HomeMy WebLinkAboutCT 97-13; CARLSBAD OAKS NORTH; TEMPORARY DESILTING BASIN CALCULATIONS;Temporary
Desilting Basin Calculations
Carlsbad Oaks North
J.N. 961005/5
Prepared By:
O'DA Y CONSULT ANTS, INC.
2710 Loker Avenue West, Suite 100
Carlsbad, CA 92008
SECTION
1
2
3
4
5
DESILTING BASIN CALCULATIONS
DESCRIPTION
Surface Area Calculations Explanation
Soil Loss Calculations Explanation
Dewatering Calculation Explanation
Basin Sizing, Soil Loss, & Outlet Works Calculation
Spreadsheets
Exhibits
SECTION 1
Surface Area Calculations
According to the Fact Sheet for Water Quality Order 99-08-D WQ issued by the State
Water Resources Control Board (SWRCB), sediment basins shall, at a minimum, be
designed and maintained as follows:
Option 1: Pursuant to local ordinance for sediment basin design and maintenance,
provided that the design efficiency is as protective or more protective of water
quality than Option 3.
OR
Option 2: Sediment basin(s), as measured from the bottom of the basin to the principal
outlet. shall have at least a capacity equivalent to 3,600 cubic feet of storage
per acre draining into the sediment basin. The length of the basin shall be
more than twice the width of the basin. The length is determined by measuring
the distance between the inlet and the outlet; and the depth must not be less
than three feet nor greater than five feet for safety reasons anq for maximum
efficiency.
OR
Option 3: Sediment basin(s) shall be designed using the standard equation:
As= l.2QNs
Where: As is the minimum surface area for trapping soil particles of a certain
size; Vs is the settling velocity of the design particle size chosen; and
Q=CxlxA where Q is the discharge rate measured in cubic feet per second; C
is the runoff coefficient; I is the precipitation intensity for the 10-year, 6-hour
rain event and A is the area draining into the sediment basin in acres. The
design particle size shall be the smallest soil grain size determined by wet sieve
analysis, or the fine silt sized (0.01 mm) particle, and the Vs used shall be 100
percent of the calculated settling velocity.
The length is determined by measuring the distance between the inlet and the
outlet; the length shall be more than twice the dimension as the width; the
depth shall not be less than three feet nor greater than five feet for safety
reasons and for maximum efficiency (two feet of storage, two feet of capacity).
The basin(s) shall be located on the site where it can be maintained on a year-
round basis and shall be maintained on a schedule to retain the two feet of
capacity;
OR
Option 4: The use of an equivalent surface area design or equation, provided that the
design efficiency is as protective or more protective of water quality than
Option 3.
Sediment basins for Carlsbad Oaks were designed to satisfy the requirements of Option
L using the following parameters:
Appendix 11-A-4 of the San Diego County Hydrology Manual gives the precipitation for
a 10-year, 6-hour storm as 1.9 inches for this project. (See Exhibit "N')
P = 1.9 inches/6 hours
I = 0.32 avg. inches/hour (per Goldman et al., p. 8.16)
Appendix IX of the San Diego County Hydrology Manual gives the runoff coefficients
for this project as C=0.35 to C=0.45. (See Exhibit "B")
Table 8.1 of the Erosion and Sediment Control Handbook (See Exhibit "C") gives the
settling velocity for a 0.01 mm sized particle as Vs= 0.00024 feet/second.
The San Diego County Soils Interpretation Study gives the soil classification for this
project as "B", "C", and "D". (See Exhibit "D")
FOR BASIN CALCULATION SUMMARY SPREADSHEET SEE SECTION 4
(
SECTION2
SOIL LOSS CALCULATIONS
CHAPTER 5 OF THE EROSION AND SEDIMENT CONTROL HANDBOOK
DISCUSSES CALCULATING SOIL LOSS WITH THE UNIVERSAL SOIL LOSS
EQUATION
IJ.2& Tile EquaUoa
n.,-.1r-o1t11elUUftlNINillaa..--11:
A•RXKXLSXCXP
when A • loi1 lou, tona/(aa-.) (yNr)
RAINFALL INDEX '"R"
R • ralnJ'LII eroaloa 1.ncla., la 100 ft • t.ona/llCl'I X la/hr
K • IOI trodiblUtj factor, V>U/eue pw unit o1 R
La • .i.,. -ct.II• ~ fact«, dlmen■lon,_
CL r111bdft-,..__,.., dcdw
P • .... ooatnl pniatlee r.cw, r!h •• fr:-
RAINFALL EROSION INDEX ''R" IS BASED ON THE GEOGRAPHICAL
0TypelA
Im Typej
al Type 11
Fis. 5.3 Diitribution of atorrn type. in the
.11ttt.m Unii.d Stata (4) 'Type Il stoma
occur ill Ari&OGa, Colorado, ldaho, Moatana,
Nevad,t. N-Mexico, Utu, and Wyominc ~-
IU2
100
600 ·-··-----------+---+---+---+
i
500 --t· ·
I
i 400 --·-+-·
j: ~-t=
100
·-+·-. ----··--1-·-
25 50 75
,______
10~
The differences in peak Intensity are reflected ID the codllclents ol the equa-
tiona for the ralnlaU fanor. Fisur• U Is a 1raphbl repreeentation ol the equa-
tlom. The eq11.1tlona, -1,o shown on the curv• for each mdivldual storm type,
are:
R • ?:rp11 type II
R • 16.55.P" type I
R • 10.2pil type IA
"P" FOR THIS EQUATION IS THE PRECIPITATION FOR A 2-YEAR, 6-HOUR
STORM EVENT. APPENDIX II-A-2 FROM THE SAN DIEGO COUNTY
HYDROLOGY MANUAL GIVES P = 1.4 (SEE EXHIBIT "E")
R = l 6.55*P/\2.2
= 16.55*1.4/\2.2
= 34.7
SOIL FACTOR "K"
FROM THE SOILS REPORT, THE SITE CONSISTS OF 50% SAND AND 50% CLAY
(t AND SILT. ASSUMING HALF OF THE 50% IS CLAY, THE OTHER HALF SILT
K = 0.24 (SEE TABLE BELOW)
PSRCBNT
CLAY
IOI
((
LENGTH SLOPE AND STEEPNESS FACTOR "LS"
SLOPE LENGTH AND STEEPNESS FACTOR "LS" IS CALCULATED USING TABLE 5.5 OF
THE EROSION AN SEDIMENT CONTROL HANDBOOK, (SEE EXHIBIT "F")
FOR BASIN CALCULATION SUMMARY SEE SECTION 4
VEGETATION COVER FACTOR "C"
THE COVER FACTOR TABLE LISTED BELOW IS USED FOR AREA
UNDER CONSTRUCTION OR CULTIVATION. TO BE CONSERVATIVE
THE HIGHEST VALUE IS ASSUMED.
