HomeMy WebLinkAboutCT 07-08; LA COSTA SPA & RESORT VILLAS; Engineering ApplicationCl"IQF CARLSBAD -ENGINEERING DEPAIQNT
• APPLICATION
ENGINEERING PLAN CHECK
Complete all appropriate Information. Write N/ A when not applicable.
PROJECT NAME: La Costa Resort & Sea DATE: 9/11/2008
PROJECT DESCRIPTION: La Costa Resort -Planning Area 1, Buildings 9A, 9B, lOA -l0E
PROJECT ADDRESS: 2100 Costa Del Mar Road
LOT NO(S).: 1 through 12 MAP NO.: 14984 APN(S).: 216-591-02, 03, 04, 08, 15, 21, 23
NUMBER OF LOTS: 12 NUMBER OF ACRES: 4.58
OWNER: W2007 La Costa I, LLC APPLICANT: W2007 La Costa I, LLC
Mailing Address: 2100 Costa Del Mar Road Mailing Address: 2100 Costa Del Mar Road
carlsbad, CA 92009 carlsbad, CA 92009
Phone Number: {760} 929-6398 Phone Number: {760} 929-6398
Fax Number: {760} 929-6313 Fax Number: {760} 929-6313
E-Mail: mnorvell@lacosta.com E-Mail: mnorvell®lacosta.com
I certify that I am the legal owner and that all the above
information is true and correct to the best of my knowledge.
I
f-BL-, ~ ~ Signature: Date: Signature ;s r I Date:
CIVIL ENGINEER: Timoth:t M. Thiele SOILS ENGINEER: Brett L. Anderson
FIRM: RBF Consultin9 FIRM: Sladden Engineering
Mailing Address: 5050 Avenida Encinas, Suite 260 Mailing Address: 39-725 Garand Lane, Suite G
carlsbad, CA 92008 Palm Desert, CA 92211
Phone Number: {760} 476-9193 Phone Number: {760} 772-3893
Fax Number: {7602 476-9198 Fax Number: {7602 523-1369
E-Mail: tthiele@rbf.com E-Mail:
State Registration Number: C 60283 State Registration Number: C 45389
ADDmONAL COMMENTS: W2007 La Costa I, LLC Contact: Michael Norvell
IMPROVEMENT VALUATION
1. What water district is the proposed project located in? (check one)
~Carlsbad Municipal Water District Drnivenhain Ovallecitos
2. If in the Carlsbad Municipal Water District, what is the total cost estimate, including the 15%
contingency fee, for water and reclaimed water improvements, sewer (for Carlsbad Municipal
Water District only), street, public (median) landscape and irrigation, and drainage improvements
(if applicable)? $ 391,875
GRADING QUANTITIES
cut 240 cy fill 12,600 C:i remedial cy import 12,360 cy export. cy
SEE REVERSE SIDE
H:/DEVELOPMENT SERVICES/MASTERS/Application for Engineering Plan Check Revised 1 /14/02