TRAFFIC IMPACT ANALYSIS
ICETOWN SKATEOPLEX SPORTS CENTER
Carlsbad, California
July 30, 2013
Revised September 18, 2013
CUP 13-09
LLG Ref. 3-13-2247
Prepared by: Under the Supervision of:
Amelia Giacalone Walter Musial, P.E. Linscott, Law &
Transportation Planner II Associate Principal Greenspan, Engineers
4542 Ruffner Street
Suite 100
San Diego, CA 92111
858.300.8800
858.300.8810 F
www.11gengineers.com
TABLE OF CONTENTS
SECTION PAGE
1.0 Introduction................................................................................................................................1
2.0 Project Description....................................................................................................................4
3.0 Existing Conditions....................................................................................................................6
3.1 Existing Street Network......................................................................................................6
3.2 Existing Traffic Volumes....................................................................................................6
4.0 Analysis Methodology..............................................................................................................10
4.1.1 Intersections .......................................................................................................... 10
4.1.2 Street Segments ..................................................................................................... 10
5.0 Significance Criteria..................... 11
6.0 Analysis of Existing Conditions..............................................................................................12
6.1 Intersection Operations.....................................................................................................12
6.2 Street Segment Operations................................................................................................12
7.0 Trip Generation/Distribution/Assignment 14
7.1 Trip Generation.................................................................................................................14
7.2 Trip Distribution/Assignment ........................................................................................... 15
8.0 Existing + Project Analysis.....................................................................................................19
8.1 .1 Intersection Operations.........................................................................................19
8.1.2 Segment Operations .............................................................................................. 19
9.0 Long-Term (Year 2035) Analysis...........................................................................................21
9.1 Long-Term (Year 2035) Traffic Volumes........................................................................21
9.2 Long-Term (Year 2035) Analysis.....................................................................................21
9.2.1 Intersection Operations ......................................................................................... 21.
9.2.2 Segment Operations .............................................................................................. 21.
9.3 Long-Term (Year 2035) + Project Analysis .......................
.
.............................................. 21
9.3.1 Intersection Operations.........................................................................................21
9.3.2 Segment Operations..............................................................................................22
10.0 Conclusions...............................................................................................................................26
LINSCOTT, LAw& GREENSPAN, engineers LLG Ref. 3-13-2247
I Skateoptex Sports Center
N:\2247ReportVftA.2247_Revised Sept 2013.docx
APPENDICES
APPENDIX
Intersection and Segment Manual Count Sheets
ICU Intersection Analysis Methodology
Existing Intersection Analysis Calculation Worksheets
Site Specific Trip Generation Information
Existing + Project Intersection Analysis Calculation Worksheets
Long-Term (Year 2035 ) Forecasting Information
Long-Term (Year 2035) intersection Analysis Calculation Worksheets
LIST OF FIGURES
SECTION—FIGURE # - FOLLOWING PAGE
Figure1-1 Vicinity Map...................................................................................................................2
Figure1-2 Project Area Map............................................................................................................3
Figure2-1 Site Plan..........................................................................................................................5
Figure 3-1 Existing Conditions Diagram..........................................................................................8
Figure 3-2 Existing Traffic Volumes................................................................................................9
Figure 7-1 Project Traffic Distribution...........................................................................................16
Figure 7-2 Project Traffic Volumes................................................................................................17
Figure 7-3 Existing + Project Traffic Volumes..............................................................................18
Figure 9-1 Long-Term (Year 2035) Traffic Volumes....................................................................24
Figure 9-2 Long-Term (Year 2035) + Project Traffic Volumes ....................................................25
LINSCOTT, LAw &GREENSPAN, engineers LLG Ref. 3-13-2247
ii Skateoplex Sports Center
N:\2247tReport\TIA.2247_Revised Sept 2013.doc,c
LIST OF TABLES
SECTION—TABLE # PAGE
Table 3-1 Existing Traffic Volumes.....................................................................................................7
Table 5-1 City Of Carlsbad Traffic impact Significant Thresholds ................................................... 11
Table 6-1 Existing intersection Operations: PM Peak Hour .............................................................. 12
Table 6-2 Existing Street Segment Operations: PM Peak Hour........................................................13
Table 7-1 Project Trip Generation Summary.....................................................................................14
Table 8-1 Existing + Project Intersection Operations: PM Peak Hour..............................................20
Table 8-2 Existing + Project Street Segment Operations: PM Peak Hour.........................................20
Table 9-1 Long-Term (Year 2035) Intersection Operations: PM Peak Hour....................................23
Table 9-2 Long-Term (Year 2035) Street Segment Operations: PM Peak Hour...............................23
LLG Ref. 3-13-2247 LINSCOTT, Lw& GREENSPAN, engineers
III Skateoplex Sports Center
N:'2247\Report\TIA.2247_Revised Sept 2013.docx
TRAFFIC IMPACT ANALYSIS
ICETOWN SKATEOPLEX SPORTS CENTER
Carlsbad, California
July 30, 2013
Revised September 18, 2013
1.0 INTRODUCTION
Linscott, Law & Greenspan, Engineers (LLG) has been retained to assess the potential traffic
impacts associated with the proposed Icetown Skateoplex Sports Center. The project site is located
at 2283 Cosmos Court, west of El Camino Real and South of Palomar Airport Road, in the City of
Carlsbad. The project proposes to locate an ice training facility within an existing 27,013 square foot
building. This traffic report includes the following:
Project Description
Existing Conditions Discussion
Analysis Approach and Methodology
Significance Criteria
Trip Generation / Distribution / Assignment
Existing and Existing + Project Analysis
Long-Term (Year 2035) and Long-Term + Project Analysis
Conclusions
The study area for this project encompasses areas of anticipated impact related to the project during
the PM commuter peak hour, since any activity is expected to occur after 9:00 AM. The analysis was
also completed per City of Carlsbad guidelines and based on a review of approved traffic studies in
the area.
Figure 1-1 shows the vicinity map. Figure 1-2 shows a more detailed project area map.
LLG Ref. 3-13-2247 Liwscorr, LAw & GREENSPAN, engineers I Skateoplex Sports Center
N:'2247\ReponVf1A.2247_Revised Sept 2013.docx
OCEANSIDE VISTA
CARLSBAD \SANJMAPOOPOOS I ESC3NDIO
*PROJ"ECT-AREA
ENCINITAS .
SOLANABEAH :
POWAY
DEL MAR -
:
PACIFIC
OCEAN
...
SAN DIEGO
SANTEE
EL CAJON
LAMESA
Legend
LEMON
City Boundary GROVE
Incorporated
()
Unincorporated CORONADO
-
o 2 4 Miles
N:\2247\GS Figure 1-1
Date: 7(24(13
Vicinity Map
SKATEOPLEX SPORTS CENTER
C Yarrow Dr PO -7
)
pccbrosia Lo
cr
o
0
Q
0
I
D
2.0 PROJECT DESCRIPTION
The Icetown Skateoplex Sports Center project site is located at 2283 Cosmos Court, west of El
Camino Real and South of Palomar Airport Road, in the City of Carlsbad. The project proposes to
locate an ice training facility within an existing 27,013 square foot building.
The Skateoplex Sports Center will consist of a regulation ice surface (approximately 16,150 sf) with
dasher boards and tempered glass surrounding the rink, as well as changing rooms, a
classroom/study area, coaches room, referee room, zamboni room, storage rooms, a full service pro
shop, and a snack bar. No spectator seating is proposed at this time.
The Center's primary use will be for training and education on skills and techniques in figure
skating, hockey, and individual team practices. Skating lessons for figure skating and hockey will be
offered through the Carlsbad Parks and Recreation program and the home school physical education
program.
During the late morning hours figure skating and freestyle sessions will be held, with no more than
20 skaters on the ice surface at any one time. The Carlsbad Parks and Recreation and afterschool
learn to skate programs will be scheduled during the afternoon sessions throughout the week and
sometimes on weekends. The class sizes will be determined by age group with class participation
between ten to fifteen students per division.
The Skateoplex Sports Center will not host youth or adult hockey tournaments or skating
competitions.
LINSCOTT, LAw& GREENSPAN, engineers LLG Ref. 3-13-2247 4 Skateoplex Sports Center
N:'2247\Report\TIA.2247_kevised Sept 2013.docx
COSMOS COURT
_
TLIIT i III1I[I:::
18 SPACES
9 SP- ACES
(-I---
EXISTING TWO STORY
- CONCRETE TILT-UP STRUCTURE
co
cn
I0
0
M
N:2247FIgures
Date: 7124113 Figure 2-1
Site Plan
SKATEOPLEX SPORTS CENTER
3.0 EXISTING CONDITIONS
Effective evaluation of the traffic impacts associated with the proposed Skateoplex Sports Center
requires an understanding of the existing transportation system within the project area. Figure 3-1
shows an existing conditions diagram, including intersections and lane configurations.
The specific study area includes the following intersections and street segments:
Intersections
Palomar Airport Road / Yarrow Drive
Yarrow Drive / Cosmos Court (Corte De La Pina)
Yarrow Drive / Camino Vida Roble
Street Segments
Yarrow Drive
Palomar Airport Road to Cosmos Court (Corte De La Pina)
Cosmos Court (Corte Dc La Pina) to Camino Vida Roble
3.1 Existing Street Network
The following is a description of the existing street network in the study area.
Palomar Airport Road is classified as a Prime Arterial on the City of Carlsbad Circulation
Element. Within the study area, Palomar Airport Road is currently an east-west six-lane divided
roadway. The posted speed limit is 55 mph. Curbside parking is not permitted. Bike lanes and bus
stops are provided.
Yarrow Drive is an unclassified roadway on the City of Carlsbad Circulation Element. Within the
study area, Yarrow Drive is currently a north-south four-lane undivided roadway. The posted speed
limit is 40 mph. Curbside parking is not permitted and bike lanes are not provided. Bus stops are
provided.
Camino Vida Roble is classified as a Secondary Arterial on the City of Carlsbad Circulation
Element. Within the study area, Camino Vida Roble is currently an east-west two-lane undivided
roadway. The posted speed limit is 40 mph. Curbside parking is not permitted. Bike lanes and bus
stops are provided.
