Loading...
HomeMy WebLinkAboutMS 06-03; OZAKI PARCEL 2; HYDROLOGY EVALUATION LETTER; 2006-02-23February 23, 2006 City of Carlsbad Engineering Department RE: HYDROLOGY EVALUATION - THE OZAKI TPM 1645 CHESTNUT AVENUE - CITY OF CARLSBAD Please allow this letter to serve as the hydrology study for the subject project. The subject Tentative Parcel Map (TPM) is a proposal to divide one existing legal lot into a total of two lots, thereby creating one new lot. There is an existing residence and detached garage on the property at this time with no plans to build an additional residence on the new lot at this time. The applicant is requesting the lot split for the future, at which time building plans, and grading plans if required, will be submitted. Based on numerous site visits and the aerial topography map prepared by Toviill, Inc., it is our professional opinion that there is very little off-site drainage entering onto this project. Therefore, the only drainage affecting this Tentative Parcel Map (TPM) is the lot(s) themselves, which is about one-half acre. Based on the County of San Diego Design and Procedure Manual and assuming urban single-family residential conditions, we would conservatively predict no more than 1 to 2 cfs in a 100-year storm, for the entire project. It is our professional opinion that typical drainage devises utilized for single family residential construction, i.e., sheet flow, landscape areas, possible area drains, etc. will be more than adequate to handle the anticipated drainage for this development. In addition, appropriate BMPs, both during and after construction, will be implemented to the City's satisfaction. As Engineer of Work for this application, we respectively request your acceptance of this hydrology evaluation. Should you have any questions or comments, please feel free to contact t3.icoffice or resp9nd, as such, with plan check comments. Si GINF,ERING Douglas E Logan, R.C.E. 39726 Principal UI '5 -b12.31Q jm CA