Loading...
HomeMy WebLinkAboutMS 05-08; GARFIELD HOMES; DRAINAGE STUDY; 2005-12-28 (3)- .. -- -------------... ------------------ DRAINAGE STUDY for GARFIELD PROJECT sop os-01,cp os-01111Smr-Olt' __ RE_c_o_RD __ c_o_P-=v=-=·---, Drawing No. 436-8A APN: 206-013-19 ~ l:z\1.0\t>] Prepared for: City of Carlsbad 1635 Faraday Avenue Carlsbad,CA 92008 Telephone: (760) 602-4600 Prepared by: Alta Consultants 4901 Morena Blvd., Suite 409 San Diego, CA 92117 (858) 581-6101, Fax (858) 581-6138 Bartolome J. Pastor, RCE 38606 Project Site Addre1s: Northwest comer of Garfield St & Chinquapin Ave. Carlsbad, CA 92008 Revision Date: December28,2005 Submitted by: Mr. Bernard Goldstein 160 Tamrack Ave. Carlsbad, CA 92008 Engm~14iL RCE 38606, Expires 03/03/2007 ALTA CONSULTANTS PLANNING ENGINEERING SURVEYING "ti Date RECEJVVn MAR 15 r:s ENGINEL DEPART,· 4901 Morena Blvd., Suite 409, San Diego, CA 92117, Tel. {858) 581-6101, FAX {858) 581-6138 >-a.. c:::» c.:, w"' .. -1 9/,;,··'UII .... ........ ----Contents .. Project Description .......................................................................................... Page 1 Methodology ................................................................................................... Page 1 -Analysis & Conclusions .................................................................................. Page 2 -References ....................................................................................................... Page 2 -Hydrology Calculations .................................................................................. Page 3 -Additional Attachments -Exhibit A .......................................... Existing & Post-Construction Hydrology Map Exhibit B ........................................................... Runoff Coefficient Selection Chart -Exhibit C ............................................. Hydrology & Hydraulic Reference Formula -Exhibit D ................................................................ Intensity-Duration Design Chart -Exhibit E ................................................................... Isopluvial & Soil Group Maps ... Exhibit F ............................................... Post-Construction Hydrology Calculations Exhibit G ......................................................... StormFilter Cartridge Specifications - .. .. .. .. ---- ---.. -.. --- .. -.. ---... --- ------- -.. - -.. - --.. • .. - -- PROJECT DESCRIPTION: The project is located at 3981 Garfield Avenue within the City of Carlsbad in San Diego County, California. The project site is located at the Northwest comer of the intersection of Garfield Street and Chinquapin A venue. The Garfield Project Grading and Improvement Plans (Drawing No. 436-8A) propose four residential attached units on an existing 0.25 acre lot. The project site has been previously developed with an existing single-family dwelling and utilities. The project proposes to demolish the existing residence and construct four attached dwelling units. The project also proposes public improvements to Garfield Street including new asphalt paving, curb, gutter and sidewalk. All existing drainage is conveyed by sheet flow into Garfield Street or Chinquapin A venue. No existing runoff is detained on-site or filtered prior to entering the existing streets. Once construction is complete, all runoff created by this development will be filtered prior to out-letting into Garfield Street or Chinquapin A venue. No environmental resource agency permits are required for this project. PURPOSE OF STUDY: The purpose of this study is to support the proposed grading and improvements required to accommodate the proposed residential