HomeMy WebLinkAboutCUP 2018-0023; BUENA VISTA RESERVIOR SITE; DRAINAGE STUDY; 2020-05-01DRAINAGE STUDY
BUENA VISTA RESERVOIR SITE
CU P2018-0023 I GR2019-0040 I DWG 521-1A
MARCH, 2019
- REVISED: MAY, 2020
DRAINAGE STUDY FOR:
BUENA VISTA RESERVOIR SITE
APN 156-200-16
1605 BUENA VISTA WAY, CARLSBAD, CA 92008
CUP2018-0023 I GR2019-0040 I DWG 521-1A
Prepared For:
SCHMIDT DESIGN GROUP, INC.
1310 ROSECRANS STREET, SUITE G
SAN DIEGO, CA 92106
(619) 236-1462
Prepared By:
LATITUDE 33 PLANNING AND ENGINEERING
9968 HIBERT STREET 2ND FLOOR
SAN DIEGO, CA 92131
(858) 751 - 0633
RECEIVED
MAY 29 2O2'3
No. 67697 LAND DEVELOPMENT
uj ENGINEERING
Nick Psyhogios Date Prepared by: JG
RCE 67697 Expires: 06/2021 Reviewed by: NP
TABLE OF CONTENTS
Executive Summary Page #
Purpose 2
Project Description 2
Vicinity Map 2
Existing Conditions 3
Proposed Conditions 3
Water Quality 4
Discussion and Conclusions 5
Methodology & Model Development
County of San Diego and City of Carlsbad
Drainage Design Criteria 8
Rational Method Hydrologic Analysis 9
Appendix 17
Existing Hydrology Map
Proposed Hydrology Map
Hydrology Calculations
Maps and References 18
Isopluvial Maps
Excerpts from County of San Diego Hydrology Manual
1Page
Executive Summary
PURPOSE
The purpose of this drainage study is to evaluate the existing and proposed drainage conditions
and anticipated runoff flows associated with the Buena Vista Reservoir Site project proposed at
the intersection of Buena Vista Way and Arland Road. This report will document the hydrologic
and hydraulic impacts due to this development.
PROJECT DESCRIPTION
PROJECT LOCATION
The proposed project site is located within the City of Carlsbad on Buena Vista Way near the
intersection with Arland Road. The site is approximately 3.16 acres and is described as Tract
121 of Parcel Map No. 1661.
NOT TO
/*\ SCALE
VICINITY MAP
2IPage
EXISTING CONDITION
Under pre-project conditions, the site is in a mass graded state, but has not been built out.
Ground coverage consists primarily of scattered grasses and bushes, exposed soil, and some
impervious pavement serving as a vehicle access road. The existing drainage pattern for the site
directs runoff as surface flow to the adjacent parcels to the East, South, and West and to Buena
Vista Way to the North. From here, storm water continues to surface flow until reaching
existing offsite storm drain infrastructure where it is then conveyed and discharged into Buena
Vista Lagoon.
The existing impervious portion of the project is under a sump condition and can hold up to
300,000 cubic feet of water before overflowing into the existing stand pipe. This basin shown as
E40 on the Existing Hydrology Map is considered self-retaining since does not contribute to the
overall outfall of the project site.
PROPOSED CONDITION
This project proposes to construct a public park consisting primarily of landscaping and garden
areas with some impervious concrete walkways and plazas for pedestrian circulation. A brow
ditch will be constructed along the West, East, and South edges of the property to prevent
runoff from leaving the site and flowing into the adjacent parcels. Additionally, public
improvements consisting of on-street parking stalls, concrete sidewalk, curb ramps, and
crosswalk striping are proposed along the Northern edge of the lot where it meets the Southern
edge of Buena Vista Way.
The majority of onsite storm water will fall on or be dispersed to pervious landscaping areas
before being directed to a proposed biofiltration (BF-1) BMP at the Northwest corner of the
project site.
WATER QUALITY AND HYDROMODI FICATION
The post-construction phase of this project will require permanent BMPs designed to minimize
discharge of pollutants generated on-site throughout the life of the project. The proposed water
quality BMP for the project will include landscape and irrigated areas, and a biofiltration basin.
Priority development projects are also required to implement hydromodification mitigation
measures so that post-project runoff flow rates and durations do not exceed the pre-project
where such increases would result in a potential for increase erosion or significant impacts to
beneficial uses. The proposed biofiltration basin will also provide the required hydromodification
mitigation. For more details regarding the onsite BMP see the Storm Water Quality Management
Plan for the project.
DISCUSSION AND CONCLUSIONS
The onsite drainage areas for this project encompass approximately 3.16-acres and is the limit of
the drainage analysis for this report.
3IPage
Our technical approach in developing our basin flows was based on Land use and C coefficients
directly from the County of San Diego Hydrology Manual (Table 3-1). These are also listed in the
Methodology section of the report. Each basin was made up of individual subareas that were
based on Low Density Residential and a "Rural" C coefficient factor of 0.32 was implemented.
This accurately accounts for the landscape and small portions of impervious areas. Therefore,
each basin was calculated based on these individual subareas and their associate C values to
develop Os and Vs. The project area is Hydrologic Soil Group B per the geotechnical report.
The Rational Method for the 100-year and 50-year peak storm flow rate were used in the design
of the proposed drainage systems. The hydrologic and hydraulic analyses of these systems were
evaluated using the Autodesk Storm and Sanitary Analysis (SSA) software. The results of the
analysis are listed below.
M
0 [Le ~a 010M Basin ___Cyiient C C
E10 1.00 0.32 3.910 3.46 1.25 1.11
E20 0.46 0.32 5.882 5.20 0.85 0.75
E30 0.51 0.32 6.849 6.06 1.12 0.99
6.06 5.24 4.64 E40
0.85 0.9 6.849 (not included) (not included)
Total 2.82 3.22 2.85
P10 2.38 0.32 2.90 2.57 2.21 1.96
P20 0.52 0.32 2.35 2.08 0.39 0.35
Total
Mitigated 2.90 0.89 0.36
As illustrated above, the proposed drainage conditions for the site result in a 2.33 cfs and 2.49
cfs decrease overall throughout the project for the 100-year storm and 50-year storm
respectively. Runoff on the Northwest corner of the project will decrease by 0.36 cfs and 0.75 cfs
for the 100-year storm and 50-year storm respectively.
This great reduction is due to detention of all runoff from drainage basin PlO on the proposed
Biofiltration Basin. For the 100-year storm, the biofiltration basin is capable of detaining most of
the runoff and releases approximately 0.63 cfs at the overflow structure. However, the
Biofiltration basin is capable of detaining all of the runoff for PlO on a 50-year storm. This explain
why the total mitigated 050 is similar to the 050 of drainage basin P20. The Project outlets at a
proposed curb outlet located on the northwest corner of the project, and the V100 and V50 are
3.18 fps and 2.23 fps respectively.
Regarding the overflow structure, to accommodate the 0.63 cfs released from the basin during
the 100-year storm, this feature requires a minimum 144 square inches of clear opening space at
its inlet. Additionally, given that this is the only overflow route for the basin, it is being treated
as an inlet in a "sump" condition. Per the San Diego County Hydraulic Manual, inlets in a sump
condition are to be analyzed assuming a 50% clogging factor. Given these criteria, this design
proposes a 24-inch by 24-inch catch basin structure to act the as the biofiltration basin overflow,
see grading plans for additional information. Utilizing a structure this size will allow for the
required 144 square inch clear opening space even while the inlet is 50% obstructed.
4 I P a g e
Methodology & Model Development
County of San Diego and City of Carlsbad Drainage Design Criteria
Rational Method Hydrologic Analysis
7Page
METHODOLOGY & MODEL DEVELOPMENT
The proposed development was analyzed in conformance with the County of San Diego
Hydrology Manual, dated June 2003 and the City of Carlsbad Drainage Standards. The total area
of all basins analyzed are less than one square mile. Therefore, the Rational Method was utilized
to calculate peak storm runoff.