C=l.O
TA■LII U C v.,.. e. a.At--...11ae•
If-. ~ ,,.....u-C-,U.turt.i)
T-11 •,....U.,.. ••-.-uaa...-ao...&ldl
W ... lbw -..W.." "-/_,. (l.'J t/11&), wit.la ....tt
------.Jutet
S-..... t 1.a-i-,a., tJlla). t.Mlra4 ......
''-'-(9.0 t/1,a), ~ .....
-~-...._, .. , ...... ,,.. .......... ,,,.
EROSION CONTROL PRACTICE FACTOR "P,,
s..a .... c .... ,..._._,.
u • Ul ..
cu .. u Ill cu ,.
u IO oa •
THE P VALUES LISTED BELOW ARE GIVEN FOR AREAS UNDER
CONSTRUCTION OR CULTIVATION. TO BE CONSERVATIVE,
THE HIGHEST VALUE WAS ASSUMED.
P= 1.3
Sud-ooad.ldaa
~ and IIJDOOUl
Tnckw.lbd aJoac coat.our•
~ up ud down ll<>pet
PundMdauaw
~uncuJa,cut
LooM lo 12-ID (3Ckm) d.pU.
u
l.S u
o..t u a.a
SECTION 5.31, PAGES 5.27 TO 5.28 LISTS A STEP BY STEP PROCEDURE FOR
USING THE UNIVERSAL SOIL LOSS EQUATION (SEE EXHIBIT "G")
FOR SOIL LOSS CALCULATION SUMMARY SPREADSHEET SEE SECTION 4
SECTION3
j_
------11: -·-----------------·---------·---..
. ---~---~-----·----------~~ CO:Oot.t,') =-.-tt..~---------····· ... ·-
.... -·-·. -· -~t--·-· ··-··--------------·-· ·--~----___________ -2(_ 11+'-f: -------···--· ---------· -· ... -·
. _ ·--· .... J.--·----------·-----------~--/4.~.(o OlA'.:J5~74J ___ ==-____ ,N 2 __________________ _ ; ~ •
·-----·---------·-··---------------------... -rr-... ----· ----
... r.. . --..... ·--. -. ., .•...••....... -·-··--·. ··---·•---·-··· --·--·-·----
w
LPv 0
E9C-FN<.. '-t
_:_._-4J.-------------t---------------------
------------·---------------------
--------·---··----------------------·------.---------------
'
----------4-•" ....... ----··--... ---. -----··------···· ------·------···-
SECTION 4
( ,asin A -Lot 20
Oesiltation Basin Calculations
Oavg = C X iavg X A
C= 0.45
iavg = P6/6 hr.
Pa= 1.9 in. (per 10 yr.-6 hr. lsopluvial)
iavg = 0.32 in./hr
Pad A= 1.89 ac.
Slope A= 0.28 ac.
Total A= 2.17 ac.
Oavg = 0.308979 cfs
Vs= 0.00024 ft/sec
min. As =
actual As=
1545 sf
2619 sf
~oil Loss Calculations
A = R X K X LS X C X p
R =16.55(p)2-2
p = 1.4
R = 34.70
in . (per 2yr.-6 hr. lsopluvial)
Standpipe Calculations
Q=CxlxA
Tc= 5 min. (see Desilting Basin Tributary Area Exhibit)
I = 7.64 in./hr.
Q = 7.2 cfs
h= ft.
Case 1 Case 2
Q = CPh312 Q = CA(2gh) 112
C= 3.0 C= 0.67
P= 2.40074 ft A= 1.34 ft2
d= 0.76 ft d= 1.31 ft
24" pipe
K = 0.24 (CIE2, CmE2, & CnG2 soils -per Table 5-2)
C = 1.0 (Bare areas -per Table 5-5)
P= 1.0 (Packed & Smooth -per Table 5-6)
Area Use % Area Length** Slope/ Grade
Slope 13.1% 45 2:1
Pad 86.9% 300 2%
** = See Desilting Basin Tributary Area Exhibit
*** = Per Figure 5-5
Avg. LS= 1.81
A= 15.07 tn/yr/ac
-oil Loss = 32.7 tn/yr
= 594 ,cf
LS***
12
0.28
Basin Dewaterinq Calculations
Ao = As(2H) 112
3600(T)Cct(g) 112
H= 2 ft
T= 40 hr
Cd= 0.6
g= 32.2 ft/sec
Ao = 0.010684 ft"
= 1.54 in2
'lasin B -Lot 21
Desiltation Basin Calculations
Oavg = C X iavg X A
C = 0.45
iavg = P6/6 hr.
Pe= 1.9 in . (per 10 yr.-6 hr. lsopluvial)
iavg = 0.32 in./hr
Pad A = 3.11 ac.
Slope A= 0.77 ac.
Total A= 3.88 ac.
Oav9 = 0.552695 cfs
Vs = 0.00024 ft/sec
min. As = 2763 sf
actual As= 4075 sf
Soil Loss Calculations
. = R X K X LS X C X p
R =16.55(p)22
p = 1.4
R = 34.70
in. (per 2yr.-6 hr. lsopluvial)
Standpipe Calculations
Q=CxlxA
Tc= 5 min. (see Desilting Basin Tributary Area Exhibit)
I = 7 .64 in./hr.
Q = 14.8 cfs
h= ft.
Case 1 Case 2
Q = CPh312 Q = CA(2gh) 112
C= 3.0 C= 0.67
P= 4.939174 ft A= 2.75 ft2
d= 1.57 ft d= 1.87 ft
24" pipe
K = 0.24 (CIE2, CmE2, & CnG2 soils -per Table 5-2)
C = 1.0 (Bare areas -per Table 5-5)
P= 1.0 (Packed & Smooth -per Table 5-6)
Area Use %Area Length** Slope/ Grade
Slope 19.9% 40 1.5: 1
Pad 80.1% 350 2% .. ** = See Des1ltmg Basin Tributary Area Exhibit
*** = Per Figure 5-5
Avg. LS= 3.60
A= 29.95 tn/yr/ac
Soil Loss= 116.2 tn/yr
= 2112 ,cf
LS***
16.88
0.29
Basin Oewatering Calculations
H=
T=
Cd=
g=
As(2H)112
3600(T)Cd(g) 112
2 ft
40 hr
0.6
32.2 ft/sec
Ao= 0.016623 ft"
= 2.39 in2
"1asin C -Fill Area Lot 22
Oesiltation Basin Calculations Standpipe Calculations
Oavg = C X iavg X A Q=CxlxA
C= 0.45 Tc= 5 min. (see Desilting Basin Tributary Area Exhibit)
iavg = P6/6 hr. I = 7 .64 in./hr.
P5 = 1.9 in. (per 10 yr.-6 hr. lsopluvial) Q = 15.1 cfs
iavg = 0.32 in./hr h = 1 ft.
Pad A= 3.14 ac.
