHP), Open Space (OS), Transportation Corridor (T-C), Industrial (M), Public Utility (P- U), Planned Industrial/Office (P-M/P) Hilton Garden Inn Carlsbad Beach, Solamar Community, Carlsbad Seapointe Resort West Open Space (OS) Open Space (OS) South Carlsbad State Beach, Pacific Ocean The City of Carlsbad has already prioritized traffic safety through its policies projects, services and special initiatives. The city’s Capital Improvement Program (CIP) includes 40 planned traffic and mobility related projects to street improvements, which includes this project. This project is also identified in the Safer Streets Together Plan, developed after the City Council's declaration of a local state of emergency for mobility safety on Aug. 30, 2022. Consequently, the City Council has twice endorsed this initiative through adoption of these plans. This project was approved by the City Council on Sept. 27, 2022, as part of the mobility safety declaration; construction began in December 2021 and was completed in March 2023. During its construction, a complaint was made to the California Coastal Commission (“Coastal Commission”) which began conversations with the City and Coastal Commission staff about the review authority designated to approve of the Carlsbad Boulevard lane reconfiguration. City staff shared that this type of project has been processed consistent with exemptions in the Carlsbad Municipal Code 21.201.060 (B) (11) that exempts “Activities of public utilities as specified in the repair, maintenance and utility hookup exclusion adopted by the coastal commission, Sept.5, 1978, and as modified from time to time.” The city’s interpretation related to that attachment is that Pavement Delineation Programs that do not change the physical improvements are exempt and a CDP was not required. However, the staff of the Coastal Commission determined that the lane configuration results in a change in capacity, which could have an impact to access and resources in the Coastal Zone; therefore, the project is considered 'development' and would require a Coastal Development Permit. Coastal Commission staff recommended that the city process retroactive Coastal Development Permit (CDP) for the work that was already completed. The Coastal Commission allowed the work to continue under the condition that an after-the-fact CDP be obtained. Approval of this CDP by the Planning Commission would conform with the Coastal Commission's recommendation and help complete and close-out this project. This area is within the appealable area of the Coastal Zone. The project corridor is also highlighted in the Sustainable Mobility Plan, aiming to establish an efficient, interconnected active transportation network across the city. Specifically, the plan advocates for buffered bike lanes along the Carlsbad Boulevard corridor. This project introduced buffered bike lanes, creating a more convenient travel path for all roadway users. Nov. 15, 2023 Item #1 Page 2 of 159 General Plan Designation Zoning Designation Proposed Project Historically, much of the city’s transportation system was designed with a primary focus on the driver's level of service (LOS), often overlooking the needs of pedestrians and bicyclists. However, as the city's street transportation system has largely been built out, there's been a shift towards a multi-modal approach. By adopting a multi-modal level of service (MMLOS) methodology in the 2015 General Plan, the city has been striving to implement a balanced multi-modal transportation network. This new direction includes a comprehensive, complete streets policy, ensuring all streets are designed, operated, and maintained for all roadway users’ safety. The MMLOS provides a framework that integrates with the city's existing procedures to better assess transportation impacts and mobility needs for every road user. This project converted the two southbound vehicle travel lanes into one travel lane and repurposed the remaining pavement for other uses. The lane realignment occurs along Carlsbad Boulevard between Solamar Road and Island Way while maintaining the same number of dedicated turn lanes at intersections. Among the changes is an upgrade to the existing Class II bike lane, adding a larger buffer to provide more separation between non- motorized travelers, vehicle lanes, and on-street parking along Carlsbad Boulevard. These safety buffers, extending two to three feet on each side, enhance safety. In addition, intersections are highlighted with vivid green paint, drawing attention to zones where different road users might intersect and potentially conflict. On- street parking was strategically reconfigured to accommodate the larger bike lane buffer, adding six additional parallel parking stalls near the Carlsbad Boulevard and Island Way intersection. The Mobility Element of the General Plan sets standards for MMLOS, emphasizing an approach that evaluates transportation services from a comprehensive, multi-modal standpoint. This includes a performance measurement that assesses the LOS for motorized vehicles, with vehicular LOS graded from 'A' to 'F' — 'A' representing a high level of service, and 'F' indicating a low level. A traffic memorandum for the project, referenced as Exhibit 3, was prepared to analyze the roadway segment and intersection operations with the proposed changes and to discuss the vehicle LOS findings. The project improvements yield a southbound AM/PM LOS of 'E'/'F' (failing) for the roadway along Carlsbad Boulevard between Solamar Drive and Island Way and an AM/PM LOS of 'A'/'B' (acceptable) at the intersections. According to General Plan Policy 3-P.15, the City Council has the authority to approve any road narrowing that would reduce vehicle capacity to a LOS of 'D' or below. Nov. 15, 2023 Item #1 Page 3 of 159 General Plan Policy 3-P.15 states: Evaluate methods and transportation facility improvements to promote biking, walking, safer street crossings, and attractive streetscapes. The City Council shall have the sole discretion to approve any such road diet or vehicle traffic calming improvements that would reduce vehicle capacity to or below a LOS 'D'. On Sept. 27, 2022, the City Council approved the road reconfiguration and allowed this project to operate at a LOS of 'E' (Resolution No. 2022-227 and the Staff Report is provided in Exhibit 6) . Further analysis of General Plan Policy 3-P.15 can be found in Exhibit 2. After receiving approval from the City Council, the project was finalized in March 2023. During its construction, city staff was informed by the Coastal Commission that a change in the number of vehicle lanes is considered 'development' and recommended that a CDP must be processed to retroactively approve the CIP. Specific compliance with CDP requirements is analyzed in Exhibit 2. Although there were initial concerns about processing the CIP without a CDP review, the city has received no complaints about the restriping since the project's completion, and there have been no reported collisions along the project site. The project is located within Local Facilities Management Zone 22 in the southwest quadrant of the city. Public Outreach & Comment Public notice of the project was mailed on Oct. 27, 2023, to property owners within 600 feet of the subject property, and a total of 140 owners were notified. There were no occupants within 100 feet of the subject property. No other comments were received during this public outreach effort. Project Analysis General Plan Consistency The City of Carlsbad General Plan includes several goals and policies that guide development and land use within the city. A discussion of how the project is consistent with the applicable General Plan policies is summarized in Exhibit 2. Municipal Code Consistency The City of Carlsbad Municipal Code, most notably Title 21 Zoning Code, includes requirements and provisions that guide development and land use within the city, consistent with the General Plan. Specific compliance with these relevant requirements is described in Exhibit 2. Local Coastal Program Consistency The project site is in the Coastal Zone and requires a Coastal Development Permit. The project complies with the Local Coastal Program, including all goals and policies of the General Plan and all zoning code standards, as referenced above. The project is within the Coastal Commission’s appealable area of the Local Coastal Program. Discretionary Actions & Findings The proposed project requires approval of a Coastal Development Permit, which is discussed below. Coastal Development Permit (CDP 2023-0036) Approval of a Coastal Development Permit (CDP) is required to ensure that the project complies with the Local Coastal Program, including all goals and policies of the General Plan and all zoning code standards, as referenced above. Staff finds that the required findings for this application can be met (Exhibit 2). Environmental Review Nov. 15, 2023 Item #1 Page 4 of 159 I The California Environmental Quality Act (“CEQA”) and its implementing regulations (“CEQA Guidelines”) adopted by the Secretary of the California Natural Resources Agency list classes of projects that have been determined not to have a significant effect on the environment and as a result are exempt from further environmental review under CEQA. City staff completed a review of the project and potential environmental impacts associated with the project pursuant to CEQA and concluded that the project qualified for an exemption pursuant to CEQA Guidelines section 15301(c) Existing Facilities (Class 1). The CEQA Guidelines include a list of classes of projects which have been determined not to have a significant effect on the environment and which shall, therefore, be exempt from the provisions of CEQA. CEQA Guidelines Section 15301(c) is a Class 1 exemption for Existing Facilities. Exempted are existing highways and streets, sidewalks, gutters, bicycle and pedestrian trails, and similar facilities (this includes road grading for the purpose of public safety), and other alterations such as the addition of bicycle facilities, including but not limited to bicycle parking, bicycle-share facilities and bicycle lanes, transit improvements such as bus lanes, pedestrian crossings, street trees, and similar alterations that do not create additional automobile lanes. The project and site meet the criteria of the Section 15301(c) Class 1 Existing Facilities exemption. A notice of intended decision regarding the environmental determination was advertised on Oct.19, 2023 and posted on the city’s website. The notice included a general description of the project, the environmental findings, and a general explanation of the matter to be considered. The findings and determination contained in that notice were declared as final on the date of the noticed decision, unless appealed as provided by the procedures commencing in Chapter 21.54 (Procedures, Hearings, Notices, and Fees) of the Zoning Ordinance. During the 10-day public review period, the city received no comment letters from the public regarding the prospective environmental determination. Since no appeal was filed and no substantial evidence was submitted that would support a finding that the exemption requirements would not be satisfied, the project was determined by the City Planner to not have a significant effect on the environment. The CEQA determination letter is attached to this staff report as (Exhibit 4) and demonstrates that the project is categorically exempt from further environmental review. The City Planner’s written decision is final and the CEQA determination is not within the Planning Commission’s purview. With the appropriate environmental clearances in place, all of the city’s procedural requirements and relevant aspects of CEQA have been satisfied. Conclusion Considering the information above and in the referenced Exhibits, staff has found that the project is consistent with all applicable policies of the General Plan and Local Coastal Program, provisions of the Municipal Code and Local Facility Management Zone 22. In addition, there are no environmental issues associated with the project. The project is conditioned to ensure compatibility with the surrounding properties and that the public health, safety, and welfare of the community are maintained. Staff recommends the Planning Commission adopt the resolution approving the project described in this staff report. Exhibits 1. Resolution – Coastal Development Approval 2. Project Analysis 3. Traffic Memorandum 4. CEQA Determination Letter 5. Location Map 6. City Council Staff Report & Resolution, Sept. 27, 2022 7. Reduced Exhibits 8. Full-Size Exhibits “A” – “B” dated Nov. 15, 2023, on file in the office of the City Clerk. 9. List of Acronyms and Abbreviations Nov. 15, 2023 Item #1 Page 5 of 159 PLANNING COMMISSION RESOLUTION NO. 7500 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF CARLSBAD, CALIFORNIA, APPROVING A COASTAL DEVELOPMENT PERMIT FOR CARLSBAD BOULEVARD RESTRIPING PROJECT ON PUBLIC RIGHT-OF-WAY GENERALLY LOCATED ALONG CARLSBAD BOULEVARD BETWEEN SOLAMAR DRIVE AND ISLAND WAY WITHIN THE MELLO II SEGMENT OF THE CITY'S LOCAL COASTAL PROGRAM AND WITHIN LOCAL FACILITIES MANAGEMENT ZONE 22 CASE NAME: CASE NO: CARLSBAD BOULEVARD RESTRIPING PROJECT CDP 2023-0036 WHEREAS, City of Carlsbad, "Applicant," has filed a verified application with the City of Carlsbad regarding property owned by City of Carlsbad, described as public right-of-way along Carlsbad Boulevard between Solamar Drive and Island Way ("the Property"); and WHEREAS, said verified application constitutes a request for a Coastal Development Permit as shown on Exhibits "A" -"B" dated Nov. 15, 2023, attached hereto and on file in the Carlsbad Planning Division, CARLSBAD BOULEVARD RESTRIPING PROJECT, CDP 2023-0036, as provided in Chapter 21.201.030 of the Carlsbad Municipal Code; and WHEREAS, the Planning Division studied the Coastal Development Permit application and performed the necessary investigations to determine if the project qualified for an exemption from further environmental review under the California Environmental Quality Act, (CEQA, Public Resources Code section 2100 et. Seq.), and its implementing regulations (the State CEQA Guidelines), Article 14 of the California Code of Regulations section 1500 et. seq. After consideration of all evidence presented, and studies and investigations made by the city planner and on its behalf, the city planner determined that the project was exempt from further environmental review pursuant to State CEQA Guidelines section 15301 -Existing Facilities, in that the project is consistent with the General Plan, Zoning Ordinance, and Local Coastal Program; the project site is within the city limits, is less than five acres in size, and is substantially Exhibit 1 Nov. 15, 2023 Item #1 Page 6 of 159 surrounded by urban uses; there is no evidence that the site has value as habitat for endangered, rare, or threatened species; approval of the project will not result in significant effects relating to traffic, noise, air quality, or water quality; and the site can be adequately served by all required utilities and public services. The project will not have a significant effect on the environment and all requirements of CEQA have been met; WHEREAS, on Oct.19, 2023, the city distributed a notice of the intended decision to adopt "Existing Facilities" exemptions. The notice was circulated for a 10-day period, which began on Oct. 19, 2023, and ended on Oct. 30, 2023. The city did not receive any comment letter on the CEQA findings and determination. The effective date and order of the city planner CEQA determination was Oct. 30, 2023. WHEREAS, the Planning Commission did, on Nov. 15, 2023, hold a duly noticed public hearing as prescribed by law to consider said request; WHEREAS, at said public hearing, upon hearing and considering all testimony and arguments, if any, of all persons desiring to be heard, said Commission considered all factors relating to the Coastal Development Permit. NOW, THEREFORE, BE IT HEREBY RESOLVED by the Planning Commission of the City of Carlsbad, as follows: A)That the above recitations are true and correct. B)That based on the evidence presented at the public hearing, the Commission APPROVE CARLSBAD BOULEVARD RESTRIPING PROJECT, CDP 2023-0036, based on the following findings and subject to the following conditions: Findings: 1.That the proposed development is in conformance with the Certified Local Coastal Program and all applicable policies in that the proposed project is in the Mello II Segment of the Local Coastal Program (LCP) and is within the appealable jurisdiction of the California Coastal Commission. Carlsbad LCP Mello II segment policies are specific toNov. 15, 2023 Item #1 Page 7 of 159 individual properties, the portions of the proposed project that overlap within the Mello II segment only include restriping and pedestrian improvements and not road widening. The proposed restriping is consistent with the Land Use, Drainage, and Environmental Protection Policies. The project is in conformance with the following policies of the LCP. 2.The proposal is in conformity with the public access and recreation policies of Chapter 3 of the Coastal Act in that the proposed multimodal use of the roadway would improve public access opportunities and recreational resources capacity and keep level of service of this arterial roadway the same for vehicles. The improvements will not obstruct any views as seen from public right of way. The project will not impact agricultural uses. The project is not located in an area of known geologic instability. 3.The project is consistent with the provisions of the Coastal Resource Protection Overlay Zone (Chapter 21.203 of the Zoning Ordinance) in that the project will adhere to the city's Master Drainage Plan, Grading Ordinance, Storm Water Ordinance, BMP Design Manual and Jurisdictional Runoff Management Program (JRMP) to avoid increased urban runoff, pollutants, and soil erosion. The project does not include steep slopes or native vegetation on the subject property and the site is not located. in an area prone to landslides or susceptible to accelerated erosion, floods, or liquefaction. The Planning Commission has reviewed each of the exactions imposed on the Applicant contained in this resolution, and hereby finds, in this case, that there are no impacts caused by or reasonably related to the project. Conditions: General NOTE: Unless otherwise specified herein, the project is subject to the following conditions. 1.Staff is authorized and directed to make, or require the applicant to make, all corrections and modifications to the CDP 2023-0036 documents, as necessary to make them internally consistent and in conformity with the final action on the project. Development shall occur substantially as shown on the approved Exhibits. Any proposed development, different from this approval, shall require an amendment to this approval. 2.Applicant shall comply with all applicable provisions of federal, state, and local laws and regulations. 3.This project shall comply with all conditions and mitigation measures which are required as part of the Zone 22 Local Facilities Management Plan and any amendments made to that Plan. Nov. 15, 2023 Item #1 Page 8 of 159 I' 4.This approval is granted subject to the approval of CDP 2023-0036 and is subject to all conditions contained in this Planning Commission Resolution for those other approvals incorporated herein by reference. NOTICE TO APPLICANT An appeal of this decision to the City Council must be filed with the City Clerk at 1200 Carlsbad Village Drive, Carlsbad, California, 92008, within ten {10) calendar days of the date of the Planning Commission's decision. Pursuant to Carlsbad Municipal Code Chapter 21.54, section 21.54.150, the appeal must be in writing and state the reason(s) for the appeal. The City Council must make a determination on the appeal prior to any judicial review. The project site is within the appealable area of the California Coastal Commission. This Coastal Development Permit {CDP) shall not become effective until ten (10) working days have elapsed, without a valid appeal being filed with the Coastal Commission, following the Coastal Commission's receipt of the city's notice of the CDP issuance {"Notice of Final Action"). The filing of a valid appeal with the Coastal Commission within such time limit shall stay the effective date of this CDP until such time as a final decision on the appeal is reached by the Coastal Commission. NOTICE Please take NOTICE that approval of your project includes the "imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to for convenience as "fees/exactions." You have 90 days from date of final approval to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedure set forth in Government Code Section 66020{a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity charges, nor planning, zoning, grading, or other similar application processing or service fees in connection with this project; NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired. PASSED, APPROVED, AND ADOPTED at a regular meeting of the Planning Commission of the City of Carlsbad, California, held on Nov. 15, 2023, by the following vote, to wit: Nov. 15, 2023 Item #1 Page 9 of 159 j -· • AYES: Merz, Hubinger, Kamenjarin, Lafferty, Meenes, Sabellico, Stine. NAYES: ABSENT: ABSTAIN: PETER MERZ, Chair CARLSBAD PLANNING COMMISSION ATTEST: ERIC LARDY City Planner �-?. ��,,,..,,. •• - -· �--=·-- Nov. 15, 2023 Item #1 Page 10 of 159 PROJECT ANALYSIS Exhibit 2 (GENERAL PLAN, MUNICIPAL CODE, AND OTHER REGULATIONS) PROJECT ANALYSIS The project is subject to the following regulations: A.General Plan B.Coastal Development Permit (CMC Chapter 21.201), Local Coastal Program (Mello II) C. McClellan-Palomar Airport Land Use Compatibility Plan D.Sustainable Mobility Plan E.Growth Management and Local Facilities Management Zone 22 The recommendation for approval of this project was developed by analyzing the project’s consistency with the applicable regulations and policies. The project’s compliance with each of the above regulations is discussed in detail in the sections below. A.General Plan The project site is located entirely within the right of way. The project also complies with the other Elements of the General Plan as outlined in Table “A” below: TABLE A – GENERAL PLAN COMPLIANCE ELEMENT USE, CLASSIFICATION, GOAL, OBJECTIVE, OR PROGRAM PROPOSED USES & IMPROVEMENTS COMPLY Land Use & Community Design Goal 2-G.2 – Promote a diversity of compatible land uses throughout the city, to enable people to live close to job locations, adequate and convenient commercial services, and public support systems such as transit, parks, schools, and utilities. This project reconfigured the existing roadway space within the area to improve safety, calm traffic, support safer speeds, and provide better access to the beach. This project provides more space for pedestrians and bicyclists, adds a larger buffer to the existing Class II bike lanes, and adds six new parking stalls along Carlsbad Boulevard. The project enables people to use alternative forms of transportation. Yes Land Use & Community Design Goal 2-G.18 - Ensure that new development fosters a sense of community and is designed with the focus on residents, including children, the disabled and the elderly, by providing: safe, pedestrian-friendly, tree-lined streets; walkways to common destinations such as schools, bikeways, trails, parks and stores; homes that exhibit visual diversity, The project supports efforts to create a sense of community by allowing all modes of transportation to be better served in providing access along the coastline. By reducing vehicle lanes and installing traffic calming measures, vehicles will experience more appropriate flows through the segment. Also, bicycles will experience improved conditions with wider buffered bike Yes Nov. 15, 2023 Item #1 Page 11 of 159 ELEMENT USE, CLASSIFICATION, GOAL, OBJECTIVE, OR PROGRAM PROPOSED USES & IMPROVEMENTS COMPLY pedestrian-scale and prominence to the street; central gathering places; and recreation amenities for a variety of age groups. lanes, and pedestrians will have more space away from automobile travel lanes. Mobility Goal 3-G.1 - Keep Carlsbad moving with livable streets that provide a safe, balanced, cost-effective, multi- modal transportation system accommodating the mobility needs of all community members, including children, the elderly, and the disabled. The city’s adopted multi-modal level of service standard aims to provide the necessary tools for assessing the performance of all travel modes, thus allowing the consideration of trade-offs between different road users. The proposed project will provide bicycle and pedestrian improvements and enable people to use alternative forms of transportation along Carlsbad Boulevard. Yes Mobility Policy 3-P-1 - Implement a comprehensive livable streets network. This network identifies the transportation modes that shall be accommodated, based on street typology, to ensure accessibility of the city’s street system to persons of all ages and abilities. The existing lane configuration for the Carlsbad Boulevard corridor provides wide areas for vehicles but not sufficient room for other modes of transportation. Upgrading the current Class II bike lanes with larger buffers provides more separation between non-motorized travelers from vehicle lanes and the on-street parking along Carlsbad Boulevard. Further, intersections are emphasized with vivid green paint, signaling attention to zones where different road users intersect and may come into conflict. Yes Mobility Policy 3-P.15: Evaluate methods and transportation facility improvements to promote biking, walking, safer street crossings, and attractive streetscapes. The City Council shall have the sole discretion to approve any such road diet or vehicle traffic calming improvements that would reduce vehicle capacity to or below a LOS D. The project reduces vehicle lanes in one segment of the roadway, on Carlsbad Boulevard from Solamar Drive to Island Way, in the southbound direction. The project provides bicycle and pedestrian improvements and enables people to use alternative forms of transportation along Carlsbad Boulevard. Supporting documentation shows the vehicular LOS at an 'E' grade. On Sept. 27, 2022, the City Council approved the road reconfiguration and allowed this project to operate at a LOS of Yes Nov. 15, 2023 Item #1 Page 12 of 159 ELEMENT USE, CLASSIFICATION, GOAL, OBJECTIVE, OR PROGRAM PROPOSED USES & IMPROVEMENTS COMPLY 'E'. Although the conservative segment analysis showed a LOS E, The traffic signal operation analysis indicates that both signalized intersections would operate at a level of service B or better in the morning, midday and afternoon peak hours on weekdays and in the peak hour on weekends under existing conditions as well as pre- pandemic conditions. Because the number of lanes at the intersections would remain unchanged with the proposed project, the operation of the signals is expected to remain at a level of service B or better. It is worth noting that the No. 2 lane on Carlsbad Boulevard, the second lane from the center or westernmost lane, was closed in the southbound direction between Solamar Drive and Island Way in 2016 due to severe erosion near the Encinas Creek Bridge. To ensure the safety of drivers, bicyclists and pedestrians and to help facilitate the necessary repairs, the city implemented a long-term lane closure in January 2016 and lasted through early 2017. During this long-term lane closure, traffic impacts were observed to be minimal, and the single southbound lane was found to provide adequate capacity, as documented in the May 22, 2017, council memorandum provided in Exhibit 6. The traffic volumes in 2016 were likely higher than the current traffic volumes on Carlsbad Boulevard and comparable to the 2019 volumes. The existing one lane on southbound Carlsbad Boulevard between Solamar Drive and Island Way has been accommodating the traffic with minimal impacts to vehicle travel time. Nov. 15, 2023 Item #1 Page 13 of 159 ELEMENT USE, CLASSIFICATION, GOAL, OBJECTIVE, OR PROGRAM PROPOSED USES & IMPROVEMENTS COMPLY Mobility Policy 3-P.16 - Design new streets, and explore funding opportunities for existing streets, to minimize traffic volumes and/or speed, as appropriate, within residential neighborhoods without compromising connectivity for emergency responders, bicycles, and pedestrians consistent with the city’s Carlsbad Active Transportation Strategies. This should be accomplished through management and implementation of livable streets strategies and such programs like the Carlsbad Residential Traffic Management Plan. The existing right-of-way is shared by multiple modes of travel, each using their assigned portion of the road allowance. The project includes engineering design changes that will improve safety for non- motorized vehicles. Bicyclists will experience improved conditions through the use of wider buffers for the existing bike lanes and clear delineation of conflict zones with visibility green striping at intersections. Yes Noise Goal 5-G.1 – Protect public health and welfare by eliminating existing noise problems where feasible, maintaining an acceptable indoor and outdoor acoustic environment, and preventing significant degradation of the acoustic environment. Goal 5-G.2 – Ensure that new development is compatible with the noise environment, by continuing to use potential noise exposure as a criterion in land use planning. The project improves the existing roadway experience for all roadway users without widening or adding lanes that could potentially increase traffic noise in the project area. The project primarily focuses on developing bicycle and pedestrian facilities, which are non-motorized travel modes that not only reduce engine noise but also ensure slower travel speeds, thus decreasing noise levels. Moreover, promoting non- motorized transportation modes would significantly reduce the emission of air pollutants, leading to improved air quality in the project area. Yes Public Safety Goal 6-G.2 – Minimize safety hazards related to aircraft operations in areas around the McClellan-Palomar Airport. The proposed project falls outside the boundaries of the McClellan- Palomar Airport Land Use Compatibility Plan (ALUCP). The ALUCP was amended on December 1, 2011, and all projects within its boundary are required to be reviewed for consistency with its goals and policies. The ALUCP identifies four types of airport impacts that must be considered for each development: Noise, Safety, Yes Nov. 15, 2023 Item #1 Page 14 of 159 ELEMENT USE, CLASSIFICATION, GOAL, OBJECTIVE, OR PROGRAM PROPOSED USES & IMPROVEMENTS COMPLY Airspace Protection, and Overflight. Based on a review of the ALUCP, the project sites are not located within any noise contour or safety zone. The section of the project is located along Carlsbad Boulevard and is within the overflight notification area and is outside of the Airport Influence Area. Sustainability Policy 9-P.1 – Enforce the Climate Action Plan (CAP) as the city’s strategy to reduce greenhouse gas emissions. The project includes multi-modal improvements to enable comfortable access for pedestrians and cyclists of all skill levels to key destinations in the project area. This would promote non-motorized travel that would contribute to a reduction in vehicle miles traveled and greenhouse gas emissions. Yes B. Coastal Development Permit (Chapter 21.201) The project is within the Coastal Zone and is subject to the Mello II segments of the Local Coastal Program (LCP). The project is also within the appealable jurisdiction of the California Coastal Commission. The project’s compliance with each of these programs and ordinances is discussed below: Mello II Segment of the Certified Local Coastal Program and all applicable policies The majority of the policies within the Mello II segments relate to land uses outside of the right-of-way. The road improvements will not obstruct views of the coastline as seen from public lands or the public right of way, nor otherwise damage the visual beauty of the coastal zone. Furthermore, no agricultural uses exist on the site, nor are there any sensitive resources located on the previously developed land. The project is not located in any area of known geologic instability and is not located within a 100-year flood area. The site does have frontage along the coastline that provides coastal shoreline access. The proposed lane reductions on Carlsbad Boulevard in the southbound direction will not affect access to the beach. In fact, by improving bike infrastructure and enhancing walkability, the road improvements will make it easier for people to use alternative modes of transportation to access the beach. While this project reduces the vehicle lanes in this corridor from two to one, the reconfiguration calms traffic, supports slower speeds and provides better access to the beach. The project enables people to use alternative forms of transportation to access the beach. Mello II Segment: The project is consistent with the following Carlsbad Mello II policies: a. Carlsbad LCP Policy 1-1 Allowable land Uses. The project complies because it is consistent with the General Plan and the Local Coastal Program. b. Carlsbad LCP Policy 3-1.1 Habitat Management Plan (HMP). The project does not include any Nov. 15, 2023 Item #1 Page 15 of 159 grading and will not damage or harm any sensitive environmental resources. c. Carlsbad LCP Policy 3-4 Grading and Landscaping Requirements. The project does not include any grading. d. Carlsbad LCP Policy 4-4 Removal of Natural Vegetation. The project is not located within sensitive resources and entirely within existing right-of-way. Carlsbad LCP Chapter 3: The proposal is in conformance with the public access and recreation policies of Chapter 3 of the Coastal Act in that the proposed multi-modal use of the roadway would improve public access opportunities and recreational resources capacity and keep level of service through this Arterial the same. The improvements will not obstruct any views as seen from public right of way. The project will not impact agricultural uses. The project is not located in an area of known geologic instability. Coastal Resource Protection Overlay Zone: The project is consistent with the provisions of the Coastal Resource Protection Overlay Zone. The project is consistent with the provisions of the Coastal Resource Protection Overlay Zone (CMC Chapter 21.203 of the Zoning Ordinance) in that the project will adhere to the city’s Master Drainage Plan, Grading Ordinance, Storm Water Ordinance, BMP Design Manual and Jurisdictional Runoff Management Program (JRMP) to avoid increased urban run-off, pollutants and soil erosion. The subject property is within the public right-of-way and public utility and access easements, does not include steep slopes (equal to or greater than 25 percent gradient) nor native vegetation. The site is not located within an area prone to landslides or susceptible to accelerated erosion, liquefaction, or flooding. Required Findings for a Coastal Development Permit (CMC Chapter 21.201) 1. That the proposed development is in conformance with the Certified Local Coastal Program and all applicable policies in that the proposed project is in the MeIlo II Segment of the Local Coastal Program (LCP). Carlsbad LCP Mello II segment policies are specific to individual properties, the portions of the proposed project that overlap within the MeIlo II segments only include restriping and pedestrian improvements and not road widening. The proposed restriping is consistent with the Land Use, Drainage, and Environmental Protection Policies. The project is in conformance with the policies of the LCP. 2. The proposal is in conformity with the public access and recreation policies of Chapter 3 of the Coastal Act in that the proposal is in conformance with the public access and recreation policies of Chapter 3 of the Coastal Act in that the proposed multi-modal use of the roadway would improve public access opportunities and recreational resources capacity and keep the level of service through this arterial at acceptable levels as approved by the City Council on Sept. 27, 2022. The improvements will not obstruct any views as seen from the public right of way. The project will not impact agricultural uses. The project is not located in an area of known geologic instability. While this project reduces the vehicle lanes in this corridor from two to one, the reconfiguration calms traffic, supports slower speeds and provides better access to the beach. The project enables people to use alternative forms of transportation to access the beach. This project is also providing six new parking spaces which would help increase access to the beach. Nov. 15, 2023 Item #1 Page 16 of 159 C. McClellan-Palomar Airport Land Use Compatibility Plan The project falls outside the boundaries of the McClellan-Palomar Airport Land Use Compatibility Plan (ALUCP). The ALUCP was amended on Dec. 1, 2011, and all projects within its boundary are required to be reviewed for consistency with its goals and policies. The ALUCP identifies four types of airport compatibility factors that must be considered for each development: Noise, Safety, Airspace Protection, and Overflight. Based on a review of the ALUCP, the project site is not located within any noise contours, safety zones, or Airport Influence Areas. The project site is located within the overflight notification area. However, these development restrictions apply to residential developments, and therefore no further action is required. D. Sustainable Mobility Plan The project emerged from the Sustainable Mobility Plan, which aims to create a highly efficient and interconnected active transportation network throughout the city. The Carlsbad Boulevard corridor was selected through a careful and strategic process. Factors included commuter flow, connections to schools, residential areas, popular destinations like the coastline, and integration with public transportation hubs. The proposed project facilitates a more seamless and convenient path of travel for all roadway users. E. Growth Management (CMC Chapter 21.90) The project is located within Local Facilities Management Zone 22 in the southwest quadrant of the city. The project is in compliance with the adopted performance standards and would provide the necessary public facilities identified in the facilities plan. Nov. 15, 2023 Item #1 Page 17 of 159 5050 Avenida Encinas, Suite 260 | Carlsbad, CA 92008 Office: 760-476-9193 | Fax: 760-476-9198 | mbakerintl.com MBAKERINTL.COM August 30, 2022 John T. Kim, PE, TE City Traffic Engineer Traffic & Mobility Division City of Carlsbad 1635 Faraday Avenue Carlsbad, CA 92008 Re: Carlsbad Boulevard Restriping (PSA21-1350TRAN) – Roadway Segment Analysis Michael Baker International (Michael Baker) conducted a roadway segment level of service (LOS) analysis for southbound Carlsbad Boulevard from Solamar Drive to Island Way. In efforts to address climate adaptation along this segment of Carlsbad Boulevard, the City is planning to restripe the southbound travel lanes from two lanes to one lane while maintaining the bicycle lane and on-street parking that exists today. The City of Carlsbad Service Volume Tables Report dated May 2021 was used to evaluate southbound Carlsbad Boulevard from Solamar Drive to Island Way under Existing Conditions and conditions with Proposed Modifications. Existing Conditions: Southbound Carlsbad Boulevard between Solamar Drive and Island Way provides two 10-foot travel lanes, a two-foot buffer, and an 8-foot striped bicycle lane. Angled parking is currently provided along the west side of Carlsbad Boulevard for approximately 360 feet which translates to approximately 30 parking spaces. New AM and PM peak hour turning movement counts were collected on Tuesday, July 19, 2022 and Saturday, July 23, 2022. In addition, 24-hour segment volumes were collected on Carlsbad Boulevard from Solamar Drive to Island Way on Tuesday (July 19, 2022), Wednesday (July 20, 2022), Saturday (July 23, 2022) and Sunday (July 24, 2022). The average of the weekday and weekend daily volumes from July 2022 were then compared to the daily volume collected in 2019 to determine whether the daily volumes prior to COVID were higher or lower than the volumes in 2022. Table 1 presents the comparison of the weekday daily volume collected in 2019 and 2022 which shows the daily volume in 2019 were 39.9% higher during the weekday and 37.7% higher during the weekend compared to the 2022 daily volume. The daily traffic volume collected in June 2021 in the southbound approach on Carlsbad Boulevard from Solamar Drive to Island Way was 7,340 (approx. 14,680 assuming both directions). This volume is much lower than the 2019 daily segment volume (26,278) and 2022 daily segment volume (18,779) collected. Therefore, the 2021 daily volume was not included in the comparison table. Exhibit 3 Nov. 15, 2023 Item #1 Page 18 of 159 Michael Baker We Make a Difference INTERNATIONAL 2 To provide a conservative analysis, the increase in daily traffic volumes on the weekday (39.9%) and weekend (37.7%) were applied to the AM and PM peak hour traffic counts collected in July 2022 to represent the Existing Post-COVID Adjustment volumes. Daily and peak hour traffic volumes without and with the Post-COVID Adjustments are provided in Attachment A of this document. TABLE 1 ROADWAY SEGMENT DAILY TRAFFIC VOLUME COMARISON Carlsbad Boulevard (Solamar Drive to Island Way) Weekday Daily Volume1 Weekday Daily Volumes Weekend Daily Volumes Weekday Daily Average (2022) Weekend Daily Average (2022) Weekday % Change Weekend % Change 2019 Tuesday (7/19/22) Wednesday (7/20/22) Saturday (7/23/22) Sunday (7/24/22) 26,278 19,006 18,551 19,142 19,037 18,779 19,090 39.9% 37.7% (1) Traffic volume obtained from City of Carlsbad’s MMLOS 2019 Monitoring Results for Coastal, Village, Identity and School Streets, prepared by Fehr & Peers. Carlsbad Boulevard is not identified as a “Specific Corridor” in Table 1 (Roadway Service Volume Table-Specific Corridor) of the City of Carlsbad Service Volume Tables Report; therefore, Table 2 (Roadway Service Volume Table – Generalized Data) of the City report was utilized to obtain segment capacity thresholds. More specifically, the “Hourly Volume In Peak Direction” segment capacities for Arterial Streets as specified in Table 2 of the City’s report were used for this analysis. As shown in Table 2 below, a peak hour segment capacity of 1,820 vehicles was used since: 1) the existing roadway has 2 travel lanes in the southbound direction, 2) the posted speed limit is 50 miles per hour (MPH), and 3) is divided by a landscaped median. The weekday segment analysis shows southbound Carlsbad Boulevard from Solamar Drive to Island Way is operating at LOS C during both the AM and PM peak hours for the Existing Year 2022 and LOS D for the Existing Year 2022 with Post-COVID adjustment and this is considered favorable operating conditions in the City. Table 3 shows the weekend segment analysis under Existing Conditions with two travel lanes in the southbound direction along Carlsbad Boulevard operating at LOS D during the mid- day peak hour for the Existing Year 2022 volumes and the Existing Year with Post-COVID adjustment. Nov. 15, 2023 Item #1 Page 19 of 159 Michael Baker We Make a Difference INTERNATIONAL 3 TABLE 2 EXISTING CONDITIONS - ROADWAY SEGMENT ANALYSIS (WEEKDAY) Segment Location Count Date Dir. Lanes/ Speed/ Median1 Segment Capacity2 (veh/hr) Existing Conditions AM Peak Hour PM Peak Hour Volume (veh/hr) LOS Volume (veh/hr) LOS Carlsbad Boulevard Solamar Drive to Island Way Tuesday July 19, 2022 Existing Year 2022 SB 2/50/D 1,820 610 C 657 C Existing Year 2022 Post-COVID Adjustment SB 2/50/D 1,820 853 D 919 D (1)2/50/D = Number of lanes, posted speed limit, Divided (D) Road (2) Source: City of Carlsbad Segment Volumes Tables Report (May 2021) & Table 2 - Roadway Service Volume Table - Generalized Data (LOS E threshold) TABLE 3 EXISTING CONDITIONS - ROADWAY SEGMENT ANALYSIS (WEEKEND) Segment Location Count Date Dir. Lanes/Speed/ Median1 Segment Capacity2 (veh/hr) Existing Conditions Mid-Day Peak Hour Volume (veh/hr) LOS Carlsbad Boulevard Solamar Drive to Island Way Saturday July 23, 2022 Existing Year 2022 SB 2/50/D 1820 895 D Existing Year 2022 Post-COVID Adjustment SB 2/50/D 1820 1232 D (1)2/50/D = Number of lanes, posted speed limit, Divided (D) Road (2) Source: City of Carlsbad Segment Volumes Tables Report (May 2021) & Table 2 - Roadway Service Volume Table - Generalized Data (LOS E threshold) Proposed Modifications: Proposed modifications to southbound Carlsbad Boulevard from Solamar Drive to Island Way involve restriping the existing two travel lanes to one travel lane. Immediately south of the signal at Solamar Drive, two lanes would merge to one travel lane. The existing angled parking along southbound Carlsbad Boulevard south of Solamar Drive would remain unchanged. At the merge, southbound Carlsbad Boulevard would taper down from two 10-foot travel lanes to one 11-foot travel lane along with a two-foot striped buffer, 8-foot striped bicycle lane, and a 4-foot to 10- foot buffer to be used by pedestrians. Parallel parking spaces will be added along the westside of Carlsbad Boulevard near Island Way. Refer to the striping plan for additional details related to the location of parking. Nov. 15, 2023 Item #1 Page 20 of 159 Michael Baker We Make a Difference INTERNATIONAL I I I I I I I I I I I I I I I • I I I I I I I I I I 4 Table 4 presents the weekday roadway segment analysis based on conditions with the proposed modifications. As shown, a peak hour segment capacity of 910 vehicles per hour (1,820 vehicles per hour / 2 lanes) is based on a single travel lane according to the Roadway Service Volume Table – Generalized Data (Table 2) from the City’s Segment Volumes Tables Report. Due to the proposed reduction in travel lanes, the segment capacity along Carlsbad Boulevard is reduced from 1,820 to 910 vehicles per hour. During the weekday, the study segment of Carlsbad Boulevard would operate at a favorable LOS D during the AM and PM peak hour with the proposed modifications for the Existing Year 2022 condition. Using the Existing Year 2022 volumes with Post-COVID Adjustment, Carlsbad Boulevard would operate at LOS E during the AM peak hour and LOS F during the PM peak hour. TABLE 4 PROPOSED IMPROVEMENTS - ROADWAY SEGMENT ANALYSIS (WEEKDAY) Segment Location Count Date Dir. Lanes/ Speed/ Median1 Segment Capacity2 (veh/hr) Proposed Modifications AM Peak Hour PM Peak Hour Volume (veh/hr) LOS Volume (veh/hr) LOS Carlsbad Boulevard Solamar Drive to Island Way Tuesday July 19, 2022 Existing Year 2022 SB 1/50/D 910 610 D 657 D Existing Year 2022 Post-COVID Adjustment SB 1/50/D 910 853 E 919 F (1)1/50/D = Number of lanes, posted speed limit, Divided (D) Road (2) Source: City of Carlsbad Segment Volumes Tables Report (May 2021) & Table 2 - Roadway Service Volume Table - Generalized Data (LOS E threshold); Segment capacity is 910 vehicles per hour (1820 vehicles per hour / 2 lanes) based on the 2/50/D capacity due to the lane reduction from 2 travel lanes to 1 travel lane in the southbound approach. Table 5 presents the Carlsbad Boulevard study segment analysis during a typical weekend with the proposed modifications. As shown, this study segment was found to operate at LOS E during the mid-day peak hour on a typical Saturday using Existing Year 2022 volumes. Using Existing Year 2022 with Post-COVID Adjustment volumes, this study segment would operate at LOS F. Nov. 15, 2023 Item #1 Page 21 of 159 Michael Baker We Make a Difference INTERNATIONAL I • • I I I I I I I I I I I I I 5 TABLE 5 PROPOSED IMPROVEMENTS - ROADWAY SEGMENT ANALYSIS (WEEKEND) Segment Location Count Date Dir. Lanes/Speed/ Median1 Segment Capacity2 (veh/hr) Proposed Modifications Mid-Day Peak Hour Volume (veh/hr) LOS Carlsbad Boulevard Solamar Drive to Island Way Saturday July 23, 2022 Existing Year 2022 SB 1/50/D 910 895 E Existing Year 2022 Post-COVID Adjustment SB 1/50/D 910 1232 F (1)1/50/D = Number of lanes, posted speed limit, Divided (D) Road (2) Source: City of Carlsbad Segment Volumes Tables Report (May 2021) & Table 2 - Roadway Service Volume Table - Generalized Data (LOS E threshold); Segment capacity is 910 vehicles per hour (1820 vehicles per hour / 2 lanes) based on the 2/50/D capacity due to the lane reduction from 2 travel lanes to 1 travel lane in the southbound approach. Intersection Operations Analysis Intersection operations were evaluated at Carlsbad Boulevard & Solamar Drive and Carlsbad Boulevard & Island Way under Existing 2022 Conditions and Existing 2022 Post-COVID Adjustment Conditions. Using the intersection analysis software Synchro, Version 11, both study intersections were analyzed under Existing 2022 Conditions and Existing 2022 Post-COVID Adjustment Conditions. It may be noted the lane geometry at both locations were analyzed based on the existing configuration. Table 6 shows the delay and LOS reported for the study intersections under Existing 2022 Conditions and Existing Year 2022 Post-COVID Adjustment during the weekday. TABLE 6 EXISTING YEAR 2022 & EXISTING YEAR 2022 POST-COVID ADJUSTMENT LEVEL OF SERVICE COMARISON (WEEKDAY) LOS Comparison: Existing Year 2022 & Existing Year 2022 Post-COVID Adjustment (WEEKDAY) ID Study Intersection Control Type Existing Year 2022 Existing Year 2022 Post-COVID Adjustment AM Noon PM AM Noon PM Delay LOS Delay LOS Delay LOS Delay LOS Delay LOS Delay LOS 1 Carlsbad Boulevard & Solamar Drive Signal 6.0 A 6.8 A 7.4 A 6.5 A 7.4 A 8.0 A 2 Carlsbad Boulevard (SB) & Island Way Signal 10.2 B 12.6 B 7.9 A 11.0 B 13.1 B 13.7 B 3 Carlsbad Boulevard (NB) & Island Way Signal 12.6 B 12.5 B 17.4 B 14.2 B 14.7 B 18.1 B 1) Delay = Average delay per vehicle expressed in seconds. 2) LOS = Level of Service Nov. 15, 2023 Item #1 Page 22 of 159 Michael Baker We Make a Difference INTERNATIONAL I . I I I I I I I I I I 6 As shown, the study intersections currently operate at LOS B or better which is acceptable operating conditions within the City of Carlsbad. Table 7 shows the delay and LOS reported for the study intersections under Existing 2022 Conditions and Existing Year 2022 Post-COVID Adjustment during the weekend. As shown, the study intersections operate acceptably (LOS D or better) during the weekend. The LOS worksheets can be found in Attachment B. TABLE 7 EXISTING YEAR 2022 & EXISTING YEAR 2022 POST-COVID ADJUSTMENT LEVEL OF SERVICE COMARISON (WEEKEND) LOS Comparison: Existing Year 2022 & Existing Year 2022 Post-COVID Adjustment (WEEKEND) ID Study Intersection Control Type Existing Year 2022 Existing Year 2022 Post-COVID Adjustment AM Noon PM AM Noon PM Delay LOS Delay LOS Delay LOS Delay LOS Delay LOS Delay LOS 1 Carlsbad Boulevard & Solamar Drive Signal 6.3 A 6.7 A 8.5 A 6.8 A 7.2 A 9.3 A 2 Carlsbad Boulevard (SB) & Island Way Signal 12.7 B 10.6 B 12.4 B 13.0 B 11.3 B 13.4 B 3 Carlsbad Boulevard (NB) & Island Way Signal 11.8 B 13.5 B 17.7 B 12.8 B 16.6 B 19.9 B 1) Delay = Average delay per vehicle expressed in seconds. 2) LOS = Level of Service Conclusions Southbound Carlsbad Boulevard from Solamar Drive to Island Way will be restriped from two lanes to one lane which will reduce the vehicular capacity of the roadway. Under Existing Conditions, the study segment of Carlsbad Boulevard has a capacity of 1,820 vehicles during a peak hour and the roadway currently operates at a LOS D during the AM and PM peak hour on a weekday and weekend. With the proposed modifications, the study segment of Carlsbad Boulevard would have a capacity of 910 vehicles per hour which results in the segment operating at LOS D during the weekday and LOS E during the weekend. Using Post-COVID Adjustment volumes, the segment would operate at LOS E in the AM peak hour and LOS F in the PM peak hour during the weekday and LOS F during the weekend. It is important to note the proposed improvement is an interim modification to Carlsbad Boulevard until a Nov. 15, 2023 Item #1 Page 23 of 159 Michael Baker We Make a Difference INTERNATIONAL 7 permanent solution is designed. The intersection analysis shows acceptable operating conditions under Year 2022 Condition Without and With Post-COVID Adjustment Conditions during the weekday and weekend. If you have any questions related to the information in this memorandum, please contact me at 619-456-1410 or Jacob.swim@mbakerintl.com. Sincerely, Jacob Swim, TE Michael Baker International Nov. 15, 2023 Item #1 Page 24 of 159 Michael Baker We Make a Difference INTERNATIONAL 8 Source: City of Carlsbad Service Volume Tables Report, May 2021 Nov. 15, 2023 Item #1 Page 25 of 159 Michael Baker We Make a Difference INTERNATIONAL Table 2: Roadway Service Volume Table -Generalized Data Segment Capacity Threshold for Arterial Streets Segment Capacity Threshold for Industrial Streets Hourly Volume in Peak Direction Hourly Volume in Peak Direction Speed Speed Lanes Limit Median B C D E Lanes Limit Median B C D E 3S Undivided .. 180 590 740 1 3S Divided .. 190 630 780 2S Undivided ... 110 450 560 25 Di vided .. 140 610 720 35 Divided .. 520 1390 1540 45 Divided .. 600 1560 1760 2 .. 50 Divided 850 1690 1820 35 Undivided ... 180 590 740 1 Divided ···• 35 190 630 780 40 Undivided .. 216 708 888 55 Divided ..... 1050 1800 1890 40 Di vided .. 228 756 936 35 Divided .. 680 2230 2540 45 Divided ... 2040 2660 2700 3 .. 50 Divided 2360 2760 2800 55 Divided 390 2600 2870 2900 4 4S Divided .. 2780 3560 3620 Hourly Volume in Both Direction Hourly Volume in Both Direction Speed Speed lanes Limit Median B C D E lanes Limit Median s. C D E 35 Undivided .. 340 1100 1380 2 .. 3S Divided 360 1170 1450 25 Undivid@d .. 200 800 990 25 Di vided .. 250 1080 1270 35 Divided .. 970 2580 2860 45 Divided ** 1120 2890 3260 4 ... 50 Divided 1580 3130 3380 35 Undivided .. 340 1100 1380 2 Di vided ... 35 360 1170 1450 40 Undivided ,.. .• 408 1320 1656 55 Divided ••t• 1950 3340 3500 40 Divided .. 432 1404 1740 5 55 Divided .. 3395 4343 4455 3S Divided .. 1260 4130 4720 6 50 Divided .. 4380 5120 5180 55 Divided 7:)0 4620 5:120 5:JGO 7 45 Divided .. 4483 5785 5878 Annual Average Daily Traffic Annual Average Daily Traffic Speed Speed lanes Limit Median B C D E Lanes Limit Median B C D E 35 Undivided .. 4200 13700 17200 2 35 Divided •·+· 4400 14600 18100 25 Undivided .. 2200 8900 11000 25 Di vided .. 2800 12000 14100 35 Divided .. 12100 32200 35800 45 Divided .. 13900 31:,200 40800 4 .. 50 Divided 19700 39200 42200 35 Undivided .. 4200 13700 17200 2 .. 35 Di vided 4400 14600 18100 40 Undivided .. 5040 16440 20640 55 Divided .. 24400 41700 43800 40 Di vided .. 5280 17520 21720 35 Divided .. 15800 51700 59000 6 50 Divided .. 54700 63900 64800 55 Divided 9100 60200 66500 67000 Attachment A Traffic Count Data Nov. 15, 2023 Item #1 Page 26 of 159 Day:City:Carlsbad Date:Project #:CA22_040121_001 NB SB EB WB 9,768 9,238 0 0 AM Period NB SB EB WB NB SB EB WB 0:00 18 9 27 156 160 316 0:15 9 9 18 173 169 342 0:30 10 5 15 161 176 337 0:45 3 40 4 27 7 67 139 629 150 655 289 1284 1:00 6 3 9 173 149 322 1:15 3 2 5 168 164 332 1:30 5 4 9 163 170 333 1:45 4 18 2 11 6 29 173 677 168 651 341 1328 2:00 5 4 9 155 179 334 2:15 1 1 2 160 172 332 2:30 1 3 4 200 155 355 2:45 2 9 1 9 3 18 193 708 159 665 352 1373 3:00 1 0 1 201 158 359 3:15 2 3 5 244 175 419 3:30 4 2 6 245 158 403 3:45 1 8 2 7 3 15 220 910 165 656 385 1566 4:00 3 2 5 236 184 420 4:15 5 2 7 249 157 406 4:30 4 2 6 287 158 445 4:45 6 18 8 14 14 32 259 1031 152 651 411 1682 5:00 7 8 15 280 174 454 5:15 7 22 29 274 173 447 5:30 12 21 33 250 117 367 5:45 19 45 33 84 52 129 268 1072 150 614 418 1686 6:00 34 58 92 271 172 443 6:15 27 61 88 221 139 360 6:30 42 79 121 183 148 331 6:45 72 175 76 274 148 449 138 813 113 572 251 1385 7:00 51 114 165 164 126 290 7:15 67 114 181 137 152 289 7:30 67 130 197 135 142 277 7:45 67 252 166 524 233 776 143 579 118 538 261 1117 8:00 91 157 248 137 152 289 8:15 88 144 232 125 139 264 8:30 89 143 232 95 125 220 8:45 116 384 127 571 243 955 82 439 90 506 172 945 9:00 105 120 225 72 69 141 9:15 93 117 210 55 107 162 9:30 111 115 226 46 70 116 9:45 103 412 132 484 235 896 36 209 66 312 102 521 10:00 131 138 269 37 56 93 10:15 132 128 260 30 30 60 10:30 152 168 320 35 29 64 10:45 140 555 131 565 271 1120 24 126 34 149 58 275 11:00 150 161 311 20 26 46 11:15 121 160 281 12 17 29 11:30 156 166 322 11 8 19 11:45 179 606 148 635 327 1241 10 53 13 64 23 117 TOTALS 2522 3205 5727 7246 6033 13279 SPLIT %44.0% 56.0%30.1%54.6% 45.4%69.9% NB SB EB WB 9,768 9,238 0 0 AM Peak Hour 11:45 11:45 11:45 16:30 13:30 16:30 AM Pk Volume 669 653 1322 1100 689 1757 Pk Hr Factor 0.934 0.928 0.966 0.958 0.962 0.968 7 - 9 Volume 636 1095 0 0 1731 2103 1265 0 0 3368 7 - 9 Peak Hour 8:00 7:45 8:00 16:30 16:30 16:30 7 - 9 Pk Volume 384 610 0 0 955 1100 657 0 0 1757 Pk Hr Factor 0.828 0.919 0.000 0.000 0.963 0.958 0.944 0.000 0.000 0.968 4 - 6 Peak Hour 4 - 6 Pk Volume SPLIT % TOTAL Pk Hr Factor PM Peak Hour PM Pk Volume Pk Hr Factor 4 - 6 Volume 20:45 TOTAL 23:45 TOTALS Total 19,006 DAILY TOTALS 21:00 21:15 20:30 DAILY TOTALS 22:15 22:30 22:45 23:00 23:15 23:30 Carlsbad Blvd Bet. Manzano Dr & Island Way 21:30 21:45 22:00 Total 19,006 19:30 19:45 20:00 20:15 18:00 18:15 18:30 18:45 19:00 19:15 16:45 17:00 17:15 Tuesday 17:30 17:45 15:15 15:30 15:45 16:00 16:15 16:30 14:00 14:15 14:30 7/19/2022 14:45 15:00 DAILY TOTALS PM Period VOLUME Prepared by National Data & Surveying Services 13:15 13:30 13:45 12:00 12:15 12:30 12:45 13:00 Nov. 15, 2023 Item #1 Page 27 of 159 Day:City:Carlsbad Date:Project #:CA22_040121_001 NB SB EB WB 9,312 9,239 0 0 AM Period NB SB EB WB NB SB EB WB 0:00 5 9 14 172 150 322 0:15 7 7 14 139 163 302 0:30 6 11 17 180 174 354 0:45 8 26 8 35 16 61 159 650 189 676 348 1326 1:00 5 5 10 154 157 311 1:15 3 2 5 165 163 328 1:30 9 3 12 157 167 324 1:45 4 21 6 16 10 37 164 640 175 662 339 1302 2:00 2 3 5 173 165 338 2:15 1 0 1 158 159 317 2:30 2 6 8 178 152 330 2:45 6 11 2 11 8 22 184 693 176 652 360 1345 3:00 3 1 4 176 175 351 3:15 0 0 0 226 172 398 3:30 4 3 7 214 158 372 3:45 1 8 6 10 7 18 241 857 154 659 395 1516 4:00 2 5 7 213 193 406 4:15 2 2 4 225 163 388 4:30 6 2 8 242 155 397 4:45 10 20 14 23 24 43 239 919 179 690 418 1609 5:00 6 5 11 264 152 416 5:15 9 21 30 275 151 426 5:30 11 21 32 258 140 398 5:45 15 41 43 90 58 131 249 1046 152 595 401 1641 6:00 33 38 71 217 169 386 6:15 38 67 105 215 129 344 6:30 37 67 104 172 142 314 6:45 37 145 80 252 117 397 121 725 115 555 236 1280 7:00 62 74 136 133 149 282 7:15 50 99 149 145 147 292 7:30 52 113 165 132 131 263 7:45 68 232 128 414 196 646 155 565 145 572 300 1137 8:00 100 129 229 122 154 276 8:15 87 117 204 128 135 263 8:30 106 141 247 96 128 224 8:45 96 389 177 564 273 953 68 414 88 505 156 919 9:00 96 115 211 56 73 129 9:15 100 145 245 51 77 128 9:30 105 137 242 35 77 112 9:45 120 421 132 529 252 950 31 173 72 299 103 472 10:00 116 146 262 39 45 84 10:15 114 133 247 34 36 70 10:30 121 149 270 39 33 72 10:45 131 482 132 560 263 1042 29 141 41 155 70 296 11:00 134 172 306 17 25 42 11:15 154 177 331 13 15 28 11:30 157 142 299 18 16 34 11:45 180 625 151 642 331 1267 20 68 17 73 37 141 TOTALS 2421 3146 5567 6891 6093 12984 SPLIT %43.5% 56.5%30.0%53.1% 46.9%70.0% NB SB EB WB 9,312 9,239 0 0 AM Peak Hour 11:45 11:00 11:45 17:00 16:00 16:45 AM Pk Volume 671 642 1309 1046 690 1658 Pk Hr Factor 0.932 0.907 0.924 0.951 0.894 0.973 7 - 9 Volume 621 978 0 0 1599 1965 1285 0 0 3250 7 - 9 Peak Hour 8:00 8:00 8:00 17:00 16:00 16:45 7 - 9 Pk Volume 389 564 0 0 953 1046 690 0 0 1658 Pk Hr Factor 0.917 0.797 0.000 0.000 0.873 0.951 0.894 0.000 0.000 0.973 Prepared by National Data & Surveying Services VOLUME Carlsbad Blvd Bet. Manzano Dr & Island Way Wednesday 7/20/2022 DAILY TOTALS Total 18,551 TOTAL PM Period TOTAL 12:00 12:15 12:30 12:45 13:00 13:15 13:30 13:45 14:00 14:15 14:30 14:45 15:00 15:15 15:30 15:45 16:00 16:15 16:30 16:45 17:00 17:15 17:30 17:45 18:00 18:15 18:30 18:45 19:00 19:15 19:30 19:45 20:00 20:15 20:30 20:45 21:00 21:15 SPLIT % 21:30 21:45 22:00 22:15 22:30 22:45 DAILY TOTALS Total 18,551 PM Peak Hour PM Pk Volume 23:00 23:15 23:30 23:45 TOTALS Pk Hr Factor 4 - 6 Volume 4 - 6 Peak Hour 4 - 6 Pk Volume Pk Hr Factor DAILY TOTALS Nov. 15, 2023 Item #1 Page 28 of 159 Day:City:Carlsbad Date:Project #:CA22_040121_001 NB SB EB WB 9,502 9,640 0 0 AM Period NB SB EB WB NB SB EB WB 0:00 11 16 27 237 189 426 0:15 11 10 21 208 216 424 0:30 16 23 39 212 218 430 0:45 18 56 13 62 31 118 216 873 217 840 433 1713 1:00 7 9 16 198 190 388 1:15 22 9 31 186 207 393 1:30 9 13 22 203 225 428 1:45 10 48 9 40 19 88 206 793 193 815 399 1608 2:00 4 4 8 219 208 427 2:15 5 6 11 183 228 411 2:30 5 5 10 194 237 431 2:45 7 21 2 17 9 38 225 821 222 895 447 1716 3:00 2 6 8 189 217 406 3:15 2 4 6 190 229 419 3:30 5 4 9 189 205 394 3:45 3 12 6 20 9 32 169 737 211 862 380 1599 4:00 4 5 9 213 241 454 4:15 4 6 10 217 201 418 4:30 4 4 8 198 191 389 4:45 5 17 4 19 9 36 164 792 164 797 328 1589 5:00 7 4 11 174 164 338 5:15 5 6 11 196 167 363 5:30 7 11 18 197 180 377 5:45 11 30 20 41 31 71 167 734 171 682 338 1416 6:00 18 28 46 210 165 375 6:15 24 36 60 171 130 301 6:30 26 34 60 146 152 298 6:45 34 102 34 132 68 234 143 670 135 582 278 1252 7:00 45 39 84 145 139 284 7:15 42 56 98 128 122 250 7:30 54 47 101 129 120 249 7:45 50 191 52 194 102 385 147 549 132 513 279 1062 8:00 77 67 144 121 129 250 8:15 87 79 166 106 121 227 8:30 81 92 173 85 65 150 8:45 121 366 96 334 217 700 82 394 86 401 168 795 9:00 108 110 218 60 79 139 9:15 115 119 234 52 50 102 9:30 117 129 246 68 73 141 9:45 115 455 142 500 257 955 59 239 54 256 113 495 10:00 120 147 267 54 50 104 10:15 165 169 334 37 71 108 10:30 148 152 300 28 52 80 10:45 174 607 154 622 328 1229 34 153 28 201 62 354 11:00 181 189 370 28 29 57 11:15 169 146 315 38 33 71 11:30 201 170 371 21 21 42 11:45 191 742 205 710 396 1452 13 100 22 105 35 205 TOTALS 2647 2691 5338 6855 6949 13804 SPLIT %49.6% 50.4%27.9%49.7% 50.3%72.1% NB SB EB WB 9,502 9,640 0 0 AM Peak Hour 11:45 11:45 11:45 12:00 14:30 14:00 AM Pk Volume 848 828 1676 873 905 1716 Pk Hr Factor 0.895 0.950 0.974 0.921 0.955 0.960 7 - 9 Volume 557 528 0 0 1085 1526 1479 0 0 3005 7 - 9 Peak Hour 8:00 8:00 8:00 16:00 16:00 16:00 7 - 9 Pk Volume 366 334 0 0 700 792 797 0 0 1589 Pk Hr Factor 0.756 0.870 0.000 0.000 0.806 0.912 0.827 0.000 0.000 0.875 Prepared by National Data & Surveying Services VOLUME Carlsbad Blvd Bet. Manzano Dr & Island Way Saturday 7/23/2022 DAILY TOTALS Total 19,142 TOTAL PM Period TOTAL 12:00 12:15 12:30 12:45 13:00 13:15 13:30 13:45 14:00 14:15 14:30 14:45 15:00 15:15 15:30 15:45 16:00 16:15 16:30 16:45 17:00 17:15 17:30 17:45 18:00 18:15 18:30 18:45 19:00 19:15 19:30 19:45 20:00 20:15 20:30 20:45 21:00 21:15 SPLIT % 21:30 21:45 22:00 22:15 22:30 22:45 DAILY TOTALS Total 19,142 PM Peak Hour PM Pk Volume 23:00 23:15 23:30 23:45 TOTALS Pk Hr Factor 4 - 6 Volume 4 - 6 Peak Hour 4 - 6 Pk Volume Pk Hr Factor DAILY TOTALS Nov. 15, 2023 Item #1 Page 29 of 159 Day:City:Carlsbad Date:Project #:CA22_040121_001 NB SB EB WB 9,903 9,134 0 0 AM Period NB SB EB WB NB SB EB WB 0:00 17 26 43 219 206 425 0:15 19 15 34 234 224 458 0:30 14 15 29 242 223 465 0:45 6 56 10 66 16 122 243 938 195 848 438 1786 1:00 7 8 15 201 193 394 1:15 4 7 11 225 210 435 1:30 6 12 18 223 191 414 1:45 9 26 8 35 17 61 237 886 214 808 451 1694 2:00 5 10 15 231 196 427 2:15 9 8 17 246 231 477 2:30 2 8 10 230 216 446 2:45 2 18 3 29 5 47 186 893 232 875 418 1768 3:00 4 5 9 218 216 434 3:15 3 2 5 221 181 402 3:30 0 0 0 223 215 438 3:45 0 7 3 10 3 17 197 859 205 817 402 1676 4:00 4 5 9 183 175 358 4:15 3 5 8 171 195 366 4:30 7 7 14 151 170 321 4:45 3 17 6 23 9 40 204 709 151 691 355 1400 5:00 10 6 16 189 177 366 5:15 5 7 12 198 156 354 5:30 7 12 19 211 171 382 5:45 7 29 16 41 23 70 217 815 138 642 355 1457 6:00 12 17 29 179 143 322 6:15 16 17 33 230 128 358 6:30 17 20 37 198 132 330 6:45 30 75 32 86 62 161 182 789 129 532 311 1321 7:00 35 34 69 182 129 311 7:15 36 51 87 165 124 289 7:30 34 50 84 155 141 296 7:45 50 155 43 178 93 333 151 653 119 513 270 1166 8:00 72 67 139 127 102 229 8:15 53 75 128 99 95 194 8:30 69 90 159 87 100 187 8:45 101 295 80 312 181 607 75 388 71 368 146 756 9:00 89 105 194 53 60 113 9:15 98 87 185 44 80 124 9:30 129 130 259 49 58 107 9:45 108 424 116 438 224 862 39 185 56 254 95 439 10:00 136 135 271 34 40 74 10:15 152 160 312 25 33 58 10:30 167 182 349 24 30 54 10:45 169 624 159 636 328 1260 16 99 26 129 42 228 11:00 190 169 359 18 17 35 11:15 223 198 421 16 23 39 11:30 238 174 412 12 16 28 11:45 255 906 196 737 451 1643 11 57 10 66 21 123 TOTALS 2632 2591 5223 7271 6543 13814 SPLIT %50.4% 49.6%27.4%52.6% 47.4%72.6% NB SB EB WB 9,903 9,134 0 0 AM Peak Hour 11:45 11:45 11:45 13:45 14:15 13:45 AM Pk Volume 950 849 1799 944 895 1801 Pk Hr Factor 0.931 0.948 0.967 0.959 0.964 0.944 7 - 9 Volume 450 490 0 0 940 1524 1333 0 0 2857 7 - 9 Peak Hour 8:00 8:00 8:00 17:00 16:15 16:45 7 - 9 Pk Volume 295 312 0 0 607 815 693 0 0 1457 Pk Hr Factor 0.730 0.867 0.000 0.000 0.838 0.939 0.888 0.000 0.000 0.954 Prepared by National Data & Surveying Services VOLUME Carlsbad Blvd Bet. Manzano Dr & Island Way Sunday 7/24/2022 DAILY TOTALS Total 19,037 TOTAL PM Period TOTAL 12:00 12:15 12:30 12:45 13:00 13:15 13:30 13:45 14:00 14:15 14:30 14:45 15:00 15:15 15:30 15:45 16:00 16:15 16:30 16:45 17:00 17:15 17:30 17:45 18:00 18:15 18:30 18:45 19:00 19:15 19:30 19:45 20:00 20:15 20:30 20:45 21:00 21:15 SPLIT % 21:30 21:45 22:00 22:15 22:30 22:45 DAILY TOTALS Total 19,037 PM Peak Hour PM Pk Volume 23:00 23:15 23:30 23:45 TOTALS Pk Hr Factor 4 - 6 Volume 4 - 6 Peak Hour 4 - 6 Pk Volume Pk Hr Factor DAILY TOTALS Nov. 15, 2023 Item #1 Page 30 of 159 National Data & Surveying ServicesIntersection Turning Movement Count Location:Carlsbad Blvd/Palomar Airport Rd Ramp & Solamar DrCity:Carlsbad Project ID: Control:Signalized Date: NS/EW Streets: Explanation for extra leg movements 1 2 0 0 0 1 2 0 0 0 0 0 0 0 1 0 0 0 0 0NLNTNRNUNT2SLSTSRSUELETEREUWLWTWRWUWR2S2T2S2U2 TOTAL Movements entering the extra leg 7:00 AM 0 25 1 6 11 6 75 0 0 0 0 0 0 1 0 1 0 6 0 0 132 S2U2 Movements coming from SB on Carlsbad Blvd entering into the Extra Leg (Palomar Airport Rd Ramp)7:15 AM 0 33 1 5 11 2 61 0 2 0 0 0 0 0 0 0 0 4 0 1 120 NT2 Movements coming from NB on Carlsbad Blvd entering into the Extra Leg (Palomar Airport Rd Ramp)7:30 AM 0 30 0 5 22 3 78 0 1 0 0 0 0 0 0 3 0 6 0 0 148 WR2 Movements coming from WB on Hilton Graden Inn entering into the Extra Leg (Palomar Airport Rd Ramp) 7:45 AM 0 31 2 5 27 3 110 0 2 0 0 0 0 1 0 2 0 3 0 2 1888:00 AM 0 53 1 10 31 4 108 0 1 0 0 0 0 0 0 1 0 7 0 0 216 Movements exiting the extra leg 8:15 AM 0 43 3 9 20 3 96 0 1 0 0 0 0 0 0 5 0 6 0 0 186 S2T2 Movements exiting from Extra Leg (Palomar