The design is based upon the following:
1) Within floodplain and floodplain fringe areas as defined by the Federal Emergency
Management Agency (FEMA), runoff calculations shall be based upon a 100-year
frequency storm.
2) For all drainage channels and storm drain systems which will convey drainage from a
tributary area greater than or equal to one square mile, runoff calculations shall be
based upon a 100-year frequency storm.
3) For tributary areas under 1 square mile:
The storm drain system shall be designed to carry 10-year, 6-hour underground
and 100-year, 6-hour storm within top of curbs so that the combination of storm
drain system capacity and overflow both inside and outside the right of way will
be able to carry the 100-year frequency storm without damaging adjacent existing
buildings or potential building sites. All culverts must be designed with 1 ft of
freeboard at inlets and headwalls for the 100-year, 6-hour storm.
The storm drain system shall be designed so that the combination of storm drain
system capacity and allowable street overflow will be able to carry the 100-year
frequency storm without damaging adjacent property.
Where a storm drain is required under headings 1 or 2 above, then as a minimum,
the drain shall be designed to carry the 10-year frequency storm.
4) Sump areas are to be designed for a sump capacity or outfall of a 100-year frequency
storm.
5) Type B soil shall be used for all areas.
8IPage
Rational Method Hydrologic Analysis
Design Storm - 100-year/50-year return interval
Land Use - Residential / Multifamily
Soil Type - Based on geotechnical borings Hydrologic soil group B covers 99% of the project area,
therefore soil group B was assured for all areas.
Runoff Coefficient - In accordance with the County of San Diego Hydrology Manual, runoff
coefficients are as followed:
Undisturbed Natural Terrain uses a coefficient of 0.25.
Low Density Residential (LDR) uses a coefficient of 0.32-0.41.
Medium Density Residential uses a coefficient of 0.45-0.58.
High Density Residential uses a coefficient of 0.0.67-0.77.
Commercial/Industrial uses a coefficient of 0.77-0.87.
When a watershed encompasses solely pavement conditions, a runoff coefficient of 0.95 was
selected.
Method of Analysis - The Rational Method is the most widely used hydrologic model for
estimating peak runoff rates. Applied to small urban and semi-urban areas with drainage areas
less than 0.5 square miles, the Rational Method relates storm rainfall intensity, a runoff
coefficient, and drainage area to peak runoff rate. This relationship is expressed by the equation:
Q=CIA, where:
Q = The peak runoff rate in cubic feet per second at the point of analysis.
C = A runoff coefficient representing the area - averaged ratio of runoff to rainfall intensity.
= The time-averaged rainfall intensity in inches per hour corresponding to the time of
concentration.
A = The drainage basin area in acres.
Computer Software - Autodesk® Storm and Sanitary Analysis 2018
This software uses the San Diego County Hydrology Manual standards to calculate
time of concentration. The intensity-duration-frequency curves used in the analysis
are from the County of San Diego.
Design Storm - 100-year/50-year return interval
9IPage
Appendix
I I_I__I__ R
50 YEAR EXISTING CONDITIONS
Autodesk® Storm and Sanitary Analysis 2016 - Version 12.0.42 (Build 0)
-
Proj ect Description
File Name .................EX conditions.SPF
Analysis Options
** * * * * ** * **
Flow Units ................cfs
Subbasin Hydrograph Method. Rational
Time of Concentration......FAA
Return Period..............50 years
Storage Node Exfiltration.. Constant rate, free surface area
Starting Date .............DEC-12-2018 00:00:00
Ending Date ...............DEC-12-2018 07:00:00
Report Time Step ..........00:00:10
*************
Element Count
*************
Number of subbasins .......4
Number of nodes ...........4
Number of links ...........0
*** ** ** * ** * *
Subbasin Summary
Subbasin Total Flow Average
Area Length Slope
ID acres ft ---------------------------------------------------
E1O 1.00 268.00 7.2000
E20 0.45 91.00 9.5000
E30 0.51 91.00 19.6700
E40 0.85 298.00 3.2000
** *** * * * * * **
Node Summary
* * *
Node Element Invert Maximum Ponded External
ID Type Elevation Elev. Area Inflo
ft ft ft2
POCOl OUTFALL
------------------------------------------------------------------------------
0.00 0.00 0.00
P00O2 OUTFALL 0.00 0.00 0.00
P00O3 OUTFALL - 0.00 0.00 0.00
P0004 OUTFALL 0.00 0.00 0.00
Volume Depth
Runoff Quantity Continuity acre-ft inches
**************************
Total Precipitation 0.135 0.575
Continuity Error (%) 0.530
Volume Volume
Flow Routing Continuity acre-ft Mgallons
Auto desk Storm and Sanitary Analysis
External Inflow 0.000 0.000
External Outflow 0.063 0.021
Initial Stored Volume 0.000 0.000
Final Stored Volume 0.000 0.000
Continuity Error (%) 0.000
Runoff Coefficient Computations Report
---------------
Subbasin E10 ---------------
Area Soil Runoff
Soil/Surface Description (acres) Group Coeff. -----------------------------------------------------------------------------------------
- 1.23 B 0.32
Composite Area & Weighted Runoff Coeff. 1.23 0.32
------------
Subbasin E20
Area Soil Runoff
Soil/Surface Description (acres) Group Coeff. -----------------------------------------------------------------------------------------
- 0.45 B 0.32
Composite Area & Weighted Runoff Coeff. 0.45 0.32
------------
Subbasin E30
Area Soil Runoff
Soil/Surface Description (acres) Group Coeff. -----------------------------------------------------------------------------------------
- 0.51 B 0.32
Composite Area & Weighted Runoff Coeff. 0.51 0.32
---------------
Subbasin E40 ---------------
Area Soil Runoff
Soil/Surface Description (acres) Group Coeff. -----------------------------------------------------------------------------------------
Concrete 0.85 B 0.90
Composite Area & Weighted Runoff Coeff. 0.85 0.90
* **************** * * *********** * *****
FAA (Federal Aviation Agency) Time of Concentration Computations Report
Tc = (1.8 * (1.1 - C) * (L0.5) * (S-0.333))
Where:
Tc = Time of Concentration (mm)
C = Runoff Coefficient
L = Flow Length (ft)
S = Slope (%)
---------------
Subbasin E10 ---------------
Runoff Coefficient: 0.32
Flow Length (ft) : 268.00
Autodesk Storm and Sanitary Analysis
Slope (%) : 7.20
Computed TOC (minutes): 11.91
---------------
Subbasin E20
---------------
Runoff Coefficient: 0.32
Flow Length (ft): 91.00
Slope (%) : 9.50
Computed TOC (minutes): 6.33
---------------
Subbasin E30
---------------
Runoff Coefficient: 0.32
Flow Length (ft) : 91.00
Slope (%) : 19.67
Computed TOC (minutes): 4.97
---------------
Subbasin E40
---------------
Runoff Coefficient: 0.90
Flow Length (ft) : 298.00
Slope (%): 3.20
Computed TOC (minutes): 4.22
***********************
Subbasin Runoff Summary
Subbasin Accumulated Rainfall
---------------------------------------------------------------------------------------
Total Peak Weighted Time of
ID Precip Intensity Runoff Runoff Runoff Concentration
in in/hr in cfs Coeff days hh:mm:ss
E1O 0.68 3.46
---------------------------------------------------------------------------------------