Slope A= 0.81 ac. Case 1 Case 2
Total A= 3.94 ac. Q = CPh312 Q = CA(2gh) 112
Oavg = 0.561691 cfs C= 3.0 C= 0.67
P= 5.019569 ft A= 2.80 ft2
d= 1.60 ft d= 1.89 ft
Vs = 0.00024 ft/sec 24" pipe
min. As = 2808 sf
actual As = 4459 sf
Soil Loss Calculations
..... = R X K X LS X C X p
R =16.55(p)22
p = 1.4 in . (per 2yr.-6 hr. lsopluvial)
R = 34 .70
K = 0.24 (CIE2, CmE2, & CnG2 soils -per Table 5-2)
C = 1.0 (Bare areas -per Table 5-5)
P= 1.0 (Packed & Smooth -per Table 5-6)
Area Use %Area Length** Slope/ Grade
Slope 20.4% 50 1.5: 1
Pad 79.6% 430 2%
** = See Desilting Basin Tributary Area Exhibit
*** = Per Figure 5-5
Avg. LS= 4.10
A = 34.18 tn/yr/ac
Soil Loss= 134.7 tn/yr
= 2449 cf
LS***
18.87
0.31
Basin Oewatering Calculations
H=
T=
Cd =
g=
As(2H)112
3600(T)Cd(g) 112
2
40
0.6
32.2
ft
hr
Ao: 0.018190 ftL
= 2.62 in2
'lasin D-Lot 23
Oesiltation Basin Calculations
Oavg = C X iavg X A
C= 0.45
iavg = Psf6 hr.
Ps = 1.9 in. (per 10 yr.-6 hr. lsopluvial)
iavg = 0.32 in ./hr
Pad A= 3.81 ac.
Slope A= 0.30 ac.
Total A= 4.11 ac.
Oavg =· 0.585675 cfs
Vs= 0.00024 ft/sec
min. As=
actual As=
2928 sf
2930 sf
Soil Loss Calculations
. = R X K X LS X C X p
R =16.55(p)2 2
p = 1.4
R = 34.70
in. (per 2yr.-6 hr. lsopluvial)
Standpipe Calculations
Q=CxlxA
Tc = 5 min. (see Desilting Basin Tributary Area Exhibit)
I = 7 .64 in./hr.
Q = 15.7 cfs
h= ft.
Case 1 Case 2
Q = CPh312 Q = CA(2gh) 112
C= 3.0 C= 0.67
P= 5.233905 ft A= 2.92 ft2
d= 1.67 ft d= 1.93 ft
24" pipe
K = 0.24 (CIE2, CmE2, & CnG2 soils -per Table 5-2)
C = 1.0 (Bare areas -per Table 5-5)
P= 1.0 (Packed & Smooth -per Table 5-6)
Area Use % Area Length** Slope/ Grade
Slope 7.3% 55 2:1
Pad 92.7% 300 2%
** = See Desilting Basin Tributary Area Exhibit
*** = Per Figure 5-5
Avg . LS = 1.22
A = 10.19 tn/yr/ac
Soil Loss = 41. 9 tn/yr
= 762 cf
LS***
13.21
0.28
Basin Dewaterinq Calculations
H=
T=
Cd=
g=
As(2H)112
3600(T)Cig) 112
2 ft
40 hr
0.6
32.2 ft/sec
A0 = 0.011952 ft'
= 1.72 in2
{
"1asin E -Lot 24 (WEST)
Desiltation Basin Calculations
Oavg = C X iavg X A
C= 0.45
iavg = P6/6 hr.
Ps = 1.9 in . (per 10 yr.-6 hr. lsopluvial)
iavg = 0.32 in./hr
Pad A= 2.00 ac.
Slope A= 0.00 ac.
Total A= 2.00 ac.
Oavg = 0.285 cfs
Vs = 0.00024 ft/sec
min. As=
actual As=
1425 sf
2355 sf
Soil Loss Calculations
. ' = R X K X LS X C X p
R =16.55(p)2-2
p = 1.4
R = 34.70
in. (per 2yr.-6 hr. lsopluvial)
Standpipe Calculations
Q=CxlxA
Tc= 5 min. (see Desilting Basin Tributary Area Exhibit)
I = 7 .64 in./hr.
Q = 7.6 cfs
h= ft.
Case 1 Case 2
Q = CPh 312 Q = CA(2gh) 112
C= 3.0 C= 0.67
P= 2.546913 ft A= 1.42 ft2
d= 0.81 ft d= 1.35 ft
18" pipe
K = 0.24 (CIE2, CmE2, & CnG2 soils -per Table 5-2)
C = 1.0 (Bare areas -per Table 5-5)
P= 1.0 (Packed & Smooth -per Table 5-6)
Area Use %Area Length** Slope/ Grade
Slope 0.0% 0 2:1
Pad 100.0% 230 2%
** = See Desilting Basin Tributary Area Exhibit
*** = Per Figure 5-5
Avg. LS = 0.26
A = 2.17 tn/yr/ac
Soil Loss=
=
4.3
79 .
tn/yr
cf
LS***
0
0.26
Basin Dewatering Calculations
As(2H)112
3600(T)Cd(g) 112
H= 2 ft
T= 40 hr
Cd= 0.6
g= 32 .2 ft/sec
A0 = 0.009607 ftL
= 1.38 in2
( ~asin F -Lot 24 (NORTH)
Desiltation Basin Calculations
Oavg = C X iavg X A
C= 0.45
iavg = P6/6 hr.
P5 = 1.9 in . (per 10 yr.-6 hr. lsopluvial)
iavg = 0.32 in./hr
Pad A= 5.83 ac.
Slope A= 0.00 ac.
Total A= 5.83 ac.
Oav9 = 0.830775 cfs
As = 1.2QNs
Vs = 0.00024 ft/sec
min. As= 4154 sf
actual As= 4655 sf
Soil Loss Calculations
.. = R X K X LS X C X p
R =16.55(p)2-2
p = 1.4 in. (per 2yr.-6 hr. lsopluvial)
R = 34 .70
Standpipe Calculations
Q=CxlxA
Tc= 7.4 min. (see Oesilting Basin Tributary Area Exhibit)
I = 5.93 in./hr.
Q = 17.3 cfs
h = 1 ft.
