Loading...
HomeMy WebLinkAbout1790 RATCLIFF RD; ; CBR2020-3060; PermitBuilding Permit Finaled Residential Permit Print Date: 04/05/2024 Job Address: 1790 RATCLIFF RD, Permit Type: BLDG-Residential Parcel#: 1562700400 Valuation: $14,790.00 Occupancy Group: #of Dwelling Units: Bedrooms: Bathrooms: Occupant Load: Code Edition: Sprinkled: Project Title: CARLSBAD, CA 92008-1041 Work Class: Track#: Lot#: Project#: Plan#: Construction Type: Orig. Plan Check#: Plan Check#: Description: MENON : 600 SF RETAINING WALL FEE BUILDING PERMIT FEE ($2000+) BUILDING PLAN CHECK FEE (BLDG) Property Owner: SATISH MENON 1790 RATCLIFF RD CARLSBAD, CA 92008 SB1473 GREEN BUILDING STATE STANDARDS FEE STRONG MOTION-RESIDENTIAL SWPPP INSPECTION FEE TIER 1 -Medium BLDG SWPPP PLAN REVIEW FEE TIER 1 -MEDIUM Retaining Wall Total Fees: $574.75 Total Payments To Date: $574.75 {cityof Carlsbad Permit No: St atus: CBR2020-3060 Closed -Finaled Applied: 11/23/2020 Issued: 02/23/2021 Finaled Close Out: 04/05/2024 Final Inspection: 04/04/2024 INSPECTOR: Renfro, Chris Contractor: COTI DEVELOPMENTS INC 3755 VISTA CAMPANA N, # 32 OCEANSIDE, CA 92057 (760) 672-1111 Balance Due: AMOUNT $159.31 $111.52 $1.00 $1.92 $246.00 $55.00 $0.00 Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DO ES NOT APPLY to water and sewer connection fees and ca pacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar t o this, or as to which the statute of limitation has previously otherwise expired. Building Division Page 1 of 1 1635 Faraday Avenue, Carlsbad CA 92008-7314 I 442-339-2719 I 760-602-8560 f I www.carlsbadca.gov IDENTIFY WHO WILL PERFORM THE WORK BY COMPLETING (OPTION A) OR (OPTION B) BELOW: (OPTION A): LICENSED CONTRACTOR DECLARATION: I hereby affirm under penalty of perjury that I am licensed under provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code, and my license is in f ull force and effect. I also affirm under penalty of perj ury one of t he following declarations: Q 1 have and will maintain a certificate of consent to self-insure for workers' compensation provided by Section 3700 of the labor Code, for the performance of the work which this permit is issued. Policy No .. _______________________________________ _ 0 I have and will maintain worker's compensation, as required by Section 3700 of the labor Code, for the performance of the work for which this permit is issued. My workers' compensation insurance carrier and policy number are: Insurance Company Name: _____________________ _ Policy No. ____________________________ Expiration Date: _______________ _ 0 Certificate of Exemption: I certify that in t he performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the workers' compensation Laws of California. WARNING: Failure to secure workers compensation coverage is unlawful and shall subject an employer to criminal penalties and civil fines up to $100,000.00, in addition the to the cost of compensation, damages as provided for in Section 3706 of the Labor Code, interest and attorney's fees. CONSTRUCTION LENDING AGENCY, IF ANY: I hereby affirm that there is a construction lending agency for the performance of the work this permit is issued (Sec. 3097 (i) Civil Code). Lender's Name:. _____________________ Lender's Address: ____________________ _ CONTRACTOR PRINT: _________ SIGN: _________ DATE: (OPTION B): OWNER-BUILDER DECLARATION: I hereby affirm that I am exempt from Contractor's License Law for the following reason: 0 I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractor's license law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale). 't1(i. as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's license Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's license Law). 0 I am exempt under Business and Professions Code Division 3, Chapter 9, Article 3 for this reason: O•owner Builder acknowledgement and verification form" has been filled out, signed and attached to this application. 0 Owners "Authorized Agent Form" has been filled out, signed and attached to this application giving the agent authority to obtain the permit on the owner's behalf By my signature below I acknowledge that, except for my personal residence in which I must have resided for at least one year prior to completion of the improvements covered by this permit, I cannot legally sell a structure that I have built as an owner-builder if it has not been constructed in its entirety by licensed contractors. / understand th a py of the applicable law, Section 7044 af the Busines a d Prof essions Cade, is ilable upon request when this application is submitted ar at the fallawi ~ ~;3/r;:;;i1ot;:v;~1;;S·hltGmlN. ·. OWNER PRINT: /v / k v~r 1,,,.;,,;,~~~~~~~-.;,,. ..__..;;;,;;,;__.,.ATE: If bzj2o2.o J APPLICANT CERTIFICATION: SIGNATURE REQUIRED AT THE TIME OF SUBMITTAL By my signature below, I certify that: I am the property owner or State of California Licensed Contractor or authorized to act on the property owner or contractor's behalf. I certify that I have read the application and state that the above information is correct and that the information on the plans is accurate. I agree to comply with all City ordinances and State laws relating to building construction. I hereby authorize representative of the City of Carlsbad to enter upon the above mentioned property f or inspection purposes. I ALSO AGREE TO SA VE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANYWAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT. OSHA: A SHA permit is required f or excavations over 5'0' deep and demolition or construction of structures over 3 stories in height. APPLICANT PRINT, [h Vl"'-1[) Wn ~ ~s1GN, ...,w,..,i..,_,. __ .._ ____ DATE: 1635 Faraday Ave Carlsbad, CA 92008 Ph: 760-602-2719 Fax: 7 Email: Building@carlsbadca.gov 2 REV. 08/20 Building Permit Inspection History Finaled {city of Carlsbad Permit Type: Work Class: Status: Scheduled Date 02/24/2021 PERMIT INSPECTION HISTORY for {CBR2020-3060) BLDG-Residential Retaining Wall Closed -Finaled Actual Inspection Type Start Date 02/24/2021 BLDG-11 Foundatlon/Ftg/Plers (Rebar) Checklist Item Application Date: 11/23/2020 Issue Date: 02/23/2021 Expiration Date: 04/10/2024 IVR Number: 30131 Inspection No. Inspection Status 151276-2021 Partial Pass COMMENTS Owner: SATISH MENON Subdivision: LEBARR ESTS UNIT# 2 Address: 1790 RATCLIFF RD CARLSBAD, CA 92008-1041 Primary Inspector Reinspection Inspection Chris Renfro Reinspection Incomplete Passed BLDG-Building Deficiency Partial pass on Keystone block wall with gravel footing. Call when wall is completed and compaction of soil and gravel complete. Have final soils & compaction reports at final inspection Yes BLDG-66 Grout Checklist Item 151277-2021 COMMENTS BLDG-Building Deficiency Wrong inspection Cancelled Chris Renfro Reinspection Incomplete Passed No 04/02/2024 04/02/2024 BLDG-Final Inspection 243871-2024 Partial Pass Chris Renfro Re inspection Incomplete Checklist Item BLDG-Building Deficiency BLDG-Structural Final COMMENTS Missing required Soils Reports for compaction behind retaining wall 04/04/2024 04/04/2024 BLDG-Final Inspection 244269-2024 Passed Friday, April 5, 2024 Checklist Item BLDG-Building Deficiency BLDG-Structural Final COMMENTS Passed No Yes Chris Renfro Complete Passed Yes Yes Page 1 of 1 SIERRA GEOTECHNICAL SERVICES Gf:OT/:CHNICAl • Gf:OWGY • £NVIIIONM£N1'Al • HYOROGf:OLOGY • MINING • MATf:RIAlS Ca/trans Lab# 214 DAILY JNSPECTION REPORT Project: 1790 Ratcliff Road, Block Retaining Wall Danny Wright Consulting Contact: Client: Location: Weather: Partly Cloudy Contractor. Danny Wright Foreman: Danny A.V .U.JMIDlnl SGS Job No: ___ .;;.3."'3"--17--'3'"'0 __ _ PaQe No 1 of 1 Dale, 3/9/2021 Day Wednesday Temperature: 60 Total Hours: TYPE OF INSPECTION AND/OR TESTING CONCRETE/ MORTAR/ GROUT SAMPLE TEST DATA □ Project/safety meeting □ Reinforcing steel Set No: 1 2 3 4 5 □ Site Inspection □ Batch plant operations Time: 181 Construction observation □ Concrete/grout sampling Ticket No: 181 Earthwork/mass grading □ Post tension Mix No: □ Foundations/footings □ CMU construction Load No: □ Subdrain installation □ Coring asphalt/concrete Mix Temp (°F): □ Utility installation □ Welding Air Temp (°F): □ Aggregate base placement □ Structural steel Air Entrain(%): 181 Compaction testing □ Fire proofing Slump (in): □ Asphaltic concrete □ Other: Design Str (psi): NUCLEAR FIELD DENSITY TEST SUMMARY Field Max. Relative Ory Dry Probe Field Opt Density Density Compaction [%) Test LOCATION/ STATION / ELEVATION Depth Moist. Moist. No. lin.l f%) (%) [pct) (pct) Actual 1 2 3 4 5 6 7 8 9 10 11 12 REMARKS: On-site for final inspection and testing of block wall. Contractor has placed final lift (see DIR 3/2) up to top cap. Area probed fo r compaction. Top 2-3" were loose, but are considered topsoil and not part of engineered fill. Material below is dense. Wall is complete and has been constructed in general accordance with plans and our report dated 11/20/2020. Signed: Joe Adler www.sqsi.us Spec SIERRA GEOTECHNICAL SERVICES GEOTECHNICAL • GEOLOGY • ENVIIIONMENTAL • HYDROGEOWGY • MINING • MATERIALS