0.22 1.11 0.320 0 00:11:54
E20 0.55 5.20 0.18 0.75 0.320 0 00:06:19
E30 0.50 6.06 0.16 0.99 0.320 0 00:05:00
E40 0.50 6.06
---------------------------------------------------------------------------------------
0.45 4.64 0.900 0 00:05:00
Analysis began On: Tue Feb 19 12:05:00 2019
Analysis ended On: Tue Feb 19 12:05:00 2019
Total elapsed time: < 1 sec
Autodesk Storm and Sanitary Analysis
100 YEAR EXISTING CONDITIONS
AutodeskO Storm and Sanitary Analysis 2016 - Version 12.0.42 (Build 0)
-
Project Description
File Name .................EX conditions.SPF
Analysis Options
Flow Units ................cfs
Subbasin Hydrograph Method. Rational
Time of Concentration......FAA
Return Period..............100 years
Storage Node Exfiltration.. Constant rate, free surface area
Starting Date .............DEC-12-2018 00:00:00
Ending Date ...............DEC-12-2018 07:00:00
Report Time Step ..........00:00:10
Element Count
Number of subbasins .......4
Number of nodes ...........4
Number of links ...........0
Subbasin Summary
Subbasin Total Flow Average
Area Length Slope
ID acres ft ---------------------------------------------------
E1O 1.00 268.00 7.2000
E20 0.45 91.00 9.5000
E30 0.51 91.00 19.6700
E40 0.85 298.00 3.2000
Node Summary
Node Element Invert Maximum Ponded External
ID Type Elevation Elev. Area Inflow
ft ft ft2
POCOl OUTFALL
------------------------------------------------------------------------------
0.00 0.00 0.00
P00O2 OUTFALL 0.00 0.00 0.00
P00O3 OUTFALL 0.00 0.00 0.00
P0004 OUTFALL 0.00 0.00 0.00
Volume Depth
Runoff Quantity Continuity acre-ft inches
Total Precipitation 0.152 0.650
Continuity Error (%) 0.530
************** Volume Volume
Flow Routing Continuity acre-ft Mgallons
Autodesk Storm and Sanitary Analysis
External Inflow 0.000 0.000
External Outflow 0.072 0.023
Initial Stored Volume . 0.000 0.000
Final Stored Volume 0.000 0.000
Continuity Error (%) 0.000
**************************************
Runoff Coefficient Computations Report
---------------
Subbasin E10 ---------------
Area Soil Runoff
Soil/Surface Description (acres) Group Coeff. -----------------------------------------------------------------------------------------
- 1.23 B 0.32
Composite Area & Weighted Runoff Coeff. 1.23 0.32
---------------
Subbasin E20 ---------------
Area Soil Runoff
Soil/Surface Description (acres) Group Coeff. -----------------------------------------------------------------------------------------
- 0.45 B 0.32
Composite Area & Weighted Runoff Coeff. 0.45 0.32
---------------
Subbasin E30 ---------------
Area Soil Runoff
Soil/Surface Description (acres) Group Coeff. -----------------------------------------------------------------------------------------
- 0.51 B 0.32
Composite Area & Weighted Runoff Coeff. 0.51 0.32
---------------
Subbasin E40 ---------------
Area Soil Runoff
Soil/Surface Description (acres) Group Coeff. -----------------------------------------------------------------------------------------
Concrete 0.85 B 0.90
Composite Area & Weighted Runoff Coeff. 0.85 0.90
FAA (Federal Aviation Agency) Time of Concentration Computations Report
Tc = (1.8 * (1.1 - C) * (L0.5) * (S-0.333))
Where:
Tc = Time of Concentration (mm)
C = Runoff Coefficient
L = Flow Length (ft)
S = Slope (%)
---------------
Subbasin ElO ---------------
Runoff Coefficient: 0.32
Flow Length (ft) : 268.00
Autodesk Storm and Sanitary Analysis
Slope (t): 7.20
Computed TOC (minutes): 11.91
---------------
Subbasin E20 ---------------
Runoff Coefficient: 0.32
Flow Length (ft): 91.00
Slope (%) : 9.50
Computed TOC (minutes): 6.33
---------------
Subbasin E30 ---------------
Runoff Coefficient: 0.32
Flow Length (ft): 91.00
Slope (%) : 19.67
Computed TOC (minutes): 4.97
---------------
Subbasin E40 ---------------
Runoff Coefficient: 0.90
Flow Length (ft) : 298.00
Slope (%): 3.20
Computed TOC (minutes): 4.22
Subbasin Runoff Summary
Subbasin Accumulated Rainfall
---------------------------------------------------------------------------------------
Total Peak Weighted Time of ID Precip Intensity Runoff Runoff Runoff Concentration
in in/hr in cfs Coeff days hh:mm:ss
ElO 0.77 3.91
---------------------------------------------------------------------------------------
0.25 1.25 0.320 0 00:11:54 E20 0.62 5.88 0.20 0.85 0.320 0 00:06:19
E30 0.57 6.85 0.18 1.12 0.320 0 00:05:00
E40 0.57 6.85 --------------------------------------------------------------------------------------- 0.51 5.24 0.900 0 00:05:00
Analysis began On: Wed Dec 12 09:07:21 2018
Analysis ended On: Wed Dec 12 09:07:22 2018
Total elapsed time: 00:00:01
Autodesk Storm and Sanitary Analysis
50 YEAR PROPOSED CONDITIONS
Autodesk® Storm and Sanitary Analysis 2016 - Version 12.0.42 (Build 0) -----------------------------------------------------------------------------------------
Proj ect Description
File Name .................PR Conditions.SPF
Analysis Options
Flow Units ................cfs
Subbasin Hydrograph Method Rational
Time of Concentration ......FAA
Return Period..............50 years
Link Routing Method .......Steady Flow
Storage Node Exfiltration.. Constant rate, free surface area
Starting Date .............DEC-04-2018 00:00:00
Ending Date ...............DEC-04-2018 06:00:00
Report Time Step ..........00:00:10
Element Count
Number of subbasins .......2
Number of nodes ...........6
Number of links ...........4
Subbasin Summary
Subbasin Total Flow Average
Area Length Slope
ID acres ft
510
---------------------------------------------------
2.38 386.00 3.1000
S20 0.52 729.00 3.0000
Node Summary
Node Element Invert Maximum Ponded External
ID Type Elevation Elev. Area Inflow
ft ft ft2
Ji JUNCTION
------------------------------------------------------------------------------
166.10 169.85 0.00
PlO OUTFALL 164.00 164.83 0.00 Yes
SO-1 OUTFALL 0.00 0.00 0.00
SO-20 OUTFALL 0.00 0.00 0.00
SUBSURFACE STORAGE 165.85 168.85 0.00
SURFACE STORAGE 168.85 170.10 0.00 Yes
Link Summary
Link From Node To Node Element Length Slope Manning's ID
-------------------------------------------------------------------------------------------- Type ft % Roughness
Link-Ol Jl PlO CONDUIT 46.0 4.5652 0.0110 LOWFLOW SUBSURFACE Jl ORIFICE
OVERFLOW SURFACE Jl ORIFICE
Autodesk Storm and Sanitary Analysis
INF_5 IN/HR SURFACE SUBSURFACE OUTLET
* *********** ** ***** * *
Cross Section Summary
*********************
Link Shape Depth! Width No. of Cross Full Flow
Design
ID Diameter Barrels Sectional Hydraulic
Flow
Area Radius
Capacity
ft ft ft3 ft
cfs
-------------------------------------------------------------------------------------------------
Link-Ol CIRCULAR 0.83 0.83 1 0.55 0.21
5.53
Volume Depth
Runoff Quantity Continuity acre-ft inches
**************************
Total Precipitation 0.201 0.831
Continuity Error (%) 0.683
************************** Volume Volume
Flow Routing Continuity acre-ft Mgallons
**************************
External Inflow 0.173 0.056
External Outflow 0.101 0.033
Initial Stored Volume 0.000 0.000
Final Stored Volume 0.135 0.044
Continuity Error (%) 0.000
Runoff Coefficient Computations Report
**************************************
Subbasin S10
---------------
Area Soil Runoff
Soil/Surface Description (acres) Group Coeff.