Case 1 Case 2
Q = CPh3I2 Q = CA(2gh) 112
C= 3.0 C= 0.67
P= 5.765458 ft A= 3.21 ft2
d= 1.84 ft d= 2.02 ft
24" pipe
K = 0.24 (CIE2, CmE2, & CnG2 soils -per Table 5-2)
C = 1.0 (Bare areas -per Table 5-5)
P= 1.0 (Packed & Smooth -per Table 5-6)
Area Use %Area Length** Slope/ Grade
Slope 0.0% 0 2:1
Pad 100.0% 730 2%
** = See Desilting Basin Tributary Area Exhibit
*** = Per Figure 5-5
Avg. LS = 0.36
A= 3.00 tn/yr/ac
SoilLoss= 17.5 tn/yr
= 318 cf
LS***
0
0.36
Basin Dewatering Calculations
As(2H)112
3600(T)Cd(g) 112
H= 2 ft
T= 40 hr
Cd= 0.6
g= 32.2 ft/sec
Ac,= 0.018989 ft"
= 2.73 in2
~asin G -Lot 24 (SOUTH)
Oesiltation Basin Calculations
Oavg = C X iavg X A
C= 0.45
iavg = Ps/6 hr.
Ps = 1.9 in. (per 10 yr.-6 hr. lsopluvial)
iavg = 0.32 in./hr
Pad A= 12.44 ac.
Slope A= 0.00 ac.
Total A= 12.44 ac.
Oavg = 1. 7727 cfs
As= 1.2QNs
Vs= 0.00024 ft/sec
min. As =
actual As=
8864 sf
9080 sf
Soil Loss Calculations
, \ = R X K X LS X C X p
R =16.55(p)22
p = 1.4 in. (per 2yr.-6 hr. lsopluvial)
R = 34.70
Standpipe Calculations
Q=CxlxA
Tc = 10 min. (see Desilting Basin Tributary Area Exhibit)
I = 4.89 in./hr.
Q = 30.4 cfs
h= ft.
Case 1 Case 2
Q = CPh312 Q = CA(2gh) 112
C= 3.0 C= 0.67
P= 10.13071 ft A= 5.65 ft2
d= 3.23 ft d= 2.68 ft
42" pipe
K = 0.24 (CIE2, CmE2, & CnG2 soils -per Table 5-2)
C = 1.0 (Bare areas -per Table 5-5)
P= 1.0 (Packed & Smooth -per Table 5-6)
Area Use % Area Length** Slope/ Grade
Slope 0.0% 0 2:1
Pad 100.0% 1350 2%
** = See Desilting Basin Tributary Area Exhibit
*** = Per Figure 5-5
Avg. LS = 0.43
A= 3.58 tn/yr/ac
Soil Loss = 44.5 tn/yr
= 810 cf
LS***
0
0.43
Basin Dewatering Calculations
As(2H)112
3600(T)Cig) 112
H= 2 ft
T= 40 hr
Cd= 0.6
g= 32.2 ft/sec
A0 = 0.037040 ftL
= 5.33 in2
..,_asin H -Lot 25
Desiltation Basin Calculations
Oavg = C X iavg X A
C= 0.45
iavg = P6/6 hr.
Ps = 1.9 in . (per 10 yr.-6 hr. lsopluvial)
iavg = 0.32 in./hr
Pad A= 6.41 ac.
Slope A= 1.37 ac.
Total A= 7.78 ac.
Oavg = 1. 10865 cfs
Vs= 0.00024 ft/sec
min. As =
actual As=
5543 sf
5655 sf
Soil Loss Calculations
.. = R X K X LS X C X p
R =16.55(p)22
p = 1.4
R = 34.70
in . (per 2yr.-6 hr. lsopluvial)
Standpipe Calculations
Q=CxlxA
Tc= 5 min. (see Desilting Basin Tributary Area Exhibit)
I = 7.64 in./hr.
Q = 29.7 cfs
h= ft.
Case 1 Case 2
Q = CPh312 Q = CA(2gh) 112
C= 3.0 C= 0.67
P= 9.90749 ft A= 5.52 ft2
d= 3.16 ft d= 2.65 ft
36" pipe
K = 0.24 (CIE2, CmE2, & CnG2 soils -per Table 5-2)
C = 1.0 (Bare areas -per Table 5-5)
P= 1.0 (Packed & Smooth -per Table 5-6)
Area Use %Area Length** Slope/ Grade
Slope 17.6% 85 2:1
Pad 82.4% 550 2%
** = See Desilting Basin Tributary Area Exhibit
*** = Per Figure 5-5
Avg. LS= 3.17
A = 26.42 tn/yr/ac
Soil Loss = 205.6 tn/yr
= 3738 cf
LS***
16.43
0.34
Basin Dewaterinq Calculations
As(2H) 112
3600(T)Cig) 112
H= 2 ft
T= 40 hr
Cd= 0.6
g= 32.2 ft/sec
Ao: 0.023069 ftL
= 3.32 in2
• ~asin I -Lot 26
Oesiltation Basin Calculations Standpipe Calculations
Oavg = C X iavg X A Q=CxlxA
C= 0.45 Tc = 5 min . (see Desilting Basin Tributary Area Exhibit)
iavg = P6/6 hr. I = 7.64 in./hr.
Pe= 1.9 in. (per 10 yr.-6 hr. lsopluvial) Q = 15.5 cfs
iavg = 0.32 in./hr h= ft.
Pad A= 3.55 ac.
Slope A= 0.52 ac. Case 1 Case 2
Total A= 4.07 ac. Q = CPh312 Q = CA(2gh) 112
Oavg = 0.579975 cfs C= 3.0 C= 0.67
P= 5.182967 ft A= 2.89 ft2
d= 1.65 ft d= 1.92 ft
Vs= 0.00024 ft/sec 24" pipe
min. As = 2900 sf
actual As= 3655 sf
Soil Loss Calculations
. ' = R X K X LS X C X p
R =16.55(p)22
p = 1.4 in . (per 2yr.-6 hr. lsopluvial)
R = 34.70
K = 0.24 (CIE2, CmE2, & CnG2 soils -per Table 5-2)
C = 1.0 (Bare areas -per Table 5-5)
P= 1.0 (Packed & Smooth -per Table 5-6)
Area Use %Area Length** Slope/ Grade
Slope 12.8% 55 2:1
Pad 87.2% 440 2%
** = See Desilting Basin Tributary Area Exhibit
*** = Per Figure 5-5
Avg. LS = 1.97
A= 16.38 tn/yr/ac
Soil Loss= 66.7 tn/yr
1212 cf
LS***
13.21
0.32
Basin Dewatering Calculations
H=
T=
Cd=
g=
As(2H) 112
3600(T)Cd(g) 112
2 ft
40 hr
0.6
32.2 ft/sec
Ao= 0.014910 ft'
= 2.15 in2
MODIFIED TYPE 'F'
TYPE 'F' CATCH BASIN
CAPACITY
(
I
I
.... w w
LL.
z
§
X 0
al
LL.,
0 .... ::c C>
w ::c
t /<,
,12
II
10
9
8
1
6
5
4
3
•• ~(70;
QI,'/,
TiP t
)Q.t/
.... 0
0 LL.
400
300
200
100
80
.6
.5
CHART I
EXAMPLE
5'• 2' Bo• Q: 75 cfs
0/B : 15 eta/ft.
