Loading...
HomeMy WebLinkAboutCT 08-07; DRAINAGE STUDY; 2011-12-29DRAINAGE STUDY U La Costa Town Square Office Job No. 10-1290 December 29, 2011 Prepared For: PROPERTY DEVELOPMENT CENTERS 5918 Stoneridge Mall Road Pleasanton, CA 94588 (925) 738-1232 Prepared by: FESSil 19 O'DAY CONSULTANTS, INC. A. 2710 Loker Avenue West Suite 100 Carlsbad, California 92008-6603 Uj Tel: (760) 931-7700 EXP Ali ~Ik Fax: (760) 931-8680 CNIV 0 12— Nichole A. Fine RCE 70035 Date Exp. 09/30/12 1 I Declaration of Responsible Charge I hereby declare that I am the Engineer of Work for this project, that I have exercised responsible charge over the design of this project as defined in section 6703 of the Business and Professions - Code, and that the design is consistent with current standards. I understand that the check of project drawings and specifications by the City of Carlsbad is confined to a review only and does not relieve me, as the Engineer of Work, of my responsibilities for the project design. - O'Day Consultants, Inc. P 2710 Loker Avenue West, Suite 100 Carlsbad, CA 92010 (760) 931-7700 'V1ce&r - Date: Nichole A. Fine R.C.E. No. 70035 Exp. 9/30/12 OFESS C 70035 * EXP. W *4 oil L,,4kZL0FCAV - 2 TABLE OF CONTENTS Section Description Introduction and Project Description Hydrology Appendix 1- 100 Year Hydrologic Calculations for Existing Conditions Appendix 2- 100 Year Hydrologic Calculations for Mass Grading Appendix 3- 100 Year Hydrologic Calculations for Ultimate Conditions Page No. 4 4-7 5-15 16-35 36-57 N Exhibits Exhibit A - Vicinity Map Exhibit B - Table 3-1 Runoff Coefficients For Urban Areas (RationalMethod) Exhibit C - Soil Group Map per USDA NRCS Exhibit D - 100-year 6-hour precipitation map Exhibit E - 100-year 24-hour precipitation map Exhibit F - Figure 3-3 Urban Areas Overland Time of Flow Nomagraph Exhibit G - Figure 3-1 Intensity Duration Design Chart Exhibit H - Table 3-2 Maximum Overland Flow Length & Initial Time of Concentration Exhibit I - Fig. 3-4 Nomograph of Tc for Natural Watersheds Exhibit J - 100-Scale Existing Conditions Hydrologic Map (Map Pocket) Exhibit K - 40-Scale Proposed Conditions Hydrologic Map (Map Pocket) 3 A. INTRODUCTION AND PROJECT DESCRIPTION This drainage study was prepared to support grading plans for the Office at La Costa Town Square. The project is located south and east of Rancho Santa Fe Road and North of La Costa Avenue in the City of Carlsbad, California. The site is generally described as mostly undisturbed vacant land with the exception of small borrow and stockpile sites for the grading and improvements of Rancho Santa Fe Road and La Costa Avenue per City of Carlsbad drawing 409-4B. The disturbed areas have since been revegetated. The site is steep with well-defined drainage courses and generally slopes toward the south with slopes ranging from 10% along the northern portion to 18% southerly. There are several drainage courses with steep side slopes - greater than 40%. See Exhibit 'A' for a Vicinity Map of the site. Site runoff enters the City's MS4 along La Costa Avenue and combines with flows from - surrounding developments before discharging to a regional detention facility. Mitigated flows then enter an unnamed conveyance system which enters Encinitas Creek approximately 1.9 miles downstream. It then enters Batiquitos Lagoon about 1.6 miles further. The site will be graded at 2% minimum towards the center of the site. A future site plan is unknown at this time. It is assumed that the future office site will consist of parking lots and buildings and will be typical of the general commercial run-off coefficient. B. HYDROLOGY Hydrologic calculations were performed utilizing the San Diego County Rational Method as - described in the San Diego County Hydrology Manual, June 2003. Pertinent exhibits from the San Diego County Hydrology Manual are enclosed for reference, as follows: Exhibit B - Runoff Coefficients (Table 3-1) & Calculated Coefficients Exhibit C - Soil Group Map Exhibit D - 100-year 6-hour Isopluvial Map Exhibit E - 100-year 24-hour Isopluvial Map Exhibit G - Intensity-Duration Design Chart Exhibit F - Rational Formula-Overland Time of Flow Nomograph 11 APPENDIX 1 100 Yr. Existing Hydrologic Calculations (See Exhibit 'J') I I I I I I I 1 I I I I I San Diego County Rational Hydrology Program CIVILCADD/CIVILDESIGN Engineering Software, (C) 2004 Version 3.2 Rational method hydrology program based on - San Diego County Flood Control Division 2003 hydrology manual Rational Hydrology Study Date: 08/29/07 ----------------------------------------------------------------------- LA COSTA TOWN SQUARE BASIN A - EXISTING CONDITIONS G:\ACCTS\001017\1017A.OUT ********* Hydrology Study Control Information - O'Day Consultants, San Diego, California - SIN 10125 Ra:ional hydrology study storm event year is 100.0 May data precipitation entered: 6 hour, precipitation(inches) = 2.800 24 hour precipitation(inches) = 5.100 Adjusted 6 hour precipitation (inches) = 2.800 P5/P24= 54.9% San Diego hydrology manual 'C' values used Runoff coefficients by rational method +++++++++++++++++-+++++++++++++++++++++++++++++++++++1++++++++++++++++ Process from Point/Station 100.000 to Point/Station 100.000 *k** USER DEFINED FLOW INFORMATION AT A POINT **** PER DWG. 368-2C, SHT. 15 User specified 'C' value of 0.800 given for subarea Rainfall intensity (I) = 3.797 for a 100.0 year storm User specified values are as follows: TC = 14.00 mm. Rain intensity = 3.80(In/Hr) Tonal area = 19.50(Ac.) Total runoff = 63.50(CFS) Process from Point/Station 100.000 to Point/Station 311.000 IRREGULAR CHANNEL FLOW TRAVEL TIME **** Estimated mean flow rate at midpoint of channel = 89.388(CFS) Depth of flow = 1.482(Ft.), Average velocity = 10.181(Ft/s) Irregular Channel Data *********** ----------------------------------------------------------------- Information entered for subchannel number 1 Point number 'X' coordinate 'Y' coordinate 1 0.00 2.50 2 10.00 0.00 n. 3 20.00 2.50 Manning's 'N' friction factor 0.040 ----------------------------------------------------------------- Sub-Channel flow = 89.389(CFS) flow top width = 11.852 (Ft.) velocity= 10.181(Ft/s) area = 8.780(Sq.Ft) Froude number = 2.085 Upstream point elevation = 383.000(Ft.) Downstream point elevation = 285.000(Ft.) Flow length = 840.000(Ft.) Travel time = 1.38 mm. Time of concentration = 15.38 mm. Depth of flow = 1.482(Ft.) Average velocity = 10.181(Ft/s) Total irregular channel flow = 89.388(CFS) Irregular channel normal depth above invert elev. = 1.482(Ft.) Average velocity of channel(s) = 10.181(Ft/s) Sub-Channel No. 1 critical depth = 1.984(Ft.) critical flow top width = 15.875 (Ft.) critical flow velocity= 5.675(Ft/s) critical flow area = 15.751(Sq.Ft) Adding area flow to channel - User specified 'C value of 0.350 given for subarea Rainfall intensity = 3.575(In/Hr) for a 100.0 year storm Runoff coefficient used for sub-area, Rational method,Q=KCIA, C = 0.350 Subarea runoff = 19.893(CFS) for 15.900(Ac.) - Total runoff = 83.393(CFS) Total area = 35.40(Ac.) +++++++++++++++++-++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 311.000 to Point/Station 312.000 PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation = 285.53 (Ft.) Downstream point/station elevation = 282.84 (Ft.) Pipe length = 55.56 (Ft.) Manning's N = 0.013 No. of pipes = 1 Required pipe flow = 83.393(CFS) Given pipe size = 24.00(In.) NOTE: Normal flow is pressure flow in user selected pipe size. The approximate hydraulic grade line above the pipe invert is 21.270(Ft.) at the headworks or inlet of the pipe(s) Pipe friction loss = 7.547(Ft.) Minor friction loss = 16.412(Ft.) K-factor = 1.50 Pipe flow velocity = 26.54 (Ft/s) Travel time through pipe = 0.03 mm. Time of concentration (TC) = 15.41 mm. I Process from Point/Station 311.000 to Point/Station 312.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 1 I 7 Stream flow area = 35.400 (Ac.) Runoff from this stream = 83.393(CFS) Time of concentration = 15.41 mm. Rainfall intensity = 3.569(In/Hr) Process from Point/Station 401.000 to Point/Station 402.000 INITIAL AREA EVALUATION User specified 'C' value of 0.350 given for subarea Time of concentration computed by the natural watersheds nomograph (App X-A) TC = [11.9*1engthMi)3)/(elevation change)] 385 *60(min/hr) + 10 mm. Initial subarea flow distance = 240.00(Ft.) Highest elevation = 373.00(Ft.) Lowest elevation = 358.00(Ft.) Elevation difference = 15.00(Ft.) TC=((11.9*0.0455E)/( 15.00)]".385= 1.55 + 10 mm. = 11.55 mm. Rainfall intensity (I) = 4.300 for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.350 Subarea runoff = 0.090(CFS) Total initial stream area = 0.060 (Ac.) + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + . + + + + + + + + + + + + + + + + + . + + Process from Point/Station 402.000 to Point/Station 403.000 IRREGULAR CHANNEL FLOW TRAVEL TIME Estimated mean flcw rate at midpoint of channel = 0.873(CFS) Depth of flow = 0.188(Ft.), Average velocity = 2.458(Ft/s) Irregular Channel Data ----------------------------------------------------------------- Information entered for subchannel number 1 Point number 'X' coordinate 'Y coordinate 1 0.00 2.00 2 20.00 0.00 3 40.00 2.00 Manning's 'N' friction factor = 0.040 ----------------------------------------------------------------- Sub-Channel flow = 0.873(CFS) flow top width = 3.769 (Ft velocity= 2.458(Ft/s) area = 0.355(Sq.Ft) Froude number = 1.411 Upstream point elevation = 358.000(Ft.) Downstream point elevation = 285.000(Ft.) Flow length = 710.000(Ft.) Travel time = 4.81 mm. Time of concentration = 16.36 mm. Depth of flow = 0.188(Ft.) Average velocity = 2.458(Ft/s) Total irregular channel flow = 0.873(CFS) Irregular channel normal depth above invert elev. = 0.188(Ft.) Average velocity cf channel(s) = 2.458(Ft/s) Sub-Channel No. 1 critical depth = 0.217 (Ft.) critical flow top width = 4.336(Ft.) critical flow velocity= 1.857(Ft/s) critical flow area = 0.470(Sq.Ft) Adding area flow to channel User specified 'C value of 0.350 given for subarea Rainfall intensity = 3.435(In/Hr) for a 100.0 year storm Runoff coefficient used for sub-area, Rational method,Q=KCIA, C = 0.350 Subarea runoff = 1.250(CFS) for 1.040(Ac.) Total runoff = 1.340(CFS) Total area = 1.10(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 403.000 to Point/Station 312.000 PIPEFLOW TRAVEL TIME (User specified size) kk Upstream point/station elevation = 284.98(Ft.) Downstream point/station elevation = 282.84 (Ft.) Pipe length = 58.27(Ft.) Manning's N = 0.013 No. of pipes = 1 Required pipe flow = 1.340(CFS) Given pipe size = 18.00(In.) Calculated individual pipe flow = 1.340(CFS) Normal flow depth in pipe = 3.15 (In.) Flow top width inside pipe = 13.67 (In.) Critical Depth = 5.20(In.) Pipe flow velocity = 6.46(Ft/s) Travel time through pipe = 0.15 mm. Time of concentration (TC) = 16.51 mm. ++ ++++++++++++++++++++++++++++++++++++++++++.