HomeMy WebLinkAbout2460 IMPALA DR; ; CBC2024-0014; PermitBuilding Permit Finaled
Ccityof
Carlsbad
Commercial Permit
Print Date: 08/28/2024
Job Address:
Permit Type:
Parcel #:
Valuation:
Occupancy Group:
#of Dwelling Units:
Bedrooms:
Bathrooms:
Occupant Load:
Code Edition:
Sprinkled:
Project Title:
2460 IMPALA DR, CARLSBAD, CA 92010-7226
BLDG-Commercial
2090412100
$49,282.20
Work Class:
Track#:
Lot#:
Project#:
Plan#:
Construction Type:
Orig. Plan Check#:
Plan Check#:
Tenant Improvement
Permit No:
Status:
(8(2024-0014
Closed -Finaled
Applied: 01/11/2024
Issued: 03/14/2024
Finaled Close Out: 08/28/2024
Final Inspection: 08/13/2024
INSPECTOR: Alvarado, Tony
Kersch, Tim
Description: JAZZERCISE: (855 SF) TENANT IMPROVEMENT INCLUDING RESTROOMS FOR ADA COMPLIANCE
Applicant:
M ICHELE KUSH
925 FORT STOCKTO N DR
SAN DIEGO, CA 92103-1817
(619) 297-6153
FEE
BUILDING PLAN CHECK
Property Owner:
JAZZERCISE INC
2460 IMPALA DR
CARLSBAD, CA 92010-7226
(760) 476-1750
BUILDING PLAN REVIEW -MINOR PROJECTS (LDE)
BUILDING PLAN REVIEW -MINOR PROJECTS (PLN)
CERTIFICATE OF OCCUPANCY
COMM/IND Tl -NON-STRUCTURAL
SB1473 -GREEN BUILDING STATE STANDARDS FEE
STRONG MOTION -COMMERCIAL (SMIP)
Total Fees: $1,689.90 Total Payments To Date: $1,689.90
Contractor:
SPW CONSTRUCTION DBA WHITE
CONSTRUCTION
1808 ASTON AVE, # STE 100
CARLSBAD, CA 92008-7369
(760) 931-1130
Balance Due:
AMOUNT
$533.00
$197.00
$104.00
$20.00
$820.10
$2.00
$13.80
$0.00
Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter
collectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest imposition of these
fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the
protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section
3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their
imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection
fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this
project. NOR DOES IT AP PLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the
statute of limitation has previously otherwise expired.
Building Division Page 1 of 1
1635 Faraday Avenue, Carlsba d CA 92008-7314 I 442-339-2719 I 760-602-8560 f I www.carlsbadca.gov
{ City of
Carlsbad
COMMERCIAL
BUILDING PERMIT
APP LI CATION
B-2
Plan Check Cty 1,,()2-~ -0() I j
Est. Value
PC Deposit 1535. DO
Date 1-I I -#Vj
Job Address 2460 IMPALA DRIVE CARLSBAD, CA 92010 Suite: NIA APN: 209-041-21 -----·
Tenant Name#: JAZZERCISE Lot#: PAR 1 PM2o9-o5 Year Built: 1985 ---------------------------
Year Built: 1985 ---Occupancy: B & s, Construction Type:_111 __ Fire sprinklers@'ES0NO A/C:{vYES0No
BRIEF DESCRIPTION OF WORK: COMMERCIAL TENANT IMPROVEMENT
D Addition/New: ____________ New SF and Use, __________ New SF and Use
______ SF Deck, SF Patio Cover, SF Other (Specify) ___ _
0Tenant Improvement: _85_5 ____ SF, Existing Use: OFFICE/WAREHOUSE Proposed Use: OFFICE/WAREHOUSE
_____ SF, Existing Use: _______ Proposed Use: ______ _
D Pool/Spa: _____ SF Additional Gas or ElectricalFeatures? ____________ _
D Solar: KW, ___ Modules, Mounted:ORoof OGround
D Re roof: _____________________________________ _
[{] Plumbing/Mechanical/Electrical
D Other:--------------------------------------
APPLICANT (PRIMARY CONTACT)
Name: MICHELE ARNOLD-KUSH
Address· 925 FORT STOCKTON DRIVE
PROPERTY OWNER
Name: JAZZERCISE
City· SAN DIEGO State:_c_A __ .Zip: 92103
Address: 2460 IMPALA DR.