HW HW Inlet o feet./
( I) 1.75 3.5
(2) 1.90 3.B
(3) 2.05 4.1
(2)
(3)
30" to 75•
90• and ts•
o• (extensions
of sides)
To use scole (2) or (3). project
horizontally to scale (1), then
use stroi9ht inclined lina through
D and 0 scales, or reverse as
Illustrated.
./
( I ) (2) (3)
/.: 8 9
1 8
6 7
6
5
5
4
4
3
3
2
2
1.5
1.5
1.0
1.0
.8 .9
.7 .8
.7
.6
.6
.5
.5
.4
.4
.30 .35
HEADWATER DEPTH
FOR soxr curVERfs~
1' ~ WITH i'N[: -;t·· ..... -~, \,) ..-, .... -· ;J"""C.Q.NT. KOL o ,·.,z_
10
8
7
6
5
4
3
2
1.5
1.0
.9
.1
.6
.5
.4
.35
.:.
OUTLET PIPES
(
(
(
O'Day Consultants Inc .
2710 Loker Avenue West, Suite 100
Carlsbad, CA 92008
Tel: (760) 931-7700 Fax: (760)
Inside Diameter
24 .00 in.)
*
* *
* *
* *
AAAAAAAAAAAAAAAAAAAAA
* Water *
* *
* *
* *
* *
* --
Circular Channel Section
Flowrate ................. . 15.700
Velocity ................. . 12 .641
Pipe Diameter ............ . 24.000
Depth of Flow ............ . 10.020
Depth of Flow ............ . 0 .835
Critical Depth ........... . 1.430
Depth/Diameter (D/d) 0.418
Slope of Pipe ............ . 2.600
X-Sectional Area 1.242
Wetted Perimeter ......... . 2 .810
AR"(2/3) ................. . 0.721
Mannings 'n' ............. . 0.011
Min. Frie . Slope, 24 inch
Pipe Flowing Full ..... . 0 .345
931-8680
Lo,
-;::
10.02 in.)
0.835 ft .)
I
I
V --
CFS
fps
inches
inches
feet
feet
%
sq . ft.
feet
%
23
O'Day Consultants Inc.
2710 Loker Avenue West, Suite
Carlsbad, CA 92008
Tel: (760) 931-7700 Fax: (760)
*
*
Inside Diameter
24.00 in.)
*
* *
*
*
100
931-8680
-AAAAAAAAAAAAAAAAAAAAA A
* Water *
* *
* *
* *
* *
*
Circular Channel Section
Flowrate ................. . 7.600
Velocity ................. . 7.331
Pipe Diameter ............ . 24 .000
Depth of Flow ............ . 8.758
Depth of Flow ............ . 0.730
Critical Depth ........... . 0.985
Depth/Diameter (D/d) 0.365
Slope of Pipe ............ . 1.000
X-Sectional Area 1.037
Wetted Perimeter ......... . 2.594
AR" (2/3) ................. . 0 .563
Mannings 'n' ............. . 0.011
Min. Frie. Slope, 24 inch
Pipe Flowing Full ..... . 0.081
8.76 in .)
0.730 ft.)
CFS
fps
I
I
V
inches
inches
feet
feet
%
sq. ft.
feet
%
O'Day Consultants Inc.
2710 Loker Avenue West, Suite
Carlsbad, CA 92008
Tel: (760) 931-7700 Fax: (760)
Inside Diameter
18.00 in.)
*
* *
* *
* *
* Water *
* *
* *
* *
* *
*
Circular Channel Section
Flowrate ................. . 17.300
Velocity ................. . 11. 325
Pipe Diameter ............ . 18 .000
Depth of Flow ............ . 14.518
Depth of Flow ............ . 1.210
Critical Depth ........... . Greater than
Depth/Diameter (D/d) 0.807
Slope of Pipe ............ . 2.000
X-Sectional Area 1.527
Wetted Perimeter ......... . 3.346
ARA (2/3) ................. . 0.905
Mannings 'n' ............. . 0.011
Min. Frie. Slope, 18 inch
Pipe Flowing Full ..... . 1.941
100
931-8680
Lor
:;:-
14.52 in.)
1.210 ft .)
I
I
V
CFS
fps
inches
inches
feet
Pipe Diameter
%
sq . ft.
feet
%
(
O'Day Consultants Inc .
2710 Loker Avenue West, Suite 100
Carlsbad, CA 92008
Tel: (760) 931-7700 Fax: (760) 931-8680
*
*
Inside Diameter
24.00 in.)
*
* *
*
* -AAAAAAAAAAAAAAAAAAAAA A
* Water *
* *
* *
* *
* *
*
Circular Channel Section
Flowrate ................. . 30.400
Velocity ................. . 30 .902
Pipe Diameter ............ . 24 .000
Depth of Flow ............ . 8.424
Depth of Flow ............ . 0.702
Critical Depth ........... . 1.867
Depth/Diameter (D/d) 0.351
Slope of Pipe ............ . 18 .500
X-Sectional Area ......... . 0.984
Wetted Perimeter ......... . 2.536
AR"(2/3) ................. . 0.523
Mannings 'n ' ............. . 0.011
Min. Frie. Slope, 24 inch
Pipe Flowing Full ..... . 1.293
8 . 42 in.)
0.702 ft.)
CFS
fps
I
I
V
inches
inches
feet
feet
%
sq. ft.
feet
%
LOT z. '1 ( Sou TH)
(
O'Day Consultants Inc.
2710 Loker Avenue West, Suite 100
Carlsbad, CA 92008
Tel: (760 ) 931-7700 Fax: (760) 931 -8680
Inside Diameter
24.00 in.)
*
* *
* *
* *
A AAAAAAAAAAA AAAAA AAAA
* Water *
* *
* *
* *
* *
* --
Circular Channel Section
Flowrate ................. . 29.700
Velocity ................. . 22.089
Pipe Diameter ............ . 24 .000
Depth of Flow ............ . 10 .639
Depth of Flow ............ . 0.887
Critical Depth ........... . 1.862
Depth/Diameter (D/d) 0.443
Sl ope of Pi pe ............ . 7 .500
X-Sectional Area ......... . 1 .345
Wetted Perimeter ......... . 2 .914
ARA (2/3) ................. . 0 .803
Mannings ' n ' ............. . 0 .011
Min. Frie. Slope, 24 inch
Pipe Flowing Full ..... . 1 .234
,;
10.64
0.887
I
I
V --
CFS
fps
inches
inches
feet
feet
%
sq . ft.
feet
%
zs
in.)
ft .)
O'Day Consultants Inc.
2710 Loker Avenue West, Suite 100
Carlsbad, CA 92008
Te 1 : ( 7 6 0) 9 3 1 -7 7 0 0 Fax : ( 7 6 0) 9 3 1 -8 6 8 0
*
*
Inside Diameter
24.00 in.)