development located at 3981 Garfield Street in Carlsbad, California. METHODOLOGY: This hydrology study incorporates a manual application of the Rational Method as described in the San Diego County Hydrology Manual, dated June 2003. Rainfall Data: Standard intensity-duration design curve data generated from Figure 3-1 of the San Diego County Hydrology Manual (shown in Exhibit F) . Soil Type Data: The soil type was obtained from the San Diego County Hydrology Manual Soils Hydrologic Groups Map. A copy of this map is included with this report in Exhibits F and G. The predominant soil type obtained from the Map was determined to be soil type "D" . Type of Development: Low Density Residential (1.0 DU/ A) was used for the existing condition and Low Density Residential (2.0 DU/A) was used for the developed condition in generating Runoff Coefficients. Topographic Data: The Hydrology Maps shown in Exhibit A ( existing & proposed conditions), define and contain information used as a basis of generating the project hydrology study . Runoff Calculations: All runoff calculations and sizing information is shown on the Hydrology Maps & in the tables in Attachment F. All formula used are included as Exhibit D of this report. --... .. .. .. .. --- ----.. ... -.. --- --.. • .. .. - .. ... ANALYSIS & CONCLUSIONS: The proposed project will provide minimal changes in grade and flow directions and will enhance the quality of storm water runoff. With the installation of the catch basins with Stormfilter Cartridge and the proposed sump pump outlet, only a minimal amount of runoff will have the potential to leave the site via sheet flow runoff. This is a reduction from the existing condition (1.39 cfs) of untreated sheet flow leaving the site. The sections below outline the existing and proposed storm water conditions. Based on the data, calculations and recommendations contained in this report, a system can be constructed to adequately convey the proposed Q100 to the appropriate discharge points. As shown in the tables on page 4 of this report, the proposed project will increase the composite runoff coefficent from C=0.85 to C= 1.00. Also, the peak flow rate leaving the site will decrease, from 1.39 cfs under the existing condition (untreated sheet flow) to 0. 74 cfs under the proposed condition. The existing site and hydrology flow directions are shown on Exhibit A. The preliminary design of the proposed storm drain system is included in the Hydrology Map, also in Exhibit A. Summaries of the post-construction hydrology calculations are included in the tables in Attachment F of this report. The flows were developed using the 85th Percentile Precipitation map developed by the County of San Diego, as well as the County of San Diego Hydrology Manual . REFERENCES: This report has been prepared in accordance with current County of San Diego regulations and procedures. The following have been used in preparation of this study: • City of San Diego Drainage Design Manual, 1984 Edition • City of San Diego Storm Water Standards Manual, Revised May 2003 • County of San Diego Hydrology Manual, 2003 Edition • Handbook of Hydraulics (7th Edition), Baxter and King The calculations are based on the Rational Method . ----- ---- -... .. -.. .. --... .. - -.. --• - .. .. - PRE-DEVELOPMENT HYDROLOGY CALCULATION SUMMARY Project: Garfield Street Location: 3981 Garfield Street, Carlsbad, CA Storm Frequency: 100 Years Area A= 0.25 Acres Precipitation P6= 2.0 Inches Length of Travel L= 120 Feet Time of Concentration Tc= 3.57 Minutes Runoff Coefficient C = 0.85 Intensity I = 6.54 Inches/hour Pre-development Runoff Q= 1.39 CFS -------.. ----- .. .. -.. .. ----.. -• ------- Exhibit