Loading...
HomeMy WebLinkAboutCD 2017-0013; THE BEACON; PRELIMINARY UPDATE GEOTECHNICAL EVALUATION; 2020-05-11Good & Roberts, LLC general contractor ca lic.1986915 Good & Roberts, LLC 2455 Impala Drive, Carlsbad, California 92010 Phone: 760 598 7614 Fax:7608938777 C-~ z,.:,(1 -oo ,.3 ... 'I RFI #35 Project: 20-06-0008 -The Beacon Phase IIA -Site 7750 El Camino Real Carlsbad, California 92009 Asphalt Paving Design TO: DATE INITIATED: LOCATION: PROJECT STAGE: SUB JOB: COST IMPACT: DRAWING NUMBER: LINKED DRAWINGS: RECEIVED FROM: COPIES TO: Tiffannie Shively (Architecture Design Collaborative) 04/20/2020 Yes (Unknown) FROM: STATUS: DUE DATE: COST CODE: Sean Rodkey (Good & Roberts, LLC) Open 04/20/2020 SCHEDULE IMPACT: Yes (Unknown) SPEC SECTION: REFERENCE: Craig Chinn (Architecture Design Collaborative), Sam Jacoby (R.A. Smith, Inc.). Welch Liles (Asana Partners), Ashley McDonald (Asana Partners) . Kemery McGarry (Good & Roberts, LLC), Ryan Perez (Dasher & Tabata, Inc.), Jeff Scott (Good & Roberts, LLC), Jamey Tabata (Dasher & Tabata, Inc.) Question from Sean Rodkey (Good & Roberts, LLC) at 06:32 PM on 04/20/2020 As part of the pavement rehabilitation noted on sheet 9 & 10, note 54 refers to min. 4" AC on 8" base per geotech report. This same note also refers to note 5 on sheet 20, that calls out geotech min. 4" AC, 12" base in commercial drives and 4" AC, 8" base in parking areas. Referring to the geotech report, pavement sections are called out as 4" AC over 15" class II base for fire lanes. 4" AC over 11" class II base for drive isles and 4" AC over 7" class II base for parking stalls. Also on sheet 9 & 10 note 51 refers to construct asphalt per geotech report. The Inspector for the City of Carlsbad has indicated they are to follow the most stringent design as noted in the geotech report. Any deviation will need to be corrected by the engineer of record. Please provide the correct design to follow. We will update costs per the updated design. Awaiting an Official Response All Replies: 04-30-2020 ADC Response: Per client direction, please follow the recommendations listed in the geotechnical report for the area between buildings 7720 and 7740. Once Koury's testing is complete in the area in front of 7750, we will revisit this issue and attempt to mitigate costs if possible. 05-11-2020 RASmith: Per coordiantion with Owner, Contractor, its the understanding of raSmith that the area between 7720 and 7740 was reconstructed per the more-restrictive 2017 Ninyo & Moore report. Per further coordination with Contractor and Ninyo and Moore, the on-site testing firm. Koury Engineering, is becoming the Geotechnical Engineer of record. Per their preliminary results (subject to change, and note that the final report has not been issued as of 5/11 midday), raSmith has prepared the attached guidance memo. Please note that final changes to the approved report should be incorporated/follwed, and all construction should adhere to recomendations of Koury Engineering. 05-11 -2020 ADC Response: Please follow the above and attached RASmith response. 05-19-2020 ADC Response: Please see above and attached for RASmith response, Koury report, and city approval. Sam Jacoby, R.A.Smitht BY Tiffannie Shively architecture design collaborative Good & Roberts, LLC 5/11/2020 DATE 05-19-2020 Page 1 of 1 Welch Liles (Asana Partners), Ashley McDonald (Asana Partners), Sean Rodkey (Good & Roberts, LLC). Kemery McGarry (Good & Roberts, LLC), Jeff Scott (Good & Roberts, LLC). Craig Chinn (Architecture Design Collaborative) COPIES TO Printed On: 04/20/2020 06:32 PM q raSmith CREATIVITY BEYON0 ENGINEERING MEMORANDUM DATE: May 11, 2020 TO: Ashley McDonald, Asana Partners FR: Samuel Jacoby, P.E., raSmith CC: file/distribution RE: "Beacon" Project, Carlsbad, CA F.K.A. Phase II of the La Costa Towne Center Pavement Section Analysis RAS Project: 3160389 Ref. Docs: Preliminary Update By Koury Engineering (as distributed by Good & Roberts) Geotechnical Evaluation, The Beacon Project, Project Number 108375001, dated 9/1/17 by Ninyo & Moore (approved via City project No. CD2017-0013, Drawing No. 510-4A, ref: grading plans dated 6/30/2019) Geotechnical Evaluation, La Costa Towne Center, Project Number 107302005, dated 4/17/2015 by Ninyo & Moore (approved via City project No. PD15-06, Drawing No. 488-3A, ref: grading plans dated 12/4/2015) Recommendations/Summary Based on conversation with the Site General Contractor, the pavement sections are being altered by Koury Engineering (report to be prepared by Koury) as initially distributed by Good & Roberts, as Koury has taken over as Geotechnical Engineer of Record and has re-tested for R-value. Proposed sections are depicted on page 2 as received -these sections are subject to change By Koury Engineering. Clarification Statements: ✓ Note 54 (Sheet 9 &10) of the grading plans should be clarified (this sheet only): Areas of pavement maintenance within fire lane East of Building 7720, pavement shall be 4# A.G. on 13" base in fire lanes. ( j Note 54 (Sheet 9 &10) of the grading plans should be clarified (this sheet only): Areas of pavement maintenance between Buildings 7740 and 7720, pavement shall be 4" A.G. on 4" base in parking areas, 4" A.G. on 6.5" base in commercial drives, and 4" A.G. on 9. 