Residential_1DU/AC_or_sess 2.38 B 0.32
Composite Area & Weighted Runoff Coeff. 2.38 0.32
---------------
Subbasin S20
---------------
Area Soil Runoff
Soil/Surface Description (acres) Group Coeff. -----------------------------------------------------------------------------------------
ResidentiallDU/ACorsess 0.50 B 0.32
Composite Area & Weighted Runoff Coeff. 0.50 0.32
******* ******* * ********************* * * *****
FAA (Federal Aviation Agency) Time of Concentration Computations Report
*** ** * * ****************** ******* * ****** * ******** * ************ * * ********
Tc = (1.8 * (1.1 - C) * (L0.5) * (S-0.333))
Autodesk Storm and Sanitary Analysis
Where:
Tc = Time of Concentration (mm)
C = Runoff Coefficient
L = Flow Length (ft)
S = Slope (%)
---------------
Subbasin S10 ---------------
Runoff Coefficient: 0.32
Flow Length (ft) : 386.00
Slope (t): 3.10
Computed TOC (minutes): 18.93
---------------
Subbasin S20 ---------------
Runoff Coefficient: 0.32
Flow Length (ft): 729.00
Slope M : 3.00
Computed TOC (minutes): 26.29
***********************
Subbasin Runoff Summary
Subbasin Accumulated Rainfall
---------------------------------------------------------------------------------------
Total Peak Weighted Time of
ID Precip Intensity Runoff Runoff Runoff Concentration
in in/hr in cfs Coeff days hh:mm:ss
S1O 0.81 2.57
---------------------------------------------------------------------------------------
0.26 1.96 0.320 0 00:18:55
S20 0.91 2.08 --------------------------------------------------------------------------------------- 0.29 0.35 0.320 0 00:26:17
Node Depth Summary
******************
Node Average Maximum Maximum Time of Max Total Total Retention
ID Depth Depth HGL Occurrence Flooded Time Time
Attained Attained Attained Volume Flooded
ft ft ft days hh:mm acre-in minutes hh:mm:ss
Jl 0.02 0.09
-----------------------------------------------------------------------------------------
166.19 0 04:27 0 0 0:00:00
PlO 0.02 0.09 164.09 0 04:27 0 0 0:00:00
SO-1 0.00 0.00 0.00 0 00:00 0 0 0:00:00
SO-20 0.00 0.00 0.00 0 00:00 0 0 0:00:00
SUBSURFACE 0.66 1.67 167.52 0 06:00 0 0 0:00:00 SURFACE 0.34 1.04 169.89 0 04:27 0 0 0:00:00
Node Flow Summary
------------------------------------------------------------------------------------
Node Element Maximum Peak Time of Maximum Time of Peak
ID Type Lateral Inflow Peak Inflow Flooding Flooding
Inflow Occurrence Overflow Occurrence
cfs cfs days hh:mm cfs days hh:mm ------------------------------------------------------------------------------------
Autodesk Storm and Sanitary Analysis
Jl JUNCTION 0.00 0.13 0 04:27 0.00
PlO OUTFALL 0.35 0.36 0 04:12 0.00
SO-1 OUTFALL 1.96 1.96 0 00:19 0.00
SO-20 OUTFALL 0.35 0.35 0 00:26 0.00
SUBSURFACE STORAGE 0.00 0.28 0 03:24 0.00
SURFACE STORAGE 1.96 1.96 0 04:09 0.00
Storage Node Summary
------------------------------------
Storage Node ID Maximum Maximum
-------------------------------------------------------------------------------------------------
Time of Max Average Average Maximum
Maximum Time of Max. Total
Ponded Ponded Ponded Ponded Ponded Storage Node
Exfiltration Exfiltration Exfiltrated
Volume Volume Volume Volume Volume Outflow
Rate Rate Volume
1000 ft, (%) days hh:mm 1000 ft3 (%) cfs
cfm hh:mm:ss 1000 ft
------------------------------------
SUBSURFACE 4.079 56
-------------------------------------------------------------------------------------------------
0 06:00 1.599 22 0.03
0.00 0:00:00 0.000
SURFACE 2.543 83 0 04:27 0.835 27 0.39
0.00 0:00:00 0.000
Outfall Loading Summary
Outfall Node ID
-----------------------------------------------
Flow Average Peak
Frequency Flow Inflow
(%) cfs cfs
PlO
-----------------------------------------------
99.48 0.08 0.36
SO-1 10.55 0.98 1.96
SO-20 14.59 0.17 0.35
System
-----------------------------------------------
41.54 1.23 2.21
Link Flow Summary
Link ID Element Time of Maximum Length Peak Flow Design Ratio of
Ratio of Total Reported
Type Peak Flow Velocity Factor during Flow Maximum
Maximum Time Condition
Occurrence Attained Analysis Capacity /Design
Flow Surcharged
days hh:mm ft/sec cfs cfs Flow Depth minutes
-------------------------------
Link-Ol CONDUIT 0 04:27
-------------------------------------------------------------------------------------------------
3.95 1.00 0.13 5.53 0.02
Autodesk Storm and Sanitary Analysis
0.11 0 Calculated
LOWFLOW ORIFICE
0.00
OVERFLOW ORIFICE
INF_5 IN/HR OUTLET
0 06:00 0.03
0 04:27 0.11
0 03:24 0.28
Highest Flow Instability Indexes
All links are stable.
WARNING 107 : Initial water surface elevation defined for Junction Jl is below junction invert
elevation.
Assumed initial water surface elevation equal to invert elevation.
WARNING 108 : Surcharge elevation defined for Junction J1 is below junction maximum elevation.
Assumed surcharge elevation equal to maximum elevation.
WARNING 110 : Initial water surface elevation defined for Storage Node SUBSURFACE is below
storage node invert elevation.
Assumed initial water surface elevation equal to invert elevation.
WARNING 110 : Initial water surface elevation defined for Storage Node SURFACE is below storage
node invert elevation.
Assumed initial water surface elevation equal to invert elevation.
Analysis began On: Tue Feb 19 11:47:01 2019
Analysis ended On: Tue Feb 19 11:47:02 2019
Total elapsed time: 00:00:01
Autodesk Storm and Sanitary Analysis
General
Time series ID: TS-02 Time Series Plot Add ]
L Delete
[_Load...
Save...
Time Series
r Close j
[HeIp]
6-HOUR HYDROGRAPHS
Time Senes I :z
General
Time seriesiD: TS-01
Description:
BASIN I :
Time series data
Data type
@ User defined
C) Standard rainfall [Rainfall Designer...
f Add ]
2.0--
1.8
1.4
1.2
a)
0.8
0.4
2
0
0
0.6
0
Time Series Plot
Close
Time series curves
I I I 1 2 3 4 5 6
Eiapsedlime(hours)
H ]
Date
MM/DDffl'YY)
Time
(HAM)
Value 2
0:00
0:22
0.000
0.110
0.114
0.124
0:41
1:00
1:18 0.130
0.144
0.152 =
______
1:56
2 TS-02
- ID, Number of Description
Points
15
100 YEAR PROPOSED CONDITIONS
Autodesk® Storm and Sanitary Analysis 2016 - Version 12.0.42 (Build 0) -----------------------------------------------------------------------------------------
Proj ect Description
File Name .................PR Conditions.SPF
Analysis Options
Flow Units ................cfs
Subbasin Hydrograph Method Rational
Time of Concentration ......FAA
Return Period..............100 years
Link Routing Method .......Steady Flow
Storage Node Exfiltration.. Constant rate, free surface area
Starting Date .............DEC-04-2018 00:00:00
Ending Date ...............DEC-04-2018 06:00:00
Report Time Step ..........00:00:10
****** ** * * * * *
Element Count
*************
Number of subbasins .......2
Number of nodes ...........6
Number of links ...........4
****************
Subbasin Summary
Subbasin Total Flow Average
Area Length Slope
ID acres ft
S1O
---------------------------------------------------
2.38 386.00 3.1000
S20 0.52 729.00 3.0000
Node Summary
Node Element Invert Maximum Ponded External
ID Type Elevation Elev. Area Inflow
ft ft ft2
Jl JUNCTION
------------------------------------------------------------------------------
166.10 169.85 0.00
PlO OUTFALL 164.00 164.83 0.00 Yes
SO-1 OUTFALL 0.00 0.00 0.00
SO-20 OUTFALL 0.00 0.00 0.00
SUBSURFACE STORAGE 165.85 168.85 0.00
SURFACE STORAGE 168.85 170.10 0.00 Yes
************
Link Summary
************
Link From Node To Node Element Length Slope Manning's
ID Type ft % Roughness
Link-Ol Jl
--------------------------------------------------------------------------------------------
P10 CONDUIT 46.0 4.5652 0.0110 LOWFLOW SUBSURFACE Ji ORIFICE
OVERFLOW SURFACE Ji ORIFICE
Autodesk Storm and Sanitary Analysis
INF5 IN/HR SURFACE SUBSURFACE OUTLET
*********************
Cross Section Summary
Link Shape Depth! Width No. of Cross Full Flow
Design
ID Diameter Barrels Sectional Hydraulic
Flow
Area Radius
Capacity
ft ft ft2 ft
cfs
-------------------------------------------------------------------------------------------------
Link-Ol CIRCULAR 0.83 0.83 1 0.55 0.21
5.53
Volume Depth
Runoff Quantity Continuity acre-ft inches
Total Precipitation 0.227 0.939
Continuity Error (%) 0.683
Volume Volume
Flow Routing Continuity acre-ft Mgallons
External Inflow 0.196 0.064
External Outflow 0.125 0.041
Initial Stored Volume 0.000 0.000
Final Stored Volume 0.142 0.046
Continuity Error (%) 0.000
Runoff Coefficient Computations Report
****** * * * *
Subbasin Sb ---------------
Area Soil Runoff Soil/Surface Description (acres) Group Coeff.
