HomeMy WebLinkAboutMS 14-11; MATHIS LEVANTE SUBDIVISION; LIMITED SITE INVESTIGATION; 2002-07-25EASCOUNTY SOIL- CONSULTATION AND ENGINEERING, INC. 10925 HARTLEY ROAD, SUITE "I" SANTEE, CALIFORNIA 92071 (619) 258-7901 Fax 258-7902 Dennis Mathis Construction July 25, 2002 3351 Venado Street Project No. 02-1147J"- Rancho La Costa, California 92009 Subject: Limited Site Investigation Four Proçosed Single Family Residences Lot 230 & 231 Levante Street APN 223-170-18 & 19 S E P ?2 City of Carlsbad, California Dear Mr. Mathis: In accordance with your request, we have performed a limited investigation of the soil conditions at the subject site. The investigation was undertaken to provide the soil engineering criteria for site grading and to recommend an appropriate foundation system for the proposed residences. The Site was previously graded as cut and fill pads with a maximum depth of fill of approximately 12 feet. Underlying the fill soils was dense sandstone of the Santiago Formation. It is our opinion that the proposed development is feasible provided the recommendations herein are implemented during construction. Respectfully submitted, M, Mamadou Saliou Diallo, P.E ROE 54071 DENNL5 [THIS CONSTRUCTION PROJECT. 01-1147,;2 INTRODUCTION This is to present the findings and conclusions of a soils investigation for four proposed single family residences to be located on the north side of Levante Street, in the City of Carlsbad, California. The objectives of the investigation were to determine the existing soils conditions and provide recommendations for site development. In order to accomplish these objectives, eight (8) exploratory trenches were excavated to a maximum depth of 13.0 feet; undisturbed and loose bag samples were obtained, and laboratory tests were performed. SITE DESCRIPTION AND PROPOSED CONSTRUCTION The subject site is located on the north side of Levante Street, in the City of Carlsbad, California. The site was previously graded as cut and fill pads. Prior to the grading operation, the site sloped moderately to the west. Vegetation consists of grass. The proposed development includes the construction of four two- story, wood-framed, single-family residences to be founded on continuous footings with a slab-on-grade floor system. FIELD INVESTIGATION On March 28, 2002, eight exploratory trenches were excavated to a maximum depth of 13.0 feet by a Caterpillar 4163 backhoe equipped with a 24 inch bucket. The approximate locations of the trenches are shown on the attached Plate No. 1, entitled "Location of Exploratory Trenches". A continuous log of the soils encountered was recorded at the time of excavation and is shown on Plates No. 2 through 4 entitled "Summary Sheet". The soils were visually and texturally classified according to the filed identification procedures set forth on the at-:ached Plate No. 5 entitled "Uniform Soil Classification Chart. SURFACE CONDITIONS The surface soils encountered during the course of our investigation were fill soils to a maximum depth of twelve (12) feet. These soils consist of tan clayey sand and silt.r sand, with a loose to medium dense consistency. The fill soils were underlain by dense sandstone of the Santiago Formation (Tsa) 2 DENNIL THIS CONSTRUCTION PROJECT 01-1147J2 EXPANSIVE SOILS An expansion test was performed on a representative sample of the fill soils to determine volumetric change characteristics with change in moisture content. An expansion index of 40 indicates a low potential for expansion. GROUNDWATER Groundwater was not encountered during the course of our investigation. Groundwater is anticipated at a depth greater than 150 feet. We do not expect groundwater to affect the proposed development. GEOLOGIC HAZARDS A review of the available geological literature pertaining to the site indicates the existence of the Rose Canyon Fault Zone approximately '10.5 Km to the west. Ground shaking from this fault or one of the major active faults in the region is the most likely happening to affect the site. With respect to this hazard, the site is comparable to others in the general area. The proposed residential structures should be designed in accordance