A Existing & Post-Construction Hydrology Maps vi . -----:::./,. -·= ,_. -·-"'>•··, ~-::_ _'u·--· ENGINEER OF WORK: Firm: Name: Phone #: FAX #: ALT A CONSUL TAN TS BARTOLOME J. PASTOR 4901 MOF~ENA BL VD. # 409 SAN DIEGO, CA., 92117 (858) 581-6101 (858) 581-6138 BARTOLOME J. PASTOR DA TE: RCE 38606, EXP. 3/31/2007 ALTA CONSULTANTS PLANJ\TJNG ENGINEERING SURVEYING 4901 Morena Blvd. Ste. 409 San Diego, CA 92117 (858) 581-6101 Fax (858) 581-6138 .JOB NO. 257 06, DATED SEPTEMBER 16, 2005 'z! 1 PROPOSED TYPE C-1 f- z ::0 --' f MASONRY WALL ~ J G' MAX ~E:H:IDEYARD ~· I 0 i--------------------:a ~ ~ OUTLET PIPE~ ~ _[j fa J 1% 1% s·l MIN.~ ,»~-<'ij.,s>'_ , , , , , , $.~, R• • • ALE~,"$'.~ EXl~\\'~\\f I--, ,--J '\,_CATCH BASIN W/ la "'1--::::.\ \ 1:-I LJ O FOSSIL FILTER INSERT ~ TG=60.20, IE=58. 73 SECTION D-D NOT TO SCALE BASEMENT SUMP PUMP IE=52.00 10 I --- 0 5 ' , I ! I I i -1· / l l I l l I i 1 j 'i l ; ; ; ; ; i •. I 1 ; l 30' ----- 1 n' ,v GRAPHIC SCALE 10 20 -40 ' I~ ____ ; ( IN FEET ) 1 inch = 10 ft.. I I ,./,GRADE 'f' 62.38' I I w z -' >-f-a:: w CL 0 0:: CL ~, >-, ,_ a: w (L 0 a: (L TV/=66.66' F.FL. 72.49 F.FL. 69.87 F_FL. 61.38 42" Guardrail TYPICAL SECTION C-C NOT TO SCALE TYPICAL SECTION B-B NOT TO SCALE BENCH MARK: LOCATION: 2.5" DISK IN SOUTHEAST CORNER OF DRAINAGE BOX INLET MARKED LS 6215. MONUMENT !S IN THE NORTHEAST CORNER OF GRAND AVE. AND WASHINGTON ST., 52' WEST OF RAILROAD TRACKS AND 40' NORTH OF THE CENTER OF GRAND AVE. STATION CLSB-130. ELEVATION: 43.09 DA TUM: COUNTY: OF SAN DIEGO, M.S.L. "AS BU I LT" I RCE __ _ EXP. ___ _ DATE REVIEWED BY: INSPECTOR DATE '~-+-:--t------------+--t----t------t---1 I SH2EET I CITY OF CARLSBAD I SH~ETS I ,. ' ENGINEERING DEPARTMENT ._, • ;::==:'....:==========::....:::::==; GRADING PLANS FOR: GARFIELD PROJECT 3981 GARFIELD STREET APPROVED 51274 9/30/2007 GLENN THOMAS PRU\M 1----+---+----------------+---t-----t----t------i RCE EXPIRES -~D~A~TE~ DATE INITlAL ENGINEER OF WORK DA TE INITIAL REVISION DESCRIPTION DA TE INITIAL OTHER APPROVAL CITY APPROVAL OWN BY: ALTA CHKD BY: __ _ RVWD BY: PROJECT NO MS 05-08 DRA½1NG NO. 436-SA I . m I "' i==1 EX. HOUSE .• ·~· . bl:·, .?l I')_ "r>? -¢·• :::v ASSESSOR'S PARCEL NO. ]2 EX. HOUSE \ ' ··-----------THICK BUSHES IN THIS AREA--------,,_ \.__EX. STAIRS TO UPPER FLOOR EX. 8" 01 A. TREE EX. HOUSE FF=59.68 EX. 6" DIA. TREE I . I I I 203-013-19 "J . . . . (/) . I- . I . 30: • . . . . C/) I ::, I 0 V! ~2-EX. /\.NC~OR I ~ :, . I i l:c. "°' . . : ,..----EX. EDGE """'o...-,..., ·' ,C4N~ , !lr',VHI..:> \::, : '----2 . EX. WATER METER EX-: POWER P OLE0 ' EX. O:VERHEAD UTILITIES . -· ' C/) (/) (/) + > I 30' . I I . I -------r EX. AC SERM 10 Ru. ,--, EX. CURB & GUTT:C:R GRAPHIC SCALE 5 10 20 "' ' , ____ , I ( IN FEET ) 1 inch = 10 ft. EX. ,2" DI/\ .. TREE EX. 1' DRAIN INLET ··n :::, I 0 N '01 --\,/ NOTES: EX PARKING I / I ~ I o EX. SIGN J --,;:-. . . . ~;1 -<~> ~=c-t---\'--=e:..· ~::,;,:----~~ -<::s-=~c--s ~=~s--===,,-t, CHINQ "''IL.J1N A VENUE ~--ss:--~~,-Css:c.,:--:. ,--=. ~--s,:---~~= <:::::'::::cc_== !~==-<' ·• ;: \ --\,/ >9f! EX. POWER POLE / & TELCO RISER__,, I ·-•· ,;..: ... c". ----------------- --\✓ r~ . --! EX. CURB & GUTTER PREPARED BY: ALTA CONSULTANTS \,/ 'vi .. ;.·-· \ :::, \,/ y2s \,/ ,/· \ I \--. I ,~---- ' \ • !'\ EX. PEDESTRIAN RAMP EX. POWER POLE BENCH MARK: C/) I ' EX.JosEWER MA1HOLE • -r> I ' (/) (/) (/) (/) ), -,--. . c::l cc \C< .. --\ -/' ' .