Loading...
HomeMy WebLinkAboutCUP 2018-0023; BUENA VISTA RESERVIOR SITE; FOUNDATION PLAN REVIEW; 2019-12-20GEOCON INCORPORATED GEOTECHNICAL a ENVIRONMENTAL • MATERIALS 0 Project No. G2225-52-01 December 20, 2019 RECEIVED Schmidt Design Group, Inc. 1111 Sixth Avenue, Suite 500 San Diego, California 92101 Attention: Mr. Mark Moss Subject: FOUNDATION PLAN REVIEW BUENA VISTA RESERVOIR SITE CARLSBAD, CALIFORNIA JAN 14 2020 LAND DEVELOPMENT ENGINEERING References: 1. Update Geotechnical Investigation, Buena Vista Reservoir Site, Carlsbad, California, prepared by Geocon Incorporated, dated December 18, 2019 (Project No. G2225-52-01). 2. Landscape Construction Details for: Buena Vista Reservoir Site, City of Carlsbad, California, prepared by Schmidt Design Group, plot dated December 9, 2019 (Sheets LC-2.5 and LC-2.7). Dear Mr. Moss: In accordance with your request, we reviewed the referenced foundation plans for the proposed shade structure and sail shade and subject project. Based on our review of the plans and the information contained within the referenced geotechnical reports, we opine the plans and details have been prepared in substantial conformance with recommendations presented in the referenced geotechnical report. Our review was limited to geotechnical aspects of project development and did not include the review of other details on the referenced plans. Geocon Incorporated has no opinion regarding other details found on the referenced plans, civil, structural or otherwise, that do not directly pertain to geotechnical aspects of site development. If you have any questions regarding this letter, or if we may be of further service, please contact the undersigned at your convenience. Very truly yours, GEOCON INCORPORATED tu - 9MIW'4" K'elli A. James Shawn M ZI Foy Weedon RCE 79438 GE 2714 KAJ:SFW:dmc (1/del) Addressee 6960 Flanders Drive 0 San Diego, California 92121 U Telephone (858) 558-6900 0 Fax (858) 558-6159