*
* *
*
* -AAAAAAAAAAAAAAAAAAAAA A
* Water *
* *
* *
* *
* *
*
Circular Channel Section
Flowrate ................. . 15.500
Velocity ................. . 12 .598
Pipe Diameter ............ . 24.000
Depth of Flow ............ . 9.949
Depth of Flow ............ . 0.829
Critical Depth ........... . 1. 424
Depth/Diameter (D/d) 0.415
Slope of Pipe ............ . 2.600
X-Sectional Area ......... . 1.231
Wetted Perimeter ......... . 2.798
ARA (2/3) ................. . 0.712
Mannings 'n' ............. . 0 .0ll
Min . Frie. Slope, 24 inch
Pipe Flowing Full ..... . 0.336
9 . 95 in .)
0. 829 ft.)
CFS
fps
I
I
V
inches
inches
feet
feet
%
sq . ft.
feet
%
LoT ZG
SECTIONS
j ; I .. .
-~--
l \
-r-i
! +.·
' '
H1i
·+ . i I
'~-j.
I.:_
i. I
I
County of San Diego
Hydrology Manual
• Rain/all Jsopluvials
2 Year R.aiafall Eveut -6 Hours
ll;opluvial (inches)
P= I. 7' 1N.,
E>oHt6'IT /f-/'
i ' A f : , i 1 • ,7--;-'""T77Tf: --• ~ --1 l : , ,...,,-,--r,-; n r T'-Trr ··R=r-rT1
0 I ci-,i :1:-!• I ·Jt~ !'! ,·-i ,·rl;-·:-i 11·1,:-rl.0-;--r l'i-:-: . g l t • ·'+ L-i-~i-~_;:_ , '1 ,--·•-+J·;··_:_~:-1-~f•"4i ~:_;J-_ i=p:r -;
_ _ ~ ; :: 1 ! '-.. -;:-, i i i .-, j-~ ~J-l -=l +~+!--:: ·1--;-
Qr~\ll('Je -·"'-' :.r· I ' . ' •-,-;~=]
.Co411ty ., 1 !~·~4-.,_"'-;...·,· _______ !_i~-·-l' --~
I . ' _..,.,,J ; i :' .-f l<o•i , . ; . :_ ' : ' ;_~_:(
{,_ '••' -j ·(_ , ! •rt.,•/, -~Y; ; I ~ r ' ' l" ·, -, ••• ... ; ,.~, ,··· ' I ~7:::-Ctlri:'f.i$.Etf.;tt±:1~~:'l=i:i~t±-N~r:t~!::rf1d-~+t.:~af1r1$;:$~1:tt:tr.::l:$.i:::=l-1-:,:::::-Tr· I • '1 ••• ,'j; ••-~_.•f _.•°J..,/0
•-.,y--'i::; •-t-: ! • • ·t :..:~"!-·;•···· .t ti·;" I rrr • ' _'.l,··,.:-;--r'J .~;1 ,_···-'_~·: .,v ,.•· , 1.1-'·, L!•, • ~-f .. /·r . -~l-:~ :-:-::--
.... ·······.! i ;~-~.: ---r-
. ! :-1-., --.. , ... ., ..
County of San Diego
Hydrology Manual
• Rain/all Jsopluvials . . , .... ___________________ _
., i
··t· ''
ii-I '. ·! ! ! ~---, I --Ii r
r i
i I
'' ·t-··-~-1-.
• i '.'
Jj".:-_ -h -·r·r-·
;
;
;
;"" r-,-
1-
\0f-:
-----r--.. . :-i •
I •
10 Year Rainfall Event -6 Hours
bopluvilll (lnclwa)
P=-/, ? /A/.
N , ... ....,.IS~ .. ,ltOUT~Ol'-...-0..UltftllMl'Rlia + C:wl~ICl.UDMl.anNOT LMlialO.lMfN'UiO~ Ol'~NG ..... PQIA..-.c&A,M~ ~...-..--......
,._....,_ ... _... ....... ._ .. IMGloG....,_. E ~_.=-.. -:_-•...----"-..,... __ .._._ ____ _
,.__..,...,._ ..... ~
s
3 0 3 Miles ,...,
.J . .!.l
... : l
l . i I
... /
• ·: r
...
I
;-.... .
f ·: ~ ~-: ... '. l • I
• •-i --··
i I I I • ! '.
.• ; l
:o ·
-~
c;,'
•?
! '
. ;-. ··1 •
l
•·!,.
Ljl=
f-· I
'• I ~ .. I
I -l
rt--J-"";-+'I"' +1' +"' -+"' -+.;. ..+-+-1"'-11!l-1=l-1=t7..ifLl--~ll:O:~ •_:_: • i ! .'.
I-~·: I I -i
.1•M•• . . -. -,
I
.. i....
County of San Diego
Hydrology Manual
,
• Rainfall Isopluvials
100 Year .Raiofall Event -6 Houn
!l 3 Miles
I
RU~OFF COEFFICIENTS (RATIONAL METHOD)
L...\i.'lD USE
Undeveloped
Residential:
!lural
Single Family
Multi-Units
Mobile Homes (2)
Commercial (2)
30\ Impervious
Industri al (2)
90\ Impervious
:--:OTES:
Coefficient. C
Soil Group (1)
A 8 C D
. 30 . 35 . 40 . -l-5
. 30 -,. . ~::, . 4-0 . _.,
. 40 .45 . so . ~:>
.45 . 50 . 60 . ;o
. 45 . 50 . 55_ .65
. 70 . 75 . 80 .35
.80 .85 .90 .95
(l) Obtain soil group from maps on file witn the Department of Sanitat .:.1.m
and Flood Control .
(2) Wh ere actual conditions deviate significantly from the tabulated
imperviousness values of 80% OT 90%, the values given for coefficien~
C, may be revised by multiplying 80% or 90% by the ratio of actual
imperviousness to the tabulated imperviousness. However, i n no case
sh a ll the final coefficient be less than 0.50 . For example : Cons .:.Jer
ccmrnercial property on O soil group .
Actual imperviousness = 50%
Tabulated imperviousness = 80 ~.;
Revised C = ~ X 0.85 = 0.5.,
8.16 Erosion and Sediment Control Handbook
TABLE 8.1 Surface Area Requirement. of Sediment Trapa and Basins
Particle size, inm
0.5 (coarse aand)
0.2 (medium aand)
0.1 (line 11and)
0.05 (coane silt)
0.0~ (medium silt)
0.01 (finlt'l!lilt)
0.006 (clay)
Settlin1 velocity,
ft/sec (m/sec)
0.19 (0.058)
0.067 (0.020)
0.023 (0.0070)
0.0062 (0.0019)
o.0009& co.ooo:m •
0.00024 (0.000073)
0.00006 (0.000018)
SUJface area requirements.,
rt2 per f\3/aec (m1 per m3/aec
discharge dilchaqe)
8.3
17.9
52.2
193.6
1,250.0
5,000.0
20,000.0
(20.7)
(58. 7)
(171.0)
(635.0)
(4,101.0)
(16,404.0)
(65,617.0)
eight composed of particles in the 0.01-to 0.02-mm range. A surface area 4
.:imea larger would be needed to capture 5 percent more of this soil.