5" base in fire lanes per approved geotechnical report (Koury Engineering ,/Sheet 20, Detail 5, Note 5 & 6 shou tate Project shall conform to approved geotechnical reports. Paveme intenance Areas etall sheet 20) should be amended to state: Pavement reconstruction (full depth) sha con orm o Approve Geotechnical Reports. Between Buildings 7750 pavement shall be 4" A. C. on 4" base in parking areas, 4" A. C. on 6. 5" base in commercial drives, a(" A.G. on 9. 5" base in fire lanes per approved geotechnical report (Koury Engineering). ? f'r,-,O tJJ lr...0.,.1, __.:.- Brookfield, WI I Milwaukee, WI I Appleton, WI I Madison, WI I Cedarburg, WI I Mount Pleasant, W I Naperville, IL I Irvine, CA , raSmith Page 2 / 5/11/2020 Beacon, Carlsbad, CA For Reference Only: By Koury Engineering (as distributed by Good & Roberts) (subject to revision by Koury Engineering) Table 1 -AspbaJt Pavement Sections-Fire Lane P t7 -( \,le:, Lf L- Traffic Fi.re Lane Asphalt Tbiekness Bae Coune Thieknns l■da R-Value (Inches) (I■cll~) s 17 4.0 6.0 6 17 4.0 9.5 7 17 4.0 13.0 Table 2 -Asphalt Pavement Sections-*Pot Hole Tnfllc J!lreLaae Asphalt Tblcbaa Base Course Tbfcbas Index R.-VaJue (Inches) (Inches) 5 32 4.0 4.0 6 32 4.0 6.5 7 32 4.0 9.5 •Pot Hole 2 is in the driveway north of BuildinF,'l 7750 mfr f1~ KOURY \ j ..bJ' i#i&Pll-l•iieFH3-liiM•l!tJMiii Mr. Sean Rodkey Good & Roberts, LLC 2455 Impala Drive Carlsbad, CA 92010 Subject: Additional Pavement Recommendations The Beacon Shopping Center 7720, 7740, 7750 El Camino Real Carlsbad, CA 92010 Dear Mr. Rodkey: May 11, 2020 Project No. 19-0738 DOC-200512-1267 Per your request, we have obtained two soil samples of the subject site for R-value testing. Presented herein are the results of the additional R-value testing and pavement structural analysis for pavement located in the parking lot associated with Building 7750 and the adjacent fire lane to the east. This report also includes our geotechnical recommendations for asphalt and aggregate base compaction. The recommendations provided within this submittal are based on t he results of our field exploration, laboratory testing and engineering analysis. Our services were performed in general accordance with our Proposal No. 19-0738, dated April 23, 2020. Our professional services have been performed using the degree of care and skill ordinarily exercised, under similar circumstances, by reputable geotechnical consultants practicing in this or similar localities. No other warranty, expressed or implied, is made as to the professional advice included in this report. This report has been prepared exclusively for Good & Roberts, LLC for pavement design. The report has not been prepared for use by other parties and may not contain sufficient information for the purposes of other parties or other uses. Koury Engineering & Testing, Inc. • (909) 606-6111 • www.kouryengineering.com Chino • Gardena • San Diego ' PROPOSED IMPROVEMENTS May 11, 2020 Project No. 19-0738 DOC-200512-1267 Koury understands Good & Roberts, LLC have recently removed the existing asphaltic concrete from the parking lot located east of Building 7750. The parking lot and fire lane are to be graded based on the updated pavement sections determined from the additional R-value tests derived from this study. FIELD EXPLORATION The field exploration program consisted of observation of site conditions and of soil sampling. Two hand auger soil test borings (pot holes) were advanced on April 24, 2020. The potholes were augered to depths of about 18 inches below the exposed subgrade surface. The locations of the potholes are shown on the Pot Hole Location Map, Figure A-1, presented in Appendix A. During the field exploration, we noted that the existing pavement exhibited signs of alligator cracking, raveling, and potholing. Bulk samples were obtained for laboratory testing from the excavation performed. The depths, test results, and the Unified Soil Classification Systems (USCS) description of the samples are presented in Table 1 of this report. LABO RA TORY TESTING Laboratory tests, including moisture contents, #200 sieve wash and R-value were performed to aid in the classification of the soils encountered and to evaluate their engineering properties. The laboratory test results are discussed in the following paragraphs. SOIL CONDITIONS The subsurface soil profile consists of fill underlain by formational material. The fill depth was found to be greater than 18 inches at the pothole locations. Deeper fill may be encountered at utility locations, or at other locations between and beyond the pot holes. The data for the two pothole borings are summarized in Table l below .Page 2 of 5 Pot Hole No. PH-I (Prkg Lot) PH-2 (Fire Lane) Table l: Summary of Laboratory -:rest Results Sample Subgrade Moisture Fine Depth (ft) Soil Type (%) Content(%) 0.5-1.5 Clayey 12.6 20 Sand (SC) 0.5-1.5 Clayey 13.6 34 Sand (SC) May 11, 2020 Project No. 19-0738 Resistance Value 32 17 ASPHALT CONCRETE (AC) PAVEMENT ANALYSIS The required pavement structural sections depend on the expected wheel loads, volume of traffic, and subgrade soils. The characteristics of subgrade soils are determined by R-value testing. The following pavement sections were calculated based on assumed traffic indices of 5, 6 and 7. The project Civil Engineer should determine the traffic index to be used for different areas of the site. Table 2 -Asphalt Pavement Sections-Pot Hole 2 -Fire Lane Traffic Fire Lane Asphalt Thickness Base Course Thickness Index R-Value • (Inches) (Inches) 5 17 4.0 6.0 6 17 4.0 9.5 7 17 4.0 13.0 Table 3 -Asphalt Pavement Sections-*Pot Hole 1 (Parking Lot E. of 7750) Traffic Parking Asphalt Thickness Base Course Thickness Index Lot (Inches) (Inches) R-Value 5 32 4.0 4.0 6 32 4.0 6.5 7 32 4.0 9.5 *Pot Hole 1 is in the driveway east of Buildings 7750 and 7720 Page 3 of5 May 11, 2020 Project No. 19-0738 Base course material should consist of Crushed Aggregate Base (CAB) as defined by Section 200- 2.2 of the Standard Specifications for Public Works Construction ("Greenbook"). Base course should be compacted to at least 95 percent of the maximum dry density of that material. Crushed Miscellaneous Base (CMB) may be used as an alternative if the supplier can demonstrate that the aggregate does not contain contaminated material or as detennined by the project specifications. The upper 12 inches of the subgrade and base materials should be compacted to at least 95 percent relative compaction as determined by ASTM D1557. We recommend that asphalt concrete be compacted to 95 percent relative compaction as compared to the material 's Hveem density. CONCLUSIONS AND RECOMMENDATIONS Based on our findings from the field investigation and laboratory test results, it is our opinion that the fire lane design needs to be adjusted to accommodate the revised pavement sections based on the latest R-value tests. A traffic index of 6 or greater should be considered where 70,000-lbs fire trucks are anticipated. For the parking lot and driveways providing access to the parking lot, the new R-value is similar to what was used for design recommendations in the project geotechnical report. The pavement section should be selected based on the traffic index determined by the project civil engineer or the minimum pavement sections required by the City, whichever are greater. For parking lots we understand the traffic index required by the City is at least 5. For the main driveway leading to the parking lot we suggest a traffic index greater than the minimum traffic index for the parking lot. CONSTRUCTION OBSERVATION AND TESTING This report has been prepared assuming that Koury Engineering & Testing, lnc. will perform all geotechnical-related field observations and testing. If the recommendations presented in this report are utilized, and observation of the geotechnical work is performed by others, the party performing the observations must review this report and assume responsibility for the recommendations contained herein. That party would then assume the title of "Geotechnical Consultant of Record". A representative of the Geotechnical Consultant should be present to observe all grading and pavement operations. Page 4 of5 CLOSURE May 11, 2020 Project No. 19-0738 The findings and recommendations presented in this report were based on the results of our field and laboratory investigations, combined with professional engineering experience and judgment. The report was prepared in accordance with generally accepted engineering principles and practice. We make no