Cosmos Court is an unclassified roadway on the City of Carlsbad Circulation Element. Within the
study area, Cosmos Court is currently an east-west two-lane undivided roadway. There is no posted
speed limit. Curbside parking is permitted intermittently. Bike lanes and bus stops are not provided.
3.2 Existing Traffic Volumes
Table 3-1 is a summary of the most recent available average daily traffic volumes (ADTs) from
LLG counts conducted on Tuesday, July 16, 2013.
LINSCOTT, LAw &GREENSPAN, engineers LLG Ref. 3-13-2247 6 5kateoplex Sports Center
N:',2247\Report\TIA.2247_Revised Sept 2013.docic
Figure 3-2 shows the Existing Traffic Volumes. Appendix A contains the manual count sheets.
TABLE 3-1
EXISTING TRAFFIC VOLUMES
Street Segment AD Ta Date Source
Yarrow Drive
Palomar Airport Road to Cosmos Court 3,860 July 16, 2013 LLG (Corte De La Pina)
Cosmos Court (Corte De La Pina) to 2,310 July 16, 2013 LLG CaminoVida Roble
Footnotes:
a. Average Daily Traffic Volumes.
LINSCorT, L LLG Ref. 3-13-2247&w & GREENSPAN, engineers
7 Skateoplex Sports Center
30
N:\2247Report\TIA.2247_Revised Sept 2013.docx
?( Turn Lane Configurations
UO Intersection Control
# Number of Travel Lanes
D I U Divided I Undivided Roadway
XMX Posted Speed Limit
C-
• - On Street Parking Permitted
Bicycle Lane
S Bus Stop
4
C) 0
D CD
C) CD 0.
9
2U
44,
i r
CosmosCt
(Corte De La Pina)
•
Ab
Ect
2(1 40
Camino Vs MPH
da RoMe
-
0
N:t2247tFigures Figure 3-1 Date: 7124113
Existing Conditions Diagram
SKATEOPLEX SPORTS CENTER
N:t2247Figures Figure 3-2 1((III Date: 7124113
Existing Traffic Volumes
SKATEOPLEX SPORTS CENTER
4.0 ANALYSIS METHODOLOGY
Level of service (LOS) is the term used to denote the different operating conditions which occur on a
given roadway segment under various traffic volume loads. It is a qualitative measure used to
describe a quantitative analysis taking into account factors such as roadway geometries, signal
phasing, speed, travel delay, freedom to maneuver, and safety. Level of service provides an index to
the operational qualities of a roadway segment or an intersection. Level of service designations
range from A to F, with LOS A representing the best operating conditions and LOS F representing
the worst operating conditions. Level of service designation is reported differently for signalized and
unsignalized intersections, as well as for roadway segments.
4.1.1 Intersections
Per City of Carlsbad standards, the signalized and unsignalized intersections were analyzed using the
Intersection Capacity Utilization (ICU) method for Existing and Existing + Project conditions.
The ICU procedure is based on an article in the Institute of Transportation Engineers Journal,
August 1978 and assumes the traffic flow characteristics of signalized intersections. It computes the
Level of Service (LOS) for the total intersection based upon a summation of volume to capacity
(V/C) ratios for the key conflicting movements. The ICU numerical value represents the percent of
signal green time, and thus, the capacity required to serve the traffic demand. The LOS for
signalized intersections varies from A (free flow, little delay) to F ("heavy congestion" conditions).
ICU methodology and calculation worksheets can be found in Appendix B.
4.1.2 Street Segments
Per City of Carlsbad standards, the street segments in the project area were analyzed on a peak hour
basis. The midblock peak hour volumes were utilized to calculate volume to capacity ratio (V/C) for
each direction of the street segment. The City of Carlsbad assumes a one-direction capacity of 1,800
vehicles per hour per lane for through lanes. A Level of service (LOS) is determined by using V/C
thresholds.
LINSCOTT, LAw & GREENSPAN, engineers LLG Ref. 3-13-2247 10 Skateoplex Sports Center
N:'2247\ReportVr1A.2247_Revised Sept 2013.docx
5.0 SIGNIFICANCE CRITERIA
As outlined in the City of Carlsbad's Growth Management Plan, a traffic impact is considered to be
significant if the addition of project traffic causes the intersection or Street segment LOS to decrease
to worse than LOS D during the peak hour.
For intersections or street segments which are currently operating worse than LOS D, a project
impact will be considered significant if the project causes the ICU value at an intersection to increase
by more than 0.02 or the volume-to-capacity ratio at a segment to increase by more than 0.02.
TABLE 5-1
CITY OF CARLSBAD
TRAFFIC IMPACT SIGNIFICANT THRESHOLDS
LOSS
without
Project
Allowable Increase Due to Project Impacts
Roadway Segments
(V/C) b
Intersections
(ICU)
A,B,C,D A project's impact is deemed significant if the LOS is degraded to LOS E or F
E, F 0.02 0.02
Footnotes:
LOS = Level of Service
V/C = Volume to Capacity Ratio
C. ICU = Intersection Capacity Utilization
Lascoir, LAw & GREENSPAN, engineers LLG Ref. 3-13-2247
11 5kateoplex Sports Center
N:\2247\ReportVlIA.2247_Revised Sept 2013.docx
6.0 ANALYSIS OF EXISTING CONDITIONS
The analysis of existing conditions is discussed below. Appendix C contains the Existing
intersection Level of Service analysis worksheets.
6.1 Intersection Operations
PM commuter peak hour analysis of the study area intersections under existing conditions was
performed using the ICU Methodology, consistent with the City's practice and the Growth
Management Plan.
Table 6-1 shows that, under existing conditions, the study area intersections are calculated to
currently operate at LOS C or better.
6.2 Street Segment Operations
Weekday analysis of the study area street segments was performed using the methodology outlined
in Section 5. Table 6-2 shows that, during the PM peak hour, the study area street segments are
calculated to operate at LOS A.
TABLE 6-1
EXISTING INTERSECTION OPERATIONS: PM PEAK HOUR
Intersection Control
Type Peak Hour
Existing
Icua LOS'
Palomar Airport Road / Yarrow Drive Signal PM 0.642 C
Yarrow Drive / Cosmos Court (Corte Dc La Pina) TWSCC PM 0.291 A
Yarrow Drive / Camino Vida Roble OWSCd PM 0.410 A
ICU LOS
Footnotes: 0.0 < 0.55 A
a. Intersection Capacity Utilization 0.56 to 0.64 B
b. Level of Service. 0.65 to 0.73 C
c. TWSC - Two-Way Stop Controlled Intersection 0.74 to 0.82 D
d. OWSC - One-Way Stop Controlled intersection. 0.83 to 0.91 E
>0.92 F
LiNscorl, LAW& GREENSPAN, engineers LLG Ref. 3-13.2247
12 Skateoplex Sports Center
N:'2247Report\TIA.2247_Revised Sept 2013.docx
TABLE 6-2
EXISTING STREET SEGMENT OPERATIONS: PM PEAK HOUR
Street Segment Direction Peak
Hour Capacity '
Existing ______________________
Volume b LOS'
Yarrow Drive
Palomar Airport Road to Cosmos Court (Corte NB PM 3,600 377 0.105 A
DeLaPina) SB PM 3,600 148 0.041 A
Cosmos Court (Corte Dc La Pina) to Camino NB PM 3,600 104 0.029 A
Vida Roble SB PM 3,600 144 0.040 A
Footnotes:
Capacities based on 1,800 vehicles per lane per hour.
Volume to Capacity.
Level of Service.
LOS V/C
A <0.6
B 0.61-0.70
C 0.71-0.80
D 0.81-0.90
E 0.91-1.0
F >1.0
LiNscoir, LAw & GREENSPAN, engineers LLG Reff, 3-13-2247
13 Skateoplex Sports Center
N:\2247\ReportVflA.2247_Revised Sept 2013.docx
7.0 TRIP GENERATION/DISTRIBUTION/ASSIGNMENT
The Icetown Skateoplex Sports Center proposes to locate an ice training facility within an existing
27,013 square foot building, which will consist of one regulation ice surface (approximately 16,150
SO.
Typically, per City of Carlsbad standards, trip generation is based on rates provided in SANDAG 's
Brief Guide of Vehicular Traffic Generation Rates for the San Diego Region. However, since
SANDAG does not provide a rate for ice skating rinks or any similar land use, trip generation
estimates for the proposed project were based on a site-specific trip generation rate calculated by
obtaining ADT volumes at the existing Riverside Icetown location. The existing Riverside Icetown
will serve as the headquarters for operations of the proposed Skateoplex Sports Center. Open since
1997, Riverside Icetown is a 61,450 square foot facility including two regulation ice surfaces and
offers public skating sessions, freestyle skating, birthday parties, skating lessons, spectator seating,
and a hockey program for youths and adults.
ADT counts at the Riverside Icetown driveways were conducted on Tuesday, July 16, 2013, when
both ice rinks were fully occupied and programmed. The counts show that 672 ADT was generated
by the 2 rink facility, or 336 ADT per rink. Therefore it was concluded that the proposed Skateoplex
Sports Center, consisting on one rink, will generate 336 ADT. PM peak hour trip generation
estimates were calculated using a similar methodology. No trip credits for the land use / entitlements
of the existing building were conservatively assumed in this analysis.
It should be noted that the ice skating rink rate was calculated using the number of rinks as the
independent variable since the rinks are the primary trip attracter, as opposed to the square footage.
This approach also yields the highest trip generation for the project.
Further information regarding the site specific trip generation rate can be found in Appendix D.
7.1 Trip Generation
Table 7-1 tabulates the total project traffic generation. The project is calculated to generate
approximately 336 ADT with 12 inbound /21 outbound trips during the PM commuter peak hour.
TABLE 7.1
PROJECT TRIP GENERATION SUMMARY
Land Use Quantity
Daily Trip Ends (ADT) PM Commuter Peak Hour
Rate Volume Rate
In:Out Volume
Split % In Out Total
Ice Skating Rink I Rink 336/Rink 336 9.7% 37:63 12 21 33
Footnotes:
Trip generation rate derived from existing counts conducted on July 16, 2013.