+++++++++++++++++++++++++ Process from Point/Station 403.000 to Point/Station 312.000 CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 2 Stream flow area = 1.100(Ac.) Runoff from this stream = 1.340(CFS) Tine of concentration = 16.51 mm. Rainfall intensity = 3.414(In/Hr) Summary of stream data: Stream Flow rate TC Rainfall Intensity N. (CFS) (mm) (In/Hr) 1 83.393 15.41 3.569 2 1.340 16.51 3.414 Qmax(l) = 1.000 * 1.000 * 83.393) + 1.000 * 0.933 * 1.340) + = 84.644 Qmax(2) = 0.957 * 1.000 * 83.393) + 1.000 * 1.000 * 1.340) + = 81.110 Total of 2 streams to confluence: Flow rates before confluence point: I I I I I 83.393 1.340 Maximum flow rates at confluence using above data: 84.644 81.110 I Area of streams before confluence: 35.400 1.100 Results of confluence: Total flow rate = 84.644(CFS) I Time of concentration = 15.410 mm. Effective stream area after confluence = 36.500(Ac.) I ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 312.000 to Point/Station 313.000 kk) PIPEFLOW TRAVEL TIME (User specified size) **** I Upstream point/station elevation = 282.51 (Ft.) Downstream point/station elevation = 268.22 (Ft.) Pipe length = 290.95 (Ft.) Mannings N = 0.013 I No. of pipes = 1 Required pipe flow = 84.644(CFS) Given pipe size = 24.00(In.) NOTE: Normal flow is pressure flow in user selected pipe size. I The approximate hydraulic grade line above the pipe invert is 43.337(Ft.) at the headworks or inlet of the pipe(s) Pipe friction loss = 40.718(Ft.) Minor friction loss = 16.908(Ft.) K-factor = 1.50 I PiDe flow velocity = 26.94 (Ft/s) Travel time through pipe = 0.18 mm. Time of concentration (TC) = 15.59 mm. + + + + + + + + . + + + + + + + + - + + + + + + + + + + + + + . + + + + + + + + + + + + + + + + + + + + + + + + + + + + ± + . + + + + . + + Process from Point/Station 313.000 to Point/Station 313.000 I **** SUBAREA FLOW ADDITION User specified 'C value of 0.350 given for subarea Time of concentration = 15.59 mm. I Rainfall intensity = 3.543(In/Hr) for a 100.0 year storm Runoff coefficient used for sub-area, Rational method,Q=KCIA, C = 0.350 Subarea runoff = 2.728(CFS) for 2.200(Ac.) Total runoff = 87.372(CFS) Total area = 38.70(Ac.) +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++. I Process from Point/Station 313.000 to Point/Station 313.000 SUBAREA FLOW ADDITION **** I User specified 'C' value of 0.900 given for subarea Time of concentration = 15.59 mm. Rainfall intensity = 3.543(In/I-Ir) for a 100.0 year storm Runoff coefficien- used for sub-area, Rational method,Q=KCIA, C = 0.900 I Subarea runoff = 4.464(CFS) for 1.400(Ac.) Total runoff = 91.836(CFS) Total area = 40.10(Ac.) I ++++++++++++++++++++++±+++++++++±++++++++++++++++++++++++++±++++++++++ Process from Poin/Station 313.000 to Point/Station 153.000 'k PIPEFLOW TRAVEL TIME (User specified size) .10 **** I I Upstream point/station elevation = 266.22 (Ft.) Downstream point/station elevation = 265.72(Ft.) Pipe length = 21.26 (Ft.) Manning's N = 0.013 No. of pipes = 1 Required pipe flow = 91.836(CFS) Given pipe size = 24.00(In.) NOTE: Normal flow is pressure flow in user selected pipe size. The approximate hydraulic grade line above the pipe invert is 22.906(Ft.) at the headworks or inlet of the pipe(s) Pipe friction loss = 3.502(Ft.) Minor friction loss = 19.904(Ft.) K-factor = 1.50 Pipe flow velocity = 29.23 (Ft/s) Travel time through pipe = 0.01 mm. Time of concentration (TC) = 15.60 mm. +++++++++++++++++++++++++++++++++++++++++-1-++++++++++++++++++++++++++++ Process from Point/Station 153.000 to Point/Station 154.000 kk PIPEFLOW TRAVEL TIME (User specified size) Upstream point/station elevation = 265.72 (Ft.) Downstream point/station elevation = 264.11 (Ft.) Pipe length = 72.32 (Ft.) Manning's N = 0.013 No. of pipes = 1 Required pipe flow = 91.836(CFS) Given pipe size = 54.00 (In.) Calculated individual pipe flow = 91.836(CFS) Normal flow depth in pipe = 20.74(In.) F13w top width inside pipe = 52.53(In.) Critical Depth = 33.71(In.) Pipe flow velocity = 16.31 (Ft/s) Travel time through pipe = 0.07 mm. Time of concentration (TC) = 15.68 mm. End of computations, total study area = 40.10 (Ac.) 11 I I San Diego County Rational Hydrology Program CIVILCADD/CIVILDESIGN Engineering Software, (c) 2004 Version 3.2 Rational method hydrology program based on San Diego County Flood Control Division 2003 hydrology manual Rational Hydrology Study Date: 08/29/07 ----------------------------------------------------------------------- LA COSTA TOWN SQUARE BASIN B - EXISTING CONDITIONS G:\ACCTS\001017\1017B.OUT Hydrology Study Control Information ********** O'Day Consultants, San Diego, California - SIN 10125 ----------------------------------------------------------------------- Rational hydrology study storm event year is 100.0 Map data precipitation entered: 6 hour, precipitation(inches) = 2.800 24 hour precipitation(inches) = 5.100 Adjusted 6 hour precipitation (inches) = 2.800 P6/P24 = 54.9% San Diego hydrology manual 'C' values used Runoff coefficients by rational method ++±++++++++++++++++++++++++++++++.++++++++++++++++++++++++++++++++++++ Process from Point/Station 200.000 to Point/Station 200.000 USER DEFINED FLOW INFORMATION AT A POINT **** PER DWG. 368-2C, SHT. 14 User specified 'C' value of 0.800 given for subarea Rainfall intensity (I) = 2.879 for a 100.0 year storm User specified values are as follows: TC = 21.50 mm. Rain intensity = 2.88(In/Hr) Total area = 22.10(Ac.) Total runoff = 45.40(CFS) Process from Point/Station 200.000 to Point/Station 202.000 IRREGULAR CHANNEL FLOW TRAVEL TIME kk Estimated mean flow rate at midpoint of channel = 60.602(CFS) Depth of flow = 1.266(Ft.), Average velocity = 7.559(Ft/s) Irregular Channel Data ----------------------------------------------------------------- Information entered for subchannel number 1 Point number 'X' coordinate Y' coordinate 1 0.00 2.00 2 10.00 0.00 12 3 20.00 2.00 Manning's 'N' friction factor = 0.040 ----------------------------------------------------------------- Sub-Channel flow = 60.602(CFS) flow top width = 12.662 (Ft.) velocity= 7.559(Ft/s) area = 8.017(Sq.Ft) Froude number = 1.674 Upstream point elevation = 347.000(Ft.) Downstream point elevation = 261.000(Ft.) Flow length = 1100.000(Ft.) Travel time = 2.43 mm. Time of concentration = 23.93 mm. Depth of flow = 1.266 (Ft.) Average velocity = 7.559(Ft/s) Total irregular channel flow = 60.602(CFS) Irregular channel normal depth above invert elev. = 1.266 (Ft.) Average velocity of channel(s) = 7.559(Ft/s) Sub-Channel No. 1 critical depth = 1.555 (Ft.) critical flow top width = 15.547 (Ft.) critical flow velocity= 5.015(Ft/s) critical flow area = 12.085(Sq.Ft) Adding area flow to channel User specified 'C' value of 0.350 given for subarea Rainfall intensity = 2.688(In/Hr) for a 100.0 year storm Runoff coefficient used for sub-area, Rational method,Q=KCIA, C = 0.350 Subarea runoff = 13.922(CFS) for 14.800(Ac.) Total runoff = 59.322(CFS) Total area = 36.90 (Ac.) Process from Point/Station 202.000 to Point/Station 202.000 SUBAREA FLOW ADDITION **** User specified 'C' value of 0.350 given for subarea Time of concentration = 23.93 mm. Rainfall intensity = 2.688(In/Hr) for a 100.0 year storm Runoff coefficient, used for sub-area, Rational method,Q=KCIA, C = 0.350 Subarea runoff = 8.466(CFS) for 9.000(Ac.) Total runoff = 67.788(CFS) Total area = 45.90Ac.) Process from Point/Station 202.000 to Point/Station 202.000 SUBAREA FLOW ADDITION **** User specified 'C value of 0.900 given for subarea Time of concentration = 23.93 mm. Rainfall intensity = 2.688(In/Hr) for a 100.0 year storm Runoff coefficient used for sub-area, Rational method,Q=KCIA, C = 0.900 Subarea runoff = 5.563(CFS) for 2.300 (Ac.) Toal runoff = 73.351(CFS) Total area = 48.20 (Ac.) End of computations, total study area = 48.20 (Ac.) 13 San Diego County Rational Hydrology Program CIVILCADD/CIVILDESIGN Engineering Software, (c) 2004 Version 3.2 Rational method hydrology program based on San Diego County Flood Control Division 2003 hydrology manual Rational Hydrology Study Date: 08/29/07 ----------------------------------------------------------------------- LA COSTA TOWN SQUARE BASIN C - EXISTING CONDITIONS G:\ACCTS\001017\1017C.OUT Hydrology Study Control Information O 'Day Consultants, San Diego, California - SIN 10125 ----------------------------------------------------------------------- Rational hydrology study storm event year is 100.0 Map data precipitation entered: 6 hour, precipitation(inches) = 2.800 24 hour precipitation(inches) = 5.100 Adjusted 6 hour precipitation (inches) = 2.800 P6/P24 = 54.9% San Diego hydrology manual C values used Runoff coefficients by rational method I 42 I I I I I ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++±+++++++++ Process from Point/Station 300.000 to Point/Station 300.000 USER DEFINED FLOW INFORMATION AT A POINT **** PER DWG. 368-2, SHT. User specified C value of 0.800 given for subarea Rainfall intensity (I) = 3.350 for a 100.0 year storm User specified values are as follows: TC = 17.00 mm. Rain intensity = 3.35(In/Hr) Tonal area = 10.80(Ac.) Total runoff = 32.50(CFS) ++f++++++++++++++-+++++++++++++++++++++++++++++.+f+++++++++...+++..++. Process from Point/Station 300.000 to Point/Station 300.000 SUBAREA FLOW ADDITION **** User specified C value of 0.350 given for subarea Time of concentration = 17.00 mm. Rainfall intensity = 3.350(In/Hr) for a 100.0 year storm 14 I Runoff coefficient used for sub-area, Rational method,Q=KCIA, C = 0.350 Subarea runoff = 1.173(CFS) for 1.000(Acj Total runoff = 33.673(CFS) Total area = 11.80(Ac.) +++++++++++++++++-1-++++++++++++++++++++++++++-1-+++++++++++++++++++++++++ Process from Point/Station 300.000 to Point/Station 302.000 I IMPROVED CHANNEL TRAVEL TIME Upstream point elevation = 308.00(Ft.) I Downstream point elevation = 268.00(Ft.) Channel length thru subarea = 600.00(Ft.) Channel base width = 1.000(Ft.) Slope or 'Z' of left channel bank = 2.000 I Slope or 'Z' of right channel bank = 2.000 Estimated mean flow rate at midpoint of channel = 40.664(CFS) Manning's 'N' = 0.015 I Maximum depth of channel = 1.000 (Ft.) Flow(q) thru subarea = 40.664(CFS) Depth of flow = 0.900(Ft.), Average velocity = 16.143(Ft/s) Channel flow top width = 4.599(Ft.) I Flow Velocity = 16.14 (Ft/s) Travel time = 0.62 mm. Time of concentration = 17.62 mm. Critical depth = 1.672(Ft.) I Adding area flow to channel User specified 'C' value of 0.350 given for subarea Rainfall intensity = 3.274(In/Hr) for a 100.0 year storm I Runoff coefficient used for sub-area, Rational method,Q=KCIA, C = 0.350 Subarea runoff = 5.615(CFS) for 4.900(Ac.) Total runoff = 39.287(CFS) Total area = 16.70(Ac.) I +++++++++++++++++++++++++++++++++++++++++++++++++_++++++++++++++++++++ Process from Point/Station 302.000 to Point/Station 302.000 I SUBAREA FLOW ADDITION User specified 'C' value of 0.350 given for subarea Time of concentration = 17.62 mm. I Rainfall intensity = 3.274(In/Hr) for a 100.0 year storm Runoff coefficient used for sub-area, Rational method,Q=KCIA, C = 0.350 Subarea runoff = 15.469(CFS) for 13.500(AcJ Total runoff = 54.757(CFS) Total area = 30.20(Ac.) I End of computations, total study area = 30.20 (Ac.) 15 APPENDIX 2 100 Yr. Interim Hydrologic Calculations- Mass Grading (See Exhibit 'J') 16 San Diego County Rational Hydrology Program CPJILCADD/CIVILDESIGN Engineering Software, (c)1991-2004 Version 7.4 Rational method hydrology program based on San Diego County Flood Control Division 2003 hydrology manual Rational Hydrology Study Date: 12/30/11 ----------------------------------------------------------------------- 100 Year Storm Hydrology Calculations LCTS-Office Pad Grading- Basin A Calculations By: NF 12/30/2011 I: \001017\_Office\Stormwater\Drainage\1090kga.out Hydrology Study Control Information Program License Serial Number 5007 Rational hydrology study storm event year is 100.0 English (in-lb) input data Units used Map data precipitation entered: 6 hour, precipitation(inches) = 2.800 24 hour precipitation(inches) = 5.100 P6/P24 = 54.9% San Diego hydrology manual C values used ++±.++++++++++++++++++++++++++++++++++++++++++++++.+++++++++++++++++++ Process from Point/Station 100.000 to Point/Station 101.000 INITIAL AREA EVALUATION **** Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 [UNDISTURBED NATURAL TERRAIN I (Permanent Open Space Impervious value, Ai = 0.000 Sub-Area C Value = 0.350 Initial subarea total flow distance = 65.000(Ft.) Highest elevation = 338.000(Ft.) Lowest elevation = 317.200(Ft.) Elevation difference = 20.800(Ft.) Slope = 32.000 % Top of Initial Area Slope adjusted by User to 30.000 % INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 100.00 (Ft) for the top area slope value of 30.00 %, in a development type of 17 I Permanent Open Space In Accordance With Figure 3-3 Initial Area Time of Concentration = 4.34 minutes I TC = [1.8*(1.1_C)*distance(Ft.).5)/(% slope"(1/31] TC = [1.8*(1.1_0.3500)*( 100.000".5)/( 30.000'(1/3)1= 4.34 Rainfall intensity (I) = 8.077(In/I-Ir) for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.350 I Subarea runoff = 0.141(CFS) Total initial stream area = 0.050(Ac.) ++-I-++++++++++++++++++++++++++++++++++++++++++++++{.