HomeMy WebLinkAboutSAN DIEGO GAS & ELECTRIC; 2024-04-18;ATTACHMENT A
Submitted to Applicant by: Ilario Romano
SDG&E Work Order(s): T&C-300000449356
C&C-300000338091
CP-300000338009
AGREEMENT FOR REPLACEMENT OF OVERHEAD
WITH UNDERGROUND FACILITIES
OH RFS-300000338008
THIS AGREEMENT, made and entered into, by and between SAN DIEGO GAS & ELECTRIC
COMPANY, a corporation, hereinafter called "Utility", and THE CITY OF CARLSBAD, hereafter called
"Applicant(s)".
WITNESSETH:
. WHEREAS, Applicant(s) are the owners, lessees, or others having a legal interest in
·those certain premises known as the Valley & Magnolia Rule 20A Conversion Project ("Project'') located at
certain areas of Valley Street and Magnolia Avenue; and
WHEREAS, Applicant's desire that existing overhead facilities be replaced with
underground facilities, and in consideration of the desirability and value which said underground facilities
will add and contribute to_ the above premises; and
NOW, THEREFORE, it is agreed by and between Utility and Applicants as follows:
1. Subject to the conditions hereinafter provided, Utility, upon obtaining satisfactory easements for any
required rights of way for the Project, shall remove its existing overhead electric power facilities
serving Applicants and shall replace these facilities with underground facilities, in accordance with
its Rule 20.A for Replacement of Overhead with Underground Facilities as filed with the California
Public Utilities Commission.
2. All work performed by the Utility and Applicants pursuant to this Agreement shall be in conformity with
the General Conditions and the Specifications attached hereto and by this reference made a part
hereof. After construction of the Project, Utility shall furnish underground electric service to the
premises shown on Specifications and, upon completion of the work specified herein, Utility shall not
furnish overhead electric service to any of such premises.
3. This Agreement shall become effective only upon compliance with all of the fol.lowing conditions:
a) All Applicants shall execute this Agreement and shall perform all of the conditions herein
contained.
b) All Applicants shall execute a companion agreement with each company, municipality, or
agency that is a joint user with Utility of poles, or maintains other poles, within the area from
which Utility's pole will be removed pursuant to Section 1, for providing communication
service, traffic signals, police or fire alarm boxes, or street or safety lighting supplied by
overhead wiring. Such agreement or agreements will provide for such service to be
discontinued or converted and maintained through underground circuits or other appropriate
and lawful means, so that all of said poles which are no longer necessary for their existing
purpose can be removed from the area within a reasonable time after Utility has removed its
poles.
c) Applicants will, at their expense and in conformity with the Contract Documents as defined in
the General Conditions, furnish and install the material, and facilities and perform the work
indicated below by a check mark. The material, facilities and work listed below which are not
indicated with a check mark shall be furnished, installed and performed by Utility at
Applicants' expense.
FORM 106-2759L (4/91)
□
□
□
Excavation, backfill and compaction
Conduits
Concrete substructures
d) Utility shall notify Applicants, in writing, of final acceptance of the work specified herein.
Applicants hereby grant to Utility all facilities installed by Applicants pursuant to this
Agreement, said grant to be effective upon receipt of Utility's written final acceptance.
e) Each Applicant shall, at his expense, promptly provide any necessary changes to the existing
facilities on his property so as to receive underground electric service at the points specified
on the Specifications. The Applicants' work shall be in accord with Utility's Rule on Service
Connections filed with the California Public Utilities Commission effective as of the date of
this Agreement, and in accord with the Contract Documents. Underground electric service
will not be supplied until all affected premises are equipped to receive electric service in
accordance with said plan and specifications.
4. The entire undergrounding work is estimated to cost $6,895,981 .00. The Utility expects to receive
payment from the associated Communications Infrastructure Providers (CIPS) in the amount of
$121 ,346.00 for participation in the agreed upon joint trench. The Utility has included this value as a
credit against the total cost of this project (" JTO Value"). The Utility has issued a credit for the value
of $1 ,105,794.00 against the total cost of this project ("Relocation Credit") for the estimated value of
Utility's relocation work had the Applicant not opted to proceed with undergrounding of certain
facilities under Rule 20A. The remaining estimated cost of the undergrounding work, less the JTO
Value and the Relocation Credit is $5,668,841 .00.
Applicant's current Rule 20A work credit balance is $1 ,729,513.00. Applicant(s) will utilize its
available Rule 20A Work Credits to fund this work, and the remainder of the costs associated with
the Project will be paid for by Applicant(s) as follows: payment via check made out to SDG&E and
mailed to the address listed on the attached Cost Remittance.
Receipt by Utility is acknowledged from Applicant(s) in the amount of $3,939,328.00, which is an
amount equal to the estimated cost of the Ll1ility's conversion work, less the JTO value, less the
Relocation Credit, less the City's available Rule 20A Work Credits, plt:1s the applicable ITCCA
revenue tax which is billed at 24% of the collectible total, in accordance with its Filed Rule on
Replacement of Overhead with Underground Facilities.