A balance between the cost-effectiveness of a certain basin size and the d~ire
to capture fine particles muat be achieved. It is desirable to captW'e the very
small soil particles (claya and fine silts) because they cause tuzbidity and other
water quality problems. However, Table 8.1 shows that a basin would have to be
very large to capture particlea smaller than 0.02 mm, particularly clay pBl'ticlea
0.005 mm and smaller. Because of the high coat of trapping very small particles,
the au~hors recommend 0.02 as the design plll'ticle size for sediment basins
except in areas with coarse soila, where a larger design particle may be used. The
0.02-mm particle is classified aa a medium silt by the AASHTO soil classification
system.
8.2d Basin Discharge Rate
The peak discharge, calculated by the rational or another approved method, is
used to size the basin riser. Owing any major storm, a sediment basin should fill
with water to the top of its riser and then discharge at the rate of inflow to the
basin. A sediment basin is not designed with a large water storage volume as is
a reservoir. If the inflow exceeds the design peak flow used to size the riser, the
overflow should discharge down an emergency spillway.
8.2e Design Runoff Rate
In the equation for surface area of a sediment basin, the discharge rate Q is a
variable to be chosen by the designer. The above discussion of basin discharge
·a shows that the discharge rate is, to a large extent, equal to the inilow. The
. ,ser is sized to handle the peak inflow to the basin. The authors suggest deter-
mining the surface area by the average runoff nf a IO-year, 6-hr sto,:m instead
I
I
Sediment Retention Struct,
of the peak flow. A substaI
and basin efficiency is not s
Consider a basin designe
off rate. The average rainfal
storm (Sec. 4.lf). On·a site,
ideal settling conditiona thi
soil (i.e., 62 percent of the
particles).
If the surface area of th
would be roughly 3 times
Reclamation (10), 25 perce1
period (Fig. 4.2). Since the
limeters) per hour, the pel
percent of the 6-hr total Si
discharge rate (A =-1.2Q/1
times the average rate (50~
flow would be about 3 times
sized for the peak flow woul
particles with approximate
cle. Since the 0.02-mm part
with a settling velocity of
tured. These are approxim1
Suppose a basin on a sit.
rate. For the purpose of ill
of the San Francisco Bay J
tides, by weight, greater tl
0.02 mm). A basin with a ls
ture the 0.01-to 0.02-mm I
67 percent of the eroded m,
cent (5/62) by tripling the
effective to size a basin b}
basin emd~n~;; ·_~H(~~~-~:
8.2f Settling Depth
If a basin is too shallow, w
settled particles and decre
grit-settling chambers at s
trolled to prevent particle
grit chamber (2) is:
V :.cou.r
l.·
.. _/
t ! ' I • . •
; V
) ·.·,'
. --·· .
'\ '•' ·~ ..., ... -,, ___ .. , ~·..: \
c.E 6.5 LS . (10)
Slope
LS valuea for followui, alope .1en&tha l, ft·fm) LS valuea for followiuc llope Janitba l, ft (m)
~adiant 10 20 30 .(() 50 60 70 80 90 100 ·i 150 200 250 300 S50 400 .so 500 600 700 800 900 1000
#, % (3.0) (6.1) (9.1) (12.2) (15.2) (18.3) (21.3) (2'-4) (27.4) (30.5) i (46) (61) (76) (91) (107) (122) (137) (152) (183) (213) (2") (274) (305)
i
0.5 0.06 0.07 0.07 0.08 0.08 0.09 0.09 0.09 ·0.09 0.10 ) 0.10 0.11 0.11 0.12 0.12 0.13 0.13 0.13 0.1' 0.14 0.14 0.15 0.15
l 0.08 0.09 0.10 0.10 0.11 0.11 0.12 0.12 0.12 0.12 0.1' 0.1' 0.15 0.16 0.16 0.16 0.11 0.17 0.18 0.18 0.19 0.19 0.20
0.18 0.19 0.19 0.20
,
0.23 0.25 0.32: 2-··· 0.10 0.12 0.14 0.15 0.16 0.17 i 0.26 0.28 0.29 0.30 0.33 0-3-' 0.36 0.37 0.39 0.40
3 0.14 0.18 0.20 0.22 0.23 0.25 0.26 0.27 0.28 0.29 1 .0.32 0.35 0.38 0.40 0.'2 0.-'3 0."5 0..6 0..9 0.51 0.64 0.55 0.57
4 0.16 0.21 0.25 0.28 0.30 0.33 0.35 0.87 0.38 0.40 ' o.~7 0.53 0.58 0.62 0.66 0.70 0.73 0.76 0.82 0.87 0.92 0.96 1.00 J
5 0.17 0.24 • 0.29 0.34 0.38 0.41 0.45 o.~ 0.51 0.53 ' 0.66 0.76 0.85 0.93 1.00 1.07 1.19 1.20 1.31 1.42 1.51 1.60 1.69
Ef 0.21 0.30 0.37 0.43 o.~ 0.52 0.66 0.60 0.64 0.67 1• 0.82 0.95 1.06 1.16 L26 1.3" U3 1.50 1.66 1.78 1.90 • 2.02 2.13 I
7 0.26 0.37 0.46 0.52 0.58 0.64 0.69 0.7' 0.78 0.82 1.01 1.17 1.30 U,1 L54 1.65 1.75 1.84 2.02 2.18 2.33 2.47 2.61
8 0.31 o.-u 0.54 0.63 0.70 0.77 0.83 0.89 0.9" 0.99 i,' L21 UD 1.57 L72 1.85 1.98 2.10 2.22 2.43 2.62 2.80 2.97 3.13
9 0.37 0.52 0.64 0.74 0.83 0.91 0.98 1.05 1.11 1.17 I . U4 1.66 1.85 2.03 2.19 2.35 U9 2.62 2.87 3.10 3.32 3.52 3.71
~
10 0.43 0.61 0.75 0.87 0.97 1.06 1.15 1.22 1.30 1.37 1.68 1.94 2.16 2.37 2.66 2.7' 2.90 3.06 3.35 3.62 3.87 4.11 4.33