• \~?.:t\,: -. ,,,,-EX. PEDESTRIAN RAMP . / i -.. / \ ,:__~ ·-'~-.;- \ --··: - LEGAL DESCRIPTION: SITE ADDRESS: PREPARED FOR: EDUARDO POSADA GARFIELD STREET URBiTEC1URE PLATFORM 1. TI-HS IS NOT A BOUNDARY SURVEY 1-----------------------1 2. THIS IS A TOPOGRAPHIC SURVEY ONLY ALTA CONSULTANTS 3. DIMENSIONS SHOWN ARE PER RECORD DATA ONLY 4901 MORENA BLVD. SUllE 409 SAN DIEGO, CA. 92117 DESCRIPTION: 2.5" IN SE COR. DRAINAGE BOX MARKED LS-6215 LOCATION: NE CORNER OF GRAND A VE. & WASHINGTON ST. NAD 83 N2003725.464, E6224844.422, STATION CLSB-130 LOT 10 & A PORTION OF LOT 11, BLOCK I, MAP NO. 1747, IN THE CITY OF CARLSBAD, COUNTY OF SAN DIEGO, STATE OF CALIFORNIA. CARLSBAD, CA. 92008 1761 HOTEL CIRCLE SOUTH, SUITE 350 PLANNING ENGINEERING SURVEYING 4901 Moren.a Blvd. Ste. 4-09 Sen Diego, CA 92117 (858) 581-6101 Fox (856) ~1-6138 ,JOB NO. 257-06 DATED ,nJLY 22, 2004 PHONE: (858) 581-6101 FAX: (858) 581-6138 SURVEYED ON: 07 19 2004 ------------------------------------------------------------- 1--A-_-p ___ N ____________ SAN DIEGO, CA. 92108-3318 ELEV: 43.09 DA TUM: M.S.L. 203-013-19 Cl-ilNQUAPIN2-1.DWG Exhibit B Runoff Coefficient Selection Chart San Diego County Hydrology Manual Date: June 2003 Table 3-1 Section: Page: RUNOFF COEFFICIENTS FOR URBAN AREAS Land Use I Runoff Coefficient "C" Soil Type NRCS Elements Coun Elements %IMPER. A B Undisturbed Natural Terrain (Natural) Permanent Open Space o• 0.20 0.25 Low Density Residential (LOR) Residential, l.0 DU/ A or less 10 0.27 0.32 Low Density Residential (LOR) Residential, 2.0 DU/ A or less 20 0.34 0.38 Low Density Residential (LOR) Residential, 2.9 DU/ A or less 25 0.38 0.41 Medium Density Residential (MOR) Residential, 4.3 DU/A or less 30 0.41 0.45 Medium Density Residential (MOR) Residential, 7.3 DU/A or less 40 0.48 0.51 Medium Density Residential (MOR) Residentia~ 10.9 DU/A or less 45 0.52 0.54 Medium Density Residential (MOR) Residential, 14.5 DU/A or less 50 0.55 0.58 High Density Residential (HOR) Residential, 24.0 DU/ A or less 65 0.66 0.67 High Density Residential (HOR) Residential, 43.0 DU/A or less 80 0.76 0.77 Commercial/Industrial (N. Com) Neighborhood Commercial 80 0.76 0.77 Commercial/Industrial (G. Com) General Commercial 85 0.80 0.80 Commercial/Industrial (O.P. Com) Office Professional/Commercial 90 0.83 0.84 Commercial/Industrial (Limited I.) Limited Industrial 90 0.83 0.84 Commercial/Industrial (General I.) General Industrial 95 0.87 0.87 3 6 of26 C D 0.30 0.35 0.36 0.41 0.42 0.46 0.45 0.49 0.48 0.52 0.54 0.57 0.57 0.60 0.60 0.63 0.69 0.71 0.78 0.79 0.78 0.79 0.81 0.82 0.84 0.85 0.84 0.85 0.87 0.87 •The values associated with 0% impervious may be used for direct calculation of the runoff coefficient as described in Section 3.1.2 (representing the pervious runoff coefficient, Cp, for the soil type), or for areas that will remain undisturbed in perpetuity. Justification must be given that the area will remain natural forever ( e.g., the area is located in Cleveland National Forest). DU/A = dwelling units per acre NRCS = National Resources Conservation Service 3-6 Exhibit C Hydrology & Hydraulic Reference Formula 1-IYDROLOGY & HYDRAULIC REFERENCE FOR1\1ULA TTh1E OF CONCENTRATIO;\: 11 _9L _; .335 Tc=(--) H Tc = 1.8(1.1 -C) /I s1/3 INTENSITY (Ins./hr.): I = 7.44 P6 D -o.6.:5 Natural \\'atershed -County Dwg.: Appendex X-A \Yhere: Tc= 1\1inutes + Initial 10 Minutes L = Miles of\Vatershed Along Natural Channel H = Difference in Ele\'ation along effective slope Line Urban Area Overland FJO\,\' Fig. 3-5 \\'here: Tc = Minutes • C = Runoff Coeffic.ient L = Overland Travel Distance S = Effective Slope(%) Intensity-Duraton-Freguency -County Design and .Procedure Manual (Appendix XI-A) \\'here: I= Intensity (insJhr.) P6 = 6 hours Precipitaton in (Ins.) D = Duration in minutes M.t\NNING' S FOR PIPE: (Designed Runoff) Q = Q = 0.4632 ds.'1s112 n l ,•/ Q = -"-ds-'3s 1-'2 n 5 ', 0. 0737 (0,.ud -sin 0) • n . 2D) G = 2arccos (1--. d Q =9. 