Ca/trans lab# 214 www.sgsi.us AIV ,1,,UH10NI SGS Job No: -----'-3""'".3~17....c3..c..0 __ SIERRA GEOTECHNICAL SERVICES G£0TliCIINIC/II, • GEOLOGY • £NVIRONM£NT/IL • I-IYDROG£0LOGY • MINING • MAT£RI/ILS Ca/trans lab# 214 DAILY INSPECTION REPORT Project: 1790 Ratcliff Road, Block Retaining Wall Client: Dan ny Wrigh t Cons ulting Contact; Location; Weather: Sunny Contractor: Danny Wright Foreman: Danny ADV .u ... o .... SGS Job No: ___ ~3=.3-"'1""'73'--'0'---- Pa!!e No 1 ofl Date: 3/1/2021 Day: Monday Temperature: 65 Total Hours: TYPE OF INSPECTION AND/OR TESTING CONCRETE/ MORTAR/ GROUT SAMPLE TEST DATA □ Project/safety meeting □ Reinforcing steel Set No: 1 2 3 4 5 □ Site Inspection □ Batch plant operations Time: 181 Construction observation □ Concrete/grout sampling Ticket No: 181 Earthwork/mass grading □ Post tension Mix No: □ Foundations/footings □ CMU construction Load No: □ Subdrain installation □ Coring asphalt/concrete Mix Temp (°F): □ Utility installation □ Welding Air Temp (°F): □ Aggregate base placement □ Structural steel Air Entrain(%): 181 Compaction testing □ Fire proofing Slump (in): □ Asphaltic concrete □ Other: Design Str (psi): NUCLEAR FIELD DENSITY TEST SUMMARY Field Max. Relative Probe Pield Opt Dry Dry Compaction (%) Test LOCATION/ STATION/ ELEVATION Depth Moist Moist Density Density No. /in.) (%1 (%1 (pcf) (pct) Actual Spec 1 2 3 4 s 6 7 8 9 10 11 12 REMARKS: On-site for compaction testing of wall backfill. Contractor has placed backfill -processed native - up to approximately 48" above bottom (6th course of block). Area probed for compaction. 6-8" of loose soil with roots encountered in multiple locations. Discussed with contractor. Roots to be removed, and a reas to be recompacted. Will retest tomorrow. Signed: Joe Adler www.sgsi.us SIERRA GEOTECHNICAL SERVICES GEOTECHNICAL • GEOLOGY • ENVIRONMENTAL • HYDROGEOLOGY • MINING • MATE.RIALS Ca/trans Lab# 214 www.sqsi.us AIV ........... SGS Job No: __ ---=3:.:.::.3c.=.17:...:3:..::.0 __ SIERRA GEOTECHNICAL SERVICES GEOTECHNICAl • GEOLOGY • ENVIRONMENTAL • HYDROGEOLOGY • MINING • MATERIALS Ca/trans lab# 214 DAILY INSPECTION REPORT Project: 1790 Ratcliff Road, Block Retaining Wall Danny Wright Consulting Contact Client· Location: Weather. Sunny Contractor: Danny Wright Foreman: Danny SGS Job No: ___ ..:::3:..,:.3~17.:...:3::..::0:..._ __ Paee No 1 ofl Date 2/26/2021 Day, Friday Temperature: 60 Total Hours: TYPE OF INSPECTION AND/OR TESTING CONCRETE / MORTAR/ GROUT SAMPLE TEST DATA □ Project/safety meeting □ Reinforcing steel Set No: 1 2 3 4 5 □ Site Inspection □ Batch plant operations Time: 181 Construction observation □ Concrete/grout sampling Ticket No: 181 Earthwork/mass grading □ Post tension Mix No: □ Foundations/footings □ CMU construction Load No: □ Subdrain installation □ Coring asphalt/concrete Mix Temp (°F): □ Utility installation □ Welding Air Temp (°F): □ Aggregate base placement □ Structural steel Air Entrain (%): 181 Compaction testing □ Fire proofing Slump (in): □ Asphaltic concrete □ Other: Design Str (psi): NUCLEAR FIELD DENSITY TEST SUMMARY Field Max. Relative Probe Field Opt Dry Dry Compaction (%) Test LOCATION/ STATION/ ELEVATION Depth Moist Moist Density Density No. (in.l (%1 (%1 (pct) (pd] Actual Spec 1 BF 10' N ofS end; 32" AB (retest 2/25) 12 8.5 9.5 112.6 124.S 90 90 2 BF 35' S of N end; 32" AB (Retest 2/25) 12 8.0 9.5 113.5 124.5 91 90 3 BF 50' S ofN end; 32" AB 12 8.3 9.5 111.8 124.5 90 90 4 5 6 7 8 9 10 11 12 REMARKS: On-site for compaction retesting of wall backfill from 2/25/2021. Level reworked. All tests met or exceeded min 90% compaction. Work to continue. Signed: Joe Adler www.sqsi.us SIERRA GEOTECHNICAL SERVICES GEOTECf/NICAL • GEOLOGY • ENVIRONMENTAL • HYDROGEOLOGY • MINING • MATl,RIALS Ca/trans l ab# 214 SGS Job No: ___ ..c.3~.3cc.17'"'3c..c0 __ _ DAILY INSPECTION REPORT Pa'1e No 1 of 1 Project: 1790 Ratcliff Road, Block Retaining Wall Dale:2/19/2021 Danny Wright Consulting Contact: Day: Friday Client: Location: Weather Sunny Temperature: 70 Danny Wright Danny Total Hours: Contractor: Foreman: TYPE OF INSPECTION AND/OR TESTING CONCRETE/ MORTAR/ GROUT SAMPLE TEST DATA □ Project/safety meeting □ Reinforcing steel Set No: 1 2 3 4 5 □ Site Inspection □ Batch plant operations Time: ~ Construction observation □ Concrete/grout sampling Ticket No: ~ Earthwork/mass grading □ Post tension Mix No: □ Foundations/footings □ CM U construction Load No: □ Subdrain installation □ Coring asphalt/concrete Mix Temp (°F): □ Utility installation □ Welding Air Temp (°F): □ Aggregate base placement □ Structural steel Air Entrain (%): ~ Compaction testing □ Fire proofing Slump (in): □ Asphaltic concrete □ Other: Design Str (psi): NUCLEAR FIELD DENSITY TEST SUMMARY Field Max. Relative Dry Dry Probe Field Opt Density Density Compaction (%) Test LOCATION/ STATION/ ELEVATION Depth Moist Moist No. fin.) (%1 (%1 (pcf) (pcf) Actual 1 2 3 4 5 6 7 8 9 10 11 12 REMARKS: On-site to review excavation for Keystone Block retaining wall. Contractor has excavated wall keyway area and 1st bench behind key. See attached pictures. Excavation has exposed competent granular soils, which are consistent with materials noted in our letter dated 11/20/2020. No adverse conditions noted. Bottom ofkeyway was probed for density. Penetrations were less than 1". Area is considered suitable for placement of leveling gravel. In addition, perforated subdrain pipe with filter sleeve was observed in key area bottom. Signed: Joe Adler www.sqsius Spec SIERRA GEOTECHNICAL SERVICES GEOTECIINICA/, • G£0WGY • £NVIRONME'NTA/, • HYDROG£0LOGY • MINING • MATERIALS Ca/trans Lab fl 214 www.sqsi.us AV ......... SGS Job No: -----=3c:..:::.3-=-1 7'-"3"'-0 __ SIERRA GEOTECHNICAL SERVICES GF.OTF.CHNICAL • GEOLOGY • t:NVIRONMF.NTAL • 1/YDROGF.OLOGY • MINING • MATE'RIALS Ca/trans Lab# 214 www.sqsi.us SGS Job No: ___ 3c..c..3c...clc....7.c..30~-- SIERRA GEOTECHNICAL SERVICES GEOTECf/NICAL • GEOLOGY • ENVIRONMENTAL • f/YDROGEOLOGY • MINING • MATERIALS Ca/trans lab# 214 SGS Job No: ---=-3."'-3=-17:....:3:....:0 __ _ DAILY INSPECTION REPORT Pa,:,e No 1 ofl Project: 1790 Ratcliff Road, Block Retaining Wall Dale 2/25/20 21 Danny Wright Consulting Contact: Day: Thursday Client Location: Weather: Sunny Temperature: 60 Contractor. Danny Wright Danny Total Hours: Foreman: TYPE OF INSPECTION AND/OR TESTING CONCRETE/ MORTAR/ GROUT SAMPLE TEST DATA □ Project/safety meeting □ Reinforcing steel Set No: 1 2 3 4 5 □ Site Inspection □ Batch plant operations Time: 18] Construction observation □ Concrete/grout sampling Ticket No: 18] Earthwork/mass grading □ Post tension Mix No: □ Foundations/footings □ CM U construction Load No: □ Subdrain installation □ Coring asphalt/concrete Mix Temp (°F): □ Utility installation □ Welding Air Temp (°F): □ Aggregate base placement □ Structural steel Air Entrain(%): 18] Compaction testing □ Fire proofing Slump (in): □ Asphaltic concrete □ Other: Design Str (psi): NUCLEAR FIELD DENSITY TEST SUMMARY Field Max. Relative Probe Field Opt Dry Dry Compaction (%) Test LOCATION/ STATION/ ELEVATION Depth Moist. Moist Density Density No. rin.l (%1 (%1 (pd) (pd) Actual Spec 1 BF 20' S of N end; 32" AB 12 9.7 9.5 114.0 124.5 92 90 2 BF 10' N ofS End; 32" AB 12 7.3 9.5 94.8 124.5 76 90 3 BF 35' S ofN End; 32" AB 12 9.2 9.5 106.4 124.5 85 90 4 5 6 7 8 9 10 11 12 REMARKS: On-site for compaction testing of wall backfill. Contractor has placed backfill -processed native - up to approximately 32" above bottom ( 4th course of block). Some compaction tests results were less than 90%. Discussed failing tests with contractor. Areas to be recompacted. Will retest tomorrow. Signed: Joe Adler www.sqsi.us SIERRA GEOTECHNICAL SERVICES GEOTECHNICAL • GEOI.OGY • f:NV/RONMENTAL • 1-/YDROGEOLOGY • MINING • MATERIALS Ca/trans Lab# 214 www.sqsi.us SGS Job No: ___ ..c.3.-"-3"--17--'3'-'-0 __ _ SIERRA GEOTECHNICAL SERVICES GEOTECHNICAL • GEOLOGY • ENVIRONMENTAL • HYDROGEOLOGY • MINING • MA'l'EIIIALS Ca/trans lab # 214 www.sqsi.us A• ...... ,o .... SGS Job No: __ ---=3.:.:::.3.::.:17:...::3-=-0 __ SIERRA GEOTECHNICAL SERVICES GEOTECIINICAL • GEOLOGY • ENVIRONMENTAL • HYDROGEOLOGY • MINING • MATERIALS Ca/trans lab# 214 www.sqsi.us SGS Job No: ___ =3=.3=17'--'3'--'0 __ _ AdOO a~003~ CHNICAL SERVICES City of Carlsbad APR O 4 2024 AV AA:WfOttl GEOTECHNICAL • GEOLOGY Ca/trans lab# 214 eortE>y ALS • BUILDING Dl\!