11 0.50 0.71 0.86 1.00 1.12 1.22 1.32 1.41 1.50 1.58 .. 1.93 2.23 2.50 2.7' 2.95 3.16 3.35 3.63 3.87 4.18 4.47 4.74 4.99
12.5 0.61 0.86 1.05 1.22 1.36 1.49 1.61 1.72 1.82 1.92 2.35 2.72 3.04 3.33 3.59 3.84 '-08 4.30 4.71 5.08 5.43 5.76 6.08
15 0.81 1.14 1.40 1.62 1.81 1.98 2.14 2.29 2.43 2.56 ·i· 3.13 3.62 4.06 4.43 4.79 6.12 6.43 6,72 6.27 6.77 7.24 7.68 8.09
16.7 0.96 1.36 1.67 1.92 2.15 2.36 2.54 • 2.72 2.88 3.<K 3.72 4.30 4..81 5.zt 6.61J 6.08 6.46 6.80 7.46 8.04 8.60 9.12 9.62
20 1.29 1.82 2.23 2.58 2.88 3,16 3.41 3.65 3.87 4.08 5.00 . 5.77 U5 7.06 7.63 8.16 8.66 9.12 9.99 10.79 11.64 12.24 12.90 ;
22 1.51 2.13 2.61 3.02 3.37 3.69 3.99 '-27 4.63 t.77 .. 5.M 6.75 7.54 8.28 8.92 9.54 10.12 10.67 ll.68 12.62 13.49 14.31 15.08
25 1.86 2.63 3.23 3.73 4.16 4.56 ·'-93 5.27 U9 5.89 ' 7.21 8.3a 9.31 10.20 11.02 ll.78 11'9 13.17 14.43 15.58 16.66 17.67 18.63
30 2.51 3.66 4.36 6.03 5.62 6.16 6.65 7.11 7.64 7.95 l 9.74 11.26 12.67 13.77 l'-88 16.91 16.87 17.78 19.'8 21.04 22.49 23.86 25.15
33.3 2.98 4.22 5.17 5.96 6.67 7.30 7.89 U3 8.95 9.43 11.55 13.3" 1'.91 16.33 17.6' 18.86 20.00 21.09 23.10 2'.95 26.67 28.29 29.82
35 3.23 4.57 5.60 6.46 7.23 7.92 8.55 9.1' 9.70 10.22 { 12.52 1U6 16.16 17.70 19.12 20.44 21.68 22.86 25.IW 27.04 28.91 30.67 32.32
40 4.00 6.66 6.93 8.00 8.96 9.80 10.59 11.32 12.00 12.65 15.50 17.89 20.01 21.91 23.67 25.30 26.84 28.29 30.99 33.'8 35.79 37.96 .40.01
45 4.81 6.80 8.33 9.61 10.76 ll.77 12.72 13.60 1U2 15.20 18.62 21.60 24.03 26Jl3 28.-U 30.40 32.24 33.99 37.23 40..22 '2.99 46.60 '8.07
50 5.64 7.97 9.76 11.27 12.60 13.81 14.91 15,94 16.91 17.82 r 2L83 25.21 28.18 30.87 33.34 35.66 37.81 39.85 43.66 47.16 50.41 63.47 56.36
55 6.48 9.16 11~ 12.96 U.'8 lli.87 17.U Ul.32 19."3 20 . .S 25.09 28.97 32.39 36.'8 38.32 40.97 48.'6 '5.80 60.18 64.20 67.94 61.45 64.78
57 6.82 9.64 11.80 13.63 15.24 16.69 18.03 19.28 20.45 2L55 26.40 30.~ 3'.08 37.33 40.32 ~.10 '6.72 '8.19 52.79 57.02 60.96 64.66 68.15
60 7.32 10.35 12.68 U.64 16.37 17.93 19.37 20.71 21.96 23.15 28.35 32.74 36.60 40.10 ~.31 46.:)0 49.11 61.77 66.71 61..25 65.48 69.45 73.21
66.7 8.44 11.93 14.61 16.88 18.87 20.67 22.32 23.87 25.31 26.68 f 32.68 37.7' "2.19 '6.22 49.92 63.37 56.60 69.66 66.36 70.60 75.'7 80.05 84.38
12.70 2L99 23.75 25.39 26.93 28.39 I 85.17 89.78 70 8.98 15.55 17.96 20.08
j.
3'.77 40.15 44.89 48.17 63.11 66.78 60.23 63.48 69.54 76.12 80.30
75 9.78 13.83 16.9' 19.56 21.87 23.96 25.87 27.66 29.34 30.92 37.87 "1. 73 48.89 63.56 57.85 61.85 65.60 69.15 75.75 81.82 87..46 92.77 97.79 .
80 10.55 14.93 18.28 21.ll 23.60 25.85 27.93 29.85 3L66 33.38 40.88 47.20 62.77 57.81 62." 66.76 70.80. 74.63 81.76 88.31 9'.41 100.13 105.55
85 U .30 15.98 19.58 22.61 25.27 27.69 29.90 3L97 33.91 35.7, '3.78 50.66 56.61 61.91 66.87 71.~ 75.82 79.92 87.55 94.67 101.09 107.23 113.03 I
90 12.02 17.00 20.82 24.04 26.88 29.44 31.80 34..00 36.06 38.01 I 46.55 63.76 60.10 66M 71.11 76.02 80.63 84.99 93.11 100.57 107.51 114.03 120.20
95 12.71 17.97 22.01 25.41 28.41 31.12 33.62 35.94 38.12 40.18 49.21 66.82 63.53 69.59 76.17 80.36 85.23 89.84 98.'2 106.30 11_3.64 120.64 127 .06
100 13.36 18.89 23.14 26.72 29.87 32.72 35.34 37.78 40.08 42.24 51.7' 59.7' 66.79 73.17 79.03 84.49 89.61 94.46 103.'8 111.77 119.48 126.73 133.59
tlai:.d from
(
65.41 X s2 4.56 X • ) ( I )"' LS • topocrapbic factor + + 0.066 -Sa + 10,000 J 1• + 10,000 72.6 I • alope laDcih, ft (m X O.ao48)
I • alope ltlepual,
m • •~t dlpendent upo11 alope ateepneai
(0.2 for alopea < l"• 0.3 Coulope11 to H, c><H/6'/T r \
M Car alopee 3.5 to 4.6%, ud ,E
0.5for a1opo1 > 6'1i)
Sample Soll Loss Calculation; Step-by-Step Procedu,..
1. Determine the R ractor.
2. Bued on soil sample particle alze analy1ts: determine the K value from the
nomo1raph (Fi1. 5.6). Repeat if you have more than one 1011 sample.
3. Divide the aite into aectlona of uniform slope 1radient and length. ·Aasign an
LS value to each section (Table 6.6).
4. Choose the C value(a) to represent a seasonal average of the effect or mulch
and vegetation (Tabla 5.6).
5. Set the P factor based on the final gradin1 practice applied to the slopes
(Table 5.7).
8. Multiply the five ractora to1atber to obtain per acre aoil lo.._
7. Multiply soil Ion per acre by the acreage to find the total volu~e of sediment.
Ir the aoil loss prediction shows excessive volume loat from the ■ite, consider '.
(a) workin1 only a portion of the site at one time, (b} alterin1 the slope length
and gradient, or (c) increasing mulch application rate or seeding.
( r-