++++++++++++++++++++ Process from Point/Station 101.000 to Point/Station 102.000 IMPROVED CHANNEL TRAVEL TIME 1 Upstream point elevation = 317.200(Ft.) Downstream point elevation = 305.400 (Ft.) Channel length thru subarea = 770.000 (Ft.) I Channel base width = 0.000(Ft.) Slope or Z' of left channel bank = 1.000 Slope or 'Z of right channel bank = 1.000 I Estimated mean flow rate at midpoint of channel = 0.889(CFS) Manning's 'N = 0.015 Maximum depth of channel = 1.000 (Ft.) Flow(q) thru subarea = 0.889(CFS) I Depth of flow = 0.485(Ft.), Average velocity = 3.784(Ft/s) Channel flow top width = 0.969 (Ft.) Flow Velocity = 3.78(Ft/s) I Travel time = 3.39 mm. Time of concentration = 7.74 mm. Critical depth = 0.547(Ft.) Adding area flow to channel I Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 I [UNDISTURBED NATURAL TERRAIN (Permanent Open Space Impervious value, Ai = 0.000 I Sub-Area C Value = 0.350 Rainfall intensity = 5.567(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.350 CA = 0.277 I Subarea runoff = 1. 398(CFS) for 0.740 (Ac.) Total runoff = 1.539(CFS) Total area = 0.790(Ac.) Depth of flow = 0.596(Ft.), Average velocity = 4.340(Ft/s) Critical depth = 0.680(Ft.) ++++++++++++++++++.+++++++++++++++++++++++++++++++++++++++++++++++++++ I Prccess from Point/Station 102.000 to Point/Station 103.000 PIPEFLOW TRAVEL TIME (User specified size) I Upstream point/station elevation = 290.500 (Ft.) Downstream point/station elevation = 278.220 (Ft.) Pipe length = 103.40 (Ft.) Manning's N = 0.013 No. of pipes = 1 Required pipe flow = 1.539(CFS) 18 Given pipe size = 12.00(In.) Calculated individual pipe flow = 1.539(CFS) Normal flow depth in pipe = 2.87 (In.) Flow top width inside pipe = 10.24(In.) Critical Depth = 6.31(In.) Pipe flow velocity = 10.68(Ft/s) Travel time through pipe = 0.16 mm. Time of concentration (TC) = 7.90 mm. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++-+++++++++ Process from Point/Station 102.000 to Point/Station 103.000 CONFLUENCE OF MAIN STREAMS **** I The following data inside Main Stream is listed: In Main Stream number: 1 Stream flow area = 0.790(Ac.) Runoff from this stream = 1.539(CFS) I Time of concentration = 7.90 mm. Rainfall intensity = 5.493(In/Hr) Program is now starting with Main Stream No. 2 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 104.000 to Point/Station 105.000 INITIAL AREA EVALUATION Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 I Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 [UNDISTURBED NATURAL TERRAIN (Permanent Open Space I Impervious value, Ai = 0.000 Sub-Area C Value = 0.350 Initial subarea total flow distance = 75.000 (Ft.) I Highest elevation = 294.500(Ft.) Lowest elevation = 292.000(Ft.) Elevation difference = 2.500(Ft.) Slope = 3.333 % INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: I The maximum overland flow distance is 100.00 (Ft) for the top area slope value of 3.33 %, in a development type of Permanent Open Space I In Accordance With Figure 3-3 Initial Area Time of Concentration = 9.04 minutes TC = [1.8*(1.1_C)*distance(Ft.).5)/(% slope"(1/3)} 'u = 1 1."(I.1-0.5500)( 100.000^.5)/( 3.333''(1/3)1 = 9.04 Rainfall intensity (I) = 5.036(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0,350 Subarea runoff = 0.106(CFS) To-:al initial stream area = 0.060(Ac.) I ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 105.000 to Point/Station 106.000 IMPROVED CHANNEL TRAVEL TIME I 19 I Upstream point elevation = 291.000(Ft.) Downstream point elevation = 288.500 (Ft.) Channel length thru subarea = 130.000 (Ft.) Channel base width = 0.000(Ft.) Slope or 'Z of left channel bank = 2.000 Slope or 'Z' of right channel bank = 2.000 Estimated mean flow rate at midpoint of channel = 0. 652 (CFS) Mannings 'N = 0.020 Maximum depth of channel = 1.000 (Ft.) Flow(q) thru subarea = 0.652(CFS) Depth of flow = 0.335(Ft.), Average velocity = 2.906 (Ft/s) Channel flow top width = 1.340 (Ft.) Flow Velocity = 2.91(Ft/s) Travel time = 0.75 mm. Time of concentration = 9.78 mm. Critical depth = 0.367 (Ft.) Adding area flow to channel Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 [UNDISTURBED NATURAL TERRAIN (Permanent Open Space Impervious value, Ai = 0.000 Sub-Area C Value = 0.350 Rainfall intensity = 4.785(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.350 CA = 0.238 Subarea runoff = 1.033(CFS) for 0.620(Ac.) Total runoff = 1.139(CFS) Total area = 0.680(Ac.) Depth of flow = 0.413(Ft.), Average velocity = 3.341(Ft/s) Critical depth = 0.457(Ft.) ++++++++++++-1-+++++.+++++++++++++++++++++++++++++++++++.++++++++++++++++ Process from Point/Station 105.000 to Point/Station 106.000 CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 2 in normal stream number 1 Stream flow area = 0.680(Ac.) Runoff from this stream = 1.139(CFS) Time of concentration = 9.78 mm. Rainfall intensity = 4.785(In/Hr) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 107.000 to Point/Station 108.000 INITIAL AREA EVALUATION **** Decimal fraction soil group A = 0.000 I Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group ID = 1.000 I [UNDISTURBED NATURAL TERRAIN (Permanent Open Space Impervious value, Ai = 0.000 Sub-Area C Value = 0.350 I i 20 I I I area I I Initial subarea total flow distance = 170.000(Ft.) Highest elevation = 294.500(Ft.) Lowest elevation = 290.100(Ft.) Elevation difference = 4.400(Ft.) Slope = 2.588 % INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 100.00 (Ft) for the top area slope value of 2.59 %, in a development type of Permanent Open Space In Accordance With Figure 3-3 Initial Area Time of Concentration = 9.83 minutes TC = [1.8*(1.1_C)*distance(Ft.).5)/(% slope(1/3)] TC = [1.8*(1.1_0.3500)*( 100.000".5)/( 2.588"(1/3)1= 9.83 The initial area total distance of 170.00 (Ft.) entered leaves a remaining distance of 70.00 (Ft.) Using Figure 3-4, the travel time for this distance is 0.84 minutes for a distance of 70.00 (Ft.) and a slope of 2.59 % with an elevation difference of 1.81(Ft.) from the end of the top Tt = [11.9*length(Mi)s3)/(elevation change(Ftj)].385 *60(min/hr) = 0.840 Minutes Tt=[(11.9*0.01333)/( 1.81)1.385= 0.84 Total initial area Ti = 9.83 minutes from Figure 3-3 formula plus 0.84 minutes from the Figure 3-4 formula = 10.67 minutes Rainfall intensity (I) = 4.524(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.350 Subarea runoff = 0.174(CFS) Total initial stream area = 0.110 (Ac.) ++++++++++++.++++++++++++++++.++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 108.000 to Point/Station 109.000 IMPROVED CHANNEL TRAVEL TIME Upstream point elevation = 290.100 (Ft.) Downstream point elevation = 289.000 (Ft.) Channel length thru subarea = 110.000 (Ft.) Channel base width = 0.000(Ft.) Slope or Z' of left channel bank = 2.000 Slope or Z' of right channel bank = 2.000 Estimated mean flow rate at midpoint of channel = 0. 815 (CFS) Manning's 'N = 0.020 Maximum depth of channel = 1.000 (Ft.) Flow(q) thru subarea = 0.815(CFS) Depth of flow = 0.412(Ft.), Average velocity = 2.405 (Ft/s) Channel flow top width = 1.647 (Ft.) Flow Velocity = 2.40 (Ft/s) Travel time = 0.76 mm. Time of concentration = 11.44 mm. Critical depth = 0.400(Ft.) Adding area flow to channel Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 [UNDISTURBED NATURAL TERRAIN (Permanent Open Space Impervious value, Ai = 0.000 21 Sub-Area C Value = 0.350 Rainfall intensity = 4.327(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0350 CA = 0.322 Subarea runoff = 1.219(CFS) for 0.810(Ac.) Total runoff = 1.393(CFS) Total area = 0.920(Ac.) Depth of flow = 0.503(Ft.), Average velocity = 2.749(Ft/s) Critical depth = 0.496(Ft.) ++++++++++++++.++-++++++++++++++++++++-I-+++++++++++++++++++++++++++++++ Process from Point/Station 108.000 to Point/Station 109.000 CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 2 in normal stream number 2 Stream flow area = 0.920(Ac.) Runoff from this stream = 1.393(CFS) Time of concentration = 11.44 mm. Rainfall intensity = 4.327(In/Hr) Summary of stream data: Stream Flow rate TC No. (CFS) (mm) 1 1.139 9.78 2 1.393 11.44 Qmax(1) = 1.000 * 1.000 * 1.000 * 0.856 * Qmax(2) = Rainfall Intensity (In/Hr) 4.785 4.327 1.139) + 1.393) + = 2.331 0.904 * 1.000 * 1.139) + 1.000 * 1.000 * 1.393) + = 2.423 Total of 2 streams to confluence: Flow rates before confluence point: 1.139 1.393 Maximum flow rates at confluence using above data: 2.331 2.423 Area of streams before confluence: 0.680 0.920 Results of confluence: Total flow rate = 2.423(CFS) Time of concentration = 11.435 mm. Effective stream area after confluence = 1.600 (Ac.) +++++++++++++++++ -'-++++++++++++++++++++++++++4++++++++++++++++++++++++. Process from Point/Station 110.000 to Point/Station 103.000 PIPEFLOW TRAVEL TIME (User specified size) Upstream point/station elevation = 281.000 (Ft.) Downstream point/station elevation = 278.220(Ft.) Pipe length = 245.10 (Ft.) Manning's N = 0.013 No. of pipes = 1 Required pipe flow = 2.423(CFS) Given pipe size = 18.00 (In.) Calculated individual pipe flow = 2.423(CFS) 22 Normal flow depth in pipe = 5.69(In.) Flow top width inside pipe = 16.74(In.) Critical Depth = 7.06(In.) Pipe flow velocity = 5.06 (Ft/s) Travel time through pipe = 0.81 mm. Time of concentration (TC) = 12.24 mm. Process from Point/Station 110.000 to Point/Station 103.000 CONFLUENCE OF MAIN STREAMS **** The following data inside Main Stream is listed: In Main Stream number: 2 Stream flow area = 1.600(Ac.) Runoff from this stream = 2.423(CFS) Time of concentration = 12.24 mm. Rainfall intensity = 4.140(In/Hr) Summary of stream data: Stream Flow rate TC Rainfall Intensity No. (CFS) (mm) (In/Hr) 1 1.539 7.90 5.493 2 2.423 12.24 4.140 Qmax(l) = 1.000 * 1.000 * 1.539) + 1.000 * 0.645 * 2.423) + = 3.102 Qmax(2) = 0.754 * 1.000 * 1.539) + 1.000 * 1.000 * 2.423) + = 3.583 Toa1 of 2 main streams to confluence: Flow rates before confluence point: 1.539 2.423 Maximum flow rates at confluence using above data: - 3.102 3.583 Area of streams before confluence: 1 0.790 1.600 Results of confluence: Total flow rate = 3.583(CFS) Time of concentration = 12.243 mm. Effective stream area after confluence = 2.390(Ac.) +++++++++++++++++++++++++++++++++++++++++++++++++++++.++++++++++++++++ Process from Point/Station 103.000 to Point/Station 111.000 PIPEFLOW TRAVEL TIME (User specified size) Upstream point/station elevation = 277.890 (Ft.) Downstream point/station elevation = 276.650(Ft.) Pipe length = 7.80 (Ft.) Mannings N = 0.013 Im No. of pipes = 1 Required pipe flow = 3.583(CFS) Given pipe size = 18.00(In.) - 23 Calculated individual pipe flow = 3.583(CFS) Normal flow depth in pipe = 3.56(In.) Flow top width inside pipe = 14.34(In.) Critical Depth = 8.68(In.) Pipe flow velocity = 14.48 (Ft/s) Travel time through pipe = 0.01 mm. Time of concentration (TC) = 12.25 mm. End of computations, total study area = 2.390 (Ac.) I H I 24 I San Diego County Rational Hydrology Program I CIVILCADD/CIVILDESIGN Engineering Software, (c)1991-2004 Version 7.4 Rational method hydrology program based on I San Diego County Flood Control Division 2003 hydrology manual Rational Hydrology Study Date: 01/04/12 ----------------------------------------------------------------------- I 100 Year Storm Hydrology Calculations LCTS-Office Pad Grading- Basin B Calculations By: NF I I: \001017\_Office\Stormwater\Drainage\1090kgb.out Hydrology Study Control Information ********** Program License Serial Number 5007 Rational hydrology study storm event year is 100.0 English (in-lb) input data Units used Mao data precipitation entered: 6 hour, precipitation(inches) = 2.800 24 hour precipitation(inches) = 5.100 P6/P24 = 54.9% San Diego hydrology manual 'C' values used +++++++++++++++++ ±++++++++++.+++++++++++++++++++++++++++++++++++++++++ I Process from Point/Station 104.000 to Point/Station 201.000 INITIAL AREA EVALUATION **** I Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 [UNDISTURBED NATURAL TERRAIN I (Permanent Open Space Impervious value, Ai = 0.000 Sub-Area C Value = 0.350 I Initial subarea total flow distance = 85.000 (Ft.) Highest elevation = 294.500(Ft.) Lowest elevation = 291.300(Ft.) Elevation difference = 3.200(Ft.) Slope = 3.765 % I Top of Initial Area Slope adjusted by User to 2.000 % INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: I i 25 The maximum overland flow distance is 85.00 (Ft) for the top area slope value of 2.00 %, in a development type of Permanent Open Space In Accordance With Figure 3-3 Initial Area Time of Concentration = 9.88 minutes TC = [1.8*(1.1_C)*distance(Ftj.5)/(% slope"(1/3)) TC = [1.8*(1.1_0.3500)*( 85.000".5)/( 2.000"(1/3)1= 9.88 Rainfall intensity (I) = 4.755(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.350 Subarea runoff = 0.150 (CFS) Total initial stream area = 0.090 (Ac.) +++++++++++++++++++++++++++++++++++++++++++++++++.