ADT = Average Daily Traffic
LINSCOIr, LAw &GREENSPAN, engineers LLG Ref. 3-13-2247
14 Skateoplex Sports Center
N:\2247\Report\TIA.2247_Revised Sept 201 3.docx
7.2 Trip Distribution/Assignment
The project-generated traffic was distributed to the street system based on existing travel patterns
and adjacent land uses. Figure 7-1 depicts the project traffic distribution percentages and Figure 7-2
depicts the project traffic assignment based on this distribution. Figure 7-3 shows the PM commuter
peak hour and ADT traffic volumes for the Existing + Project scenario.
LlNscorr, LAw &GREENSPAN, engineers LLG Ref. 3.13-224715 Skateoplex Sports Center
N:\224Report\TI&2247_Revised Sept 2013.docx
N:2247Wigures Figure 7-1 mirnii Date: 7124113
Project Traffic Distribution
SKATEOPLEX SPORTS CENTER
XXX Project Traffic Volumes
XXX— PM Peak Hour Traffic Volumes
c
#0
çb
6'
15
1-?
A
C) 0
(0
0.
112 L 336
- Cosmos Ct
1 (Corte De La Pina) a.
Project
Site
- c.n
-
Camino Vida Roble
0
N:l2247tFigures Figure 7-2 Date: 7124113
Project Traffic Volumes
SKATEOPLEX SPORTS CENTER
X,XXX Daily Traffic Volumes
XXX— PM Peak Hour Traffic Volumes
.0
\0
CD
—213 Iz .
ç79
4-4 t , CcsmosCt
I I (Corte DeLaPine)
OTh
Project
Site
1%)
0)
CD cc 30
144
0—' Camino Vida Roble
0
N:t2247Wigures
Date: 7124113 Figure 7-3
Existing + Project Traffic Volumes
SKATEOPLEX SPORTS CENTER
8.0 ExIsTING + PROJECT ANALYSIS
8.1.1 Intersection Operations
Table 8-1 summarizes the intersection operations under Existing + Project conditions. As shown in
Table 8-1, the study area intersections are calculated to continue to operate at LOS C or better.
No significant impacts were calculated under the Existing + Project scenario.
Appendix E contains the peak hour analysis worksheets for the Existing + Project scenario.
8.1.2 Segment Operations
Table 8-2 summarizes the Street segment operations under Existing + Project conditions. As shown
in Table 8-2, the study area segments are calculated to continue to operate at LOS A.
No significant impacts were calculated under the Existing + Project scenario.
LiNscorl, LAw &GREENSPAN, engineers LLG Ref. 3.13-2247
19 Skateoplex Sports Center
N:\2247\ReportVrlA.2247_Revised Sept 2013docx
Footnotes:
Intersection Capacity Utilization
Level of Service
C. A denotes project induced ICU increase.
TWSC - Two-Way Stop Controlled intersection
OWSC - One-Way Stop Controlled intersection.
ICU LOS
0.0 < 0.55 A
0.56 to 0.64 B
0.65 to 0.73 C
0.74 to 0.82 D
0.83 to 0.91 E
>0.92 F
TABLE 8-1
EXISTING + PROJECT INTERSECTION OPERATIONS: PM PEAK HOUR
Intersection Control
Type
Peak
Hour
Existing Existing + Project Ac
ICUa LOS" ICU LOS
Palomar Airport Road / Yarrow Drive Signal PM 0.642 C 0.647 C 0.005
Yarrow Drive / Cosmos Court (Corte De La Pina) TWSCd PM 0.291 A 0.306 A 0.015
Yarrow Drive / Camino Vida Roble OWSCC PM 0.410 A 0.414 A 0.004
TABLE 8-2
EXISTING + PROJECT STREET SEGMENT OPERATIONS: PM PEAK HOUR
Peak Existing Existing +Project Street Segment Direction I L_Hour Capacity Ac
Volume I V/C I LOSd Volume V/C LOS
Yarrow Drive
Palomar Airport Road to NB PM 3,600 377 0.105 A 389 0.108 A 0.003
Cosmos Court (Corte De La
Pina) SB PM
PM,
3,600 148 0.041 A 155 0.043 A 0.002
NB 3,600 104 0.029 A 109 0.030 A 0.001 Cosmos Court (Corte De La
Pina) to Camino Vida Roble 144 A SB PM 3,600 0.040 153 0.043 A 0.003
Footnotes:
Capacities based on 1,800 vehicles per lane per hour.
Volume to Capacity.
Level of Service.
LOS V/C
A <0.6
B 0.61-0.70
C 0.71-0.80
D 0.81-0.90
E 0.91-1.0
F >1.0
LlNscoTr, LAW & GREENSPAN, engineers LLG Ref. 3-13-224720 Skateoplex Sports Center
N:\2247\RcporttTlA.2247_Revised Sept 2013.docx
9.0 LONG-TERM (YEAR 2035) ANALYSIS
The following section presents the analysis of study area intersections and street segments under
Long-Term (Year 2035) conditions with and without the proposed project.
9.1 Long-Term (Year 2035) Traffic Volumes
Long-Term (Year 2035) traffic volumes were forecasted for the study area using the SANDAG
Series 12 Year 2035 traffic model. The volumes on Palomar Airport Road were factored up as the
model appears to under represent future traffic. The traffic volumes represent LLG's best efforts of
forecasting Long-Term (Year 2035) conditions with the most recent modeling information available
at the time this report was prepared. No improvements to the roadway network were assumed under
Long-Term conditions.
Further information on the SANDAG Series 12 model can be found in Appendix F.
Based on the projected forecast ADT volumes, the Long-Term (Year 2035) PM peak hour volumes
were calculated based on the existing relationship between ADT and peak hour volumes. The
forecast volumes were also checked for consistency between intersections, where no driveways or
roadways exist between intersections, and were compared to existing volumes for accuracy.
Figure 9-1 shows the forecasted Long-Term (Year 2035) traffic volumes, and Figure 9-2 shows the
Long-Term (Year 2035) + Project traffic volumes.
9.2 Long-Term (Year 2035) Analysis
9.2.1 Intersection Operations
Table 9-1 summarizes the intersection operations under Long-Term (Year 2035) conditions. As
shown in Table 9-1, the study area intersections are calculated to operate at LOS D or better.
Appendix G contains the peak hour analysis worksheets for the Long-Term (Year 2035) scenario.
9.2.2 Segment Operations
Table 9-2 summarizes the street segment operations under Long-Term (Year 2035) conditions. As
shown in Table 9-2, the study area segments are calculated to operate at LOS A.
9.3 Long-Term (Year 2035) + Project Analysis
9.3.1 Intersection Operations
Table 9-1 summarizes the intersection operations under Long-Term (Year 2035) + Project
conditions. As shown in Table 9-1, the study area intersections are calculated to continue to operate
at LOS D or better with the addition of project traffic.
No significant impacts were calculated under the Long-Term (Year 2035) + Project scenario.
Appendix G contains the peak hour analysis worksheets for the Long-Term (Year 2035) + Project
scenario.
LINSCOTT, LAw & GREENSPAN, engineers LLG Ref. 3-13-2247 21 Skateoplex Sports Center
N;\2247\ReportvrlA.2247_Revised Sept 2013.docx
9.3.2 Segment Operations
Table 9-2 summarizes the street segment operations under Long-Term (Year 2035) + Project
conditions. As shown in Table 9-2, the study area segments are calculated to continue to operate at
LOS A with the addition of project traffic.
No significant impacts were calculated under the Long-Term (Year 2035) + Project scenario.
L!NSCOTT, LAw& GREENSPAN, engineers LLG Ref. 3-13-2247 22 Skateoplex Sports Center
N:2247\ReportVF1A.2247_Revised Sept 2013 docic
Footnotes:
Intersection Capacity Utilization
Level of Service
C. A denotes project induced ICU increase.
TWSC - Two-Way Stop Controlled intersection
OWSC - One-Way Stop Controlled intersection.
ICU LOS
0.0 < 0.55 A
0.56 to 0.64 B
0.65 to 0.73 C
0.74 to 0.82 D
0.83 to 0.91 E
>0.92 F
TABLE 9-1
LONG-TERM (YEAR 2035) INTERSECTION OPERATIONS: PM PEAK HOUR
Intersection Control
Type
Peak
Hour
Long Term
(Year 2035)
Long-Term (Year
2035) + Project AC
1CUa LOSS ICU LOS
Palomar Airport Road / Yarrow Drive Signal PM 0.758 D 0.763 D 0.005
Yarrow Drive / Cosmos Court (Corte De La Pina) TWSCd PM 0.380 A 0.426 A 0.046
Yarrow Drive / Camino Vida Roble owsce PM 0.434 A 0.438 A 0.004
TABLE 9-2
LONG-TERM (YEAR 2035) STREET SEGMENT OPERATIONS: PM PEAK HOUR
Street Segment Direction Peak
Capacity
Long-Term (Year 2035) Long-Term (Year 2035) + Project Ac
Hour Volume V/Cc LOSd Volume V/C LOS
Yarrow Drive
Palomar Airport Road to NB PM 3,600 430 0.119 A 442 0.123 A 0.003
Cosmos Court (Corte De La
Pina) SB PM
PM
3,600 170 0.047 A 177 0.049 A 0.002
NB 3,600 130 0.036 A 135 0.038 A 0.001
Cosmos Court (Corte De La
Pina) to Camino Vida Roble SB PM 3,600 180 0.050 A 189 0.053 A 0.003
Footnotes:
Capacities based on 1,800 vehicles per lane per hour.
Volume to Capacity.
Level of Service.
LOS V/C
A <0.6
B 0.61-0.70
C 0.71-0.80
D 0.81-0.90
E 0.91-1.0
F >1.0
LINSCOTr, LAw& GREENSPAN, engineers LLG Ref. 3-13-2247
23 Skateoplex Sports Center
N:22471ReportVflA.2247_Revised Sept 2013.docx
N:2247Figures Figure 9-1
Date: 9117113
Long-Term (Year 2035) Traffic Volumes
SKATEOPLEX SPORTS CENTER
N:2247FIgures Figure 9-2 I1Iil Date: 9117113
Long-Term (Year 2035) + Project Traffic Volumes
SKATEOPLEX SPORTS CENTER
10.0 CoNcLusioNs
The proposed Skateoplex Sports Center will consist of a regulation ice surface (approximately
16,150 sf) with dasher boards and tempered glass surrounding the rink, as well as changing rooms, a
classroom/study area, coaches room, referee room, zamboni room, storage rooms, a full service pro
shop, and a snack bar. No spectator seating is proposed at this time.