with seismic design requirements of the 1997 Uniform Building Code or the Structural Engineers Association of California using the following seismic design criteria: Seismic Zone Factor, Z 0.40 Table 16-I Soil Profile Type SD Table 16-J Seismic Coefficient, Ca 0.44 Table 16-Q Seismic Coefficient, Cv 0.64. Table 16-R Near-Source Factor, Na 1.0 Table 16-S Near-Source Factor, Nv 1.0 Table 16-T Seismic Source B Table 16-U Based on the absence of shallow groundwater, type and consistency of the underlying soils, it is our opinion that the potential for liquefaction is 'very low. DENNIS THIS CONSTRUCTION PROJECT) 01-1147J2 CONCLUSIONS AND RECOMMENDATIONS The following conclusions and recommendations a r e b a s e d u p o n t h e analysis of the data and information obtai n e d f r o m o u r s o i l investigation. This includes visual inspection; field investigation; laboratory testing and our genera l k n o w l e d g e o f t h e soils native to the site. The site is suitable f o r t h e p r o p o s e d development provided the recommendations set forth a r e i m p l e m e n t e d during construction. GRADING AND EARTHWORK Site grading should begin with clearing and gr u b b i n g , e . g . t h e removal of vegetation and deleterious materi a l s . I t i s o u r understanding that the two existing pads will be g r a d e d i n t o f o u r individual pads. Due to the transition between c u t a n d f i l l o n t h e existing pads and the loose consistency in the u p p e r 3 f e e t o f t h e existing fill soils, we recommend that the s u b g r a d e s o i l s b e overexcavated to a minimum depth of three feet b e l o w p r o p o s e d p a d grades, moisture conditioned 2 to 4 percent o v e r o p t i m u m a n d compacted to a minimum of 90 percent rela t i v e d e n s i t y . T h e overexcavation should extend a minimum of 5 feet b e y o n d p e r i m e t e r footings. The actual depth and extent of re m o v a l s h o u l d b e evaluated in the field at the time of ex c a v a t i o n b y a representative of this firm. Grading should be do n e i n a c c o r d a n c e with the attached appendix A. FOUNDATION AND SLAB Continuous footings and/or spread footings are s u i t a b l e f o r u s e and should extend a minimum of 18 inches fo r t h e t w o s t o r y residential dwellings into the compacted fill s o i l s . C o n t i n u o u s footings should be 15 inches wide and reinforc e d w i t h f o u r # 4 steel bars; two bars placed near the top of the f o o t i n g s a n d t h e other two bars placed near the bottom of the footi n g s . Concrete floor slabs should be a minimum 4 i n c h e s t h i c k . Reinforcement should consist of #3 bars placed a t 1 6 i n c h e s o n center each way. Slab reinforcement should b e p l a c e d w i t h i n t h e middle third of the slab by supporting the stee l o n c h a i r s o r concrete blocks dobies1'. The slab should be underlain by 2 inches of clean sand over a 10-mil visqueen moisture barr i e r . T h e e f f e c t of concrete shrinkage will result in cracks i n v i r t u a l l y a l l concrete slabs. To reduce the extent of shrinkag e , t h e c o n c r e t e should be placed at a maximum of 4-inch slump. T h e m i n i m u m s t e e l recommended is not intended to prevent shrinkage c r a c k s . 4 DENNIS THIS CONSTRUCTION PROJECT 01-114712 c. Where moisture sensitive floor coverings are anticipated over the slab, the 10-iril plastic moisture barrier should be underlain by a capillary break at least 4 inches thick, consisting of sand, gravel or crushed rock not exceeding 3/4 inch in size with no more than 5 percent passing the #200 sieve. SOIL BEARING VALUE An allowable soil bearing value of 1500 pounds per square foot may be used for the design of continuous and spread footings founded a minimum of 12 inches. into the compacted fill soils. TIis value may be increased by 20 percent for each additional foot of width or depth to a maximum. value of 4500 lb/ft2 as set forth in the 1997 Edition of the Uniform Building Code, Table No. 18-1-A. LATERAL SOIL PRESSURE Lateral resistance to horizontal movement may be provided by the soil passive pressure and the friction of concrete to