The conversion work will be tracked and billed on an actual cost basis, meaning that all costs will be
reconciled at completion of the work and SDG&E will bill or refund to Applicant any differences
larger than $1 DO.In the event any additions, rearrangements, or changes to the electric wiring are
required or performed on Applicants' several premises, other than the work pursuant to Section 3.e)
above, Applicants shall cause said additions, rearrangements, and changes to be made at their
expense.
5. All wires, cables, conductors, conduits, ducts, connectors and appurtenances installed by Utility, or its
agents, on the premises of Applicants, or elsewhere, and all facilities granted to Utjlity by Applicants,
shall become and remain the property of Utility notwithstanding any payment n:iade under this
Agreement. Such facilities will be maintained and operated by Utility in accordance with its Rules-for
the Sale of Electric Energy on file with the California Public Utilities Commission.
a) Utility shall be under no obligation to perform and complete the work undertaken by it
pursuant to this Agreement until Applicants' obligations incurred pursuant to Paragraphs 3.b)
and 3.e) of this Agreement shall have been fulfilled.
b) If the Specifications attached hereto require the installation of new street lighting standards,
Utility shall be under no obligation to remove and cease operating its overhead electric
facilities nor to furnish underground electric service to any of the premises shown on the
Specifications until said street lighting standards have been installed and energized.
c) Utility at its sole election, may undertake to perform the work to be performed by it prior to the
occurrence of the conditions specified in section 7. and subsection b) of this Section. The
commencement of any such work by Utility under the provisions of this subsection shall not
constitute a waiver of any of the requirements imposed upon any Applicants under section 7.
or subsection b) of this Section, or under any other provisions of this Agreement.
2 FORM 106-2759L (4/91)
If any Applicants shall, within one year of the date of this Agreement, fail or refuse to comply with any of the
conditions hereof or to perform all work required under the contracts executed pursuant to Paragraph 3.b) of
this Agreement, Utility shall have the right to make such changes and to impose such further conditions
upon the Applicants as may be necessary to protect its rights under any existing agreement for any
increase in its costs of installation, and to provide in any other manner for the accomplishment of the
purposes of this Agreement consistent with applicable rules, laws, ordinances and its contractual
obligations hereunder.
6. Once Applicant has started to perform the work required by the Contract Documents, Applicants agree
to exercise reasonable diligence in pursuing such work to completion within one year after the effective
date of the Contract Documents. If such work has not been completed within two years after the
effective date of the Contract Documents, Utility shall have the right, upon giving written notice to
Applicants, to cancel and terminate the Contract Documents. Utility shall return to Applicants, an
amount equal to the above cash advance, minus Utility's costs. Utility's costs are defined as the actual
cost (including but not limited to labor, materials and overhead) incurred by Utility prior to such
cancellation and termination in connection with work done in furtherance of Applicants' project, plus the
actual cost of removing any of the Utility installed facilities which Utility desires to salvage, minus the
salvage value of such facilities. Upon exercise of this right to cancel and terminate, and upon payment
to Applicants, all of Utility's obligations under the Contract Documents shall cease.
7. This Agreement shall at all times be subject to such changes or modifications by the Caiifornia Public
Utility Commission as said <:;;ommission may, from time to time, direct in the exercise of its jurisdiction.
8. All terms and situations heretofore made and agreed to by the parties in relation to said electric line
replacement are set forth in this Agreement and no representation of any agent or employees shall be
binding upon Utility except as expressed herein. Appendix A attached hereto is solely for use by Utility
and nothing contained therein shall in any way alter or vary any term, condition or stipulation contained
in this Agreement.
9. If Applicant is a corporation, partnership, join! ver,ture or a group of individuals, the subscriber hereto
represents that he has the authority to bind said corporation, partners, joint venture or individuals as
the case may be. Each Applicant signing this Agreement agrees that be shall be jointly and severally
liable under the terms of.this Agreement with every oJher a·pplicant signing the Agreement.
10. All of the terms and conditions ofttiis Agreement shail be binding upon and shall insure to the benefit of
the parties hereto, their heirs, administrators, executors, personal representatives, trustees, •
successors and assigns.
11 . The Contract Documents shall become effective only upon the date signed by the authorized
representative of Utility. •
3 FORM 106-2759L (4/91)
IN WITNESS WHEREOF, the parties hereto have individually executed, or have caused
this Agreement to be executed for and on behalf of each, by and through their responsible agents,
partners duly authorized corporate officers, as the case may be.
Name: --=;;f=--a,,....xo'-"-±"---""tU\~D. ...... d'-"""w~i~C~b--
(Please Print or Type)
Title: __,.,C ........ .-i4a__,_____,.,.........tv\_a..:::..cCLv\==------=-Q~~~--
Date: _(_to_~_M0_~4' ____ _
Address:
Telephone: (81,.\'2-j 3 '3j • 7--8 2, \
4
SAN DIEGO GAS & ELECTRIC COMPANY,
a corporation
By:______...._M_Ui------=+-JJ 11-?'A:-"----------=---
(Authorized Individual-Utility)
Date Executed:
March 28, 2024
FORM 106-2759L (4/91)