The proposed project was calculated to generate 336 ADT with 12 inbound / 21 outbound trips
during the PM commuter peak hour.
The project was calculated to have no significant impacts at any of the study area intersections or
street segments under Existing + Project or Long-Tern (Year 2035) + Project conditions during the
PM commuter peak hour.
LINscOIT, LAw & GREENSPAN, engineers LLG Ref. 3-13-2247 26 Skateoplex Sports Center
N:\2247\Repofl\TIA.2247_Revised Sept 2013.docx
TECHNICAL APPENDICES
SKATEOPLEX SPORTS CENTER
Carlsbad, California
September 18, 2013
LLG Ref. 3-13-2247
Linscott, Law&
Greenspan, Engineers
4542 Ruffner Street
Suite 100
San Diego, CA 92111
858.300.8800 T
858.300.8810
www.11gengineers.com
INTERSECTION AND SEGMENT MANUAL COUNT SHEETS
LINSCOIr, LAw & GREENSPAN, engineers LLG Ref. 3-13-2247
Skateoplex Sports Center
N:2247Rport\Appendices\Appendix2247.doc
Turn Count Summary
Accurate Video Counts Inc
info@accuratevideocounts.com
(619) 987-5136
Location: Palomar Airport Road
Date of Count: Tuesday, July 16, 2013
Analysts: LWCD
Weather: Sunny
AVC Proj No: 13-0084
@ Yarrow Drive
www.accuratevideocounts.com P.O. Box 261425 San Diego CA 92196 7/24/2013
Vehicular Count
Accurate Video Counts Inc
info@accuratevideocounts.com
(619) 987-5136
Location: Palomar Airport Road @ Yarrow Drive
Left
Southbound
Thru Right Left..
Westbound
Thru Right
I &SIII P M)
Northbound
Left Thru Right Left
Eastbound
Thru Right TOTAL
4:00 PM 17 10 14 23 211 8 35 1 41 8 403 22 793
4:15 PM 15 2 15 28 247 10 24 3 40 6 322 18 730
4:30 PM 20 3 8 26 207 5 44 2 70 12 445 7 849
4:45 PM 19 5 10 21 280 6 22 1 53 6 355 11
789
5:00 PM 13 0 9 19 283., 6 33 3 75 6 427 17 891
5:15 PM 22 5 4 15 276 14 32 0 42 7 354 19
790
5:30 PM II 3 8 16 261 11 30 0 48 3 335 21 747
5:45 PM 5 0 6 25 244 7 16 1 27 10 351 16
708
Total 122 28 74 173 2,009 67 236 11 396 1 58 2.992 131 6,297
PM Intersection Peak Hour: 4:30 PM - 5:30 PM Intersection PEIF: 0.93
Southbound
Left Thru Right
Westbound
Left Thru Right
Northbound
Left Thru Right
Eastbound
Left Thru Right
TOTAL
Volume 74 13 31 81 1046 31 131 6 240 31 1581 54 3319
PHF 0.84 0.65 0.775 0.779 0.924 0.554 0.744 0.5 0.8 0.646 0.888 0.711
0.93
MoveinentPHF 0.87 0.94 0.81 0.90 0.93
www.accuratevideocounts.com P.O. Box 261425 San Diego CA 92196 7/24/2013
Turn Count Summary
Accurate Video Counts Inc
info@accuratevideocounts.com
(619) 987-5136
Location: Cosmos Court (Carte De La Pina) @ Yarrow Drive
Date of Count: Tuesday, July 16, 2013
Analysts: LV/CD
Weather: Sunny
AVC Proj No: 13-0084
www.accuratevideocounts.com P.O. Box 261425 San Diego CA 92196 7/24/2013
Vehicular Count
Accurate Video Counts Inc
info@accuratevideocounts.com
(619) 987-5136
Location: Cosmos Court (Corte De La Pina) @ Yarrow Drive
Left
Southbound
Thru Right
thi
Left
Peri od 1ernI.IJ
Westbound
Thru Right
6:00 PM)
Northbound
Left Thru Right Left
Eastbound
Thru Right TOTAL
4:00 PM 10 26 0 13 0. 32 0 29 6 2 0 0 118
4:15 PM 10 18 0 8 0. 27, 0 16 2 0 0 0
81
4:30 PM 6 13 0 20 0 80 0 23 6 0 0 0
- 148
4:45 PM 7 18 0 8 0 37 1 14 5 1 0 0
91
5:00 PM 2 20 0 28 0 51 0 30 5 1 0 0 137
5:15 PM 2 23 0 14 0 33 0 16 4 2 0 0 94
5:30 PM 3 21 0 10 0 31 0 17 1 0 0 0
83
5:45 PM 3 15 0 9 0 18- 0 14 3 0 0 0
62
Total 43 154 0 110 0 309 1 159 32 6 0 0 814
PM Intersection Peak Hour: 4:30 PM - 5:30 PM Intersection PHF: 0.79
Southbound
Left Thru Right
Westbound
Left Thru Right
Northbound
Left Thru Right
Eastbound
Left Thru Right
TOTAL
Volume 17 74 0 70 0 201 1 83 20 4 0 0 470
PHF 0.61 0.804 #!# 0.625 ##?## 0.628 0.25 0.692 0.833 0.5 ##### #####
0.79
Movement PHF 0.91 0.68 0.74 0.50
0.79
www.accuratevideocounts.com P.O. Box 261425 San Diego CA 92196 7/24/2013
Turn Count Summary
Accurate Video Counts Inc
info@accuratevideocounts.com
(619) 987.5136
Location: Camino Vida Roble @ Yarrow Drive
Date of Count: Tuesday, July 16, 2013
Analysts: LV/CD
Weather: Sunny
AVC Proj No: 13-0084
www.accuratevideocounts.com P.O. Box 261425 San Diego CA 92196 7/24/2013
Vehicular Count
Accurate Video Counts Inc
infocaccuratevideocounts.com
(619) 987-5136
Location: Camino Vida Roble @ Yarrow Drive
Left
Southbound
Thru Right Left
Westbound
Thru Right
6:00 PM)
Northbound
Left Thru Right Left
Eastbound -
Thru Right TOTAL
4:00 PM 34 0 12 0 40 7 0 0 0 15 84 0 192
4:15 PM 18 0 5 0 40 8 0 0 0 6 95 0 172
4:30 PM 24 0 13 0 38 12 0 0 0 8 89 0 184
4:45 PM 21 0 5 0 36 7 0 0 0 4 96 0 169
5:00 IM 45 0 10 0 45 9 0 0 0 7 177 0 293
5:15 I'M 40 0 8 0 30 6 0 0 0 4 132 0 220
5:30 I'M 26 0 15 0 33 4 0 0 0 4 108 0 190
5:45 I'M 15 0 7 0 21 2 0 0 0 7 75 0 127
Total
1
223 0 75 0 283 55 0 0 0 55 856 0
PM Intersection Peak Hour: 4:45 PM - 5:45 PM Intersection PHF: 0.74
Southbound
Left Thru Right
Westbound
Left Thru Right
Northbound
Left Thru Right
Eastbound
Left Thru Right
TOTAL
Volume 132 0 38 0 144 26 0 0 0 19 513 0 872
PHF 0.73 ll#### 0.633 #### 0.8 0.722 ##### #### ##Il# 0.679 0.725 #### 0.74
MoveinentPHF 0.77 0.79 #DIV/0! 0.72
0.74
www.accuratevideocounts.com P.O. Box 261425 San Diego CA 92196 7/24/2013
24 Hour Segment Count
Accurate Video Counts Inc
info@accuratevideocounts.com
(619)987-5136
Location: 1. Yarrow Drive: Palomar Airport Road to Cosmos Court (Corte De La Pina)
Orientation: North-South
Date of Count: Tuesday, July 16, 2013
Analysts: DASH
Weather: Sunny
AVC Proj. No: 13-0084
Volum 24 Hour Segmen
Hourly Volume Time NB SB Total
12:00 AM - 1:00 AM 5 3 8
1:00 AM - 2:00 AM 14 0 14
2:00 AM - 3:00 AM 0 0 0
3:00 AM - 4:00 AM 1 1 2
4:00 AM - 5:00 AM 4 14 18
5:00 AM - 6:00 AM 10 92 102
6:00 AM - 7:00 AM 47 262 309
7:00 AM - 8:00 AM 63 283 346
8:00 AM - 9:00 AM 62 238 300
9:00 AM - 10:00 AM 102 164 266
10:00 AM - 11:00 AM 85 92 177
11:00AM - 12:00 PM 113 100 213
Total 506 1,249 1,755
Hourly Volume Time NB SB Total
12:00 PM - 1:00 PM 156 141 297
1:00 PM - 2:00 PM 124 142 266
2:00 PM - 3:00 PM 124 113 237
3:00 PM - 4:00 PM 221 101 322
4:00 PM - 5:00 PM 292 104 396
5:00 PM - 6:00 PM 226 71 297
6:00 PM - 7:00 PM 89 41 130
7:00 PM - 8:00 PM 40 20 60
8:00 PM - 9:00 PM 17 15 32
9:00 PM - 10:00 PM 14 13 27
10:00 PM - 11:00 PM 14 11 25
11:00 PM - 12:00 AM 14 2 16
Total 1,331 774 2,105
—NB —SB —Total
I 700 900I l!(!o] 450
400
350
300
250 TI 200
50
150
100
+00 AM 2:00 AM 4:00 AM 6:00 AM' 8:00 AM 10:00AM 12:00PM 2:00PM 4:00PM6:00PM 8:00 PM 10:00 PM -50
www.accuratevideocounts.com P.O. Box 261425 San Diego CA 92196 7/24/2013
24 Hour Segment Count
Accurate Video Counts Inc
info@accuratevideocounts.com
(619) 987-5136
Location: 1. Yarrow Dave: Cosmos Court (Carte De La Pina) to Camino Vida Roble
Orientation: North-South
Date of Count: Tuesday, July 16, 2013
Analysts: DASH
Weather: Sunny
AVC Proj. No:
-
13-0084
Volum 24 Hour Segmer.