739DrHe 1•5 Basic Fomrnla-: For Capacity Calculation, S should be Sf -for Pipe Flowing Full So -for Pipe Partially Fu11 Handbooks for Hyoraulics by Baxter & Kings " ) Pipe on channel flow Exhibit D Intensity-Duration Design Chart 10.0 9.0 8.0 7.0 ..... ·i.... ............... ~ ' .... ".... ....... ... ..... "i.... ................ .r ........... I'" 6.0 , ~" ..._ ', .... ""'"'"'~ ~~ EQUATION I ... ..._ ,..... ~ •~ I = 7 44 Ps o-0.645 ·i.... ..... • """ "'~ ~ i. • 5.0 1 r,.. ... .._ "' ,. ~ ~ I = Intensity (in/hr) ~i.... , .. ""' • ~ ~ i. P5 = 6-Hour Precipitation (in) 4.0 1 ..._ ... ..._ • "'" ~ D = Duration (min) ' ..... "' ~~ i. ~ 3.0 . ... ~,. ~ ~ ~~ I "' ... ~ ~ .... ...~ ~~ ~ .... ~ ~ ~ r-.. I...,• ~ 2.0 ~... '"' ~~~ ~~ t'r-.. 11-I--IH~.4-+-+-l-++::~+++++-PNd-l-+++1+1--Mi!-I-H+~I.H+Pl4+1~~fH,l,~..i-+..,1~+-!f+++++++++t1++++1+H-Mt-...,..._ "' ~ " ....... ' g t .o ~0.9 ·i,;09 Iii • 50.7 0.6 ..... ·~ I" , ...... ....... ~~ ~ 1-. ... , • " .... "' ..... "' I"'" " ~ ~ ~ o. ~~ I",..._ I• I' I' ~ , ... ~ ~ I._ '," "i,. ~ ~ ~ ~~ I", I",' .... " ~ ~ ~ ~~ ..... "'"' ~ ~ ~ "' "' ~ ~ ... I' l"'i,, ~ I'.._ I• ~~~ ~ ~ I ~~ I'' "'~ ~ ~ I"'" ~ ~ 1-. .... ~ 0.5 I "' ~ ~ 0.4 l•i,, ~ I" "' ~ I" I' ~ 0.3 0.2 0.1 I I I I I I I I I I I I I 111 I 5 6 7 8 9 10 15 20 30 40 50 2 3 4 5 6 Minutes Hours Duration 'r' ~ !:; -0 ~ 6.0 -§: 5.5 i 5.0 g 4.5 3' (') 4.0 16 3.5 .!!!. 3.0 2.5 2.0 1.5 1.0 Directions for Appllcatlon: (1) From precipitation maps determine 6 hr and 24 hr amounts for the selected frequency. These maps are included in the County Hydrology Manual (10, 50, and 100 yr maps included in the Design and Procedure Manual). (2) Adjust 6 hr precipitation (if necessary) so that it is within the range of 45% to 65% of the 24 hr precipitation (not applicaple to Desert). (3) Plot 6 hr precipitation on the right side of the chart. (4) Draw a line through the point parallel to the plotted lines. (5) This line is the intensity-duration curve for the location being analyzed. Application Fonn: I (a) Selected frequency J..2_ year (b)Ps= 2,o in.,P24 : --•~ = __ %!2) 24 (c) Adjusted P6<2l = __ in. (d) tx = __ min . (e) I ::; __ in./hr. Note: This chart replaces the Intensity-Duration-Frequency curves used since 1965. P6 ~ 1 -t-1.srz-2.5.:_ 3 • 3.5 L ~4.5 ..-5 L 5.s ~ e Duration I I I I I 1------i-r I I I f I I 5 2.63 3.95t 5.2;;:., 6.59 + 7.90 9.22 10.54 11.86 13.17 14.49 + 15.81 7 2.12 3.18 4.24 , 5.30 6.36 7.42 8.48 9.54 10.60 11.66 12.72 • ~ ~ 1 ' • • t .. , •• 10 1.68 2.53 3.37 4.21 5.05 5.90 6.74 7.58 8.42 9.27 .r..!QJ.! 15 1.30 1.95 2.59 3.24 3.89 4.54 5.19..i.5.84 _6.49 7.1~~ 20 1.08 11.6~t2-15.,..2.69 ,3.23 3.77 4.31 4.85 5.39 5.93..., 6.48 25 0.93 , 1.40 I 1.87 2.33 . 2.80 3.27 3. 73 , 4.20 j 4.67. 5.13 5.60 30 0.83 '1.24:1 1.66 2.07 ,2.49 .. 2.90 3.32-j' 3.73 4.15µ,.56 4.98 40 0.69 1.03~1.38~1.72 2.07,2.41 2.76 3.1~ 13.45 3.79 4.13 50 o.60 .o.oo 1.11_ 1.49.,..1.79...-2.09 2.391 2.6~2.98 . 3.28l 3.58 1---60~-cco~ to.so 1.os; 1.33 1.59 1.ss 2.121.39 2.65 2.92 ) 3.18 90 o.41 1 0.61 o.~0 1.02-+123.,..1.43 1.63 1.8412.~1 2.25 2.45 120 0.34 0.51 0.68 0.85 1.02 1.19 1.36 1.53 1.7~ t 1.87:m-04 150 o.29+0.44 0Ji9 __ 10.1310.sa 1.03ti1.1s _1.32 1.47J.1_.62 1.z6 180 _Q_J-6 0"--39 O-~i:0.65 Ti0.78)o.91 1.04 1.18 1.31 1._¥ 1.57 240 0.22 o.33(43 ! o.54 ..... o.6ill~:76 o.a1 o.98 . 1.os ...... 1.19 1.30 300 0.19_0.28 0.38 0.4L_0.56_().66 0.7~85 0.94 1.03 ..J.13 3tlO FIGURE Intensity-Duration Design Chart -Template I 3-1 Exhibit E Isopluvial & Soil Group Maps ! : ' j· I ! : ' = : -- ' ' ' • ' • !: ··-: /,/ . :-,•' • L~_ • ! ~ • .. ~ . ' ' \ i i .