§}Qi'!: __ ....::.3·=31:..:....:73:..::..0 __ DAILY INSPECTION REPORT Pa11:e No 1 ofl Project 179 0 Ratcliff Road, Block Reta ining Wa ll Dale: 2/23/20 21 Client: Danny Wright Consulting Contact.: Day: Tuesday Location: Weather: Su nny Temperature: 7 0 Contractor: Danny Wright Da nny Total Hours: Foreman: TYPE OF INSPECTION AND/OR TESTING CONCRETE / MORTAR/ GROUT SAMPLE TEST DATA □ Project/safety meeting □ Reinforcing steel Set No: 1 2 3 4 5 □ Site Inspection □ Batch plant operations Time: 181 Construction observation □ Concrete/grout sampling Ticket No: 181 Earthwork/mass grading □ Post tension Mix No: □ Foundations/footings □ CMU construction Load No: □ Subdrain installation □ Coring asphalt/concrete Mix Temp (°F); □ Utility installation □ Welding Air Temp (°F): □ Aggregate base placement □ Structural steel Air Eno·ain (%): 181 Compaction testing □ Fi re proofing Slump (in): D Asphaltic concrete □ Other: Design Str (psi): NUCLEAR FIELD DENSITY TEST SUMMARY Field Max. Relative Dry Dry Probe Field Opt Density Density Compaction (%) Test LOCATION/ STATION/ ELEVATION Depth Moist Moist No. lin.1 (%1 (%1 (pct) (pct) Actual Spec 1 2 3 4 5 6 7 8 9 10 11 12 REMARKS: On-site to review construction progress of Keystone Block retaining wall. Contractor has placed four block -Keystone Compac Ill -courses and geogrid and is in process of backfilling key area with gravel. Gravel backfi ll extends to face/top of vertical bench behind. Work progressing along Highland Drive to radius of Ratcliff. Work consistent with plan. Contractor likely to place backfill starting tomo rrow. Will call when ready for compaction testin . Signed: Joe Adler www.sqsi.us SIERRA GEOTECHNICAL SERVICES GEOTECIINICAL • GEOLOGY• ENVIRONMENTAL • 1-/YDROGEOLOGY • MINING • MATERIALS Ca/trans lab# 214 www.sqsi.us AV ........ SGS Job No: __ __:3:.:.::.3c=.17.:...::3:.::.0 __ SIERRA GEOTECHNICAL SERVICES GEOTEC/INICAL • GEOLOGY • ENVIRONMENTAL • 1/YDROGF.OLOGY • MINING • MATERIALS Ca/trans Lab# 214 www.sqsi.us Allll ......... SGS Job No: ___ .::::3·.::::31c..:7..:::3.::..0 __ SIERRA GEOTECHNICAL SERVICES GEOTECl·INICAl • GEOLOGY • ENVIRONMENTAL • HYDROGEOLOGY • MINING • MATERIAIS Ca/trans Lab# 214 www.sqsi.us Al!lif ........ SGS Job No: __ -----"3=.3-=--17'-=3--=--0 __ ✓. EsG1I A SAFEbu,lt' Company DATE: 1-14-2021 JURISDICTION: Carlsbad PLAN CHECK#.: CBR2020-3060.RC1 PROJECT ADDRESS: 1790 Ratcliff Road SET: II PROJECT NAME: Menon Residence-Keystone Retaining Wall □ APPLICANT □ JURIS. ~ The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. D The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. D The check list transmitted herewith is for your information. The plans are being held at EsGil until corrected plans are submitted for recheck. D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. D The applicant's copy of the check list has been sent to: ~ EsGil staff did not advise the applicant that the plan check has been completed. D EsGil staff did advise the applicant that the plan check has been completed. Person contacted: Date contacted: Mail Telephone 0 REMARKS: (by: Telephone#: ) Email: Fax In Person By: Erich A. Kuchar, P.E. EsGil 1-5-2021 Enclosures: 9320 Chesapeake Drive, Suite 208 ♦ San Diego, Californ ia 92123 ♦ (858) 560-1468 ♦ Fax (858) 560-1576 Carlsbad CBR2020-3060.RC1 1-14-2021 ✓. EsG1I A SAFEbuiltCompany DATE: 12-11-2020 JURISDICTION: Carlsbad PLAN CHECK#.: CBR2020-3060 PROJECT ADDRESS: 1790 Ratcliff Road SET: I PROJECT NAME: Menon Residence-Keystone Retaining Wall D APPLICANT D JURIS. D The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's codes. D The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. ~ The check list transmitted herewith is for your information. The plans are being held at EsGil until corrected plans are submitted for recheck. D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. D The applicant's copy of the check list has been sent to: D EsGil staff did not advise the applicant that the plan check has been completed. ~ EsGil staff did advise the applicant that the plan check has been completed. Person contacted: Danny Wright Telephone#: 760-696-7794 Date contacted: (by: ) Email: unreadable Mail Telephone Fax In Person 0 REMARKS: By: Erich A. Kuchar, P.E. Enclosures: EsGil 11 -24-2020 9320 Chesapeake Drive, Suite 208 ♦ San Diego, California 92123 ♦ (858) 560-1468 ♦ Fax (858) 560-1576 Carlsbad CBR2020-3060 12-11-2020 PLAN REVIEW CORRECTION LIST SINGLE FAMILY DWELLINGS AND DUPLEXES PLAN CHECK#.: CBR2020-3060 JURISDICTION: Carlsbad PROJECT ADDRESS: 1790 Ratcliff Road FLOOR AREA: REMARKS: DATE PLANS RECEIVED BY JURISDICTION: 11-23-2020 DATE INITIAL PLAN REVIEW COMPLETED: 12-11-2020 FOREWORD (PLEASE READ): STORIES: 1 HEIGHT: 5'-0" DATE PLANS RECEIVED BY ESGIL CORPORATION: 11-24-2020 PLAN REVIEWER: Erich A. Kuchar, P.E. This plan review is limited to the technical requirements contained in the California Residential Code, California Building Code, California Plumbing Code, California Mechanical Code, California I Electrical Code and state laws regulating energy conservation, noise attenuation and access for the disabled. This plan review is based on regulations enforced by the Building Department. You may have other corrections based on laws and ordinance by the Planning Department, Engineering Department, Fire Department or other departments. Clearance from those departments may be required prior to the issuance of a building permit. Present California law mandates that construction comply with the 2019 edition of the California Code of Regulations (Title 24), which adopts the following model codes: 2019 CRC, 2019 CBC, 2019 CPC, 2019 CMC and 2019 CEC. The above regulations apply, regardless of the code editions adopted by ordinance. The following items listed need clarification , modification or change. All items must be satisfied before the plans will be in conformance with the cited codes and regulations. Per Sec. 105.4 of the 2019 California Building Code, the approval of the plans does not permit the violation of any state, county or city law. To speed up the recheck process, please note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet number. specification section, etc. Be sure to enclose the marked up list when you submit the revised plans. Carlsbad CBR2020-3060 12-11-2020 PLANS 1. Please make all corrections, as requested in the correction list. Submit FOUR new complete sets of plans for commercial/industrial projects (THREE sets of plans for residential projects). For expeditious processing, corrected sets can be submitted in one of two ways: 1. Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602-2700. The City will route the plans to EsGil and the Carlsbad Planning, Engineering and Fire Departments. 2. Bring TWO corrected set of plans and calculations/reports to EsGil, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments. NOTE: Plans that are submitted directly to EsGil only will not be reviewed by the City Planning, Engineering and Fire Departments until review by EsGil is complete. 2. A reminder that due to Covid-19, the City will not permit counter corrections. Please make sure all the items are satisfied ; otherwise, another round of corrections will be necessary. 3. All plan sheets must be stamped and signed by active licensed Civil Engineer. The three plan sheets submitted are missing this. 4. Provide a statement on the Title Sheet of the plans stating that this project shall comply with the 2019 California Residential Code, which adopts the 2019 CBC, 2019 CMC, 2019 CPC and the 2019 CEC. Section R 106.1. Current plan sheets call out 2013 CBC. STRUCTURAL 5. Submit structural specs and details for foundation of the wall. 6. The plans shall indicate that special inspection will be provided for the following work. (CBC Chapter 17 and Section 107.2) a) Concrete construction. Special inspections and verifications should be provided in accordance with Section 1705.3. b) Masonry construction. Special inspection should be provided for all masonry construction in accordance with Section 1705.4. c) Soils. Special inspection should be provided for placement of fill 12 inches or more deep in accordance with Section 1705.6. Carlsbad CBR2020-3060 12-11-2020 MISCELLANEOUS 7. To speed up the review process, note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet, note or detail number, calculation page, etc. 8. Please indicate here if any changes have been made to the plans that are not a result of corrections from this list. If there are other changes, please briefly describe them and where they are located in the plans. • Have changes been made to the plans not resulting from this correction list? Please indicate: Yes □ No □ 9. The jurisdiction has contracted with EsGil, located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact Erich A. Kuchar, P.E. at EsGil. Thank you. COMPACII & COEMPAC III Standardized Manual for Engineered Retaining Walls up to 6 feet SOILS REPORT REQUIRED. PLEASE CHECK WITH YOUR LOCAL BUii.DiNG DEPARTMENT •'OR FURTHER INFORMATION ON BUU,DING PERMIT REQUIREMENTS. CHULA VISTA LEMON GROVE SANTEE ENCINITAS ESCONDIDO MURRIETA 75 N. 4t1, Ave. 8240 Broadway 8755 Magnolia Ave. 577 N. Vulcan Ave. 1070 W. Mission Ave. 25725 Jefferson Ave. (619) 474-1516 (619) 460-9101 (619) 448-2240 (760) 753-1164 (760) 480-9696 (951) 677-1489 ® BLOCK & BRICK Reta i 11 i n g Ex c e I I e t1 c e~ ~TENCATE Mirafi DESIGNED EXCLUSIVELY FOR USE WITH KEYSTONE COMPAC II & COM PAC Ill UNITS MGF. BY RCP BLOCK & BRICK AND MIRAGRID 2XT MANUFACTURED BY TENCATE KEYSTONE COMPAC II & COMPAC III STANDARDIZED MANUAL INTRODUCTION This manual is specifically written, and all material contained within, for the Keystone Retaining Wall System. Each Keystone retaining wall unit has different strength, weight, and size considerations which