Residential_lDU/AC_or_sess 2.38 B 0.32 Composite Area & Weighted Runoff Coeff. 2.38 0.32
---------------
Subbasin S20 ---------------
Area Soil Runoff
Soil/Surface Description (acres) Group Coeff. -----------------------------------------------------------------------------------------
Residential_1DU/AC_or seas 0.50 B 0.32 Composite Area & Weighted Runoff Coeff. 0.50 0.32
* ** ************* ******* ******** *********** * * * * *******
FAA (Federal Aviation Agency) Time of Concentration Computations Report
Tc = (1.8 * (1.1 - C) * (L0.5) * (S-0.333))
Autodesk Storm and Sanitary Analysis
Where:
Tc = Time of Concentration (mm)
C = Runoff Coefficient
L = Flow Length (ft)
S = Slope (%)
---------------
Subbasin Sb ---------------
Runoff Coefficient: 0.32
Flow Length (ft): 386.00
Slope (%): 3.10
Computed TOC (minutes): 18.93
---------------
Subbasin S20 ---------------
Runoff Coefficient: 0.32
Flow Length (ft) : 729.00
Slope (%): 3.00
Computed TOC (minutes): 26.29
***********************
Subbasin Runoff Summary
Subbasin Accumulated Rainfall
---------------------------------------------------------------------------------------
Total Peak Weighted Time of
ID Precip Intensity Runoff Runoff Runoff Concentration
in in/hr in cfs Coeff days hh:mm:ss
S1O 0.92 2.90
---------------------------------------------------------------------------------------
0.29 2.21 0.320 0 00:18:55
S20 1.03 2.35 --------------------------------------------------------------------------------------- 0.33 0.39 0.320 0 00:26:17
Node Depth Summary
Node Average Maximum Maximum Time of Max Total Total Retention
ID Depth Depth HGL Occurrence Flooded Time Time
Attained Attained Attained Volume Flooded
ft ft ft days hh:mm acre-in minutes hh:mm:ss
J]. 0.03 0.19 166.29
-----------------------------------------------------------------------------------------
0 04:22 0 0 0:00:00
PlO 0.03 0.19 164.19 0 04:22 0 0 0:00:00
SO-1 0.00 0.00 0.00 0 00:00 0 0 0:00:00
SO-20 0.00 0.00 0.00 0 00:00 0 0 0:00:00
SUBSURFACE 0.71 1.75 167.60 0 06:00 0 0 0:00:00
SURFACE 0.37 1.13 169.98 0 04:22 0 0 0:00:00
** ** * * * *
Node Flow Summary
*****************
Node Element Maximum Peak Time of Maximum Time of Peak
ID Type Lateral Inflow Peak Inflow Flooding Flooding
Inflow Occurrence Overflow Occurrence
cfs cfs days hh:mm cfs days hh:mm ------------------------------------------------------------------------------------
Autodesk Storm and Sanitary Analysis
J1 JUNCTION 0.00 0.63 0 04:22 0.00
PlO OUTFALL 0.39 0.89 0 04:21 0.00
SO-1 OUTFALL 2.21 2.21 0 00:19 0.00
50-20 OUTFALL 0.39 0.39 0 00:26 0.00
SUBSURFACE STORAGE 0.00 0.28 0 03:15 0.00
SURFACE STORAGE 2.21 2.21 0 04:09 0.00
Storage Node Summary
* * *
------------------------------------
Storage Node ID Maximum Maximum
-------------------------------------------------------------------------------------------------
Time of Max Average Average Maximum
Maximum Time of Max. Total
Ponded Ponded Ponded Ponded Ponded Storage Node
Exfiltration Exfiltration Exfiltrated
Volume Volume Volume Volume Volume Outflow
Rate Rate Volume
1000 ft (%) days hh:mm 1000 ft3 (%) cfs
cfm hh:mm:ss 1000 ft
------------------------------------
SUBSURFACE 4.270 58
-------------------------------------------------------------------------------------------------
0 06:00 1.728 24 0.03
0.00 0:00:00 0.000
SURFACE 2.754 90 0 04:22 0.897 29 0.89
0.00 0:00:00 0.000
***********************
Outfall Loading Summary
***********************
Outfall Node ID
-----------------------------------------------
Flow Average Peak
Frequency Flow Inflow
(%) cfs cfs
P10
-----------------------------------------------
99.55 0.11 0.89
SO-1 10.55 1.11 2.21
80-20 14.59 0.20 0.39
System
-----------------------------------------------
41.56 1.41 2.50
*****************
Link Flow Summary
*****************
-------------------------------
Link ID Element Time of
-------------------------------------------------------------------------------------------------
Maximum Length Peak Flow Design Ratio of Ratio of Total Reported
Type Peak Flow Velocity Factor during Flow Maximum Maximum Time Condition
Occurrence Attained Analysis Capacity /Design Flow Surcharged
days hh:mm ft/sec cfs cfs Flow Depth minutes
-------------------------------
Link-Ol CONDUIT 0 04:22 6.72 1.00 0.63 5.53 0.11
Autodesk Stonn and Sanitary Analysis
0.23 0 Calculated
LOWFLOW ORIFICE 0 06:00 0.03
0.00
OVERFLOW ORIFICE 0 04:22 0.61
INF 51W/HR OUTLET 0 03:15 0.28
* **** * * ****************** *******
Highest Flow Instability Indexes
********************************
All links are stable.
WARNING 107 : Initial water surface elevation defined for Junction Jl is below junction invert
elevation.
Assumed initial water surface elevation equal to invert elevation.
WARNING 108 : Surcharge elevation defined for Junction Ji is below junction maximum elevation.
Assumed surcharge elevation equal to maximum elevation.
WARNING 110 : Initial water surface elevation defined for Storage Node SUBSURFACE is below
storage node invert elevation.
Assumed initial water surface elevation equal to invert elevation.
WARNING 110 : Initial water surface elevation defined for Storage Node SURFACE is below storage
node invert elevation.
Assumed initial water surface elevation equal to invert elevation.
Analysis began on: Tue Feb 19 11:25:36 2019
Analysis ended On: Tue Feb 19 11:25:36 2019
Total elapsed time: < 1 sec
Autodesk Stonn and Sanitary Analysis
Add
[ Delete
Save...