City: CARLSBAD State:_c_A __ Zip: 92010
Phone· 619-297-6153 Phone: 760-602-7143
Email· MICHELE@SAFDIERABINES.COM Email: bjones@jazzercise.com
DESIGN PROFESSIONAL CONTRACTOR OF RECORD
Name: SAME AS APPLICANT Business Name: WHITE CONSTRUCTION INC
Address: Address: 1808 ASTON AVE . STE. 100
City: ________ State: ___ Zip: _____ City: CARLSBAD State: CA Zip:_9_20_0_8 ____ _
Phone: Phone: 760-931-11130
Email: Email: NANCY@WHITECONSTRUCTIONINC.COM
Architect State License: CSLB License#: 1023856 Class:_B ______ _
Carlsbad Business License# (Required): BLNRooo431-02-2o17
APPLICANT CERT/FICA T/ON: I certify that I have read the application and state that the above information is correct and that the
information on the plans is accurate. I agree to comply with all City ordinances and State laws relating to building
construction.
NAME (PRINT): Michele Arnold-Kush SIGN: ----------DATE: 01 .11 .2024
1635 Faraday Ave Carlsbad, CA 92008 Ph: 442-339-2719 Fax: 760-602-8558 Email: Building@carlsbadca.gov
1 REV. 07/21
THIS PAGE REQUIRED AT PERMIT ISSUANCE PLAN CHECK NUMBER: _______ _
A BUILDING PERMIT CAN BE ISSUED TO EITHER A STATE LICENSED CONTRACTOR OR A PROPERTY OWNER. IF THE PERSON
SIGNING THIS FORM IS AN AGENT FOR EITHER ENTITY AN AUTHORIZATION FORM OR LETTER IS REQUIRED PRIOR TO
PERMIT ISSUANCE.
(OPTION A): LICENSED CONTRACTOR DECLARATION:
/herebyaffirmunderpenaltyofperjurythatlamlicensedunderprovisionsofChapter9(commencingwithSection7000)ofDivision3
of the Business and Professions Code, and my license is in full force and effect. I also affirm under penalty of perjury one of the
fallowing declarations (CHOOSE ONE}:
D1 have and will maintain a certificate of consent to self-insure for workers' compensation provided by Section 3700 of the Labor Code, for the performance of the
work which this permit is issued. PolicyNo .. _____________________________________ _
-OR-
[!)1 have and will maintain worker's compensation, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued.
My workers' compensation insurance carrier and policy number are: lnsuranceCompany Name: _..,,._c_ .. _eo_o1_-._,..,._· _. •_A ______________ _
Polley No. 73•22•512 Expiration Date: _1_11125 _____________ _
-OR-
Ocertificate of Exemption: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become
subject to the workers' compensation Laws of California. WARNING: Failure to secure workers compensation coverage Is unlawful and shall subject an employer to
criminal penalties and civil fines up to $100,000.00, In addition the to the cost of compensation, damages as provided for In Section 3706 of the Labor Code,
Interest and attorney's fees.
CONSTRUCTION LENDING AGENCY, IF ANY:
I hereby affirm that there is a construction lending agency for the performance of the work this permit is issued (Sec. 3097 (i) Civil Code).
lender's Name: ____________________ Lender's Address: ___________________ _
CONTRACTOR CERT/FICA TION: I certify that I have read the opp/ icationand state that the above information is correct and that
the information on the plans is accurate. I agree to comply with all City ordinances and State laws relating to building
construct ion.
NAME (PRINT): Nancy Young, Project jfSIGNATUR ... ·....L.~-::Q...;4::::::.i.::=-----DATE: 3113124
Note: If the person signing above Is an authorized agent for the contractor provide a letter of t on contractor letterhead.
-OR -
(OPTION B): OWNER-BUILDER DECLARATION:
I hereby affirm that I am exempt from Contractor's License Law for the following reason: n I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec.
'-7d44, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does such
work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold
within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale).
-OR-
01, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The
Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed
pursuant to the Contractor's License Law).
-OR-□I am exempt under Business and Professions Code Division 3, Chapter 9, Article 3 for this reason:
AND,
D FORM 8·61 "Owner Builder Acknowledgement and Verification Form" is required for any permit issued to a property owner.