Time Hourly Volume
NB SB Total
12:00 AM - 1:00 AM 3 2 5
1:00 AM - 2:00 AM 1 1 2
2:00 AM - 3:00 AM 1 0 1
3:00 AM - 4:00 AM 1 2 3
4:00 AM - 5:00 AM 3 3 6
5:00 AM - 6:00 AM 18 18 36
6:00 AM - 7:00 AM 61 45 106
7:00 AM - 8:00 AM 87 57 144
8:00 AM - 9:00 AM 128 59 187
9:00 AM - 10:00 AM 87 65 152
10:00 AM - 11:00 AM 56 54 110
11:00 AM - 12:00 PM 74 100 174
Total 520 406 926
_
4
Time Hourly Volume
NB SB Total
12:00 PM - 1:00 PM 109 135 244
1:00 PM - 2:00 PM 118 78 196
2:00 PM - 3:00 PM 79 85 164
3:00 PM - 4:00 PM 85 111 196
4:00 PM - 5:00 PM 68 126 194
5:00 PM - 6:00 PM 42 164 206
6:00 PM - 7:00 PM 16 63 79
7:00 PM - 8:00 PM 14 27 41
8:00 PM - 9:00 PM 10 21 31
9:00 PM - 10:00 PM 6 9 15
10:00 PM - 11:00 PM 1 11 12
11:00 PM - 12:00 AM 1 6 1 4 1 10
Total 554 834 1,388
24-Hour NB Volume 1,074 24-Hour SB Volume 1,240
www.accuratevideocounts.com P.O. Box 261425 San Diego CA 92196 7/24/2013
APPENDIX B
ICU INTERSECTION METHODOLOGY
10
LINSCOTT, LAW& GREENSPAN, engineers LLG Ref. 3-13-2247
Skateoplex Sports Center
N:\2247Report\Appendices\Appendix,2247.doc
Table 4.-1 Signalized Intersection Level of Service (2000 11CM)
LOS Control Delay Per Vehicle -(s)
A :510
B >10and:520
C >20 and ~35
D >35 and :555
E >55 and c80
F >80
Signing Settings
For an unsignalized two-way stopped controlled (TWSC) or all-way stop-controlled (AWSC)
intersection, the Level of Service for the intersection is calculated by taking the Intersection
Delay and converting it to a letter using Table 4-2.
Table 4-2 TWSC & AWSC Level of Service Criteria (2000 11CM)
LOS Control Delay Per Vehicle(s)
A :M
B - >10and:915
C >l5 and --25
D >25 and ~35
E >35 and 50
F >50
The LOS criteria fol' TWSC and AWSC intersections are different than that used for a signalized
intersection. The primary reason for this is that drivers expect different levels of performance
between signalized and unsignalized intersections.
Intersection Capacity Utilization
Intersection Capacity Utilization is the 2003 (ICU 2003) for the intersection. Full details of the
ICU 2003 can be found in the topic, Intersection Capacity (ICU) Report (see page 15-11). A full
description of ICU 2003 along with commentary and instructions is available in the reference
book, Intersection Capacity Utilization 2003 available from Trafficware.
4-10
The ICU is shown for unsignalized intersections because it represents the potential capacity for
the intersection if it were to be signalized.
ICU Level of Service
The ICU Level of Service (LOS) gives insight into how an intersection is functioning and how
much extra capacity is available to handle traffic fluctuations and incidents. ICU is not a value
that can be measured with a stopwatch, but it does give a good reading on the conditions that
can be expected at the intersection. Full details of the ICU LOS can be found in the topic,
Intersection Capacity (ICU) Report.
Letters A to H are assigned to the intersection based on the Intersection Capacity Utilization
using Table 4-3 Note that the ICU 2003 includes additional levels past F to further differentiate
congested operation.
Table 4-3 Level of Service Criteria for ICU Analysis
ICU Level of Service
0to55% A
>55% to 64% B
>64% to 73% C
>73% to 82% D
>82%to91% E
>91%to100% F
>100%to109% G
>109% I-I
Offset Settings
The settings in the Offset settings box specify the phase the offset is reference to and the value
of the current oflet. Each intersection is given one offset that can be referenced to the beginning
of green, yellow or red of the phase. The offset value represents the number of seconds that the
reference phase lags the master reference (or arbitrary reference if no master is specified) The
master reference synchronizes the intersections sharing a common cycle length to provide a
coordinated system.
4-Il
APPENDIX C
EXISTING ANALYSIS CALCULATION WORKSHEETS
30
LINSCOIr, LAw& GREENSPAN, engineers LLG Ref. 3-13-2247
Skateoplex Sports Center
N:2241\Report\Appendices\Appendix.2247.doc
Intersection Capacity Utilization
1: Palomar Airport Rd & McClellan 7/25/2013
tp'd
Lane Configurations ' ffl . 'I ffl ' tl+
Yolurne(vph) 54 81 104631 131 6 1.
Pedestrians
Ped Button
Pedestrian Timing (s)______________
Freeght,_ - No No No No
Ideal Flow 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lost Time (s) 4040Th4040 40 - 40 44O 4 040 40
Minimum Green (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
efi Cycle L'rigth(s)' "'120 ' T.' "T'..."
Volume Combined (vph) 31 1635 0 81 1077 0 131 246 0 0 118 0
Lane Utilization Factor 1.00 0.91 1.00 1.00 o.9firoo 1.00 0.95 i.00 ioo 1.00 1.00,
Turning Factor (vph) ______ 0.95 1.00 0.85 0.95 1.00 0.85 0.95 0.85 0.85 0.95 0.93 0.85
aturated Flow (vph) - 1805 5150 0 1805 5153 0 1805 3088 0 0 1768 0
Pedlntflime(s) 00 000.0 0.0 0.9 0.0
Pedestrian Frequency (%) 0.00 ... 0.00 0.00 0.00
Protected Option Allowed Yes Yes No No
Reference Time (s):: 21 .38.1 . .5.4 25.1 0.0 '0.0 .: .0.6
Ad] Reference Time (s) 8.0 42.1 0.0 9.4 29.1 0.0 0.0 0.0
Permitted Option
Ad] Saturation A(vph) 120 1717 120 1718 1252 1544 0 167
Reference Time A(s) 30.9 38.1 80.8 25.1 12.6 9.6 - 0.0 84.8 ]
Ad] Saturation B (vph NA NA NA NA 0 3088 NA NA
Reference Time B (s)_ NA - NA NA 16.7 9.6 NA jj
Reference Time (s) 38.1 80.8 12.6 84.8
djReferenceTimes)..4Z1 -- 84.8 16.6 , , 88.8
Split Option
Ref TimeCombined(s) 2.1 38.1 5.4 25.1 - 8.7 9.6 0.0 0.0
Ref Time Seperate (s) 2.136.8 5.4 24.4 8.7 0.2 4.9 0.9
Reference Time (s) _38.138.1 25.1_25.1 - 9.6 9.6 - 8.0 8.0 j Ad] Reference Time (s) 42.1 42.1 29.1 29.1 13.6 13.6 12.0 12.0
Protected Option (s)
Permitted Opfion(s) -
51.5 NA
84.8 _88.8 Split Option (s)
Minimum(s)
71.2 25.8 -- 51.5_ - 25.6 77.1
ihiTjrns
Mi Reference Time (s)
Oncomig Left Ref Time
Cross Thru Ref Time
Combined (s)
Intersection Capacity Utilization 64.2% ICU Level of Service
Reference Times and Phasing Options do not represent an optimized timing plan.
Skateoplex Sports Center 7/24/2013 Ex PM Synchro 7- Report
Page 1
Intersection Capacity Utilization
2: Cormos Ct (Cone De La Pina) & Yarrow Dr 7125/2013
t,d
Lane Configurations 4, 4, 41' 41
Volume (vph) 4 -- 00 70 0 201 j83 20 _17 74_ 0
Pedestrians
Ped Button - -- - - I
Pedestrian Timing (s)
Free Right No No No Nd
Ideal Flow 19001900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lost Time (s) 40 40 40 40 40 _40 40 40 40 40 40 40
Minimum Green (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
RefrCycle Length (s) 120
Volume Combined (vph) 0 4 0 0 271 0 0 104 0 0 91 0
Lane Utilization Factor 1.o0 100 1 00 1 00 1 00 1 00 iO 095 100 1 00 095 i.06
Turning Factor (VphL 0.95 0.95 0.85 0.95 0.88 0.85 0.95 0.97 0.85 0.95 0.99 0.85
Saturated Flow (vph) 0 1805 - 0 --0-i 667 0 0 3512 0 0 3584 0
Ped lntf Time (s) 0.0 0.0 0.0 0.0 . 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Pedestrian Frequency (%) _-0.60- 000 0.00: .::0.00
Protected Option Allowed No No No No
Reference Time (s) - 00 - 00 00 00
Adj Reference Time (s) 0.0 0.0 0.0 0.0
Permitted Option -___ ___
Adj Saturation A (vph) 0 587 0 1828 0 1368 0 119
.Reference time A(s) 00 .0.8 0.6 17.8 . 0.04.4 0 17.1
Adj Saturation B (vph NA NA 0 0 0 1756 0 1809
Reference Time B (s) - NA NA 12.7 2L5 81 7.6 9.1 7.0
Reference Time (s) 0.8
- - 1.8 - - - 4.4 9.1
Adj Reference Time (s) 8.0 21.8 8.4 13.1
Split Option
Ref Time Combined (s) 0.0 0.3 0.0 19.5 - 0.0 3.6 0.03.0
Ref time Seperate(s) 0.3 0.0 - 4.7 0.0 01 2.8 . 1.1 2.5
Reference Time (s) 0.3 0.3 19.5 19 3.6 3.6 - 3.0 3.0
Adj Reference Time (s) 8.0 8.0 23.5 23.5 8.0 8.0 8.0
--
8.0
Protected Option (s) NA NA - - - Permitted Option (s) 21.8 - - - 13.1 - - - - - -
Split Option (s) 31.5 16.0
- Minimum (s) 21.8 13.1 34.9 - -
hWurns
Adj Reference Time
Cross Thru Ref Time (s)
Oncoming Left Ref Time (s)
Combined (s)
Intersection Capacity Utilization 29.1% ICU Level of Service A
Reference Times and Phasing Options do not represent an optimized timing plan.
