Loading...
HomeMy WebLinkAboutCUP 2017-0008; OAKMONT OF CARLSBAD; THIRD PARTY GEOTECHNICAL REVIEW (THIRD); 2019-11-12HETHERINGMN ENGINEERING, INC. SOIL & FOUNDATION ENGINEERING • ENGINEERING GEOLOGY • HYDROGEOLOGY November 12, 2019 Project No. 8844.1 Log No. 20753 City of Carlsbad Land Development Engineering 1635 Faraday Avenue Carlsbad, California 92008-7314 Attention: Mr. David Rick Subject: THIRD-PARTY GEOTECHNICAL REVIEW (THIRD) Oakmont of California 2740 Faraday Avenue Carlsbad, California Project ID: CUP2017-008/GR2019-0013 Dear Mr. Rick: In accordance with your request, Hetherington Engineering, Inc. has provided third-party geotechnical review of Reference 9. Based on our review, the Geotechnical Consultant has responded to our prior comments and we have no additional comments. Obsçrvation and testing by the Geotechnical Consultant during grading and construction should be required to verify anticipated conditions or to revise the geotechnical recommendations as considered necessary. A final geotechnical report of grading and construction should be required. The opportunity to be of service is sincerely appreciated. If you have any questions regarding this review, please contact this office at your convenience. Sincerely, Civil Engineer 30488 onal Geologist 3772 Geotechnical Enginec 1 Engineering Geologist 11 (expires 3/31/20) I Hydrogeologist 591 3/31/20 1 1-via e-mail (David.Rickcarlsbadca.gov) 5365 Avenida Encinas, Suite A • Carlsbad, CA 92008-4369 • (760) 931-1917 • Fax (760) 931.0545 33.3 Third Street, Suite 2 • Laguna Beach, CA 9265,1-2306 • (949) 715-5440 • Fax (760) 931-0545 www.hetheringtonengineeririg.com CUP t1-oa9 3. REFERENCES 1.. "Carlsbad Oaks North Business Park - Phase 1, Lots 1 through 9, Carlsbad, California, Final Report of Testing and Observation Services During Site Grading," by Geocon, Inc., dated August 30, 2006. "Carlsbad Oaks North Business Park - Phase 1, Lot 1, Carlsbad, California, Addendum to Final Report of Testing and Observation Services During Site Grading," by Geocon, Inc., dated October 30, 2008. "Transmittal of Geotechnical Information, Carlsbad Oaks North-Lot 1, Carlsbad, California," by Geocon, Inc., dated September 25, 2017. "Grading Plans for: Oakmont of Carlsbad, Lot 1 of Tract No. 14926," by Alliance Land Planning & Engineering, Inc., dated March 1, 2019 (9 sheets). 'Third-Party Geotechnical Review (First), Oakmont of California, Carlsbad, California, Project ID: CUP2017-008", by Hetherington Engineering, Inc., dated April 23, 2019. "Update Geotechnical Report, Oakmont of Carlsbad, Carlsbad Oaks North Business Park -.Lot 1, CUP2017-0008, GR2019-0013, DWG 5174A, Carlsbad, California", by Geocon Inc., dated May 20, 2019, "Grading Plans for: Oakmont of Carlsbad, Lot 1 of Tract No. 14926," by Alliance Land Planning & Engineering, Inc., dated September 3, 2019 (14 sheets). "Third-Party Geotechnical Review (Second), Oakmont of California, 2740 Faraday Avenue, Carlsbad, California, Project ID: CUP2017-008/GR2019-0013", by Hetherington Engineering, Inc., dated October 9, 2019. "Response to Third-Party Geotechnical Review Comments, Oakmont of Carlsbad, Carlsbad Oaks North Business Park - Lot 1, CUP2017-0008, GR2019-0013, DWG 5174A, Carlsbad, California", by Geocon Inc., dated October 30; 2019. Project No. 8844.1 Log No; 20753 HETHERINGTON ENGINEERING, INC.