requires an individual analysis. Geogrid soil reinforcement has performance properties which are unique to the polymer type and material designation also requiring individual analysis. Different Keystone retaining wall unit and geogrid combinations have unique design properties that require special analysis. The purpose of Standardized Manual is to provide working parameters for the design and construction of small Keystone retaining walls in accordance with current standard of practice. Larger or more complex walls typically require site specific engineering analysis. Permitting may be required for any retaining wall of any height so please check local requirements before proceeding with construction. This Standardized Manual provides pre-engineered design for construction of segmental block retaining walls (SRW) up to 6 feet high using 8-inch (203mm) high Keystone Compac II & Compac III units. The designs provided are for walls no greater than 6' in total height with specific backfill and surcharge conditions. The design is consistent with the National Concrete Masonry Association (NCMA) "Design Manual for Segmental Retaining Walls, Third Edition." COMPACT II AND COMPAC III BLOCK DETAILS Compact II Block Unit Tri-plane Face Unit Straight Split Face Unit Piece Height Width Depth Core Weight Pcs/sq ft Available Dimension Colors Tri-plane 8" 18" 12" 4.5"x7" 76-81 lbs 1 Tan, Natural Straight Split 8" 18" 12" 4.5"x7" 84-89 lbs I Tan, Natural DESIGNED EXCLUSIVELY FOR USE WITH KEYSTONE COMPAC II & COM PAC Ill UNITS, MANUFACTURED BY RCP BLOCK & BRICKS AND MIRAGRID 2XT MANUFACTURED BY TENCATE 1 KEYSTONE COMPAC II & COMPAC III STANDARDIZED MANUAL Compact III Block Unit Tri-plane Face Unit Straight Split Face Unit Piece Height Width Depth Core Weight Pcs/sq ft Available Dimension Colors Tri-plane 8" 18" 12" 5.6"x7.25" 67-72 lbs I Tan, Natural Straight Split 8" 18" 12" 5.6"x7.25" 71-76 lbs I Tan, Natural APPLICABILITY This manual is applicable for retaining walls with total height of 6 feet or less, including a 6" deep embedment below grade. The wall has either level backfill or sloping backfill with no greater than a 26.6-degree slope or traffic load of 250 pounds per square foot. The soils at the site classify as sand, silty sand, clayey sand, silty gravel, clayey gravel, or mixtures thereof, and has the internal angle of friction of 30° or greater. Such soils are soil types considered to be California Building Code (CBC) Class 4 type soils. BUILDING PERMIT The user shall consult the local building authority for permit requirements for construction of retaining walls for specific conditions at the site. The user shall use experienced construction contractor or should have experience in construction of these walls and knowledge of soil compaction. The authority may require a report from a licensed soils engineer for soil type and its strength parameters, and for confirming applicability of this guideline. DESIGN SUMMARY The design presented in this guidance meets minimum acceptable factors of safety of 1.5 against sliding failures, and 2.0 against overturning and bearing capacity failures. An Earthquake acceleration coefficient of 0.15 g is used in the design. Wall batter considered is approximately 0-degree batter (almost vertical wall) and approximately 8 degree batter. Geogrid reinforcements are Miragrid 2XT manufactured by Tencate. The tables and plates that follow provide typical wall details and reinforcement schedule for Geosynthetic- Reinforced SRWs up to 6' in height. The grading around the wall allows positive drainage of surface water away from and around the wall. Hyrdrostatic pressures are not considered in the design. DESIGNED EXCLUSIVELY FOR USE WITH KEYSTONE COMPAC II & COMPAC Ill UNITS, MANUFACTURED BY RCP BLOCK & BRICKS AND MIRAGRID 2XT MANUFACTURED BY TENCATE 2 KEYSTONE COMPAC II & COMPAC III STANDARDIZED MANUAL STEPS FOR DESIGN SELECTION 1. Determine if Keystone Standard Manual is applicable to your project: This manual can be used when acceptable to local building officials and when the wall height, surcharge load, and soil type are consistent with those indicated in this manual. 2. Determine total wall height including proposed embedment: The total wall height is defined as the exposed height plus embedment depth. The minimum wall embedment required is 6" for level grade at the base of the wall, or depth required to achieve 5' distance to daylight at the base of the wall. 3. Determine the type of soils that will be retained: Estimate the soil type based on visual soil classification or soil testing. For more details on soil type at your site, contact a Soils Engineer. 4. Determine loading condition on the wall: All cases apply for a near-level soil surface at the toe of the wall. a. Case A depicts a near-level wall backfill with no surcharge load near the wall crest. b. Case B depicts a near-level wall crest with surcharge load applied by traffic, for example, along a driveway or a parking lot at the top of the wall. c. Case C depicts a 2H : 1 V sloping surcharge (26.6 degrees maximum) above the wall. 5. Select proper wall design sections from the charts: Select geogrid reinforcement schedule from Design Tables 1-3, or Plates 2 and 3. 6. Determine if building permits are required for wall construction: Building permit requirements for segmental retaining walls are unique to each jurisdiction and can only be determined through direct contact with local building officials. If permits are required, submit this Standard Engineering Manual along with other site drawings, survey plans, literature, etc. that may be required by the building departmen·t. • • 7. Wall Construction: Start wall construction only after you confirm that you do not need a permit, or after a permit is obtained. Construct wall per details shown on Plate 1. Consult a Keystone representative or hire a licensed engineer to understand the construction details and methods. Note: Documentation of soil types by a licensed engineer or testing lab may be required to use Standardized Engineering when obtaining permits. USCS soil classification types are defined by ASTM 02487 & ASTM 02488. EXCLUSIONS Do not use this design guideline, if any of the following applies: 1) The user has no knowledge of strength parameters of soils, 2) Total wall height is in excess of 6 feet, 3) Back slope is steeper than 2 horizontal to 1 vertical (26.6 degrees), 4) Special surcharge loading conditions exist, such as, buildings or other structures, or, 5) Groundwater or drainage problems exist at the site. LIMITATIONS The design presented herein is based on the use of the specified product manufactured under license from RCP Blocks & Bricks and for specific soil conditions. It is the responsibility of the user of this manual to verify the actual site soil conditions, and to construct the wall in accordance with standard construction DESIGNED EXCLUSIVELY FOR USE WITH KEYSTONE COMPAC II & COMPAC Ill UNITS, MANUFACTURED BY RCP BLOCK & BRICKS AND MIRAGRID 2XT MANUFACTURED BY TENCATE 3 KEYSTONE COMPAC II & COMPAC III STANDARDIZED MANUAL procedures and manufacturer's recommendations. A qualified geotechnical engineer may be retained to determine the soil type and any other geotechnical condition which may affect the design and stability of the wall and surrounding area, and to provide inspection and testing services during wall construction. The geotechnical engineer or his appointed representative shall observe and verify the installation of segmental blocks, geosynthetic reinforcement, and compaction of fill soils. All fill soils should be compacted to at least 90% of the maximum dry density determined using Modified Proctor Compaction Test per ASTM D1557 Test Standards. The design of the retaining wall assumes no build-up of hydrostatic pressures within the reinforced fill zone of the wall. Therefore, construction of an effective subdrain system behind the wall is critical to the performance of the wall. Any back-cut drain required shall be determined by the project geotechnical engineer and shall be installed per the direction of the project geotechnical engineer. The user of this design manual or his representatives agree, to the fullest extent permitted by law, to limit the liability of RCP Blocks & Bricks and ABI Engineering Consultants, Inc. for any and all claims, losses, cost, damages of any nature whatsoever or claims expenses from any cause or causes, so that the total aggregate liability of RCP Blocks & Bricks and ABI Engineering Consultants, Inc shall not exceed $1,000 or the cost of the wall materials, whichever is less. Such claims and causes include, but are not limited to negligence, professional errors or omissions, strict liability, breach of contract or warranty. The user of this manual or his representatives also agree to fully protect, indemnify, hold harmless and defend RCP Blocks & Bricks and ABI Engineering Consultants, Inc., their principals, officers, employees, and agents from and against any and all loss, cost, damage, injury, liability