Skateoplex Sports Center 7/24/2013 Ex PM Synchro 7- Report
Page 2
Intersection Capacity Utilization
3: Camino Vida Roble & Yarrow Dr 7/25/2013
-d
Lane Configurations 'I ji
Volume (vph) 19 513 14426 132 38
Pedestrians
Ped Button
Pedestrian Timing (s)
"Free Right ________ No No
Ideal Flow 1900 1900 1900 1900 1900 1900
Lostlime(s) 4.0 4O4 4 4.0 40
Minimum Green' -(,s-) - 4.0 4 4.0&0 4.0 4.0 - - - Refr Cycle Length (s) 120
Volume Cornbrned(vph) 19 513 1700 132 38
Lane UtilizationFactor 1.0011001_00 1.00 1.60-1.0d--
Turning Factor (vph) 0.95 1.00 0.98 0.85 0.95 0.85
Saturated Flow (vph) 1805 19001856 0 1805 1615 -
PedIntf Time (s) 0.0 0.0 0.00.0 0.0 0.0
Pedestrian Frequency (%) 0.00 0.00 0.00
Protected Option Allowed Yes Yes No
ReferenceTi 1.3 324 11.0 OM
Ad] Reference Time (s) 8.0 36.4 15.0 0.0 8.0
Permitted Option.........
Ad] Saturation A (vph)120 19001856 120
Reference Time Ms 189_24 110 1316
Adj Saturation B (vph NA NA NA NA
nce1me(s)NA NA NA NA - - __-
Reference Time (s)32.411.0
dj Reference Time (s) 36.4 15.0
Split Option
Ref TirneCombined(s)1.3 32.4 11.0 8.8
Ref Time Seperate (s) 1.3 32.4 9.3 8.8
!rence Time(s) 32.4 32.4 11.0 8.8
Ad] Reference Time (s) 36.4 36.4 15.0 12.8
ummary EBIWB SBIIWC-omBi d
Protected Option (s) 36.4 NA
PermittedOption(s) -- _____ 36.4 - Err
Split Option (s) 51.4 12.8
murn(s) - _________- __364 128
Pig %T SBR
Ad] Reference Time (s) 8.0
Cross Thru Ref Time s) 15.0
çomingef Time (s) 00
Combined (s) 23.0 -
tëtiTSummary
Intersection Capacity Utilization 41.0% ICU Level of Service A
Reference Times and Phasing Options do not represent an optimized timing plan.
Skateoplex Sports Center 7/24/2013 Ex PM Synchro 7- Report
Page 3
FAZZ NMI I]
SITE SPECIFIC TRIP GENERATION RATE INFORMATION
LINSCOTT, IAW& GREI
- - - - - - - - - - - - - - - -_- - L
I -
OM N
p
-
Pig
- :
/ ,
- -
tA
I—----n~r
Vtl
Ali
L %'t
a tog
- -
Im
Riverside Icetown
10540 Magnolia Avenue • Riverside, CA • 92505
64,450 SF facility with 2 Ice Rinks.
Site specific trip generation rate counted on July 16, 2013.
584 ADT counted + 15% factor to account for any uncounted trips = 672 ADT.
Rate = 336 ADT / Rink. PM peak = 9.7% of ADT (37% in / 63% out).
Tuesday, July 16, 2013 CITY: Riverside PROJECT: sc0211
#VALUE! Prepared by: Field Data Services of Arizona,
PREPARED BY: PACIFIC TRAFFIC DATA SERVICES pacific@aimld.com tel 951 249 3226
AM Period INi OUT1 IN2 OUT2 PM Period INi 0011 IN2 OUT2
00:00 0 0 0 0 12:00 2 0 1 0
00:15 0 0 0 0 12:15 3 1 0 4
00:30 0 0 0 0 12:30 2 2 5 6
00:45 0 0 0 0 0 0 0 0 12:45 2 9 0 3 4 10 7 17 39
01:00 0 0 0 0 13:00 1 0 3 5
01:15 0 0 0 0 13:15 2 0 5 13
01:30 0 0 0 0 13:30 3 0 0 5
01:45 0 0 0 0 0 0 0 0 13:45 3 9 0 0 3 11 4 27 47
02:00 0 0 0 0 14:00 0 1 2 4
02:15 0 0 0 0 14:15 4 2 6 5
02:30 0 0 0 0 14:30 2 0 4 6
02:45 0 0 0 0 0 0 0 0 14:45 0 6 0 3 3 15 6 21 45
03:00 0 0 0 0 15:00 1 0 5 4
03:15 0 0 0 0 15:15 1 0 4 3
03:30 0 0 0 0 15:30 1 1 7 10
03:45 0 0 0 0 0 0 0 0 15:45 1 4 0 1 9 25 7 24 54
04:00 0 0 0 0 16:00 1 0 2 14
04:15 0 0 0 0 16:15 2 0 3 8
04:30 0 0 0 0 16:30 1 0 4 7
04:45 0 0 0 0 0 0 0 0 16:45 0 4 1 1 8 17 6 35 57
05:00 0 0 0 0 17:00 1 1 5 9
05:15 0 0 0 0 17:15 2 1 8 2
05:30 1 0 2 0 17:30 1 0 6 5
05:45 0 1 0 0 0 2 0 0 3 17:45 0 4 0 2 4 23 5 21 50
06:00 0 0 3 0 18:00 0 0 2 9
06:15 0 0 1 1 18:15 0 0 2 6
06:30 0 0 0 2 18:30 3 0 4 22
06:45 0 0 0 0 0 4 1 4 8 18:45 1 4 0 0 1 9 8 45 58
07:00 0 0 2 1 19:00 0 0 2 2
07:15 1 0 4 1 19:15 1 0 0 3
07:30 0 0 2 0 19:30 1 0 1 4
07:45 2 3 0 0 5 13 1 3 19 19:45 2 4 0 0 2 5 2 11 20
08:00 4 1 6 6 20:00 0 0 0 5
08:15 1 0 2 6 20:15 1 0 0 3
08:30 0 1 7 2 20:30 1 1 0 3
08:45 0 5 0 2 4 19 3 17 43 20:45 0 2 0 1 0 0 3 14 17
09:00 0 0 2 0 21:00 0 0 0 3
09:15 0 0 5 4 21:15 0 0 0 0
09:30 1 0 3 7 21:30 0 0 0 1
09:45 0 1 2 2 3 13 0 11 27 21:45 0 0 0 0 0 0 2 6 6
10:00 0 0 4 6 22:00 0 0 0 1
10:15 2 0 3 5 22:15 0 0 0 1
10:30 1 0 3 1 22:30 0 0 0 0
10:45 0 3 0 0 7 17 3 15 35 22:45 0 0 1 1 0 0 0 2 3
11:00 1 0 9 7 23:00 0 0 0 0
11:15 1 0 5 6 23:15 0 0 0 0
11:30 1 1 6 6 23:30 0 0 0 0
11:45 0 3 1 2 5 25 4 23 53 23:45 0 0 0 0 0 0 0 0
Total Vol. 16 6 93 73 188 46 12 115 223 396
Daily Totals
IN1 OUT1 IN2 OUT2 Combined
62 18 208 296 584
AM PM
Split % 19.0% 36.5% 23.8% 20.6% 36.8% 29.6% 21.3% 23.1% 25.9% 63.2%
Peak Hour 10:30 10:00 10:15 11:15 10:30 17:15 14:45 16:45 12:00 17:15
Volume 6 8 5 5 19 9 5 5 6 16
P.H.F. 0.38 0.50 0.63 0.63 0.53 0.50 0.63 0.63 0.75 0.57
pacific@aimtd.com Tell. 951 249 3226
fl
I
I
I
I
1~
I
I
I
I
I
I
I
I
I
1
I
1
Intersection Capacity Utilization
2: Cormos Ct (Corte De La Pina) & Yarrow Dr 7/26/2013
Lane Configurations
Volumevph) - 4 0 0 !9Q_3_1 83 2524 74 0
Pedestrians _____
.Ped Button
Pedestrianhimuig(s)
Free Right - No No No No
Ideal Flow 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lost Time (s). 4.0 - 4.0 4.0 4.0 4.0......., .4.0. ....4.0.. 4.0 4.9 4.0 4
Minimum Green (s) -
4.0 4.0 4.0 4.0 4.9 4.0
Refr
4.0 - 4.0 4.0 4.0 4.0 4.0
Cycle Length (s) 120
Volume Combined (vph) 0 4 0 0 292 0 0 109 0 0 98 0
Lane Utilization Factor 1.00 1.00. 1.00 1 00 1 00 1.00 1.00 :0.95: 1.00 1.00 0.95 100
Turning Factor (vph) 0.95 0.95 0.85 0.95 0.88 0.85 0.95 0.97 0.85 0.95 0.99 0.85
Saturated Flow (vph) 0 1805 0 0 1669 0______0 3492 0. 0 3573 0
Pedlntf Time (s) P.00.0 0.0 - 0.0 0.0 0.9 0.0 0.9 0.90.90.0 0.0
Pedestrian Frequency (%) 7 0.00 0.00 0.00 0.00
Protected Option Allowed No No No No
Reference Time (s) - 00 0 0 0.0 0.0
Ad] Reference Time (s) 0.0 0.0 0.0 0.0
Permitted Option - - - - _____ - - -
Adj Saturation A (vph) 0 --60 609 0 1835 0 1375
-
0 119
Reference Time A(s) - 00 08 00 191 - 00 46 00242 -
Adj Saturation B (vph NA NA 0 0 0 1746 0 1809
ReferenceTimeB(s) NA NA 13.3 29.0 8.1 7.7 -- 9.6 7.2
Reference Time (s) 0.8 19.1 4.6 9.6
Ad] Reference Time (s) 8.0 23.1 8.6 13.6
Split Option _________
RefTimeC ombi ned(s) - 00 03 00 210 00 37 00 33
Ref Time Seperate (s) 0.3 0.0 5.3 0.0 0.1 2.9 1.6 2.5
ReferenceTime(s) 0 0.3 21.0 21.0 - 31 31 -
Adj Reference Time (s) 8.0 8.0 25.0 25.0 8.0 8.0 8.0 8.0
Piummarylllllllllllllllllllll WB1Wl5 NBjSB G6i
Protected Option (s) NA NA
Permitted Option(s) 23.1 13.6
Split Option (s) 33.0 16.0
Minimum(s) - - 231 - 136 367 - - -
Rigfifil.urn
Mj Reference Time (s) . ..... .. :. . : .. . ..:
Cross Thru Ref Time (s) - - -
OncomrngLeftRefTime(s)
Combined (s)
iitëtiiiTSummary
Intersection Capacity Utilization 30.6% ICU Level of Service A
Reference Times and Phasing Options do not represent an optimized timing plan
Skateoplex Sports Center 7/24/2013 Ex + P PM Synchro 7- Report
Page 2
Intersection Capacity Utilization
3: Camino Vida Roble & Yarrow Dr 7/26/2013
Lane Configurations 'j j' f ' r
Volume (vph) 20513144 30139 40
Pedestrians
PedButton
Pedestrian Timing (-s)--
Free Right NO -. No 1
-
!deal Flow 1900 1900 1900 1900 1900 1900
Lost Time (s) 4.0 4.0 4.0 4.0 - 4.0 4.0 - -
Minimum Green (s) 4.0 4.0 4.0 4.0 4.0 4.0
Refr Cycle Length (s) 120
Volume Combined (vph) . 20 - 513 174 0 139 40
Lane Utilization Factor 1-.0-0 1.00-- 1001 001 00 1_00 -- - - -
Turning Factor (vph) 0.95 1.00 0.97 0.85 0.95 0.85
Saturated Flow(vph) 1805 1900 18510 18051615 - - - - -
Ped lntf Time (s) 0.0 0.0 0.0 0.0 0.0 0.0
-...........-
Pedestrian Frequency (%) 0.00 0.00 0.00 .