Airport Rd Ramp) entering into Carlsbad Blvd heading SB8:30 AM 0 52 3 2 26 5 107 0 1 0 0 0 0 1 0 4 0 14 0 0 2158:45 AM 0 52 2 3 30 3 83 0 2 0 0 0 0 3 0 4 0 3 0 3 188 NL NT NR NU NT2 SL ST SR SU EL ET ER EU WL WT WR WU WR2 S2T2 S2U2 TOTALTOTAL VOLUMES :0 319 13 45 178 29 718 0 10 0 0 0 0 6 0 20 0 49 0 6 1393 APPROACH %'s :0.00%57.48%2.34%8.11%32.07%3.83%94.85%0.00%1.32%8.00%0.00%26.67%0.00%65.33%0.00%100.00%PEAK HR :08:00 AM 41 0 0 TOTAL PEAK HR VOL :0 200 9 24 107 15 394 0 5 0 0 0 0 4 0 14 0 30 0 3 805 PEAK HR FACTOR :0.000 0.943 0.750 0.600 0.863 0.750 0.912 0.000 0.625 0.000 0.000 0.000 0.000 0.333 0.000 0.700 0.000 0.536 0.000 0.250 Headers NBL NBT NBR NBU NBT2 SBL SBT SBR SBU EBL EBT EBR EBU WBL WBT WBR WBU WBR2 SB2T2 SB2U2 1 2 0 0 0 1 2 0 0 0 0 0 0 0 1 0 0 0 0 0NLNTNRNUNT2SLSTSRSUELETEREUWLWTWRWUWR2S2T2S2U2 TOTAL 11:00 AM 0 79 1 9 30 7 129 0 1 0 0 0 0 6 0 2 1 9 0 1 27511:15 AM 0 66 3 10 25 7 141 0 1 0 0 0 0 2 0 2 0 4 0 3 264 11:30 AM 0 93 2 2 24 2 136 0 3 0 0 0 0 1 0 3 0 9 0 0 27511:45 AM 0 107 0 5 33 3 128 0 2 0 0 0 0 2 0 2 0 4 0 2 28812:00 PM 0 81 3 9 30 8 132 0 1 0 0 0 0 2 0 0 0 2 0 0 268 12:15 PM 0 84 0 8 39 6 116 0 5 0 0 0 0 0 0 1 0 4 0 2 26512:30 PM 0 93 2 12 34 2 130 0 2 0 0 0 0 2 0 1 0 1 0 0 279 12:45 PM 0 78 3 5 22 7 124 0 3 0 0 0 0 2 0 3 0 5 0 3 255 NL NT NR NU NT2 SL ST SR SU EL ET ER EU WL WT WR WU WR2 S2T2 S2U2 TOTAL TOTAL VOLUMES :0 681 14 60 237 42 1036 0 18 0 0 0 0 17 0 14 1 38 0 11 2169APPROACH %'s :0.00%68.65%1.41%6.05%23.89%3.83%94.53%0.00%1.64%24.29%0.00%20.00%1.43%54.29%0.00%100.00% PEAK HR :11:00 AM 161 0 0 TOTAL PEAK HR VOL :0 345 6 26 112 19 534 0 7 0 0 0 0 11 0 9 1 26 0 6 1102 PEAK HR FACTOR :0.000 0.806 0.500 0.650 0.848 0.679 0.947 0.000 0.583 0.000 0.000 0.000 0.000 0.458 0.000 0.750 0.250 0.722 0.000 0.500 1 2 0 0 0 1 2 0 0 0 0 0 0 0 1 0 0 0 0 0 NL NT NR NU NT2 SL ST SR SU EL ET ER EU WL WT WR WU WR2 S2T2 S2U2 TOTAL4:00 PM 0 146 3 7 37 8 144 0 2 0 0 0 0 2 0 0 0 8 0 1 358 4:15 PM 0 161 2 8 50 8 159 0 0 0 0 0 0 1 0 0 0 5 0 2 3964:30 PM 0 138 4 11 48 7 128 0 0 0 0 0 0 3 0 1 0 9 0 3 3524:45 PM 0 141 3 11 38 5 127 0 3 0 0 0 0 0 0 3 0 5 0 0 336 5:00 PM 0 125 5 13 63 6 140 0 3 0 0 0 0 1 0 4 0 5 0 2 3675:15 PM 0 131 3 10 48 7 145 0 3 0 0 0 0 2 0 2 0 9 0 1 361 5:30 PM 0 156 3 10 59 6 113 0 3 0 0 0 0 0 0 5 0 10 0 0 3655:45 PM 0 131 6 10 69 9 128 0 1 0 0 0 0 2 0 2 0 5 0 5 368 NL NT NR NU NT2 SL ST SR SU EL ET ER EU WL WT WR WU WR2 S2T2 S2U2 TOTALTOTAL VOLUMES :0 1129 29 80 412 56 1084 0 15 0 0 0 0 11 0 17 0 56 0 14 2903APPROACH %'s :0.00%68.42%1.76%4.85%24.97%4.85%93.85%0.00%1.30%13.10%0.00%20.24%0.00%66.67%0.00%100.00% PEAK HR :05:00 PM 293 0 0 TOTAL PEAK HR VOL :0 543 17 43 239 28 526 0 10 0 0 0 0 5 0 13 0 29 0 8 1461PEAK HR FACTOR :0.000 0.870 0.708 0.827 0.866 0.778 0.907 0.000 0.833 0.000 0.000 0.000 0.000 0.625 0.000 0.650 0.000 0.725 0.000 0.400 22-040120-001 7/19/2022 05:00 PM - 06:00 PM 0.9930.923 0.910 0.783 11:00 AM - 12:00 PM 0.9570.843 0.940 0.653 PM NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND NOON NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND SOUTHBOUND2 08:00 AM - 09:00 AM 0.9320.895 0.916 0.632 AM NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND Data - Totals Carlsbad Blvd/Palomar Airport Rd Ramp Carlsbad Blvd/Palomar Airport Rd Ramp Solamar Dr Solamar Dr Nov. 15, 2023 Item #1 Page 31 of 159 National Data & Surveying ServicesIntersection Turning Movement Count Location:Carlsbad Blvd/Palomar Airport Rd Ramp & Solamar Dr City:Carlsbad Project ID: Control:Signalized Date: NS/EW Streets: 1 2 0 0 0 1 2 0 0 0 0 0 0 0 1 0 0 0 0 0 NL NT NR NU NT2 SL ST SR SU EL ET ER EU WL WT WR WU WR2 S2T2 S2U2 TOTAL 7:00 AM 0 8 0 0 1 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 13 7:15 AM 0 3 0 0 0 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 7 7:30 AM 0 5 0 0 0 0 7 0 0 0 0 0 0 0 0 0 0 0 0 0 12 7:45 AM 0 13 0 0 2 0 12 0 0 0 0 0 0 0 0 1 0 0 0 0 28 8:00 AM 0 3 0 1 0 0 13 0 1 0 0 0 0 0 0 0 0 0 0 0 188:15 AM 0 13 0 0 2 0 6 0 0 0 0 0 0 0 0 0 0 0 0 0 218:30 AM 0 11 0 0 0 1 10 0 0 0 0 0 0 0 0 1 0 0 0 0 238:45 AM 0 13 0 0 0 0 10 0 0 0 0 0 0 0 0 0 0 0 0 0 23 NL NT NR NU NT2 SL ST SR SU EL ET ER EU WL WT WR WU WR2 S2T2 S2U2 TOTAL TOTAL VOLUMES :0 69 0 1 5 1 66 0 1 0 0 0 0 0 0 2 0 0 0 0 145 APPROACH %'s :0.00%92.00%0.00%1.33%6.67%1.47%97.06%0.00%1.47%0.00%0.00%100.00%0.00%0.00% PEAK HR :08:00 AM 41 0 0 TOTAL PEAK HR VOL :0 40 0 1 2 1 39 0 1 0 0 0 0 0 0 1 0 0 0 0 85 PEAK HR FACTOR :0.000 0.769 0.000 0.250 0.250 0.250 0.750 0.000 0.250 0.000 0.000 0.000 0.000 0.000 0.000 0.250 0.000 0.000 0.000 0.000 Headers NBL NBT NBR NBU NBT2 SBL SBT SBR SBU EBL EBT EBR EBU WBL WBT WBR WBU WBR2 SB2T2 SB2U2 1 2 0 0 0 1 2 0 0 0 0 0 0 0 1 0 0 0 0 0NLNTNRNUNT2SLSTSRSUELETEREUWLWTWRWUWR2S2T2S2U2 TOTAL11:00 AM 0 14 0 0 0 0 15 0 0 0 0 0 0 0 0 0 0 0 0 0 2911:15 AM 0 10 0 0 0 0 14 0 0 0 0 0 0 0 0 1 0 0 0 0 2511:30 AM 0 12 0 0 1 0 16 0 0 0 0 0 0 0 0 0 0 0 0 0 2911:45 AM 0 12 0 2 0 0 15 0 0 0 0 0 0 1 0 0 0 0 0 0 30 12:00 PM 0 11 2 0 0 0 6 0 0 0 0 0 0 0 0 2 0 0 0 0 21 12:15 PM 0 16 0 0 0 0 10 0 0 0 0 0 0 0 0 0 0 0 0 0 26 12:30 PM 0 13 0 1 0 0 11 0 0 0 0 0 0 0 0 0 0 0 0 0 25 12:45 PM 0 15 0 0 0 0 13 0 0 0 0 0 0 0 0 0 0 0 0 0 28 NL NT NR NU NT2 SL ST SR SU EL ET ER EU WL WT WR WU WR2 S2T2 S2U2 TOTAL TOTAL VOLUMES :0 103 2 3 1 0 100 0 0 0 0 0 0 1 0 3 0 0 0 0 213 APPROACH %'s :0.00%94.50%1.83%2.75%0.92%0.00%100.00%0.00%0.00%25.00%0.00%75.00%0.00%0.00% PEAK HR :11:00 AM 161 0 0 TOTAL PEAK HR VOL :0 48 0 2 1 0 60 0 0 0 0 0 0 1 0 1 0 0 0 0 113 PEAK HR FACTOR :0.000 0.857 0.000 0.250 0.250 0.000 0.938 0.000 0.000 0.000 0.000 0.000 0.000 0.250 0.000 0.250 0.000 0.000 0.000 0.000 1 2 0 0 0 1 2 0 0 0 0 0 0 0 1 0 0 0 0 0NLNTNRNUNT2SLSTSRSUELETEREUWLWTWRWUWR2S2T2S2U2 TOTAL4:00 PM 0 6 0 0 0 1 7 0 0 0 0 0 0 0 0 0 0 0 0 0 144:15 PM 0 6 0 0 2 0 11 0 0 0 0 0 0 0 0 0 0 0 0 0 194:30 PM 0 10 0 0 0 0 10 0 0 0 0 0 0 0 0 0 0 0 1 0 214:45 PM 0 5 0 0 1 0 7 0 1 0 0 0 0 0 0 0 0 0 0 0 14 5:00 PM 0 4 0 1 0 0 6 0 0 0 0 0 0 0 0 0 0 0 0 0 11 5:15 PM 0 14 0 0 0 0 13 0 0 0 0 0 0 0 0 0 0 0 0 0 27 5:30 PM 0 4 0 0 0 0 9 0 0 0 0 0 0 0 0 0 0 0 0 1 14 5:45 PM 0 8 0 0 0 0 8 0 0 0 0 0 0 0 0 0 0 0 0 0 16 NL NT NR NU NT2 SL ST SR SU EL ET ER EU WL WT WR WU WR2 S2T2 S2U2 TOTAL TOTAL VOLUMES :0 57 0 1 3 1 71 0 1 0 0 0 0 0 0 0 0 0 1 1 136 APPROACH %'s :0.00%93.44%0.00%1.64%4.92%1.37%97.26%0.00%1.37%50.00%50.00% PEAK HR :05:00 PM 293 0 0 TOTAL PEAK HR VOL :0 30 0 1 0 0 36 0 0 0 0 0 0 0 0 0 0 0 0 1 68 PEAK HR FACTOR :0.000 0.536 0.000 0.250 0.000 0.000 0.692 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.250 22-040120-001 7/19/2022 05:00 PM - 06:00 PM 0.6300.554 0.692 11:00 AM - 12:00 PM 0.9420.911 0.938 0.500 PM NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND NOON NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND SOUTHBOUND2 08:00 AM - 09:00 AM 0.9240.717 0.732 0.250 AM NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND Data - Bikes Carlsbad Blvd/Palomar Airport Rd Ramp Carlsbad Blvd/Palomar Airport Rd Ramp Solamar Dr Solamar Dr Nov. 15, 2023 Item #1 Page 32 of 159 National Data & Surveying ServicesIntersection Turning Movement Count Location:Carlsbad Blvd/Palomar Airport Rd Ramp & Solamar Dr Project ID: City:Carlsbad Date: NS/EW Streets: EB WB EB WB NB SB NB SB EB WB TOTAL 7:00 AM 0 0 3 2 1 1 0 0 0 0 7 7:15 AM 0 0 2 2 0 2 0 0 0 0 6 7:30 AM 0 0 3 0 3 0 0 0 0 0 6 7:45 AM 0 0 1 0 0 1 0 0 0 0 2 8:00 AM 0 0 1 0 1 0 0 0 0 0 2 8:15 AM 0 0 1 2 0 1 0 0 0 0 4 8:30 AM 0 0 0 1 1 1 0 0 0 0 3 8:45 AM 0 0 2 1 1 0 0 0 0 0 4 EB WB EB WB NB SB NB SB EB WB TOTAL TOTAL VOLUMES :0 0 13 8 7 6 0 0 0 0 34 APPROACH %'s :61.90%38.10%53.85%46.15% PEAK HR :08:00 AM 40 -1 -1 TOTAL PEAK HR VOL :0 0 4 4 3 2 0 0 0 0 13 PEAK HR FACTOR :0.500 0.500 0.750 0.500 Headers NEB NWB SEB SWB ENS ESB WNB WSB N2EB N2WB EB WB EB WB NB SB NB SB EB WB TOTAL 11:00 AM 0 0 2 1 0 2 0 0 0 0 5 11:15 AM 0 0 0 3 0 3 0 0 0 0 6 11:30 AM 0 0 2 2 3 0 0 0 0 0 7 11:45 AM 0 0 0 3 0 4 0 0 0 0 7 12:00 PM 0 0 2 0 2 0 0 0 0 0 4 12:15 PM 0 0 1 0 1 0 0 0 0 0 2 12:30 PM 0 0 4 3 4 2 0 0 0 0 13 12:45 PM 2 0 2 1 2 1 0 0 0 0 8 EB WB EB WB NB SB NB SB EB WB TOTAL TOTAL VOLUMES :2 0 13 13 12 12 0 0 0 0 52 APPROACH %'s :100.00%0.00%50.00%50.00%50.00%50.00% PEAK HR :11:00 AM 159 -2 -2 TOTAL PEAK HR VOL :0 0 4 9 3 9 0 0 0 0 25 PEAK HR FACTOR :0.500 0.750 0.250 0.563 EB WB EB WB NB SB NB SB EB WB TOTAL 4:00 PM 0 0 5 2 5 2 0 0 0 0 14 4:15 PM 0 0 4 1 3 2 0 0 0 0 10 4:30 PM 0 0 1 0 2 0 0 0 0 0 3 4:45 PM 0 0 1 0 0 0 0 0 0 0 1 5:00 PM 0 0 0 3 0 5 0 0 0 0 8 5:15 PM 0 0 0 0 0 2 0 0 0 0 2 5:30 PM 0 1 5 2 5 0 0 0 0 0 13 5:45 PM 0 0 0 4 0 0 0 0 0 0 4 EB WB EB WB NB SB NB SB EB WB TOTAL TOTAL VOLUMES :0 1 16 12 15 11 0 0 0 0 55 APPROACH %'s :0.00%100.00%57.14%42.86%57.69%42.31% PEAK HR :05:00 PM 290 -3 -3 TOTAL PEAK HR VOL :0 1 5 9 5 7 0 0 0 0 27 PEAK HR FACTOR :0.250 0.250 0.563 0.250 0.350 22-040120-001 7/19/2022 0.5190.250 0.500 0.600 05:00 PM - 06:00 PM NORTH LEG 2 11:00 AM - 12:00 PM 0.8930.813 0.750 PM NORTH LEG SOUTH LEG EAST LEG WEST LEG NOON NORTH LEG SOUTH LEG EAST LEG WEST LEG NORTH LEG 2 0.8130.667 0.625 08:00 AM - 09:00 AM AM NORTH LEG SOUTH LEG EAST LEG WEST LEG NORTH LEG 2 Data - Pedestrians (Crosswalks) Carlsbad Blvd/Palomar Airport Rd Ramp Carlsbad Blvd/Palomar Airport Rd Ramp Solamar Dr Solamar Dr Nov. 15, 2023 Item #1 Page 33 of 159 Prepared by National Data & Surveying Services ID:22-040120-001 Day: City:Carlsbad Date: AM 0 394 15 5 AM NOON 0 534 19 7 NOON PM 0 526 28 10 PM AM NOON PM PM NOON AM 0 2 1 0 0 13 9 14 1 0 0 0 0 0 0 0 0 5 11 4 0 0 0 0 TEV 665 958 1185 0 0 1 0 0 0 0 0 PHF 0.93 0.96 0.99 0 0 0 0 0 1 2 0 AM NOON PM PM NOON AM PM 43 0 543 17 PM NOON 26 0 345 6 NOON AM 24 0 200 9 AM 361 11:00 AM - 01:00 PM 05:00 PM - 06:00 PM 566 Carlsbad Blvd/Palomar Airport Rd Ramp & Solamar Dr Peak Hour Turning Movement Count Carlsbad Blvd/Palomar Airport Rd Ramp Tuesday SOUTHBOUND 7/19/2022 4:00 PM - 06:00 PMPE A K H O U R S 08:00 AM - 09:00 AM 219 7:00 AM - 09:00 AM CO U N T P E R I O D S 11:00 AM - 12:00 PM 45 26 24 Total (AM)574 Total Bikes (AM) So l a m a r D r EA S T B O U N D WE S T B O U N D So l a m a r D r 0 0 0 CONTROL Signalized Pedestrians (Crosswalks) Total (PM)Total Bikes (PM) 571 422 NORTHBOUND Carlsbad Blvd/Palomar Airport Rd Ramp Total (NOON)Total Bikes (NOON) NOONAM PM PM AM AM NOON PM PM NOON AM AM NOON PM NOON NO O N PM AM NO O N AM PM NO O N AM PMNO O N PM AM 0 0 0 0 0 0 5 4 4 994 5 3 3 7 9 2 100000 0 0 00 0 0 0 36 0 0300 1 0 10 0 0 0 60 0 0480 1 0 00 0 0 0 39 1 0400 13 0 50 0 0 0 52 6 28 1754 3 0 9 0 110 0 0 0 53 4 19 634 5 0 14 0 40 0 0 0 39 4 15 920 0 0 Nov. 15, 2023 Item #1 Page 34 of 159 ., .. '+lt t. .. .) ' .; c;' .. .,, ¢ National Data & Surveying ServicesIntersection Turning Movement Count Location:Carlsbad Blvd/Palomar Airport Rd Ramp & Solamar DrCity:Carlsbad Project ID: Control:Signalized Date: NS/EW Streets: Explanation for extra leg movements 1 2 0 0 0 1 2 0 0 0 0 0 0 0 1 0 0 0 0 0NLNTNRNUNT2SLSTSRSUELETEREUWLWTWRWUWR2S2T2S2U2 TOTAL Movements entering the extra leg 7:00 AM 0 22 1 5 3 1 33 0 1 0 0 0 0 0 0 0 0 3 0 1 70 S2U2 Movements coming from SB on Carlsbad Blvd entering into the Extra Leg (Palomar Airport Rd Ramp)7:15 AM 0 22 0 4 7 2 53 0 0 0 0 0 0 0 0 3 0 3 0 0 94 NT2 Movements coming from NB on Carlsbad Blvd entering into the Extra Leg (Palomar Airport Rd Ramp)7:30 AM 0 33 0 14 13 1 32 0 1 0 0 0 0 1 0 0 0 3 0 0 98 WR2 Movements coming from WB on Hilton Graden Inn entering into the Extra Leg (Palomar Airport Rd Ramp) 7:45 AM 0 26 0 7 14 6 38 0 0 0 0 0 0 3 0 1 0 7 0 1 1038:00 AM 0 36 2 3 13 3 59 0 1 0 0 0 0 2 0 4 0 4 0 1 128 Movements exiting the extra leg 8:15 AM 0 42 1 8 17 2 74 0 2 0 0 0 0 2 0 4 0 8 0 0 160 S2T2 Movements exiting from Extra Leg (Palomar Airport Rd Ramp) entering into Carlsbad Blvd heading SB8:30 AM 0 39 1 7 12 5 65 0 0 0 0 0 0 1 0 1 0 6 0 1 1388:45 AM 0 53 6 9 14 2 83 0 1 0 0 0 0 1 0 3 0 6 0 0 178 NL NT NR NU NT2 SL ST SR SU EL ET ER EU WL WT WR WU WR2 S2T2 S2U2 TOTALTOTAL VOLUMES :0 273 11 57 93 22 437 0 6 0 0 0 0 10 0 16 0 40 0 4 969 APPROACH %'s :0.00%62.90%2.53%13.13%21.43%4.73%93.98%0.00%1.29%15.15%0.00%24.24%0.00%60.61%0.00%100.00%PEAK HR :08:00 AM 41 0 0 TOTAL PEAK HR VOL :0 170 10 27 56 12 281 0 4 0 0 0 0 6 0 12 0 24 0 2 604 PEAK HR FACTOR :0.000 0.802 0.417 0.750 0.824 0.600 0.846 0.000 0.500 0.000 0.000 0.000 0.000 0.750 0.000 0.750 0.000 0.750 0.000 0.500 Headers NBL NBT NBR NBU NBT2 SBL SBT SBR SBU EBL EBT EBR EBU WBL WBT WBR WBU WBR2 SB2T2 SB2U2 1 2 0 0 0 1 2 0 0 0 0 0 0 0 1 0 0 0 0 0NLNTNRNUNT2SLSTSRSUELETEREUWLWTWRWUWR2S2T2S2U2 TOTAL 11:00 AM 0 93 4 5 23 4 156 0 6 0 0 0 0 1 0 5 0 13 0 0 31011:15 AM 0 99 0 9 28 3 125 0 1 0 0 0 0 0 0 0 0 9 0 0 274 11:30 AM 0 104 3 8 32 4 113 0 1 0 0 0 0 0 0 3 0 3 0 2 27311:45 AM 0 96 0 11 30 3 147 0 2 0 0 0 0 0 0 1 0 6 0 0 29612:00 PM 0 149 1 6 27 8 151 0 6 0 0 0 0 4 0 3 0 4 0 4 363 12:15 PM 0 109 1 7 27 3 167 0 3 0 0 0 0 0 0 5 0 4 0 3 32912:30 PM 0 118 3 8 47 5 149 0 1 0 0 0 0 2 0 1 0 7 0 3 344 12:45 PM 0 119 2 11 22 6 181 0 1 0 0 0 0 1 0 1 0 5 0 0 349 NL NT NR NU NT2 SL ST SR SU EL ET ER EU WL WT WR WU WR2 S2T2 S2U2 TOTAL TOTAL VOLUMES :0 887 14 65 236 36 1189 0 21 0 0 0 0 8 0 19 0 51 0 12 2538APPROACH %'s :0.00%73.79%1.16%5.41%19.63%2.89%95.43%0.00%1.69%10.26%0.00%24.36%0.00%65.38%0.00%100.00% PEAK HR :12:00 PM 165 0 0 TOTAL PEAK HR VOL :0 495 7 32 123 22 648 0 11 0 0 0 0 7 0 10 0 20 0 10 1385 PEAK HR FACTOR :0.000 0.831 0.583 0.727 0.654 0.688 0.895 0.000 0.458 0.000 0.000 0.000 0.000 0.438 0.000 0.500 0.000 0.714 0.000 0.625 1 2 0 0 0 1 2 0 0 0 0 0 0 0 1 0 0 0 0 0 NL NT NR NU NT2 SL ST SR SU EL ET ER EU WL WT WR WU WR2 S2T2 S2U2 TOTAL4:00 PM 0 153 3 10 42 14 174 0 1 0 0 0 0 3 0 3 0 7 0 1 411 4:15 PM 0 148 1 9 54 11 163 0 1 0 0 0 0 2 0 1 0 2 0 2 3944:30 PM 0 134 5 11 38 9 161 0 0 0 0 0 0 0 0 0 0 9 0 1 3684:45 PM 0 93 5 12 36 8 130 0 5 0 0 0 0 1 0 3 0 4 0 2 299 5:00 PM 0 106 1 9 44 8 131 0 2 0 0 0 0 1 0 4 0 6 0 1 3135:15 PM 0 117 3 6 26 5 132 0 3 0 0 0 0 1 0 1 0 2 0 1 297 5:30 PM 0 96 0 4 35 8 136 0 4 0 0 0 0 1 0 3 0 7 0 0 2945:45 PM 0 100 1 4 35 3 136 0 3 0 0 0 0 1 0 2 0 3 0 2 290 NL NT NR NU NT2 SL ST SR SU EL ET ER EU WL WT WR WU WR2 S2T2 S2U2 TOTALTOTAL VOLUMES :0 947 19 65 310 66 1163 0 19 0 0 0 0 10 0 17 0 40 0 10 2666APPROACH %'s :0.00%70.62%1.42%4.85%23.12%5.29%93.19%0.00%1.52%14.93%0.00%25.37%0.00%59.70%0.00%100.00% PEAK HR :04:00 PM 289 0 0 TOTAL PEAK HR VOL :0 528 14 42 170 42 628 0 7 0 0 0 0 6 0 7 0 22 0 6 1472PEAK HR FACTOR :0.000 0.863 0.700 0.875 0.787 0.750 0.902 0.000 0.350 0.000 0.000 0.000 0.000 0.500 0.000 0.583 0.000 0.611 0.000 0.750 22-040120-001 7/23/2022 04:00 PM - 05:00 PM 0.8950.889 0.896 0.673 12:00 PM - 01:00 PM 0.9540.898 0.906 0.841 PM NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND NOON NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND SOUTHBOUND2 08:00 AM - 09:00 AM 0.8480.802 0.863 0.750 AM NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND Data - Totals Carlsbad Blvd/Palomar Airport Rd Ramp Carlsbad Blvd/Palomar Airport Rd Ramp Solamar Dr Solamar Dr Nov. 15, 2023 Item #1 Page 35 of 159 National Data & Surveying ServicesIntersection Turning Movement Count Location:Carlsbad Blvd/Palomar Airport Rd Ramp & Solamar Dr City:Carlsbad Project ID: Control:Signalized Date: NS/EW Streets: 1 2 0 0 0 1 2 0 0 0 0 0 0 0 1 0 0 0 0 0 NL NT NR NU NT2 SL ST SR SU EL ET ER EU WL WT WR WU WR2 S2T2 S2U2 TOTAL 7:00 AM 0 5 0 0 0 0 9 0 0 0 0 0 0 0 0 0 0 0 0 0 14 7:15 AM 0 16 0 0 0 0 11 0 0 0 0 0 0 0 0 0 0 0 0 0 27 7:30 AM 0 7 0 2 0 0 18 0 0 0 0 0 0 0 0 0 0 0 0 0 27 7:45 AM 0 11 0 0 1 0 20 0 0 0 0 0 0 0 0 0 0 0 0 0 32 8:00 AM 0 28 0 1 0 0 22 0 0 0 0 0 0 0 0 0 0 0 0 0 518:15 AM 0 19 0 1 0 0 23 0 2 0 0 0 0 0 0 0 0 0 0 0 458:30 AM 0 23 2 0 0 0 22 0 2 0 0 0 0 0 0 0 0 0 0 0 498:45 AM 0 77 0 0 1 0 23 0 7 0 0 0 0 0 0 0 0 0 0 0 108 NL NT NR NU NT2 SL ST SR SU EL ET ER EU WL WT WR WU WR2 S2T2 S2U2 TOTAL TOTAL VOLUMES :0 186 2 4 2 0 148 0 11 0 0 0 0 0 0 0 0 0 0 0 353 APPROACH %'s :0.00%95.88%1.03%2.06%1.03%0.00%93.08%0.00%6.92% PEAK HR :08:00 AM 41 0 0 TOTAL PEAK HR VOL :0 147 2 2 1 0 90 0 11 0 0 0 0 0 0 0 0 0 0 0 253 PEAK HR FACTOR :0.000 0.477 0.250 0.500 0.250 0.000 0.978 0.000 0.393 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Headers NBL NBT NBR NBU NBT2 SBL SBT SBR SBU EBL EBT EBR EBU WBL WBT WBR WBU WBR2 SB2T2 SB2U2 1 2 0 0 0 1 2 0 0 0 0 0 0 0 1 0 0 0 0 0NLNTNRNUNT2SLSTSRSUELETEREUWLWTWRWUWR2S2T2S2U2 TOTAL11:00 AM 0 18 0 0 0 0 43 0 0 0 0 0 0 0 0 0 0 0 0 0 6111:15 AM 0 27 0 0 1 0 54 0 1 0 0 0 0 0 0 0 0 0 0 0 8311:30 AM 0 19 0 1 3 0 39 0 0 0 0 0 0 0 0 0 0 0 0 0 6211:45 AM 0 28 1 0 3 0 28 0 2 0 0 0 0 0 0 0 0 0 0 0 62 12:00 PM 0 23 0 1 3 0 26 0 1 0 0 0 0 2 0 0 0 0 0 0 56 12:15 PM 0 30 0 0 0 2 25 0 0 0 0 0 0 0 0 2 0 0 0 0 59 12:30 PM 0 18 0 0 2 0 25 0 0 0 0 0 0 0 0 0 0 0 0 0 45 12:45 PM 0 32 0 1 2 0 32 0 0 0 0 0 0 0 0 0 0 0 0 0 67 NL NT NR NU NT2 SL ST SR SU EL ET ER EU WL WT WR WU WR2 S2T2 S2U2 TOTAL TOTAL VOLUMES :0 195 1 3 14 2 272 0 4 0 0 0 0 2 0 2 0 0 0 0 495 APPROACH %'s :0.00%91.55%0.47%1.41%6.57%0.72%97.84%0.00%1.44%50.00%0.00%50.00%0.00%0.00% PEAK HR :12:00 PM 165 0 0 TOTAL PEAK HR VOL :0 103 0 2 7 2 108 0 1 0 0 0 0 2 0 2 0 0 0 0 227 PEAK HR FACTOR :0.000 0.805 0.000 0.500 0.583 0.250 0.844 0.000 0.250 0.000 0.000 0.000 0.000 0.250 0.000 0.250 0.000 0.000 0.000 0.000 1 2 0 0 0 1 2 0 0 0 0 0 0 0 1 0 0 0 0 0NLNTNRNUNT2SLSTSRSUELETEREUWLWTWRWUWR2S2T2S2U2 TOTAL4:00 PM 0 12 0 0 0 0 8 0 0 0 0 0 0 0 0 0 0 0 0 0 204:15 PM 0 5 0 0 1 0 9 0 0 0 0 0 0 0 0 0 0 0 0 0 154:30 PM 0 13 0 0 0 0 14 0 0 0 0 0 0 0 0 0 0 0 0 0 274:45 PM 0 12 1 0 0 0 8 0 0 0 0 0 0 0 0 1 0 0 0 0 22 5:00 PM 0 12 0 0 0 0 6 0 0 0 0 0 0 0 0 0 0 0 0 0 18 5:15 PM 0 6 0 0 2 0 22 0 0 0 0 0 0 0 0 0 0 0 0 0 30 5:30 PM 0 16 0 1 1 0 10 0 0 0 0 0 0 0 0 0 0 0 0 1 29 5:45 PM 0 5 0 0 0 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 8 NL NT NR NU NT2 SL ST SR SU EL ET ER EU WL WT WR WU WR2 S2T2 S2U2 TOTAL TOTAL VOLUMES :0 81 1 1 4 0 80 0 0 0 0 0 0 0 0 1 0 0 0 1 169 APPROACH %'s :0.00%93.10%1.15%1.15%4.60%0.00%100.00%0.00%0.00%0.00%0.00%100.00%0.00%0.00%0.00%100.00% PEAK HR :04:00 PM 289 0 0 TOTAL PEAK HR VOL :0 42 1 0 1 0 39 0 0 0 0 0 0 0 0 1 0 0 0 0 84 PEAK HR FACTOR :0.000 0.808 0.250 0.000 0.250 0.000 0.696 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.250 0.000 0.000 0.000 0.000 22-040120-001 7/23/2022 04:00 PM - 05:00 PM 0.7780.846 0.696 0.250 12:00 PM - 01:00 PM 0.8470.800 0.867 0.500 PM NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND NOON NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND SOUTHBOUND2 08:00 AM - 09:00 AM 0.5860.487 0.842 AM NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND Data - Bikes Carlsbad Blvd/Palomar Airport Rd Ramp Carlsbad Blvd/Palomar Airport Rd Ramp Solamar Dr Solamar Dr Nov. 15, 2023 Item #1 Page 36 of 159 National Data & Surveying ServicesIntersection Turning Movement Count Location:Carlsbad Blvd/Palomar Airport Rd Ramp & Solamar Dr Project ID: City:Carlsbad Date: NS/EW Streets: EB WB EB WB NB SB NB SB EB WB TOTAL 7:00 AM 0 0 0 4 0 1 0 0 0 0 5 7:15 AM 0 1 1 2 2 2 0 0 0 1 9 7:30 AM 0 1 3 0 1 1 0 0 1 1 8 7:45 AM 0 0 0 1 1 0 0 0 0 0 2 8:00 AM 0 0 0 0 0 2 0 0 4 0 6 8:15 AM 0 0 2 1 0 1 0 0 0 0 4 8:30 AM 0 0 0 5 0 1 0 0 0 0 6 8:45 AM 0 0 3 3 1 0 0 0 0 0 7 EB WB EB WB NB SB NB SB EB WB TOTAL TOTAL VOLUMES :0 2 9 16 5 8 0 0 5 2 47 APPROACH %'s :0.00%100.00%36.00%64.00%38.46%61.54%71.43%28.57% PEAK HR :08:00 AM 40 -1 -1 TOTAL PEAK HR VOL :0 0 5 9 1 4 0 0 4 0 23 PEAK HR FACTOR :0.417 0.450 0.250 0.500 0.250 Headers NEB NWB SEB SWB ENS ESB WNB WSB N2EB N2WB EB WB EB WB NB SB NB SB EB WB TOTAL 11:00 AM 0 0 0 0 0 0 0 0 0 0 0 11:15 AM 0 0 8 0 6 0 0 0 0 0 14 11:30 AM 0 0 0 0 0 0 0 0 0 0 0 11:45 AM 0 0 0 2 1 0 0 0 0 0 3 12:00 PM 0 0 0 1 0 0 0 0 0 0 1 12:15 PM 0 0 0 5 0 0 0 0 1 0 6 12:30 PM 0 0 0 0 0 0 0 0 0 0 0 12:45 PM 0 0 0 0 0 0 0 0 0 0 0 EB WB EB WB NB SB NB SB EB WB TOTAL TOTAL VOLUMES :0 0 8 8 7 0 0 0 1 0 24 APPROACH %'s :50.00%50.00%100.00%0.00%100.00%0.00% PEAK HR :12:00 PM 163 -2 -2 TOTAL PEAK HR VOL :0 0 0 6 0 0 0 0 1 0 7 PEAK HR FACTOR :0.300 0.250 EB WB EB WB NB SB NB SB EB WB TOTAL 4:00 PM 0 0 9 6 0 0 0 0 0 0 15 4:15 PM 0 0 2 2 0 0 0 0 0 0 4 4:30 PM 0 0 6 2 0 0 0 0 0 0 8 4:45 PM 0 0 0 1 1 0 0 0 0 0 2 5:00 PM 0 0 1 1 0 0 0 0 0 0 2 5:15 PM 0 0 0 3 1 0 0 0 0 0 4 5:30 PM 0 0 0 1 0 0 0 0 0 0 1 5:45 PM 0 0 6 3 0 0 0 0 0 0 9 EB WB EB WB NB SB NB SB EB WB TOTAL TOTAL VOLUMES :0 0 24 19 2 0 0 0 0 0 45 APPROACH %'s :55.81%44.19%100.00%0.00% PEAK HR :04:00 PM 286 -3 -3 TOTAL PEAK HR VOL :0 0 17 11 1 0 0 0 0 0 29 PEAK HR FACTOR :0.472 0.458 0.250 22-040120-001 7/23/2022 0.4830.467 0.250 04:00 PM - 05:00 PM NORTH LEG 2 12:00 PM - 01:00 PM 0.2920.300 PM NORTH LEG SOUTH LEG EAST LEG WEST LEG 0.250 NOON NORTH LEG SOUTH LEG EAST LEG WEST LEG NORTH LEG 2 0.8210.583 0.625 0.250 08:00 AM - 09:00 AM AM NORTH LEG SOUTH LEG EAST LEG WEST LEG NORTH LEG 2 Data - Pedestrians (Crosswalks) Carlsbad Blvd/Palomar Airport Rd Ramp Carlsbad Blvd/Palomar Airport Rd Ramp Solamar Dr Solamar Dr Nov. 15, 2023 Item #1 Page 37 of 159 Prepared by National Data & Surveying Services ID:22-040120-001 Day: City:Carlsbad Date: AM 0 281 12 4 AM NOON 0 648 22 11 NOON PM 0 628 42 7 PM AM NOON PM PM NOON AM 0 2 1 0 0 7 10 12 1 0 0 0 0 0 0 0 0 6 7 6 0 0 0 0 TEV 522 1232 1274 0 0 0 0 0 0 0 0 PHF 0.85 0.95 0.90 0 0 0 0 0 1 2 0 AM NOON PM PM NOON AM PM 42 0 528 14 PM NOON 32 0 495 7 NOON AM 27 0 170 10 AM 516 11:00 AM - 01:00 PM 04:00 PM - 05:00 PM 542 Carlsbad Blvd/Palomar Airport Rd Ramp & Solamar Dr Peak Hour Turning Movement Count Carlsbad Blvd/Palomar Airport Rd Ramp Saturday SOUTHBOUND 7/23/2022 4:00 PM - 06:00 PMPE A K H O U R S 08:00 AM - 09:00 AM 186 7:00 AM - 09:00 AM CO U N T P E R I O D S 12:00 PM - 01:00 PM 56 29 22 Total (AM)676 Total Bikes (AM) So l a m a r D r EA S T B O U N D WE S T B O U N D So l a m a r D r 0 0 0 CONTROL Signalized Pedestrians (Crosswalks) Total (PM)Total Bikes (PM) 687 314 NORTHBOUND Carlsbad Blvd/Palomar Airport Rd Ramp Total (NOON)Total Bikes (NOON) NOONAM PM PM AM AM NOON PM PM NOON AM AM NOON PM NOON NO O N PM AM NO O N AM PM NO O N AM PMNO O N PM AM 0 0 0 0 0 0 17 0 5 1169 1 0 1 0 0 4 000000 1 0 00 0 0 0 39 0 1420 2 0 20 0 0 0 10 8 2 010 3 0 0 0 00 0 0 0 90 0 214 7 0 7 0 60 0 0 0 62 8 42 1452 8 0 10 0 70 0 0 0 64 8 22 749 5 0 12 0 60 0 0 0 28 1 12 1017 0 0 Nov. 15, 2023 Item #1 Page 38 of 159 ., .. '+lt t. .. .) ' .; c;' .. .,, ¢ National Data & Surveying ServicesIntersection Turning Movement Count Location:Carlsbad Blvd & Island Way City:Carlsbad Project ID: Control:Signalized Date: NS/EW Streets: 0 2 0 0 1 2 0 0 0 0 0 0 0 1 0 0 NL NT NR NU SL ST SR SU EL ET ER EU WL WT WR WU TOTAL 7:00 AM 0 38 1 0 2 64 0 3 0 0 0 0 1 0 0 0 109 7:15 AM 0 42 3 0 0 72 0 3 0 0 0 0 1 0 2 0 123 7:30 AM 0 47 0 0 1 71 0 8 0 0 0 0 1 0 3 0 131 7:45 AM 0 53 2 0 3 104 0 9 0 0 0 0 5 0 2 0 178 8:00 AM 0 82 2 0 1 95 0 6 0 0 0 0 4 0 3 0 193 8:15 AM 0 63 2 0 3 87 0 13 0 0 0 0 4 0 2 0 174 8:30 AM 0 70 3 0 4 100 0 7 0 0 0 0 1 0 1 0 186 8:45 AM 0 73 1 0 6 84 0 7 0 0 0 0 2 0 4 0 177 NL NT NR NU SL ST SR SU EL ET ER EU WL WT WR WU TOTAL TOTAL VOLUMES :0 468 14 0 20 677 0 56 0 0 0 0 19 0 17 0 1271 APPROACH %'s :0.00%97.10%2.90%0.00%2.66%89.91%0.00%7.44%52.78%0.00%47.22%0.00% PEAK HR :07:45 AM 40 0 0 TOTAL PEAK HR VOL :0 268 9 0 11 386 0 35 0 0 0 0 14 0 8 0 731 PEAK HR FACTOR :0.000 0.817 0.750 0.000 0.688 0.928 0.000 0.673 0.000 0.000 0.000 0.000 0.700 0.000 0.667 0.000 Headers NBL NBT NBR NBU SBL SBT SBR SBU EBL EBT EBR EBU WBL WBT WBR WBU 0 2 0 0 1 2 0 0 0 0 0 0 0 1 0 0 NL NT NR NU SL ST SR SU EL ET ER EU WL WT WR WU TOTAL 11:00 AM 0 93 3 0 9 124 0 16 0 0 0 0 4 0 4 0 253 11:15 AM 0 99 6 0 5 129 0 8 0 0 0 0 4 0 1 0 252 11:30 AM 0 102 9 0 3 119 0 8 0 0 0 0 4 0 3 0 248 11:45 AM 0 120 2 0 5 127 0 13 0 0 0 0 4 0 3 0 274 12:00 PM 0 109 4 0 7 119 0 15 0 0 0 0 5 0 5 0 264 12:15 PM 0 110 2 0 4 103 0 18 0 0 0 0 5 0 4 0 246 12:30 PM 0 113 4 0 6 124 0 17 0 0 0 0 2 0 6 0 272 12:45 PM 0 100 8 0 4 110 0 12 0 0 0 0 5 0 1 0 240 NL NT NR NU SL ST SR SU EL ET ER EU WL WT WR WU TOTAL TOTAL VOLUMES :0 846 38 0 43 955 0 107 0 0 0 0 33 0 27 0 2049 APPROACH %'s :0.00%95.70%4.30%0.00%3.89%86.43%0.00%9.68%55.00%0.00%45.00%0.00% PEAK HR :11:45 AM 164 0 0 TOTAL PEAK HR VOL :0 452 12 0 22 473 0 63 0 0 0 0 16 0 18 0 1056 PEAK HR FACTOR :0.000 0.942 0.750 0.000 0.786 0.931 0.000 0.875 0.000 0.000 0.000 0.000 0.800 0.000 0.750 0.000 0 2 0 0 1 2 0 0 0 0 0 0 0 1 0 0 NL NT NR NU SL ST SR SU EL ET ER EU WL WT WR WU TOTAL 4:00 PM 0 187 4 0 3 149 0 13 0 0 0 0 2 0 4 0 362 4:15 PM 0 194 8 0 7 141 0 13 0 0 0 0 7 0 5 0 375 4:30 PM 0 174 8 0 7 117 0 14 0 0 0 0 3 0 3 0 326 4:45 PM 0 187 5 0 7 110 0 20 0 0 0 0 4 0 3 0 336 5:00 PM 0 173 4 0 4 118 0 21 0 0 0 0 5 0 5 0 330 5:15 PM 0 166 4 0 8 137 0 19 0 0 0 0 1 0 4 0 339 5:30 PM 0 199 11 0 5 102 0 19 0 0 0 0 2 0 4 0 342 5:45 PM 0 186 8 0 4 106 0 18 0 0 0 0 5 0 3 0 330 NL NT NR NU SL ST SR SU EL ET ER EU WL WT WR WU TOTAL TOTAL VOLUMES :0 1466 52 0 45 980 0 137 0 0 0 0 29 0 31 0 2740 APPROACH %'s :0.00%96.57%3.43%0.00%3.87%84.34%0.00%11.79%48.33%0.00%51.67%0.00% PEAK HR :04:00 PM 289 0 0 TOTAL PEAK HR VOL :0 742 25 0 24 517 0 60 0 0 0 0 16 0 15 0 1399 PEAK HR FACTOR :0.000 0.956 0.781 0.000 0.857 0.867 0.000 0.750 0.000 0.000 0.000 0.000 0.571 0.000 0.750 0.000 22-040120-002 7/19/2022 04:00 PM - 05:00 PM 0.9330.949 0.911 0.646 11:45 AM - 12:45 PM 0.9640.951 0.949 0.850 07:45 AM - 08:45 AM 0.947 PM NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND NOON NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND 0.824 0.931 0.786 AM NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND Data - Totals Carlsbad Blvd Carlsbad Blvd Island Way Island Way Nov. 15, 2023 Item #1 Page 39 of 159 National Data & Surveying ServicesIntersection Turning Movement Count Location:Carlsbad Blvd & Island Way City:Carlsbad Project ID: Control:Signalized Date: NS/EW Streets: 0 2 0 0 1 2 0 0 0 0 0 0 0 1 0 0 NL NT NR NU SL ST SR SU EL ET ER EU WL WT WR WU TOTAL 7:00 AM 0 4 0 0 0 4 0 0 0 0 0 0 0 0 0 0 8 7:15 AM 0 4 0 0 0 6 0 0 0 0 0 0 1 0 0 0 11 7:30 AM 0 8 0 0 0 3 0 0 0 0 0 0 0 0 0 0 11 7:45 AM 0 11 0 0 1 14 0 1 0 0 0 0 0 0 0 0 27 8:00 AM 0 4 0 0 0 10 0 2 0 0 0 0 0 0 0 0 16 8:15 AM 0 11 2 1 0 6 0 1 0 0 0 0 0 0 0 0 21 8:30 AM 0 17 0 0 0 7 0 0 0 0 0 0 0 0 0 0 24 8:45 AM 0 7 1 0 0 13 0 0 0 0 0 0 0 0 0 0 21 NL NT NR NU SL ST SR SU EL ET ER EU WL WT WR WU TOTAL TOTAL VOLUMES :0 66 3 1 1 63 0 4 0 0 0 0 1 0 0 0 139 APPROACH %'s :0.00%94.29%4.29%1.43%1.47%92.65%0.00%5.88%100.00%0.00%0.00%0.00% PEAK HR :07:45 AM 40 0 0 TOTAL PEAK HR VOL :0 43 2 1 1 37 0 4 0 0 0 0 0 0 0 0 88 PEAK HR FACTOR :0.000 0.632 0.250 0.250 0.250 0.661 0.000 0.500 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Headers NBL NBT NBR NBU SBL SBT SBR SBU EBL EBT EBR EBU WBL WBT WBR WBU 0 2 0 0 1 2 0 0 0 0 0 0 0 1 0 0 NL NT NR NU SL ST SR SU EL ET ER EU WL WT WR WU TOTAL 11:00 AM 0 12 5 1 0 14 0 0 0 0 0 0 1 0 0 0 33 11:15 AM 0 9 0 0 0 14 0 0 0 0 0 0 0 0 2 0 25 11:30 AM 0 12 1 0 2 8 0 2 0 0 0 0 0 0 0 0 25 11:45 AM 0 13 0 0 0 19 0 0 0 0 0 0 0 0 0 0 32 12:00 PM 0 11 0 0 0 4 0 1 0 0 0 0 0 0 4 0 20 12:15 PM 0 12 0 0 1 11 0 2 0 0 0 0 0 0 0 0 26 12:30 PM 0 14 0 0 0 9 0 0 0 0 0 0 0 0 2 0 25 12:45 PM 0 10 0 0 0 13 0 3 0 0 0 0 0 0 1 0 27 NL NT NR NU SL ST SR SU EL ET ER EU WL WT WR WU TOTAL TOTAL VOLUMES :0 93 6 1 3 92 0 8 0 0 0 0 1 0 9 0 213 APPROACH %'s :0.00%93.00%6.00%1.00%2.91%89.32%0.00%7.77%10.00%0.00%90.00%0.00% PEAK HR :11:45 AM 164 0 0 TOTAL PEAK HR VOL :0 50 0 0 1 43 0 3 0 0 0 0 0 0 6 0 103 PEAK HR FACTOR :0.000 0.893 0.000 0.000 0.250 0.566 0.000 0.375 0.000 0.000 0.000 0.000 0.000 0.000 0.375 0.000 0 2 0 0 1 2 0 0 0 0 0 0 0 1 0 0 NL NT NR NU SL ST SR SU EL ET ER EU WL WT WR WU TOTAL 4:00 PM 0 9 1 1 1 9 0 0 0 0 0 0 1 0 1 0 23 4:15 PM 0 3 0 1 1 9 0 0 0 0 0 0 0 0 2 0 16 4:30 PM 0 11 2 0 0 10 0 2 0 0 0 0 0 0 0 0 25 4:45 PM 0 1 1 1 0 6 0 0 0 0 0 0 0 0 0 0 9 5:00 PM 0 5 0 0 0 8 0 0 0 0 0 0 0 0 1 0 14 5:15 PM 0 11 0 0 0 11 0 0 0 0 0 0 0 0 0 0 22 5:30 PM 0 6 0 0 0 11 0 0 0 0 0 0 0 0 2 0 19 5:45 PM 0 6 0 0 1 6 0 0 0 0 0 0 0 0 1 0 14 NL NT NR NU SL ST SR SU EL ET ER EU WL WT WR WU TOTAL TOTAL VOLUMES :0 52 4 3 3 70 0 2 0 0 0 0 1 0 7 0 142 APPROACH %'s :0.00%88.14%6.78%5.08%4.00%93.33%0.00%2.67%12.50%0.00%87.50%0.00% PEAK HR :04:00 PM 289 0 0 TOTAL PEAK HR VOL :0 24 4 3 2 34 0 2 0 0 0 0 1 0 3 0 73 PEAK HR FACTOR :0.000 0.545 0.500 0.750 0.500 0.850 0.000 0.250 0.000 0.000 0.000 0.000 0.250 0.000 0.375 0.000 22-040120-002 7/19/2022 04:00 PM - 05:00 PM 0.7300.596 0.792 0.500 11:45 AM - 12:45 PM 0.8050.893 0.618 0.375 07:45 AM - 08:45 AM 0.815 PM NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND NOON NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND 0.676 0.656 AM NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND Data - Bikes Carlsbad Blvd Carlsbad Blvd Island Way Island Way Nov. 15, 2023 Item #1 Page 40 of 159 National Data & Surveying ServicesIntersection Turning Movement CountLocation:Carlsbad Blvd & Island Way Project ID: City:Carlsbad Date: NS/EW Streets: EB WB EB WB NB SB NB SB TOTAL 7:00 AM 4 0 0 0 0 0 0 0 4 7:15 AM 1 2 0 0 0 0 0 0 3 7:30 AM 2 0 0 0 0 0 0 0 2 7:45 AM 5 5 0 0 0 0 0 0 10 8:00 AM 5 11 0 0 0 0 0 0 16 8:15 AM 2 5 0 0 0 0 0 0 7 8:30 AM 0 1 1 0 1 0 0 0 3 8:45 AM 9 6 0 0 0 0 0 0 15 EB WB EB WB NB SB NB SB TOTAL TOTAL VOLUMES :28 30 1 0 1 0 0 0 60 APPROACH %'s :48.28%51.72%100.00%0.00%100.00%0.00% PEAK HR :07:45 AM 39 -1 -1 TOTAL PEAK HR VOL :12 22 1 0 1 0 0 0 36 PEAK HR FACTOR :0.600 0.500 0.250 0.250 Headers NEB NWB SEB SWB ENS ESB WNB WSB EB WB EB WB NB SB NB SB TOTAL 11:00 AM 0 3 0 0 0 0 0 0 3 11:15 AM 0 5 0 0 0 0 0 0 5 11:30 AM 6 7 0 0 1 0 0 0 14 11:45 AM 8 2 0 0 0 0 0 0 10 12:00 PM 7 0 0 0 0 1 0 0 8 12:15 PM 9 1 1 0 0 0 0 0 11 12:30 PM 0 1 0 0 0 0 0 0 1 12:45 PM 7 6 0 0 0 0 0 0 13 EB WB EB WB NB SB NB SB TOTAL TOTAL VOLUMES :37 25 1 0 1 1 0 0 65 APPROACH %'s :59.68%40.32%100.00%0.00%50.00%50.00% PEAK HR :11:45 AM 162 -2 -2 TOTAL PEAK HR VOL :24 4 1 0 0 1 0 0 30 PEAK HR FACTOR :0.667 0.500 0.250 0.250 EB WB EB WB NB SB NB SB TOTAL 4:00 PM 8 1 0 0 0 0 0 0 9 4:15 PM 2 0 0 0 0 0 0 0 2 4:30 PM 3 11 0 0 0 0 0 0 14 4:45 PM 3 4 0 0 0 1 0 0 8 5:00 PM 4 7 0 0 0 0 0 0 11 5:15 PM 5 8 0 0 0 0 0 0 13 5:30 PM 13 8 0 0 0 0 0 0 21 5:45 PM 4 2 0 0 0 0 0 0 6 EB WB EB WB NB SB NB SB TOTAL TOTAL VOLUMES :42 41 0 0 0 1 0 0 84 APPROACH %'s :50.60%49.40%0.00%100.00% PEAK HR :04:00 PM 286 -3 -3 TOTAL PEAK HR VOL :16 16 0 0 0 1 0 0 33 PEAK HR FACTOR :0.500 0.364 0.250 22-040120-002 7/19/2022 0.5890.571 0.250 04:00 PM - 05:00 PM 11:45 AM - 12:45 PM 0.6820.700 0.250 0.250 0.5630.531 PM NORTH LEG SOUTH LEG EAST LEG WEST LEG NOON NORTH LEG SOUTH LEG EAST LEG WEST LEG 0.250 0.250 07:45 AM - 08:45 AM AM NORTH LEG SOUTH LEG EAST LEG WEST LEG Data - Pedestrians (Crosswalks) Carlsbad Blvd Carlsbad Blvd Island Way Island Way Nov. 15, 2023 Item #1 Page 41 of 159 Prepared by National Data & Surveying Services ID:22-040120-002 Day: City:Carlsbad Date: AM 0 386 11 35 AM NOON 0 473 22 63 NOON PM 0 517 24 60 PM AM NOON PM PM NOON AM 0 2 1 0 0 15 18 8 1 0 0 0 0 0 0 0 0 16 16 14 0 0 0 0 TEV 731 1056 1399 0 0 0 0 0 0 0 0 PHF 0.95 0.96 0.93 0 0 0 0 0 0 2 0 AM NOON PM PM NOON AM PM 0 0 742 25 PM NOON 0 0 452 12 NOON AM 0 0 268 9 AM 533 11:00 AM - 01:00 PM 04:00 PM - 05:00 PM 817 Carlsbad Blvd & Island Way Peak Hour Turning Movement Count Carlsbad Blvd Tuesday SOUTHBOUND 7/19/2022 4:00 PM - 06:00 PMPE A K H O U R S 07:45 AM - 08:45 AM 311 7:00 AM - 09:00 AM CO U N T P E R I O D S 11:45 AM - 12:45 PM 49 34 20 Total (AM)533 Total Bikes (AM) Is l a n d W a y EA S T B O U N D WE S T B O U N D Is l a n d W a y 0 0 0 CONTROL Signalized Pedestrians (Crosswalks) Total (PM)Total Bikes (PM) 489 400 NORTHBOUND Carlsbad Blvd Total (NOON)Total Bikes (NOON) NOONAM PM PM AM AM NOON PM PM NOON AM AM NOON PM NOON NO O N PM AM NO O N AM PM NO O N AM PMNO O N PM AM 0 0 0 0 0 0 0 1 1 000 0 0 1 1 1 0 16422162412 3 0 10 0 0 0 34 2 4240 6 0 00 0 0 0 43 1 0500 0 0 00 0 0 0 37 1 2430 15 0 160 0 0 0 51 7 24 2574 2 0 18 0 160 0 0 0 47 3 22 1245 2 0 8 0 140 0 0 0 38 6 11 926 8 0 Nov. 15, 2023 Item #1 Page 42 of 159 ., .. '+lt t. .. .) ' .; c;' .. .,, ¢ National Data & Surveying ServicesIntersection Turning Movement Count Location:Carlsbad Blvd & Island Way City:Carlsbad Project ID: Control:Signalized Date: NS/EW Streets: 0 2 0 0 1 2 0 0 0 0 0 0 0 1 0 0 NL NT NR NU SL ST SR SU EL ET ER EU WL WT WR WU TOTAL 7:00 AM 0 27 1 0 3 28 0 1 0 0 0 0 0 0 1 0 61 7:15 AM 0 24 4 0 3 39 0 7 0 0 0 0 5 0 2 0 84 7:30 AM 0 47 0 0 3 27 0 7 0 0 0 0 1 0 2 0 87 7:45 AM 0 37 4 0 2 43 0 6 0 0 0 0 1 0 3 0 96 8:00 AM 0 48 1 0 3 45 0 11 0 0 0 0 2 0 0 0 110 8:15 AM 0 55 2 0 5 67 0 5 0 0 0 0 1 0 3 0 138 8:30 AM 0 54 5 0 3 63 0 9 0 0 0 0 4 0 2 0 140 8:45 AM 0 62 4 0 5 79 0 10 0 0 0 0 3 0 3 0 166 NL NT NR NU SL ST SR SU EL ET ER EU WL WT WR WU TOTAL TOTAL VOLUMES :0 354 21 0 27 391 0 56 0 0 0 0 17 0 16 0 882 APPROACH %'s :0.00%94.40%5.60%0.00%5.70%82.49%0.00%11.81%51.52%0.00%48.48%0.00% PEAK HR :08:00 AM 41 0 0 TOTAL PEAK HR VOL :0 219 12 0 16 254 0 35 0 0 0 0 10 0 8 0 554 PEAK HR FACTOR :0.000 0.883 0.600 0.000 0.800 0.804 0.000 0.795 0.000 0.000 0.000 0.000 0.625 0.000 0.667 0.000 Headers NBL NBT NBR NBU SBL SBT SBR SBU EBL EBT EBR EBU WBL WBT WBR WBU 0 2 0 0 1 2 0 0 0 0 0 0 0 1 0 0 NL NT NR NU SL ST SR SU EL ET ER EU WL WT WR WU TOTAL 11:00 AM 0 108 3 0 4 145 0 9 0 0 0 0 1 0 7 0 277 11:15 AM 0 125 3 0 7 118 0 14 0 0 0 0 3 0 1 0 271 11:30 AM 0 130 3 0 5 107 0 15 0 0 0 0 5 0 6 0 271 11:45 AM 0 124 7 0 4 138 0 7 0 0 0 0 3 0 4 0 287 12:00 PM 0 173 4 0 5 143 0 4 0 0 0 0 2 0 4 0 335 12:15 PM 0 137 4 0 9 159 0 12 0 0 0 0 4 0 3 0 328 12:30 PM 0 146 6 0 5 133 0 19 0 0 0 0 1 0 6 0 316 12:45 PM 0 137 2 0 4 179 0 9 0 0 0 0 4 0 2 0 337 NL NT NR NU SL ST SR SU EL ET ER EU WL WT WR WU TOTAL TOTAL VOLUMES :0 1080 32 0 43 1122 0 89 0 0 0 0 23 0 33 0 2422 APPROACH %'s :0.00%97.12%2.88%0.00%3.43%89.47%0.00%7.10%41.07%0.00%58.93%0.00% PEAK HR :12:00 PM 165 0 0 TOTAL PEAK HR VOL :0 593 16 0 23 614 0 44 0 0 0 0 11 0 15 0 1316 PEAK HR FACTOR :0.000 0.857 0.667 0.000 0.639 0.858 0.000 0.579 0.000 0.000 0.000 0.000 0.688 0.000 0.625 0.000 0 2 0 0 1 2 0 0 0 0 0 0 0 1 0 0 NL NT NR NU SL ST SR SU EL ET ER EU WL WT WR WU TOTAL 4:00 PM 0 176 1 0 12 149 0 19 0 0 0 0 7 0 5 0 369 4:15 PM 0 205 7 0 6 150 0 21 0 0 0 0 9 0 3 0 401 4:30 PM 0 153 4 0 9 154 0 11 0 0 0 0 3 0 3 0 337 4:45 PM 0 145 2 0 3 139 0 12 0 0 0 0 3 0 5 0 309 5:00 PM 0 131 3 0 10 127 0 13 0 0 0 0 6 0 6 0 296 5:15 PM 0 127 7 0 4 120 0 16 0 0 0 0 5 0 4 0 283 5:30 PM 0 127 4 0 4 113 0 14 0 0 0 0 4 0 6 0 272 5:45 PM 0 104 8 0 7 131 0 25 0 0 0 0 5 0 3 0 283 NL NT NR NU SL ST SR SU EL ET ER EU WL WT WR WU TOTAL TOTAL VOLUMES :0 1168 36 0 55 1083 0 131 0 0 0 0 42 0 35 0 2550 APPROACH %'s :0.00%97.01%2.99%0.00%4.33%85.34%0.00%10.32%54.55%0.00%45.45%0.00% PEAK HR :04:00 PM 289 0 0 TOTAL PEAK HR VOL :0 679 14 0 30 592 0 63 0 0 0 0 22 0 16 0 1416 PEAK HR FACTOR :0.000 0.828 0.500 0.000 0.625 0.961 0.000 0.750 0.000 0.000 0.000 0.000 0.611 0.000 0.800 0.000 22-040120-002 7/23/2022 04:00 PM - 05:00 PM 0.8830.817 0.951 0.792 12:00 PM - 01:00 PM 0.9760.860 0.887 0.929 08:00 AM - 09:00 AM 0.834 PM NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND NOON NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND 0.875 0.811 0.750 AM NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND Data - Totals Carlsbad Blvd Carlsbad Blvd Island Way Island Way Nov. 15, 2023 Item #1 Page 43 of 159 National Data & Surveying ServicesIntersection Turning Movement Count Location:Carlsbad Blvd & Island Way City:Carlsbad Project ID: Control:Signalized Date: NS/EW Streets: 0 2 0 0 1 2 0 0 0 0 0 0 0 1 0 0 NL NT NR NU SL ST SR SU EL ET ER EU WL WT WR WU TOTAL 7:00 AM 0 9 0 0 0 9 0 0 0 0 0 0 0 0 0 0 18 7:15 AM 0 12 0 0 0 10 0 0 0 0 0 0 0 0 0 0 22 7:30 AM 0 8 0 1 0 15 0 0 0 0 0 0 0 0 0 0 24 7:45 AM 0 13 1 0 0 24 0 1 0 0 0 0 0 0 0 0 39 8:00 AM 0 22 1 0 1 19 0 0 0 0 0 0 8 0 5 0 56 8:15 AM 0 22 0 0 0 27 0 0 0 0 0 0 0 0 0 0 49 8:30 AM 0 24 0 2 0 20 0 1 0 0 0 0 0 0 1 0 48 8:45 AM 0 84 0 0 2 19 0 0 0 0 0 0 0 0 0 0 105 NL NT NR NU SL ST SR SU EL ET ER EU WL WT WR WU TOTAL TOTAL VOLUMES :0 194 2 3 3 143 0 2 0 0 0 0 8 0 6 0 361 APPROACH %'s :0.00%97.49%1.01%1.51%2.03%96.62%0.00%1.35%57.14%0.00%42.86%0.00% PEAK HR :08:00 AM 41 0 0 TOTAL PEAK HR VOL :0 152 1 2 3 85 0 1 0 0 0 0 8 0 6 0 258 PEAK HR FACTOR :0.000 0.452 0.250 0.250 0.375 0.787 0.000 0.250 0.000 0.000 0.000 0.000 0.250 0.000 0.300 0.000 Headers NBL NBT NBR NBU SBL SBT SBR SBU EBL EBT EBR EBU WBL WBT WBR WBU 0 2 0 0 1 2 0 0 0 0 0 0 0 1 0 0 NL NT NR NU SL ST SR SU EL ET ER EU WL WT WR WU TOTAL 11:00 AM 0 20 5 0 1 46 0 0 0 0 0 0 0 0 1 0 73 11:15 AM 0 25 1 0 0 53 0 0 0 0 0 0 1 0 1 0 81 11:30 AM 0 23 2 0 0 37 0 0 0 0 0 0 1 0 2 0 65 11:45 AM 0 29 1 0 0 30 0 1 0 0 0 0 1 0 0 0 62 12:00 PM 0 31 1 0 0 29 0 0 0 0 0 0 0 0 0 0 61 12:15 PM 0 26 2 0 1 21 0 0 0 0 0 0 0 0 0 0 50 12:30 PM 0 15 0 0 0 24 0 4 0 0 0 0 0 0 1 0 44 12:45 PM 0 31 2 0 0 30 0 2 0 0 0 0 1 0 0 0 66 NL NT NR NU SL ST SR SU EL ET ER EU WL WT WR WU TOTAL TOTAL VOLUMES :0 200 14 0 2 270 0 7 0 0 0 0 4 0 5 0 502 APPROACH %'s :0.00%93.46%6.54%0.00%0.72%96.77%0.00%2.51%44.44%0.00%55.56%0.00% PEAK HR :12:00 PM 165 0 0 TOTAL PEAK HR VOL :0 103 5 0 1 104 0 6 0 0 0 0 1 0 1 0 221 PEAK HR FACTOR :0.000 0.831 0.625 0.000 0.250 0.867 0.000 0.375 0.000 0.000 0.000 0.000 0.250 0.000 0.250 0.000 0 2 0 0 1 2 0 0 0 0 0 0 0 1 0 0 NL NT NR NU SL ST SR SU EL ET ER EU WL WT WR WU TOTAL 4:00 PM 0 10 7 0 0 5 0 0 0 0 0 0 2 0 0 0 24 4:15 PM 0 10 0 0 0 11 0 0 0 0 0 0 0 0 0 0 21 4:30 PM 0 9 0 0 2 10 0 0 0 0 0 0 0 0 0 0 21 4:45 PM 0 10 4 0 5 3 0 2 0 0 0 0 0 0 1 0 25 5:00 PM 0 8 1 0 0 2 0 2 0 0 0 0 2 0 3 0 18 5:15 PM 0 5 2 0 4 16 0 5 0 0 0 0 0 0 2 0 34 5:30 PM 0 11 1 0 0 11 0 0 0 0 0 0 1 0 2 0 26 5:45 PM 0 4 1 0 0 1 0 0 0 0 0 0 0 0 1 0 7 NL NT NR NU SL ST SR SU EL ET ER EU WL WT WR WU TOTAL TOTAL VOLUMES :0 67 16 0 11 59 0 9 0 0 0 0 5 0 9 0 176 APPROACH %'s :0.00%80.72%19.28%0.00%13.92%74.68%0.00%11.39%35.71%0.00%64.29%0.00% PEAK HR :04:00 PM 289 0 0 TOTAL PEAK HR VOL :0 39 11 0 7 29 0 2 0 0 0 0 2 0 1 0 91 PEAK HR FACTOR :0.000 0.975 0.393 0.000 0.350 0.659 0.000 0.250 0.000 0.000 0.000 0.000 0.250 0.000 0.250 0.000 22-040120-002 7/23/2022 04:00 PM - 05:00 PM 0.9100.735 0.792 0.375 12:00 PM - 01:00 PM 0.8370.818 0.867 0.500 08:00 AM - 09:00 AM 0.614 PM NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND NOON NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND 0.461 0.824 0.269 AM NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND Data - Bikes Carlsbad Blvd Carlsbad Blvd Island Way Island Way Nov. 15, 2023 Item #1 Page 44 of 159 National Data & Surveying ServicesIntersection Turning Movement CountLocation:Carlsbad Blvd & Island Way Project ID: City:Carlsbad Date: NS/EW Streets: EB WB EB WB NB SB NB SB TOTAL 7:00 AM 2 2 0 0 1 0 0 0 5 7:15 AM 4 2 1 0 2 0 0 0 9 7:30 AM 5 0 0 0 0 1 0 0 6 7:45 AM 1 33 0 0 0 0 0 0 34 8:00 AM 0 11 0 0 0 1 0 0 12 8:15 AM 4 8 0 0 0 0 0 0 12 8:30 AM 30 4 0 0 1 1 0 0 36 8:45 AM 17 8 0 0 0 0 0 0 25 EB WB EB WB NB SB NB SB TOTAL TOTAL VOLUMES :63 68 1 0 4 3 0 0 139 APPROACH %'s :48.09%51.91%100.00%0.00%57.14%42.86% PEAK HR :08:00 AM 40 -1 -1 TOTAL PEAK HR VOL :51 31 0 0 1 2 0 0 85 PEAK HR FACTOR :0.425 0.705 0.250 0.500 Headers NEB NWB SEB SWB ENS ESB WNB WSB EB WB EB WB NB SB NB SB TOTAL 11:00 AM 4 13 0 0 1 2 0 0 20 11:15 AM 8 5 0 0 0 0 0 0 13 11:30 AM 3 14 0 0 2 2 0 0 21 11:45 AM 2 9 0 0 0 1 0 0 12 12:00 PM 4 5 0 0 0 0 0 0 9 12:15 PM 5 10 0 0 0 0 0 0 15 12:30 PM 2 12 0 0 0 0 0 0 14 12:45 PM 5 14 0 0 0 0 0 0 19 EB WB EB WB NB SB NB SB TOTAL TOTAL VOLUMES :33 82 0 0 3 5 0 0 123 APPROACH %'s :28.70%71.30%37.50%62.50% PEAK HR :12:00 PM 163 -2 -2 TOTAL PEAK HR VOL :16 41 0 0 0 0 0 0 57 PEAK HR FACTOR :0.800 0.732 EB WB EB WB NB SB NB SB TOTAL 4:00 PM 8 1 0 0 1 0 0 0 10 4:15 PM 24 10 0 0 0 0 0 0 34 4:30 PM 9 2 0 0 0 1 0 0 12 4:45 PM 8 18 0 0 0 0 0 0 26 5:00 PM 13 9 0 0 0 1 0 0 23 5:15 PM 14 15 0 0 0 0 0 0 29 5:30 PM 14 0 0 0 0 0 0 0 14 5:45 PM 3 0 0 0 0 1 0 0 4 EB WB EB WB NB SB NB SB TOTAL TOTAL VOLUMES :93 55 0 0 1 3 0 0 152 APPROACH %'s :62.84%37.16%25.00%75.00% PEAK HR :04:00 PM 286 -3 -3 TOTAL PEAK HR VOL :49 31 0 0 1 1 0 0 82 PEAK HR FACTOR :0.510 0.431 0.250 0.250 22-040120-002 7/23/2022 0.6030.588 0.500 04:00 PM - 05:00 PM 12:00 PM - 01:00 PM 0.7500.750 0.5900.603 PM NORTH LEG SOUTH LEG EAST LEG WEST LEG NOON NORTH LEG SOUTH LEG EAST LEG WEST LEG 0.375 08:00 AM - 09:00 AM AM NORTH LEG SOUTH LEG EAST LEG WEST LEG Data - Pedestrians (Crosswalks) Carlsbad Blvd Carlsbad Blvd Island Way Island Way Nov. 15, 2023 Item #1 Page 45 of 159 Prepared by National Data & Surveying Services ID:22-040120-002 Day: City:Carlsbad Date: AM 0 254 16 35 AM NOON 0 614 23 44 NOON PM 0 592 30 63 PM AM NOON PM PM NOON AM 0 2 1 0 0 16 15 8 1 0 0 0 0 0 0 0 0 22 11 10 0 0 0 0 TEV 554 1316 1416 0 0 0 0 0 0 0 0 PHF 0.83 0.98 0.88 0 0 0 0 0 0 2 0 AM NOON PM PM NOON AM PM 0 0 679 14 PM NOON 0 0 593 16 NOON AM 0 0 219 12 AM 652 11:00 AM - 01:00 PM 04:00 PM - 05:00 PM 758 Carlsbad Blvd & Island Way Peak Hour Turning Movement Count Carlsbad Blvd Saturday SOUTHBOUND 7/23/2022 4:00 PM - 06:00 PMPE A K H O U R S 08:00 AM - 09:00 AM 262 7:00 AM - 09:00 AM CO U N T P E R I O D S 12:00 PM - 01:00 PM 44 39 28 Total (AM)614 Total Bikes (AM) Is l a n d W a y EA S T B O U N D WE S T B O U N D Is l a n d W a y 0 0 0 CONTROL Signalized Pedestrians (Crosswalks) Total (PM)Total Bikes (PM) 625 264 NORTHBOUND Carlsbad Blvd Total (NOON)Total Bikes (NOON) NOONAM PM PM AM AM NOON PM PM NOON AM AM NOON PM NOON NO O N PM AM NO O N AM PM NO O N AM PMNO O N PM AM 0 0 0 0 0 0 0 0 0 000 1 0 1 1 0 2 314131491651 1 0 20 0 0 0 29 7 11390 1 0 10 0 0 0 10 4 1 510 3 0 6 0 80 0 0 0 85 3 115 2 0 16 0 220 0 0 0 59 2 30 1467 9 0 15 0 110 0 0 0 61 4 23 1659 3 0 8 0 100 0 0 0 25 4 16 1221 9 0 Nov. 15, 2023 Item #1 Page 46 of 159 ., .. '+lt t. .. .) ' .; c;' .. .,, ¢ 2018-2019 Traffic Monitoring Program City of Carlsbad Growth Management Plan Final Report: February 28, 2020 Nov. 15, 2023 Item #1 Page 47 of 159 {city of Carlsbad Kimley >>> Horn Carlsbad MMLOS Monitoring Results[Type here] [Type here] February 25, 2020 8 Table 1: Bicycle and Pedestrian LOS Segment Deficiencies (Continued) Roadway Extent Extent Typology Direction Length (miles) ADT (vpd) Score LOS Primary Reason for Deficiency Pedestrian LOS Deficiency (Continued) Carlsbad Blvd Island Way Palomar Airport Rd Coastal NB 0.88 26,278 0 F No sidewalk or gaps in sidewalk Palomar Airport Rd Island Way SB 0 F Carlsbad Blvd Island Way Poinsettia Ln Coastal NB 0.73 14,463 0 F No sidewalk or gaps in sidewalk Poinsettia Ln Island Way SB 0 F Carlsbad Blvd Ponto Rd Poinsettia Ln Coastal SB 0.40 14,463 0 F No sidewalk Carlsbad Blvd Ponto Rd Avenida Encinas Coastal NB 0.33 14,463 0 F No sidewalk or gaps in sidewalk Avenida Encinas Ponto Rd SB 0 F Source: Fehr & Peers, 2019. Note: * Estimated as less than 3,000 vpd under direction from City of Carlsbad staff. Nov. 15, 2023 Item #1 Page 48 of 159 7 Count Date: NBL 24 26 43 34 36 60 NBT 200 345 543 280 483 760 NBR 9 6 17 13 8 24 SBUturn 5 7 10 7 10 14 SBL 15 19 28 21 27 39 SBT 394 534 526 551 747 736 SBR 0 0 0 0 0 0 EBL 0 0 0 0 0 0 EBT 0 0 0 0 0 0 EBR 0 0 0 0 0 0 WBL 4 11 5 6 15 7 WBT 0 0 0 0 0 0 WBR 14 9 13 20 13 18 Carlsbad Blvd / Solamar Dr Tuesday, July 19, 2022 Noon Study Intersection: North/South: East/West: Carlsbad Blvd Solamar Dr PMAMPMAM Existing 2022 Existing 2022 (Post-COVID Factor) Noon Nov. 15, 2023 Item #1 Page 49 of 159 Count Date: NBL 0 0 0 0 0 0 NBT 268 452 742 375 632 1,038 NBR 9 12 25 13 17 35 SBUturn 35 63 60 49 88 84 SBL 11 22 24 15 31 34 SBT 386 473 517 540 662 723 SBR 0 0 0 0 0 0 EBL 0 0 0 0 0 0 EBT 0 0 0 0 0 0 EBR 0 0 0 0 0 0 WBL 14 0 8 20 0 11 WBT 0 0 0 0 0 0 WBR 8 18 15 11 25 21 PMAMPMAMNoon Island Way Existing 2022 (Post-COVID Factor) Study Intersection: North/South: East/West: Existing 2022 Noon Carlsbad Blvd Tuesday, July 19, 2022 Carlsbad Blvd / Island Way Nov. 15, 2023 Item #1 Page 50 of 159 Count Date: NBL 27 32 42 37 44 58 NBT 170 495 528 234 682 727 NBR 10 7 14 14 10 19 SBUturn 4 11 7 6 15 10 SBL 12 22 42 17 30 58 SBT 281 648 628 387 892 865 SBR 0 0 0 0 0 0 EBL 0 0 0 0 0 0 EBT 0 0 0 0 0 0 EBR 0 0 0 0 0 0 WBL 6 7 6 8 10 8 WBT 0 0 0 0 0 0 WBR 12 10 7 17 14 10 NoonAMNoonPM Saturday, July 23, 2022 Existing 2022 Existing 2022 (Post-COVID Factor) AM PM Study Intersection: North/South:Carlsbad Blvd East/West:Solamar Dr Carlsbad Blvd / Solamar Dr Nov. 15, 2023 Item #1 Page 51 of 159 Count Date: NBL 0 0 0 0 0 0 NBT 219 593 679 302 817 935 NBR 12 16 14 17 22 19 SBUturn 35 44 63 48 61 87 SBL 16 23 30 22 32 41 SBT 254 614 592 350 845 815 SBR 0 0 0 0 0 0 EBL 0 0 0 0 0 0 EBT 0 0 0 0 0 0 EBR 0 0 0 0 0 0 WBL 10 11 22 14 15 30 WBT 0 0 0 0 0 0 WBR 8 15 16 11 21 22 NoonAM Noon PM AM Saturday, July 23, 2022 Existing 2022 Existing 2022 (Post-COVID Factor) PM Study Intersection: North/South: Carlsbad Blvd East/West: Island Way Carlsbad Blvd / Island Way Nov. 15, 2023 Item #1 Page 52 of 159 Attachment B Existing 2022 & Existing 2022 Post-COVID Synchro Worksheets Nov. 15, 2023 Item #1 Page 53 of 159 HCM 6th Signalized Intersection Summary Existing - Weekday AM 1: Carlsbad Blvd & Solamar Dr 08/17/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 1 Movement WBL WBR NBU NBT NBR SBL SBT Lane Configurations Traffic Volume (veh/h) 4 14 24 200 9 20 394 Future Volume (veh/h) 4 14 24 200 9 20 394 Initial Q (Qb), veh 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 0.99 0.92 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 6 22 222 10 22 428 Peak Hour Factor 0.63 0.63 0.90 0.90 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 Cap, veh/h 24 89 1042 47 50 1752 Arrive On Green 0.07 0.07 0.30 0.30 0.03 0.49 Sat Flow, veh/h 334 1224 3543 154 1781 3647 Grp Volume(v), veh/h 29 0 114 118 22 428 Grp Sat Flow(s),veh/h/ln 1614 0 1777 1827 1781 1777 Q Serve(g_s), s 0.5 0.0 1.3 1.3 0.3 1.9 Cycle Q Clear(g_c), s 0.5 0.0 1.3 1.3 0.3 1.9 Prop In Lane 0.21 0.76 0.08 1.00 Lane Grp Cap(c), veh/h 118 0 537 552 50 1752 V/C Ratio(X)0.25 0.00 0.21 0.21 0.44 0.24 Avail Cap(c_a), veh/h 1985 0 1221 1256 354 2443 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I)1.00 0.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 12.1 0.0 7.2 7.2 13.2 4.0 Incr Delay (d2), s/veh 1.1 0.0 0.2 0.2 5.9 0.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.2 0.0 0.3 0.3 0.2 0.3 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 13.2 0.0 7.4 7.4 19.2 4.1 LnGrp LOS B A A A B A Approach Vol, veh/h 29 232 450 Approach Delay, s/veh 13.2 7.4 4.8 Approach LOS B A A Timer - Assigned Phs 1 2 6 8 Phs Duration (G+Y+Rc), s 5.3 14.3 19.6 8.0 Change Period (Y+Rc), s 4.5 6.0 6.0 6.0 Max Green Setting (Gmax), s 5.5 19.0 19.0 34.0 Max Q Clear Time (g_c+I1), s 2.3 3.3 3.9 2.5 Green Ext Time (p_c), s 0.0 1.1 2.4 0.1 Intersection Summary HCM 6th Ctrl Delay 6.0 HCM 6th LOS A Notes User approved volume balancing among the lanes for turning movement. User approved ignoring U-Turning movement. Nov. 15, 2023 Item #1 Page 54 of 159 V __ ll tft. ""i tt HCM 6th Signalized Intersection Summary Existing - Weekday NOON 1: Carlsbad Blvd & Solamar Dr 08/17/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 1 Movement WBL WBR NBU NBT NBR SBL SBT Lane Configurations Traffic Volume (veh/h) 11 9 26 345 6 26 534 Future Volume (veh/h) 11 9 26 345 6 26 534 Initial Q (Qb), veh 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 0.98 0.90 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 17 14 411 7 28 568 Peak Hour Factor 0.65 0.65 0.84 0.84 0.94 0.94 Percent Heavy Veh, % 2 2 2 2 2 2 Cap, veh/h 87 72 1080 18 62 1747 Arrive On Green 0.10 0.10 0.30 0.30 0.03 0.49 Sat Flow, veh/h 889 732 3661 61 1781 3647 Grp Volume(v), veh/h 32 0 204 214 28 568 Grp Sat Flow(s),veh/h/ln 1674 0 1777 1852 1781 1777 Q Serve(g_s), s 0.5 0.0 2.6 2.7 0.5 2.8 Cycle Q Clear(g_c), s 0.5 0.0 2.6 2.7 0.5 2.8 Prop In Lane 0.53 0.44 0.03 1.00 Lane Grp Cap(c), veh/h 164 0 538 561 62 1747 V/C Ratio(X)0.19 0.00 0.38 0.38 0.45 0.33 Avail Cap(c_a), veh/h 1947 0 1155 1203 335 2310 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I)1.00 0.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 12.1 0.0 8.0 8.0 13.8 4.5 Incr Delay (d2), s/veh 0.6 0.0 0.4 0.4 5.1 0.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.2 0.0 0.7 0.7 0.2 0.4 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 12.7 0.0 8.5 8.5 18.9 4.6 LnGrp LOS B A A A B A Approach Vol, veh/h 32 418 596 Approach Delay, s/veh 12.7 8.5 5.3 Approach LOS B A A Timer - Assigned Phs 1 2 6 8 Phs Duration (G+Y+Rc), s 5.5 14.9 20.4 8.9 Change Period (Y+Rc), s 4.5 6.0 6.0 6.0 Max Green Setting (Gmax), s 5.5 19.0 19.0 34.0 Max Q Clear Time (g_c+I1), s 2.5 4.7 4.8 2.5 Green Ext Time (p_c), s 0.0 2.1 3.3 0.1 Intersection Summary HCM 6th Ctrl Delay 6.8 HCM 6th LOS A Notes User approved volume balancing among the lanes for turning movement. User approved ignoring U-Turning movement. Nov. 15, 2023 Item #1 Page 55 of 159 V __ ll tft. ""i tt HCM 6th Signalized Intersection Summary Existing - Weekday PM 1: Carlsbad Blvd & Solamar Dr 08/17/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 1 Movement WBL WBR NBU NBT NBR SBL SBT Lane Configurations Traffic Volume (veh/h) 5 13 43 543 17 38 526 Future Volume (veh/h) 5 13 43 543 17 38 526 Initial Q (Qb), veh 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 0.97 0.93 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 6 17 590 18 42 578 Peak Hour Factor 0.78 0.78 0.92 0.92 0.91 0.91 Percent Heavy Veh, % 2 2 2 2 2 2 Cap, veh/h 38 107 1139 35 87 1843 Arrive On Green 0.09 0.09 0.32 0.32 0.05 0.52 Sat Flow, veh/h 402 1140 3605 107 1781 3647 Grp Volume(v), veh/h 24 0 298 310 42 578 Grp Sat Flow(s),veh/h/ln 1609 0 1777 1841 1781 1777 Q Serve(g_s), s 0.4 0.0 4.2 4.2 0.7 2.9 Cycle Q Clear(g_c), s 0.4 0.0 4.2 4.2 0.7 2.9 Prop In Lane 0.25 0.71 0.06 1.00 Lane Grp Cap(c), veh/h 151 0 576 597 87 1843 V/C Ratio(X)0.16 0.00 0.52 0.52 0.48 0.31 Avail Cap(c_a), veh/h 1767 0 1091 1130 316 2181 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I)1.00 0.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 12.9 0.0 8.5 8.5 14.3 4.3 Incr Delay (d2), s/veh 0.5 0.0 0.7 0.7 4.1 0.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.1 0.0 1.2 1.2 0.3 0.5 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 13.4 0.0 9.2 9.2 18.4 4.4 LnGrp LOS B A A A B A Approach Vol, veh/h 24 608 620 Approach Delay, s/veh 13.4 9.2 5.3 Approach LOS B A A Timer - Assigned Phs 1 2 6 8 Phs Duration (G+Y+Rc), s 6.0 16.0 22.1 8.9 Change Period (Y+Rc), s 4.5 6.0 6.0 6.0 Max Green Setting (Gmax), s 5.5 19.0 19.0 34.0 Max Q Clear Time (g_c+I1), s 2.7 6.2 4.9 2.4 Green Ext Time (p_c), s 0.0 3.0 3.3 0.0 Intersection Summary HCM 6th Ctrl Delay 7.4 HCM 6th LOS A Notes User approved volume balancing among the lanes for turning movement. User approved ignoring U-Turning movement. Nov. 15, 2023 Item #1 Page 56 of 159 V __ ll tft. ""i tt HCM 6th Signalized Intersection Summary Existing - Weekend AM 1: Carlsbad Blvd & Solamar Dr 08/17/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 1 Movement WBL WBR NBU NBT NBR SBL SBT Lane Configurations Traffic Volume (veh/h) 6 12 27 170 10 12 281 Future Volume (veh/h) 6 12 27 170 10 12 281 Initial Q (Qb), veh 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 0.98 0.79 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 8 16 212 12 14 327 Peak Hour Factor 0.75 0.75 0.80 0.80 0.86 0.86 Percent Heavy Veh, % 2 2 2 2 2 2 Cap, veh/h 50 99 1003 56 33 1694 Arrive On Green 0.10 0.10 0.30 0.30 0.02 0.48 Sat Flow, veh/h 521 1041 3461 188 1781 3647 Grp Volume(v), veh/h 25 0 110 114 14 327 Grp Sat Flow(s),veh/h/ln 1627 0 1777 1778 1781 1777 Q Serve(g_s), s 0.4 0.0 1.3 1.3 0.2 1.5 Cycle Q Clear(g_c), s 0.4 0.0 1.3 1.3 0.2 1.5 Prop In Lane 0.32 0.64 0.11 1.00 Lane Grp Cap(c), veh/h 155 0 529 529 33 1694 V/C Ratio(X)0.16 0.00 0.21 0.21 0.43 0.19 Avail Cap(c_a), veh/h 1973 0 1204 1205 349 2408 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I)1.00 0.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 11.7 0.0 7.4 7.4 13.6 4.2 Incr Delay (d2), s/veh 0.5 0.0 0.2 0.2 8.5 0.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.1 0.0 0.3 0.3 0.1 0.2 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 12.1 0.0 7.6 7.6 22.2 4.3 LnGrp LOS B A A A C A Approach Vol, veh/h 25 224 341 Approach Delay, s/veh 12.1 7.6 5.0 Approach LOS B A A Timer - Assigned Phs 1 2 6 8 Phs Duration (G+Y+Rc), s 5.0 14.4 19.4 8.7 Change Period (Y+Rc), s 4.5 6.0 6.0 6.0 Max Green Setting (Gmax), s 5.5 19.0 19.0 34.0 Max Q Clear Time (g_c+I1), s 2.2 3.3 3.5 2.4 Green Ext Time (p_c), s 0.0 1.0 1.8 0.0 Intersection Summary HCM 6th Ctrl Delay 6.3 HCM 6th LOS A Notes User approved volume balancing among the lanes for turning movement. User approved ignoring U-Turning movement. Nov. 15, 2023 Item #1 Page 57 of 159 V __ ll tft. ""i tt HCM 6th Signalized Intersection Summary Existing - Weekend AM 1: Carlsbad Blvd & Solamar Dr 08/17/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 1 Movement WBL WBR NBU NBT NBR SBL SBT Lane Configurations Traffic Volume (veh/h) 7 10 32 495 7 22 648 Future Volume (veh/h) 7 10 32 495 7 22 648 Initial Q (Qb), veh 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 0.99 0.85 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 8 12 550 8 24 720 Peak Hour Factor 0.84 0.84 0.90 0.90 0.90 0.90 Percent Heavy Veh, % 2 2 2 2 2 2 Cap, veh/h 43 65 1082 16 54 1763 Arrive On Green 0.07 0.07 0.30 0.30 0.03 0.50 Sat Flow, veh/h 629 944 3669 52 1781 3647 Grp Volume(v), veh/h 21 0 273 285 24 720 Grp Sat Flow(s),veh/h/ln 1652 0 1777 1851 1781 1777 Q Serve(g_s), s 0.3 0.0 3.5 3.5 0.4 3.5 Cycle Q Clear(g_c), s 0.3 0.0 3.5 3.5 0.4 3.5 Prop In Lane 0.38 0.57 0.03 1.00 Lane Grp Cap(c), veh/h 113 0 538 560 54 1763 V/C Ratio(X)0.19 0.00 0.51 0.51 0.44 0.41 Avail Cap(c_a), veh/h 2037 0 1237 1289 342 2449 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I)1.00 0.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 12.1 0.0 7.9 7.9 13.1 4.4 Incr Delay (d2), s/veh 0.8 0.0 0.7 0.7 5.6 0.2 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.1 0.0 0.9 0.9 0.2 0.5 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 12.9 0.0 8.7 8.6 18.7 4.5 LnGrp LOS B A A A B A Approach Vol, veh/h 21 558 744 Approach Delay, s/veh 12.9 8.7 5.0 Approach LOS B A A Timer - Assigned Phs 1 2 6 8 Phs Duration (G+Y+Rc), s 5.3 14.3 19.7 7.9 Change Period (Y+Rc), s 4.5 6.0 6.0 6.0 Max Green Setting (Gmax), s 5.3 19.2 19.0 34.0 Max Q Clear Time (g_c+I1), s 2.4 5.5 5.5 2.3 Green Ext Time (p_c), s 0.0 2.8 4.2 0.0 Intersection Summary HCM 6th Ctrl Delay 6.7 HCM 6th LOS A Notes User approved volume balancing among the lanes for turning movement. User approved ignoring U-Turning movement. Nov. 15, 2023 Item #1 Page 58 of 159 V __ ll tft. ""i tt HCM 6th Signalized Intersection Summary Existing PM Weekend 1: Carlsbad Blvd & Solamar Dr 08/17/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 1 Movement WBL WBR NBU NBT NBR SBL SBT Lane Configurations Traffic Volume (veh/h) 6 7 42 528 14 49 628 Future Volume (veh/h) 6 7 42 528 14 49 628 Initial Q (Qb), veh 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 0.94 0.93 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 9 10 593 16 54 698 Peak Hour Factor 0.67 0.67 0.89 0.89 0.90 0.90 Percent Heavy Veh, % 2 2 2 2 2 2 Cap, veh/h 109 121 1044 28 105 1743 Arrive On Green 0.15 0.15 0.30 0.30 0.06 0.49 Sat Flow, veh/h 734 815 3620 95 1781 3647 Grp Volume(v), veh/h 20 0 299 310 54 698 Grp Sat Flow(s),veh/h/ln 1630 0 1777 1844 1781 1777 Q Serve(g_s), s 0.4 0.0 4.7 4.7 1.0 4.1 Cycle Q Clear(g_c), s 0.4 0.0 4.7 4.7 1.0 4.1 Prop In Lane 0.45 0.50 0.05 1.00 Lane Grp Cap(c), veh/h 242 0 526 546 105 1743 V/C Ratio(X)0.08 0.00 0.57 0.57 0.51 0.40 Avail Cap(c_a), veh/h 1667 0 1042 1082 268 2031 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I)1.00 0.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 12.2 0.0 9.9 9.9 15.2 5.4 Incr Delay (d2), s/veh 0.1 0.0 1.0 0.9 3.8 0.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.1 0.0 1.4 1.5 0.4 0.8 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 12.3 0.0 10.9 10.8 19.0 5.5 LnGrp LOS B A B B B A Approach Vol, veh/h 20 609 752 Approach Delay, s/veh 12.3 10.9 6.5 Approach LOS B B A Timer - Assigned Phs 1 2 6 8 Phs Duration (G+Y+Rc), s 6.5 15.8 22.3 10.9 Change Period (Y+Rc), s 4.5 6.0 6.0 6.0 Max Green Setting (Gmax), s 5.0 19.5 19.0 34.0 Max Q Clear Time (g_c+I1), s 3.0 6.7 6.1 2.4 Green Ext Time (p_c), s 0.0 3.0 3.9 0.0 Intersection Summary HCM 6th Ctrl Delay 8.5 HCM 6th LOS A Notes User approved volume balancing among the lanes for turning movement. User approved ignoring U-Turning movement. Nov. 15, 2023 Item #1 Page 59 of 159 V __ ll tft. ""i tt HCM 6th Signalized Intersection Summary Existing with Covid Adjustment - Weekday AM 1: Carlsbad Blvd & Solamar Dr 08/22/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 1 Movement WBL WBR NBU NBT NBR SBL SBT Lane Configurations Traffic Volume (veh/h) 6 20 34 280 13 28 551 Future Volume (veh/h) 6 20 34 280 13 28 551 Initial Q (Qb), veh 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 0.99 0.92 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 10 32 311 14 30 599 Peak Hour Factor 0.63 0.63 0.90 0.90 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 Cap, veh/h 33 105 1016 45 66 1742 Arrive On Green 0.09 0.09 0.29 0.29 0.04 0.49 Sat Flow, veh/h 376 1202 3543 154 1781 3647 Grp Volume(v), veh/h 43 0 159 166 30 599 Grp Sat Flow(s),veh/h/ln 1616 0 1777 1827 1781 1777 Q Serve(g_s), s 0.7 0.0 2.0 2.0 0.5 2.9 Cycle Q Clear(g_c), s 0.7 0.0 2.0 2.0 0.5 2.9 Prop In Lane 0.23 0.74 0.08 1.00 Lane Grp Cap(c), veh/h 141 0 523 538 66 1742 V/C Ratio(X)0.31 0.00 0.30 0.31 0.45 0.34 Avail Cap(c_a), veh/h 1936 0 1190 1223 345 2380 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I)1.00 0.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 12.2 0.0 7.8 7.8 13.4 4.4 Incr Delay (d2), s/veh 1.2 0.0 0.3 0.3 4.8 0.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.2 0.0 0.5 0.5 0.2 0.4 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 13.4 0.0 8.1 8.1 18.2 4.6 LnGrp LOS B A A A B A Approach Vol, veh/h 43 325 629 Approach Delay, s/veh 13.4 8.1 5.2 Approach LOS B A A Timer - Assigned Phs 1 2 6 8 Phs Duration (G+Y+Rc), s 5.6 14.4 19.9 8.5 Change Period (Y+Rc), s 4.5 6.0 6.0 6.0 Max Green Setting (Gmax), s 5.5 19.0 19.0 34.0 Max Q Clear Time (g_c+I1), s 2.5 4.0 4.9 2.7 Green Ext Time (p_c), s 0.0 1.6 3.5 0.1 Intersection Summary HCM 6th Ctrl Delay 6.5 HCM 6th LOS A Notes User approved volume balancing among the lanes for turning movement. User approved ignoring U-Turning movement. Nov. 15, 2023 Item #1 Page 60 of 159 V __ ll tft. ""i tt HCM 6th Signalized Intersection Summary Existing with Covid Adjustment - Weekday NOON 1: Carlsbad Blvd & Solamar Dr 08/22/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 1 Movement WBL WBR NBU NBT NBR SBL SBT Lane Configurations Traffic Volume (veh/h) 15 13 36 483 8 37 747 Future Volume (veh/h) 15 13 36 483 8 37 747 Initial Q (Qb), veh 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 0.98 0.91 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 23 20 575 10 39 795 Peak Hour Factor 0.65 0.65 0.84 0.84 0.94 0.94 Percent Heavy Veh, % 2 2 2 2 2 2 Cap, veh/h 95 83 1123 20 82 1796 Arrive On Green 0.11 0.11 0.31 0.31 0.05 0.51 Sat Flow, veh/h 872 758 3660 62 1781 3647 Grp Volume(v), veh/h 44 0 286 299 39 795 Grp Sat Flow(s),veh/h/ln 1668 0 1777 1852 1781 1777 Q Serve(g_s), s 0.8 0.0 4.1 4.1 0.7 4.4 Cycle Q Clear(g_c), s 0.8 0.0 4.1 4.1 0.7 4.4 Prop In Lane 0.52 0.45 0.03 1.00 Lane Grp Cap(c), veh/h 182 0 559 583 82 1796 V/C Ratio(X)0.24 0.00 0.51 0.51 0.48 0.44 Avail Cap(c_a), veh/h 1823 0 1074 1119 326 2170 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I)1.00 0.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 12.7 0.0 8.7 8.7 14.5 4.9 Incr Delay (d2), s/veh 0.7 0.0 0.7 0.7 4.2 0.2 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.3 0.0 1.2 1.2 0.3 0.7 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 13.4 0.0 9.4 9.4 18.7 5.1 LnGrp LOS B A A A B A Approach Vol, veh/h 44 585 834 Approach Delay, s/veh 13.4 9.4 5.7 Approach LOS B A A Timer - Assigned Phs 1 2 6 8 Phs Duration (G+Y+Rc), s 5.9 15.8 21.7 9.4 Change Period (Y+Rc), s 4.5 6.0 6.0 6.0 Max Green Setting (Gmax), s 5.7 18.8 19.0 34.0 Max Q Clear Time (g_c+I1), s 2.7 6.1 6.4 2.8 Green Ext Time (p_c), s 0.0 2.9 4.5 0.1 Intersection Summary HCM 6th Ctrl Delay 7.4 HCM 6th LOS A Notes User approved pedestrian interval to be less than phase max green. User approved volume balancing among the lanes for turning movement. User approved ignoring U-Turning movement. Nov. 15, 2023 Item #1 Page 61 of 159 V __ ll tft. ""i tt HCM 6th Signalized Intersection Summary Existing with Covid Adjustment - Weekday PM 1: Carlsbad Blvd & Solamar Dr 08/22/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 1 Movement WBL WBR NBU NBT NBR SBL SBT Lane Configurations Traffic Volume (veh/h) 7 18 60 760 24 53 736 Future Volume (veh/h) 7 18 60 760 24 53 736 Initial Q (Qb), veh 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 0.97 0.94 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 9 23 826 26 58 809 Peak Hour Factor 0.78 0.78 0.92 0.92 0.91 0.91 Percent Heavy Veh, % 2 2 2 2 2 2 Cap, veh/h 44 114 1312 41 109 1996 Arrive On Green 0.10 0.10 0.37 0.37 0.06 0.56 Sat Flow, veh/h 438 1119 3601 110 1781 3647 Grp Volume(v), veh/h 33 0 418 434 58 809 Grp Sat Flow(s),veh/h/ln 1606 0 1777 1841 1781 1777 Q Serve(g_s), s 0.7 0.0 6.9 6.9 1.1 4.6 Cycle Q Clear(g_c), s 0.7 0.0 6.9 6.9 1.1 4.6 Prop In Lane 0.27 0.70 0.06 1.00 Lane Grp Cap(c), veh/h 163 0 664 689 109 1996 V/C Ratio(X)0.20 0.00 0.63 0.63 0.53 0.41 Avail Cap(c_a), veh/h 1533 0 968 1003 255 1996 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I)1.00 0.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 14.7 0.0 9.1 9.1 16.2 4.4 Incr Delay (d2), s/veh 0.6 0.0 1.0 1.0 4.0 0.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.2 0.0 2.0 2.1 0.5 0.8 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 15.3 0.0 10.1 10.1 20.2 4.6 LnGrp LOS B A B B C A Approach Vol, veh/h 33 852 867 Approach Delay, s/veh 15.3 10.1 5.6 Approach LOS B B A Timer - Assigned Phs 1 2 6 8 Phs Duration (G+Y+Rc), s 6.7 19.3 26.0 9.6 Change Period (Y+Rc), s 4.5 6.0 6.0 6.0 Max Green Setting (Gmax), s 5.1 19.4 19.0 34.0 Max Q Clear Time (g_c+I1), s 3.1 8.9 6.6 2.7 Green Ext Time (p_c), s 0.0 4.0 4.5 0.1 Intersection Summary HCM 6th Ctrl Delay 8.0 HCM 6th LOS A Notes User approved volume balancing among the lanes for turning movement. User approved ignoring U-Turning movement. Nov. 15, 2023 Item #1 Page 62 of 159 V __ ll tft. ""i tt HCM 6th Signalized Intersection Summary Existing with Covid Adjustment - Weekend AM 1: Carlsbad Blvd & Solamar Dr 08/22/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 1 Movement WBL WBR NBU NBT NBR SBL SBT Lane Configurations Traffic Volume (veh/h) 8 17 37 234 14 23 387 Future Volume (veh/h) 8 17 37 234 14 23 387 Initial Q (Qb), veh 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 0.98 0.79 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 11 23 292 18 27 450 Peak Hour Factor 0.75 0.75 0.80 0.80 0.86 0.86 Percent Heavy Veh, % 2 2 2 2 2 2 Cap, veh/h 54 112 967 59 60 1702 Arrive On Green 0.11 0.11 0.29 0.29 0.03 0.48 Sat Flow, veh/h 510 1066 3435 203 1781 3647 Grp Volume(v), veh/h 35 0 153 157 27 450 Grp Sat Flow(s),veh/h/ln 1622 0 1777 1768 1781 1777 Q Serve(g_s), s 0.6 0.0 1.9 2.0 0.4 2.2 Cycle Q Clear(g_c), s 0.6 0.0 1.9 2.0 0.4 2.2 Prop In Lane 0.31 0.66 0.11 1.00 Lane Grp Cap(c), veh/h 171 0 514 512 60 1702 V/C Ratio(X)0.20 0.00 0.30 0.31 0.45 0.26 Avail Cap(c_a), veh/h 1909 0 1169 1163 339 2215 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I)1.00 0.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 11.8 0.0 8.0 8.0 13.7 4.5 Incr Delay (d2), s/veh 0.6 0.0 0.3 0.3 5.2 0.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.2 0.0 0.5 0.5 0.2 0.4 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 12.4 0.0 8.3 8.3 18.9 4.6 LnGrp LOS B A A A B A Approach Vol, veh/h 35 310 477 Approach Delay, s/veh 12.4 8.3 5.4 Approach LOS B A A Timer - Assigned Phs 1 2 6 8 Phs Duration (G+Y+Rc), s 5.5 14.4 19.8 9.0 Change Period (Y+Rc), s 4.5 6.0 6.0 6.0 Max Green Setting (Gmax), s 5.5 19.0 18.0 34.0 Max Q Clear Time (g_c+I1), s 2.4 4.0 4.2 2.6 Green Ext Time (p_c), s 0.0 1.5 2.5 0.1 Intersection Summary HCM 6th Ctrl Delay 6.8 HCM 6th LOS A Notes User approved pedestrian interval to be less than phase max green. User approved volume balancing among the lanes for turning movement. User approved ignoring U-Turning movement. Nov. 15, 2023 Item #1 Page 63 of 159 V __ ll tft. ""i tt HCM 6th Signalized Intersection Summary Existing with Covid Adjustment - Weekend NOON 1: Carlsbad Blvd & Solamar Dr 08/22/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 1 Movement WBL WBR NBU NBT NBR SBL SBT Lane Configurations Traffic Volume (veh/h) 10 14 44 682 10 45 892 Future Volume (veh/h) 10 14 44 682 10 45 892 Initial Q (Qb), veh 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 0.98 0.87 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 12 17 758 11 50 991 Peak Hour Factor 0.84 0.84 0.90 0.90 0.90 0.90 Percent Heavy Veh, % 2 2 2 2 2 2 Cap, veh/h 51 72 1265 18 100 1953 Arrive On Green 0.08 0.08 0.35 0.35 0.06 0.55 Sat Flow, veh/h 660 935 3671 52 1781 3647 Grp Volume(v), veh/h 30 0 376 393 50 991 Grp Sat Flow(s),veh/h/ln 1650 0 1777 1852 1781 1777 Q Serve(g_s), s 0.5 0.0 5.6 5.6 0.9 5.6 Cycle Q Clear(g_c), s 0.5 0.0 5.6 5.6 0.9 5.6 Prop In Lane 0.40 0.57 0.03 1.00 Lane Grp Cap(c), veh/h 128 0 629 655 100 1953 V/C Ratio(X)0.23 0.00 0.60 0.60 0.50 0.51 Avail Cap(c_a), veh/h 1743 0 1071 1116 282 2098 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I)1.00 0.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 13.9 0.0 8.5 8.5 14.8 4.5 Incr Delay (d2), s/veh 0.9 0.0 0.9 0.9 3.9 0.2 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.2 0.0 1.5 1.6 0.4 0.8 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 14.9 0.0 9.4 9.4 18.6 4.7 LnGrp LOS B A A A B A Approach Vol, veh/h 30 769 1041 Approach Delay, s/veh 14.9 9.4 5.4 Approach LOS B A A Timer - Assigned Phs 1 2 6 8 Phs Duration (G+Y+Rc), s 6.3 17.4 23.7 8.5 Change Period (Y+Rc), s 4.5 6.0 6.0 6.0 Max Green Setting (Gmax), s 5.1 19.4 19.0 34.0 Max Q Clear Time (g_c+I1), s 2.9 7.6 7.6 2.5 Green Ext Time (p_c), s 0.0 3.8 5.3 0.1 Intersection Summary HCM 6th Ctrl Delay 7.2 HCM 6th LOS A Notes User approved volume balancing among the lanes for turning movement. User approved ignoring U-Turning movement. Nov. 15, 2023 Item #1 Page 64 of 159 V __ ll tft. ""i tt HCM 6th Signalized Intersection Summary Existing with Covid Adjustment - Weekend PM 1: Carlsbad Blvd & Solamar Dr 08/22/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 1 Movement WBL WBR NBU NBT NBR SBL SBT Lane Configurations Traffic Volume (veh/h) 8 10 58 727 19 68 865 Future Volume (veh/h) 8 10 58 727 19 68 865 Initial Q (Qb), veh 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 0.95 0.93 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 12 15 817 21 76 961 Peak Hour Factor 0.67 0.67 0.89 0.89 0.90 0.90 Percent Heavy Veh, % 2 2 2 2 2 2 Cap, veh/h 107 134 1221 31 129 1900 Arrive On Green 0.15 0.15 0.35 0.35 0.07 0.53 Sat Flow, veh/h 694 868 3626 91 1781 3647 Grp Volume(v), veh/h 28 0 411 427 76 961 Grp Sat Flow(s),veh/h/ln 1620 0 1777 1846 1781 1777 Q Serve(g_s), s 0.6 0.0 7.6 7.6 1.6 6.6 Cycle Q Clear(g_c), s 0.6 0.0 7.6 7.6 1.6 6.6 Prop In Lane 0.43 0.54 0.05 1.00 Lane Grp Cap(c), veh/h 249 0 614 638 129 1900 V/C Ratio(X)0.11 0.00 0.67 0.67 0.59 0.51 Avail Cap(c_a), veh/h 1430 0 886 920 245 1900 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I)1.00 0.