6-HOUR HYDROGRAPHS
Time Series I z
General
Time series ID: TS-01 Time Series Plot I Add]
F Delete ] : Description: BASIN 1 2.2-
Time series data 2.0
Data type
* User defined
o Standard rainfall [Rainfall Designer...]
1.8
1.6
0) 12-
0.8
0.6- Time series curves
0.4-
0• I I I 0 1 2 3 4 5 6 _____
Close ] Elapsed Time (hours)
Time Series L
Date
(MM/DD/YYYY)
Time
I:MM)
Value
0
aoo 0.000
0:41 —JO
0:22 0.124
1:00
146
0.162
0.172 J1:56
- ID! Number of
Points
Desciiption
TS-02 15 2
General
Time series ID: TS-02
Description: BASIN 2
Time series data
Data type
i3 User defined
0 Standard rainfall Rainfall DesigT.
t D e Time Value
(MM/DD/Y',YY) (H:MM)
0:00 0.000
a
0.038
0:47 0.029
1:12 0030
- 0.035
0.046 2:30 _ —r- 2:55 0.053
Time series curves
- ID' Number of
Points
Description
1 TS-01 20
I.
Maps and References
Isopluvial Maps
Excerpts from County of San Diego Hydrology Manual
ill P a g e
-T - - T F '-T L,- 9fflJT f P4 1—tU 1Tt J H+it L:.ttf 4 I1 County of San Diego F-1 -4t---4-' 1-i--t jr -tt-ji --r-1-- 1 VLH j_-+. t
ran _ Pt ±J1f -Ji + 4--t ; 4:
-
Hydrology Manual
jtt4LJt1 tfj: i4f - H,tt
1I1± t r E
_
---.'
i'l 1L T I
—~ f
- I
i Rainfall Isopluvials
33 1 FT
i4 bHThLJ Etf3 ti t L 5O Year Rainfall Event
HH titU 1ItI bcEANsID -j r ___ : I
___
LLp n rr ii t_
,+
Ali- i Site
t +4
1ttITI
J T ______________ t d t I I I - 4 I - 13-O %
__
1 cOUN t
I i MA ~ _J
SOLANA BEACH
..JQ DEL / •' ..__,.1t -.
L' 4I44 LL+L
I
Mt
t +i 1m -1i--+ JHj •\I -----
tT I T 4 4 -+ 01
1 t 1 - I1 T • :. f - I ± i + I 4 I + I_I I_I
ri L + 1 + .. * -
i4-t-:1t - U1 2. iLt II4 I +
T ' 1 + I I: .4 . 1. I .. . + 4 . I I
Ll -
+ _H
L' i: 1';-----+-+ -i---'-f--' -i---
L:LT1T4- i1- _ )tttTLL -L_ +
DPW
t:+s
_
I
LJ : GIS SftaitGIS
11 1 + - - - . - + ~ + + L + - + 4 4 cowpw- Ha Sn Diego
STA. . J. F . +
- ~ ~_f.. I
t-4
-- + i __-- ---- - ---
+ f +
l+ .. N THIS MAP IS PRCMDEO WITHOUT WARRANTY OF ANY IUND. EITHER EXPRESS _r --- I I- i . A OF MERCHANTABILITY AND FITN FOR A PARTICULAR PURPOSE.
-t I ~--- -
-- • 4 + L--4- IMPERIALBC - - ..c'.J tTT4 44 + 4 * I .J_i:1l4Ll4._J C -4 +I 4- - _.,_ _. _ . -.1. -4. ,.., .1 + .. __,_ .~ ., I 1 - I. 4—I- - ~ - -4- + V I + -4 -4 1 . 1 I- I- + - I -. + 4 F Ths product may codalnInf,niaUo asbeen reproduced with I r , Li4 _~ 4 +_ 4 - f. + • t1 - * t 4 --+ - - 1- --4---+ I Il 4 -- +
- -+4-,
-permission grarded by Thomas Bralsers Mops.
132°30' I J I
I I I I I I . I - - - - 4 -"-
4.4 4 S i__i +J I 4rg, 4 I 4 . L.] - -L - -i- - -- • + U) 4 1 - b-+---. -j . I re— I I ----- ---4 3 0 3 Miles
L
-4----t -'— - r t T 4- + I 4 I++ f_.I. f.4_.+ . +co 14 L, r --~- + '-4 L~
- _ I t I - 4- 4 4 '-•-- + i . 4 4 4-
' I - . . ..i . j I . i - I . I 1
— — U I U • _________ I — I — — I
_I TI11-T-T TTTIT-T : IIJ1T[
u Hii I-i- 1ii County of San Diego I LL
I 1 Hydrology Manual
L~R,!v iiil~t
I Lit
XV 5.
Lfli ILftj1 - i1JTLfl 4J
.
J.
I:1 JJ' H-H-- Rainfall Isopluvials
_ H ii 4
-- _I - • - --: L __ - ________________________________________ fill L-r1 -33° I i I -. - I - i • I • - pG 3 5'
iih ii 'LL1i Tt___ 5O Year Rainfall Event -24Hours
t LIL :
t • 4 4
-
I - o. - + i._
I_if
0. - - I ____ -------- Isopiuvial (inches)
IiiT -.• _.1Lrf4.1ii.L Site iifT6Ak -:
DQ
i!i it T1j J± I
I P=42+ I' -
+ •. I I, I - - -
Tk4 ENINIIAS - _ 4_4 i:-
J 1.1 'II I - - __ I I r I j 4 I t t F 1T t
r
I I + i - - I
il WOO
t 1-~---H-j tT4 f SOLANA BEAC T L J t \I _ j S coUtV4
-- I I I
- --t i-I---- T 4-- -:4 •: ±+:. -t(. ------
# + 4 _____ I _ - - I
I)-
± I
5 4
__ __
TE T _UJF I_ I - I I I I : I u I + I - _ - I I H o-- titT14tFt I I IT 1H77 4-4 • J -4-.
-
-- • 4_-++_J-_4- ---1- I J I f --1----H-- I
- ____ • _I •__
•,_ ---t.-t- - +
T_
ti - .. - It--. I •• - + •1t II ± 4 • f I I 4 1 - + 4- _ I
__ _ _
T1 1i1t I
I
IJ
I:f :: : f ll +
-
+ +
I _ I I +
___ I
I I • - ?ot - + + 4-
- I I 4- -L I I I 4- - I4*5.fl 1 ' I 44-4 r -- 4- + -• ' "l tt DPW
I4- 11 t 1 14IjIff
SanGis 1 + + I + I + 4- t J_ + - + I 4- I4- - + 4- 1 - 4 I
- #\- + c Sn Dig ( t 1.L - .. —I-_1__.--.
I_1--_. ~ _-_f -. StA, 1.
_- + - - f ~ - + t -
+++ - 4 1
J4-
44-
-1 -44-j
I
Ib OF MERICK0117ABILITY AND FITNESS FOR A PARTICULAR PURPOSE.
N OR IMPLIED. INCLUDING. BUT NOT I WARRANTY U HRJESS
writhin Pendleton of SANDI
- - ' '-4- - I 4 1 -+- -~ - I I + - + .+ + - - L - - +
+ t - - + ._ +_I +]43203O.._ I
1j ; 'I II I I I I
'I
II .4_____ S
1--4 +t-+rn++----- -I--'-------14- 3 0 3 Miles I - L T 4- + —4------ 4 4-k-. --4-- Li + . + ---+ * 4 1-4 4- Ô---+-4-44- - t 4-- 4 J)4
I: - 4- 1 - + + 4 L L i t 4 1 -- 4- . + - + i 4- 4 4- . i + + 4 + 4- + ± _____ + I I- —f + - I :. .
County of San Diego
Hydrology Manual
+"qd4'
L_\ -1- 1:''±-i .--r-.
:t 1.