++++++++++++++++++++ Process from Point/Station 201.000 to Point/Station 202.000 IMPROVED CHANNEL TRAVEL TIME Upstream point elevation = 291.300(Ft.) Downstream point elevation = 290.300 (Ft.) Channel length thru subarea = 95.000 (Ft.) Channel base width = 0.000(Ft.) Slope or 'Z of left channel bank = 2.000 Slope or Z of right channel bank = 2.000 Estimated mean flow rate at midpoint of channel = 0.666(CFS) Mannings N = 0.020 Maximum depth of channel = 1.000(Ft.) Flow(q) thru subarea = 0.666(CFS) Depth of flow = 0.378(Ft.), Average velocity = 2.330(Ft/s) Channel flow top width = 1.512 (Ft.) Flow Velocity = 2.33(Ft/s) Travel time = 0.68 mm. Time of concentration = 10.56 mm. Critical depth = 0.369 (Ft.) Adding area flow to channel Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 [UNDISTURBED NATURAL TERRAIN I (Permanent Open Space Impervious value, Ai = 0.000 Sub-Area C Value = 0.350 Rainfall intensity = 4.555(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.350 CA = 0.249 Subarea runoff = 0.982(CFS) for 0.620(Ac.) Total runoff = 1.132(CFS) Total area = 0.710(Ac.) Depth of flow = 0.461(Ft.), Average velocity = 2.661(Ft/s) Critical depth = 0.457(Ft.) Process from Point/Station 201.000 to Point/Station 202.000 CONFLUENCE OF MAIN STREAMS **** The following data inside Main Stream is listed: In Main Stream number: 1 26 Stream flow area = 0.710(Ac.) Runoff from this stream = 1.132(CFS) Time of concentration = 10.56 mm. Rainfall intensity = 4.555(In/Hr) Program is now starting with Main Stream No. 2 ++++++++++++++++++++++++++++++++++++++-f-++++++++++-f-++++++++++++++++++++ Process from Point/Station 203.000 to Point/Station 204.000 INITIAL AREA EVALUATION Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 [UNDISTURBED NATURAL TERRAIN (Permanent Open Space Impervious value, Ai = 0.000 Sub-Area C Value = 0.350 Initial subarea total flow distance = 220.000(Ft.) Highest elevation = 298.500(Ft.) Lowest elevation = 293.300(Ft.) Elevation difference = 5.200(Ft.) Slope = 2.364 % INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 85.00 (Ft) for the top area slope value of 2.36 %, in a development type of Permanent Open Space In Accordance With Figure 3-3 Initial Area Time of Concentration = 934 minutes TC = [1.8*(1.1C)*distance(Ft.).5)/(% slope'(1/3)] TC= [1.8*(1.1_0.3500)*( 85.000".5)/( 2.364(1/3)]= 9.34 The initial area total distance of 220.00 (Ft.) entered leaves a remaining distance of 135.00 (Ft.) Using Figure 3-4, the travel time for this distance is 1.44 minutes for a distance of 135.00 (Ft.) and a slope of 2.36 % with an elevation difference of 3.19(Ft.) from the end of the top Tt = [11.9*length(Mi)3)/ (elevation change(Ft.) ) ]".385 *60(min/hr) = 1.442 Minutes Tt=[(11.9*0.02563)/( 3.19)]'.385= 1.44 Total initial area Ti = 9.34 minutes from Figure 3-3 formula plus 1.44 minutes from the Figure 3-4 formula = 10.79 minutes Rainfall intensity (I) = 4.493(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.350 Subarea runoff = 0.283(CFS) Total initial stream area = 0.180 (Ac.) +++++++++++++++++-I-++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 204.000 to Point/Station 205.000 IMPROVED CHANNEL TRAVEL TIME Upstream point elevation = 293.300 (Ft.) Downstream point elevation = 290.630(Ft.) Channel length thru subarea = 207.000(Ft.) Channel base width = 0.000(Ft.) Slope or 'Z of left channel bank = 2.000 area 27 Slope or 'Z' of right channel bank = 2.000 Estimated mean flow rate at midpoint of channel = 1.422(CFS) Manning's 'N' = 0.020 Maximum depth of channel = 1.000(Ft.) Flow(q) thru subarea = 1.422(CFS) Depth of flow = 0.484(Ft.), Average velocity = 3.040(Ft/s) Channel flow top width = 1.934(Ft.) Flow Velocity = 3.04 (Ft/s) Travel time = 1.13 mm. Time of concentration = 11.92 mm. Critical depth = 0.500(Ft.) Adding area flow to channel Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 [UNDISTURBED NATURAL TERRAIN I (Permanent Open Space Impervious value, Ai = 0.000 Sub-Area C Value = 0.350 Rainfall intensity = 4.212(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.350 CA = 0.588 Subarea runoff = 2.194(CFS) for 1.500 (Ac.) Total runoff = 2.477(CFS) Total area = 1.680(Ac.) Depth of flow = 0.595(Ft.), Average velocity = 3.493(Ft/s) Critical depth = 0.625(Ft.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 204.000 to Point/Station 205.000 CONFLUENCE OF MAIN STREAMS **** The following data inside Main Stream is listed: In Main Stream number: 2 Stream flow area = 1.680(Ac.) Runoff from this stream = 2.477(CFS) Time of concentration = 11.92 mm. Rainfall intensity = 4.212(In/Hr) Summary of stream data: Stream Flow rate TC Rainfall Intensity No. (CFS) (mm) (In/Hr) 1 1.132 10.56 4.555 2 2.477 11.92 4.212 Qmax(l) = 1.000 * 1.000 * 1.132) + 1.000 * 0.886 * 2.477) + = 3.326 Qmax(2) = 0.925 * 1.000 * 1.132) + 1.000 * 1.000 * 2.477) + = 3.524 Total of 2 main streams to confluence: Flow rates before confluence point: 1.132 2.477 Maximum flow rates at confluence using above data: 3.326 3.524 Area of streams before confluence: 0.710 1.680 Results of confluence: Total flow rate = 3.524(CFS) Time of concentration = 11.920 mm. Effective stream area after confluence = 2.390(Ac.) ++++++++++++++++.+++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 206.000 to Point/Station 207.000 'k'kk PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation = 282.900 (Ft.) Downstream point/station elevation = 279.370 (Ft.) Pipe length = 320.80 (Ft.) Manning's N = 0.013 No. of pipes = 1 Required pipe flow = 3.524(CFS) Given pipe size = 18.00(In.) Calculated individual pipe flow = 3.524(CFS) Normal flow depth in pipe = 7.00(In.) Flow top width inside pipe = 17.55(In.) Critical Depth = 8.59(In.) Pipe flow velocity = 5.55 (Ft/s) Travel time through pipe = 0.96 mm. Time of concentration (TC) = 12.88 mm. Process from Point/Station 207.000 to Point/Station 208.000 PIPEFLOW TRAVEL TIME (User specified size) Upstream point/station elevation = 279.020 (Ft.) Downstream point/station elevation = 258.500(Ft.) Pipe length = 64.40(Ft.) Manning's N = 0.013 No. of pipes = 1 Required pipe flow = 3.524(CFS) Given pipe size = 18.00(In.) Calculated individual pipe flow = 3.524(CFS) Normal flow depth in pipe = 2.98(In.) Flow top width inside pipe = 13.37(In.) Critical Depth = 8.59(In.) Pipe flow velocity = 18.40 (Ft/s) Travel time through pipe = 0.06 mm. Time of concentration (TC) = 12.94 mm. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 207.000 to Point/Station 208.000 CONFLUENCE OF MAIN STREAMS **** The following data inside Main Stream is listed: In Main Stream number: 1 Stream flow area = 2.390(Ac.) Runoff from this stream = 3.524(CFS) Time of concentration = 12.94 mm. 29 R Rainfall intensity = 3.995(In/Hr) Program is now starting with Main Stream No. 2 +++++++++++++++++++++++-I-++++++++++++++++++++++++++++++++++++1.+++++++++ Process from Point/Station 105.000 to Point/Station 209.000 kk INITIAL AREA EVALUATION **** Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 [UNDISTURBED NATURAL TERRAIN (Permanent Open Space Impervious value, Ai = 0.000 Sub-Area C Value = 0.350 Initial subarea tctal flow distance = 95.000(Ft.) Highest elevation = 292.000(Ft.) Lowest elevation = 287.400(Ft.) Elevation difference = 4.600(Ft.) Slope = 4.842 % INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 100.00 (Ft) for the top area slope value of 4.84 %, in a development type of Permanent Open Space In Accordance With Figure 3-3 Initial Area Time of Concentration = 7.98 minutes TC = [1.8*(1.1C)*distance(Ft.).5)/(% s1ope'(1/3] TC= [1.8*(1.1_0.3500)*( 100.000'.5)/( 4.842"(1/3)]= 7.98 Rainfall intensity (I) = 5.457(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.350 Subarea runoff = 0.172(CFS) Total initial stream area = 0.090 (Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++_+++++++++ Process from Point/Station 209.000 to Point/Station 210.000 IMPROVED CHANNEL TRAVEL TIME Upstream point elevation = 287.400 (Ft.) Downstream point elevation = 277.000 (Ft.) Channel length thru subarea = 110.000(Ft.) Channel base width = 0.000 (Ft.) Slope or 'Z' of left channel bank = 2.000 Slope or 'Z' of right channel bank = 2.000 Estimated mean flow rate at midpoint of channel = 0.535 (CFS) Manning's 'N' = 0.020 Maximum depth of channel = 1.000 (Ft.) Flow(q) thru subarea = 0.535(CFS) Depth of flow = 0.231(Ft.), Average velocity = 5.025 (Ft/s) Channel flow top width = 0.923 (Ft.) Flow Velocity = 5.03 (Ft/s) Travel time = 0.36 mm. - Time of concentration = 8.34 mm. Critical depth = 0.338 (Ft.) Adding area flow to channel User specified 'C' value of 0.350 given for subarea Rainfall intensity = 5.302(In/Hr) for a 100.0 year storm 30 I Effective runoff coefficient used for total area (Q=KCIA) is C = 0.350 CA = 0.164 Subarea runoff = 0.700(CFS) for 0.380 (Ac.) I Total runoff = 0.872(CFS) Total area = 0.470(Ac.) Depth of flow = 0.277(Ft.), Average velocity = 5.679(Ft/s) Critical depth = 0.410(Ft.) I Prccess from Point/Station 209.000 to Point/Station 210.000 I CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 2 in normal stream number 1 Stream flow area = 0.470 (Ac.) I Runoff from this stream = 0.872(CFS) Time of concentration = 8.34 mm. Rainfall intensity = 5.302(In/Hr) +++++++++++++++++++++++++++++++++++++++++++++++++++++++++4++++++++++++ Process from Point/Station 210.100 to Point/Station 210.200 INITIAL AREA EVALUATION **** Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 [UNDISTURBED NATURAL TERRAIN (Permanent Open Space Impervious value, Ai = 0.000 Sub-Area C Value = 0.350 Initial subarea total flow distance = 57.000(Ft.) Highest elevation = 291.600(Ft.) Lowest elevation = 278.300(Ft.) Elevation difference = 13.300(Ft.) Slope = 23.333 % Top of Initial Area Slope adjusted by User to 30.000 % INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 100.00 (Ft) for the top area slope value of 30.00 %, in a development type of Permanent Open Space In Accordance With Figure 3-3 Initial Area Time of Concentration = 4.34 minutes TC = [1.8*(1.1_C)*distance(Ft.).5)/(% slope"(1/3)] TC = [1.8*(1.1_0.3500)*( 100.000".5)/( 30.000"(1/3)1= 4.34 Rainfall intensity (I) = 8.077(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.350 Subarea runoff = 0.085(CFS) Total initial stream area = 0.030(Ac.) Process from Point/Station 210.200 to Point/Station 210.300 IMPROVED CHANNEL TRAVEL TIME ?k Upstream point elevation = 278.000 (Ft.) Downstream point elevation = 272.500 (Ft.) Channel length thru subarea = 277.000 (Ft.) 31 I I Li I I I I Li I I 1 I Channel base width = 0.000(Ft.) Slope or 'Z' of left channel bank = 8.000 Slope or 'Z' of right channel bank = 8.000 Estimated mean flow rate at midpoint of channel = 0.333(CFS) Manning's 'N' = 0.015 Maximum depth of channel = 0.170 (Ft.) Flow(q) thru subarea = 0.333(CFS) Depth of flow = 0.135(Ft.), Average velocity = 2.297(Ft/s) Channel flow top width = 2.153 (Ft.) Flow Velocity = 2.30(Ft/s) Travel time = 2.01 mm. Time of concentration = 6.35 mm. Critical depth = 0.160(Ft.) Adding area flow to channel Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 [UNDISTURBED NATURAL TERRAIN (Permanent Open Space Impervious value, Ai = 0.000 Sub-Area C Value = 0.350 Rainfall intensity = 6.321(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.350 CA = 0.080 Subarea runoff = 0.424(CFS) for 0.200(Ac.) Total runoff = 0.509(CFS) Total area = 0.230(Ac.) Depth of flow = 0.158(Ft.), Average velocity = 2.555(Ft/s) Critical depth = 0.188(Ft.) Process from Point/Station 210.200 to Point/Station 210.300 CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 2 in normal stream number 2 Stream flow area = 0.230(Ac.) Runoff from this stream = 0.509(CFS) Time of concentration = 6.35 mm. Rainfall intensity = 6.321(In/Hr) Summary of stream data: Stream Flow rate TC Rainfall Intensity No. (CFS) (mm) (In/Hr) 1 0.872 8.34 5.302 2 0.509 6.35 6.321 Qmax(l) = 1.000 * 1.000 * 0.872) + 0.839 * 1.000 * 0.509) + = 1.299 Qmax(2) = 1.000 * 0.761 * 0.872) + 1.000 * 1.000 * 0.509) + = 1.173 Total of 2 streams to confluence: Flow rates before confluence point: 32 0.872 0.509 Maximum flow rates at confluence using above data: 1.299 1.173 Area of streams before confluence: 0.470 0.230 Results of confluence: Total flow rate = 1.299(CFS) Time of concentration = 8.345 mm. Effective stream area after confluence = 0.700(Ac.) +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++f++++++++ Process from Point/Station 210.000 to Point/Station 211.000 PIPEFLOW TRAVEL TIME (User specified size) kk Upstream point/station elevation = 266.500(Ft.) Downstream point/station elevation = 265.900 (Ft.) Pipe length = 80.50(Ft.) Mannings N = 0.013 No. of pipes = 1 Required pipe flow = 1.299(CFS) Given pipe size = 12.00(In.) Calculated individual pipe flow = 1.299(CFS) Normal flow depth in pipe = 5.44(In.) Flow top width inside pipe = 11.95(In.) Critical Depth = 5.78(In.) Pipe flow velocity = 3.75(Ft/s) Travel time through pipe = 0.36 mm. Time of concentration (TC) = 8.70 mm. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 211.000 to Point/Station 212.000 IMPROVED CHANNEL TRAVEL TIME **** Upstream point elevation = 265.900 (Ft.) Downstream point elevation = 262.400 (Ft.) Channel length thru subarea = 230.000 (Ft.) Channel base width = 6.000 (Ft.) Slope or Z of left channel bank = 2.000 Slope or Z' of right channel bank = 2.000 Estimated mean flow rate at midpoint of channel = 1.619 (CFS) Mannings N = 0.035 Maximum depth of channel = 1.000 (Ft.) Flow(q) thru subarea = 1.619(CFS) Depth of flow = 0.167(Ft.), Average velocity = 1.526 (Ft/s) Channel flow top width = 6.670(Ft.) Flow Velocity = 1.53 (Ft/s) Travel time = 2.51 mm. Time of concentration = 11.21 mm. Critical depth = 0.129(Ft.) Adding area flow to channel Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 [UNDISTURBED NATURAL TERRAIN (Permanent Open Space Impervious value, Ai = 0.000 33 Sub-Area C Value = 0.350 RaLnfall intensity = 4.381(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.350 CA = 0.430 Subarea runoff = 0.587 (CFS) for 0.530 (Ac.) Total runoff = I 1.886(CFS) Total area = 1.230(Ac.) Depth of flow = 0.183(Ft.), Average velocity = 1.615(Ft/s) Crtical depth = 0.143(Ft.) + + - + + + + + + + + + +,+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + Process from Point/Station 212.000 to Point/Station 208.000 PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation = 259.400 (Ft.) Downstream point/station elevation = 258.500(Ft.) Pipe length = 167.30 (Ft.) Manning's N = 0.013 No.. of pipes = 1 Required pipe flow = 1.886(CFS) Given pipe size = 18.00(In.) Calculated individual pipe flow = 1.886(CFS) Normal flow depth in pipe = 6.06(In.) Flow top width inside pipe = 17.02 (In.) Critical Depth = 6.20(In.) Pipe flow velocity. = 3.60 (Ft/s) Travel time through pipe = 0.77 mm. Time of concentration (TC) = 11.99 mm. ++-+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 212.000 to Point/Station 208.000 CONFLUENCE OF MAIN STREAMS **** The following data inside Main Stream is listed: In Main Stream number: 2 Stream flow area = 1.230 (Ac.) Runoff from this stream = 1.886(CFS) Time of concentration = 11.99 mm. Rainfall intensity = 4.197(In/Hr) Summary of stream data: Stream Flow rate TC No. (CFS) (mm) 1 3.524 12.94 2 1.886 11.99 Qmax(l) = 1.000 * 1.000 * 0.952 * 1.000 * Qmax (2) Rainfall Intensity (In/Hr) 3.995 4.197 3.524) + 1.886) + = 5.319 1.000 * 0.926 * 3.524) + 1.000 * 1.000 * 1.886) + = 5.150 Total of 2 main streams to confluence: Flow rates before confluence point: 3.524 1.886 Maximum flow rates at confluence using above data: 34 I 5.319 5.150 Area of streams before confluence: 2.390 1.230 Results of confluence: Total flow rate = 5.319(CFS) Time of concentration = 12.943 mm. Effective stream area after confluence = 3.620(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 208.000 to Point/Station 213.000 PIPEFLOW TRAVEL TIME (User specified size) "'' Upstream point/station elevation = 258.500(Ft.) Downstream point/station elevation = 257.500 (Ft.) Pipe length = 95.80 (Ft.) Manning's N = 0.013 No. of pipes = 1 Required pipe flow = 5.319(CFS) Given pipe size = 18.00(In.) Calculated individual pipe flow = 5.319(CFS) Normal flow depth in pipe = 8.95(In.) Flow top width inside pipe = 18.00(In.) Critical Depth = 10.66(In.) Pipe flow velocity = 6.06 (Ft/s) Travel time through pipe = 0.26 mm. Time of concentration (TC) = 13.21 mm. +++ ................................................................... Process from Point/Station 213.000 to Point/Station 213.000 SUBAREA FLOW ADDITION **** Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 [UNDISTURBED NATURAL TERRAIN (Permanent Open Space Impervious value, Ai = 0.000 Sub-Area C Value = 0.350 Time of concentration = 13.21 mm. Rainfall intensity = 3.943(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.350 CA = 1.365 Subarea runoff = 0.063(CFS) for 0.280 (Ac.) Total runoff = 5.382(CFS) Total area = 3.900(Ac.) End of computations, total study area = 3.900 (Ac.) I I I 35 APPENDIX 3 100 Yr. Ultimate Hydrologic Calculations (General Commercial C Value) (See Exhibit 'K') I I I I I I I I I 36 San Diego County Rational Hydrology Program CIVILCADD/CIVILDESIGN Engineering Software, (c)1991-2004 Version 7.4 Rational method hydrology program based on San Diego County Flood Control Division 2003 hydrology manual Rational Hydrology Study Date: 12/30/11 ----------------------------------------------------------------------- 100 Year Storm Hydrology Calculations LCTS-Office Ultimate Conditions- Basin A (General Commercial C Value) Calculations By: NF 12/30/2011 I:\001017\—Office\Stormwater\Drainage\1090kua.out ----------------------------------------------------------------------- Hydrology Study Control Information Program License Serial Number 5007 Raional hydrology study storm event year is 100.0 English (in-lb) input data Units used Map data precipitation entered: 6 hour, precipitation(inches) = 2.800 24 hour precipitation(inches) = 5.100 P6/P24 = 54.9% San Diego hydrology manual 'C' values used +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++-1++++++++ Process from Point/Station 100.000 to Point/Station 101.000 INITIAL AREA EVALUATION **** Decimal fraction soil group A = 0.000 Decimalfraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 [UNDISTURBED NATURAL TERRAIN (Permanent Open Space Impervious value, Ai = 0.000 Sub-Area C Value = 0.350 Initial subarea total flow distance = 65.000 (Ft.) Highest elevation = 338.000(Ft.) Lowest elevation = 317.200(Ft.) Elevation difference = 20.800(Ft.) Slope = 32.000 % L 37 I Top of Initial Area Slope adjusted by User to 30.000 % INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 100.00 (Ft) for the top area slope value of 30.00 %, in a development type of Permanent Open Space In Accordance With Figure 3-3 Initial Area Time of Concentration = 4.34 minutes TC = [1.8*(1.1_C)*distance(Ft.).5)/(% s1ope(1/3)] TC = [1.8*(l.1_0.3500)*( 100.000".5)/( 30.000"(1/3)1= 4.34 Rainfall intensity (I) = 8.077(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.350 Subarea runoff = 0.141(CFS) Total initial stream area = 0.050(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++1+++ Process from Point/Station 101.000 to Point/Station 102.000 **** IMPROVED CHANNEL TRAVEL TIME Upstream point elevation = 317.200 (Ft.) Downstream point elevation = 305.400 (Ft.) Channel length thru subarea = 770.000(Ft.) Channel base width = 0.000 (Ft.) Slope or 'Z of left channel bank = 1.000 Slope or Z' of right channel bank = 1.000 Estimated mean flow rate at midpoint of channel = 0.889(CFS) Manning's 'N' = 0.015 Maximum depth of channel = 1.000(Ft.) Flow(q) thru subarea = 0.889(CFS) Depth of flow = 0.485(Ft.), Average velocity = 3.784(Ft/s) Channel flow top width = 0.969 (Ft.) Flow Velocity = 3.78(Ft/s) Travel time = 3.39 mm. Time of concentration = 7.74 mm. Critical depth = 0.547(Ft.) Adding area flow to channel Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 [UNDISTURBED NATURAL TERRAIN I (Permanent Open Space Impervious value, Ai = 0.000 Sub-Area C Value = 0.350 Rainfall intensity = 5.567(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.350 CA = 0.277 Subarea runoff = 1.398(CFS) for 0.740(Ac.) Total runoff = 1.539(CFS) Total area = 0.790(Ac.) Depth of flow = D.596(Ft.), Average velocity = 4.340(Ft/s) Critical depth = 0.680(Ft.) Prccess from Point/Station 102.000 to Point/Station 103.000 PIPEFLOW TRAVEL TIME (User specified size) kk IN Upstream point/station elevation = 290.500(Ft.) Downstream point/station elevation = 278.220(Ft.) Pipe length = 103.40 (Ft.) Manning's N = 0.013 No. of pipes = 1 Required pipe flow = 1.539(CFS) Given pipe size = 12.00 (In.) Calculated individual pipe flow = 1.539(CFS) Normal flow depth in pipe = 2.87(In.) Flow top width inside pipe = 10.24(In.) Critical Depth = 6.31(In.) Pipe flow velocity = 10.68(Ft/s) Travel time through pipe = 0.16 mm. Time of concentration (TC) = 7.90 mm. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 102.000 to Point/Station 103.000 CONFLUENCE OF MAIN STREAMS **** The following data inside Main Stream is listed: In Main Stream number: 1 Stream flow area = 0.790 (Ac.) Runoff from this stream = 1.539(CFS) Time of concentration = 7.90 mm. Rainfall intensity = 5.493 (In/Br) Program is now starting with Main Stream No. 2 Process from Point/Station 104.000 to Point/Station 105.000 k INITIAL AREA EVALUATION **** Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 [COMMERCIAL area type (General Commercial Impervious value, Ai = 0.850 Sub-Area C Value = 0.820 Initial subarea total flow distance = 75.000 (Ft.) Highest elevation = 294.500(Ft.) Lowest elevation = 292.000(Ft.) Elevation difference = 2.500(Ft.) Slope = 3.333 % INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 85.00 (Ft) for the top area slope value of 3.33 %, in a development type of General Commercial In Accordance With Figure 3-3 Initial Area Time of Concentration = 3.11 minutes TC = [1.8*(1.1_C)*distance(Ft.).5)/(% slope'(1/3)] TC = [1.8*(1.1_0.8200)*( 85.000".5)/( 3.333"(1/3)]= 3.11 Rainfall intensity (I) = 10.019(In/I-Ir) for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.820 Subarea runoff = 0.493(CFS) Total initial stream area = 0.060 (Ac.) ow 39 I ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 105.000 to Point/Station 106.000 IMPROVED CHANNEL TRAVEL TIME Upstream point elevation = 291.000(Ft.) Downstream point elevation = 288.500(Ft.) Channel length thru subarea = 130.000 (Ft.) Channel base width = 0.000(Ft.) Slope or 'Z' of left channel bank 2.000 Slope or 'Z' of right channel bank = 2.000 Estimated mean flow rate at midpoint of channel = 2.810CFS) Manning's 'N' = 0.020 Maximum depth of channel = 1.000(Ft.) Flow(q) thru subarea = 2.810(CFS) Depth of flow = 0.579(Ft.), Average velocity = 4.187(Ft/s) Channel flow top width = 2.317 (Ft.) Flow Velocity = 4.19 (Ft/s) Travel time = 0.52 mm. Time of concentration = 3.63 mm. Critical depth = 0.656(Ft.) Adding area flow to channel Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 [COMMERCIAL area type (General Commercial Impervious value, Ai = 0.850 Sub-Area C Value = 0.820 Rainfall intensity = 9.073(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.820 CA = 0.558 Subarea runoff = 4.566(CFS) for 0.620(Ac.) Total runoff = 5.059(CFS) Total area = 0.680(Ac.) Depth of flow = 0.722(Ft.), Average velocity = 4.850(Ft/s) Critical depth = 0.832(Ft.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 105.000 to Point/Station 106.000 CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 2 in normal stream number 1 Stream flow area = 0.680 (Ac.) Runoff from this stream = 5.059(CFS) Time of concentra-ion = 3.63 mm. Rainfall intensity = 9.073(In/Hr) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++.