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 14.0 0.0 10.7 10.7 17.3 5.7 Incr Delay (d2), s/veh 0.2 0.0 1.3 1.2 4.3 0.2 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.2 0.0 2.4 2.5 0.7 1.4 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 14.2 0.0 12.0 12.0 21.6 5.9 LnGrp LOS B A B B C A Approach Vol, veh/h 28 838 1037 Approach Delay, s/veh 14.2 12.0 7.1 Approach LOS B B A Timer - Assigned Phs 1 2 6 8 Phs Duration (G+Y+Rc), s 7.3 19.3 26.6 11.9 Change Period (Y+Rc), s 4.5 6.0 6.0 6.0 Max Green Setting (Gmax), s 5.3 19.2 19.0 34.0 Max Q Clear Time (g_c+I1), s 3.6 9.6 8.6 2.6 Green Ext Time (p_c), s 0.0 3.7 4.8 0.1 Intersection Summary HCM 6th Ctrl Delay 9.3 HCM 6th LOS A Notes User approved volume balancing among the lanes for turning movement. User approved ignoring U-Turning movement. Nov. 15, 2023 Item #1 Page 65 of 159 V __ ll tft. ""i tt Lanes, Volumes, Timings Existing - Weekday AM 2: 08/17/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 1 Lane Group WBL WBR NBT NBR SBL SBT Ø2 Lane Configurations Traffic Volume (vph)14 0 0 0 46 386 Future Volume (vph)14 0 0 0 46 386 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 Storage Length (ft)0 0 0 255 Storage Lanes 1 0 0 1 Taper Length (ft)25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 0.95 Ped Bike Factor 1.00 1.00 Frt Flt Protected 0.950 0.950 Satd. Flow (prot)1770 0 0 0 1770 3539 Flt Permitted 0.950 0.950 Satd. Flow (perm)1768 0 0 0 1765 3539 Right Turn on Red Yes Yes Satd. Flow (RTOR) Link Speed (mph)30 30 30 Link Distance (ft)89 322 222 Travel Time (s)2.0 7.3 5.0 Confl. Peds. (#/hr)1 1 1 Peak Hour Factor 0.79 0.79 0.92 0.92 0.93 0.93 Adj. Flow (vph)18 0 0 0 49 415 Shared Lane Traffic (%) Lane Group Flow (vph) 18 0 0 0 49 415 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Right Left Left Median Width(ft)12 12 12 Link Offset(ft)0 0 0 Crosswalk Width(ft)16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 9 15 Number of Detectors 1 1 2 Detector Template Left Left Thru Leading Detector (ft)20 20 100 Trailing Detector (ft)0 0 0 Detector 1 Position(ft)0 0 0 Detector 1 Size(ft)20 20 6 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 Detector 1 Delay (s)0.0 0.0 0.0 Detector 2 Position(ft)94 Detector 2 Size(ft)6 Detector 2 Type Cl+Ex Detector 2 Channel Detector 2 Extend (s)0.0 Turn Type Prot Prot NA Nov. 15, 2023 Item #1 Page 66 of 159 ----""i ----""i ++ Lanes, Volumes, Timings Existing - Weekday AM 2: 08/17/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 2 Lane Group WBL WBR NBT NBR SBL SBT Ø2 Protected Phases 8 1 6 2 Permitted Phases Detector Phase 8 1 6 Switch Phase Minimum Initial (s)10.0 10.0 10.0 10.0 Minimum Split (s)47.5 23.5 24.5 24.5 Total Split (s)47.5 24.0 52.5 28.5 Total Split (%)47.5%24.0% 52.5% 29% Maximum Green (s) 42.0 18.5 46.0 22.0 Yellow Time (s)4.0 4.0 5.0 5.0 All-Red Time (s)1.5 1.5 1.5 1.5 Lost Time Adjust (s)0.0 0.0 0.0 Total Lost Time (s)5.5 5.5 6.5 Lead/Lag Lead Lag Lead-Lag Optimize?Yes Yes Vehicle Extension (s) 3.0 3.0 2.0 2.0 Minimum Gap (s)0.2 0.2 0.2 0.2 Time Before Reduce (s) 20.0 0.0 20.0 20.0 Time To Reduce (s)0.0 0.0 0.0 0.0 Recall Mode None None C-Min C-Min Walk Time (s)7.0 Flash Dont Walk (s) 35.0 Pedestrian Calls (#/hr) 10 Act Effct Green (s)16.4 10.3 80.4 Actuated g/C Ratio 0.16 0.10 0.80 v/c Ratio 0.06 0.27 0.15 Control Delay 10.2 45.2 6.1 Queue Delay 0.0 0.0 0.0 Total Delay 10.2 45.2 6.1 LOS B D A Approach Delay 10.2 10.2 Approach LOS B B Intersection Summary Area Type:Other Cycle Length: 100 Actuated Cycle Length: 100 Offset: 0 (0%), Referenced to phase 2:NBT and 6:, Start of Green Natural Cycle: 100 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.30 Intersection Signal Delay: 10.2 Intersection LOS: B Intersection Capacity Utilization 29.0%ICU Level of Service A Analysis Period (min) 15 Splits and Phases: 2: Nov. 15, 2023 Item #1 Page 67 of 159 Lanes, Volumes, Timings Existing - Weekday NOON 2: Island Way & Carlsbad Blvd SB 08/17/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 1 Lane Group WBL WBR NBT NBR SBL SBT Ø2 Lane Configurations Traffic Volume (vph)0 0 0 0 85 473 Future Volume (vph)0 0 0 0 85 473 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 Storage Length (ft)0 0 0 255 Storage Lanes 1 0 0 1 Taper Length (ft)25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 0.95 Ped Bike Factor 1.00 Frt Flt Protected 0.950 Satd. Flow (prot)1863 0 0 0 1770 3539 Flt Permitted 0.950 Satd. Flow (perm)1863 0 0 0 1765 3539 Right Turn on Red Yes Yes Satd. Flow (RTOR) Link Speed (mph)30 30 30 Link Distance (ft)89 322 222 Travel Time (s)2.0 7.3 5.0 Confl. Peds. (#/hr)1 1 Peak Hour Factor 0.85 0.85 0.92 0.92 0.95 0.95 Adj. Flow (vph)0 0 0 0 89 498 Shared Lane Traffic (%) Lane Group Flow (vph) 0 0 0 0 89 498 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Right Left Left Median Width(ft)12 12 12 Link Offset(ft)0 0 0 Crosswalk Width(ft)16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 9 15 Number of Detectors 1 1 2 Detector Template Left Left Thru Leading Detector (ft)20 20 100 Trailing Detector (ft)0 0 0 Detector 1 Position(ft)0 0 0 Detector 1 Size(ft)20 20 6 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 Detector 1 Delay (s)0.0 0.0 0.0 Detector 2 Position(ft)94 Detector 2 Size(ft)6 Detector 2 Type Cl+Ex Detector 2 Channel Detector 2 Extend (s)0.0 Turn Type Prot Prot NA Nov. 15, 2023 Item #1 Page 68 of 159 ----""i ----""i ++ Lanes, Volumes, Timings Existing - Weekday NOON 2: Island Way & Carlsbad Blvd SB 08/17/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 2 Lane Group WBL WBR NBT NBR SBL SBT Ø2 Protected Phases 8 1 6 2 Permitted Phases Detector Phase 8 1 6 Switch Phase Minimum Initial (s)10.0 10.0 10.0 10.0 Minimum Split (s)47.5 23.5 24.5 24.5 Total Split (s)47.5 24.0 52.5 28.5 Total Split (%)47.5%24.0% 52.5% 29% Maximum Green (s) 42.0 18.5 46.0 22.0 Yellow Time (s)4.0 4.0 5.0 5.0 All-Red Time (s)1.5 1.5 1.5 1.5 Lost Time Adjust (s)0.0 0.0 0.0 Total Lost Time (s)5.5 5.5 6.5 Lead/Lag Lead Lag Lead-Lag Optimize?Yes Yes Vehicle Extension (s) 3.0 3.0 2.0 2.0 Minimum Gap (s)0.2 0.2 0.2 0.2 Time Before Reduce (s) 20.0 0.0 20.0 20.0 Time To Reduce (s)0.0 0.0 0.0 0.0 Recall Mode None None C-Min C-Min Walk Time (s)7.0 Flash Dont Walk (s) 35.0 Pedestrian Calls (#/hr) 10 Act Effct Green (s)11.3 80.4 Actuated g/C Ratio 0.11 0.80 v/c Ratio 0.45 0.18 Control Delay 48.2 6.2 Queue Delay 0.0 0.0 Total Delay 48.2 6.2 LOS D A Approach Delay 12.6 Approach LOS B Intersection Summary Area Type:Other Cycle Length: 100 Actuated Cycle Length: 100 Offset: 0 (0%), Referenced to phase 2:NBT and 6:, Start of Green Natural Cycle: 100 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.45 Intersection Signal Delay: 12.6 Intersection LOS: B Intersection Capacity Utilization 18.5%ICU Level of Service A Analysis Period (min) 15 Splits and Phases: 2: Island Way & Carlsbad Blvd SB Nov. 15, 2023 Item #1 Page 69 of 159 Lanes, Volumes, Timings Existing - Weekday PM 2: Island Way & Carlsbad Blvd SB 08/17/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 1 Lane Group WBL WBR NBT NBR SBL SBT Ø2 Lane Configurations Traffic Volume (vph)8 0 0 0 24 517 Future Volume (vph)8 0 0 0 24 517 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 Storage Length (ft)0 0 0 255 Storage Lanes 1 0 0 1 Taper Length (ft)25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 0.95 Ped Bike Factor 1.00 Frt Flt Protected 0.950 0.950 Satd. Flow (prot)1770 0 0 0 1770 3539 Flt Permitted 0.950 0.950 Satd. Flow (perm)1770 0 0 0 1765 3539 Right Turn on Red Yes Yes Satd. Flow (RTOR) Link Speed (mph)30 30 30 Link Distance (ft)89 322 222 Travel Time (s)2.0 7.3 5.0 Confl. Peds. (#/hr)1 Peak Hour Factor 0.65 0.65 0.92 0.92 0.91 0.91 Adj. Flow (vph)12 0 0 0 26 568 Shared Lane Traffic (%) Lane Group Flow (vph) 12 0 0 0 26 568 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Right Left Left Median Width(ft)12 12 12 Link Offset(ft)0 0 0 Crosswalk Width(ft)16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 9 15 Number of Detectors 1 1 2 Detector Template Left Left Thru Leading Detector (ft)20 20 100 Trailing Detector (ft)0 0 0 Detector 1 Position(ft)0 0 0 Detector 1 Size(ft)20 20 6 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 Detector 1 Delay (s)0.0 0.0 0.0 Detector 2 Position(ft)94 Detector 2 Size(ft)6 Detector 2 Type Cl+Ex Detector 2 Channel Detector 2 Extend (s)0.0 Turn Type Prot Prot NA Nov. 15, 2023 Item #1 Page 70 of 159 ----""i ----""i ++ Lanes, Volumes, Timings Existing - Weekday PM 2: Island Way & Carlsbad Blvd SB 08/17/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 2 Lane Group WBL WBR NBT NBR SBL SBT Ø2 Protected Phases 8 1 6 2 Permitted Phases Detector Phase 8 1 6 Switch Phase Minimum Initial (s)10.0 10.0 10.0 10.0 Minimum Split (s)47.5 23.5 24.5 24.5 Total Split (s)47.5 23.6 52.5 28.9 Total Split (%)47.5%23.6% 52.5% 29% Maximum Green (s) 42.0 18.1 46.0 22.4 Yellow Time (s)4.0 4.0 5.0 5.0 All-Red Time (s)1.5 1.5 1.5 1.5 Lost Time Adjust (s)0.0 0.0 0.0 Total Lost Time (s)5.5 5.5 6.5 Lead/Lag Lead Lag Lead-Lag Optimize?Yes Yes Vehicle Extension (s) 3.0 3.0 2.0 2.0 Minimum Gap (s)0.2 0.2 0.2 0.2 Time Before Reduce (s) 20.0 0.0 20.0 20.0 Time To Reduce (s)0.0 0.0 0.0 0.0 Recall Mode None None C-Min C-Min Walk Time (s)7.0 Flash Dont Walk (s) 35.0 Pedestrian Calls (#/hr) 10 Act Effct Green (s)16.4 11.4 80.4 Actuated g/C Ratio 0.16 0.11 0.80 v/c Ratio 0.04 0.13 0.20 Control Delay 14.1 40.4 6.3 Queue Delay 0.0 0.0 0.0 Total Delay 14.1 40.4 6.3 LOS B D A Approach Delay 14.1 7.8 Approach LOS B A Intersection Summary Area Type:Other Cycle Length: 100 Actuated Cycle Length: 100 Offset: 0 (0%), Referenced to phase 2:NBT and 6:, Start of Green Natural Cycle: 100 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.45 Intersection Signal Delay: 7.9 Intersection LOS: A Intersection Capacity Utilization 32.6%ICU Level of Service A Analysis Period (min) 15 Splits and Phases: 2: Island Way & Carlsbad Blvd SB Nov. 15, 2023 Item #1 Page 71 of 159 Lanes, Volumes, Timings Existing - Weekend AM 2: Island Way & Carlsbad Blvd SB 08/17/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 1 Lane Group WBL WBR NBT NBR SBL SBT Ø2 Lane Configurations Traffic Volume (vph)10 0 0 0 51 254 Future Volume (vph)10 0 0 0 51 254 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 Storage Length (ft)0 0 0 255 Storage Lanes 1 0 0 1 Taper Length (ft)25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 0.95 Ped Bike Factor 0.99 Frt Flt Protected 0.950 0.950 Satd. Flow (prot)1770 0 0 0 1770 3539 Flt Permitted 0.950 0.950 Satd. Flow (perm)1770 0 0 0 1756 3539 Right Turn on Red Yes Yes Satd. Flow (RTOR) Link Speed (mph)30 30 30 Link Distance (ft)89 322 222 Travel Time (s)2.0 7.3 5.0 Confl. Peds. (#/hr)3 Peak Hour Factor 0.75 0.75 0.88 0.88 0.81 0.81 Adj. Flow (vph)13 0 0 0 63 314 Shared Lane Traffic (%) Lane Group Flow (vph) 13 0 0 0 63 314 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Right Left Left Median Width(ft)12 12 12 Link Offset(ft)0 0 0 Crosswalk Width(ft)16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 9 15 Number of Detectors 1 1 2 Detector Template Left Left Thru Leading Detector (ft)20 20 100 Trailing Detector (ft)0 0 0 Detector 1 Position(ft)0 0 0 Detector 1 Size(ft)20 20 6 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 Detector 1 Delay (s)0.0 0.0 0.0 Detector 2 Position(ft)94 Detector 2 Size(ft)6 Detector 2 Type Cl+Ex Detector 2 Channel Detector 2 Extend (s)0.0 Turn Type Prot Prot NA Nov. 15, 2023 Item #1 Page 72 of 159 ----""i ----""i ++ Lanes, Volumes, Timings Existing - Weekend AM 2: Island Way & Carlsbad Blvd SB 08/17/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 2 Lane Group WBL WBR NBT NBR SBL SBT Ø2 Protected Phases 8 1 6 2 Permitted Phases Detector Phase 8 1 6 Switch Phase Minimum Initial (s)10.0 10.0 10.0 10.0 Minimum Split (s)47.5 23.5 24.5 24.5 Total Split (s)47.5 25.0 52.5 27.5 Total Split (%)47.5%25.0% 52.5% 28% Maximum Green (s) 42.0 19.5 46.0 21.0 Yellow Time (s)4.0 4.0 5.0 5.0 All-Red Time (s)1.5 1.5 1.5 1.5 Lost Time Adjust (s)0.0 0.0 0.0 Total Lost Time (s)5.5 5.5 6.5 Lead/Lag Lead Lag Lead-Lag Optimize?Yes Yes Vehicle Extension (s) 3.0 3.0 2.0 2.0 Minimum Gap (s)0.2 0.2 0.2 0.2 Time Before Reduce (s) 20.0 0.0 20.0 20.0 Time To Reduce (s)0.0 0.0 0.0 0.0 Recall Mode None None C-Min C-Min Walk Time (s)7.0 Flash Dont Walk (s) 35.0 Pedestrian Calls (#/hr) 10 Act Effct Green (s)16.4 10.5 80.4 Actuated g/C Ratio 0.16 0.10 0.80 v/c Ratio 0.04 0.34 0.11 Control Delay 10.5 46.6 6.0 Queue Delay 0.0 0.0 0.0 Total Delay 10.5 46.6 6.0 LOS B D A Approach Delay 10.5 12.8 Approach LOS B B Intersection Summary Area Type:Other Cycle Length: 100 Actuated Cycle Length: 100 Offset: 0 (0%), Referenced to phase 2:NBT and 6:, Start of Green Natural Cycle: 100 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.34 Intersection Signal Delay: 12.7 Intersection LOS: B Intersection Capacity Utilization 26.7%ICU Level of Service A Analysis Period (min) 15 Splits and Phases: 2: Island Way & Carlsbad Blvd SB Nov. 15, 2023 Item #1 Page 73 of 159 Lanes, Volumes, Timings Existing - Weekend AM 2: Island Way & Carlsbad Blvd SB 08/17/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 1 Lane Group WBL WBR NBT NBR SBL SBT Ø2 Lane Configurations Traffic Volume (vph)11 0 0 0 67 614 Future Volume (vph)11 0 0 0 67 614 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 Storage Length (ft)0 0 0 255 Storage Lanes 1 0 0 1 Taper Length (ft)25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 0.95 Frt Flt Protected 0.950 0.950 Satd. Flow (prot)1770 0 0 0 1770 3539 Flt Permitted 0.950 0.950 Satd. Flow (perm)1770 0 0 0 1770 3539 Right Turn on Red Yes Yes Satd. Flow (RTOR) Link Speed (mph)30 30 30 Link Distance (ft)89 322 222 Travel Time (s)2.0 7.3 5.0 Peak Hour Factor 0.93 0.93 0.92 0.92 0.88 0.88 Adj. Flow (vph)12 0 0 0 76 698 Shared Lane Traffic (%) Lane Group Flow (vph) 12 0 0 0 76 698 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Right Left Left Median Width(ft)12 12 12 Link Offset(ft)0 0 0 Crosswalk Width(ft)16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 9 15 Number of Detectors 1 1 2 Detector Template Left Left Thru Leading Detector (ft)20 20 100 Trailing Detector (ft)0 0 0 Detector 1 Position(ft)0 0 0 Detector 1 Size(ft)20 20 6 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 Detector 1 Delay (s)0.0 0.0 0.0 Detector 2 Position(ft)94 Detector 2 Size(ft)6 Detector 2 Type Cl+Ex Detector 2 Channel Detector 2 Extend (s)0.0 Turn Type Prot Prot NA Protected Phases 8 1 6 2 Permitted Phases Nov. 15, 2023 Item #1 Page 74 of 159 ----""i ----""i ++ Lanes, Volumes, Timings Existing - Weekend AM 2: Island Way & Carlsbad Blvd SB 08/17/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 2 Lane Group WBL WBR NBT NBR SBL SBT Ø2 Detector Phase 8 1 6 Switch Phase Minimum Initial (s)10.0 10.0 10.0 10.0 Minimum Split (s)47.5 23.5 24.5 24.5 Total Split (s)47.5 23.6 52.5 28.9 Total Split (%)47.5%23.6% 52.5% 29% Maximum Green (s) 42.0 18.1 46.0 22.4 Yellow Time (s)4.0 4.0 5.0 5.0 All-Red Time (s)1.5 1.5 1.5 1.5 Lost Time Adjust (s)0.0 0.0 0.0 Total Lost Time (s)5.5 5.5 6.5 Lead/Lag Lead Lag Lead-Lag Optimize?Yes Yes Vehicle Extension (s) 3.0 3.0 2.0 2.0 Minimum Gap (s)0.2 0.2 0.2 0.2 Time Before Reduce (s) 20.0 0.0 20.0 20.0 Time To Reduce (s)0.0 0.0 0.0 0.0 Recall Mode None None C-Min C-Min Walk Time (s)7.0 Flash Dont Walk (s) 35.0 Pedestrian Calls (#/hr) 10 Act Effct Green (s)16.4 10.9 80.4 Actuated g/C Ratio 0.16 0.11 0.80 v/c Ratio 0.04 0.40 0.25 Control Delay 12.1 47.5 6.5 Queue Delay 0.0 0.0 0.0 Total Delay 12.1 47.5 6.5 LOS B D A Approach Delay 12.1 10.6 Approach LOS B B Intersection Summary Area Type:Other Cycle Length: 100 Actuated Cycle Length: 100 Offset: 0 (0%), Referenced to phase 2:NBT and 6:, Start of Green Natural Cycle: 100 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.40 Intersection Signal Delay: 10.6 Intersection LOS: B Intersection Capacity Utilization 35.3%ICU Level of Service A Analysis Period (min) 15 Splits and Phases: 2: Island Way & Carlsbad Blvd SB Nov. 15, 2023 Item #1 Page 75 of 159 Lanes, Volumes, Timings Existing PM Weekend 2: Island Way & Carlsbad Blvd SB 08/17/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 1 Lane Group WBL WBR NBT NBR SBL SBT Ø2 Lane Configurations Traffic Volume (vph)22 0 0 0 93 592 Future Volume (vph)22 0 0 0 93 592 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 Storage Length (ft)0 0 0 255 Storage Lanes 1 0 0 1 Taper Length (ft)25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 0.95 Frt Flt Protected 0.950 0.950 Satd. Flow (prot)1770 0 0 0 1770 3539 Flt Permitted 0.950 0.950 Satd. Flow (perm)1770 0 0 0 1770 3539 Right Turn on Red Yes Yes Satd. Flow (RTOR) Link Speed (mph)30 30 30 Link Distance (ft)89 322 222 Travel Time (s)2.0 7.3 5.0 Peak Hour Factor 0.79 0.79 0.92 0.92 0.95 0.95 Adj. Flow (vph)28 0 0 0 98 623 Shared Lane Traffic (%) Lane Group Flow (vph) 28 0 0 0 98 623 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Right Left Left Median Width(ft)12 12 12 Link Offset(ft)0 0 0 Crosswalk Width(ft)16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 9 15 Number of Detectors 1 1 2 Detector Template Left Left Thru Leading Detector (ft)20 20 100 Trailing Detector (ft)0 0 0 Detector 1 Position(ft)0 0 0 Detector 1 Size(ft)20 20 6 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 Detector 1 Delay (s)0.0 0.0 0.0 Detector 2 Position(ft)94 Detector 2 Size(ft)6 Detector 2 Type Cl+Ex Detector 2 Channel Detector 2 Extend (s)0.0 Turn Type Prot Prot NA Protected Phases 8 1 6 2 Permitted Phases Nov. 15, 2023 Item #1 Page 76 of 159 ----""i ----""i ++ Lanes, Volumes, Timings Existing PM Weekend 2: Island Way & Carlsbad Blvd SB 08/17/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 2 Lane Group WBL WBR NBT NBR SBL SBT Ø2 Detector Phase 8 1 6 Switch Phase Minimum Initial (s)10.0 10.0 10.0 10.0 Minimum Split (s)47.5 23.5 24.5 24.5 Total Split (s)47.5 23.5 52.5 29.0 Total Split (%)47.5%23.5% 52.5% 29% Maximum Green (s) 42.0 18.0 46.0 22.5 Yellow Time (s)4.0 4.0 5.0 5.0 All-Red Time (s)1.5 1.5 1.5 1.5 Lost Time Adjust (s)0.0 0.0 0.0 Total Lost Time (s)5.5 5.5 6.5 Lead/Lag Lead Lag Lead-Lag Optimize?Yes Yes Vehicle Extension (s) 3.0 3.0 2.0 2.0 Minimum Gap (s)0.2 0.2 0.2 0.2 Time Before Reduce (s) 20.0 0.0 20.0 20.0 Time To Reduce (s)0.0 0.0 0.0 0.0 Recall Mode None None C-Min C-Min Walk Time (s)7.0 Flash Dont Walk (s) 35.0 Pedestrian Calls (#/hr) 10 Act Effct Green (s)16.4 12.2 76.0 Actuated g/C Ratio 0.16 0.12 0.76 v/c Ratio 0.10 0.45 0.23 Control Delay 12.3 47.1 6.9 Queue Delay 0.0 0.0 0.0 Total Delay 12.3 47.1 6.9 LOS B D A Approach Delay 12.3 12.4 Approach LOS B B Intersection Summary Area Type:Other Cycle Length: 100 Actuated Cycle Length: 100 Offset: 0 (0%), Referenced to phase 2:NBT and 6:, Start of Green Natural Cycle: 100 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.52 Intersection Signal Delay: 12.4 Intersection LOS: B Intersection Capacity Utilization 34.7%ICU Level of Service A Analysis Period (min) 15 Splits and Phases: 2: Island Way & Carlsbad Blvd SB Nov. 15, 2023 Item #1 Page 77 of 159 Lanes, Volumes, Timings Existing with Covid Adjustment - Weekday AM 2: Island Way & Carlsbad Blvd SB 08/22/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 1 Lane Group WBL WBR NBT NBR SBL SBT Ø2 Lane Configurations Traffic Volume (vph)20 0 0 0 64 540 Future Volume (vph)20 0 0 0 64 540 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 Storage Length (ft)0 0 0 255 Storage Lanes 1 0 0 1 Taper Length (ft)25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 0.95 Ped Bike Factor 1.00 1.00 Frt Flt Protected 0.950 0.950 Satd. Flow (prot)1770 0 0 0 1770 3539 Flt Permitted 0.950 0.950 Satd. Flow (perm)1768 0 0 0 1765 3539 Right Turn on Red Yes Yes Satd. Flow (RTOR) Link Speed (mph)30 30 30 Link Distance (ft)89 322 222 Travel Time (s)2.0 7.3 5.0 Confl. Peds. (#/hr)1 1 1 Peak Hour Factor 0.79 0.79 0.92 0.92 0.93 0.93 Adj. Flow (vph)25 0 0 0 69 581 Shared Lane Traffic (%) Lane Group Flow (vph) 25 0 0 0 69 581 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Right Left Left Median Width(ft)12 12 12 Link Offset(ft)0 0 0 Crosswalk Width(ft)16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 9 15 Number of Detectors 1 1 2 Detector Template Left Left Thru Leading Detector (ft)20 20 100 Trailing Detector (ft)0 0 0 Detector 1 Position(ft)0 0 0 Detector 1 Size(ft)20 20 6 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 Detector 1 Delay (s)0.0 0.0 0.0 Detector 2 Position(ft)94 Detector 2 Size(ft)6 Detector 2 Type Cl+Ex Detector 2 Channel Detector 2 Extend (s)0.0 Turn Type Prot Prot NA Nov. 15, 2023 Item #1 Page 78 of 159 ----""i ----""i ++ Lanes, Volumes, Timings Existing with Covid Adjustment - Weekday AM 2: Island Way & Carlsbad Blvd SB 08/22/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 2 Lane Group WBL WBR NBT NBR SBL SBT Ø2 Protected Phases 8 1 6 2 Permitted Phases Detector Phase 8 1 6 Switch Phase Minimum Initial (s)10.0 10.0 10.0 10.0 Minimum Split (s)47.5 23.5 24.5 24.5 Total Split (s)47.5 24.0 52.5 28.5 Total Split (%)47.5%24.0% 52.5% 29% Maximum Green (s) 42.0 18.5 46.0 22.0 Yellow Time (s)4.0 4.0 5.0 5.0 All-Red Time (s)1.5 1.5 1.5 1.5 Lost Time Adjust (s)0.0 0.0 0.0 Total Lost Time (s)5.5 5.5 6.5 Lead/Lag Lead Lag Lead-Lag Optimize?Yes Yes Vehicle Extension (s) 3.0 3.0 2.0 2.0 Minimum Gap (s)0.2 0.2 0.2 0.2 Time Before Reduce (s) 20.0 0.0 20.0 20.0 Time To Reduce (s)0.0 0.0 0.0 0.0 Recall Mode None None C-Min C-Min Walk Time (s)7.0 Flash Dont Walk (s) 35.0 Pedestrian Calls (#/hr) 10 Act Effct Green (s)16.4 10.9 76.0 Actuated g/C Ratio 0.16 0.11 0.76 v/c Ratio 0.09 0.36 0.22 Control Delay 10.6 46.4 6.8 Queue Delay 0.0 0.0 0.0 Total Delay 10.6 46.4 6.8 LOS B D A Approach Delay 10.6 11.0 Approach LOS B B Intersection Summary Area Type:Other Cycle Length: 100 Actuated Cycle Length: 100 Offset: 0 (0%), Referenced to phase 2:NBT and 6:, Start of Green Natural Cycle: 100 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.40 Intersection Signal Delay: 11.0 Intersection LOS: B Intersection Capacity Utilization 33.3%ICU Level of Service A Analysis Period (min) 15 Splits and Phases: 2: Island Way & Carlsbad Blvd SB Nov. 15, 2023 Item #1 Page 79 of 159 Lanes, Volumes, Timings Existing with Covid Adjustment - Weekday NOON 2: Island Way & Carlsbad Blvd SB 08/22/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 1 Lane Group WBL WBR NBT NBR SBL SBT Ø2 Lane Configurations Traffic Volume (vph)0 0 0 0 119 662 Future Volume (vph)0 0 0 0 119 662 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 Storage Length (ft)0 0 0 255 Storage Lanes 1 0 0 1 Taper Length (ft)25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 0.95 Ped Bike Factor 1.00 Frt Flt Protected 0.950 Satd. Flow (prot)1863 0 0 0 1770 3539 Flt Permitted 0.950 Satd. Flow (perm)1863 0 0 0 1765 3539 Right Turn on Red Yes Yes Satd. Flow (RTOR) Link Speed (mph)30 30 30 Link Distance (ft)89 322 222 Travel Time (s)2.0 7.3 5.0 Confl. Peds. (#/hr)1 1 Peak Hour Factor 0.85 0.85 0.92 0.92 0.95 0.95 Adj. Flow (vph)0 0 0 0 125 697 Shared Lane Traffic (%) Lane Group Flow (vph) 0 0 0 0 125 697 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Right Left Left Median Width(ft)12 12 12 Link Offset(ft)0 0 0 Crosswalk Width(ft)16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 9 15 Number of Detectors 1 1 2 Detector Template Left Left Thru Leading Detector (ft)20 20 100 Trailing Detector (ft)0 0 0 Detector 1 Position(ft)0 0 0 Detector 1 Size(ft)20 20 6 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 Detector 1 Delay (s)0.0 0.0 0.0 Detector 2 Position(ft)94 Detector 2 Size(ft)6 Detector 2 Type Cl+Ex Detector 2 Channel Detector 2 Extend (s)0.0 Turn Type Prot Prot NA Nov. 15, 2023 Item #1 Page 80 of 159 ----""i ----""i ++ Lanes, Volumes, Timings Existing with Covid Adjustment - Weekday NOON 2: Island Way & Carlsbad Blvd SB 08/22/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 2 Lane Group WBL WBR NBT NBR SBL SBT Ø2 Protected Phases 8 1 6 2 Permitted Phases Detector Phase 8 1 6 Switch Phase Minimum Initial (s)10.0 10.0 10.0 10.0 Minimum Split (s)47.5 23.5 24.5 24.5 Total Split (s)47.5 23.6 52.5 28.9 Total Split (%)47.5%23.6% 52.5% 29% Maximum Green (s) 42.0 18.1 46.0 22.4 Yellow Time (s)4.0 4.0 5.0 5.0 All-Red Time (s)1.5 1.5 1.5 1.5 Lost Time Adjust (s)0.0 0.0 0.0 Total Lost Time (s)5.5 5.5 6.5 Lead/Lag Lead Lag Lead-Lag Optimize?Yes Yes Vehicle Extension (s) 3.0 3.0 2.0 2.0 Minimum Gap (s)0.2 0.2 0.2 0.2 Time Before Reduce (s) 20.0 0.0 20.0 20.0 Time To Reduce (s)0.0 0.0 0.0 0.0 Recall Mode None None C-Min C-Min Walk Time (s)7.0 Flash Dont Walk (s) 35.0 Pedestrian Calls (#/hr) 10 Act Effct Green (s)12.8 80.4 Actuated g/C Ratio 0.13 0.80 v/c Ratio 0.55 0.24 Control Delay 49.9 6.5 Queue Delay 0.0 0.0 Total Delay 49.9 6.5 LOS D A Approach Delay 13.1 Approach LOS B Intersection Summary Area Type:Other Cycle Length: 100 Actuated Cycle Length: 100 Offset: 0 (0%), Referenced to phase 2:NBT and 6:, Start of Green Natural Cycle: 100 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.55 Intersection Signal Delay: 13.1 Intersection LOS: B Intersection Capacity Utilization 23.7%ICU Level of Service A Analysis Period (min) 15 Splits and Phases: 2: Island Way & Carlsbad Blvd SB Nov. 15, 2023 Item #1 Page 81 of 159 Lanes, Volumes, Timings Existing with Covid Adjustment - Weekday PM 2: Island Way & Carlsbad Blvd SB 08/22/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 1 Lane Group WBL WBR NBT NBR SBL SBT Ø2 Lane Configurations Traffic Volume (vph)11 0 0 0 118 723 Future Volume (vph)11 0 0 0 118 723 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 Storage Length (ft)0 0 0 255 Storage Lanes 1 0 0 1 Taper Length (ft)25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 0.95 Ped Bike Factor 1.00 Frt Flt Protected 0.950 0.950 Satd. Flow (prot)1770 0 0 0 1770 3539 Flt Permitted 0.950 0.950 Satd. Flow (perm)1770 0 0 0 1764 3539 Right Turn on Red Yes Yes Satd. Flow (RTOR) Link Speed (mph)30 30 30 Link Distance (ft)89 322 222 Travel Time (s)2.0 7.3 5.0 Confl. Peds. (#/hr)1 Peak Hour Factor 0.65 0.65 0.92 0.92 0.91 0.91 Adj. Flow (vph)17 0 0 0 130 795 Shared Lane Traffic (%) Lane Group Flow (vph) 17 0 0 0 130 795 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Right Left Left Median Width(ft)12 12 12 Link Offset(ft)0 0 0 Crosswalk Width(ft)16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 9 15 Number of Detectors 1 1 2 Detector Template Left Left Thru Leading Detector (ft)20 20 100 Trailing Detector (ft)0 0 0 Detector 1 Position(ft)0 0 0 Detector 1 Size(ft)20 20 6 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 Detector 1 Delay (s)0.0 0.0 0.0 Detector 2 Position(ft)94 Detector 2 Size(ft)6 Detector 2 Type Cl+Ex Detector 2 Channel Detector 2 Extend (s)0.0 Turn Type Prot Prot NA Nov. 15, 2023 Item #1 Page 82 of 159 ----""i ----""i ++ Lanes, Volumes, Timings Existing with Covid Adjustment - Weekday PM 2: Island Way & Carlsbad Blvd SB 08/22/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 2 Lane Group WBL WBR NBT NBR SBL SBT Ø2 Protected Phases 8 1 6 2 Permitted Phases Detector Phase 8 1 6 Switch Phase Minimum Initial (s)10.0 10.0 10.0 10.0 Minimum Split (s)47.5 23.5 24.5 24.5 Total Split (s)47.5 23.6 62.5 38.9 Total Split (%)43.2%21.5% 56.8% 35% Maximum Green (s) 42.0 18.1 56.0 32.4 Yellow Time (s)4.0 4.0 5.0 5.0 All-Red Time (s)1.5 1.5 1.5 1.5 Lost Time Adjust (s)0.0 0.0 0.0 Total Lost Time (s)5.5 5.5 6.5 Lead/Lag Lead Lag Lead-Lag Optimize?Yes Yes Vehicle Extension (s) 3.0 3.0 2.0 2.0 Minimum Gap (s)0.2 0.2 0.2 0.2 Time Before Reduce (s) 20.0 0.0 20.0 20.0 Time To Reduce (s)0.0 0.0 0.0 0.0 Recall Mode None None C-Min C-Min Walk Time (s)7.0 Flash Dont Walk (s) 35.0 Pedestrian Calls (#/hr) 10 Act Effct Green (s)16.4 13.6 86.0 Actuated g/C Ratio 0.15 0.12 0.78 v/c Ratio 0.06 0.59 0.29 Control Delay 18.9 56.4 6.6 Queue Delay 0.0 0.0 0.0 Total Delay 18.9 56.4 6.6 LOS B E A Approach Delay 18.9 13.6 Approach LOS B B Intersection Summary Area Type:Other Cycle Length: 110 Actuated Cycle Length: 110 Offset: 0 (0%), Referenced to phase 2:NBT and 6:, Start of Green Natural Cycle: 110 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.59 Intersection Signal Delay: 13.7 Intersection LOS: B Intersection Capacity Utilization 38.3%ICU Level of Service A Analysis Period (min) 15 Splits and Phases: 2: Island Way & Carlsbad Blvd SB Nov. 15, 2023 Item #1 Page 83 of 159 Lanes, Volumes, Timings Existing with Covid Adjustment - Weekend AM 2: Island Way & Carlsbad Blvd SB 08/22/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 1 Lane Group WBL WBR NBT NBR SBL SBT Ø2 Lane Configurations Traffic Volume (vph)14 0 0 0 70 350 Future Volume (vph)14 0 0 0 70 350 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 Storage Length (ft)0 0 0 255 Storage Lanes 1 0 0 1 Taper Length (ft)25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 0.95 Frt Flt Protected 0.950 0.950 Satd. Flow (prot)1770 0 0 0 1770 3539 Flt Permitted 0.950 0.950 Satd. Flow (perm)1770 0 0 0 1770 3539 Right Turn on Red Yes Yes Satd. Flow (RTOR) Link Speed (mph)30 30 30 Link Distance (ft)89 322 222 Travel Time (s)2.0 7.3 5.0 Peak Hour Factor 0.75 0.75 0.88 0.88 0.81 0.81 Adj. Flow (vph)19 0 0 0 86 432 Shared Lane Traffic (%) Lane Group Flow (vph) 19 0 0 0 86 432 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Right Left Left Median Width(ft)12 12 12 Link Offset(ft)0 0 0 Crosswalk Width(ft)16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 9 15 Number of Detectors 1 1 2 Detector Template Left Left Thru Leading Detector (ft)20 20 100 Trailing Detector (ft)0 0 0 Detector 1 Position(ft)0 0 0 Detector 1 Size(ft)20 20 6 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 Detector 1 Delay (s)0.0 0.0 0.0 Detector 2 Position(ft)94 Detector 2 Size(ft)6 Detector 2 Type Cl+Ex Detector 2 Channel Detector 2 Extend (s)0.0 Turn Type Prot Prot NA Protected Phases 8 1 6 2 Permitted Phases Nov. 15, 2023 Item #1 Page 84 of 159 ----""i ----""i ++ Lanes, Volumes, Timings Existing with Covid Adjustment - Weekend AM 2: Island Way & Carlsbad Blvd SB 08/22/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 2 Lane Group WBL WBR NBT NBR SBL SBT Ø2 Detector Phase 8 1 6 Switch Phase Minimum Initial (s)10.0 10.0 10.0 10.0 Minimum Split (s)47.5 23.5 24.5 24.5 Total Split (s)47.5 25.0 52.5 27.5 Total Split (%)47.5%25.0% 52.5% 28% Maximum Green (s) 42.0 19.5 46.0 21.0 Yellow Time (s)4.0 4.0 5.0 5.0 All-Red Time (s)1.5 1.5 1.5 1.5 Lost Time Adjust (s)0.0 0.0 0.0 Total Lost Time (s)5.5 5.5 6.5 Lead/Lag Lead Lag Lead-Lag Optimize?Yes Yes Vehicle Extension (s) 3.0 3.0 2.0 2.0 Minimum Gap (s)0.2 0.2 0.2 0.2 Time Before Reduce (s) 20.0 0.0 20.0 20.0 Time To Reduce (s)0.0 0.0 0.0 0.0 Recall Mode None None C-Min C-Min Walk Time (s)7.0 Flash Dont Walk (s) 35.0 Pedestrian Calls (#/hr) 10 Act Effct Green (s)16.4 11.2 80.4 Actuated g/C Ratio 0.16 0.11 0.80 v/c Ratio 0.07 0.43 0.15 Control Delay 12.0 48.1 6.1 Queue Delay 0.0 0.0 0.0 Total Delay 12.0 48.1 6.1 LOS B D A Approach Delay 12.0 13.1 Approach LOS B B Intersection Summary Area Type:Other Cycle Length: 100 Actuated Cycle Length: 100 Offset: 0 (0%), Referenced to phase 2:NBT and 6:, Start of Green Natural Cycle: 100 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.43 Intersection Signal Delay: 13.0 Intersection LOS: B Intersection Capacity Utilization 28.0%ICU Level of Service A Analysis Period (min) 15 Splits and Phases: 2: Island Way & Carlsbad Blvd SB Nov. 15, 2023 Item #1 Page 85 of 159 Lanes, Volumes, Timings Existing with Covid Adjustment - Weekend NOON 2: Island Way 08/22/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 1 Lane Group WBL WBR NBT NBR SBL SBT Ø2 Lane Configurations Traffic Volume (vph)15 0 0 0 93 845 Future Volume (vph)15 0 0 0 93 845 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 Storage Length (ft)0 0 0 255 Storage Lanes 1 0 0 1 Taper Length (ft)25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 0.95 Frt Flt Protected 0.950 0.950 Satd. Flow (prot)1770 0 0 0 1770 3539 Flt Permitted 0.950 0.950 Satd. Flow (perm)1770 0 0 0 1770 3539 Right Turn on Red Yes Yes Satd. Flow (RTOR) Link Speed (mph)30 30 30 Link Distance (ft)89 322 222 Travel Time (s)2.0 7.3 5.0 Peak Hour Factor 0.84 0.84 0.92 0.92 0.91 0.91 Adj. Flow (vph)18 0 0 0 102 929 Shared Lane Traffic (%) Lane Group Flow (vph) 18 0 0 0 102 929 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Right Left Left Median Width(ft)12 12 12 Link Offset(ft)0 0 0 Crosswalk Width(ft)16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 9 15 Number of Detectors 1 1 2 Detector Template Left Left Thru Leading Detector (ft)20 20 100 Trailing Detector (ft)0 0 0 Detector 1 Position(ft)0 0 0 Detector 1 Size(ft)20 20 6 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 Detector 1 Delay (s)0.0 0.0 0.0 Detector 2 Position(ft)94 Detector 2 Size(ft)6 Detector 2 Type Cl+Ex Detector 2 Channel Detector 2 Extend (s)0.0 Turn Type Prot Prot NA Protected Phases 8 1 6 2 Permitted Phases Nov. 15, 2023 Item #1 Page 86 of 159 ----""i ----""i ++ Lanes, Volumes, Timings Existing with Covid Adjustment - Weekend NOON 2: Island Way 08/22/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 2 Lane Group WBL WBR NBT NBR SBL SBT Ø2 Detector Phase 8 1 6 Switch Phase Minimum Initial (s)10.0 10.0 10.0 10.0 Minimum Split (s)47.5 23.5 24.5 24.5 Total Split (s)47.5 23.5 52.5 29.0 Total Split (%)47.5%23.5% 52.5% 29% Maximum Green (s) 42.0 18.0 46.0 22.5 Yellow Time (s)4.0 4.0 5.0 5.0 All-Red Time (s)1.5 1.5 1.5 1.5 Lost Time Adjust (s)0.0 0.0 0.0 Total Lost Time (s)5.5 5.5 6.5 Lead/Lag Lead Lag Lead-Lag Optimize?Yes Yes Vehicle Extension (s) 3.0 3.0 2.0 2.0 Minimum Gap (s)0.2 0.2 0.2 0.2 Time Before Reduce (s) 20.0 0.0 20.0 20.0 Time To Reduce (s)0.0 0.0 0.0 0.0 Recall Mode None None C-Min C-Min Walk Time (s)7.0 Flash Dont Walk (s) 35.0 Pedestrian Calls (#/hr) 10 Act Effct Green (s)16.4 11.9 80.4 Actuated g/C Ratio 0.16 0.12 0.80 v/c Ratio 0.06 0.49 0.33 Control Delay 16.3 48.8 7.1 Queue Delay 0.0 0.0 0.0 Total Delay 16.3 48.8 7.1 LOS B D A Approach Delay 16.3 11.3 Approach LOS B B Intersection Summary Area Type:Other Cycle Length: 100 Actuated Cycle Length: 100 Offset: 0 (0%), Referenced to phase 2:NBT and 6:, Start of Green Natural Cycle: 100 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.49 Intersection Signal Delay: 11.3 Intersection LOS: B Intersection Capacity Utilization 41.7%ICU Level of Service A Analysis Period (min) 15 Splits and Phases: 2: Island Way Nov. 15, 2023 Item #1 Page 87 of 159 Lanes, Volumes, Timings Existing with Covid Adjustment - Weekend PM 2: Island Way & Carlsbad Blvd SB 08/22/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 1 Lane Group WBL WBR NBT NBR SBL SBT Ø2 Lane Configurations Traffic Volume (vph)30 0 0 0 128 815 Future Volume (vph)30 0 0 0 128 815 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 Storage Length (ft)0 0 0 255 Storage Lanes 1 0 0 1 Taper Length (ft)25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 0.95 Frt Flt Protected 0.950 0.950 Satd. Flow (prot)1770 0 0 0 1770 3539 Flt Permitted 0.950 0.950 Satd. Flow (perm)1770 0 0 0 1770 3539 Right Turn on Red Yes Yes Satd. Flow (RTOR) Link Speed (mph)30 30 30 Link Distance (ft)89 322 222 Travel Time (s)2.0 7.3 5.0 Peak Hour Factor 0.79 0.79 0.92 0.92 0.95 0.95 Adj. Flow (vph)38 0 0 0 135 858 Shared Lane Traffic (%) Lane Group Flow (vph) 38 0 0 0 135 858 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Right Left Left Median Width(ft)12 12 12 Link Offset(ft)0 0 0 Crosswalk Width(ft)16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 9 15 Number of Detectors 1 1 2 Detector Template Left Left Thru Leading Detector (ft)20 20 100 Trailing Detector (ft)0 0 0 Detector 1 Position(ft)0 0 0 Detector 1 Size(ft)20 20 6 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 Detector 1 Delay (s)0.0 0.0 0.0 Detector 2 Position(ft)94 Detector 2 Size(ft)6 Detector 2 Type Cl+Ex Detector 2 Channel Detector 2 Extend (s)0.0 Turn Type Prot Prot NA Protected Phases 8 1 6 2 Permitted Phases Nov. 15, 2023 Item #1 Page 88 of 159 ----""i ----""i ++ Lanes, Volumes, Timings Existing with Covid Adjustment - Weekend PM 2: Island Way & Carlsbad Blvd SB 08/22/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 2 Lane Group WBL WBR NBT NBR SBL SBT Ø2 Detector Phase 8 1 6 Switch Phase Minimum Initial (s)10.0 10.0 10.0 10.0 Minimum Split (s)47.5 23.5 24.5 24.5 Total Split (s)47.5 23.6 62.5 38.9 Total Split (%)43.2%21.5% 56.8% 35% Maximum Green (s) 42.0 18.1 56.0 32.4 Yellow Time (s)4.0 4.0 5.0 5.0 All-Red Time (s)1.5 1.5 1.5 1.5 Lost Time Adjust (s)0.0 0.0 0.0 Total Lost Time (s)5.5 5.5 6.5 Lead/Lag Lead Lag Lead-Lag Optimize?Yes Yes Vehicle Extension (s) 3.0 3.0 2.0 2.0 Minimum Gap (s)0.2 0.2 0.2 0.2 Time Before Reduce (s) 20.0 0.0 20.0 20.0 Time To Reduce (s)0.0 0.0 0.0 0.0 Recall Mode None None C-Min C-Min Walk Time (s)7.0 Flash Dont Walk (s) 35.0 Pedestrian Calls (#/hr) 10 Act Effct Green (s)16.4 14.5 86.0 Actuated g/C Ratio 0.15 0.13 0.78 v/c Ratio 0.14 0.58 0.31 Control Delay 15.2 54.5 6.8 Queue Delay 0.0 0.0 0.0 Total Delay 15.2 54.5 6.8 LOS B D A Approach Delay 15.2 13.3 Approach LOS B B Intersection Summary Area Type:Other Cycle Length: 110 Actuated Cycle Length: 110 Offset: 0 (0%), Referenced to phase 2:NBT and 6:, Start of Green Natural Cycle: 110 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.66 Intersection Signal Delay: 13.4 Intersection LOS: B Intersection Capacity Utilization 40.9%ICU Level of Service A Analysis Period (min) 15 Splits and Phases: 2: Island Way & Carlsbad Blvd SB Nov. 15, 2023 Item #1 Page 89 of 159 Lanes, Volumes, Timings Existing - Weekday AM 3: Carlsbad Blvd NB & Island Way 08/17/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph)35 11 0 0 14 8 0 268 9 0 0 0 Future Volume (vph)35 11 0 0 14 8 0 268 9 0 0 0 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 0.95 1.00 1.00 1.00 Ped Bike Factor 0.98 0.99 1.00 Frt 0.952 0.995 Flt Protected 0.963 Satd. Flow (prot)0 1794 0 0 1751 0 0 3511 0 0 0 0 Flt Permitted 0.963 Satd. Flow (perm)0 1762 0 0 1751 0 0 3511 0 0 0 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR)10 3 Link Speed (mph)30 30 30 30 Link Distance (ft)89 352 328 558 Travel Time (s)2.0 8.0 7.5 12.7 Confl. Peds. (#/hr)34 34 1 1 Confl. Bikes (#/hr)43 37 Peak Hour Factor 0.82 0.82 0.82 0.79 0.79 0.79 0.82 0.82 0.82 0.92 0.92 0.92 Adj. Flow (vph)43 13 0 0 18 10 0 327 11 0 0 0 Shared Lane Traffic (%) Lane Group Flow (vph) 0 56 0 0 28 0 0 338 0 0 0 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft)0 0 0 0 Link Offset(ft)0 0 0 0 Crosswalk Width(ft)16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 1 2 2 2 Detector Template Left Thru Thru Thru Leading Detector (ft)20 100 100 100 Trailing Detector (ft)0 0 0 0 Detector 1 Position(ft)0 0 0 0 Detector 1 Size(ft)20 6 6 6 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 Detector 1 Delay (s)0.0 0.0 0.0 0.0 Detector 2 Position(ft)94 94 94 Detector 2 Size(ft)6 6 6 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s)0.0 0.0 0.0 Turn Type Split NA NA NA Protected Phases 1 1 8 2 Permitted Phases Nov. 15, 2023 Item #1 Page 90 of 159 Lanes, Volumes, Timings Existing - Weekday AM 3: Carlsbad Blvd NB & Island Way 08/17/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 2 Lane Group Ø6 Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Util. Factor Ped Bike Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type Protected Phases 6 Permitted Phases Nov. 15, 2023 Item #1 Page 91 of 159 Lanes, Volumes, Timings Existing - Weekday AM 3: Carlsbad Blvd NB & Island Way 08/17/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 3 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Detector Phase 1 1 8 2 Switch Phase Minimum Initial (s)10.0 10.0 10.0 10.0 Minimum Split (s)23.5 23.5 47.5 24.5 Total Split (s)24.0 24.0 47.5 28.5 Total Split (%)24.0% 24.0%47.5%28.5% Maximum Green (s) 18.5 18.5 42.0 22.0 Yellow Time (s)4.0 4.0 4.0 5.0 All-Red Time (s)1.5 1.5 1.5 1.5 Lost Time Adjust (s)0.0 0.0 0.0 Total Lost Time (s)5.5 5.5 6.5 Lead/Lag Lead Lead Lag Lead-Lag Optimize? Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 2.0 Minimum Gap (s)0.2 0.2 0.2 0.2 Time Before Reduce (s) 0.0 0.0 20.0 20.0 Time To Reduce (s)0.0 0.0 0.0 0.0 Recall Mode None None None C-Min Walk Time (s)7.0 Flash Dont Walk (s)35.0 Pedestrian Calls (#/hr)10 Act Effct Green (s)10.3 16.4 66.4 Actuated g/C Ratio 0.10 0.16 0.66 v/c Ratio 0.30 0.09 0.15 Control Delay 10.8 21.9 12.2 Queue Delay 0.0 0.0 0.0 Total Delay 10.8 21.9 12.2 LOS B C B Approach Delay 10.8 21.9 12.2 Approach LOS B C B Intersection Summary Area Type:Other Cycle Length: 100 Actuated Cycle Length: 100 Offset: 0 (0%), Referenced to phase 2:NBT and 6:, Start of Green Natural Cycle: 100 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.30 Intersection Signal Delay: 12.6 Intersection LOS: B Intersection Capacity Utilization 44.7%ICU Level of Service A Analysis Period (min) 15 Splits and Phases: 3: Carlsbad Blvd NB & Island Way Nov. 15, 2023 Item #1 Page 92 of 159 Lanes, Volumes, Timings Existing - Weekday AM 3: Carlsbad Blvd NB & Island Way 08/17/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 4 Lane Group Ø6 Detector Phase Switch Phase Minimum Initial (s)10.0 Minimum Split (s)24.5 Total Split (s)52.5 Total Split (%)53% Maximum Green (s) 46.0 Yellow Time (s)5.0 All-Red Time (s)1.5 Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) 2.0 Minimum Gap (s)0.2 Time Before Reduce (s) 20.0 Time To Reduce (s)0.0 Recall Mode C-Min Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Intersection Summary Nov. 15, 2023 Item #1 Page 93 of 159 Lanes, Volumes, Timings Existing - Weekday NOON 3: Carlsbad Blvd NB & Island Way 08/17/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph)63 22 0 0 0 18 0 452 12 0 0 0 Future Volume (vph)63 22 0 0 0 18 0 452 12 0 0 0 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 0.95 1.00 1.00 1.00 Ped Bike Factor 0.99 0.97 1.00 Frt 0.865 0.996 Flt Protected 0.964 Satd. Flow (prot)0 1796 0 0 1560 0 0 3515 0 0 0 0 Flt Permitted 0.964 Satd. Flow (perm)0 1770 0 0 1560 0 0 3515 0 0 0 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR)348 2 Link Speed (mph)30 30 30 30 Link Distance (ft)89 352 328 558 Travel Time (s)2.0 8.0 7.5 12.7 Confl. Peds. (#/hr)28 1 1 28 1 1 Confl. Bikes (#/hr)50 Peak Hour Factor 0.95 0.95 0.95 0.85 0.85 0.85 0.95 0.95 0.95 0.95 0.95 0.95 Adj. Flow (vph)66 23 0 0 0 21 0 476 13 0 0 0 Shared Lane Traffic (%) Lane Group Flow (vph) 0 89 0 0 21 0 0 489 0 0 0 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft)0 0 0 0 Link Offset(ft)0 0 0 0 Crosswalk Width(ft)16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 1 2 2 2 Detector Template Left Thru Thru Thru Leading Detector (ft)20 100 100 100 Trailing Detector (ft)0 0 0 0 Detector 1 Position(ft)0 0 0 0 Detector 1 Size(ft)20 6 6 6 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 Detector 1 Delay (s)0.0 0.0 0.0 0.0 Detector 2 Position(ft)94 94 94 Detector 2 Size(ft)6 6 6 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s)0.0 0.0 0.0 Turn Type Split NA NA NA Protected Phases 1 1 8 2 Permitted Phases Nov. 15, 2023 Item #1 Page 94 of 159 Lanes, Volumes, Timings Existing - Weekday NOON 3: Carlsbad Blvd NB & Island Way 08/17/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 2 Lane Group Ø6 Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Util. Factor Ped Bike Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type Protected Phases 6 Permitted Phases Nov. 15, 2023 Item #1 Page 95 of 159 Lanes, Volumes, Timings Existing - Weekday NOON 3: Carlsbad Blvd NB & Island Way 08/17/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 3 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Detector Phase 1 1 8 2 Switch Phase Minimum Initial (s)10.0 10.0 10.0 10.0 Minimum Split (s)23.5 23.5 47.5 24.5 Total Split (s)24.0 24.0 47.5 28.5 Total Split (%)24.0% 24.0%47.5%28.5% Maximum Green (s) 18.5 18.5 42.0 22.0 Yellow Time (s)4.0 4.0 4.0 5.0 All-Red Time (s)1.5 1.5 1.5 1.5 Lost Time Adjust (s)0.0 0.0 0.0 Total Lost Time (s)5.5 5.5 6.5 Lead/Lag Lead Lead Lag Lead-Lag Optimize? Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 2.0 Minimum Gap (s)0.2 0.2 0.2 0.2 Time Before Reduce (s) 0.0 0.0 20.0 20.0 Time To Reduce (s)0.0 0.0 0.0 0.0 Recall Mode None None None C-Min Walk Time (s)7.0 Flash Dont Walk (s)35.0 Pedestrian Calls (#/hr)10 Act Effct Green (s)11.3 16.4 61.0 Actuated g/C Ratio 0.11 0.16 0.61 v/c Ratio 0.44 0.04 0.23 Control Delay 8.3 0.1 13.8 Queue Delay 0.0 0.0 0.0 Total Delay 8.3 0.1 13.8 LOS A A B Approach Delay 8.3 0.1 13.8 Approach LOS A A B Intersection Summary Area Type:Other Cycle Length: 100 Actuated Cycle Length: 100 Offset: 0 (0%), Referenced to phase 2:NBT and 6:, Start of Green Natural Cycle: 100 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.45 Intersection Signal Delay: 12.5 Intersection LOS: B Intersection Capacity Utilization 47.4%ICU Level of Service A Analysis Period (min) 15 Splits and Phases: 3: Carlsbad Blvd NB & Island Way Nov. 15, 2023 Item #1 Page 96 of 159 Lanes, Volumes, Timings Existing - Weekday NOON 3: Carlsbad Blvd NB & Island Way 08/17/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 4 Lane Group Ø6 Detector Phase Switch Phase Minimum Initial (s)10.0 Minimum Split (s)24.5 Total Split (s)52.5 Total Split (%)53% Maximum Green (s) 46.0 Yellow Time (s)5.0 All-Red Time (s)1.5 Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) 2.0 Minimum Gap (s)0.2 Time Before Reduce (s) 20.0 Time To Reduce (s)0.0 Recall Mode C-Min Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Intersection Summary Nov. 15, 2023 Item #1 Page 97 of 159 Lanes, Volumes, Timings Existing - Weekday PM 3: Carlsbad Blvd NB & Island Way 08/17/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph)60 24 0 0 8 15 0 742 25 0 0 0 Future Volume (vph)60 24 0 0 8 15 0 742 25 0 0 0 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 0.95 1.00 1.00 1.00 Ped Bike Factor 0.98 0.98 1.00 Frt 0.911 0.995 Flt Protected 0.965 Satd. Flow (prot)0 1798 0 0 1659 0 0 3515 0 0 0 0 Flt Permitted 0.965 Satd. Flow (perm)0 1769 0 0 1659 0 0 3515 0 0 0 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR)23 3 Link Speed (mph)30 30 30 30 Link Distance (ft)89 352 328 558 Travel Time (s)2.0 8.0 7.5 12.7 Confl. Peds. (#/hr)32 32 1 Confl. Bikes (#/hr)24 Peak Hour Factor 0.91 0.91 0.91 0.65 0.65 0.65 0.95 0.95 0.95 0.92 0.92 0.92 Adj. Flow (vph)66 26 0 0 12 23 0 781 26 0 0 0 Shared Lane Traffic (%) Lane Group Flow (vph) 0 92 0 0 35 0 0 807 0 0 0 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft)0 0 0 0 Link Offset(ft)0 0 0 0 Crosswalk Width(ft)16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 1 2 2 2 Detector Template Left Thru Thru Thru Leading Detector (ft)20 100 100 100 Trailing Detector (ft)0 0 0 0 Detector 1 Position(ft)0 0 0 0 Detector 1 Size(ft)20 6 6 6 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 Detector 1 Delay (s)0.0 0.0 0.0 0.0 Detector 2 Position(ft)94 94 94 Detector 2 Size(ft)6 6 6 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s)0.0 0.0 0.0 Turn Type Split NA NA NA Protected Phases 1 1 8 2 Permitted Phases Nov. 15, 2023 Item #1 Page 98 of 159 Lanes, Volumes, Timings Existing - Weekday PM 3: Carlsbad Blvd NB & Island Way 08/17/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 2 Lane Group Ø6 Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Util. Factor Ped Bike Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type Protected Phases 6 Permitted Phases Nov. 15, 2023 Item #1 Page 99 of 159 Lanes, Volumes, Timings Existing - Weekday PM 3: Carlsbad Blvd NB & Island Way 08/17/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 3 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Detector Phase 1 1 8 2 Switch Phase Minimum Initial (s)10.0 10.0 10.0 10.0 Minimum Split (s)23.5 23.5 47.5 24.5 Total Split (s)23.6 23.6 47.5 28.9 Total Split (%)23.6% 23.6%47.5%28.9% Maximum Green (s) 18.1 18.1 42.0 22.4 Yellow Time (s)4.0 4.0 4.0 5.0 All-Red Time (s)1.5 1.5 1.5 1.5 Lost Time Adjust (s)0.0 0.0 0.0 Total Lost Time (s)5.5 5.5 6.5 Lead/Lag Lead Lead Lag Lead-Lag Optimize? Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 2.0 Minimum Gap (s)0.2 0.2 0.2 0.2 Time Before Reduce (s) 0.0 0.0 20.0 20.0 Time To Reduce (s)0.0 0.0 0.0 0.0 Recall Mode None None None C-Min Walk Time (s)7.0 Flash Dont Walk (s)35.0 Pedestrian Calls (#/hr)10 Act Effct Green (s)11.4 16.4 65.3 Actuated g/C Ratio 0.11 0.16 0.65 v/c Ratio 0.45 0.12 0.35 Control Delay 37.5 15.8 15.1 Queue Delay 0.0 0.0 0.0 Total Delay 37.5 15.8 15.1 LOS D B B Approach Delay 37.5 15.8 15.1 Approach LOS D B B Intersection Summary Area Type:Other Cycle Length: 100 Actuated Cycle Length: 100 Offset: 0 (0%), Referenced to phase 2:NBT and 6:, Start of Green Natural Cycle: 100 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.45 Intersection Signal Delay: 17.4 Intersection LOS: B Intersection Capacity Utilization 57.1%ICU Level of Service B Analysis Period (min) 15 Splits and Phases: 3: Carlsbad Blvd NB & Island Way Nov. 15, 2023 Item #1 Page 100 of 159 Lanes, Volumes, Timings Existing - Weekday PM 3: Carlsbad Blvd NB & Island Way 08/17/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 4 Lane Group Ø6 Detector Phase Switch Phase Minimum Initial (s)10.0 Minimum Split (s)24.5 Total Split (s)52.5 Total Split (%)53% Maximum Green (s) 46.0 Yellow Time (s)5.0 All-Red Time (s)1.5 Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) 2.0 Minimum Gap (s)0.2 Time Before Reduce (s) 20.0 Time To Reduce (s)0.0 Recall Mode C-Min Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Intersection Summary Nov. 15, 2023 Item #1 Page 101 of 159 Lanes, Volumes, Timings Existing - Weekend AM 3: Island Way & Carlsbad Blvd 08/17/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph)35 16 0 0 11 8 0 219 12 0 0 0 Future Volume (vph)35 16 0 0 11 8 0 219 12 0 0 0 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 0.95 1.00 1.00 1.00 Ped Bike Factor 0.96 0.97 0.98 Frt 0.943 0.992 Flt Protected 0.967 Satd. Flow (prot)0 1801 0 0 1705 0 0 3456 0 0 0 0 Flt Permitted 0.967 Satd. Flow (perm)0 1732 0 0 1705 0 0 3456 0 0 0 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR)11 5 Link Speed (mph)30 30 30 30 Link Distance (ft)89 352 328 558 Travel Time (s)2.0 8.0 7.5 12.7 Confl. Peds. (#/hr)82 82 3 3 Confl. Bikes (#/hr)152 Peak Hour Factor 0.81 0.81 0.81 0.75 0.75 0.75 0.88 0.88 0.88 0.92 0.92 0.92 Adj. Flow (vph)43 20 0 0 15 11 0 249 14 0 0 0 Shared Lane Traffic (%) Lane Group Flow (vph) 0 63 0 0 26 0 0 263 0 0 0 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft)0 0 0 0 Link Offset(ft)0 0 0 0 Crosswalk Width(ft)16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 1 2 2 2 Detector Template Left Thru Thru Thru Leading Detector (ft)20 100 100 100 Trailing Detector (ft)0 0 0 0 Detector 1 Position(ft)0 0 0 0 Detector 1 Size(ft)20 6 6 6 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 Detector 1 Delay (s)0.0 0.0 0.0 0.0 Detector 2 Position(ft)94 94 94 Detector 2 Size(ft)6 6 6 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s)0.0 0.0 0.0 Turn Type Split NA NA NA Protected Phases 1 1 8 2 Permitted Phases Nov. 15, 2023 Item #1 Page 102 of 159 Lanes, Volumes, Timings Existing - Weekend AM 3: Island Way & Carlsbad Blvd 08/17/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 2 Lane Group Ø6 Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Util. Factor Ped Bike Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type Protected Phases 6 Permitted Phases Nov. 15, 2023 Item #1 Page 103 of 159 Lanes, Volumes, Timings Existing - Weekend AM 3: Island Way & Carlsbad Blvd 08/17/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 3 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Detector Phase 1 1 8 2 Switch Phase Minimum Initial (s)10.0 10.0 10.0 10.0 Minimum Split (s)23.5 23.5 47.5 24.5 Total Split (s)25.0 25.0 47.5 27.5 Total Split (%)25.0% 25.0%47.5%27.5% Maximum Green (s) 19.5 19.5 42.0 21.0 Yellow Time (s)4.0 4.0 4.0 5.0 All-Red Time (s)1.5 1.5 1.5 1.5 Lost Time Adjust (s)0.0 0.0 0.0 Total Lost Time (s)5.5 5.5 6.5 Lead/Lag Lead Lead Lag Lead-Lag Optimize? Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 2.0 Minimum Gap (s)0.2 0.2 0.2 0.2 Time Before Reduce (s) 0.0 0.0 20.0 20.0 Time To Reduce (s)0.0 0.0 0.0 0.0 Recall Mode None None None C-Min Walk Time (s)7.0 Flash Dont Walk (s)35.0 Pedestrian Calls (#/hr)10 Act Effct Green (s)10.5 16.4 66.2 Actuated g/C Ratio 0.10 0.16 0.66 v/c Ratio 0.33 0.09 0.11 Control Delay 6.5 20.4 12.3 Queue Delay 0.0 0.0 0.0 Total Delay 6.5 20.4 12.3 LOS A C B Approach Delay 6.5 20.4 12.3 Approach LOS A C B Intersection Summary Area Type:Other Cycle Length: 100 Actuated Cycle Length: 100 Offset: 0 (0%), Referenced to phase 2:NBT and 6:, Start of Green Natural Cycle: 100 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.34 Intersection Signal Delay: 11.8 Intersection LOS: B Intersection Capacity Utilization 51.6%ICU Level of Service A Analysis Period (min) 15 Splits and Phases: 3: Island Way & Carlsbad Blvd Nov. 15, 2023 Item #1 Page 104 of 159 Lanes, Volumes, Timings Existing - Weekend AM 3: Island Way & Carlsbad Blvd 08/17/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 4 Lane Group Ø6 Detector Phase Switch Phase Minimum Initial (s)10.0 Minimum Split (s)24.5 Total Split (s)52.5 Total Split (%)53% Maximum Green (s) 46.0 Yellow Time (s)5.0 All-Red Time (s)1.5 Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) 2.0 Minimum Gap (s)0.2 Time Before Reduce (s) 20.0 Time To Reduce (s)0.0 Recall Mode C-Min Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Intersection Summary Nov. 15, 2023 Item #1 Page 105 of 159 Lanes, Volumes, Timings Existing - Weekend AM 3: Carlsbad Blvd NB & Island Way 08/17/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph)44 23 0 0 11 15 0 593 16 0 0 0 Future Volume (vph)44 23 0 0 11 15 0 593 16 0 0 0 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 0.95 1.00 1.00 1.00 Ped Bike Factor 0.97 0.97 0.99 Frt 0.923 0.996 Flt Protected 0.968 Satd. Flow (prot)0 1803 0 0 1668 0 0 3507 0 0 0 0 Flt Permitted 0.968 Satd. Flow (perm)0 1757 0 0 1668 0 0 3507 0 0 0 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR)16 2 Link Speed (mph)30 30 30 30 Link Distance (ft)89 352 328 558 Travel Time (s)2.0 8.0 7.5 12.7 Confl. Peds. (#/hr)57 57 Confl. Bikes (#/hr)103 Peak Hour Factor 0.89 0.89 0.89 0.93 0.93 0.93 0.86 0.86 0.86 0.89 0.89 0.89 Adj. Flow (vph)49 26 0 0 12 16 0 690 19 0 0 0 Shared Lane Traffic (%) Lane Group Flow (vph) 0 75 0 0 28 0 0 709 0 0 0 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft)0 0 0 0 Link Offset(ft)0 0 0 0 Crosswalk Width(ft)16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 1 2 2 2 Detector Template Left Thru Thru Thru Leading Detector (ft)20 100 100 100 Trailing Detector (ft)0 0 0 0 Detector 1 Position(ft)0 0 0 0 Detector 1 Size(ft)20 6 6 6 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 Detector 1 Delay (s)0.0 0.0 0.0 0.0 Detector 2 Position(ft)94 94 94 Detector 2 Size(ft)6 6 6 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s)0.0 0.0 0.0 Turn Type Split NA NA NA Protected Phases 1 1 8 2 Permitted Phases Nov. 15, 2023 Item #1 Page 106 of 159 Lanes, Volumes, Timings Existing - Weekend AM 3: Carlsbad Blvd NB & Island Way 08/17/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 2 Lane Group Ø6 Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Util. Factor Ped Bike Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type Protected Phases 6 Permitted Phases Nov. 15, 2023 Item #1 Page 107 of 159 Lanes, Volumes, Timings Existing - Weekend AM 3: Carlsbad Blvd NB & Island Way 08/17/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 3 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Detector Phase 1 1 8 2 Switch Phase Minimum Initial (s)10.0 10.0 10.0 10.0 Minimum Split (s)23.5 23.5 47.5 24.5 Total Split (s)23.6 23.6 47.5 28.9 Total Split (%)23.6% 23.6%47.5%28.9% Maximum Green (s) 18.1 18.1 42.0 22.4 Yellow Time (s)4.0 4.0 4.0 5.0 All-Red Time (s)1.5 1.5 1.5 1.5 Lost Time Adjust (s)0.0 0.0 0.0 Total Lost Time (s)5.5 5.5 6.5 Lead/Lag Lead Lead Lag Lead-Lag Optimize? Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 2.0 Minimum Gap (s)0.2 0.2 0.2 0.2 Time Before Reduce (s) 0.0 0.0 20.0 20.0 Time To Reduce (s)0.0 0.0 0.0 0.0 Recall Mode None None None C-Min Walk Time (s)7.0 Flash Dont Walk (s)35.0 Pedestrian Calls (#/hr)10 Act Effct Green (s)10.9 16.4 65.8 Actuated g/C Ratio 0.11 0.16 0.66 v/c Ratio 0.38 0.10 0.31 Control Delay 7.3 17.7 14.0 Queue Delay 0.0 0.0 0.0 Total Delay 7.3 17.7 14.0 LOS A B B Approach Delay 7.3 17.7 14.0 Approach LOS A B B Intersection Summary Area Type:Other Cycle Length: 100 Actuated Cycle Length: 100 Offset: 0 (0%), Referenced to phase 2:NBT and 6:, Start of Green Natural Cycle: 100 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.40 Intersection Signal Delay: 13.5 Intersection LOS: B Intersection Capacity Utilization 57.9%ICU Level of Service B Analysis Period (min) 15 Splits and Phases: 3: Carlsbad Blvd NB & Island Way Nov. 15, 2023 Item #1 Page 108 of 159 Lanes, Volumes, Timings Existing - Weekend AM 3: Carlsbad Blvd NB & Island Way 08/17/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 4 Lane Group Ø6 Detector Phase Switch Phase Minimum Initial (s)10.0 Minimum Split (s)24.5 Total Split (s)52.5 Total Split (%)53% Maximum Green (s) 46.0 Yellow Time (s)5.0 All-Red Time (s)1.5 Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) 2.0 Minimum Gap (s)0.2 Time Before Reduce (s) 20.0 Time To Reduce (s)0.0 Recall Mode C-Min Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Intersection Summary Nov. 15, 2023 Item #1 Page 109 of 159 Lanes, Volumes, Timings Existing PM Weekend 3: Carlsbad Blvd NB & Island Way 08/17/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph)63 30 0 0 22 16 0 679 14 0 0 0 Future Volume (vph)63 30 0 0 22 16 0 679 14 0 0 0 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 0.95 1.00 1.00 1.00 Ped Bike Factor 0.96 0.97 1.00 Frt 0.944 0.997 Flt Protected 0.967 Satd. Flow (prot)0 1801 0 0 1709 0 0 3522 0 0 0 0 Flt Permitted 0.967 Satd. Flow (perm)0 1736 0 0 1709 0 0 3522 0 0 0 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR)20 2 Link Speed (mph)30 30 30 30 Link Distance (ft)89 352 328 558 Travel Time (s)2.0 8.0 7.5 12.7 Confl. Peds. (#/hr)80 80 2 Confl. Bikes (#/hr)39 Peak Hour Factor 0.82 0.82 0.82 0.79 0.79 0.79 0.82 0.82 0.82 0.92 0.92 0.92 Adj. Flow (vph)77 37 0 0 28 20 0 828 17 0 0 0 Shared Lane Traffic (%) Lane Group Flow (vph) 0 114 0 0 48 0 0 845 0 0 0 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft)0 0 0 0 Link Offset(ft)0 0 0 0 Crosswalk Width(ft)16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 1 2 2 2 Detector Template Left Thru Thru Thru Leading Detector (ft)20 100 100 100 Trailing Detector (ft)0 0 0 0 Detector 1 Position(ft)0 0 0 0 Detector 1 Size(ft)20 6 6 6 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 Detector 1 Delay (s)0.0 0.0 0.0 0.0 Detector 2 Position(ft)94 94 94 Detector 2 Size(ft)6 6 6 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s)0.0 0.0 0.0 Turn Type Split NA NA NA Protected Phases 1 1 8 2 Permitted Phases Nov. 15, 2023 Item #1 Page 110 of 159 Lanes, Volumes, Timings Existing PM Weekend 3: Carlsbad Blvd NB & Island Way 08/17/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 2 Lane Group Ø6 Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Util. Factor Ped Bike Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type Protected Phases 6 Permitted Phases Nov. 15, 2023 Item #1 Page 111 of 159 Lanes, Volumes, Timings Existing PM Weekend 3: Carlsbad Blvd NB & Island Way 08/17/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 3 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Detector Phase 1 1 8 2 Switch Phase Minimum Initial (s)10.0 10.0 10.0 10.0 Minimum Split (s)23.5 23.5 47.5 24.5 Total Split (s)23.5 23.5 47.5 29.0 Total Split (%)23.5% 23.5%47.5%29.0% Maximum Green (s) 18.0 18.0 42.0 22.5 Yellow Time (s)4.0 4.0 4.0 5.0 All-Red Time (s)1.5 1.5 1.5 1.5 Lost Time Adjust (s)0.0 0.0 0.0 Total Lost Time (s)5.5 5.5 6.5 Lead/Lag Lead Lead Lag Lead-Lag Optimize? Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 2.0 Minimum Gap (s)0.2 0.2 0.2 0.2 Time Before Reduce (s) 0.0 0.0 20.0 20.0 Time To Reduce (s)0.0 0.0 0.0 0.0 Recall Mode None None None C-Min Walk Time (s)7.0 Flash Dont Walk (s)35.0 Pedestrian Calls (#/hr)10 Act Effct Green (s)12.2 16.4 57.0 Actuated g/C Ratio 0.12 0.16 0.57 v/c Ratio 0.52 0.16 0.42 Control Delay 15.2 21.2 17.8 Queue Delay 0.0 0.0 0.0 Total Delay 15.2 21.2 17.8 LOS B C B Approach Delay 15.2 21.2 17.8 Approach LOS B C B Intersection Summary Area Type:Other Cycle Length: 100 Actuated Cycle Length: 100 Offset: 0 (0%), Referenced to phase 2:NBT and 6:, Start of Green Natural Cycle: 100 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.52 Intersection Signal Delay: 17.7 Intersection LOS: B Intersection Capacity Utilization 62.4%ICU Level of Service B Analysis Period (min) 15 Splits and Phases: 3: Carlsbad Blvd NB & Island Way Nov. 15, 2023 Item #1 Page 112 of 159 Lanes, Volumes, Timings Existing PM Weekend 3: Carlsbad Blvd NB & Island Way 08/17/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 4 Lane Group Ø6 Detector Phase Switch Phase Minimum Initial (s)10.0 Minimum Split (s)24.5 Total Split (s)52.5 Total Split (%)53% Maximum Green (s) 46.0 Yellow Time (s)5.0 All-Red Time (s)1.5 Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) 2.0 Minimum Gap (s)0.2 Time Before Reduce (s) 20.0 Time To Reduce (s)0.0 Recall Mode C-Min Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Intersection Summary Nov. 15, 2023 Item #1 Page 113 of 159 Lanes, Volumes, Timings Existing with Covid Adjustment - Weekday AM 3: Carlsbad Blvd NB & Island Way 08/22/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph)49 15 0 0 20 11 0 375 13 0 0 0 Future Volume (vph)49 15 0 0 20 11 0 375 13 0 0 0 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 0.95 1.00 1.00 1.00 Ped Bike Factor 0.98 0.99 1.00 Frt 0.952 0.995 Flt Protected 0.963 Satd. Flow (prot)0 1794 0 0 1751 0 0 3510 0 0 0 0 Flt Permitted 0.963 Satd. Flow (perm)0 1762 0 0 1751 0 0 3510 0 0 0 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR)14 3 Link Speed (mph)30 30 30 30 Link Distance (ft)89 352 328 558 Travel Time (s)2.0 8.0 7.5 12.7 Confl. Peds. (#/hr)34 34 1 1 Confl. Bikes (#/hr)43 37 Peak Hour Factor 0.82 0.82 0.82 0.79 0.79 0.79 0.82 0.82 0.82 0.92 0.92 0.92 Adj. Flow (vph)60 18 0 0 25 14 0 457 16 0 0 0 Shared Lane Traffic (%) Lane Group Flow (vph) 0 78 0 0 39 0 0 473 0 0 0 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft)0 0 0 0 Link Offset(ft)0 0 0 0 Crosswalk Width(ft)16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 1 2 2 2 Detector Template Left Thru Thru Thru Leading Detector (ft)20 100 100 100 Trailing Detector (ft)0 0 0 0 Detector 1 Position(ft)0 0 0 0 Detector 1 Size(ft)20 6 6 6 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 Detector 1 Delay (s)0.0 0.0 0.0 0.0 Detector 2 Position(ft)94 94 94 Detector 2 Size(ft)6 6 6 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s)0.0 0.0 0.0 Turn Type Split NA NA NA Protected Phases 1 1 8 2 Permitted Phases Nov. 15, 2023 Item #1 Page 114 of 159 Lanes, Volumes, Timings Existing with Covid Adjustment - Weekday AM 3: Carlsbad Blvd NB & Island Way 08/22/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 2 Lane Group Ø6 Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Util. Factor Ped Bike Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type Protected Phases 6 Permitted Phases Nov. 15, 2023 Item #1 Page 115 of 159 Lanes, Volumes, Timings Existing with Covid Adjustment - Weekday AM 3: Carlsbad Blvd NB & Island Way 08/22/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 3 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Detector Phase 1 1 8 2 Switch Phase Minimum Initial (s)10.0 10.0 10.0 10.0 Minimum Split (s)23.5 23.5 47.5 24.5 Total Split (s)24.0 24.0 47.5 28.5 Total Split (%)24.0% 24.0%47.5%28.5% Maximum Green (s) 18.5 18.5 42.0 22.0 Yellow Time (s)4.0 4.0 4.0 5.0 All-Red Time (s)1.5 1.5 1.5 1.5 Lost Time Adjust (s)0.0 0.0 0.0 Total Lost Time (s)5.5 5.5 6.5 Lead/Lag Lead Lead Lag Lead-Lag Optimize? Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 2.0 Minimum Gap (s)0.2 0.2 0.2 0.2 Time Before Reduce (s) 0.0 0.0 20.0 20.0 Time To Reduce (s)0.0 0.0 0.0 0.0 Recall Mode None None None C-Min Walk Time (s)7.0 Flash Dont Walk (s)35.0 Pedestrian Calls (#/hr)10 Act Effct Green (s)10.9 16.4 62.7 Actuated g/C Ratio 0.11 0.16 0.63 v/c Ratio 0.40 0.13 0.21 Control Delay 12.1 22.4 13.9 Queue Delay 0.0 0.0 0.0 Total Delay 12.1 22.4 13.9 LOS B C B Approach Delay 12.1 22.4 13.9 Approach LOS B C B Intersection Summary Area Type:Other Cycle Length: 100 Actuated Cycle Length: 100 Offset: 0 (0%), Referenced to phase 2:NBT and 6:, Start of Green Natural Cycle: 100 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.40 Intersection Signal Delay: 14.2 Intersection LOS: B Intersection Capacity Utilization 47.2%ICU Level of Service A Analysis Period (min) 15 Splits and Phases: 3: Carlsbad Blvd NB & Island Way Nov. 15, 2023 Item #1 Page 116 of 159 Lanes, Volumes, Timings Existing with Covid Adjustment - Weekday AM 3: Carlsbad Blvd NB & Island Way 08/22/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 4 Lane Group Ø6 Detector Phase Switch Phase Minimum Initial (s)10.0 Minimum Split (s)24.5 Total Split (s)52.5 Total Split (%)53% Maximum Green (s) 46.0 Yellow Time (s)5.0 All-Red Time (s)1.5 Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) 2.0 Minimum Gap (s)0.2 Time Before Reduce (s) 20.0 Time To Reduce (s)0.0 Recall Mode C-Min Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Intersection Summary Nov. 15, 2023 Item #1 Page 117 of 159 Lanes, Volumes, Timings Existing with Covid Adjustment - Weekday NOON 3: Carlsbad Blvd NB & Island Way 08/22/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph)88 31 0 0 0 25 0 632 17 0 0 0 Future Volume (vph)88 31 0 0 0 25 0 632 17 0 0 0 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 0.95 1.00 1.00 1.00 Ped Bike Factor 0.99 0.97 1.00 Frt 0.865 0.996 Flt Protected 0.964 Satd. Flow (prot)0 1796 0 0 1560 0 0 3515 0 0 0 0 Flt Permitted 0.964 Satd. Flow (perm)0 1770 0 0 1560 0 0 3515 0 0 0 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR)263 2 Link Speed (mph)30 30 30 30 Link Distance (ft)89 352 328 558 Travel Time (s)2.0 8.0 7.5 12.7 Confl. Peds. (#/hr)28 1 1 28 1 1 Confl. Bikes (#/hr)50 Peak Hour Factor 0.95 0.95 0.95 0.85 0.85 0.85 0.95 0.95 0.95 0.95 0.95 0.95 Adj. Flow (vph)93 33 0 0 0 29 0 665 18 0 0 0 Shared Lane Traffic (%) Lane Group Flow (vph) 0 126 0 0 29 0 0 683 0 0 0 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft)0 0 0 0 Link Offset(ft)0 0 0 0 Crosswalk Width(ft)16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 1 2 2 2 Detector Template Left Thru Thru Thru Leading Detector (ft)20 100 100 100 Trailing Detector (ft)0 0 0 0 Detector 1 Position(ft)0 0 0 0 Detector 1 Size(ft)20 6 6 6 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 Detector 1 Delay (s)0.0 0.0 0.0 0.0 Detector 2 Position(ft)94 94 94 Detector 2 Size(ft)6 6 6 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s)0.0 0.0 0.0 Turn Type Split NA NA NA Protected Phases 1 1 8 2 Permitted Phases Nov. 15, 2023 Item #1 Page 118 of 159 Lanes, Volumes, Timings Existing with Covid Adjustment - Weekday NOON 3: Carlsbad Blvd NB & Island Way 08/22/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 2 Lane Group Ø6 Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Util. Factor Ped Bike Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type Protected Phases 6 Permitted Phases Nov. 15, 2023 Item #1 Page 119 of 159 Lanes, Volumes, Timings Existing with Covid Adjustment - Weekday NOON 3: Carlsbad Blvd NB & Island Way 08/22/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 3 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Detector Phase 1 1 8 2 Switch Phase Minimum Initial (s)10.0 10.0 10.0 10.0 Minimum Split (s)23.5 23.5 47.5 24.5 Total Split (s)23.6 23.6 47.5 28.9 Total Split (%)23.6% 23.6%47.5%28.9% Maximum Green (s) 18.1 18.1 42.0 22.4 Yellow Time (s)4.0 4.0 4.0 5.0 All-Red Time (s)1.5 1.5 1.5 1.5 Lost Time Adjust (s)0.0 0.0 0.0 Total Lost Time (s)5.5 5.5 6.5 Lead/Lag Lead Lead Lag Lead-Lag Optimize? Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 2.0 Minimum Gap (s)0.2 0.2 0.2 0.2 Time Before Reduce (s) 0.0 0.0 20.0 20.0 Time To Reduce (s)0.0 0.0 0.0 0.0 Recall Mode None None None C-Min Walk Time (s)7.0 Flash Dont Walk (s)35.0 Pedestrian Calls (#/hr)10 Act Effct Green (s)12.8 16.4 59.5 Actuated g/C Ratio 0.13 0.16 0.60 v/c Ratio 0.55 0.06 0.33 Control Delay 10.6 0.2 16.0 Queue Delay 0.0 0.0 0.0 Total Delay 10.6 0.2 16.0 LOS B A B Approach Delay 10.6 0.2 16.0 Approach LOS B A B Intersection Summary Area Type:Other Cycle Length: 100 Actuated Cycle Length: 100 Offset: 0 (0%), Referenced to phase 2:NBT and 6:, Start of Green Natural Cycle: 100 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.55 Intersection Signal Delay: 14.7 Intersection LOS: B Intersection Capacity Utilization 52.5%ICU Level of Service A Analysis Period (min) 15 Splits and Phases: 3: Carlsbad Blvd NB & Island Way Nov. 15, 2023 Item #1 Page 120 of 159 Lanes, Volumes, Timings Existing with Covid Adjustment - Weekday NOON 3: Carlsbad Blvd NB & Island Way 08/22/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 4 Lane Group Ø6 Detector Phase Switch Phase Minimum Initial (s)10.0 Minimum Split (s)24.5 Total Split (s)52.5 Total Split (%)53% Maximum Green (s) 46.0 Yellow Time (s)5.0 All-Red Time (s)1.5 Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) 2.0 Minimum Gap (s)0.2 Time Before Reduce (s) 20.0 Time To Reduce (s)0.0 Recall Mode C-Min Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Intersection Summary Nov. 15, 2023 Item #1 Page 121 of 159 Lanes, Volumes, Timings Existing with Covid Adjustment - Weekday PM 3: Carlsbad Blvd NB & Island Way 08/22/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph)84 34 0 0 11 21 0 1038 35 0 0 0 Future Volume (vph)84 34 0 0 11 21 0 1038 35 0 0 0 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 0.95 1.00 1.00 1.00 Ped Bike Factor 0.98 0.98 1.00 Frt 0.912 0.995 Flt Protected 0.966 Satd. Flow (prot)0 1799 0 0 1658 0 0 3516 0 0 0 0 Flt Permitted 0.966 Satd. Flow (perm)0 1769 0 0 1658 0 0 3516 0 0 0 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR)32 3 Link Speed (mph)30 30 30 30 Link Distance (ft)89 352 328 558 Travel Time (s)2.0 8.0 7.5 12.7 Confl. Peds. (#/hr)32 32 1 Confl. Bikes (#/hr)24 Peak Hour Factor 0.91 0.91 0.91 0.65 0.65 0.65 0.95 0.95 0.95 0.92 0.92 0.92 Adj. Flow (vph)92 37 0 0 17 32 0 1093 37 0 0 0 Shared Lane Traffic (%) Lane Group Flow (vph) 0 129 0 0 49 0 0 1130 0 0 0 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft)0 0 0 0 Link Offset(ft)0 0 0 0 Crosswalk Width(ft)16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 1 2 2 2 Detector Template Left Thru Thru Thru Leading Detector (ft)20 100 100 100 Trailing Detector (ft)0 0 0 0 Detector 1 Position(ft)0 0 0 0 Detector 1 Size(ft)20 6 6 6 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 Detector 1 Delay (s)0.0 0.0 0.0 0.0 Detector 2 Position(ft)94 94 94 Detector 2 Size(ft)6 6 6 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s)0.0 0.0 0.0 Turn Type Split NA NA NA Protected Phases 1 1 8 2 Permitted Phases Nov. 15, 2023 Item #1 Page 122 of 159 Lanes, Volumes, Timings Existing with Covid Adjustment - Weekday PM 3: Carlsbad Blvd NB & Island Way 08/22/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 2 Lane Group Ø6 Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Util. Factor Ped Bike Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type Protected Phases 6 Permitted Phases Nov. 15, 2023 Item #1 Page 123 of 159 Lanes, Volumes, Timings Existing with Covid Adjustment - Weekday PM 3: Carlsbad Blvd NB & Island Way 08/22/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 3 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Detector Phase 1 1 8 2 Switch Phase Minimum Initial (s)10.0 10.0 10.0 10.0 Minimum Split (s)23.5 23.5 47.5 24.5 Total Split (s)23.6 23.6 47.5 38.9 Total Split (%)21.5% 21.5%43.2%35.4% Maximum Green (s) 18.1 18.1 42.0 32.4 Yellow Time (s)4.0 4.0 4.0 5.0 All-Red Time (s)1.5 1.5 1.5 1.5 Lost Time Adjust (s)0.0 0.0 0.0 Total Lost Time (s)5.5 5.5 6.5 Lead/Lag Lead Lead Lag Lead-Lag Optimize? Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 2.0 Minimum Gap (s)0.2 0.2 0.2 0.2 Time Before Reduce (s) 0.0 0.0 20.0 20.0 Time To Reduce (s)0.0 0.0 0.0 0.0 Recall Mode None None None C-Min Walk Time (s)7.0 Flash Dont Walk (s)35.0 Pedestrian Calls (#/hr)10 Act Effct Green (s)13.6 16.4 65.6 Actuated g/C Ratio 0.12 0.15 0.60 v/c Ratio 0.58 0.18 0.54 Control Delay 11.4 17.8 18.9 Queue Delay 0.0 0.0 0.0 Total Delay 11.4 17.8 18.9 LOS B B B Approach Delay 11.4 17.8 18.9 Approach LOS B B B Intersection Summary Area Type:Other Cycle Length: 110 Actuated Cycle Length: 110 Offset: 0 (0%), Referenced to phase 2:NBT and 6:, Start of Green Natural Cycle: 110 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.59 Intersection Signal Delay: 18.1 Intersection LOS: B Intersection Capacity Utilization 65.6%ICU Level of Service C Analysis Period (min) 15 Splits and Phases: 3: Carlsbad Blvd NB & Island Way Nov. 15, 2023 Item #1 Page 124 of 159 Lanes, Volumes, Timings Existing with Covid Adjustment - Weekday PM 3: Carlsbad Blvd NB & Island Way 08/22/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 4 Lane Group Ø6 Detector Phase Switch Phase Minimum Initial (s)10.0 Minimum Split (s)24.5 Total Split (s)62.5 Total Split (%)57% Maximum Green (s) 56.0 Yellow Time (s)5.0 All-Red Time (s)1.5 Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) 2.0 Minimum Gap (s)0.2 Time Before Reduce (s) 20.0 Time To Reduce (s)0.0 Recall Mode C-Min Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Intersection Summary Nov. 15, 2023 Item #1 Page 125 of 159 Lanes, Volumes, Timings Existing with Covid Adjustment - Weekend AM 3: Carlsbad Blvd NB & Island Way 08/22/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph)48 22 0 0 14 11 0 302 17 0 0 0 Future Volume (vph)48 22 0 0 14 11 0 302 17 0 0 0 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 0.95 1.00 1.00 1.00 Ped Bike Factor 0.96 0.97 0.98 Frt 0.940 0.992 Flt Protected 0.967 Satd. Flow (prot)0 1801 0 0 1697 0 0 3457 0 0 0 0 Flt Permitted 0.967 Satd. Flow (perm)0 1732 0 0 1697 0 0 3457 0 0 0 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR)15 5 Link Speed (mph)30 30 30 30 Link Distance (ft)89 352 328 558 Travel Time (s)2.0 8.0 7.5 12.7 Confl. Peds. (#/hr)82 82 3 3 Confl. Bikes (#/hr)152 Peak Hour Factor 0.81 0.81 0.81 0.75 0.75 0.75 0.88 0.88 0.88 0.92 0.92 0.92 Adj. Flow (vph)59 27 0 0 19 15 0 343 19 0 0 0 Shared Lane Traffic (%) Lane Group Flow (vph) 0 86 0 0 34 0 0 362 0 0 0 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft)0 0 0 0 Link Offset(ft)0 0 0 0 Crosswalk Width(ft)16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 1 2 2 2 Detector Template Left Thru Thru Thru Leading Detector (ft)20 100 100 100 Trailing Detector (ft)0 0 0 0 Detector 1 Position(ft)0 0 0 0 Detector 1 Size(ft)20 6 6 6 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 Detector 1 Delay (s)0.0 0.0 0.0 0.0 Detector 2 Position(ft)94 94 94 Detector 2 Size(ft)6 6 6 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s)0.0 0.0 0.0 Turn Type Split NA NA NA Protected Phases 1 1 8 2 Permitted Phases Nov. 15, 2023 Item #1 Page 126 of 159 Lanes, Volumes, Timings Existing with Covid Adjustment - Weekend AM 3: Carlsbad Blvd NB & Island Way 08/22/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 2 Lane Group Ø6 Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Util. Factor Ped Bike Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type Protected Phases 6 Permitted Phases Nov. 15, 2023 Item #1 Page 127 of 159 Lanes, Volumes, Timings Existing with Covid Adjustment - Weekend AM 3: Carlsbad Blvd NB & Island Way 08/22/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 3 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Detector Phase 1 1 8 2 Switch Phase Minimum Initial (s)10.0 10.0 10.0 10.0 Minimum Split (s)23.5 23.5 47.5 24.5 Total Split (s)25.0 25.0 47.5 27.5 Total Split (%)25.0% 25.0%47.5%27.5% Maximum Green (s) 19.5 19.5 42.0 21.0 Yellow Time (s)4.0 4.0 4.0 5.0 All-Red Time (s)1.5 1.5 1.5 1.5 Lost Time Adjust (s)0.0 0.0 0.0 Total Lost Time (s)5.5 5.5 6.5 Lead/Lag Lead Lead Lag Lead-Lag Optimize? Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 2.0 Minimum Gap (s)0.2 0.2 0.2 0.2 Time Before Reduce (s) 0.0 0.0 20.0 20.0 Time To Reduce (s)0.0 0.0 0.0 0.0 Recall Mode None None None C-Min Walk Time (s)7.0 Flash Dont Walk (s)35.0 Pedestrian Calls (#/hr)10 Act Effct Green (s)11.2 16.4 61.1 Actuated g/C Ratio 0.11 0.16 0.61 v/c Ratio 0.43 0.12 0.17 Control Delay 8.1 20.0 13.3 Queue Delay 0.0 0.0 0.0 Total Delay 8.1 20.0 13.3 LOS A B B Approach Delay 8.1 20.0 13.3 Approach LOS A B B Intersection Summary Area Type:Other Cycle Length: 100 Actuated Cycle Length: 100 Offset: 0 (0%), Referenced to phase 2:NBT and 6:, Start of Green Natural Cycle: 100 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.43 Intersection Signal Delay: 12.8 Intersection LOS: B Intersection Capacity Utilization 52.2%ICU Level of Service A Analysis Period (min) 15 Splits and Phases: 3: Carlsbad Blvd NB & Island Way Nov. 15, 2023 Item #1 Page 128 of 159 Lanes, Volumes, Timings Existing with Covid Adjustment - Weekend AM 3: Carlsbad Blvd NB & Island Way 08/22/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 4 Lane Group Ø6 Detector Phase Switch Phase Minimum Initial (s)10.0 Minimum Split (s)24.5 Total Split (s)52.5 Total Split (%)53% Maximum Green (s) 46.0 Yellow Time (s)5.0 All-Red Time (s)1.5 Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) 2.0 Minimum Gap (s)0.2 Time Before Reduce (s) 20.0 Time To Reduce (s)0.0 Recall Mode C-Min Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Intersection Summary Nov. 15, 2023 Item #1 Page 129 of 159 Lanes, Volumes, Timings Existing with Covid Adjustment - Weekend NOON 3: Carlsbad Blvd NB & Island Way 08/22/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph)61 32 0 0 15 21 0 817 22 0 0 0 Future Volume (vph)61 32 0 0 15 21 0 817 22 0 0 0 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 0.95 1.00 1.00 1.00 Ped Bike Factor 0.97 0.97 0.99 Frt 0.920 0.996 Flt Protected 0.968 Satd. Flow (prot)0 1803 0 0 1661 0 0 3507 0 0 0 0 Flt Permitted 0.968 Satd. Flow (perm)0 1757 0 0 1661 0 0 3507 0 0 0 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR)23 2 Link Speed (mph)30 30 30 30 Link Distance (ft)89 352 328 558 Travel Time (s)2.0 8.0 7.5 12.7 Confl. Peds. (#/hr)57 57 Confl. Bikes (#/hr)103 Peak Hour Factor 0.89 0.89 0.89 0.93 0.93 0.93 0.86 0.86 0.86 0.89 0.89 0.89 Adj. Flow (vph)69 36 0 0 16 23 0 950 26 0 0 0 Shared Lane Traffic (%) Lane Group Flow (vph) 0 105 0 0 39 0 0 976 0 0 0 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft)0 0 0 0 Link Offset(ft)0 0 0 0 Crosswalk Width(ft)16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 1 2 2 2 Detector Template Left Thru Thru Thru Leading Detector (ft)20 100 100 100 Trailing Detector (ft)0 0 0 0 Detector 1 Position(ft)0 0 0 0 Detector 1 Size(ft)20 6 6 6 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 Detector 1 Delay (s)0.0 0.0 0.0 0.0 Detector 2 Position(ft)94 94 94 Detector 2 Size(ft)6 6 6 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s)0.0 0.0 0.0 Turn Type Split NA NA NA Protected Phases 1 1 8 2 Permitted Phases Nov. 15, 2023 Item #1 Page 130 of 159 Lanes, Volumes, Timings Existing with Covid Adjustment - Weekend NOON 3: Carlsbad Blvd NB & Island Way 08/22/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 2 Lane Group Ø6 Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Util. Factor Ped Bike Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type Protected Phases 6 Permitted Phases Nov. 15, 2023 Item #1 Page 131 of 159 Lanes, Volumes, Timings Existing with Covid Adjustment - Weekend NOON 3: Carlsbad Blvd NB & Island Way 08/22/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 3 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Detector Phase 1 1 8 2 Switch Phase Minimum Initial (s)10.0 10.0 10.0 10.0 Minimum Split (s)23.5 23.5 47.5 24.5 Total Split (s)23.5 23.5 47.5 29.0 Total Split (%)23.5% 23.5%47.5%29.0% Maximum Green (s) 18.0 18.0 42.0 22.5 Yellow Time (s)4.0 4.0 4.0 5.0 All-Red Time (s)1.5 1.5 1.5 1.5 Lost Time Adjust (s)0.0 0.0 0.0 Total Lost Time (s)5.5 5.5 6.5 Lead/Lag Lead Lead Lag Lead-Lag Optimize? Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 2.0 Minimum Gap (s)0.2 0.2 0.2 0.2 Time Before Reduce (s) 0.0 0.0 20.0 20.0 Time To Reduce (s)0.0 0.0 0.0 0.0 Recall Mode None None None C-Min Walk Time (s)7.0 Flash Dont Walk (s)35.0 Pedestrian Calls (#/hr)10 Act Effct Green (s)11.9 16.4 60.4 Actuated g/C Ratio 0.12 0.16 0.60 v/c Ratio 0.49 0.13 0.46 Control Delay 10.4 16.9 17.3 Queue Delay 0.0 0.0 0.0 Total Delay 10.4 16.9 17.3 LOS B B B Approach Delay 10.4 16.9 17.3 Approach LOS B B B Intersection Summary Area Type:Other Cycle Length: 100 Actuated Cycle Length: 100 Offset: 0 (0%), Referenced to phase 2:NBT and 6:, Start of Green Natural Cycle: 100 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.49 Intersection Signal Delay: 16.6 Intersection LOS: B Intersection Capacity Utilization 64.3%ICU Level of Service C Analysis Period (min) 15 Splits and Phases: 3: Carlsbad Blvd NB & Island Way Nov. 15, 2023 Item #1 Page 132 of 159 Lanes, Volumes, Timings Existing with Covid Adjustment - Weekend NOON 3: Carlsbad Blvd NB & Island Way 08/22/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 4 Lane Group Ø6 Detector Phase Switch Phase Minimum Initial (s)10.0 Minimum Split (s)24.5 Total Split (s)52.5 Total Split (%)53% Maximum Green (s) 46.0 Yellow Time (s)5.0 All-Red Time (s)1.5 Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) 2.0 Minimum Gap (s)0.2 Time Before Reduce (s) 20.0 Time To Reduce (s)0.0 Recall Mode C-Min Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Intersection Summary Nov. 15, 2023 Item #1 Page 133 of 159 Lanes, Volumes, Timings Existing with Covid Adjustment - Weekend PM 3: Carlsbad Blvd NB & Island Way 08/22/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph)87 41 0 0 30 22 0 935 19 0 0 0 Future Volume (vph)87 41 0 0 30 22 0 935 19 0 0 0 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 0.95 1.00 1.00 1.00 Ped Bike Factor 0.96 0.97 1.00 Frt 0.943 0.997 Flt Protected 0.967 Satd. Flow (prot)0 1801 0 0 1702 0 0 3527 0 0 0 0 Flt Permitted 0.967 Satd. Flow (perm)0 1731 0 0 1702 0 0 3527 0 0 0 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR)28 2 Link Speed (mph)30 30 30 30 Link Distance (ft)89 352 328 558 Travel Time (s)2.0 8.0 7.5 12.7 Confl. Peds. (#/hr)80 80 2 Peak Hour Factor 0.82 0.82 0.82 0.79 0.79 0.79 0.82 0.82 0.82 0.92 0.92 0.92 Adj. Flow (vph)106 50 0 0 38 28 0 1140 23 0 0 0 Shared Lane Traffic (%) Lane Group Flow (vph) 0 156 0 0 66 0 0 1163 0 0 0 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft)0 0 0 0 Link Offset(ft)0 0 0 0 Crosswalk Width(ft)16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 1 2 2 2 Detector Template Left Thru Thru Thru Leading Detector (ft)20 100 100 100 Trailing Detector (ft)0 0 0 0 Detector 1 Position(ft)0 0 0 0 Detector 1 Size(ft)20 6 6 6 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 Detector 1 Delay (s)0.0 0.0 0.0 0.0 Detector 2 Position(ft)94 94 94 Detector 2 Size(ft)6 6 6 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s)0.0 0.0 0.0 Turn Type Split NA NA NA Protected Phases 1 1 8 2 Permitted Phases Detector Phase 1 1 8 2 Nov. 15, 2023 Item #1 Page 134 of 159 Lanes, Volumes, Timings Existing with Covid Adjustment - Weekend PM 3: Carlsbad Blvd NB & Island Way 08/22/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 2 Lane Group Ø6 Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Util. Factor Ped Bike Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type Protected Phases 6 Permitted Phases Detector Phase Nov. 15, 2023 Item #1 Page 135 of 159 Lanes, Volumes, Timings Existing with Covid Adjustment - Weekend PM 3: Carlsbad Blvd NB & Island Way 08/22/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 3 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Switch Phase Minimum Initial (s)10.0 10.0 10.0 10.0 Minimum Split (s)23.5 23.5 47.5 24.5 Total Split (s)23.6 23.6 47.5 38.9 Total Split (%)21.5% 21.5%43.2%35.4% Maximum Green (s) 18.1 18.1 42.0 32.4 Yellow Time (s)4.0 4.0 4.0 5.0 All-Red Time (s)1.5 1.5 1.5 1.5 Lost Time Adjust (s)0.0 0.0 0.0 Total Lost Time (s)5.5 5.5 6.5 Lead/Lag Lead Lead Lag Lead-Lag Optimize? Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 2.0 Minimum Gap (s)0.2 0.2 0.2 0.2 Time Before Reduce (s) 0.0 0.0 20.0 20.0 Time To Reduce (s)0.0 0.0 0.0 0.0 Recall Mode None None None C-Min Walk Time (s)7.0 Flash Dont Walk (s)35.0 Pedestrian Calls (#/hr)10 Act Effct Green (s)14.5 16.4 64.7 Actuated g/C Ratio 0.13 0.15 0.59 v/c Ratio 0.66 0.24 0.56 Control Delay 19.7 24.8 19.7 Queue Delay 0.0 0.0 0.0 Total Delay 19.7 24.8 19.7 LOS B C B Approach Delay 19.7 24.8 19.7 Approach LOS B C B Intersection Summary Area Type:Other Cycle Length: 110 Actuated Cycle Length: 110 Offset: 0 (0%), Referenced to phase 2:NBT and 6:, Start of Green Natural Cycle: 110 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.66 Intersection Signal Delay: 19.9 Intersection LOS: B Intersection Capacity Utilization 69.6%ICU Level of Service C Analysis Period (min) 15 Splits and Phases: 3: Carlsbad Blvd NB & Island Way Nov. 15, 2023 Item #1 Page 136 of 159 Lanes, Volumes, Timings Existing with Covid Adjustment - Weekend PM 3: Carlsbad Blvd NB & Island Way 08/22/2022 Scenario 1 12:32 pm 08/10/2022 Baseline Synchro 11 Report Page 4 Lane Group Ø6 Switch Phase Minimum Initial (s)10.0 Minimum Split (s)24.5 Total Split (s)62.5 Total Split (%)57% Maximum Green (s) 56.0 Yellow Time (s)5.0 All-Red Time (s)1.5 Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) 2.0 Minimum Gap (s)0.2 Time Before Reduce (s) 20.0 Time To Reduce (s)0.0 Recall Mode C-Min Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Intersection Summary Nov. 15, 2023 Item #1 Page 137 of 159 Revised 07/21 CEQA DETERMINATION OF EXEMPTION Exhibit 4 Subject: This California Environmental Quality Act (CEQA) Determination of Exemption is in compliance with Carlsbad Municipal Code Section 19.04.060. An appeal to this determination must be filed in writing with the required fee within ten (10) calendar days of the City Planner’s decision consistent with Carlsbad Municipal Code Section 21.54.140. City Planner Decision Date: Oct. 19, 2023 Project Number and Title: Carlsbad Boulevard Restriping Project (CDP2023-0036) Project Location: Public right of way along Carlsbad Boulevard, starting at Solamar Drive to Island Way/District 3 Project Location - City: Carlsbad Project Location - County: San Diego Description of Project: A request to approve an after-the-fact Coastal Development Permit to relocate existing roadway space with restriping for bicyclist and pedestrian improvements along Carlsbad Boulevard between Solamar Drive and Island Way. Name of Public Agency Approving Project: City of Carlsbad Name of Person or Agency Carrying Out Project: City of Carlsbad, Public Works Name of Applicant: Miriam Jim, Senior Engineer Applicant’s Address: 1635 Faraday Avenue, Carlsbad, CA 92008 Applicant’s Telephone Number: 7442-339-5796 Name of Applicant/Identity of person undertaking the Project (if different from the applicant above): N/A Exempt Status: (Check One) Ministerial (Section 21080(b)(1); 15268); Declared Emergency (Section 21080(b)(3); 15269(a)); Emergency Project (Section 21080(b)(4); 15269 (b)(c)); Categorical Exemption - State type and section number: Section 15301(c) Existing Facilities (Class 1) Statutory Exemptions - State code number: Common Sense Exemption (Section 15061(b)(3)) Reasons why Project is exempt: The California Environmental Quality Act (“CEQA”), and its implementing regulations (“CEQA Guidelines”) adopted by the Secretary of the California Natural Resources Agency list classes of projects that have been determined not to have a significant effect on the environment and as a result are exempt from further environmental review under CEQA. City staff completed a review of the project and potential environmental impacts associated with the project pursuant to CEQA and concluded that the project qualified for an exemption pursuant to CEQA Guidelines section 15301(c) (Existing Facilities). The CEQA Guidelines include a list of classes of projects which have been determined not to have a significant effect on the environment and which shall, therefore, be exempt from the provisions of CEQA. CEQA Guidelines Section 15301 is a Class 1 exemption for existing facilities and includes (c) Existing highways and streets, sidewalks, gutters, bicycle and pedestrian trails, and similar facilities (this includes road grading for the purpose of public safety), and other alterations such as the addition of bicycle facilities, including but not limited to bicycle parking, bicycle-share facilities, and bicycle lanes, transit improvements such as bus lanes, pedestrian crossings, street trees, and other similar alterations that do Nov. 15, 2023 Item #1 Page 138 of 159 □ □ □ ~ □ □ Revised 07/21 not create additional automobile lanes). The improvements to these streets involve negligible expansion of the current uses beyond the existing and do not result in additional automobile lanes. The improvements to the city’s existing mobility network under this action will improve public safety. Actions are anticipated to involve negligible expansion of the current facilities and infrastructure beyond the existing and will not result in additional automobile lanes. The actions are not expected to increase vehicular use of the roadway and will not change the overall facility use of the mobility network. No exception to the exemption as set forth in CEQA Guidelines Section 15300.2 applies. Additionally, none of the limitations on using an exemption in Carlsbad Municipal Code 19.04.070 (B) applies. For the reasons stated above, the action is categorically exempt from CEQA under CEQA Guidelines Section 15304(c). Lead Agency Contact Person: Izzak Mireles, Associate Planner Telephone: 442-339-2693 Eric Lardy, City Planner Date Nov. 15, 2023 Item #1 Page 139 of 159 Exhibit 5 Nov. 15, 2023 Item #1 Page 140 of 159 SITE MAP • N NOT TO SCALE Carlsbad Restriping Project CDP 2023-0036 (CIP No. 6096) Map generated on: 10/18/2023 CA Review _RMC_ Meeting Date: Sept. 27, 2022 To: Mayor and City Council From: Scott Chadwick, City Manager Staff Contact: John Kim, City Traffic Engineer john.kim@carlsbadca.gov, 442-339-2757 Subject: Approval of Lane Reduction on Southbound Carlsbad Boulevard between Solamar Drive and Island Way, Approval of Plans and Specifications and Award of Contract for Construction of the Carlsbad Boulevard Restriping between Manzano Drive and Island Way, Bike Lane Improvements at Five Locations on Carlsbad Boulevard and Three Sustainable Mobility Plan Bike Enhancement Projects Districts: All Recommended Action Adopt one resolution: •Approving the proposed lane reduction on southbound Carlsbad Boulevard between Solamar Drive and Island Way; and •Approving the plans and specifications and awarding a contract to VSS International, Inc., a California corporation, in the amount of $381,120 for: o Construction of the Carlsbad Boulevard Restriping Project between Manzano Drive and Island Way o Bike lane improvements at five locations on Carlsbad Boulevard o Three Sustainable Mobility Plan Bike Enhancement Projects, at: La Costa Avenue at the intersections of Piraeus Street, Saxony Road and El Camino Real Jefferson Street between Las Flores Drive and the Interstate 5 overpass Paseo Del Norte at Cannon Road Executive Summary Three projects have been combined into a single set of plans and specifications to maximize cost efficiency: 1.The Carlsbad Boulevard Restriping Project, Capital Improvement Program Project No. 6096, combined two projects: a.Restriping southbound Carlsbad Boulevard from Manzano Drive to Island Way b.Bike lane improvements at five locations on Carlsbad Boulevard south of Island Way 2.Sustainable Mobility Plan projects at three locations, CIP Project No. 6104 Sept. 27, 2022 Item #9 Page 1 of 144 Exhibit 6 Nov. 15, 2023 Item #1 Page 141 of 159 Carlsbad Boulevard Restriping Project, Capital Improvement Program Project No. 6096 The Carlsbad Boulevard Restriping Project will restripe southbound Carlsbad Boulevard from Manzano Drive to Island Way and will reduce the number of travel lanes on southbound Carlsbad Boulevard between Solamar Drive and Island Way from two lanes to one lane while enhancing the existing bike lane and on-street parking. Reducing the number of travel lanes on this segment of southbound Carlsbad Boulevard would provide width on the roadway to shift traffic to the east, away from the coast, and provide enhancements to the existing bike lane and additional on-street parking on the west side of the street. Green bike lane enhancements will be added to areas where bicycle and vehicle traffic conflicts, where appropriate. Like most road reconfiguration projects, this project will reduce the long-term maintenance costs for this road segment by reducing the area subjected to daily vehicle loads. This project also includes additional bike lane improvements on both sides of Carlsbad Boulevard south of Island Way, adding green bike lane enhancements in bike-car conflict areas at Lanikai Lane, Breakwater Road, Poinsettia Lane, Ponto Road and Avenida Encinas. Sustainable Mobility Plan projects, IP Project No. 6104 The final component to these projects are three Sustainable Mobility Plan projects on La Costa Avenue, Jefferson Street and at the Paseo Del Norte and Cannon Road intersection, which will enhance existing bike facilities through modifications to signage and striping. State of local emergency On Aug. 23, 2022, the City Manager/Director of Emergency Services proclaimed a state of local emergency for bike, e-bike and traffic safety. On Aug. 30, 2022, the City Council adopted Resolution No. 2022-214, ratifying the proclamation. The Carlsbad Boulevard Restriping Project, bike lane improvements at five locations and three Sustainable Mobility Plan Projects have been identified as priority projects that will be expedited in response to the proclamation. In light of this emergency, the usual construction-related procurement requirements do not apply under Carlsbad Municipal Code, or CMC, Section 3.28.120 – Emergencies. As the awarding authority for construction contracts over $200,000, the City Council may also determine these usual requirements do not apply under CMC Section 3.28.110 – Exemptions, subsections (A) and (N). Proposed lane reduction Additionally, the General Plan’s Mobility Element, the city’s primary transportation planning document, has a policy (Implementing Policy 3-P.15) that states that the City Council shall have the sole discretion to approve any road diet or vehicle traffic calming improvements that would reduce vehicle capacity to or below what is found to be a level of service rated at a D, with F being a failing rating. Staff recommend the City Council approve the proposed lane reduction on southbound Carlsbad Boulevard between Solamar Drive and Island Way. Sept. 27, 2022 Item #9 Page 2 of 144Nov. 15, 2023 Item #1 Page 142 of 159 Discussion Carlsbad Boulevard Restriping Project, CIP Project No. 6096 This project will feature the following improvements on Carlsbad Boulevard between Manzano Drive and Avenida Encinas: • Stripe one 10-foot travel lane, a 2-foot buffer and an 8-foot bike lane on southbound Carlsbad Boulevard between Manzano Drive and Island Way • Provide a 1- to 8-foot wide shoulder along the west side of Carlsbad Boulevard • Add approximately 300 feet of parallel on-street parking, which is approximately 15 parking spots, adjacent to the existing parking lot just north of Island Way. A 3-foot buffer will be provided between the bike lane and this proposed parking lane. These parking areas can also be designated as bike parking areas with bicycle racks to promote active transportation. The determination of the final design for which areas will be designated as bicycle parking will be determined by the City Engineer within three months after the completion of the improvements to observe performance of the interface between the parking areas and the modes of travel. The existing angled on- street parking just south of Solamar Drive will be maintained. • Add dashed green paint bike lane to highlight bike-car conflict areas at five intersections on Carlsbad Boulevard. These intersections are located at Lanikai Lane, Breakwater Road, Poinsettia Lane, Ponto Road and Avenida Encinas. Carlsbad Boulevard is classified as a Coastal Street in the General Plan’s Mobility Element and is therefore not subject to the city’s level of service standards for vehicular travel. However, because Implementing Policy 3-P.15 of the General Plan Mobility Element gives the City Council sole discretion to approve any road narrowing that would reduce vehicle capacity to or below a level of service of D, staff are including the appropriate analysis of the level of service. A traffic memorandum for the project, provided as Exhibit 3, was prepared to analyze the roadway segment and intersection operations with the proposed lane reduction on southbound Carlsbad Boulevard between Solamar Drive and Island Way and to discuss level of service findings. The level of service is represented as a letter grade ranging from A to F. A level of service of A represents a high level of service, that is, the free flow of vehicles, while an F would reflect a low or inadequate level of service, heavy congestion. According to Implementing Policy 3-P.4 of the General Plan Mobility Element, the performance standard for roadways is to maintain a level of service of D or better. Staff collected traffic counts in July 2022 and compared them to those collected in 2019, under pre-pandemic pandemic conditions. The comparison shows that the average daily traffic volume is lower than that from pre-pandemic conditions. To provide a conservative analysis, staff studied traffic operation under existing conditions, during 2022, and pre-pandemic conditions with traffic volumes adjusted to pre-pandemic conditions. The tables below provide a summary of the roadway segment analysis results for weekdays and weekends, respectively. With the existing two travel lanes, the study segment of Carlsbad Boulevard has a roadway capacity of 1,820 vehicles during peak hour travel and the roadway operates at a Level of Service, or LOS, C during the morning and afternoon peak hours on both weekdays and weekends. Sept. 27, 2022 Item #9 Page 3 of 144Nov. 15, 2023 Item #1 Page 143 of 159 With the proposed single lane on southbound Carlsbad Boulevard between Solamar Drive and Island Way, the roadway will have a capacity of 910 vehicles during peak hour travel. This segment of Carlsbad Boulevard would operate at a level of service D during the morning and afternoon peak hours, on weekdays and a level of service E during peak hours on weekends under existing conditions. Under pre-pandemic conditions, however, the roadway segment would operate at a level of service D during the morning peak hour on weekdays and a level of service F during the afternoon peak hour on weekdays and peak hour on weekends. Summary of results of analysis of Carlsbad Boulevard segment (Weekdays) Lanes/ speed/ median(1) Segment capacity (2) (veh/hr) AM peak hour PM peak hour Volume (veh/hr) Level of service Volume (veh/hr) Level of service 2-lane southbound (existing conditions) 2/50/D 1,820 610 C 657 C 1-lane southbound (existing conditions) 1/50/D 910 610 D 657 D 1-lane southbound (pre-pandemic conditions) 1/50/D 910 853 D 919 F (1) 1/50/D = Number of lanes, posted speed limit, divided road (2) Source: City of Carlsbad Segment Volume Table Report Summary of Roadway Segment Analysis Results (Weekends) Lanes/ speed/ median(1) Segment capacity (2) (veh/hr) Mid-day peak hour Hour volume (veh/hr) Level of service 2-lane southbound (existing conditions) 2/50/D 1,820 895 D 1-lane southbound (existing conditions) 1/50/D 910 895 E 1-lane southbound (pre-pandemic conditions) 1/50/D 910 1232 F (1) 1/50/D = Number of lanes, posted speed limit, divided road (2) Source: City of Carlsbad Segment Volume Table Report The traffic signal operation analysis indicates that both signalized intersections would operate at a level of service B or better in the