Protected Option Allowed Yes Yes No
Reference Time (5) 1.3 32.4 11.3 0.0 3.0
Ad] Reference Time (s) 8.0 36.4 15.3 0.0 8.0
Permitted Option - - - - _____ Ad] Saturation A (vph) 120 1900 1851 120
Reference TimeA(s) 11386
Adj Saturation B (vph NA NA NA NA
Referenc"Ti e B(s) NA NA NA NA
Reference Time (s) 32.4 11.3 - - - - - -
-.
Ad] Reference Time (s) 36.4 - 15.3 - - - - - -
Split Option
Ref Time Combined (s) 1.3 32.4 11.3 9.2
Ref Time Seperate (s) 1.3 32.4 9.3 9.2
ReferenceTime(s) 32.4 32.4 11.3 9.2 . . ..
Adj Reference Time (s) 36.4 36.4 15.3 13.2 . .
ummary EBIWB SB
Protected Option (s) 36.4 NA
Permitted Option (s) 36.4 -Err
Split Option (s) 51.7 13.2
Minimum' Cs) - . - 36.4 12 49.6 -
Pitft1Turns SBB
Adj Reference Time (s) 8.0 - - - -
Cross Thru Ref Time (s)
Oncoming Left Ref Time (s) 0.0
Combined (s)
-
23.3
- - - - -
Intersection Capacity Utilization 41.4% ICU Level of Service A
Reference Times and Phasing Options do not represent an optimized timing plan.
Skateoplex Sports Center 7/24/2013 Ex + P PM Synchro 7 - Report
Page 3
APPENDIX F
LONG-TERM (YEAR 2035) FORECASTING INFORMATION
LINSCOTI, LAW & GREENSPAN, engineers LLG Ref. 3-13-2247
Skateoplex Sports Center
N:\2247ReportAppendices\Appendix2247.doc
Forecasted Volumes 2035
TFIC Home 2008 2020 2050 J Pan Zoom in. You have gone fiJi screen. Exit fiJi screen 11) IPOIt
ROAD NAME: IlAVIARA__1
Forecasted Volume (in
1000s): 12 8
Posted Speed:
Number of Lanes: 114
One Way or Two (1 or 2): 112
IMedian Type: IINO MEDIAN
[Functional Class: IICOLLECTOR!
,
6wr 'INV
..-
72 ---.-- - ;..
CIA
kLSbA
I
S .. 9,17
EI -.---v- L.
____ i• \
41
rq I
J3
c.
4 cr
-.
.
APPENDIX G
LONG-TERM (YEAR 2035) INTERSECTION ANALYSIS
CALCULATION WORKSHEETS
LlNscorr, LAw &GREENSPAN, engineers LLG Ref. 3-13-2247
Skateoplex Sports Center
N:\2247d(cport\Appendices'Appendix2247.doc
Intersection Capacity Utilization
1: Palomar Airport Rd & McClellan 9/17/2013
Lane Configurations
yolurne(vph)40 2000 60 JO 1320 40150 10 270 90 2040
Pedestrians
Ped Button
Pedestrian Timing (s)
Free Right
- No - -- No No _ No
Ideal Flow 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lost Time (s) 40 40 4040 40 40 40 40 40 40 40 40
Minimum Green (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
Refr Cycle Length (s) 120
Volume Combined (vph) 40 2060 0 90 1360 0 150 280 0 0 150 0
Lane Utilization Factor 1.00 0.91 1.00 1.00 0.91 1.00 1.00 0.95 1.00 1.00 1.00 1.00
Turning Factor (vph) 0.95 1.00 0.85 0.95 1.00 0.85 0.95 0.86 0.85 0.95 0.93 0.85
Saturated Flow(vph) 18055153 -0 1805 5153 0 1805 3094 0 769
Ped lntf Time (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Pedestrian Frequency (%) 0.00 0.00 0.00 0.00 I
Protected Option Allowed Yes Yes No No
Reference Time (s) 2.7 48.0 0.0 6.0 31.7 0.0 _0.0_ 0.0
Adj Reference Time (s) 8.0 52.0 0.0 10.0 35.7 0.0 0.0 0.0
Permitted Option - --------- ---------------*. _______ AdjSaturationA(vph) 120 1718 120 1718 1203 1547 0 173
Reference Time A(s) - 39.9 480 .89.8 31.7 - 15.0 10.9 0.0 103.9
Adj Saturation B (vph NA NA NA NA 03094 NA NA
Reference Time B (s) NA NA NA NA 180 109 NA NA
Reference Time (s) 48.0 89.8 15.0
-
103.9
Adj Reference Time (s) 52.0 93.8 19.0 107.9
Split Option
Ref Time Combined (s) .2.7 ..48.0 6.031.7 10.0 19 0.0 ___10.2 - Ref Time Seperate (s) 2.7 46.6 6.0 30.7 10.0 0.4 6.0 1.4
Reference Time (s) 48.0 48.0 - t? 31.7 J9 16.0 . 10.2 10
Adj Reference Time (s) 52.0 52.0 35.7 35.7 14.9 14.9 14.2 14.2
ummary EBIWB NBTSB
Protected Option (s) 62.0 NA
- Permitted Option (s) 93.8 107.9
Split Option (s) 87.6 29.0
_______
Minimum (s) 62 0 29.0 910 - - - -
ifT.urns
Adj Reference Time (s)
Cross Thru Ref Time (s)
Oncoming Left Ref Time (s)
Combined (s)
Intersection Capacity Utilization 75.8% ICU Level of Service
Reference Times and Phasing Options do not represent an optimized timing plan.
Skateoplex Sports Center 7/24/2013 2030 PM Synchro 7- Report
Page 1
Intersection Capacity Utilization
2: Cormos Ct (Cone De La Pina) & Yarrow Dr 9/17/2013
Lane Configurations 4+ 4+ 4t 41+
oiumevph) - 10 10 -10 ___8010240 10 9030 - 20 80 10
Pedestrians
Ped Button
PedestrianTiming (s)
FreeRht No No No - No -
ideal Flow 1900190019001900 1900190019001900 1900 1900 1900 1900
Lost Time (s) -- 40 40 4040 40 40 40 40 40 40 40 40
MinimumGreen(s)4.0 4.04.04.04.04.04.04.0 4.0 4.0 4.0 4.0
Volume Combined (vph) 0 _______ 30 0 0 330 0013000110 0
Land Utilization Factor 10o 100 1.00 1.00 1.00 1.00 1.00 0.95 1.00 1:00 -0.95 1.00
Turning Factor (vph) 0.95 0.930.850.950.880.850.95 0.96 0.85 0.95 0.98 0.85
Saturated Fkw(vph) - 0 1775 0 -- 0 1672 0 03479 0 0 3536 0 - Pedlntf Time 0.0 0.0 0.00.00.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Pedestrian Fregt(%) 0.00 000 0.00 0.00
Protected Option Allowed No ____________ No No No
Referencelime(s -00________________________00 00 - 00
Ad] Reference Time (s) 0.0 0.0 0.0 0.0
Permitted Option -
Ad] SaturationA(vph) 0 11697 0 1399 L..396 P J!
Reference Time A(s) 0.0 31 0,0 28.3 0.0 13.6 0.0 20.4
-
Adj Saturation B (vph NA NA 0 0 0 1741 0 1779
Reference Time B(s) NA ..........NA 13.3 311 8.7 8.5 9.3 7JJ
Reference Time (sL 3.1 28.3 8.7 9.3
Adj Reference Time (s) 8.0 32.3 12.7 13.3
Split Option
________
Ref Time Combined(s) OM 2.0 0.0 23.7 0.0 4.5 0.0 3.7
Ref Time Seperate (s) 0.7 0.7 5.3 0.7 0.7 3.1 1.3 2.7
Reference Time(s) 2.0 2.0 23.7 23.7 4.5 4.5 3.7 3.7
Adj Reference Time (s) 8.0 8.0 27.7 27.7 8.5 8.5 8.0 8.0
ummary EBIWB NBTSB
Protected Option (s) NA NA
Permitted Option (s) ____ _32.3 13
Split Option (s) 35.7 16.5
Minimum (s) - 32.3 13.3 45.6
AdjReferenôeTirni(. ....... . ....
Cross Thru Ref Time (s)
_____ Oncoming Left Ref Time . 77
Combined (s)
t?tiTSummary
Intersection Capacity Utilization 38.0% ICU Level of Service A
Reference Times and Phasing Options do not represent an optimized timing plan.