+++ Process from Poin/Station 107.000 to Point/Station 108.000 kk INITIAL AREA EVALUATION **** Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 Im I I I I (COMMERCIAL area type (General Commercial Impervious value, Ai = 0.850 Sub-Area C Value = 0.820 Initial subarea total flow distance = 170.000(Ft.) Highest elevation = 294.500(Ft.) Lowest elevation = 290.100(Ft.) Elevation difference = 4.400(Ft.) Slope = 2.588 % INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 85.00 (Ft) for the top area slope value of 2.59 %, in a development type of General Commercial In Accordance With Figure 3-3 Initial Area Time of Concentration = 3.38 minutes TIC = [1.8*(1.1_C)*distance(Ft.).5)/(% slope'(1/3)] TC= [l.8*(1.1_0.8200)*( 85.000".5)/( 2.588"(1/3)1= 3.38 The initial area total distance of 170.00 (Ft.) entered leaves a remaining distance of 85.00 (Ft.) Using Figure 3-4, the travel time for this distance is 0.98 minutes for a distance of 85.00 (Ft.) and a slope of 2.59 % with an elevation difference of 2.20(Ft.) from the end of the top Tt =[11.9 *length (Mi )^3 )/(elevation change(Ft.) ) ].385 *60(mjn/hr) = 0.976 Minutes Tt=[(11.9*0.0161s3)/( 2.20)]".385= 0.98 Total initial area Ti = 3.38 minutes from Figure 3-3 formula plus 0.98 minutes frcm the Figure 3-4 formula = 4.36 minutes Rainfall intensity (I) = 8.059(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.820 Subarea runoff = 0.727(CFS) Total initial stream area = 0.110(Ac.) +++++++++++++++++++++++++++++++++++++++++++++-I-++++++++++++++++++++++++ Process from Point/Station 108.000 to Point/Station 109.000 IMPROVED CHANNEL TRAVEL TIME **** Upstream point elevation = 290.100 (Ft.) Downstream point elevation = 289.000 (Ft.) Channel length thru subarea = 110.000 (Ft.) Channel base width = 0.000 (Ft.) Slope or 'Z of left channel bank = 2.000 Slope or Z of right channel bank = 2.000 Esimated mean flow rate at midpoint of channel = 3.131(CFS) Manning's 'N' = 0.020 Maximum depth of channel = 1.000 (Ft.) Flow(q) thru subarea = 3.131(CFS) Depth of flow = 0.682(Ft.), Average velocity = 3.366(Ft/s) Channel flow top width = 2.728 (Ft.) Flow Velocity = 3.37(Ft/s) Travel time = 0.54 mm. Time of concentration = 4.90 mm. Critical depth = 0.688(Ft.) Adding area flow to channel Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 41 area Decimal fraction soil group D = 1.000 [COMMERCIAL area type I (Neighborhod Commercial Impervious value, Ai = 0.800 Sub-Area C Value = 0.790 Rainfall intensity = 7.469(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.794 CA = 0.730 Subarea runoff = 4.727(CFS) for 0.810(Ac.) Total runoff = 5.453(CFS) Total area = 0.920(Ac.) Depth of flow = D.840(Ft.), Average velocity = 3.867(Ft/s) Critical depth = 0.859(Ft.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 108.000 to Point/Station 109.000 CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 2 in normal stream number 2 Stream flow area = 0.920(Ac.) Runoff from this stream = 5.453(CFS) Time of concentration = 4.90 mm. Rainfall intensity = 7.469(In/Hr) Summary of stream data: Stream Flow rate TC Rainfall Intensity No. (CFS) (mm) (In/Hr) 1 5.059 3.63 9.073 2 5.453 4.90 7.469 Qmax(l) = 1.000 * 1.000 * 5.059) + 1.000 * 0.740 * 5•453) + = 9.093 Qmax(2) = 0.823 * 1.000 * 5.059) + 1.000 * 1.000 * 5.453) + = 9.618 Total of 2 streams to confluence: Flow rates before confluence point: 5.059 5.453 Maximum flow rates at confluence using above data: 9.093 9.618 Area of streams before confluence: 0.680 0.920 Results of confluence: To-:al flow rate = 9.618(CFS) Time of concentration = 4.905 mm. Effective stream area after confluence = 1.600(Ac.) ++++++++++++++++++++++++.+++++++++++++++++++++++++++++++++.+++++++++++ Process from Point/Station 110.000 to Point/Station 103.000 PIPEFLOW TRAVEL TIME (User specified size) Upstream point/station elevation = 281.000 (Ft.) Downstream point/station elevation = 278.220 (Ft.) 42 I I I I Li Pipe length = 245.10(Ft.) Manning's N = 0.013 No. of pipes = 1 Required pipe flow = 9.618(CFS) Given pipe size = 18.00(In.) Calculated individual pipe flow = 9.618(CFS) Normal flow depth in pipe = 12.87(In.) Flow top width inside pipe = 16.25(In.) Critical Depth = 14.36(In.) Pipe flow velocity = 7.12 (Ft/s) Travel time through pipe = 0.57 mm. Time of concentration (TC) = 5.48 mm. +++++++++++++.+++++++++++++++++++++++++++++++++++++++++++++++f++++++++ Process from Point/Station 110.000 to Point/Station 103.000 **** CONFLUENCE OF MAIN STREAMS **** The following data inside Main Stream is listed: In Main Stream number: 2 Stream flow area = 1.600 (Ac.) Runoff from this stream = 9.618(CFS) Time of concentration = 5.48 mm. Rainfall intensity = 6.955(In/Hr) Summary of stream data: Stream Flow rate TC Rainfall Intensity No. (CFS) (mm) (In/Hr) 1 1.539 7.90 5.493 2 9.618 5.48 6.955 Qmax(l) = 1.000 * 1.000 * 1.539) + 0.790.* 1.000 * 9.618) + = 9.136 Qmax(2) = 1.000 * 0.694 * 1.539) + 1.000 * 1.000 * 9.618) + = 10.686 Total of 2 main streams to confluence: Flow rates before confluence point: 1.539 9.618 Maximum flow rates at confluence using above data: 9.136 10.686 Area of streams before confluence: 0.790 1.600 Results of confluence: Total flow rate = 10.686(CFS) Time of concentration = 5.478 mm. Effective stream area after confluence = 2.390(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Prccess from Point/Station 103.000 to Point/Station 111.000 PIPEFLOW TRAVEL TIME (User specified size) Upstream point/station elevation = 277.890(Ft.) 43 Downstream point/station elevation = 276.650(Ft.) Pipe length = 7.80 (Ft.) Manning's N = 0.013 No. of pipes = 1 Required pipe flow = 10.686(CFS) Given pipe size = 18.00(In.) Calculated individual pipe flow = 10.686(CFS) Normal flow depth in pipe = 6.20(In.) Flow top width inside pipe = 17.11(In.) Critical Depth = 15.06(In.) Pipe flow velocity = 19.81(Ft/s) Travel time through pipe = 0.01 mm. Time of concentration (TC) = 5.48 mm. End of computations, total study area = 2.390 (Ac.) I I I I I IM San Diego County Rational Hydrology Program CIVILCADD/CIVILDESIGN Engineering Software, (C) 1991-2004 Version 7.4 Rational method hydrology program based on San Diego County Flood Control Division 2003 hydrology manual Rational Hydrology Study Date: 01/04/12 ----------------------------------------------------------------------- 100 Year Storm Hydrology Calculations LCTS-Office Ultimate Conditions- Basin B (Commercial C Value) Caculãtions By: NF I: \001017\Office\Stormwater\Drainage\1090kub.out ----------------------------------------------------------------------- Hydrology Study Control Information ----------------------------------------------------------------------- Program License Serial Number 5007 Rational hydrology study storm event year is 100.0 English (in-lb) input data Units used Map data precipitation entered: 6 hour, precipitation(inches) = 2.800 24 hour precipitation(inches) = 5.100 P6./P24 = 54.9% San Diego hydrology manual C values used ++++++-l-+++++++++++++++++++++++++++++++++++++++++++++++++++++++4+++++++ Process from Point/Station 104.000 to Point/Station 201.000 **k* INITIAL AREA EVALUATION **** Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 [COMMERCIAL area type (General Commercial ImDervious value, Ai = 0.850 Sub-Area C Value = 0.820 Initial subarea total flow distance = 85.000 (Ft.) Highest elevation = 294.500(Ft.) I Lowest elevation = 291.300(Ft.) Elevation difference = 3.200(Ft.) Slope = 3.765 % Top of Initial Area Slope adjusted by User to 2.000 % 45 I I I INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 75.00 (Ft) for the top area slope value of 2.00 %, in a development type of General Commercial In Accordance With Figure 3-3 Initial Area Time of Concentration = 3.46 minutes TC = [1.8*(1.1_C)*distance(Ft.).5)/(% slope"(1/3)] TC = Li. L.I-U.2UU)'( /5.000".5)/( 2.000(1/3)1= 3.46 Rainfall intensity (I) = 9.347(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.820 Subarea runoff = 0.690(CFS) Total initial stream area = 0.090(Ac.) Process from Point/Station 201.000 to Point/Station 202.000 IMPROVED CHANNEL TRAVEL TIME **** Upstream point elevation = 291.300 (Ft.) Downstream point elevation = 290.300 (Ft.) Channel length thru subarea = 95.000 (Ft.) Channel base width = 0.000(Ft.) Slope or Z of left channel bank = 2.000 Slope or 'Z of right channel bank = 2.000 Estimated mean flow rate at midpoint of channel = 2.808(CFS) Manning's 'N' = 0.020 Maximum depth of channel = 1.000 (Ft.) Flow(q) thru subarea = 2.808(CFS) Depth of flow = 0.648(Ft.), Average velocity = 3.340(Ft/s) Channel flow top width = 2.594(Ft.) Flow Velocity = 3.34(Ft/s) Travel time = 0.47 mm. Time of concentration = 3.94 mm. Critical depth = 0.656(Ft.) Adding area flow to channel Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 [COMMERCIAL area type (Neighborhod Commercial Impervious value, Ai = 0.800 Sub-Area C Value = 0.790 Rainfall intensity = 8.605(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.794 CA = 0.564 Subarea runoff = 4.160(CFS) for 0.620(Ac.) Total runoff = 4.850(CFS) Total area = 0.710(Ac.) Depth of flow = 0.796(Ft.), Average velocity = 3.828(Ft/s) Critical depth = 0.820(Ft.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 201.000 to Point/Station 202.000 CONFLUENCE OF MAIN STREAMS **** The following data inside Main Stream is listed: I I I I I In Main Stream number: 1 Stream flow area = 0.710(Ac.) Runoff from this stream = 4.850(CFS) Time of concentration = 3.94 mm. Rainfall intensity = 8.605(In/Hr) Program is now starting with Main Stream No. 2 +++++++++++++++++-+++++++++++++++++++++++++++++++++++++++++(++++++++++ Process from Point/Station 203.000 to Point/Station 204.000 INITIAL AREA EVALUATION **** Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 [COMMERCIAL area type (General Commercial Impervious value, Ai = 0.850 Sub-Area C Value = 0.820 Initial subarea total flow distance = 220.000(Ft.) Highest elevation = 298.500(Ft.) Lowest elevation = 293.300(Ft.) Elevation difference = 5.200(Ft.) Slope = 2.364 % INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 75.00 (Ft) for the top area slope value of 2.36 %, in a development type of General Commercial In Accordance With Figure 3-3 Initial Area Time of Concentration = 3.28 minutes TC = [1.8* (1.1-C) "distance(Ft.) .5) / (% slope" (1/3)] TC = [1.8*(1.1_0.8200)*( 75.000".5)/( 2.364"(1/3)1= 3.23 The initial area total distance of 220.00 (Ft.) entered leaves a remaining distance of 145.00 (Ft.) Using Figure 3-4, the travel time for this distance is 1.52 minutes for a distance of 145.00 (Ft.) and a slope of 2.36 % with an elevation difference of 3.43(Ft.) from the end of the top area Tt = (11.9*lengthMi)3)/(elevation change(Ft.))]".385 *60(min/hr) = 1.524 Minutes Tt=[ (ll.9*0.02753)/( 3.43)1'.385= 1.52 Total initial area Ti = 3.28 minutes from Figure 3-3 formula plus 1.52 minutes from the Figure 3-4 formula = 4.80 minutes Rainfall intensity (I) = 7.574(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.820 Subarea runoff = 1.118(CFS) Total initial stream area = 0.180 (Ac.) +++++++++++++++++_+++++++++++++++++++++++++++++++++++++++++++++++++.++ Process from Point/Station 204.000 to Point/Station 205.000 kk IMPROVED CHANNEL TRAVEL TIME **** Upstream point elevation = 293.300 (Ft.) Downstream point elevation = 290.630 (Ft.) - Channel length thru subarea = 207.000 (Ft.) Channel base width = 0.000 (Ft.) 47 Slope or 'Z' of left channel bank = 2.000 Slope or Z' of right channel bank = 2.000 Estimated mean flow rate at midpoint of channel = 5.306(CFS) Manning's 'N' = 0.020 Maximum depth of channel = 1.000 (Ft.) Flow(q) thru subarea = 5.306(CFS) Depth of flow = 0.792(Ft.), Average velocity = 4.226(Ft/s) Channel flow top width = 3.170(Ft.) Flow Velocity = 4.23 (Ft/s) Travel time = 0.82 mm. Time of concentration = 5.62 mm. Critical depth = 0.848(Ft.) Addirg area flow to channel Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 [COMMERCIAL area type (General Commercial Impervious value, Ai = 0.850 Sub-Area C Value = 0.820 Rainfall intensity = 6.844(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.820 CA = 1.378 Subarea runoff = 8.310(CFS) for 1.500(Ac.) Total runoff = 9.428(CFS) Total area = 1.680(Ac.) Depth of flow = 0.983(Ft.), Average velocity = 4.879(Ft/s) Critical depth = 1.055(Ft.) +++++++++++++++++++++++++++++++++++++++++++++++++++++1++++++++++++++++ Process from Point/Station 204.000 to Point/Station 205.000 CONFLUENCE OF MAIN STREAMS **** The following data inside Main Stream is listed: In Main Stream number: 2 Stream flow area = 1.680(Ac.) Runoff from this stream = 9.428(CFS) Time of concentration = 5.62 mm. Rainfall intensity = 6.844(In/Hr) Summary of stream data: Stream Flow rate TC Rainfall Intensity No. (CFS) (mm) (In/Hr) 1 4.850 3.94 8.605 2 9.428 5.62 6.844 Qmax(l) = 1.000 * 1.000 * 4.850) + 1.000 * 0.701 * 9.428) + = 11.460 Qmax(2) = 0.795 * 1.000 * 4.850) + 1.000 * 1.000 * 9.428) + = 13.285 Total of 2 main streams to confluence: Flow rates before confluence point: EM 4.850 9.428 Maximum flow rates at confluence using above data: 11.460 13.285 Area of streams before confluence: 0.710 1.680 Results of confluence: Total flow rate = 13.285(CFS) Time of concentration = 5.617 mm. Effective stream area after confluence = 2.390 (Ac.) ++++++++++++++++++++++++.