other warranty, either expressed or implied. Subsurface variations between pot hole borings should be anticipated. Koury should be notified if subsurface conditions are encountered, which differ from those described in this report since updated recommendations may be required. Samples obtained during this investigation will be retained in our laboratory for a period of 45 days from the date of this report and will be disposed after this period. Should you have any questions concerning this submittal, or the recommendations contained herewith, please do not hesitate to call our office. Respectfully submitted, KOURY ENGINEERING & TESTING, INC. Jae ues . Roy P.E. L~ Principal Engineer Enclosure: Page 5 of 5 r I( F I'· • PH-2 Appro>timalc Pot Hole Location and Number 0 Project Name: PARCEL D PM 10283 PORTION OF PARCEL A-TITLE 100' Project No.: The Beacon -Pavement Section Date: --;;_-~--::. ...:.... := 19-0738 May2020 Drawing Tille: Figure: Pot Hole Location Map A-1 Tiffannie Shively From:. Sent: Jacoby, Sam <Sam.Jacoby@raSmith.com> Monday, May 18, 2020 2:13 PM To: Sean Rodkey; Ashley McDonald Cc: Tiffannie Shively; Craig Chinn Subject: RE: Beacon -Borings and Outcome with City Engineer Sean, I spoke to David Rick, they will accept the Koury report. Sam J. Jacoby, _P.E. Senior Project Engineer raSmith CUldMff M\IOND INfNNIIIINt direct: (949) 242-8041 mobile: 262-573-2415 Recognized••• Toa, Wo rllplaoe From: Sean Rodkey <srodkey@gnrgc.com> Sent: Monday, May 18, 2020 7:30 AM To: Jacoby, Sam <Sam.Jacoby@raSmith.com>; Ashley McDonald <amcdonald@asanapartners.com> Subject: RE: Beacon -Borings and Outcome with City Engineer Sam, Please let us know if you hear back today. Hopefully you can contact David today. Thanks, Good & Roberts, LLC. Sean Rodkey I Project Manager 2455 Impala Drive I Carlsbad, CA 92010 T: 760.598.7614 I M: 760.419.2502 E: srodkev@gnrgc.com I www.gnrgc.com From: Jacoby, Sam <Sam.Jacoby@raSmith.com> Sent: Friday, May 15, 2020 1:42 PM To: Sean Rodkey <srodkey@gnrgc.com>; Ashley McDonald <amcdonald@asanapartners.com> Subject: RE: Beacon -Borings and Outcome with City Engineer I tried again about 10 minutes ago -stilf no answer. FYI, below is the correspondence from David related to this issue from 4/28 - I also understand the soils engineer is researching the pavement section recommendations and will either stick with the original recommendations of the 2017 report or provide an update letter providing justification for any recommendations different than the 2017 report. We will wait to hear from you on the results. Sam J. Jacoby, P.E. Senior Project Engineer CUMMIT N'9N• HIOINIIIJNCI direct: (949) 242-8041 mobile: 262-573-2415 Recoan lied a• a Tap Wo rkplao• From: Sean Rodkey <srodkey@gnrgc.com> Sent: Friday, May 15, 2020 1:37 PM To: Jacoby, Sam <Sam.Jacoby@raSmith.com>; Ashley McDonald <amcdonald@asanapartners.com> Subject: RE: Beacon · Borings and Outcome with City Engineer Sam, Any update? ~ Good & Roberts, LLC. Sean Rodkey I Project Manager 2455 Impala Drive I Carlsbad, CA 92010 T: 760.598.7614 I M: 760.419.2502 E: srodkey@gnrgc.com I www.gnrgc.com From: Jacoby, Sam <Sam.Jacoby@raSmith.com> Sent: Friday, May 15, 2020 10:32 AM To: Ashley McDonald <amcdonald@asanapartners.com> Cc: Sean Rodkey <srodkey@gnrgc.com> Subject: RE: Beacon -Borings and Outcome with City Engineer I did, left a message, and called again this morning. I haven't heard back, but I did relay the urgency. Sam J. Jacoby, P.E. Senior Project Engineer ra Smith CllldMIY IHOND INOINIIIJNI Reco1n lied • • • Tap Workpl•o• 2 direct: (949) 242-8041 mobile: 262-573-2415 From: Ashley McDonald <amcdonald@asanapartners.com> Sent: Friday, May 15, 2020 10:29 AM To: Jacoby, Sam <Sam.Jacoby@raSmith.com> Cc: Sean Rodkey <srodkey@gnrgc.com> Subject: Beacon -Borings and Outcome with City Engineer Sam, Did you call David Rick yesterday? Any feedback on that front? The team is imminently moving forward in the 7750 area so just want to make sure we don't end up stopping and starting related to this item. Thanks, Ashley McDonald 10000 Washington Blvd. Suite 07-105 Culver City. CA 90232 The information contained in this e-mail message is intended only for the personal and confidential use of the recipient(s) named above. If the reader of this message is not the intended recipient or an agent responsible for delivering it to the intended recipient, please notify us immediately by e-mail, and delete the original message. This communication is not a solicitation to purchase or sell any securities or investment advisory services. Asana Partners, LP is a SEC-Registered Investment Adviser. 3