By my signature below I acknowledge that, except for my personal residence in which I must have resided for at least one year prior to completion of the
improvements covered by this permit, I cannot legally sell a structure that I have built as an owner-builder if it has not been constructed in its entirety by licensed
contractors./ understand that a copy of the applicable low, Section 7044 of the Business and Prof essions Code, is available upon request when this application is
submitted or at the f ollowing Web site: http :llwww.leginfo.co.gov/colow.html.
OWNER CERTIFICATION: I certify that I have read the application and state that the above information is correct and that the
information on the plans is accurate. I agree to comply with all City ordinances and State laws relating to building
construction.
NAME (PRINT): SIGN: _________ DATE: _____ _
Note: If the person signing above is an authorized agent for the property owner Include form B-62 signed by property owner.
1635 Faraday Ave Carlsbad, CA 92008 Ph: 442·339-2719 Fax: 760-602-8558 Email: Building@carlsbadca.gov
2 REV. 07/21
Building Permit Inspection History Finaled
{city of
Carlsbad
PERMIT INSPECTION HISTORY for (CBC2024-0014)
Permit Type: BLDG-Commercial Application Date: 01/11/2024 Owner: JAZZERCISE IN C
Work Class: Tenant Improvement Issue Date: 03/14/2024 Subdivision: PARCEL MAP NO 12855
Status: Closed -Finaled Expiration Date: 11/18/2024 Address: 2460 IMPALA DR
IVR Number: 54211 CARLSBAD, CA 92010-7226
Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector
Date Start Date Status
05/02/2024 05/02/2024 BLDG-21 247155-2024 Passed Tim Kersch
05/17/2024
Underground/Underflo
or Plumbing
Checklist Item
BLDG-Building Deficiency
COMMENTS
05/17/2024 BLDG-14 248792-2024 Partial Pass Tony Alvarado
Frame/Steel/Bolting/We
lding (Decks)
Checklist Item
BLDG-Building Deficiency
COMMENTS
1. Non-loadbearing partition ADA, interior
building footprint restroom walls, per
engineered, plans, and detail specifications
-partial pass.
2. No scope of rough electrical work
ready.
BLDG-34 Rough
Electrical
248793-2024 Failed Tony Alvarado
Checklist Item
BLDG-Building Deficiency
COMMENTS
1. Non-loadbearing partition ADA, interior
building footprint restroom walls, per
engineered, plans, and detail specifications
-partial pass.
2. No scope of rough electrical work
ready.
BLDG-SW-Inspection
Checklist Item
248914-2024
COMMENTS
Partial Pass Tony Alvarado
Are erosion control BMPs
functioning properly?
Are perimeter control BMPs
maintained?
Is the entrance stabilized to
prevent tracking?
Have sediments been tracked
on to the street?
Has trash/debris accumulated
throughout the site?
Are portable restrooms
properly positioned?
Do portable restrooms have
secondary containment?
Wednesday, August 28, 2024
Reinspection Inspection
Complete
Passed
Yes
Reinspection Incomplete
Passed
Yes
Reinspection Incomplete
Passed
No
Reinspection Incomplete
Passed
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Page 1 of 5
I
PERMIT INSPECTION HISTORY for (CBC2024-0014)
Application Date: 01/11/2024 Owner: JAZZERCISE INC Permit Type: BLDG-Commercial
Work Class: Tenant Improvement Issue Date: 03/14/2024 Subdivision: PARCEL MAP NO 12855
Status: Closed -Finaled Expiration Date: 11/18/2024
IVR Number: 54211
Address: 2460 IMPALA DR
CARLSBAD, CA 92010-7226
Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection Inspection
Date Start Date Status
05/21/2024 05/21/2024 BLOG-24 Rough/Topout 249108-2024 Passed Tony Alvarado
Checklist Item COMMENTS
BLDG-Building Deficiency
BLOG-34 Rough
Electrical
249109-2024 Passed Tony Alvarado
Checklist Item
BLDG-Building Deficiency
COMMENTS
May 21, 2024
1. Non-loadbearing partition ADA, interior
building footprint restroom walls, per
engineered, plans, and detail specifications
-partial pass.
2. Rough combination inspection for MEPS
-OK.