\ •. \ .. ' .;.,,, ' J .. -·· ' ' . , l' ,/· • a· " , ! j j : ·-L -"'~ ! --t ..,. . ' ! • " ' -0 I ! l "O J J ~ aJ ! ,, _, • \ \ a-l . -----_: Exhibit F Post-Construction Hydrology Calculations RUNOFF CALCULATION Page 1 of 4 Pages Project Name: GARFIELD RESIDENCE Job No. 257-06 Preliminary Hydrology Soil Classification = "D" Frequency = 100 Yr. Stonn Date:April 8, 2005 6 Hour Precipation P6= 2.00 ins/hr INITIAL HYDROLOGY (OVERLAND TIME) Remarks From Node 1 to node 2 Area A1 A= 0.02 Ac. Distance Travel L= 45 Ft. Pad Slope S= 1.00% Extrapolated Time of Concentration Tc= 8.82 Minutes Table 3-2 Intensity I= 3.65 In/hr. Runoff Coefficient C= 1.00 Designed Runoff Q= 0.07 CFS Node 2 to Njode 3 HYDROLOGY & HYDRAULIC OF PIPES From Node 2 to Node 3 Designed Runoff Q= 0.07 CFS Pipe Length L= 35.00 Ft. Pipe Diameter d= 0.33 Ft. Pipe Slooe So= 0.50% Manning's Coef. .n = 0.013 Depth of Water y= 0.20 Ft. Velocity V= 1.28 Ft./Sec. Velocity Head hv= 0.03 Ft. Travel Time Tt= 0.46 Minutes Time of Concentration Tc= 9.28 Minutes HYDROLOGY & HYDRAULIC OF PIPES From Node 3 to Node 4 Area A2 A= 0.01 Ac. Designed Runoff Q= 0.13 CFS Pipe Length L= 45.00 Ft. Pipe Diameter d= 0.33 Ft. Pipe Slooe So= 0.50% Manning's Coef. .n = 0.013 Depth of Water y= 0.33 Ft. Velocity V= 1.53 Ft./Sec. Velocity Head hv= 0.04 Ft. Travel Time Tt= 0.49 Minutes Time of Concentration Tc= 9.77 Minutes Intensity I= 3.42 ln./hr. Runoff Coefficient C= 1.00 Runoff q= 0.03 CFS Total Design Runoff Q= 0.17 CFS Node 3 to Node to 4 HYDROLOGY & HYDRAULIC OF PIPES From Node 4 to Node 5 AreaA3 A= 0.01 Ac. Designed Runoff Q= 0.17 CFS Pipe Length L= 35.00 Ft. RUNOFF CALCULATION Page2 of 4 Pages Project Name: GARFIELD RESIDENCE Job No. 257--06 Preliminary Hydrology Soil Classification = "D" Frequency= 100 Yr. Stonn Date:April 8, 2005 6 Hour Precipation P6= 2.00 ins/hr Pipe Diameter d= 0.50 Ft Remarks Pipe Slooe So= 0.50% Manning's Coef. .n = 0.013 Depth of Water v= 0.23 Ft. Velocity V= 1.94 Ft./Sec. Velocity Head hv= 0.06 Ft. Travel Time Tt= 0.30 Minutes Time of Concentration Tc= 10.07 Minutes Intensity I= 3.36 ln./hr. Runoff Coefficient C= 1.00 Runoff a= 0.03 CFS Total Desian Runoff Q= 0.20 CFS Noide 4 to Node 5 From Node 5 to Node 6 Designed Runoff Q= 0.21 CFS Pipe Length L= 38.00 Ft. Pipe Diameter d= 0.50 Ft. Pioe Slooe So= 0.50% Manning's Coef. .n = 0.013 Depth of Water y= 0.26 Ft. Velocity V= 2.05 Ft./Sec. Velocity Head hv= 0.07 Ft. Travel Time Tt= 0.31 Minutes Time of Concentration Tc= 10.37 Minutes Intensity I= 3.29 ln./hr. INITIAL HYDROLOGY (OVERLAND TIME) From Node 7 to Node 6 Area R1 A= 0.1 Ac. Distance Travel L= 98 Ft. Pad Slooe S= 0.50% lntial Travel Distance Lm= 50 Minutes Extraoolalted Initial Time Travel Ti= 9.55 Minutes Table 3-2 Remainina Distance Travel Lr= 48 Ft. Time of Concentration tc = 1.57 Minutes Fig. 3-3 Total Time of Concentration Tc= 11 .12 Minutes Intensity I= 3.15 In/hr. Runoff Coefficient C= 1.00 Desianed Runoff a= 0.31 CFS Node 7 to Node 6 Total Runodd Q= 0.52 CFS Node 6 to Node 8 HYDROLOGY & HYDRAULIC OF PIPES From Node 6 to node 8 Designed Runoff Q= 0.51 CFS Pioe Lenath L= 9.00 Ft. Pipe Diameter d= 0.67 Ft. Project Name: GARFIELD RESIDENCE Pagel of 4 Pages Job No. 257-06 Preliminary Hydrology Soil Classification = "D" Frequency= 100 Yr. Storm Date:April 8, 2005 6 Hour Precipation P6 = 2.00 ins/hr Pioe Slope So= 0.50% Remarks Manning's Coef. .n = 0.013 Depth of Water v= 0.37 Ft. Velocity V= 2.56 Ft./Sec. Velocity Head hv= 0.10 Ft. Travel Time Tt= 0.06 Minutes Time of Concentration Tc= 1.63 Minutes Intensity I= 10.86 ln./hr. INITIAL HYDROLOGY (OVERLAND TIME) From Node 9 to node 10 Area G1 A= 0.07 Ac. Distance Travel L= 97 Ft. Pad Slooe S= 0.50% lntial Travel Distance lm= 50.00 Minutes Extraoolalted Initial Time Travel Ti= 10.70 ln./hr. Table 3-2 Remaining Distance Travel Lr= 47.00 Ft. Time