++++++++++++++++++++++-+++++++++++++++++++++++ Process from Point/Station 206.000 to Point/Station 207.000 PIPEFLOW TRAVEL TIME (User specified size) kk Upstream point/station elevation = 282.900(Ft.) - Downstream point/station elevation = 279.370(Ft.) Pipe length = 320.80(Ft.) Manning's N = 0.013 No. of pipes = 1 Required pipe flow = 13.285(CFS) Given pipe size = 18.00(In.) NOTE: Normal flow is pressure flow in user selected pipe size. The approximate hydraulic grade line above the pipe invert is 2.916(Ft.) at the headworks or inlet of the pipe(s) Pipe friction loss = 5.130(Ft.) Minor friction loss = 1.316(Ft.) K-factor = 1.50 Pipe flow velocity = 7.52(Ft/s) Travel time through pipe = 0.71 mm. Time of concentration (TC) = 6.33 mm. +++++++++++++++++l++++++++++++++++++++++++++1+++++++++++++++++++++++++ Process from Point/Station 207.000 to Point/Station 208.000 " PIPEFLOW TRAVEL TIME (User specified size) Upstream point/station elevation = 279.020(Ft.) Downstream point/station elevation = 258.500 (Ft.) Pipe length = 64.40 (Ft.) Manning's N = 0.013 No. of pipes = 1 Required pipe flow = 13.285(CFS) Given pipe size = 18.00(In.) Calculated individual pipe flow = 13.285(CFS) Normal flow depth in pipe = 5.79(In.) Flow top width inside pipe = 16.82 (In.) Critical Depth = 16.33(In.) Pipe flow velocity = 27.05(Ft/s) Travel time through pipe = 0.04 mm. Time of concentration (TC) = 6.37 mm. +++++++++++++++++-++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 207.000 to Point/Station 208.000 CONFLUENCE OF MAIN STREAMS **** The following data inside Main Stream is listed: In Main Stream number: 1 Stream flow area = 2.390 (Ac.) Runoff from this stream = 13.285(CFS) Time of concentration = 6.37 mm. Rainfall intensity = 6.312(In/Hr) Program is now starting with Main Stream No. 2 Process from Point/Station 105.000 to Point/Station 209.000 INITIAL AREA EVALUATION **** Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 [COMMERCIAL area type (General Commercial Impervious value, Ai = 0.850 Sub-Area C Value = 0.820 Initial subarea total flow distance = 95.000 (Ft.) Highest elevation = 292.000(Ft.) Lowest elevation = 287.400(Ft.) Elevation difference = 4.600(Ft.) Slope = 4.842 % INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 90.00 (Ft) for the top area slope value of 4.84 %, in a development type of General Commercial In Accordance With Figure 3-3 Initial Area Time of Concentration = 2.83 minutes TC = [1.8*(1.1_C)*distance(Ft.).5)/(% slope' (l/3)] TC= [1.8*(1.1_0.8200)*( 90.000".5)/( 4.842'(1/3)1= 2.83 Rainfall intensity (I) = 10.659(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.820 Subarea runoff = 0.787(CFS) Total initial stream area = 0.090 (Ac.) ++++++++++++++++++++++++++++++++++-f+++++++++++++++++++++++++++++++++++ Process from Point/Station 209.000 to Point/Station 210.000 *k IMPROVED CHANNEL TRAVEL TIME Upstream point elevation = 287.400 (Ft.) Downstream point elevation = 277.000 (Ft.) Channel length thru subarea = 110.000 (Ft.) Channel base width = 0.000(Ft.) Slope or 'Z of left channel bank = 2.000 Slope or 'Z' of right channel bank = 2.000 Estimated mean flcw rate at midpoint of channel = 2 .365 (CFS) Manning's 'N = 0.020 Maximum depth of channel = 1.000(Ft.) Flow(q) thru subarea = 2.365(CFS) Depth of flow = 0.403(Ft.), Average velocity = 7.287 (Ft/s) Channel flow top width = 1.611 (Ft.) Flow Velocity = 7.29(Ft/s) Travel time = 0.25 mm. Time of concentration = 3.08 mm. - Critical depth = 0.613(Ft.) Adding area flow to channel 50 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 [COMMERCIAL area type (General Commercial Impervious value, Ai = 0.850 Sub-Area C Value = 0:820 Rainfall intensity = 10.088(In/Hr) for a 100.0 Effective runoff coefficient used for total area (Q=KCIA) is C = 0.820 CA = 0.385 Subarea runoff = 3.101(CFS) for 0.380 (Ac.) Total runoff = 3.888(CFS) Total area = Depth of flow = 0.485(Ft.), Average velocity = 8 Critical depth = 0.750(Ft.) year storm 0 .470 (Ac. 252 (Ft/s) +++++++++++++++++-f++++++++++++++++++++++++++++++++++++++++++.+++++++++ Process from Point/Station 209.000 to Point/Station 210.000 CONFLUENCE OF MINOR STREAMS Along Main Stream number: 2 in normal stream number 1 Stream flow area = 0.470 (Ac.) Runoff from this stream = 3.888(CFS) Time of concentration = 3.08 mm. Rainfall intensity = 10.088(In/Hr) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++4+++++++++++ Process from Point/Station 210.100 to Point/Station 210.200 INITIAL AREA EVALUATION **** Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 - Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 I [UNDISTURBED NATURAL TERRAIN I (Permanent Open Space Impervious value, Ai = 0.000 I Sub-Area C Value = 0.350 Initial subarea total flow distance = 57.000(Ft.) Highest elevation = 291.600(Ft.) Lowest elevation = 278.300(Ft.) I Elevation difference = 13.300(Ft.) Slope = 23.333 % Top of Initial Area Slope adjusted by User to 30.000 % INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 100.00 (Ft) I for the top area slope value of 30.00 %, in a development type of Permanent Open Space In Accordance With Figure 3-3 I Initial Area Time of Concentration = 4.34 minutes TC = [1.8*(1.1_C)*distance(Ft.).5)/(% slope"(1/3)] TC = [1.8*(1.1_0.3500)*( 100.000".5)/( 30.000"(1/3)1= 4.34 Rainfall intensity (I) = 8.077(In/Hr) for a 100.0 year storm I Effective runoff coefficient used for area (Q=KCIA) is C = 0.350 Subarea runoff = 0.085(CFS) Total initial stream area = 0.030 (Ac.) 1 51 I +++++++.+++++++++++++++++++++++++++++++++++++++++++++++++++++±++++++++ Process from Point/Station 210.200 to Point/Station 210.300 1kk IMPROVED CHANNEL TRAVEL TIME Upstream point elevation = 278.000 (Ft.) Downstream point elevation = 272.500(Ft.) Channel length thru subarea = 277.000 (Ft.) Channel base width = 0.000 (Ft.) Slope or 'Z of left channel bank = 8.000 Slope or 'Z of right channel bank = 8.000 Estimated mean flow rate at midpoint of channel = 0.333 (CFS) Manning's 'N' = 0.015 Maximum depth of channel = 0.170 (Ft.) Flow(q) thru subarea = 0.333(CFS) Depth of flow = 0.135(Ft.), Average velocity = 2 297 (Ft/s) Channel flow top width = 2.153 (Ft.) Flow Velocity = 2.30(Ft/s) Travel time = 2.01 mm. Time of concentration = 6.35 mm. Critical depth = 0.160(Ft.) Adding area flow to channel Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 [UNDISTURBED NATURAL TERRAIN (Permanent Open Space Impervious value, Ai = 0.000 Sub-Area C Value = 0.350 Rainfall intensity = 6.321(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.350 CA = 0.080 Subarea runoff = 0.424(CFS) for 0.200(Ac.) Total runoff = 0.509(CFS) Total area = 0.230(Ac.) Depth of flow = 0.158(Ft.), Average velocity = 2.555(Ft/s) Critical depth = 0.188(Ft.) +++++++++++++-f-++++++-1+++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 210.200 to Point/Station 210.300 CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 2 in normal stream number 2 Stream flow area = 0.230 (Ac.) Runoff from this stream = 0.509(CFS) Time of concentration = 6.35 mm. Rainfall intensity = 6.321(In/Hr) Summary of stream data: Stream Flow rate TC Rainfall Intensity No. (CFS) (mm) (In/Hr) 1 3.888 3.08 10.088 2 0.509 6.35 6.321 52 Qmax(l) = I 1.000 * 1.000 * 3.888) + 1.000 * 0.484 * 0.509) + = 4.134 Qmax(2) = I 0.627 * 1.000 * 3.888) + 1.000 * 1.000 * 0.509) + = 2.945 Total of 2 streams to confluence: I Flow rates before confluence point: 3.888 0.509 Maximum flow rates at confluence using above data: I 4.134 2.945 Area of streams before confluence: 0.470 0.230 Results of confluence: I Total flow rate = 4.134(CFS) Time of concentration = 3.078 mm. I Effective stream area after confluence = 0.700 (Ac.) Process from Point/Station 210.000 to Point/Station 211.000 I kk PIPEFLOW TRAVEL TIME (User specified size) k)k Upstream point/station elevation = 266.500 (Ft.) Downstream point/station elevation = 265.900(Ft.) I Pipe length = 80.50(Ft.) Manning's N = 0.013 No. of pipes = 1 Required pipe flow = 4.134(CFS) Given pipe size = 12.00(In.) I NOTE: Normal flow is pressure flow in user selected pipe size. The approximate hydraulic grade line above the pipe invert is 1.129(Ft.) at the headworks or inlet of the pipe(s) Pipe friction loss = 1.084(Ft.) I Minor friction loss = 0.645(Ft.) K-factor = 1.50 Pipe flow velocity = 5.26(Ft/s) Travel time through pipe = 0.25 mm. Time of concentration (TC) = 3.33 mm. ++++++++++++++++++++++++++++++++++++.+++++++++++++++++++++++++++++++++ I Process from Point/Station 211.000 to Point/Station 212.000 IMPROVED CHANNEL TRAVEL TIME **** Upstream point elevation = 265.900 (Ft.) I Downstream point elevation = 262.400 (Ft.) Channel length thru subarea = 230.000 (Ft.) I Channel base width = 6.000(Ft.) Slope or 'Z' of left channel bank = 2.000 Slope or 'Z of right channel bank = 2.000 Estimated mean flow rate at midpoint of channel = 4.496(CFS) Manning's 'N' = 0.035 I Maximum depth of channel = 1.000 (Ft.) Flow(q) thru subarea = 4.496(CFS) Depth of flow = 0.307(Ft.), Average velocity = 2.216(Ft/s) I Channel flow top width = 7.227 (Ft.) Flow Velocity = 2.22(Ft/s) Travel time = 1.73 mm. 1 I 53 Time of concentration = 5.06 mm. Critical depth = 0.252(Ft.) Adding area flow to channel Decimal fraction soil group A = 0.000 Decimal fraction soil group 3 = 0.000 - Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 [UNDISTURBED NATURAL TERRAIN (Permanent Open Space Impervious value, Ai = 0.000 Sub-Area C Value = 0.350 Rainfall intensity = 7.318(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.530 CA = 0.651 Subarea runoff = 0.633(CFS) for 0.530 (Ac.) Total runoff = 4.767(CFS) Total area = 1.230(Ac.) Depth of flow = 0.318(Ft.), Average velocity = 2.263(Ft/s) Critical depth = 0.262(Ft.) +++++++++++++++++++++++++++++++++++++++++++-l-++++++++++++++++++++++++++ Process from Point/Station 212.000 to Point/Station 208.000 kkk PIPEFLOW TRAVEL TIME (User specified size) Upstream point/station elevation = 259.400 (Ft.) Downstream point/station elevation = 258.500(Ft.) Pipe length = 167.30(Ft.) Mannings N = 0.013 No. of pipes = 1 Required pipe flow = 4.767(CFS) Given pipe size = 18.00(In.) Calculated individual pipe flow = 4.767(CFS) Normal flow depth in pipe = 10.24(In.) Flow top width inside pipe = 17.83 (In.) Critical Depth = 10.07(In.) Pipe flow velocity = 4.59(Ft/s) Travel time through pipe = 0.61 mm. Time of concentration (TC) = 5.67 mm. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 212.000 to Point/Station 208.000 CONFLUENCE OF MAIN STREAMS **** The following data inside Main Stream is listed: In Main Stream number: 2 Stream flow area = 1.230 (Ac.) - Runoff from this stream = 4.767(CFS) Time of concentration = 5.67 mm. I Rainfall intensity = 6.802(In/Hr) Summary of stream data: I Stream Flow rate TC Rainfall Intensity No. (CFS) (mm) (In/Hr) I i 13.285 6.37 6.312 2 4.767 5.67 6.802 Qmax(l) = I 54 I I 1.000 * 1.000 * 13.285) + 0.928 * 1.000 * 4.767) + = 17.709 Qmax(2) = 1 .000 * 0.890 * 13.285) + I 1.000 * 1.000 * 4.767) + = 16.597 Total of 2 main streams to confluence: I Flow rates before confluence point: 13.285 4.767 Maximum flow rates at confluence using above data: 17.709 16.597 I Area of streams before confluence: 2.390 1.230 Results of confluence: Total flow rate = 17.709(CFS) Time of concentration = 6.368 mm. Effective stream area after confluence = 3.620(Ac.) I ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 208.000 to Point/Station 213.000 PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation = 258.500(Ft.) I Downstream point/station elevation = 257.500 (Ft.) Pipe length = 95.80 (Ft.) Manning's N = 0.013 No. of pipes = 1 Required pipe flow = 17.709(CFS) I Given pipe size = 18.00(In.) NOTE: Normal flow is pressure flow in user selected pipe size. The approximate hydraulic grade line above the pipe invert is 4.061(Ft.) at the headworks or inlet of the pipe(s) I Pipe friction loss = 2.722(Ft.) Minor friction loss = 2.339(Ft.) K-factor = 1.50 Pipe flow velocity = 10.02 (Ft/s) Travel time through pipe = 0.16 mm. I Time of concentration (TC) = 6.53 mm. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 208.000 to Point/Station 213.000 CONFLUENCE OF MAIN STREAMS The following data inside Main Stream is listed: In Main Stream number: 1 Stream flow area = 3.620 (Ac.) Runoff from this stream = 17.709(CFS) Time of concentration = 6.53 mm. Rainfall intensity = 6.212(In/Hr) Program is now starting with Main Stream No. 2 ++++++++++++++++++++++++++++++++++++++++++++++.+++++++++++++++++++++++ Process from Point/Station 214.000 to Point/Station 215.000 INITIAL AREA EVALUATION **** I 55 I I I I I Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 [UNDISTURBED NATURAL TERRAIN (Permanent Open Space Impervious value, Ai = 0.000 Sub-Area C Value = 0.350 Initial subarea total flow distance = 70.000 (Ft.) Highest elevation = 293.200(Ft.) Lowest elevation = 270.500(Ft.) Elevation difference = 22.700(Ft.) Slope = 32.429 % Top of Initial Area Slope adjusted by User to 30.000 % INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 100.00 (Ft) for the top area slope value of 30.00 %, in a development type of Permanent Open Space In Accordance With Figure 3-3 Initial Area Time of Concentration = 4.34 minutes TC = [1.8*(1.1_C)*distance(Ft.).5)/(% slope'(1/3)] TC = 100.000".5)/( 30.000(1/3)1= 4.34 Rainfall intensity (I) = 8.077(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.350 Subarea runoff = 0.170(CFS) Total initial stream area = 0.060 (Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++.+++ Process from Point/Station 215.000 to Point/Station 213.000 kk IMPROVED CHANNEL TRAVEL TIME **** Upstream point elevation = 270.500 (Ft.) Downstream point elevation = 261.100 (Ft.) Channel length thru subarea = 200.000 (Ft.) Channel base width = 0.000(Ft.) Slope or 'Z' of left channel bank = 8.000 Slope or 'Z' of right channel bank = 8.000 Estimated mean flow rate at midpoint of channel = 0.481(CFS) Manning's 'N' = 0.015 Maximum depth of channel = 0.170 (Ft.) Flow(q) thru subarea = 0.481(CFS) Depth of flow = 0.131(Ft.), Average velocity = 3.479(Ft/s) Channel flow top width = 2.102 (Ft.) Flow Velocity = 3.48 (Ft/s) Travel time = 0.96 mm. Time of concentration = 5.30 mm. Critical depth = 0.184(Ft.) Adding area flow to channel Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 [UNDISTURBED NATURAL TERRAIN (Permanent Open Space Impervious value, Ai = 0.000 Sub-Area C Value = 0.350 Rainfall intensity = 7.103(In/Hr) for a 100.0 year storm I 56 I I I U Effective runoff coefficient used for total area (Q=KCIA) is C = 0.350 CA = 0.098 Subarea runoff = 0.526(CFS) for 0.220(Ac.) Total runoff = 0.696(CFS) Total area = 0.280 (Ac.) Depth of flow = 0.151(Ft.), Average velocity = 3.817(Ft/s) Critical depth = 0.211(Ft.) ++++++++++++++++++ --+++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 215.000 to Point/Station 213.000 CONFLUENCE OF MAIN STREAMS **** The following data inside Main Stream is listed: In Main Stream number: 2 Stream flow area = 0.280 (Ac.) Runoff from this stream = 0.696(CFS) Time of concentration = 5.30 mm. Rainfall intensity = 7.103(In/Hr) Surrmary of stream data: Stream Flow rate TC Rainfall Intensity Nc. (CFS) (mm) (In/Fr) 1 17.709 6.53 6.212 2 0.696 5.30 7.103 Qmax(l) = 1.000 * 1.000 * 17.709) + 0.875 * 1.000 * 0.696) + = 18.317 Qmax(2) = 1.000 * 0.812 * 17.709) + 1.000 * 1.000 * 0.696) + = 15.083 Total of 2 main streams to confluence: Flow rates before confluence point: 17.709 0.696 Maximum flow rates at confluence using above data: 18.317 15.083 Area of streams before confluence: 3.620 0.280 Results of confluence: To--al flow rate = 18.317(CFS) Time of concentration = 6.527 mm. Effective stream area after confluence = End of computations, total study area = 3 .900 (Ac. 3.900 (Ac.) 57 VICINITY MAP NO SCALE I San Diego County Hydrology Manual Section: 3 Date: June 2003 Page: 6 of 26 Table 3-1 RUNOFF COEFFICIENTS FOR URBAN AREAS - Land Use Runoff Coefficient "C" Soil Type NRCS Elements County Elements % IMPER. A B C - D Undisturbed Natural Terrain (Natural) Permanent Open Space 0.20 0.25 0.30 0.35.- 1)56 f4'- Low Density Residential (LDR) Residential, 1.0 DU/A or less 10 0.27 0.32 0.36 0.41 Low Density Residential (LDR) Residential, 2.0 DU/A or less 20 0.34 0.38 0.42 0.46 Low Density Residential (LDR) Residential, 2.9 DU/A or less 25 0.38 0.41 0.45 0.49 Medium Density Residential (MDR) Residential, 4.3 DU/A or less 30 0.41 0.45 0.48 0.52 Medium Density Residential (MDR) Residential, 7.3 DU/A or less 40 0.48 0.51 0.54 0.57 Medium Density Residential (MDR) Residential, 10.9 DU/A or less 45 0.52 0.54 0.57 0.60 Medium Density Residential (MDR) Residential, 14.5 DU/A or less 50 0.55 0.58 0.60 0.63 High Density Residential (HDR) Residential, 24.0 DU/A or less 65 0.66 0.67 0.69 0.71 High Density Residential (HDR) Residential, 43.0 DU/A or less 80 0.76 0.77 0.38 . 0.79 Commercial/Industrial (N. Corn) Neighborhood Commercial 80 0.76 0.77 0.78 0.79 0.82 Commercial/Industrial (G. Corn) General Commercial 85 0.80 0.80 0.81 it€ WTI MAN Commercial/Industrial (0.?. Corn) Office Professional/Commercial 90 0.83 0.84 0.84 0.85 Commercial/Industrial (Limited I.) Limited Industrial 90 0.83 0.84 0.84 0.85 Commercial/Industrial (General U General Industrial 95 0.87 0.87 0.87 0.87 *The values associated with 0% impervious may be used for direct calculation of the runoff coefficient as described in Section 3.1.2 (representing the. pervious runoff coefficient, Cp, for the soil type), or for areas that will remain undisturbed in perpetuity. Justification must be given that the area will remain natural forever (e.g., the area is located in Cleveland National Forest). DU/A dwelling units per acre NRCS National Resources Conservation Service 3-6 Hydrologic Soil Group—San Diego County Area, California (La Costa Town Square - Office) Map Scale: 1:1,540 if printed on A size (8.5" x 11") sheet. N .Meters 0 20 40 80 iu -.Feet 0 50 100 200 300 US Natural Resources Conservation Service 12I9/'O11 Page 1 of 4 Web Soil Survey National Cooperative Soil Survey IT 4'52" 4' 2" .33'4'45" 33" 4'53" 33 4'4 =1 Hydrologic Soil Group—San Diego County Area, California (La Costa Town Square - Office) MAP LEGEND MAP INFORMATION Area of Interest (AOl) Map Scale: 1:1,540 if printed on A size (8.5' x 11") sheet. Area of Interest (AOl) The soil surveys that comprise your AOl were mapped at 1:24.000. Soils Soil Map Units Warning: Soil Map may not be valid at this scale. Soil Ratings Enlargement of maps beyond the scale of mapping can cause I A misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting U AID soils that could have been shown at a more detailed scale. B Please rely on the bar scale on each map sheet for accurate map UI BID measurements. LI C Source of Map: Natural Resources Conservation Service Web Soil Survey URL: http://websoilsurvey.nrcs.usda.gov Coordinate System: UTM Zone 11 N NAD83 LII U This product is generated from the USDA-NRCS certified data as of Not rated or not available the version date(s) listed below. Political Features Soil Survey Area: San Diego County Area, California o Cities Survey Area Data: Version 6, Dec 17, 2007 Water Features Date(s) aerial images were photographed: 6/7/2005 Streams and Canals The orthophoto or other base map on which the soil lines were Transportation compiled and digitized probably differs from the background -i-I-I- Rails imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. .. Interstate Highways US Routes Major Roads ...-,..- Local Roads USDA Natural Resources Wcb Soil Survey 12/9/2011 Conservation Service National Cooperative Soil SunIey Page 2 of 4 Hydrologic Soil Group—San Diego County Area, California La Costa Town Square - Office Hydrologic Soil Group Hydrologic Soil Group— Summary by Map Unit - San Diego County Area, California (CA638) Map unit symbol Map unit name Rating Acres in AOl Percent of AOl AtE Altamont clay, 15 to 30 percent slopes D 3.6 48.3% F-IrD2 Huerhuero loam, 9 to 15 percent slopes, eroded D 3.8 50.6% SnG San Miguel-Exchequer rocky silt barns, 9 to 70 percent slopes D 0.1 1.1% Totals for Area of Interest 7.5 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (AID, BID, and CID). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (AID, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. USDA Natural Resources Web Soil Survey 12/9/2011 Niiiiiiiii Conservation Service National Cooperative Soil Survey Page 3 of 4 Hydrologic Soil Group—San Diego County Area, California La Costa Town Square - Office Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff. None Specified Tie-break Rule: Higher I I I I I I I I I USDA Natural Resources Web Soil Survey 12/9/2011 Qiiiiiiiiiiiii Conservation Service National Cooperative Soil Survey Page 4 of 4 I — — — — — — — — — — — — - — - - - 8 County of San Diego Hydrology Manual Rainfall Isoplu'ials -: 3311 1 100 Year K4rnldli Event 6 Hours (fl) 1 - E 323O W4 i 3 0 3 Miles =I 8 County of San Diego Hydrology Manual Cuunty .5. Rr '.rsui. Cou iy —: Rainjalllsopluvials J. kO 33115 . -p 0_S. . S S . •,.• .. . - \ IOU Year Rainfall Event - 24 Hours • S- :.- : iopLuvIdi — r ENGWOT ' I ' V 'Am 00 -- ...............4.. 32 LT 171 f so GIs - 3230 tL I 100 30 I- w I- LU w z - 20 0 LU z - o z LU LU 0 -J 0) U- o C) - LU LU 0 EXAMPLE: Given: Watercourse Distance (0) = 70 Feet Slope (s) =1.3% 1.8 (1.1-C) V15 Runoff Coefficient (C) 0.41 1 = 3\[ Overland Flow Time (1) = 9.5 Minutes SOURCE: Airport Drainage, Federal Aviation Administration, 1965 ril"i b, F I G U RE - Rational Formula - Overland Time of Flow Nomograph 3m3 2.0 Vi1li I Table 3-2 I I 3-12 San Diego County Hydrology Manual Section: 3 Date: June 2003 Page: 12 of 26 Note that the Initial Time of Concentration should be reflective of the general land-use at the upstream end of a drainage basin. A single lot with an area of two or less acres does not have a significant effect where the drainage basin area is 20 to 600 acres. Table 3-2 provides limits of the length (Maximum Length (LM)) of sheet flow to be used in hydrology studies. Initial T1 values based on average C values for the Land Use Element are also included. These values can be used in planning and design applications as described below. Exceptions may be approved by the "Regulating Agency" when submitted with a detailed study. MAXIMUM OVERLAND FLOW LENGTH (LM) & INITIAl. TIMI OF CflNr1NTP AT1fl1\T (T.\ Element* DU/ Acre .5% 1% 2% 3% 5% 10% LM Tj LM Tj LM T1 LM T1 LM T1 LM T1 Natural 50 13.2 70 12.5 85 10.9 100 10.3 100 8.7 100 6.9 LDR 1 50 12.2 1 70 11.5 1 85 10.0 1 100 9.5 1 100 8.0 1 100 6.4 LDR 2 50 11.3 1 70 10.51 85 9.2 1 100 8.8 100 7.4 100 5.8 LDR 2.9 50 10.7 70 10.01. 85 8.8 1 95 8.1 100 7.0 100 5.6 MDR 4.3 50 10.2 70 9.61 80 8.1 1 95 7.8 100 6.7 100 5.3 MDR 7.3 50 9.2 65 8.4 80 7.4 95 1 7.01 100 6.01 100 4.8 MDR 10.9 1 50 8.71 65 7.9 80 6.9 901 6.41 100 5.71 100 4.5 MDR 14.5 1 50 8.21 65 7.4 80 6.5 90 6.01 100 5.4 1001 4.3 HDR 24 50 6.7 65 6.1 75 5.1 90 4.9 95 4.3 100 3.5 HDR 43 50 5.3 65 4.7 75 4.01 85 3.8 95 3.4 100 2.7 N. Corn 50 5.3 60 4.51 75 4.01 85 3.8 95 3.4 100 2.7 G. Corn 50 4.7 60 4.11 75 3.61 85 3.4 90 2.9 100 2.4 O.P./Com 50 4.2 60 3.71 70 3.1 80 2.9 90 2.61 1001 2.2 Limited 1. 50 4.2 60 3.7 70 3.1 80 1 2.9 90 2.6 100 2.2 General I. 50 3.7 60 3.2 70 2.7 80 2.6 90 :2~.3 100 1.9 *See Table 3-1 for more detailed description I I I I I I U I I I I I FIGURE Nomograph for Determination of Time of Concentration (Ic) or Travel Time (It) for Natural Watersheds 34