BLOG-44
Rough/Ducts/Dampers
249110-2024 Partial Pass Tony Alvarado
Checklist Item COMMENTS
BLDG-Building Deficiency Mechanical ducting sealant at two
restroom locations -partial pass
BLDG-84 Rough
Combo(14,24,34,44)
249219-2024
Checklist Item
BLDG-14
Frame-Steel-Bolting-Welding
(Decks)
BLDG-24 Rough-Topout
BLDG-34 Rough Electrical
BLDG-44
Rough-Ducts-Dampers
COMMENTS
BLOG-SW-Inspection
Checklist Item
249220-2024
COMMENTS
Wednesday,August28, 2024
Are erosion control BMPs
functioning properly?
Are perimeter control BMPs
maintained?
Is the entrance stabilized to
prevent tracking?
Have sediments been tracked
on to the street?
Has trash/debris accumulated
throughout the site?
Are portable restrooms
properly positioned?
Do portable restrooms have
secondary containment?
Partial Pass Tony Alvarado
Partial Pass Tony Alvarado
Complete
Passed
Yes
Complete
Passed
Yes
Relnspectlon Incomplete
Passed
Yes
Re Inspection Incomplete
Passed
Yes
Yes
Yes
Yes
Reinspection Incomplete
Passed
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Page 2 of 5
PERMIT INSPECTION HISTORY for (CBC2024-0014)
Permit Type: BLDG-Commercial Application Date: 01/1 1/2024 Owner: JAZZERCISE INC
Work Class: Tenant Improvement Issue Date: 03/14/2024 Subdivision: PARCEL MAP NO 12855
Status: Closed -Finaled Expiration Date: 11/18/2024 Address: 2460 IMPALA DR
IVR Number: 54211 CARLSBAD, CA 92010-7226
Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection Inspection Date Start Date Status
05/22/2024 05/22/2024 BLDG-16 Insulation 249421-2024 Passed Tony Alvarado Complete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-85 T-Bar, Ceiling 249311-2024 Passed Tony Alvarado Complete
Grids, Overhead
Checklist Item COMMENTS Passed
BLDG-14 Yes
Frame-Steel-Bolting-Welding
(Decks)
BLDG-24 Rough-Topout Yes
BLDG-34 Rough Electrical Yes
BLDG-44 Yes
Rough-Ducts-Dampers
BLDG-SW-Inspection 249422-2024 Partial Pass Tony Alvarado Reinspect ion Incomplete
Checklist Item COMMENTS Passed
Are erosion control BMPs Yes
functioning properly?
Are perimeter control BMPs Yes
maintained?
Is the entrance stabilized to Yes
prevent tracking?
Have sediments been tracked Yes
on to the street?
Has trash/debris accumulated Yes
throughout the site?
Are portable restrooms Yes
properly positioned?
Do portable restrooms have Yes
secondary containment?
06127/2024 06/27/2024 BLDG-Final Inspection 253207-2024 Partial Pass Tony Alvarado Reinspection Incomplete
Wednesday, August 28, 2024 Page 3 of 5
PERMIT INSPECTION HISTORY for (CBC2024-0014)
Permit Type: BLDG-Commercial
Work Class: Tenant Improvement
Status: Closed -Finaled
Application Date: 01/11/2024 Owner: JAZZERCISE INC
Issue Date: 03/14/2024 Subdivision: PARCEL MAP NO 12855
Expiration Date: 11/18/2024
IVR Number: 54211
Address: 2460 IMPALA DR
CARLSBAD, CA 92010-7226
Scheduled
Date
Actual Inspection Type
Start Date
Inspection No. Inspection Primary Inspector Reinspection Inspection
Status
Checklist Item COMMENTS
BLDG-Building Deficiency June 27, 2024:
08/13/2024
BLDG-Plumbing Final
BLDG-Mechanical Final
BLDG-Structural Final
BLDG-Electrical Final
08/13/2024 BLDG-Final Inspection
Checklist Item
BLDG-Plumbing Final
BLDG-Mechanical Final
BLDG-Structural Final
BLDG-Electrical Final
BLDG-SW-Inspection
Wednesday, August 28, 2024
tenant improvement for two ADA title 24
compliant restrooms -partial approval.
Pending:
1. ADA restroom signage required at
restroom door, and wall locations for both
(male and female) restrooms.
2. Toilet water tank flush handle required to
be reversed at both male and female
restroom locations.
Note:
a) Informed Contractor representative.
b) Photos will suffice for final building
inspection approval.
3. the rest of interior, tenant improvement,
ADA restroom upgrades -OK per approve
stamped, signed plans and detail
specifications.