of Concentration tc = 1.55 Minutes Fig. 3-3 Total Time of Concentration Tc= 12.25 Minutes Intensity I= 2.96 ln./hr. Runoff Coefficient C= 1.00 Designed Runoff Q= 0.21 CFS Node 9 to Node 1 O HYDROLOGY & HYDRAULIC OF PIPES From Node 10 to node 8 Designed Runoff Q= 0.21 CFS Node 1 O to Node 8 Pioe Length l= 9.00 Ft. Pipe Diameter d= 0.50 Pioe Slooe So= 0.50% Manning's Coef. .n = 0.013 Depth of Water v= 0.26 Ft. Velocity V= 2.05 Ft./Sec. Velocity Head hv= 0.07 Ft. Travel Time Tt = 0.07 Minutes Time of Concentration Tc= 12.33 Minutes Intensity I= 2.94 ln./hr. HYDROLOGY & HYDRAULIC OF PIPES Node 8 to Node 11 AreaA5 A= 0.01 Runoff Q= 0.71 Confluence (8) Node 8 Pioe Length L= 40.00 Ft. Node 8 to NoOde 11 Pioe Diameter d= 0.67 Ft. Pipe Slope So= 0.50% Manning's Coef. .n = 0.01 Depth of Water v= 0.46 Ft. Velocity V= 2.74 Ft./Sec. Velocity Head hv = 0.12 Ft. Project Name: GARFIELD RESIDENCE Page4 of4 Pages Job No. 257-06 Preliminary Hydrology Soil Classification = "D" Frequency= 100 Yr. Stonn Date:April 8, 2005 6 Hour Precipation P6= 2.00 ins/hr Travel Time Tt= 0.24 Minutes Remarks Time of Concentration Tc= 12.57 Minutes Intensity I= 2.91 ln./hr. Runoff Coefficient C= 1.00 Designed Runoff Q= 0.03 CFS Tofal Runoff Q= 0.74 CFS Node 11 to Node 12 Exhibit G StormFilter Cartridge Specifications Cl!CHBASINSl•mlift• D=fl ~~~ U ~ ~~@lruiru WO ~~@lr n• £LJ ~~~£ ~~ ~---CONCRETE COLLAR FILTER CHAMBER COVER GRATE & FRAME FILTER CHAMBER INLET OVERFLOW WEIR CREST SCUM BAFFLE DEBRIS SUMP --- CLEANOUT OPENING IN WEIR WITH HOLE & EXPANSION PLUG Also available in concrete and plastic. StormFilter CARTRIDGE FILTER CHAMBER OUTLET MANAGEMENT INC . 12021-B NE Airport Way, Portland, OR 97220 (( O ao0.548.4667 O ao0.561.1271 (Z)stormwaterinc.com M-03-006-A f '{ 1______,; .............. 1~==================================================================1i\ ouru:r P!PE STUB INLET PIPE A • STUB (OPTIONAL) STEEL CATCHBASIN StormFilter -PLAN VIEW SCAl : N.f.S. INS,0[ RIM INSIDE 2·-4• 2·-4 r ::::;:::::::::;~ J'-9" STEEL CATCHBASIN StormFllter -SECTION VIEW SCAI.[. N . .S OVERF"LOW WEIR CREST OUTLET PIPE srus CLEANOlJT OPENING IN OVERFLOW WEIR A-A STEEL CATCHBASIN StormFilter -SECTION VIEW B-B CALL N.1.5. U.S. PATENT No. 5,322,629, 5,624,576, AND OTHER U.S. AND FOREIGN PATENTS PENDING The Stormwater Management StormFilter® is now available in a steel, concrete or plastic catch basin configuration. The CatchBasin StormFilter system, an extension of the widely accepted StormFilter Best Management Practice, has been engineered to replace the standard catch basin. In the CatchBasin StormFilter, polluted runoff enters the system through a traffic-bearing grate. In the inlet chamber primary settling of the runoff occurs, and the heavier solids drop to a sump on the vault floor. The water is directed under a baffle into the filter chamber where the StormFilter cartridge is housed. During filtration, finer soli9s and soluble pollutants are removed. Clean water is discharged from the filter and directed around the overflow bypass weir to the outlet pipe. During heavy storms, wh en the flow exceeds the design flow, water in the inlet chamber spills over the bypass weir, preventing the re-suspension of sediments and pollutants trapped in the cartridge chamber. SYSTEM FEATURES AND BENEFITS • Proven Storm Filter technology targets site-specific pollutants • Low cost, heav.y gauge, all steel construction • Internal bypass minimizes re-suspension of trapped pollutants • Simple, low cost installation • Easy maintenance supported by Stormwater Management • Operation and Maintenance Guidelines available from Stormwater Management Inc. • Also available in concrete and plastic