+ . .;- WA+\I4
rONE a MIME PEP
4-
tl H I IttI
t. Ht
it r1vs1de ounty- +
III
_,-vl ,-f
Rainfall Isopluvials
!!Hfl
I 33115 t
11 100 Year RainfallEvent -6Hours
IsopIuvial (inches)
I
t-%f1 - tjiN_T tjit i ijt
fflw
-.I-- IV
1TLt ' ±
- + • - : -4--- — -- - + -i.. / - - - - - _4-. -
4 - -
__ 4r
\_•_ I_ r.[1 I - - •- -
I! 4-T •p4+-+ _1_I _____II
-41+
L . -Th-. T1 t
4 1
-t- :—-4---\-~- - -H--HH- —:
4. I LU
t. •• \ ; rj ;.t dl 4-
4 . L 11----T - +
__ __ 44ItttI44
4- 4—TI I4 +--+Mf-4 - T~HI_I ttT+t 41 4-±
It44-t
+ 4—+
1
t+ i 4-i-f t tff11 f t--4- ' I __+-++' 4-14-j ~4-I4-4~4+ + + IJUJt1±1 tLtt_______ti1
I
5' 4_f -4
1-4- -- DPW -
11 4 GIS Sankx1S + 4- - Oenrnfe%tbl4s W Have Sun l)icgti (oyrcd!
+ 4
— N THIS hte.P IS PROVIDED WITHOUT WARRANTY OF ANY KIND. EITHER EXPRESS
+ 4 OR INCLUDING BUT NOT LIMITED TO. THE IMPLIED WARRANTIES + OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE.
Copyright SarGIS, All Rhts Resersed.
Tills produets may ca,ilihi Infemnstlon from the SANDAG Regional
Iflfonrratl0rI System which cannot be reproduced wllhoutlhe
ledoen penrdoSloll of SANDAG.
+ This product may anNals Infwmetlen which has been reproduced with penlitlolon granted by Thomas Brothena Mepi
S
3 0 3 Miles
_J_ CARLSBAD
- -H--i-- 4- - - --# k-- - - ---
- -+ -
1- -- -t -'r- I E2NrrAS -L _ 4330OOH--
hitt - :4f-J SOLABEACI
' j
±-L
-
rtjtfttiu
I -
Li Ir
Ii4 - 1
It
are
+ t 4-tff f + 4- 4+ + 4- 4--4- + 4-
t + + ' -f + tt 4 t - i -- + 4-4-1 + 1 L + + t + ri t I t
4 -~ * f ~ .-_ I - 4-
-i - _ 4- ---- -4- —+ 4--f 4
4- + + 1-t
4 4 .._ it + t t t tt14 t4 1 j4IMPERIAL 1Ii 1i. -4- +4-4--4--f4+4 44 - - - -.
-
4- + r + -+ 4- 4- 4 4- + + - 4 t - - t ' + +
+ 1- 4--t— 1- f -4-+ 4-4- + . - t f-4- - 4 4- .+ - 4 .---- 4--± 4-- + ------ +-+ + __432o O -.-------- Iii•il
it +.. tLtq44
.I....... ._...I__.I..__.I_lu__I _I - U I•I I - -- __ -
--i- --
Qp County of San Diego CD
-Ora 4 4 f
JFH
- Hydrology Manual r,.44
-
IThf
Rainfall Isoplzals
3301
.T
AL
flN-11 I I II liii IH+ •J- Hff' LIJH - IF* 100 Year Rainfall Event -24 Hours
t M: 4
_Isopluvial (inches)
.1 1 .T : _
r4
ofte
T1 4 JR4' f tHI:L:4 j
EN Oil 11
_ __
33000 ____ t .t
I - OLAABEA I ~SjNTV_ 4+T!
t ,
' -~ <__' I
• I +- - I
32*45
L i i
• t 214
_
- I 4 i +,'f L4J
If t tl 4-4— RON --.<: J:4 --4-T ttI--;~ :----'.4-1----+"---- t1 i 4-~t 4- tt4-t-1 4-HJ+ + 4j.j ' 14 _IJ _+4 —4-- 1-.+- -±+ f+f4 i DPW +4 +_±
—qp—, IS
t 4- -4- + _-•-__I- ---+ 1 - 4 -1_ i..4_' .•-- 1
1 -±- .r_a_ ', I +- I t + I -F + -f I I - I - 141 f +— ' 41-4— ±4-4-- —+ +4 I 4- + f
-im:GIS saiG
'F 0 We HaS.anDig(rd'
+_ I - -+ , + + 4- /-1J I -+.••4 T+ I.... 4 +. - + L
t +1' r - I ---4-- -4- N THI MAP IS PROMED WITHOUT WARRANTY OF ANY IUNO, EITHER EXPRESS
- I +4 +4 I . . -:-i-1 t + + L ++-+OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE.
ab 4-+-- Copyright SmGIS. All Rights Rmmved. 4 - 4 + ± 4-4- +i I -I- IMPERIALBEACC- / : •.--- 4_ 4- -F-+-I--'- + + --+-# —I- 4-- +-j--1- 4-- -4 -f-±4 +-+ t t +-4-+ 4---l-
----,-, Ii.Lu_:-j=f fZ j-+tc-+ +tt+t-~'-H--1---4_fi It4-It4-tf 4
+ +++_jj+__ t 4---+"r+ +1-j-----I---f 4--.-+4 t± 1-1VI#'-'-+-_-1---I-i-4--I--1-._+4Il -~----- ---t-t----- --I- -- -I-- This pmoduct may amizin Infanneflon which hm bow reproduced With
+4- t 4-4-t 4-
+ 141--tt-I-----f --1-4---4- ~-~ t1 + -f 1. T+132030'
+ 4-- + —41-1 jj 1 +1 1§4 + I + 4' U) +
_____ ___
3 0 3 Miles
+-_4_t 'r +-t 4-+++4 4 4 I I ! o I-t---i--r4 +t -i-f--t-4--++t I ++--4-+---
t+t _III_1*11
-
rx)
ZD
10 County of San Diego
__________ __________ __________
Hydrology Manual
OUflty 33°30
-- — _______________________
0 iR.tvrvv' Coint'' _____
- - / •0 /1 - - o. .J ----- - ------------
N "-
' It o rDCCC
Rainfall I:opluvials
- 33 15 3315
%fl
- -. -- --
50 Year Rainfall Event - 6 Hours
OCEANSIDE VIST/:
. .\.- •-3:&-
-- -- -- -- -. ---:. Isopiuvial (inches)
Site CARLSBAD
ESC DI \.\
P=2
-
- •
ENCINITAS 1.9
33'00'
-o
33 00 SOLANA BEACH POUV y S D COUNTY
( DEL MAR 2 & /
- - NTEE
Gb ANIE
7 JLCAJN
-
- 2
32°45 32°45'
LE GROVE
~'~®R
SD GIS SankiliS
C U
- - 2- - - - - IMPERIAL BEAOFr - -
-
N THIS MAP IS PROVIDED WITHOUT WARRANTY OF ANY KIND, EITHER EXPRESS
OR lMPLtaD. INCLUDING, BUT NOT t IMITEO TO, THE IMPLIED WARRANTIES
OF MERCHANTABILITY AND FITNESS FOR A PARTICULAu PURPOSE
CopynghtSenGIS. All RghtSRa.ar'uOd
P M e )< C _
This products may contain infoenabon from the SANOAG RegIonal
E Infomnation Sys
This product may contain information which has been reproduced with
permission granted by Thomas Brothers Maps
32030 I
32°30 S
b -
3 0 3MiIes
CD 171) County of San Diego
range Hydrology Manual
ounty __________ ___________ ___________ ___________ ______ 3330
C'.... •"
Riverside County
4& J
A4•%
2
40CCC1' 0 1
Rainfall I: opluvials
3315 /1 p5
. - - .- - - ,.. • Year Rainfall Event — 24 Hours
OCEANSID'S VI
- 19 IsopIuvial (inches)
1. ESC DIDO
Site
P=4-2
CARLSBAD 11 16 -
—
—
—
C ENCINITAS ..-- _•5,. 5'. - '.
