Loading...
HomeMy WebLinkAboutPUD 16-08; COVE DR CONDOS; PRELIMINARY DRAINAGE STUDY; 2006-09-11------------PRELIMINARY DRAINAGE STUDY COVE DRIVE -.. -----.. ---------- • Kim L. Post, R.C.E. 23166 • Vista Engineering, Inc. 930 Vista Village Drive • Vista, California 92084-6064 • (760) 941-2271 -Office (760) 941-7928 -Fax ---- September 11, 2006 PREPARED FOR: Jerzy & Jolanta Lewak 4954 Sun Valley Road Del Mar, CA 92014 Job No. 141-04 --- • PRELIMINARY DRAINAGE STUDY LOT 31, COVE DRIVE, CARLSBAD -----------------------------• ---- SITE DESCRIPTION & CONCLUSIONS: The subject property is a nearly level dirt lot with virtually no vegetation. The northeasterly end of the property slopes down to the waterline of the Agua Hedionda Lagoon at an approximately 2:1 slope which is armored with riprap. There are no existing structures on the property. The project vicinity is characterized by multi-family residences or vacation residences on narrow lots extending between Cove Drive and the lagoon. There is no drainage basin tributary to the site since Cove Drive drains southeasterly and not onto the site. Additionally the properties on either side of the site can drain to the lagoon directly, although currently minor runoff from the property to the south may enter the site. Minor increases in runoff quantities due to proposed impervious surfaces are not a concern since the site drains directly to the Agua Hedionda Lagoon which is connected to the Pacific Ocean. Water quality protections are proposed within the storm drain system. RUNOFF: Using the Rational Method from the County of San Diego Hydrology Manual, June 2003, the 0 100 rainfall runoff from the site is calculated using the equation: With i100 = 6.9 iph from the Intensity-Duration Design Chart (County Figure 3-1) and the 100 year 6 hour and 24 hour Rainfall lsopluvial maps, and the runoff coefficient C = 0.71 (for HOR, 24 DU/A or less in County Table 3-1) for Soil Type 'D': Runoff from the Northwest ½ Site: Runoff from the Southeast ½ Site: HYDRAULICS: 0 100 = Ci100 A= (0.71)(6.9)(0.05) = 0.25 cfs 0 100 = Ci100 A= (0.71)(6.9)(0.05) = 0.25 cfs The proposed storm drain piping system consists of a 6" PVC main line on each side of the property that small yard drains and roof drains will connect to which conveys runoff through a filtration box and into the lagoon (see grading plan). The 6" PVC has been designed with a minimum slope of 0.50%. Per the following worksheet, 6" PVC at this slope is able to convey 0.40 cfs which exceeds the runoff from either half of the site calculated above. The filter in the filtration box is able to treat 0.90 cfs per the manufacturers specifications which also exceeds the calculated flow. VISTA ENGINEERING, INC. I R.B. HILL & ASSOCIATES, INC. 930 Vista Village Drive, Vista, California 92084 CIVILENGINEERINGANDLANDSURVEY/NG (760) 941-2271 • Fax (760) 941-7928