GENERAL SPECIFICATIONS • Storm Filter capacity -5 -15 gpm/cartridge (up to 4 cartridges) • Peak hydraulic capacity -1.0 cfs or 3.0 cfs • Hydraulic drop (Rim to Invert) -2.3' to 3.3' • Outlet pipe diameter -6" to 12" • Load bearing capacity-H-20 rated • Optional corrosion-resistant powder coating 12021-B NE Airport Way, Portland, OR 97220 (( O so0.548.4667 0 B00.561.1271 C')stormwaterinc.com --==:::::!:::::::::====---========-~~-------- I, • □lblJ~ @D~ ~lU ~~ ~~[[))~~ ~ ~~~ ., ~ •,. ~ .. • ..... , ~~--~ • PERLITE CSF® LEAF MEDIA ZEOLITE IRON INFUSED GAC PLEATED FABRIC MEDIA SELECTION GUIDE POLLUTANT PERLITE CSF ZEOLITE GAC IRON INFUSED PLEATED FABRIC Sediments ✓ ✓ ✓ Oil and Grease ✓ ✓ Soluble Metals ✓ ✓ ✓ Organics ✓ ✓ Total Phosphorus ✓ ✓ ✓ Dissolved Phosphorus ✓ Total Nitrogen ✓ ✓ ✓ ✓ Dissolved Ammonium ✓ MANAGEMENT INC. 12021-B NE Airport Way, Portland, OR 97220 (( 0 800.548.4667 O so0.561.1271 C!}stormwaterlnc.com M-03-005-A The Stormwater Management StormFilter® uses a variety of filter media to target and remove pollutants from stormwater runoff. It is the only stormwater treatment system to offer such versatility in removing site-specific pollutants. The StormFilter can be customized for each site by using different filter media to remove sediments, soluble phosphorus, soluble metals, and oil and grease. In many cases, a combination of media is recommended to maximize the effectiveness of pollutant removal. PERLITE Perlite is a naturally-occurring puffed volcanic ash. Its highly porous, multicellular structure, and rough edges make it very effective for removing fine particles. Perlite can be used as a stand-alone media or in conjunction with other media. As a stand alone media, perlite most effectively removes suspended solids (TSS), and oil and grease. CSF® LEAF MEDIA CSF leaf media is created from a feed stock of pure deciduous leaves collected by the City of Portland, Oregon. Stormwater Management processes composted leaves into a granular organic media that is most effective at removing soluble metals, (TSS), and oil and grease. ZEOLITE Zeolite is a naturally occurring mineral that has been used in a variety of water filtration applications. Zeolite is used to remove soluble metals, ammonium and some organics. GAC (Granular Activated Carbon) GAC has been used in the water filtration industry for many years. This media is known for its micro- porous structure and extensive surface area, which provides high levels of adsorption. Stormwater Management has taken this developed filtration media and applied it to the stormwater industry primarily for the removal of oil and grease and organics such as pentachlorophenol (PCP) and TNT. IRON INFUSED MEDIA Iron infused media is Stormwater Management's newest addition to media filtration. This open-cell structured media is infused with small bits of iron to remove dissolved phosphorus. This media also reduces soluble copper and zinc, making it extremely valuable for sensitive watersheds with nutrient: loading problems. PLEATED FABRIC INSERTS Stormwater Management's pleated fabric inserts are designed primarily for TSS control. The reusable insert fits inside the standard cartridge; extra space between the insert and the center tube can be used for the addition of granular media to provide soluble pollutant removal. Media selection requires an understanding of the pollutants generated from the site and the sensitivity of the receiving waters. The media selection guide on the other side of this sheet can be used as a basic guideline when choosing the appropriate media for your site. 12021-B NE Airport Way, Portland, OR 97220 (( 0 800.548.4667 0 800.561.1271 0 stormwaterinc.com