-C... _5.., •5...--------------
33'00' - ' - - I b'?' C. *
: • 33 00 SOLANA BEACH ) pçw ' sp c6''
DEL MAR -
If
%
f/yc
-
— NTE
AN DIE
---C
•' -
SI__•
* S
___ LCiN
32'45' L\MA-.--'t .-.- -" . . :
-- C Q • • 3245
LE GROVE
---ORONA - 1. DPW
C 0 5A
GIS SahGIS
'Oi IMPERIAL BEAH
.
. • ..' • ,
.
C
- .
N THIS MAP IS PROVIDED WITHOUT WARRANTY OF ANY KIND EITHER EXPRESS
OR IMPLIED, INCLUDING. BUT NOT LIMITED TO, THE IMPLIED WARRANTIES
OF MERCHANTARILITY AND FITNESS FOR A PARTICULAR PURPOSE
Copyright SoeGIS All Rights Reserved.
This products may contain irrforv*eSoe frory the SANDAG Regional
E InformatIon Syslemn which cannot be reproduced without the
~ttcn permission of SANDAG
..L
TNsprodudmay conMwwthnrmoWhich has been reproduced wIth
32°30' 32030
C1 14, County of San Diego
3330 Hydrology Manual
3330
' Riverside CoUnty
—
• I P.,.,
"
Is opluvials
33 15
Rainfall
3.3'15'
100 Year Rainfall Event - 6 Hours
OCEANSIDE VIST
IsopIuvial (inches)
Site - CARLSBAD
SC DID - -
P=26 icp
-
ENCINITAS p\ '__./•_s.. / /
33°00' 00 C SOLANA BEACH POW y :S .D COUNTh
DEL MAR /
-c;
i
.
S•s.SS
cs-- CT:
AN DE
Id. LCAJN
3245 ________ LAMA 30 41
32'45'
LE GROVE
ORION
s CP F 7-zz;$hGIS is
C U A
- -
IMPERIAL BEACH .
/
:
-
• -
N THIS MAP IS PROVIDED WITHOUT WARRANTY OF ANT KIND, EITHER EXPRESS
OR IMPLIED, INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES
OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE
Copyright SeoGIS AU Rights Res—ad , • *
cv e X 1) ThIs products may contain ioformetloo from the SANDAG Regional
E od0000hoe Sys teoh cannot bo reproduced wtthoutthe
written parmissi
J
ch msproduct may formetocWtu has been reproduced whir
pemnission granted by Thomas Brothers Maps. 32°30' 32e30 S ____________ ______________
co 3 0 3MiIes
__I
o County of San Diego
_________ _____________________________________________
Hydrology Manual
ly
33°30
&
- !o 5
' _.J?= lit
-
.
- Rainfall Isopluvials
33'15' 40 33 15 fi
— J 100 Year Rainfall Event -24 Hours -c
OCEANSIDE VIS
/S
- * IsopIuvial (inches)
Site E DIDO
7
CARLSBAD
5-0
'5) -
P C ENCINITAS
33 00 L SOLANA BEACH rOv
33'00'-6-0-•- y S ( (OiNTY 5-0
DEL MAR
AN DIE
32°45
5\5\
5
SO San" IS
ORONA
THIS
GIS
-.
IMPERIAL BEACH
I : •• - - - - - C
-
MAP S PROVIDED WITHOUT WARRANTY OF ANY KIND, EITHER EXPRESS
OR IMPLIED. INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES 4 FOR A PARTICULAR PURPOSE
I : •
( X t ¶) C written
This produoth may contain informabon from the SANOAG Regional W E hrformahon System wthOhoarnot be reproduOAd wdhout the
permission of SAN AG P' This product may contain information which has been reproduced with permission granted by Thomas Brothers Maps.
32030'
- 32°30 S
Cl) to 3 0 3MiIes
rz~
INS
PIP-Mil
1//r,0~'O.,,000
or
"-or= W-
Oslo
EXAMPLE:
Given: Watercourse Distance (D) = 70 Feet
Slope (s) = 1.3%
Runoff Coefficient (C) = 0.41
Overland Flow Time (T) = 9.5 Minutes
T= 1.8 (1.1-C) \/5
SOURCE: Airport Drainage, Federal Aviation Administration, 1965
FIGURE
Rational Formula - Overland Time of Flow Nomograph
w W
LL
W 0 z
Cl)
Ui Cl)
0
[I]
30
20
10
If,
1111111111111111111111111 1111111111 iiliilliiiilliiiiiUU U III,, 111111 111111 1111111 C4116240. %~z;iiiiiiiiiiii 11HIIIIII Hill Hill iiiiiiiiiiiiiiiiiins millilinin lion HIM
:!IIIIHII 1111111111 IIIIllIHIIIIIIEQUATION IIIIIII
!II! !I!!11111111111111111111111 IIIII 111110
jQ11i !llk!u.lI.!.'!:!uo 111111 P6 itati _______ Duration _______________ iY:IIli1IIIuuIuI i"" u:"iip .-UUlh. 911111 Iii, bi. ii I •••UUU•I hUihh9 Ih1.'bi,
!IIi!!III !IIlui:!!III:!!!ii ! ! IIIIIIIIIIIIIIIIIIIIIIIIIIllI II
BROWN
!iIIIlI Ilk III. IIIiii!!!I!uiiiI1II!iI!!!!i
IIIiiii!!!I-SNER MR4 I 11111
UUUIIUIIII iii:uuuui
UUUUUUIIII IIIIIIIi
UUIIUIIIIII I111111I1IIIIi!!II luuhIuIIIui:!!'IIuhIIIIIiiiUIPuI!IIi;:IIiI:!!'ii
11111111111 IIIIIIIIIIIIIIIIIIlI I;!!IIoIuIIIIIIIII:!!!IIIuI!uuIi:IuI1;!!lIhi:!!!i
111111111111111111111111011111111111161111111111111111111111110 HIM 111blifiRik..
1111111111111111111111111111111111111111111 iiiii,1111111IT111111 11111 OR 'hillh i'1111111I1!!!Ihji!0
11111 1111111111 I I 11 oil lhl! I I M il 11110
•••• ••••••0"81;111 1111INN11; ••uuuuuu..u, Ili, IN, I'll uu,,uuIuu =on .••u.u..IuuIuui. 'II •••u ........uii..i.iui. ....iu.uiuuu.uuu,iuiuuu..iu..... '.u..uIIuuuuIlII, ___.. .......... ,..I...... u..hIII =moon 111111 milli No moo Eamon 1111111WHI wmm':~SNmxmvmmvllv ____. ....uuI Uuiuuul
•••• •...u...uiiuuuuuuuui..u.uuuu1u111111111111111111 .......'IUUU Uuuuull ••••111111111111111110010 mosommunn owning 61"111111111 ••••• 11111111111111111MM 1111111 ..... .....uuuuI 1111111111111IF111MM ••UUi •i•iiiuuii liuiiIuIi,U••UuuiifluiuiuuuiiUiiiiiii•U••UIlIIIIIIIUIIk ..... u..iuiuu.i iuuipiu,ii.....uiiui ..u.IuIIIII 1111111
iuii iiuuiuiuii uuuiiiIiiiuiiuliuiiuIuiIIuuiiUuiiIiIi••UIliIuuuu milli] iiiiiI1 ••u•• uuuuuuuuii 1111111111 uuuuiiiiuuuuuiiiuiuiiiiiiiii••••u•••u•uiiuuiiuiuuiiiuii ur iiuuuuiiiiiiiiiiiiiuiiuiu•••••u•uuuuuuuiuiiiuiiiiiii .IL .zrniuu 1111111111 IIIIIIIHIIIIIIIIIIIIHIIillUUUUIIIIIIIIUIlnhIIIIIlID 11.I uuuuIuIlIuIIIIIIIIII uuuiiiiiiiiiiiiuiiiiiiiiiiii••••uuiuuuuuiiuiiiiiiiiiiv III.. IuuIIuIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIiIIUUUUIIIlIIIIIIIIIIIIIIIIIII