claims, liens, demands, taxes, penalties, interest or causes of action of every nature whatsC?ever resulting from the use of this document. DESIGNED EXCLUSIVELY FOR USE WITH KEYSTONE COMPAC II & COM PAC Ill UNITS, MANUFACTURED BY RCP BLOCK & BRICKS AND MIRAGRID 2XT MANUFACTURED BY TENCATE 4 H KEYSTONE COMPAC II & COMPAC III STANDARDIZED MANUAL DESIGN TABLE l(A) Case A (1)-Level Backfill, No Surcharge -CBC soil type 4 or better (<I>= 30°) Wall batter: No Batter (minimum setback per unit) NO SURCHARGE REINFORCED: SOILZONE I Grid Length and Position above the base, between the Numbers of blocks of the wall face Total Wall Miragrid 2XT (Grid length is measured from the front face of the unit to the Height(H) Layers back of the l!eo<>rid) Grid 1 Grid2 Grid3 --2'-4 - 3'-0" I (4'-0") -- 2nd & Jnl 3'-8" I (5'-0") -- 3n1 & 4th 4'-4" 2 (4'-0") (5'-0") - 2nd & 3n1 4th&5th 5'-0" 2 (4'-0") (5'-0") - 2nd & 3n1 5th&6th 5'-8" 3 (4'-0") (4'-0") (5'-0") 2nd & 3rd 4th & 5th 6th&7th 6'-4" 3 (4'-0") (4'-0") (6'-0") 2nd & 3n1 5th & 6th 7th&8th Note: Minimum Embedment Depth = 0'-6" DESIGNED EXCLUSIVELY FOR USE WITH KEYSTONE COMPAC II & COMPAC Ill WALL UNITS, MANUFACTU11.ED BY RCP BLOCK & BRICKS AND MIRAGRID 2XT MANUFACTURED BY TENCATE H KEYSTONE COMPAC II & COMPAC III STANDARDIZED MANUAL DESIGN TABLE l(B) Case A (II)-Level Backfill, No Surcharge -CBC soil type 4 or better (<I>= 30°) Wall Batter: 8 Degrees (1" setback per unit) REINFORCED / SOILZONE / I I I Numbers or Grid Length and Position above the base, between the Total Wall blocks or the wall race Height (H) Miragrid 2XT Layers Grid 1 Grid 2 Grid3 --2'-4" -- 3'-0" I (4'-0") -- 2nd & 3m 3'-8" I (4'-0") 3m & 4th 4'-4" 2 (4'-0") (4'-0") - 2nd & 3m 4th&5th 5'-0" 2 (4'-0") (5'-0") - 2nd & 3m 5th & 6th 5'-8" 3 (4'-0") (4'-0") (5'-0") 2nd & 3m 4th & 5th 6th&7th 6'-4" 3 (5'-0") (5'-0") (5'-0") 2nd & 3rd 4th&5th 7th&8th Note: Minimum Embedment Depth= 0'-6" DESIGNED EXCLUSIVELY FOR USE WITH KEYSTONE COMPAC II & COMPAC Ill WALL UNITS, MANUFACTURED BY RCP BLOCK & BRICKS AND MIRAGRID 2XT MANUFACTURED BY TENCATE H KEYSTONE COMPAC II & COMPAC III STANDARDIZED MANUAL DESIGN TABLE 2(A) Case B (I) -Level Backfill, Uniform Surcharge of 250psf -CBC soil type 4 or better ( <I>= 30°) Wall batter: No Batter (minimum setback per unit) Grid Length and Position above the base, between the blocks of the wall face Total Wall Numbers of (Grid length is measured from the front face of the unit to the Height(H) Miragrid back of the 11eoin 'd) 2XT Layers Grid 1 Grid2 Grid3 REINFORCED: SOILZONE I 2'-4" I (4'-0:') . . I"& Znd 3'-0" z (4'-0") (4'-0") . I" & Znd zoo & 3•d 3'-8" z (4'-0") (4'-0") . I"& Znd 3ro&4th 4'-4" z (4'-0") (5'-0") . zoo & 3,d 4th&5th 5'-0" z (4'-0") (6'-0") . zoo & 3,d 5th & 6th 5'-8" 3 (5'-0") (5'-0") (6'-0") 2nd & 3,d 4th & 5th 6th & 7th 6'-4" 3 (5'-0") (5'-0") (6'-0") zoo & 3,d 4th & Slh 7th&8lh Nole: Minimum Embedmenl Depth = 0'-6" DESIGNED EXCLUSIVELY FOR USE WITH KEYSTONE COMPAC II & COMPAC Ill WALL UNITS, MANUFACTURED BY RCP BLOCK & BRICKS AND MIRA GRID 2XT MANUFACTURED BY TENCATE H KEYSTONE COMPAC II & COMPAC III STANDARDIZED MANUAL DESIGN TABLE 2(B) Case B (II) -Level Backfill, Uniform Surcharge of 250psf -CBC soil type 4 or better (<I>= 30°) Wall Batter: 8 Degrees (1" setback per unit) REINFORCED/ SOILZONE / I I I Numbers Grid Length and Position above the base, between the blocks or Total the wall race Wall or (Grid length is measured from the front face of the unit to the back Height Miragrid of the 1wolrrid) 2XT (H) Layers Grid 1 Grid 2 Grid3 Grid4 2'-8" I C4'-0"l.t I 1&21 3'-0" I (4'-0") ---2nd & 3rd 3'-8" 2 (4'-0") (4'-0") --I" &2nd 3rd&4th 4'~411 2 (4'-0") (4'-0") --2nd & 3rd 4th & 5th 5'-0" 2 (4'-0") (5'-0") - 2nd &3rd 5th&6th - 5'-8" 3 (5'-0") (5'-0") (5'-0") -2nd & 3rd 4th&5th 6th&7th 6'-4" 4 (5'-0") (5'-0") (5'-0") (5'-0") 200 & 3rd 4th & 5th 7th&g1h gth&9th Note: Minimum Embedment Depth = 0'-6" DESIGNED EXCLUSIVELY FOR USE WITH KEYSTONE COMPAC II & COMPAC III WALL UNITS, MANUFACTURED BY RCP BLOCK & BRICKS AND MIRAGRID 2XT MANUFACTURED BY TENCATE H KEYSTONE COMPAC II & COMPAC III STANDARDIZED MANUAL DESIGN TABLE 3(A) Case C (I)-2H: lV (26.6°) sloped backfill, no surcharge-CBC soil type 4 or better (<I>= 30°) Wall batter: No Batter (minimum setback per unit) REINFORCED II SOIL ZONE I Grid Length and Position above the base, between the blocks of the Numbers of wall face Total Wall Miragrid 2XT (Grid length is measured from the front face of the unit to the back of the Height (H) Layers 2eo2rid) Grid I Grid 2 Grid3 Grid4 2'-4" I (4'-0") . . I" & 2nd 2 (4'-0") (4'-0") . . 3'-0" 2nd & 3rd 3rd&4lh 3 (4'-0") (4'-0") (4'.Q") . 3'-8" ("&2nd 3n1&4lh 4"'&5"' 3 (4'-0") (4'.Q") (4'.Q") . 4'-4" zo<1 & 3rd 4"'&5"' 5"'&6"' 3 (5'-0") (5'-0") (5'.Q") . 5'-0" zoo & 3rd 5"'&6"' 6"'&7"' 4 (5'-0") (5'-0") (5'-0") (5'-0") 5'-8" zoo & 3rd 4"'&5"' 6"'&7"' 7"'&8"' 4 (6'-0") (6'-0") (6'-0") (6'-0") 6'-4" zoo & 3rd 4"'&5"' 7"'&8"' 8"'&9'h Note: Minimum Embedment Depth = 0'-6" DESIGNED EXCLUSIVELY FOR USE WITH KEYSTONE COMPAC II & COMPAC III WALL UNITS, MANUFACTURED BY RCP BLOCK & BRICKS AND MIRAGRID 2XT MANUFACTURED BY TENCATE H KEYSTONE COMPAC II & COMPAC III STANDARDIZED MANUAL DESIGN TABLE 3(B) Case C (II)-2H: lV (26.6°) sloped backfill, no surcharge -CBC soil type 4 or better (<t>= 30°) Wall Batter: 8 Degrees (1" setback per unit) REINFORCED II SOIL ZONE __ _J I I I I Grid Length and Position above the base, between the blocks Total Numbers of of the wall face Wall Miragrid (Grid length is measured from the front face of the unit to the Height 2XT back of the I eoo-rid) (H) Layers Grid l Grid2 Grid3 Grid4 2'-4" I (4'-0") -- 1"&2nd 3'-0" 2 (4'-0") (4'-0") -- 2nd & 3n1 3nt&4lh 3'-8" 3 (4'-0") (4'-0") (4'-0") - I"& 2nd Jnl &4lh 4lh&5lh 4'-4" 3 (4'-0") (4'-0") (4'-0") - 2nd & 3n1 41h &511, 511,&611, 5'-0" 3 (5'-0") (5'-0") (5'-0") - 2nd & 3,d 511,&611, 61h&71h 5'-8" 4 (5'-0") (5'-0") (5'-0") (5'-0") 2nd & 3n1 41h & 511, 61h&71h 711,&811, 6'-4" 4 (5'-0") (5'-0") (5'-0") (5'-0") 2nd & 3n1 4lh & 5lh 7lh & 811, 81h&91h Note: Minimum Embedment Depth = 0'-6" DESIGNED EXCLUSIVELY FOR USE WITH KEYSTONE COMPAC II & COMPAC Ill WALL UNITS, MANUFACTURED BY RCP BLOCK & BRICKS AND MIRAGRID 2XT MANUFACTURED BY TENCATE Sl0~~ •• KEYSTONE CAP UNIT COMPACTED LOW • I PERMEABILITY SOIL WALL HEIGHT KEYSTONE UNIT KEYSTONE FIBERGLASS PIN (2 PER BLOCK) I I I :I ITI ' 'm1 11m' 11ml.L, , -:ITT ITT Ill JR ! ,i.. _ _.,~~~~-0--0---c>--.:_:".:,_1 ~1;,:_11-_•:.._·,. "'-COMPACTED SOIL I I I UNIT DRAINAGE FILL / / (RETAINED SOIL) I ~--J~~~-GEOGRID LENGTH ---i 1'-LIMIT OF EXCAVATION FINISHED GRADE EMBEDMENT LEVELING PAD I I I ____________ _J 3"0 PERFORATED DRAIN PIPE ( FOUNDATION SOIL) Glossary KEYSTONE UNIT -Keystone Compac II or Compac Ill pinned units. Fill core with 3/4" clean crushed stone. GEOGRID (TYP.) KEYSTONE CAP UNIT -4" high cap unit. cap units are secured to upper wall units with KapSeal adhesive per manufacturefs recommendations. BLOCK SETBACK -Block setback is determined by the multiple pin locations in each unit as required by the wall geometry and design. EMBEDMENT -Embedment required is a function of wall height and top slope. General recommendation is minimum embedment of 6" below the grade in front of the wall. WALL HEIGHT -Wall height is defined as the total wall height from top of leveling pad to top of wall. LIMIT OF EXCAVATION -The limit of excavation is defined as the excavation necessary to install the wall system, leveling pad, drainage fill, drain pipe, and the geogrid reinforcement when required. LEVELING PAD -Leveling pad is typically constructed of compacted 3/4" crushed stone or gravel, 6" deep and 6" wider than the wall units front and back. Concrete may also be used. DRAIN PIPE -3" perforated pipe placed behind bottom of wall to provide additional drainage. Pipe shall be discharged to drainage swale or storm drainage system. UNIT DRAINAGE FILL-Drainage fill i~ a free draining crushed stone that i~ placed within units and for a dista~ of 12" behind the wall units. REINFORCED SOIL -Reinforced soil backfill is placed and compacted in 8" think lifts to a minimum 90% maximum dry density (ASTM 01557) with geogrid levels included at the design locations and lengths. GEOGRID -Geogrid is Mirafi Miragrid 2XT polyester reinforcement. Geogrid lengths are measured from the wall face to the end of reinforcement. Geogrid is placed on level compacted backfill and tensioned behind wall prior to backfilling. FINISHED BACKSLOPE -Finished backslope shall be low permeable soil to prevent surface runoff into wall backfill. KEYSTONE SEGMENTAL BLOCK WALL -COMPAC II & COMPAC III UNIT GEOGRID REINFORCED WALL TYPICAL SECTION SOIL TYPE = CBC SOIL TYPE 4 OR BETTER (~=30°) SEISMIC DESIGN ACCELERATION= 0.15g ® BLOCK & BRICK PLATE 1 O" SETBACK WALL-NEAR VERTIAL WALL CASE A -LEVEL BACKFILL WITH NO SURCHARGE r H -4.0' ~K H = 1'-8' H = 2'-4' H = 3'--0' H = 4'-4' CASE B -LEVEL BACKFILL WITH 250PSF SURCHARGE 250PSF r H ~ H = 1'-8' H = 2'-4" CASE C -2H:1V SLOPING BACKFILL r H l LEGEND 2 11'7 £ . H = 1'-8' H = 2'-4" ••••• GEOGRID LOCATION @ GEOGRID LENGTH H TOTAL WALL HEIGHT H = 3'--0' H = 3'-8' H = 4'-4" KEYSTONE 'SEGMENTAL BLOCK WALL -COMPAC II & COMPAC Ill UNIT GEOGRID REINFORCED WALL DESIGN CHART -O" BLOCK SETBACK VERTICAL WALL SOIL TYPE= CBC SOIL TYPE 4 OR BETTER (<1>=30°) SEISMIC DESIGN ACCELERATION= 0.15g GEOGRID = MIRAFI MIRAGRID 2XT H =5'--0' H=5'-8" H = 5'--0' H=S-8" H = 6'-4' H =5'--0' H = 5'-8" H = 6'-4' ® BLOCK & BRICK PLATE 2 1" SETBACK WALL-NEAR VERTIAL WALL CASE A -LEVEL BACKFILL WITH NO SURCHARGE Ii H 1- H =3'-8" CASE B -LEVEL BACKFILL WITH 250PSF SURCHARGE 250PSF H l Kil ,.........HW !