soil. An allowable passive pressure of 200 pounds per square foot per foot of depth may be used. A coefficient of friction of 0.35 is recommended. The soils passive pressure as well as the bearing value may be increased by 1/3 for wind and seismic loacing. RETAINING WALLS Unrestrained, cantilevered retaining walls with a level backfill may be designed to resist an active equivalent fluid pressure of 35 pounds per cubic foot, while retaining walls with a 2 to 1 sloping backfill may be designed to resist an active equivalent fluid pressure of 45 pounds per cubic foot. This pressure is based on the backfill soils being free draining and non-expansive. Backfill materials must be approved by the soils engineer prior to use. SETTLENT Settlement of compacted fill soils is normal and should be anticipated. Because of the minor thickness of the fill soil under the proposed footings and the light building loads, the settlement should be within acceptable limits. 5 DENNIS. HIS CONSTRUCTION PROJECT I )1-1147J2 UTILITY TRENCH EXCAVATIONS Excavations for on-site utility trenches may be made vertica l l y for shallow depths and must be either shored or sloped at 1H: 1 V for depths greater than 4 feet, Utilities should be bedded a n d backfilled with clean sand or approved granular soil to a depth of at least one foot over the pipe. This backfill should be uniforml y watered and compacted to a firm condition for pipe support. The remainder of the backfill may be on-site soils or non-expansive imported soils, wh:ch should be placed in thin lifts, moistur e conditioned and compacted to at least 90 % relative compaction. SLOPE SETBACK Compacted fill soils that occur within 8 feet of the face of s l o p e possess poor lateral stability, even though they have b e e n certified with a relative compaction of 90 percent or better. Proposed structures and other improvements that are located wit h i n 8 feet of the face of compacted fill slopes could suff e r differential movement as a result of the poor lateral stability o f these soils. Therefore, foundations and footings for the propose d structures or other improvements should be placed at least 8 feet back from the top of these slopes. Foundations placed closer to the top of slope than 8 feet should be deepened such that the bottom of the foundation is at least 8 feet back from the face o f the slope. DRAINAGE Adequate measures shall be undertaken to properly finish grad e t h e site after the structures and other improvements are in plac e , such that the drainage water within the site and adjacent properties is directed away from the foundations, footings, floor slabs and the tops of slopes via surface swales and subsurface drains towards the,natural drainage for this area. Proper surface and subsurface drainage will be required to minimize the potential of water seeking the level of the bearing soils under the foundations, footings and floor slabs, which may otherwise result in undermining and differential settlement of the structures an d other improvements. DENNIL I THIS CONSTRUCTION PROJECT 01-1147J2 LIMITS OF INVESTIGATION The recommendations provided in this report pertain onl y t o t h e site investigated and based upon the assumption that t h e s o i l conditions do not -deviate from those disclosed in the trenáhes. I f any variations or undesirable conditions are encountere d d u r i n g construction, or if the proposed construction will differ f r o m that planned at tie present time, East County Soil Consult a t i o n and Engineering, Inc. should be notified so that supple m e n t a l recommendations can be provided. Plates No. 1 through 5, Page L-1 and L-2, References and Ap p e n d i x A are parts of this report. Respectfully submitted, E3S'Q4 CID rn LLj 1(fc.c CN- ooii 11 Mamadou Saliou Diallo RCE 54071 MS D / md 7 k -. - 7)/ all H, :::" 11 e Irt of or AP' — J.. 77D7 4(/77I/ 5't EAST COUNTY SOIL CONSULTATION & ENGINEERING, INC. 10925 HARTLEY RD.. SUITE I. SANTEE, CA 92071 l/5&Vb,v (619) 258-7901 Fax (619) 258.7902 -y Z1'z DENNIS HIS CONSTRUCTION PROJECT A )1-1147J2 PLATE NO. 2 SUMMARY SHEET NO. 1 TRENCH NO. 1 DEPTH SOIL DESCRIPTION Y N Surface FILL (Qaf) tan, dry