Skateoplex Sports Center 7/24/20132030 PM Synchro 7- Report
Page 2
Intersection Capacity Utilization
3: Camino Vida Roble & Yarrow Dr - 9/17/2013
Lane Configurations 'j 4'
Volume (vph) 30 - 55015O 30 _10 40
Pedestrians
Ped Button
Pedestrian Timing (s)
free Right - No No.,
- Ideal Flow 1900 1900 1900 1900 1900 1900
Lost Time (s) 4.0 4.0 - &0 40&04
Minimum Green (s) 4.0 4.0 4.0 4.0 4.0 4.0
Refr Cycle Length (s) 120
Volume Combined (vph) 30 550 180 0 140 40
Lane Utilization Factor 1.00 1.00 1.00 1.00 1.00 1.00
Turning Factor (vph) 0.95 1.00 0.98 0.85 0.95 0.85
Saturated Flow (vph) 1805 1900 1853'O 1805 1615 - - - Ped lntf Time (s) 0.0 0.0 0.0 0.0 0.0 0.0
Pedestrian Frequency (%) 0.00 0.00 0.00
Protected Option Allowed Yes Yes No
Reference Time (s) 20347 117 00 30
Adj Reference Time (s) 8.0 38.7 15.7 0.0 8.0
Permitted Option VV V* Adj Saturation A (vph) 120 1900 1853
V
---f-2-0 120
Reference Time A(s) 2.9 347 11.7 139.6
Adj Saturation B (vph NA NA NA NA
Reference Time B (s) NA NA NA NA
Reference Time (s) 34.7 11.7
--
Adj Reference Time (s) 38.7 15.7
Split Option
Ref Time Combined (s) 2.0 34.7 11.7 9.3
Ref Time Seperate (s) 2.0 34.7 9.7 9.3 - V
Reference Time (s) 347 34.7 11.7- 9.3 Adj Reference Time (s) 38.7 38.7 15.7 13.3
ummary EBIWB SB
Protected Option (s) 38.7 NA
Permitted Option (s) 38.7 Err Split Option (s) 54.4 13.3
Minimum (s) 38.7 13.3 52.0 - -- - - j
Adj Reference Time (s) - - 8.0
Cross Thru Ref Time (s) 15.7
Oncoming Left Ref Time (s) - V 9.0
Combined (s) 23.7
Intersection Capacity Utilization 43.4% ICU Level of Service
Reference Times and Phasing Options do not represent an optimized timing plan.
Skateoplex Sports Center 7/24/2013 2030 PM Synchro 7- Report
Page 3
Intersection Capacity Utilization
1: Palomar Airport Rd & McClellan 9/17/2013
Lane Configurations 'j ff1. ' ff1. ' fl. 4.
Volume (vph) 40 2000 63 94 132040 156 10 276 90 20 -
Pedestrians ______
Ped Button
Pedestrian Timing (s)
Free Right No No - No No
Ideal Flow 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
MinimumGreen(s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
Refr Cycle Length (s)
Volume Combined (vph) 40 2063 0 94 1360 0 156 286 0 0 150 0
LaneUtilizationFactor _________1.00 0.91____1.00 _______1.00 0.91___________1.00 1.00 __0.951.001.00 1.00 _1.00
Turning Factor (vph) 0.95 1.00 0.85 0.95 1.00 0.85 0.95 0.86 0.85 0.95 0.93 0.85
SaturatedFlow(v)) __1805 5152 0 _f8-O6. 30940017690
Ped lntf Time (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Pedestrian Frequency (%) 0.00 77 0.00 0.00 0.00
Protected Option Allowed Yes Yes No No
Reference Time (s) 2.748.1_0 ___6.23t70 _00 0.0
Adj Reference Time (s) 8.0 52.1 0.0 10.2 35.7 0.0 0.0 0.0
Permitted Option _. ................ . -
Adj Saturation A (vph) 120 1717 1201718 1203 147_ 0 173
ReferenceTimeA(s) 39.9 __48.1 93.7 31.7_______- 15.6 __11.1 0.0 103.9j
Adj Saturation B (vph NA NA NANA 0 3094 NA NA
ReferencelimeB(s) _-NA NA NA NA.. 18.4 11.1 NA NA _j
Reference Time (s) 48.1 93.7 15.6 103.9
Adj Reference Time (s) 52.1 97.7 19.6 107.9
Split Option -----.- Ref Time Combined (s) 2.7 48.1 6.2 31.7 10.4 11.1 0.010.j_j
Ref Time Seperate (s) 2.7 46.6 6.2 30.7 10.4 0.4 6.0 1.4
Reference Time(s) 48.148.1 31.731.7 _11.111.1 10.210.2 j
Adj Reference Time (s) 52.1 52.1 35.7 35.7 15.1 15.1 14.2 14.2
Protected Option (s) 62.3 NA
Permitted Option (s) 97.7 _1Q7.9 _
Split Option (s) 87.7 29.3
Mrnimurn(s) 623 7. 293 916
RihT.orns
Adj Reference lime (s)
Cross ThruRef Time (s)
Oncoming Left Ref Time(s)
Combined (s)
Intersection Capacity Utilization 76.3% ICU Level of Service
Reference Times and Phasing Options do not represent an optimized timing plan.
Skateoplex Sports Center 7/24/2013 2030 + P PM Synchro 7- Report
Page 1
Intersection Capacity Utilization
2: Cormos Ct (Corte De La Pina) & Yarrow Dr 9/17/2013
Lane Configurations 4. 4. 41+ 41.
Volume (vph) 10 10108910 25210 90 35 27 80 10
Pedestrians
Ped button'-
Pedestrian Timing (s)
. free Right No -- No No
Ideal Flow 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lost Time (s) 4.0 4.0- 4.0 4.0 4.0 4.0 4.0 tO 4.0 4.0 4.0 tO
Minimum Green (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Co- 4.0 4.0 4.0 4.0
Refr Cycle Length (s) 120 1
Volume Combined (vph) 0 30 0 0 351 0 0 135 0 0 117 0
Lane Utilization Factor 1 00 100 100 1 00 -i-.0-0 _1_W7-100 0 95 1.00 f66 095 100
Turning Factor (vph) 0.95 0.93 0.85 0.95 0.88 0.85 0.95 0.96 0.85 0.95 0.98 0.85
Saturated Flow (vph - 0 1775 0 0 1674 0 03464 0 0 3530 0
Ped lntf Time (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Pedestrian Frequency (%T . 0.00 .. 0.00 .........................................0.00........ 0.00 I
Protected Protected Option Allowed No No . No No
Reference Time (s), 0.0 ..
Ad] Reference Time (s) 0.0 0.0 0.0 0.0
Permitted Option - - - Adj Saturation A (vph) 0 1194 0 1385 0 412 0 118
Reference Time 0 30 0 34.0.013 00 27.5
Ad] Saturation B (vph NA _W A_____0 0 0 1733 NA NA
Reference iimeB(s) - NA NA - - 13.9 33.2 8.7 8.7 NA NA
Reference time (s) 3.0 30.4 -- - 8.7 - 27.5
Ad] Reference Time (s) 8.0 34.4 12.7 31.5
Split Option .. -
Ref Time Combined (s) 0.0 2 0.0 - 25.2 0.0 4.7 0.0 to - Ref Time Seperate (s) 0.7 0.7 5.9 0.7 . 0.7 .•, . 3 . 1:8 2.7
Reference time (s) 2.0 2.0 -- 25.2 25.2 4.7 4.7 4.0 4.0 -
Ad] Reference Time (s) 8.0 8.0 29.2 29.2 8.7 8.7 8.0 8.0
Protected Option (s) NA NA .
Permitted Option (s) 34.4 31.5 -
Split Option (s) 37.2 16.7
Minimum (s) 34.4 16.7 . - 51.1 --
PihiT.urns
Ad] Reference Time (s)
Cross Thru Ref Time (s)
Oncoming Left Ref Time (s)
Combined (s)
Intersection Capacity Utilization 42.6% ICU Level of Service A
Reference Times and Phasing Options do not represent an optimized timing plan.
Skateoplex Sports Center 7/24/2013 2030 + P PM Synchro 7- Report
Page 2
iwj rceierence i ime i5)
Cross Thru Ref Time (s)
Oncoming Left Ref Time (s)
Combined (s)
0.0
ratim
Intersection Capacity Utilization
3: Camino Vida Roble & Yarrow Dr 9/17/2013
Lane Configurations j 4i 1
Iume(vph) 31 550 150 34147 _42
Pedestrians
Ped Button
Pedestrian Timing (s)
Free Right - - No No
IdealFlow 1900 1900 1900 1900 1900 1900
Lost Time (s) 40 40 4040 4040
Minimum Green (s) 4.0 4.0 4.0 4.0 4.0 4.0
Refr Cycle Length(s) 120 . ............................ . . ...
Volume Combined (vph) 31 550 184 0 147 42
Lane Utilization Factor 1.00 1.00 1.00 1.00 1.00 1.00
Turning Factor(vph) 0.95 tOO 0.97 0.85 Q5 PA Saturated Flow (vph) 1805 1900 1847 0 1805 1615 -
Ped lntf Time (s) 0.0 0.0 0.0 0.0 0.0 0.0
Pedestrian Frequency (%) 0.00 0.00 0.00
Protected Option Allowed Yes Yes No
ReferenceTime(s) 21 347 120 00 31 -
AdI Reference Time (s) 8.0 38.7 16.0 0.0 8.0
Permitted Option - ..-
Ad] Saturation A (vph) 120 1900 1847 120
Reference limeA(s) 30 34.7 12.0 146.6
Adj Saturation B (vph NA NA NA NA
-.
Reference Time B (s) NA NA NA NA
Reference Time (s) 34.7 12.0
dj Reference Time (s) 38.7 160
Split Option
Ref Time Combined(s) - 21 347 120 98
Ref Time Seperate (s) 2.1 34.7 9.7 98
Reference Time (s) 34.7 34.7 12.0 9.8 -
Adj Reference Time (s) 38.7 38.7 16.0 . 13.8
ummary EBWB SB
Protected Option (s) 38.7 NA
Permitted Option (s) 387 Err -
Split Option (s) 54.7 13.8
Minimum (s) 387 13.8 52.5
ntë?WctiitSummary
Intersection Capacity Utilization 43.8% ICU Level of Service A
Reference Times and Phasing Options do not represent an optimized timing plan.
Skateoplex Sports Center 7/24/2013 2030 + P PM Synchro 7- Report
Page 3