· ~ • . H = 1'-8" H = 3'-0' CASE C -2H:1V SLOPING BACKFILL Ii H 2 117 b§.::::· 5·-jf~:-., H = 1'-8" H = 2'-4" H = 3'-0" LEGEND ••••• GEOGRID LOCATION @ GEOGRID LENGTH H TOT AL WALL HEIGHT H = 3'-8" .4_0· a =:g.- -4 O' --cJ .. • 4 O' H = 3'-8' H = 4'-4" H = 4'-4" / b ::_g,· • 4.0' H = 4'-4' KEYSTONE SEGMENTAL BLOCK WALL -COMPAC II & COMPAC 111 UNIT GEOGRID REINFORCED WALL DESIGN CHART -1' BLOCK SETBACK 8' BATTER WALL SOIL TYPE = CBC SOIL TYPE 4 OR BETTER (<!>=30') SEISMIC DESIGN ACCELERATION= 0.15g GEOGRID = MIRAFI MIRAGRID 2XT •• 1.. .. H = 5'-0" H = 5'-8" H = 5'-0' H = 5'-8' • 5.0' • 5.11 H = 5'-0" RCP. BLOCK & BRICK • 5.11 • 5.0' H = 6'-4' • 5.11 • 5.0' PLATE 3 RECE\VED NO\J 2 3 2020 SIB , INC. cnY OF , BU\LOl l SB <:>TECHNICAL• GEOLOGY• HYDROGEOLOGY • MATERIALS TESTING• INSPECTION , 1 10N Danny Wright Consulting 3760 Vista Campana South, #25 Oceanside, CA 92057 Danraydub1@cox.net November 20, 2020 Subject: KEYSTONE RETAINING WALL GEOTECHNICAL DESIGN PARAMETERS AND PLAN REVIEW 1790 Ratcliff Road Carlsbad, California The following soil values may be used in the design for the 6-foot tall Keystone Compac III retaining wall to be constructed at the toe-of-slope along the west property line at the subject site (Figure 1). The recommendations included herein are based upon a site review, a review of the project site plan and cross sections (attached), the 2020 Keystone Compac III Standardized Manual for Retaining Walls, and the Plan Review Geotechnical Update Report prepared by Vinje & Middleton Engineering, Inc. and dated October 1, 2003, for the adjacent property at 2245 Highland Drive, Carlsbad, California, found on the City of Carlsbad Public Records Access website. • Earth Pressures Allowable Bearing Capacity .................................................................................................. 2000 psf Passive Resistance .................................................................................................................... 150 psf /ft Active Lateral Earth Pressure for level backfill... ........................................................ 40 psf /ft Coefficient of friction against sliding ................................................................................ 0.25 Soil Unit Weight ........................................................................................................................ 125 pcf Internal Angle of Friction ( <f,) .............................................................................................. 31 ° Based upon our plan review, the wall will be a 6-foot maximum height (6'4" with top cap), Keystone Compac III block retaining wall. Blocks will be 8" in height, 18" wide, and 12" deep. The lowest course will be embedded 6". The wall will meet Keystone Design Table 1 (B), Case A (II) requirements, and will include three levels of Geogrid reinforcement. Backfill will be level, no surcharge, and the· wall will not support any structures. Further, based upon our experience and a review of the above noted Geotechnical Update Report, soils in the site area consist of shallow granular surficial soils over dense granular Old Paralic Deposits. This is consistent with the Kennedy and Tan, 2007 site geologic map of the area (Figure 2). MAMMOTH OFFICE: PO BOX 5024, MAMMOTH LAKES, CA 93546 • Phn: (760) 937-4608 BISHOP OFFICE: 169 WILLOW STREET, BISHOP, CA 93514 • Phn: (760) 937-4789 CARLSBAD OFFICE: 7040AVENIDA ENCINAS, SUITE 104-469, CARLSBAD, CA 92011• Phn: (760) 937-4608 >-t= 0 ~~mn... (.~'2D20-J°'C) 1790 Ratcliff Road Keystone Wall Recommendations Project Number 3.31730 November 20, 2020 Soils were also found to be non-expansive, and meet the Keystone required Class Type 4 material, per CBC Table 1806A.2. CBC Seismic Parameters Table I presents the seismic parameters for use in preparing a Design Response Spectra, if needed. The Site coordinates of latitude 33.1752, -117.3401 were estimated using the computer program Google Earth. TABLE I SEISMIC PARAMETER TYPE RECOMMENDED (ASCE 7-161 VALUE Site Class D -Default Fa 1.2 I! Ss 1.029 g S1 0.375 e SMs 1.235 g Sos 0.823 g PGA/PGAM 0.451/0.541 g Risk Category II Wall Desi~n and Construction Per the Keystone Compac III Standardized Manual for Retaining Walls, mm1mum acceptable factors of safety are 1.5 against sliding, and 2.0 for overturning and bearing capacity failures. An earthquake acceleration coefficient of 0.15g was used in the design. Hydrostatic pressures were not considered. Wall batter for this project is approximately 8-degrees. Geogrid reinforcements are Miragrid 2XT manufactured by Tencate. Walls shall be constructed in general accordance with the attached Plate 1. • • • Earthwork Excavation should be observed by SGS!. Such observations are considered essential to identify field conditions that may differ from those anticipated, to adjust design to actual field conditions, and to determine that the earthwork is accomplished in general accordance with the recommendations of this letter. ( 1790 Ratcliff Road Keystone Wall Recommendations Project Number 3.31730 November 20, 2020 Earthwork recommendations which include guidelines for site preparation fill compaction, slope work, temporary excavations, and trench backfill are provided in Appendix A. Site soils are suitable for use as compacted fill if they are processed in accordance with the recommendations in Appendix A. Approved fill soils should be placed in thin lifts (8-inches loose thickness) and moisture conditioned to at least optimum moisture content. All fill should be compacted to a minimum of 90-percent of the laboratory maximum dry density per ASTM D1557. All backfill soils should be tested by for suitability in advance by the project Geotechnical Engineer. Soil backfill should have an expansion index (EI) of no greater than SO, a sand equivalent (SE) greater than 15, maximum plasticity index of!:, 12, a liquid limit less than 40, when measured in accordance with ASTM D 4318, and shall not contain more than 1- percent of organic materials (by volume). We appreciate the opportunity to be of service to you. Should you have any questions r~garding this report, plea,se do not hesitate to con_tact us. Respectfully, SIERRA GEOTECHNICAL SERVICES, INC. Joseph A. Adler Principal Geologist CEG 2198 (exp 3/31/2021) ~OH --OS NA 0 219 RTIFI !NEE L Thomas A. Platz Principal Engineer PE C41039 (exp 3/31/2021) * NOT TO SCALE 1>,onga.,() "\ /. { 1 ) ✓ , ... I '--~ ..... J .. .. \\ I ir I PROJECT• SITE LOCATION MAP 1790 RATCLIFF ROAD COORD• 33.1752, -117. 3401 11/2020 DRAVINGo FIGUR£DWG DRAVN BY• JAA FIGURE• . -·- ll JOB NO,, 3.31730 FIGURE 1 ... Old paralic deposits, undivided, Units 2- 4 Age Middle PletStocene Late Pleistocene (0 781 -0 0117 Ma) Oescnption Poorly sorted, moderately permeable, reddish-brown, interlingered strandhne, beach estuanne and colll.JVl8l deposits composed of siltstone, sandstone and conglomerate These deposits rest on the n<HI emergent wave rut abrasion platfoon preser,,ed by regional uplrft Reference Kennedy.MP and S S Tan dtgrt:11 prep by Bovard et al, 2007, Geologic Map of the Oceanside 30' x 60' Quadrangle. Cahforma Cahfomia Department of ConservabOn Cahfomia Geological Sun,ey 2703818 NOT TO SCALE PROJECT• SITE GEOLOGIC MAP 1790 RA TCLIFF ROAD CO□RD• 33. 1752, -117. 3401 DATE• 11/2020 DRAYING, F/GURE.DWG DRA'JN BY• JAA JOB NO., 3.31730 FIGURE• FIGURE 2 WALL HEIGHT KEYSTONE CAP UNIT KEYSTONE UNIT KEYSTONE FIBERGLASS PIN (2 PER BLOCK) I 'j__ COMPACTED LOW PERMEABILITY SOIL I I I I I ~1 Ii 1= I _1 ti I '1-m '"' .-'--41~---e-..!,i--,!O~....,--o---o---o---'_',__-c, '~"-"_ ;-COMPACTED SOIL I I I I (RETAINED SOIL) I UNIT DRAINAGE FILL i----~~4'"'+---GEOGRID LENGTH ---;1 t'--LIMIT OF EXCAVATION r'-4~ ...... ..,.._-o.,.....,...