morning, midday and afternoon peak hours on weekdays and in the peak hour on weekends under existing conditions as well as pre-pandemic conditions. Because the number of lanes at the intersections would remain unchanged with the proposed project, the operation of the signals is expected to remain at a level of service B or better. Sept. 27, 2022 Item #9 Page 4 of 144Nov. 15, 2023 Item #1 Page 144 of 159 It is worth noting that the No. 2 lane on Carlsbad Boulevard, the second lane from the center or westernmost lane, was closed in the southbound direction between Solamar Drive and Island Way in 2016 due to severe erosion near the Encinas Creek Bridge. To ensure the safety of drivers, bicyclists and pedestrians and to help facilitate the necessary repairs, the city implemented a long-term lane closure in January 2016 and lasted through early 2017. During this long-term lane closure, traffic impacts were observed to be minimal, and the single southbound lane was found to provide adequate capacity, as documented in the May 22, 2017, council memorandum provided as in Exhibit 4. As presented earlier in this report, traffic volumes in 2016 were likely higher than the current traffic volumes on Carlsbad Boulevard and comparable to the 2019 volumes. Staff believe that one lane on southbound Carlsbad Boulevard between Solamar Drive and Island Way could accommodate the amount of traffic with minimal impacts. The City Council’s approval of the proposed lane reduction on southbound Carlsbad Boulevard is required under General Plan Mobility Element Policy 3-P.15, which states, in relevant part: Evaluate methods and transportation facility improvements to promote biking, walking, safer street crossings, and attractive streetscapes. The City Council shall have the sole discretion to approve any such road diet or vehicle traffic calming improvements that would reduce vehicle capacity to or below a LOS D. Bike Enhancement Projects, or CIP Project No. 6104 The city’s Sustainable Mobility Plan was created to help improve transportation-related safety, reduce greenhouse emissions, increase travel choices and implement the Mobility Element of the city’s General Plan. The plan contains three bike enhancement projects that will enhance existing bike facilities with modifications to signage and striping. These projects are:  On La Costa Avenue at the intersections of Piraeus Street, Saxony Road and El Camino Real  Jefferson Street between Las Flores Drive and the Interstate 5 overpass  At the Paseo Del Norte and Cannon Road intersection La Costa Avenue at the intersections of Piraeus Street, Saxony Road and El Camino Real The project will add dashed green paint to the bike lane to highlight bike-car conflict areas and green paint to the bike lane to the left of the dedicated right-turn pocket on La Costa Avenue at the intersections of Piraeus Street, Saxony Road and El Camino Real. Jefferson Street between Las Flores Drive and I-5 overpass The project will add a bike lane on Jefferson Street in the northbound direction from Las Flores Drive to the I-5 overpass, which will serve as a climbing lane uphill for bikes. The southbound bike lane on Jefferson Street will be extended to the crest of the roadway at the overpass. With the proposed bike lane enhancements, on-street parking on the east side of the street will be prohibited between Las Flores Drive and the overpass. Residents will be notified the on-street parking is being removed before the project begins. Sept. 27, 2022 Item #9 Page 5 of 144Nov. 15, 2023 Item #1 Page 145 of 159 Paseo Del Norte and Cannon Road Intersection This project will include the following bike improvements at the intersection to enhance bike safety: • Narrow the eastbound travel lanes from 12 to 11 feet and provide a 7-foot bike lane with a 2-foot buffer in the eastbound direction of Cannon Road between the I-5 northbound ramps and Paseo Del Norte • Add shared lane markings on the middle of the three northbound lanes on Paseo Del Norte and on the middle lane of the three westbound lanes on Cannon Road approaching the I-5 northbound ramp intersection • Modify the existing bike lane on westbound Cannon Road at the intersection of Paseo Del Norte to better position bikers to ride in the middle of the three lanes approaching the I-5 northbound ramp intersection Traffic and Mobility Commission recommendation At its meeting on Sept. 6, 2022, the Traffic and Mobility Commission voted 5-0-0-2, with Chair Perez and Commissioner Proulx absent, to support staff’s recommendation to implement the: • Carlsbad Boulevard Restriping Project (CIP Project No. 6096) • Two of the three Sustainable Mobility plan bike enhancement projects (CIP Project No. 6104: o La Costa Avenue at the intersections of Piraeus Street, Saxony Road and El Camino Real o Paseo Del Norte and Cannon Road intersection. The Traffic and Mobility Commission voted 4-1-0-2, with Chair Perez and Commissioner Proulx absent, to support staff’s recommendation to implement the Sustainable Mobility plan bike enhancement projects on Jefferson Street between Las Flores Drive and the I-5 overpass (also CIP Project No. 6104). The summary memorandum of the Sept. 6, 2022, Traffic and Mobility Commission meeting is attached as Exhibit 5. The projects were advertised on Sept. 13, 2022. Staff received three quotes to construct the projects on Sept. 20, 2022, including one from VSS International, Inc., in the amount of $381,120. In light of the local emergency described above, the usual CMC construction-related procurement requirements do not apply to the award of this agreement. Having reviewed all three quotes, staff recommend the City Council award the construction contract to VSS International, Inc. in an amount not to exceed $381,120, in accordance with CMC section 3.28.110 – Exemptions, subsections (A) and (N) and section 3.28.120 – Emergencies. Sept. 27, 2022 Item #9 Page 6 of 144Nov. 15, 2023 Item #1 Page 146 of 159 Options Staff provide the following options for the City Council’s consideration: 1. Adopt a resolution approving the proposed lane reduction on southbound Carlsbad Boulevard between Solamar Drive and Island Way, and approving the plans and specifications, and awarding the contract to VSS International, Inc. in the amount of $381,120 for construction of the projects Pros • The projects are being expedited as part of the emergency declaration to enhance bike safety • The Carlsbad Boulevard Restriping Project will provide an interim solution to address climate adaptation along South Carlsbad Boulevard, in support of the ongoing grant-funded South Carlsbad Boulevard Climate Adaptation Project1 • Sufficient funding is available for the contract Cons • None identified 2. Do not adopt the resolution Pros • None identified Cons • Delays implementation of bike enhancements at intersections on Carlsbad Boulevard, Jefferson Street, La Costa Avenue and at Paseo Del Norte and Cannon Road intersection • Does not advance city’s emergency goals to address traffic safety in Carlsbad Staff recommend Option 1 for the City Council’s approval. Fiscal Analysis Funding for the projects has been appropriated from the gas tax, the TransNet transportation sales tax, and funds from the non-jurisdictional fee the city receives from the waste transfer station for the wear and tear on the roads from trucks coming in and out of the city to the station. A portion of the construction cost for the Carlsbad Boulevard Restriping Project, CIP Project 6096, is for slurry seal. This cost will be funded from the Pavement Management Program, CIP Project No. 6001. 1 The California Coastal Conservancy awarded the city a $500,000 climate ready grant in2020 to study coastal erosion along an approximately 3-mile stretch from Terramar to Batiquitos Lagoon, and to plan south Carlsbad Boulevard’s eventual relocation away from the coast. Sept. 27, 2022 Item #9 Page 7 of 144Nov. 15, 2023 Item #1 Page 147 of 159 The available funds and construction costs are shown in the table below: Carlsbad Boulevard Restriping Project (CIP Project No. 6096) Total appropriation to date $300,000 Total expenditures/encumbrances to date $0 Total available $300,000 Pavement Management Program (CIP Project No. 6001) Total appropriation to date $53,799,889 Total expenditures/encumbrances to date $43,871,456 Total available $9,928,433 Sustainable Mobility Plan projects (CIP Project No. 6104) Total appropriation to date $510,566 Total expenditures/encumbrances to date $0 Total available $510,566 Estimated project costs Pavement Management Program (CIP Project No. 6001) Slurry seal $117,150 Construction management, inspection, testing and communications (estimated) $46,400 Construction contingency (estimated) $30,800 Total estimated costs $194,350 Remaining balance $9,734,083 Carlsbad Boulevard Restriping Project (CIP Project No. 6096) Signing and striping, traffic control $184,234 Construction management, inspection, testing and communications (estimated) $46,400 Construction contingency (estimated) $30,800 Total estimated costs $261,434 Remaining balance $38,566 Sustainable Mobility Plan projects (CIP Project No. 6104) Signing striping, traffic control $78,736 Construction management, inspection, testing and communications (estimated) $23,200 Construction contingency (estimated) $15,400 Total estimated costs $117,336 Remaining balance $393,230 Total project costs for CIP projects 6001, 6096, 6104 $573,120 Additional appropriation requested $0 Carlsbad Municipal Code Sections 3.28 – Purchasing, subsections 040(C)(5) and 3.28.090(B) authorize the City Manager or designee to approve change orders in an amount equal to the contingency set at the time of contract award, which is $77,000 for these projects. Sept. 27, 2022 Item #9 Page 8 of 144Nov. 15, 2023 Item #1 Page 148 of 159 Next Steps Once the City Council awards the construction contract to VSS International, Inc., staff will issue a purchase order, schedule a preconstruction meeting with the contractor and issue a notice to proceed for construction of the project, which is expected to commence in October 2022. The duration of the construction contract is 30 working days, not including rainy days and delays from change orders that may extend the contract duration. The estimated completion date is January 2023. Upon successful completion of the project, a notice of completion will be recorded to release the bonds the city issued for the project. Environmental Evaluation On Aug. 23, 2022, the city proclaimed a local emergency for traffic safety, which the City Council ratified on Aug. 30, 2022. The adoption of the resolution ratified the proclamation of bicycle, e-bicycle, and motorized mobility device safety local emergency and authorized funds to support the city’s coordinated efforts to increase attention and resources on a range of solutions, including infrastructure, safety, enforcement, and safe driving and riding education. These solutions are a Class 1 categorical exemption under California Environmental Quality Act Guidelines Section 15301 – Existing Facilities. Specifically, Section 15301(c) exempts existing highways and streets, sidewalks, gutters, bicycle and pedestrian trails, and similar facilities (this includes road grading for the purpose of public safety), and other alterations such as the addition of bicycle facilities, including but not limited to bicycle parking, bicycle-share facilities, and bicycle lanes, transit improvements such as bus lanes, pedestrian crossings, street trees and other similar alterations that do not create additional automobile lanes. The improvements to the city’s existing mobility network under this action are intended to improve public safety and address the critical issues raised in the emergency proclamation. Actions are anticipated to involve negligible expansion of the current facilities and infrastructure beyond the existing facilities/infrastructure and will not result in additional automobile lanes. The actions are not expected to increase vehicular use of the roadway, will not occur within the existing public right-of-way, and will not change the overall facility use of the mobility network. No exception to the exemption as set forth in CEQA Guidelines Section 15300.2 applies. For the reasons stated above, the action is categorically exempt from CEQA under CEQA Guidelines Section 15304(e), which applies to the minor temporary use of land having negligible or no permanent effects on the environment, and CEQA Guidelines Section 15304(h), which covers the creation of bicycle lanes on existing rights-of-way. No exception to these exemptions as set forth in CEQA Guidelines Section 15300.2 applies. Public Notification This item was noticed in accordance with the Ralph M. Brown Act and it was available for public viewing at least 72 hours prior to the scheduled meeting date. Sept. 27, 2022 Item #9 Page 9 of 144Nov. 15, 2023 Item #1 Page 149 of 159 Exhibits 1.City Council resolution 2.Location map 3.Traffic memorandum for Southbound Carlsbad Boulevard Lane Reduction 4.Council memorandum dated May 22, 2017 5.Summary memorandum from the Sept. 6, 2022, Traffic and Mobility Commission meeting 6.Plans, specifications and contract documents (on file at the Office of the City Clerk) Sept. 27, 2022 Item #9 Page 10 of 144Nov. 15, 2023 Item #1 Page 150 of 159 RESOLUTION NO. 2022-227 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, APPROVING THE PROPOSED LANE REDUCTION ON SOUTHBOUND CARLSBAD BOULEVARD BETWEEN SOLAMAR DRIVE AND ISLAND WAY; APPROVING THE PLANS AND SPECIFICATIONS, AND AWARDING A CONTRACT TO VSS INTERNATIONAL, INC., A CALIFORNIA CORPORATION, FOR THE CONSTRUCTION OF THE CARLSBAD BOULEVARD RESTRIPING PROJECT, BIKE LANE IMPROVEMENTS AT FIVE LOCATIONS ON CARLSBAD BOULEVARD AND THREE SUSTAINABLE MOBILITY PLAN BIKE ENHANCEMENT PROJECTS WHEREAS, the City Council of the City of Carlsbad, California, has determined it necessary and in the public interest to approve the plans and specifications for the Carlsbad Boulevard Restriping Project, Capital Improvement Program, or CIP, Project No. 6096, and three Sustainable Mobility Plan Bike Enhancement Projects, CIP Project No. 6104 -La Costa Avenue at the intersections of Piraeus Street; Saxony Road and El Camino Real; Jefferson Street between Las Flores Drive and the Interstate 5, or 1-5, Overpass; and Paseo Del Norte and Cannon Road intersection; and WHEREAS, the plans and specifications for the Projects have been prepared and are on file at the City Clerk's office; and WHEREAS, the Carlsbad Boulevard Restriping Project, CIP Project No. 6096, will restripe southbound Carlsbad Boulevard from Manzano Drive to Island Way as an interim effort to address climate adaptation along South Carlsbad Boulevard, in support of the on-going grant-funded South Carlsbad Boulevard Climate Adaptation Project; and WHEREAS, the Carlsbad Boulevard Restriping Project, CIP Project No. 6096, will reduce the number of travel lanes on southbound Carlsbad Boulevard from two lanes to one lane while enhancing the bike lane with green paint at conflict areas and providing additional on-street parking; and WHEREAS, the Carlsbad Boulevard Restriping Project, CIP Project No. 6096, also includes additional bike lane improvements on Carlsbad Boulevard south of Island Way, adding green bike lane enhancements in conflict areas at Lanikai Lane, Breakwater Road, Poinsettia Lane, Ponto Road, and Avenida Encinas; and WHEREAS, City Council approval is required for the proposed lane reduction on southbound Carlsbad Boulevard between Solamar Drive and Island Way per General Plan Mobility Element Policy 3-P.15; and Nov. 15, 2023 Item #1 Page 151 of 159 WHEREAS, the SMP Bike Enhancement Project on La Costa Avenue at the intersections of Piraeus Street, Saxony Road and El Camino Real, CIP Project No. 6104, will add dashed green paint to the bike lane to highlight conflict areas and green paint to the bike lane to the right of the dedicated right-turn pocket on La Costa Avenue at the intersections of Piraeus Street, Saxony Road and El Camino Real; and WHEREAS, the SMP Bike Enhancement Project on Jefferson Street between Las Flores Drive and 1-5 Overpass, CIP Project No. 6104, will add a bike lane on Jefferson Street in the northbound direction from Las Flores Drive to the 1-5 Overpass and extend the southbound bike lane on Jefferson Street to the crest of the roadway at the 1-5 Overpass; and WHEREAS, the SMP Bike Enhancement Project at the Paseo Del Norte and Cannon Road Intersection, CIP No. Project 6104, will narrow the eastbound travel lanes from 12 to 11 feet and provide a 7-foot bike lane with a 2-foot buffer in the eastbound direction of Cannon Road between the 1-5 northbound ramp and Paseo Del Norte; and WHEREAS, the SMP Bike Enhancement Project at the Paseo Del Norte and Cannon Road Intersection, CIP Project No. 6095, will add sh arrows on the middle of the three northbound lanes on Paseo Del Norte and on the middle lane of the three westbound lanes on Cannon Road approaching the 1-5 northbound ramp intersection; and WHEREAS, the SMP Bike Enhancement Project at the Paseo Del Norte and Cannon Road Intersection, CIP Project No. 6104, will modify the existing bike lane on westbound Cannon Road at the intersection of Paseo Del Norte to position bikers to ride in the middle of the three lanes approaching the 1-5 northbound ramp intersection; and WHEREAS, on Aug. 23, 2022, the City Manager/Director of Emergency Services issued a Proclamation of Bicycle, E-Bicycle and Motorized Mobility Device Safety Local Emergency; and WHEREAS, on Aug. 30, 2022, the City Council adopted Resolution No. 2022-214, ratifying this emergency proclamation; and WHEREAS, under this current state of emergency, the usual construction-related procurement requirements do not apply pursuant to Carlsbad Municipal Code, or CMC, section 3.28.120 - Emergencies; and WHEREAS, the City Council hereby finds that the above-referenced projects will directly address the threat to public safety described in the Aug. 23, 2022 emergency proclamation, and, once constructed, will improve public safety and avoid danger to life or property; and Nov. 15, 2023 Item #1 Page 152 of 159 WHEREAS, the City Council hereby finds that construction of the above-referenced projects will improve roadway safety and help reduce the number of collisions involving bicycles or e-bikes; and WHEREAS, the City Council is the awarding authority for construction contracts over $200,000 under CMC section 3.28.080(E); and WHEREAS, the City Council hereby finds that, in light of Resolution No. 2022-214 and the findings described above, the usual construction-related procurement requirements do not apply under CMC section 3.28.110(A) and (N) -Exemptions; and WHEREAS, the Projects were advertised on Sept. 15, 2022; and WHEREAS, staff received three quotes on Sept. 20, 2022, which included a quote from VSS International, Inc., in the amount of $381,120; and WHEREAS, having reviewed all three quotes, staff recommend the City Council award the construction contract to VSS International, Inc., in an amount not to exceed $381,120 based on CMC section 3.28.110 -Exemptions, subsections (A) and (N), and section 3.28.120-Emergencies; and WHEREAS, the City Planner has determined that the Projects are exempt from the California Environmental Quality Act, or CEQA, per State CEQA Guidelines Section 15301(c) which exempts existing highways and streets, sidewalks, gutters, bicycle and pedestrian trails, and similar facilities (this includes road grading for the purpose of public safety), and other alterations such as the addition of bicycle facilities, including but not limited to bicycle parking, bicycle-share facilities, and bicycle lanes, transit improvements such as bus lanes, pedestrian crossings, street trees and other similar alterations that do not create additional automobile lanes because: (i) the project's proposed improvements are anticipated to involve negligible expansion of the current facilities and infrastructure beyond the existing facilities/infrastructure and will not result in additional automobile lanes; and (ii) the project's actions are not expected to increase vehicular use of the roadway, will not occur within the existing public right-of-way, and will not change the overall facility use of the mobility network; 15304(e) which applies to minor temporary use of land having negligible or no permanent effects on the environment; and CEQA Guidelines Section 15304(h), which covers the creation of bicycle lanes on existing rights-of­ way, and that no exception to these exemptions, as set forth in CEQA Guidelines section 15300.2, applies. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, California, as follows: 1.That the above recitations are true and correct. Nov. 15, 2023 Item #1 Page 153 of 159 2.That the City Council approve the proposed lane reduction, from two to one lane, on southbound Carlsbad Boulevard between Solamar Drive and Island Way. 3.That the plans and specifications for the Carlsbad Boulevard Restriping Project, CIP Project No. 6096, and three Sustainable Mobility Plan Bike Enhancement Projects, CIP Project No. 6104 -La Costa Avenue at the intersections of Piraeus Street; Saxony Road and El Camino Real; Jefferson Street between Las Flores Drive and 1-5 Overpass; and Paseo Del Norte and Cannon Road intersection; are hereby approved. 4.That the quote of $381,120 submitted by VSS International, Inc. for construction of the Carlsbad Boulevard Restriping Project, CIP Project No. 6096, and three Sustainable Mobility Plan Bike Enhancement Projects, CIP Project No. 6104 -La Costa Avenue at the intersections of Piraeus Street; Saxony Road and El Camino Real; Jefferson Street between Las Flores Drive and 1-5 Overpass; and Paseo Del Norte and Cannon Road intersection, is accepted and the Mayor is hereby authorized to execute a contract for these Projects. 5.That the City Manager or designee is hereby authorized to approve construction change orders up to $77,000. 6.That the award of this contract is contingent upon VSS International, Inc. executing the required contract and submitting the required bonds and insurance policies, as described in the contract, within 20 days of adoption of this Resolution. The City Manager may grant reasonable extensions of time to execute the contract and assemble the required bonds and insurance policies. Nov. 15, 2023 Item #1 Page 154 of 159 PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council of the City of Carlsbad on the 27th day of September, 2022, by the following vote, to wit: AYES: NAYS: ABSENT: Bhat-Patel, Acosta, Norby. Hall, Blackburn. None. MATT HALL, Mayor }.I\ JAVIOLA MEDINA, City Clerk Services Manager "( .,, (SEAL) Nov. 15, 2023 Item #1 Page 155 of 159 SIGNING AND STRIPING LEGEND: TAPER LENGTH CALCULATION Exhibit 7 Nov. 15, 2023 Item #1 Page 156 of 159 f- \ \ • CARLSBAD BLVD (NORTHBOUND) 12 330' DETAIL A, AT APPROXIMATELYPM 300' SPACING PM 12" WHITE HATCHING AT 45 DEGREES, AT 40' SPACING Q) MERGE TAPER L = (W x S) = (9 x 50) = 450' L = LENGTH OF TRANSITION W = OFFSET S = DESIGN SPEED Michael Baker 5050 Avenida Encinas Suite 260 Carlsbad, CA 92006 Phone: (760) 476-9193 MBAKERINTL.COM INTE R NATI O NAL IS R26(CA) R81B(CA) 78 180' 10' 10' I I E1 ·'2 · I I ( '--~) D I I I R26(CA) RL RB1B(CA) 320' (I] W3-3 40 20 0 40 BO 120 1-~--1 1-----,1 ---- SCALE: 1 "=40 ' ..... "' .. l J 7 2 CARLSBAD BLVD (NORTHBOUND) ( \ ;e:::_ ~Lv )__,v. E I 450' Q) MERGE TAPER [I] © ® @ ~ /[~o"' ® @ @) ~ ~ ~ p ( 12' ) 12' <I D EXISTING TO REMAIN. INSTALL CALTRANS STRIPING DETAIL PER NUMBER NOTED, INCLUDING INSTALLATION OF RAISED PAVEMENT MARKERS. INSTALL SIGN(S) AND POST IF REQUIRED AS NOTED. INSTALL PAVEMENT MARKING OR ARROW AS NOTED. REFRESH EXISTING PAVEMENT MARKING. RELOCATE EXISTING SIGN(S) TO NEW POST (IF APPLICABLE) AS NOTED. REMOVE BY GRINDING ALL EXISTING CONFLICTING TRAFFIC STRIPING, MARKING, OR ARROW AS NOTED, INCLUDING RAISED PAVEMENT MARKERS. REMOVE AND SALVAGE SIGN AND POST AS NOTED. SIGNALIZED INTERSECTION EXISTING SIGN (ONE POST) NEW SIGN (ONE POST) NEW SIGN (TWO POSTS) NEW SIGN (ON EXISTING LIGHT POLE/UTILITY POLE) EXISTING WIDTH PROPOSED WIDTH MATCH EXISTING STRIPING/END PROPOSED STRIPING LIMITS OF SLURRY SEAL. GRIND ALL EXISTING TRAFFIC STRIPING, MARKING, OR ARROW WITHIN LIMITS, INCLUDING RAISED PAVEMENT MARKERS. "AS BUil T" P.E. __ _ EXP, ___ _ DATE REVIEWED BY: INSPECTOR DATE t----+---+--------------+---+---+---+---t w ciTErlN~rNG ~~~~~N~AD ~ L!_Q__J 1------1---+----------------+-----+--+-----1f-----1 IMPROVEMENT PLANS FOR: CARLSBAD STRIPING IMPROVEMENTS ROW SIGNING & STRIPING PLANS APPROVED:THOMAS FRANK CITY ENGINEER RCE 49070 EXP.9/30/24 DATE DA TE INITIAL ENGINEER OF WORK REVISION DESCRIPTION DATE INITIAL DATE INITIAL I RVWD BY: 11 PROJECT NO. I DRAWING NO. >--O_TH_E_R_A~PP-RO-V-AL--+-C-IT_Y_A~P-PR-O-VA-L--1 CHKD BY: ---~---6_0_9_6 ___ ._, _5_3_8_-_6~ E C. si-t') N N N --.... co --.... 0, []_ 0 a:: ~ <( _J <(_ :r: .... z <( :!' <( (/) ~ 0 0 []_ I t') 0 I sl-N N co < _J f []_ (/) z <( ~ 0 0 <( 0 / <.:> z []_ a:: .... (/) w a:: 0 > _J (l) 0 <( (l) (/) _J a:: <( 0 I :;jC N N CX) / <( .... <( 0 []_ ,:::- 0 0 a:: :r: / :!' 0 0 []_ a:: 0 0 a:: w Y'. <( (l) :!' a:: Y'. (l) -<( 0 _J a:: <( ~ SIGNING AND STRIPING LEGEND:SIGNING AND STRIPING LEGEND: TAPER LENGTH CALCULATION ® SIGNING AND STRIPING LEGEND: ® Nov. 15, 2023 Item #1 Page 157 of 159 I I I I .WITHIN LIMITS '.;OF SLURRY SEAL DETAIL A, AT APPROX I MA TEL Y PM 300' SPACING TYPE I ARROW (10') :::::::::::::~~~.A..A..,A___.,A____A._..AJvLA....A_AJ,.Y Michael Baker INTERNATI O NAL 5050 Avenida Encinas Suite 260 Carlsbad, CA 92006 Phone: (760) 476-9193 MBAKERINTL.COM u I--SOUTH CARLSBAD STATE E 12" WHITE -HATCHING AT 45 PM LL BEACH GUIDE SIGN DEGREES, AT 40' SPACING ~ 25 1245~~t, A-~-~~-----------------------------~-,~-, I ,-1 ==~~2• w ,b i, ------~--------~----, I I I t I I I = • -------,1 · ~:: ,. I I I 11 I I I - - - -I :f ~ R6-1 [[) IJ,d< 31:: WITHIN LIMITS RP 12" WHITE HATCH!NG AT 45~ ~' TYPE I ARROW ( 10') PM R26 (CA) ~c O OF SLURRY SEAL -DEGREES, AT 40 SPACING R~~ ;~_;u'-'c::, ---------=-. ~ ""-' """'(rn')c~:~, ,0~e,rJdC'Ou=_,._v __ .• -·=":,:=· ••••• :_ , -l:J } R5-1A ,::_y ----,.. --8 3,-~ en ~ b l ►..:::::,k....) -I :·.... ... _. OETA:I:L:_A:_:_J ~t ~-~i=::~l=::-:;==l·-;;~~~~=:1--~ -::::::=r-:===~~-=::::z=;~~~-L------.-., :-r I ·.o i: --- -_..;---r x--x->< -)(·I ::::i= L ...-• IL-----\---~-L=:-::;;;:;;;;~:==:~;-::--R/~ -x -X --x--1( \I "BETWEE~3~i~[[) ~"---"'ic='---T""=;=~"=_"""=:_~-=:-=:~=,.._. -x X -x° x--x._x~R24(CA f !s'--19Q"7s 19Q'39A 190'39 190'39 AT APPROX I MA TEL Y PM~------=-~---\ '::) . -1 ___ ---f-----190 • lB 12" WHITE HATCHING AT 45 ..-( DETAIL A, ATAPPROXIMATELYPM , 3o_o·_sP_A_c_1N_G====::·,-,-=--=:::::=--:: ------~:_-::._-_-_-___ ___, - --.e::: -DEGREES AT 40• SPACING I \ ../ 3DO ~ SPACING 7 PM 10' X 280' GREEN BIKE EX AC DIKE • • PM 12" WHITE HATCHING AT 45 LANE SKIP PER DETAIL B DEGREES, AT 40' SPACING 270' ' I I ' I I I I © SHIFT TAPER m (l) ® @ ~ _,,.-;~o~ ® @ @ ► ► ~ t, ( 12') 12' <l r/c EXISTING TO REMAIN. INSTALL CALTRANS STRIPING DETAIL PER NUMBER NOTED, INCLUDING INSTALLATION OF RAISED PAVEMENT MARKERS. INSTALL SIGN(S) AND POST IF REQUIRED AS NOTED. INSTALL PAVEMENT MARKING OR ARROW AS NOTED. REFRESH EXISTING PAVEMENT MARKING. RELOCATE EXISTING SIGN(S) TO NEW POST (IF APPLICABLE) AS NOTED. REMOVE BY GRINDING ALL EXISTING CONFLICTING TRAFFIC STRIPING, MARKING, OR ARROW AS NOTED, INCLUDING RAISED PAVEMENT MARKERS. REMOVE AND SALVAGE SIGN AND POST AS NOTED. SIGNALIZED INTERSECTION EXISTING SIGN (ONE POST) NEW SIGN (ONE POST) NEW SIGN (TWO POSTS) NEW SIGN (ON EXISTING LIGHT POLE/UTILITY POLE) EXISTING WIDTH PROPOSED WIDTH MATCH EXISTING STRIPING/END PROPOSED STRIPING PROPOSED RED CURB • Q = Cl> X X X X ~ --x----x- © SHIFT TAPER L = (W x S) = (3 x 50) = 150' USE 270' L = LENGTH OF TRANSITION W = OFFSET S = DESIGN SPEED ® SHIFT TAPER L = (W x S) = (4 x 50) = 200' L = LENGTH OF TRANSITION W = OFFSET S = DESIGN SPEED @ BIKE SHIFT TAPER L = (W x S2)/60 = (12 x 152)/60 = 45' 110' L = LENGTH OF TRANSITION W = OFFSET S = DESIGN SPEED 0 D 40 20 0 40 80 120 1-~r---1 __ 1------,1 SCALE: 1 "=40 ' LIMITS OF SLURRY SEAL. GRIND ALL EXISTING TRAFFIC STRIPING, MARKING, OR ARROW WITHIN LIMITS, INCLUDING RAISED PAVEMENT MARKERS. "AS BUil T" P.E. __ _ EXP. ___ _ DATE REVIEWED BY: INSPECTOR DATE t----+---+--------------+---+---+---+---t w ciTErlN~rNG ~~~~~N~AD ~ L...!_Qj 1------1---+----------------+----+--+----1e----1 IMPROVEMENT PLANS FOR: CARLSBAD STRIPING IMPROVEMENTS ROW SIGNING & STRIPING PLANS APPROVED:THOMAS FRANK CITY ENGINEER RCE 49070 EXP.9/30/24 DATE DA TE INITIAL ENGINEER OF WORK REVISION DESCRIPTION DATE INITIAL DATE INITIAL I RVWD BY: 11 PROJECT NO. I DRAWING NO. ._O_TH_E_R_A~PP-RO-V-AL-+-C-IT_Y_A~P-PR-0-VA_L__, CHKD BY: ---~---6_0_9_6 ___ ._, _5_3_8_-_6~ E C. si-t') N N N --..._ co --..._ 0, [L 0 a:: ~ <( _J <(_ :r: >-z <( :!' <( (/) ~ 0 0 [L I sl- 0 I sl-N N ao < _J f [L (/) z <( ~ 0 0 <( 0 / <.:> z [L a:: >-if) w a:: 0 > _J (l) 0 <( (l) (/) _J a:: <( 0 I :;jC N N ao / <( >-<( 0 [L ,:::- 0 0 a:: :r: / :!' 0 0 [L a:: 0 0 a:: w Y'. <( (l) :!' a:: Y'. (l) -<( 0 _J a:: <( ~ Exhibit 8 Exhibit 8 - Full-Size Exhibits “A” – “B” dated Nov.15, 2023, on file in the office of the City Clerk. Nov. 15, 2023 Item #1 Page 158 of 159 LIST OF ACRONYMS AND ABBREVIATIONS Exhibit 9 This is a list of acronyms and abbreviations (in alphabetical order) that are commonly used in staff reports. Acronym Description Acronym Description APA American Planning Association LCPA Local Coastal Program Amendment APN Assessor Parcel Number LOS Level of Service AQMD Air Quality Management District MND Mitigated Negative Declaration BMP Best Management Practice NCTD North County Transit District CALTRANS California Department of Transportation ND Negative Declaration CC City Council PC Planning Commission CCR Conditions, Covenants and Restrictions PDP Planned Development Permit CEQA California Environmental Quality Act PEIR Program Environmental Impact Report CFD Community Facilities District PUD Planned Unit Development CIP Capital Improvement Program ROW Right of Way COA Conditions of Approval RWQCB Regional Water Quality Control Board CofO Certificate of Occupancy SANDAG San Diego Association of Governments CT Tentative Parcel Map SDP Site Development Permit CUP Conditional Use Permit SP Specific Plan DIF Development Impact Fee SWPPP Storm Water Pollution Prevention Program DISTRICT City Council Member District Number TM Tentative Map EIR Environmental Impact Report ZC Zone Change EIS Environmental Impact Statement (federal) EPA Environmental Protection Agency FEMA Federal Emergency Management Agency GP General Plan GPA General Plan Amendment GIS Geographic Information Systems HCA Housing Crisis Act 2019 IS Initial Study Nov. 15, 2023 Item #1 Page 159 of 159 Izzak Mireles, Associate Planner Community Development Department November 15, 2023 Carlsbad Boulevard Restriping Project CDP 2023-0036 (CIP No. 6096) 1 ( City of Carlsbad AGENDA •Safer Streets Together Plan •Location and Background •Scope •Consistency •Recommended Action AGENDA 2 {c ity of Carlsbad Safer Streets Together Plan 3 Options Worbhffl or. ... __ +I ______ Olr'-'ll'•~ .... -....,._ __ --------•w:i...•--•-iar-, ..... ..... ·--·-• • C ......... • • • • .. .. .. .. .. V V • • • .. .. .. .. -. ..._ . -•···· HISTORY •September 2022 – City Council approves Safer Streets Together Plan •September 27, 2022 – City Council approves project •March 2023 – Inquiry filed with the California Coastal Commission LOCATION AND BACKGROUND 4 {c ity of Carlsbad GENERAL PLAN ZONING 5 LOCATION AND BACKGROUND 6 SCOPE •Reconfiguration of two southbound vehicle lanes to one vehicle lane •Enlarged buffer for existing Class II bike lanes •Added six new parking spaces PROJECT SCOPE {c ity of Carlsbad BENEFITS FOR ALL USERS •Reduces speeding •Improves the line of sight and access for side street users •Identifies crossing paths of travel •More separation between cars and bikes SCOPE 7 {c ity of Carlsbad MULTI-MODAL LEVEL OF SERVICE (LOS) •Complete streets design •Performance Measurement of A-F •Intersection LOS of A/B and segment LOS of E/F •Mobility Element Policy 3-P.15 SCOPE 8 {c ity of Carlsbad PROJECT CONSISTENCY •General Plan •Zoning Ordinance •Local Coastal Program CONSISTENCY 9 {c ity of Carlsbad CEQA DETERMINATION CONSISTENCY 10 •October 19, 2023 – City Planner issued determination of exemption pursuant to CEQA Guidelines Section 15301 – Existing Facilities. •October 19, 2023 – CEQA Determination is posted for the 10-day noticing period. •October 29, 2023 – End of notice; no appeal filed. 10 1111111 {c ity of Carlsbad Izzak Mireles, Associate Planner Community Development Department November 15, 2023 Carlsbad Boulevard Restriping Project CDP 2023-0036 (CIP No. 6096) 11 ( City of Carlsbad RECOMMENDED ACTION RECOMMENDED ACTION Adopt the resolution, Exhibit 1, recommending approval of the coastal development permit 12 {c ity of Carlsbad BACK UP SLIDES 13 14 \ \ tlTHIN LIYln <r "-"""' SOL 4 ID f'lft: I NIIIOO(lO') CA)""°) 111"1 1.IWITS <r SUM< SOL 'llnllN 1.UUT$ ""-""' - 15 I ~ I !l! ~ i l -,2· •n I DCOREES. AT 45• SPACUG 12• -.1TE H4TOiit,; AT 45 COiif!a'S, AT 20• sPACIN; T'f'PC I NID (10") 12" IHltt ~ICHUC AT ~ CltfttS. At .tO" SPACIN'; c:,. I .. '-r -ema>t~ij ----- - ------OCTAIL A. AT All'fWJltU6filU. JOO" Sl'AClhli 12• ltUTt HUOtlhli AT 4' CICRES. AT .t0• SP,t,CJN; I ti I I I I , ' __ p;.---------"2.4 lO" X 210° GIIIIDI II~ LN€ 9UI" PDt DCTAIL I ..,.