to moist, loose to medium dense, silty, fine grained sand (SM) 2.0' 107.9 9.6 2.5' medium brown, moist, medium dense, silty, fine -grained sand(SM) 3.5' tan, moist, medium dense, silty 104.8 7.5 fine grained sand 5.0' reddish brown, moist, medium dense, silty, fine to medium grained sand 6.0' SANTIAGO FORMATION (Tsa) tan, moist, dense, fine grained silty sand (SM) 6.5' bottom of trench trench backfilled 3/28/02 ------------------------------------------------------------------------ TRENCH NO. 2 DEPTH SOIL DESCRIPTION Y N Surface FILL (Qaf) tan, dry to moist, loose to medium dense, silty, fine grained sand (SM) 1.0' SANTIAGO FORMATION (Tsa) tan, moist, dense, fine grained silty sand (SM) 2.0' 110.7 11.5 2.5' bottom of trench trench backfilled 3/28/02 ------------------------------------------------------------------------ TRENCH NO. 3 DEPTH SOIL DESCRIPTION Y N Surface FILL (Qaf) tan, dry to moist, loose to medium dense, silty, fine grained sand (SM) 2.0' medium brown, moist, medium dense, 103.8 20.8 clayey sand (SC) 4.0' SANTIAGO FORMATION (Tsa) tan, moist, dense, fine 101.6 5.8 grained silty sand (SM) 5.5' bottom of trench trench backfilled 3/28/02 DENNIS THIS CONSTRUCTION PROJECT? 91-1147J2 PLATE NO. 3 SUMMARY SHEET NO. 2 TRENCH NO. 4 DEPTH SOIL DESCRIPTION Y M Surface FILL (Qaf) tan, dry to moist, loose silty, fine grained sand (SM) 2.0' tan, moist, medium dense, silty, fine grained sand (SM) 5.0' reddish brown, moist, medium dense, clayey sand (SC) 6.0' SANTIAGO FORMATION (Tsa) tan, moist, dense, fine grained silty sand (SM) 6.5' bottom of trench trench backfilled 3/28/02 TRENCH NO. 5 DEPTH SOIL DESCRIPTION Y M Surface FILL (Qaf) tan, dry to moist, loose to medium dense, silty, fine grained sand (SM) 2.01 106.4 12.3 4.0' 102.4 9.6 4.5' SANTIAGO FORMATION (Tsa) medium brown, moist, medium dense, clayey sand(SC) 6.0' tan, moist, dense, fine grained silty sand (SM) 6.5' bottom of trench trench backfilled 3/23/02 TRENCH NO. 6 DEPTH SOIL DESCRIPTION y M Surface FILL (Qaf) tan, dry to moist, loose to medium dense, silty, fine grained sand (SM) 4.5' SANTIAGO FORMATION (Tsa) medium brown, moist, medium dense, clayey sand(SC) 6.0' tan, moist,- dense, fine grained sL..ty sand (SM) 6.5' bottom of trench trench backfilled 3/28/02 DENNIS. rHIS CONSTRUCTION PROJECTI' ]-1]47J2 PLATE NO. 4 SUMMARY SHEET NO. 3 TRENCH NO. 7 DEPTH SOIL DESCRIPTION Y Surface FILL (Qaf) tan, dry to moist, loose to 2.0', medium dense 2.01 -5.5', silty, fine grained sand (SM) 5.5' brown, moist, medium dense, clayey sani.(SC) 7.01 SANTIAGO FORMATION (Tsa) tan, dry, dense, fine grained silty sand (SM) 7.5' bottom of trench trench backfilled 3/28/02 ------------------------------------------------------------------------ TRENCH NO. 8 DEPTH SOIL DESCRIPTION Y M Surface FILL (Qaf) tan, dry to moist, loose to medium dense, silty, fine grained sand (SM) 4.0' 105.6 16.9 4.5' medium brown, moist, medium dense, silty, fine grained sand(SM) 5.5' tan, moist, medium dense, silty fine grained sand 6.0' 102.0 22.5 8.0' reddish brown, moist, medium dense, 99.1 22.1 clayey sand 12.0' SANTIAGO FORMATION (Tsa) tan, dry, dense, fine grained silty sand (SM) 13.0' bottom of trench trench backfilled 3/28/02 ----------------------------------------------------------------------- 10 CLASSIFICATION RANGE OF GRAIN SIZES - U.S. STANDARD GRAIN SIZE IN SIEVE SIZE MILLIMETERS BOULDERS Above 12 Inches Above 305 COBBLES 12 Inches To 3 Inches 1 305 To 76.2 GRAVEL 3 Inches to No.4 76.2 to 4.76 Coarse 3 Inches to 'h Inch 76.2 to 19.1 Fine Inch to No.4 19.1 to 4.76 SAND No. 4 to No. 200 4.76 to 0.074 Coarse No. 4 to No. 10 4.76 to 2.00 Medium No. IC- to No. 40 2.00 to 0.420 Fine No. 40 to No. 200 0.420 to 0.074 SILT AND CLAY Below No. 200 1 Below 0.074 GRAIN SIZE CHART 0 to 20 .0 40 20 50 70 00 30 too UQIJI0 uir (u.). PLASTICITY CHART 50 S. = 'I 20 to 0 MAJOR DIVISI S SYMBOL GW L RJPTION WELL GRADED GRAVELS OR GRAVEL- SAND MIXTURES, LITTLE OR NO FINES GP GRAVELS (MORE THAN POORLY GRADED GRAVELS OR GRAVEL-SAND OF COARSE MIXTURES, LITTLE OR NO FINES GM FRACTION >NO. 4 SIEVE SILTY GRAVELS, GRAVEL-SAND-SILT MIXTURES COARSE SIZE) GC GRAINED SOILS CLAYEY GRAVELS, GRAVEL-SAND-CLAY