--0---0---0---0---.. I FINISHED GRADE EMBEDMENT LEVELING PAD Glossaiy ( FOUNDATION SOIL) I I I ____________ _j 3"0 PERFORATED DRAIN PIPE KEYSTONE UNIT -Keystone Compac Ill pinned units. Fill core with 3/4" clean crushed stone. GEOGRID (TYP.) KEYSTONE CAP UNIT -4" high cap unit. Cap units are secured to upper wall units with KapSeal adhesive per manufacture(s recommendations. BLOCK SETBACK -Block setback is determined by the multiple pin locations in each unit as required by the wall geometry and design. EMBEDMENT -Embedment required is a function of wall height and top slope. General recommendation is minimum embedment of 6" below the grade in front of the wall. WALL HEIGHT -Wall height is defined as the total wall height from top of leveling pad to top of wall. LIMIT OF EXCAVATION -The limit of excavation is defined as the excavation necessary to install the wall system, leveling pad, drainage fill, drain pipe, and the geogrid reinforcement when required. LEVELING PAD -\ Leveling pad is typically constructed of compacted 3/4 • crushed stone or gravel, 6" deep and 6' wider than the wall units front and back. Concrete may also be used. DRAIN PIPE -3' perforated pipe placed behind bottom of wall to provide additional drainage. Pipe shall be discharged to drainage swale or storm drainage system. UNIT DRAINAGE FIL~ -Drainage fill is a free draining.crushed stone that is placed within u_nits and for a distance of 12" behind.the wall units. REINFORCED SOIL -Reinforced soil backfill is placed and compacted in 8" think lifts to a minimum 90% maximum dry density (ASTM D1557) with geogrid levels included at the design locations and lengths. GEOGRID -Geogrid is Mirafi Miragrid 2XT polyester reinforcement. Geogrid lengths are measured from the wall face to the end of reinforcement. Geog rid is placed on level compacted backfill and tensioned behind wall prior to backfilling. FINISHED BACKSLOPE -Finished backslope shall be low permeable soil to prevent surface runoff into wall backfill. KEYSTONE SEGMENTAL BLOCK WALL-COMPAC Ill UNIT GEOGRID REINFORCED WALL TYPICAL SECTION SOIL TYPE= CBC SOIL TYPE 4 OR BETTER (~=30°) SEISMIC DESIGN ACCELERATION= 0.15g ® BLOCK & BRICK PLATE 1 H KEYSTONE COMPAC III STANDARDIZED MANUAL DESIGN TABLE l(B) Case A (II) -Level Backfill, No Surcharge -CBC soil type 4 or better (<p=30°) Wall Batter: 8 Degrees (1" setback per unit) REINFORCED// SOIL ZONE I I I I Numbers of Grid Length and Position above the base, between the Total Wall blocks of the wall face Height (H) Miragrid 2XT Layers Grid 1 Grid 2 Grid 3 ---2'-4" - 3'-0" I (4'-0") -- 2nd & 3nt 3'-8" I (4'-0") 3rd & 4th 4'-4" 2 (4'-0") (4'-0") - 2nd & 3nt 4th&5th 5'-0" 2 (4'-0") (5'-0") - 2nd & 3nt 5th &6th 5'-8" 3 (4'-0") (4'-0") (5'-0") 2nd & 3nt 4th & 5th 6th& 7th 6'-4" 3 (S'-0") (S'-0") (5'-0") 2nd & 3nt 4th&5th 7th&8th Note: Minimum Embedment Depth = 0'-6" DESIGNED EXCLUSIVELY FOR USE WITH KEYSTONE COMPAC III WALL UNITS, MANUFACTURED BY RCP BLOCK & BRICK AND MIRA GRID 2XT MANUFACTURED BY TENCATE .... ... X ... ... z 0 ,... z f A ◄ -, PRINT ON 11 X 17 I ······· -•••••• I 101·---------------'----4 " N ~ a "i ~ ,.. :i .. 49' JJ drain inlet 1 ■ • drain outlet EL160 ◄ :I I ~ House ....... ~~ -~-, .,,.______ .. curb 82' I cross section A-A see page 2 A ◄:-1 Scale used: 1 "= 8' (. City of Carlsbad Community & Economic Devek>pment Site Plan for PooJs & Retaining Walls 1\8 inch scale shown Site Address: 1790 RATCLIFF RD, CARLSBAD, CA 92008 Legal Description: LOT 39 Contractor's Name DANNY WRIGH1' Owner's Name SATISH MENON Address: 1790 RATCLIFF RD, CARLSBAD, CA 92008 Driveway . ,.,.~ ... EL 160 + ! .!!!!!!!!!-" ,.;--.JJ ..... \~ OI!!!!!!!. ~ A.P.N 1562700400 Phone: 760-696-TT94 Phone: 650-464-4264 ,:, a: :E u -' «s a: Site Plan Checklist ~imensioned & to scale Shown: II North Arrow )(All existing and proposed structures J( Property lines dimensions )(Drainage patterns ll(Existing & proposed slopes ~lope cross section NA Distance from pool to property lines and all structures NA Distance-house to water's edge NA Distance-pool heater to P/L and any operable window NA Length, width & sq. ft. of pool NA Existing topography and pool's distance from toe/top of slope Ji!!'Easements NA Pool fencing w/height & gate compliance noted. ~ROW permit required. l'.I Indicate what will happen w/ soil excavated For Retaining Walls Add: Jl(wall heights at ends of walls or at any change in height. TW=top of wall, BW=bottom of wall. .e(cross-section of wall stating wall height above and below grade ?Grading quantities: ~ _Frn 40YDS lmpo port lhe dhcharp of polutants to any Jtorm dr .... Pf'U-ffl Is ptclhlbited. No M>ld waste, p.-a,alewn byproducts, $OI pardculau, construction ~,ui matenlls, or wnta wat• 1.n.rat.d on cOMtrYCtion slta or bV construC1ion actMdft sh~ N plamd, c~ Of dlscharpd lntothrt strfft, autt• or storm drain system. This project shall comply with the 2013 CA Building co«, 2013 CA M«honkal Code; Z013 CA Plumbing Code, 1013 CA Electrical Cade, 2013 CA Energy E/fic~ncy Standards and City of Carlsbad Municipal Code. " .-4 X .-4 .-4 z 0 ... z a: Cl. I s· I T P/L PRINT ON 11 X 17 Note: All soil excavated wi II _be put back into the wall! 10' setback P/L ,- 3' Scale used: ( City of Carlsbad Community & Economic Development Existing slope tallest case PA. 10' setback +,:---footing trench Temporary back cut tallest case P/L TW158 ~ + EL 160 ._ EL 161 • to· •ell>-~ • ,_ • I Min 6" burial Bottom footing 153 Site Plan for Pools & Retaining Walls 1\8 inch scale shown Section A-A Site Address: 1100 RATCLIFF RD, CARLSBAD, CA 92009 Legal Description: LOT39 Contractor's Name DANNYWRIGHT Owner's Name SATISH MENON Address: 1790 RATCLIFF RD, CARLSBAD, CA 92008 A.P.N 1562700400 Phone: 760-696· TT94 Phone: 650-464-4264 Site Plan Checklist [i) Dimensioned & to scale Shown: Ii) North Arrow Iii All existing and proposed structures [i] Property lines dimensions lil Drainage patterns [i) Existing & proposed slopes lil ·slope cross section NA Distance from pool to property lines and all structures NA Distance-house to water's edge NA Distance-pool heater to P/L and any operable window NA Length, width & sq. ft. of pool NA Existing topography and pool's distance from toe/top of slope lxJ Easements NA Pool fencing w/height & gate compliance noted. [i] ROW permit required. [i] Indicate what will happen w/ soil excavated For Retaining Walls Add: lil Wall heights at ends of walls or at any change in height. TW=top of wall, BW=bottom of wall. [i) Cross-section of wall stating wall height above and below grade lil Grading quantities: Cut Fill 40 cy Qmpo9xport The discharge of pollutants to any storm drainage system is prohibited. No solid waste, petroleum byproducts, soil particulate, construction waste materials, or waste water generated on construction site or by construction activities sha II be placed, conveyed or discharged into the street, gutter or storm drain system. This project shall comply with the 2013 CA Building Code, 2013 CA Mechanical Code, 2013 CA Plumbing Code, 2013 CA Electrical Code, 2013 CA Energy Efficiency Standards and City of Carlsbad Municipal Code. APPENDIX A EARTHWORK AND GRADING RECOMMENDATIONS These earthwork and grading specifications are for the grading and earthwork shown on the approved grading or construction plan(s) and/or indicated in the geotechnical report(s). Earthwork and grading should be conducted in accordance with applicable grading ordinances, the current California Building Code, and the recommendations of this report. The following recommendations are provided regarding specific aspects of the proposed earthwork construction. These recommendations should be considered subject to revision based on field conditions observed by the geotechnical consultant during grading. Geotechnical Consultant of Record Prior to commencement of work, the owner shall employ the Geotechnical Consultant of Record. The Geotechnical Consultant shall be responsible for reviewing the approved geotechnical report(s) and accepting the adequacy of the preliminary geotechnical findings, conclusions, and recommendations prior to the commencement of grading or construction. During grading and earthwork operations, the Geotechnical Consultant shall observe, map, and document the subsurface exposures to verify the geotechnical design assumptions. lfthe observed conditions are found to be significantly different than the interpreted assumptions during the design phase, the Geotechnical Consultant shall inform the owner, recommend appropriate changes in design to accommodate the observed conditions, and notify the review agency where required. Subsurface areas to be geotechnically observed, mapped, elevations recorded, and/or tested include natural ground, after it has been cleared for receiving fill but before it has been placed, bottoms of all "remedial removal areas, all key bottoms, and benches made on sloping ground to receive fill. The Geotechnical Consultant shall observe the moisture-conditioning and processing of the subgrade and fill materials and perform relative compaction testing of fill to determine the attained level of compaction. The Geotechnical Consultant shall provide the test results to the owner and the contractor on a routine and frequent basis. The Earthwork Contractor The Earthwork Contractor shall be solely responsible for performing the grading in accordance with the plans and specifications. The Earthwork Contractor shall review and ·accept the plans, geotechnical report(s) and these Specifications prior·to the commencement of grading. The Earthwork Contractor shall have the sole responsibility to provide adequate equipment and methods to accomplish the earthwork in accordance with applicable grading codes and agency ordinances, these Specifications, and the recommendations in the approved geotechnical report(s) and grading plan(s). If, in the