257877-2024
COMMENTS
August 13, 2024:
Passed Tony Alvarado
Existing Tenant improvement for (2)
-alteration of existing ADA title 24 compliant
restrooms -final approval OK.
Pending items completed:
1. ADA restroom signage required at
restroom door, and wall locations for both
(male and female) restrooms-installed and
approved.
2. Toilet water tank flush handle required to
be reversed at both male and female
restroom locations-installed, verified, and
approved.
a) Informed Contractor representative.
b) Photos will suffice for final building
inspection approval.
3. the rest of interior, tenant improvement,
ADA restroom upgrades -OK per approve
stamped, signed plans and detail
specifications.
257878-2024 Passed Tony Alvarado
Passed
Yes
Yes
Yes
Yes
Yes
Passed
Yes
Yes
Yes
Yes
Complete
Complete
Page 4 of 5
PERMIT INSPECTION HISTORY for (CBC2024-0014)
Permit Type: BLDG-Commercial
Work Class: Tenant Improvement
Status: Closed -Finaled
Application Date: 01/11/2024 Owner: JAZZERCISE INC
Issue Date: 03/14/2024 Subdivision: PARCEL MAP NO 12855
Expiration Date: 11/18/2024
IVR Number: 54211
Address: 2460 IMPALA DR
CARLSBAD, CA 92010-7226
Scheduled
Date
Actual Inspection Type
Start Date
Inspection No. Inspection Primary Inspector Reinspection Inspection
Wednesday, August 28, 2024
Checklist Item
Are erosion control BMPs
functioning properly?
Are perimeter control BMPs
maintained?
Is the entrance stabilized to
prevent tracking?
Have sediments been tracked
on to the street?
Has trash/debris accumulated
throughout the site?
Are portable restrooms
properly positioned?
Do portable restrooms have
secondary containment?
Status
COMMENTS Passed
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Page 5 of 5
Hazardous Materials Questionnaire Record ID #: Not in System
Plan Check#: DEH2024-HHMBP-014137 County of San Diego, Department of Environmental Health and Quality
PO Box 129261, San Diego, CA 92112-9261
(858) 505-6700 (800) 253-9933 www.sdcdehq.org
Business Name
Jazzercise
Business Contact
michele Arnold Kush
Telephone # Plan File #
( 161) 920-3835
Project Address
2460 impala DR 11 0 130
City
carlsbad
State
CA
Zip Code
92010
APN#
209-041-21
Applicant Applicant E-Mail Applicant Telephone#
michele Arnold Kush michele@safdierabines.com (161) 920-3835
The o ow ng quest ons reprHent the aclllty • actlvltlu, 0 t e spec c pro eel dHc pt on.
PART 1· EIRE DEPARTMENT· HAZARDOUS METERIALS DIVISION· OCCUPANCY CLASSIFICATION: (Not required for projects within the City of San Diego.)
Indicate by selecting the item, whether your business will use, process, or store any of the following hazardous materials. If any of the ~ems are selected, Applicant must
contact the Fire Protection Agency with jurisdiction prior to plan submittal.
Occupancy Rating: B Facility's Square Footage (Including proposed project): 855
0 Explosive or Blasting Agents D Organic Peroxides 0 Water Reactives D Corrosives
D
0
0
Compressed Gases
Flammable/Combustible Liquids
Flammable Solids
D
D
0
Oxidizers
Pyrophorlcs
Unstable Reactives
D Cryogenics O Other Health Hazards
D
0
Highly Toxic or Toxic Materials
Radioactives
0 None of These
PART U: SAN DIEGO COUNTY DEPARTMENT OF ENVIRONMENTAL HEALTH • HAZARDOUS MATERIALS DIVISION (HMD): If the answer to any of the questions Is
yes, applicant must contact the County of San Diego Hazardous Materials Division, in person at 5500 Overland Ave., Suite 110, San Diego, CA 92123, or by phone at (858)
505-6700 prior to issuance of a building permit. FEES ARE REQUIRED.
Project Completion Date: 1/2/2024
YES
1. D
2. D
3. D
4. D
5. 0
6. 0
7. D
8. D
NO
Iii
Iii
Iii
0
Iii
Iii
Iii
Iii
Is your business listed on the reverse side of this form? (check all that apply).
Will your business dispose of Hazardous Substances or Medical Waste in any amount?
