Loading...
HomeMy WebLinkAboutPD 15-06; PD - BUILDING 7710 SHELL + SITE; SUPPLEMENT TO GEOTECHNICAL EVALUATION; 2015-06-04&44owe Gichn:a; ?JX EnViriiniI Sciences June 4, 2015 Project No. 107302005 Mr. Dave Heilman AG-CP La Costa Owner, LP 1640 56' Street, Suite 101 Santa Monica, California 90401 Subject: Supplement to Geotechnical Evaluation La Costa Towne Center Proposed Equinox Fitness Center 7710 El Camino Real, Carlsbad, California References: Ninyo & Moore, 2015, Geotechnical Evaluation, La Costa Towne Center Proposed Equinox Fitness Center, 7710 El Camino Real, Carlsbad, California: dated April 17. R.J. Moon, Inc., 1981, Notes and Drawings for Vons Market #165, Carlsbad, Cali- fornia: dated March. Dear Mr. Hellman: Additional information in regards to the subject building's existing foundation system has been made available to our offices (R.J. Moon, Inc., 1981). Based on our review of the provided docu- ments, we understand that concrete cast-in-drilled-hole (CIDH) belled piles (referred to as caissons in the referenced notes and drawings) underlie the north building wall. Additionally, these caissons extend down to a bearing level that correlates to an elevation below the existing adjacent retaining wall to the north. However, based on the findings from our project geotechnical report (Ninyo & Moore, 2015), these caissons do not extend down into formational materials as recommended in our project geotechnical report. Accordingly, the new CIDH piles to be installed along the northern building wall should be placed at midpoint between the existing caissons. As recommended in our project geotechnical report, new CIDH piles constructed along the north and west wall building foundations should extend through the existing fill materials and be embedded 5 feet or more into competent formational materials. During installation of the new CIDH piles, the elevation of the geologic contact to the formational materials will be evaluated for the potential reduction of the number of piles based on the locations and depths of the existing caissons. The recommendations in our geotechnical report referenced above are still valid and applicable. 57 i 0 Rulfin Road San Diego, California 92123 Phone (858) 576-1000 • Fax(858)576-9600 San Diego Irvine Ls Angeles • Rancho Cucamonga Oakland San Francisco San Jose Sacramento Lis Vegas Phoenix • Tucson • PescottVaey Denver Houston La Costa Towne Center Proposed Equinox Fitness Center June 4, 2015 7710 El Camino Real, Carlsbad, California Project No. 107302005 We appreciate the opportunity to be of service on this project. Respectfully submitted, NINYO & MOORE / T A4' i(: 0.28 17 . Jeffrey T. Kent, PE, GE Senior Engineer (II CAT/JTKJRSHIgg Distribution: (1) Addressee Ronald S. Halbert, PE No. 04O4 1 Principal Engineer ' \EXP33I.I4 J, 101302005 idoc 2 Z;= ------ -- I I AUG 05