opinion of the Geotechnical Consultant unsatisfactory conditions; such as unstable soil, improper moisture condition, inadequate compaction, adverse weather, etc ... are resulting in a quality of work less than required in these Specifications, the Geotechnical Consultant shall reject the work and may recommend to the owner that construction be stopped until the conditions are rectified. Site Preparation General: Site preparation includes removal of deleterious materials, unsuitable materials, and existing improvements from areas where new improvements or new fills are planned. Deleterious materials, which include vegetation, trash, and debris, should be removed from the site and legally disposed of off-site. Unsuitable materials include loose or disturbed soils, undocumented fills, contaminated soils, or other unsuitable materials. The Geotechnical Consultant shall evaluate the extent of these removals depending on specific site conditions. Earth fill material shall not contain more than 1-percent of organic materials (by volume). Nesting of the organic materials shall not be allowed. If potentially hazardous materials are encountered, the contractor shall stop work in the affected area, and a hazardous material specialist shall be informed immediately for proper evaluation and handling of these materials prior to continuing to work in that area. As presently defined by the State of California, most refined petroleum products (gasoline, diesel fuel, motor oil, grease, coolant etc ... ) have chemical constituents that are considered to be hazardous waste. As such, the indiscriminate dumping or spillage of these fluids onto the ground may constitute a misdemeanor, punishable by fine and/or imprisonment and shall not be allowed. Any existing subsurface utilities that are to be abandoned should be removed and the trenches backfilled and compacted. If necessary, abandoned pipelines may be filled with grout or slurry cement as recommended by, and under the observation of, the Geotechnical Consultant. Excavation Excavations, as well as over-excavation for remedial purposes, shall be evaluated by the Geotechnical Consultant during grading. The actual extent of removal shall be determined by the Geotechnical Consultant based on the field evaluation of exposed conditions during grading. Where fill-over-cut slopes are to be graded, the cut portion of the slope shall be made, evaluated, and accepted by the Geotechnical Consultant prior to placement of materials for construction of the fill portion of the slope, unless otherwise recommended by the Geotechnical Consultant. In addition to removals and over-excavations recommended in the approved geotechnical report( s) and the grading plan, soft, loose, dry, saturated, spongy, organic-rich, highly fractured, or otherwise unsuitable ground shall be over- excavated to competent ground as evaluated by the Geotechnical Consultant during grading. All areas to receive fill, including removal and processed areas, key bottoms, and benches, shall be observed, mapped, elevations recorded, and/or tested prior to being accepted by the Geotechnical Consultant as suitable to receive fill. The Contractor shall obtain a written acceptance from the Geotechnical Consultant prior to fill placement. A licensed surveyor shall provide the survey control for determining elevations of processed areas, keys, and benches. Fm compaction The onsite soils are suitable for placement as compacted fill provided the organics, oversized rock (greater than 6-inches in diameter) and deleterious materials are removed. Rocks greater than 6-inches and less than 2-feet in diameter can be placed in the bottom of deeper fills or approved areas provided they are selectively placed in such a manner that no large voids are created. All rocks shall be placed a minimum of 4-feet below finish grade elevation unless used for landscaping purposes. Any import soils shall be tested for suitability in advance by the project Geotechnical Engineer. After making the recommended removals prior to fill placement, the exposed ground surface should be scarified to a depth of approximately 12-inches, moisture conditioned as necessary, and compacted to at least 95-percent of the maximum dry density obtained using ASTM D1557 as a guideline. Surfaces on which fill is to be placed which are steeper than 5:1 (Horizontal to vertical) should be benched so that the fill placement occurs on relatively level ground. For parking areas and other improvements, a one-foot removal is recommended depending on site conditions (i.e. depth of root zone, and depth of disturbance which may have locally deeper removal depths). The removal bottom should be observed (tested as needed) by the geotechnical consultant prior to placing fill soils. The upper 12-inches of subgrade material along with the Class II Aggregate Base and the Asphaltic concrete shall be compacted to a minimum of 95-percent of the materials maximum dry density as determined by ASTM D1557. The subgrade and aggregate base shall be moisture-conditioned and compacted to 95-percent of the material's maximum dry density as determined by ASTM D1557 to a depth of 12-inches. All fill and backfill to be placed in association with the proposed construction should be accomplished slightly over optimum moisture content using equipment that is capable of producing a uniformly compacted product throughout the entire fill lift. Fill materials at less than optimum moisture should have water added and the fill mixed to result in material that is uniformly above optimum moisture content. Fill materials that are too wet can be aerated by blading or other satisfactory methods until the moisture content is as required. The wet soils may be mixed with drier materials in order to achieve an acceptable moisture content. The fill and backfill should be placed in horizontal lifts at a thickness appropriate for equipment spreading, mixing, and compacting the material, but generally should not exceed eight inches in thickness. No fill soils shall be placed during unfavorable weather conditions. When work is interrupted by rains, fill operations shall not be resumed until the field tests by the geotechnical engineer indicate that the moisture content and density of the fill are as previously specified. Slopes All slopes shall be compacted in a single continuous operation upon completion of grading by means of sheepsfoot or other suitable equipment, or all loose soils remaining on the slopes shall be trimmed back until a firm compacted surface is exposed. Slope compaction tests shall be made within one foot of slope surface. Cut and fill slopes shall be a maximum of 2: 1 (horizontal to vertical) unless approved by the Geotechnical Consultant. Planting and irrigation of cut and fill slopes and/or installation of erosion control and drainage devices should be completed due to the erosion potential of the soil. Jemporacy Excavations Temporary excavation shall be made no steeper than 1:1 (horizontal to vertical). The recommended slope for temporary excavations does not preclude local raveling and sloughing. Where wet soils are exposed, flatter excavation of slopes and dewatering may be necessary. In areas of insufficient space for slope cuts, or where soils with little or no binder are encountered, shoring shall be used. All large rocks exposed above temporary cuts shall be removed prior to foundation excavation. In addition, any rocks exposed during development from raveling and sloughing should be removed immediately. All excavations should comply with the requirements of the California Construction and General Industry Safety Orders and the Occupational Safety and Health Act and other public agencies having jurisdiction. Utility Trench Backfill All utility trenches in structural areas shall be compacted to a minimum of90-percent per ASTM D1557. All trenches in non-structural areas shall be compacted to a minimum of85-percent per ASTM D1557. All material used for utility trench backfill shall be approved by the Geotechnical Engineer prior to placement. All bedding and backfill of utility trenches shall be done in accordance with the applicable provisions of Standard Specifications of Public Works Construction. Bedding material shall have a Sand Equivalent greater than 30 (SE>30). The bedding shall be placed to 1-foot over the top of the conduit and densified by jetting. Backfill shall be placed and densified to a minimum of90-percent of maximum from 1-foot above the top of the conduit to the surface. Lift thickness of utility trench backfill shall not exceed those allowed in the Standard Specifications of Public Works Construction unless the Contractor can demonstrate to the Geotechnical Consultant that the fill lift can be compacted to the minimum relative compaction by his alternative equipment and method. Regulations of the governing agency may supersede the above, and all trench excavations should conform to all applicable safety codes. The Contractor shall follow all OSHA and Cal/OSHA requirements for safety of trench excavations.