MIXTURES (MORE THAN ½ OF SOIL> sw NO. 200 SIEVE SIZE) WELL GRADED SANDS OR GRAVELLY SANDS, LITTLE OR NO FINES SP SANDS (MORE THAN V2 POORLY GRADED SANDS OR GRAVELLY SANDS, OF COARSE LITTLE OR NO FINES SM FRACTION <NO. 4 SIEVE SILTY SANDS, SILT-SAND MIXTURES SIZE) Sc CLAYEY SANDS, SAND-CLAY MIXTURES rVJL INORGANIC SILTS AND VERY FINE SANDS, ROCK SILTS & FLOUR, SILTY OR CLAYEY FINE SANDS OR CLAYEY SILTS WITH SLIGHT PLASTICITY CLAYS CL INORGANIC CLAYS OF LOW TO MEDIUM LIQUID LIMIT PLASTICITY, GRAVELLY CLAYS, SANDY CLAYS, <50 SILTY CLAYS, LEAN CLAYS OL FINE GRAINED SOILS ORGANIC SILTS AND ORGANIC SILTY CLAYS OF LOW PLASTICITY (MORE THAN ½ OF SOIL < MH NO. 200 SIEVE SIZE) INORGANIC SILTS, MICACEOUS OR DIATOMACEOUS SILTS & FINE SANDY OR SILTY SOILS, ELASTIC SILTS CH CLAYS L:QUID LIMIT INORGANIC CLAYS OF HIGH PLASTICITY, FAT 50 CLAYS OH ORGANIC CLAYS OF MEDIUM TO HIGH PLASTICITY, ORGANIC SILTY CLAYS, ORGANIC SILTS HIGHLY ORGANIC SOILS Pt PEAT AND OTHER HIGHLY ORGANIC SOILS CLASSIFICATION CHART (UNIFIED SOIL CLASSIFICATION SYSTEM) 70. - EAST COUNTY SOIL CONSULTATION AND ENGINEERING, INC. 10925 HARTLEY ROAD, SUITE "I" SANTEE, CALIFORNIA 92071 U.S.C.S. SOIL CLASSIFICATION DENNIS MATHIS CONSTRUCTION PROJECT PROJECT NO. 02-1147J2 PLATE NO. 5 7/10/02 DENNIS HIS CONSTRUCTION PROJECT )1-1147J2 PAGE L-1 LABORATORY TEST RESULTS RESULTS OF EXPANSION INDEX TEST An expansion test in conformance with UBC 18-2 was performed on a representative sample of on- site soils to determine volumetric change characteristics with change in moisture content. The recorded expansion of the sample is presented as follows: INITIAL SATURATED INITIAL DRY MOISTURE MOISTURE DENSITY EXPANSION CONTENT% CONTENT% LB./CU. FT. INDEX LOCATION 13.0 22.1 99.1 T-3 @2.5' RESULTS OF PARTICLE SIZE ANALYSIS US Standard §ie Size!.: (ASTM_D-422) PercentPmg " 100 1/2" - 98 3/8" 100 95 #4 98 90 #8 88 85 #16 80 76 #30 75 70 #60 61 58 #100 44 46 #200 33 40 USCS SM SC 11 DENNIS THIS CONSTRUCTION PROJECT 91-1147J2 PAGE L-2 LABORATORY TEST RESULTS RESULTS OF MAXIMUM DENSITY TESTS The maximum dry densities and optimum moisture contents of the fill materials as determined by ASTM D1557-91, Procedure A which uses 25 blows of a 10 pound slide hammer falling from a height of 18 inches on each of 5 equal layers in a 4 inch diameter 1/30 cubic foot compaction cylinder and Procedure C which uses 56 blows of a 10 pound slide hammer falling from a height of 18 inches on each of 5 equal layers in a 6 inch diameter 1/13.3 cubic foot compaction cylinder are presented as follows: OPTIMUM MAXIMUM MOISTURE DRY DENSITY CONTENT SOIL TYPE! PROCEDURE LB/CU. FT. % DRY WT. LOCATION 1/A TAN BROWN SILTY FINE 119.0 11.7 T-1@2.5' GRAINED SAND 2/A TAN SILTY FINE GRAINED SAND 118.0 11.4 T-3@1.0' 12 DENNIS) HIS CONSTRUCTION PROJECT N 1-1147J2 REFERENCES 1: "1997 Edition, Uniform Building Code, Volume 2, Structural Engineering and Design Provisions". "Maps of Known Active Fault Near-Source Zones in California and Adjacent Portions of Nevada", Page 0-38, used with the 1997 Edition of the Uniform Building Code, Published by International Conference of Building Officials. "Geologic Maps of the Northwestern Part of San Diego County, California. Plate Nc. 2, Geologic Maps of the Encinitas and Rancho Santa Fe 7.5' Quadrangles", by Slang S. Tan and Michael P. Kennedy, 1996. "Geologic Maps of the Northwestern Part of San Diego County, California. Plate No. 2, Geologic Maps of the Encinitas and Rancho Santa Fe 7.5' Quadrangles", by Siang S. Tan and Michael P. Kennedy, 1996. 13 EAST COUNTY SOIL CONSULTATION AND ENGINEERING, INC. 10925 HARTLEY ROAD, SUITE I SANTEE, CALIFORNIA 92071 (619) 258-7901 APPENDIX A RECOMMENDED EARTHWORK SPECIFICATIONS General Description The intent of these specifications is to obtain uniformity and adequate strength in filled ground so that the proposed structures may be safely supported. The procedures include the clearing and preparation of the land to be filled, processing the fill soils, the spreading, and compaction of the filled areas to conform with the lines and grades as shown on the approved plans. The owner shall retain a Civil Engineer qualified in soil mechanics (herein referred to as engineer) to inspect and test earthwork in accordance with these specifications. The engineer shall advise the owner and grading contractor immediately if any unsatisfactory conditions are observed to exist and shall have the authority to reject the compacted filled ground until such time that corrective measures are taken, necessary to comply with the specifications. It shall be the sole responsibility of the grading contractor to achieve the specified degree of compaction. Preparing Areas to be Filled All brush, vegetation and any biodegradable refuse shall be removed or otherwise disposed of so as to leave the areas to be filled free of vegetation and debris. Any uncompacted filled ground or loose compressible natural ground shall be removed unless the report recommends otherwise. Any buried tanks or other structures shall be removed and the depression backfilled to the satisfaction of the engineer. The natural ground which is determined to be satisfactory for the support of the filled ground shall then be plowed or scarified to a depth of at least 12 inches (12"). After the natural ground has been prepared, it shall then be brought to the proper moisture content and compacted to not less than 90 percent of maximum dry density in accordance with ASTM D1557-91. Where fills are made on slopes greater than 20 percent, horizontal benches shall be cut into the firm natural ground. The initial bench at the toe of the fill shall be at least 15 feet in width on firm undisturbed natural ground. The width of all succeeding benches shall be at least 6 feet. APPENDIX A 2 3. Fill Materials All material shall be approved by the engineer and shall consist of materials free from vegetable matter, and other lumps greater than 6 inches in diameter. If, during grading operations, soils are found which were not encountered and tested in the preliminary investigation, tests on these soils shall be performed to determine their physical characteristics. Any special treatment recommended in the preliminary or subsequent soils reports not covered herein shall become an addendum to these specifications. 4. Placing and Compacting Fill Materials When the moisture content of the fill material is below that specified, water shall be added until the moisture content is near optimum to assure uniform mixing and effective compaction. When the moisture content of the fill materials is above that specified, the fill material shall be aerated by blading and scarifying or other satisfactory methods until the moisture content is near optimum as specified. After processing, the suitable fill materials shall be placed in layers which, when compacted, shall not exceed six inches (6"). Each layer shall be spread evenly and shall be thoroughly mixed during the spreading- insure uniformity of materials and moisture in each layer. After each layer has been placed, mixed and spread evenly, it shall be thoroughly compacted to not less than the density set forth in paragraph 2 (c) above. Compaction shall be accomplished with approval types of compaction equipment. Rolling shall be accomplished while the fill material is at the specified moisture content. In place density tests shall. be performed in accordance with ASTM D1556-90. The surfaces of the fill slopes shall be compacted by means of sheepsfoot rollers or other suitable equipment. Compacting operations shall be continued until the slopes are stable and until there is no appreciable amount of loose soil on the slopes. 5. Inspection Sufficient inspection by our firm or the Soil's Engineer of record and/or his/her representative shall be maintained during the filling and compacting operations so that he/she can verify that the fill was constructed in accordance with the accepted specifications. 6. Seasonal Limits No fill material shall be placed, spread, or rolled if weather conditions increase the moisture content above permissible limits. When the work is interrupted by rain, fill operations shall not be resumed until the moisture content and density of fill are as previously specified. All recommendations presented in the attached report are a part of these specifications. 2