Will your business store or handle Hazardous Substances In quantities equal to or greater than
55 gallons, 500 pounds, or 200 cubic feet?
Will your business handle carcinogens or reproductive toxins in any quantity?
Will your business use an existing, or install an underground storage tank?
Will your business store or handle Regulated Substances (CalARP)?
Will your business use or install a Hazardous Waste Tank System (Title 22, Arlicle 10)?
Will your business store petroleum In tanks or containers at your facility with a total storage capacity
equal to or greater than 1,320 gallons? (California's Aboveground Petroleum Storage Act).
0
0
0
CalARP Exempt
CalARP Required
CalARP Complete
Review Date:
PART 111· SAN DIEGO COUNTY AIR POLLUTION CONTROL DISTRICT (APCD)· If the answer to Question #1 is 'Yes' and the answer to Question #2 is 'No', the applicant
must contact the APCD prior to the issuance of a building or demolition permit. If any answer to Questions #3, #4, or #5 is 'Yes', the applicant must contact the APCD prior to
the issuance of a building or demolition permit. If the answer to Question #3 or #4 is 'Yes', the applicant may need to submit an asbestos notifocatlon form to the APCD at
least 10 wor1dng days prior to commencing demolition or renovation (some residential projects may be exempt from the notification requirements). Contact the APCD at
10124 Old Grove Road, San Diego, CA 92131 or telephone (858) 586-2600 for more Information.
YES NO
1. 00 0
2. 00 0
3. 0 Iii
4. 0 Iii
Will any existing building materials be disturbed as part of this project? (If the answer Is 'Yes', an asbestos survey may be required.)
Has a survey been performed to determine the presence of asbestos containing materials?
Will the project Involve handling or disturbance of any asbestos containing materials?
Will the project involve the removal of any load supporting structural member?
5. D Iii
Iii
Will the subject facility or construction activities Include operations or equipment that emit or are capable of emitting an air contaminant? (See the APCD
factsheet at http://www.sdapcd.org/info/facts/permits.pdf
6. 0 (ANSWER ONLY IF QUESTION 5 IS 'YES') Will the subject facility be located within 1,000 feet of the outer boundary of a school (K through 12)? Search
the California School Directory at http://www.cde.ca.gov/re/sd/ for public and private schools or contact the appropriate school district.
Briefly describe business activities:
office
Briefly describe proposed project:
non load bearing construction
I declare under penalty of perjury that to the best of my knowledge and belief, the responses made herein are true and correct. Iii; Fees Acknowledged: Iii
michele Amold Kush
Name of Owner or Authorized Agent
FIRE DEPARTMENT OCCUPANCY CLASSIFICATION:
BY:
EXEMPT OR NO FURTHER INFORMATION
REQUIRED
COUNTY-HMO•
:.S"''i OF S-0; Cl~
c.P '< VI wro ce
M. Martinez
IGN .. Tlllf ~:::,,;
APCD
FOR OFFICIAL USE ONLY
RELEASED FOR BUILDING PERMIT BUT NOT FOR
OCCUPANCY
COUNTY-HMO APCD
2/27/2024
Date
DATE: _________ _
RELEASED FOR OCCUPANCY
COUNTY-HMO APCD
·A stamp in this box only exempts businesses from completing or updating a Hazardous Materials Business Plan. Other permitting requirements may still apply.
OEHQ_HMD_HMBP _Questionnaire v 2.0 (8/2021)
Printed on: 3/13/2024 @ 11.41 AM
( City of
Carlsbad
PURPOSE
CLIMATE ACTION PLAN
CONSISTENCY CHECKLIST
B-50
Development Services
Building Division
1635 Faraday Avenue
442-339-2719
www.carlsbadca.gov
This checklist is intended to help building permit applicants identify which Climate Action Plan (CAP) ordinance requirements
apply to their project. This completed checklist (B-50) and summary (B-55) must be included with the building permit
application. The Carlsbad Municipal Code (CMC) can be referenced during completion of this document by clicking on
the provided links to each municipal code section.
NOTE: The following type of permitsiare not required to fill out this form ; ., I. _'1?~ • , ' ., f . di I l • •
''
❖ Patio I ❖ Decks I ❖ PME (w/o panel upgrade) I ❖ Pool
Consultation with a certified Energy Consultant is encouraged to assist in filling out this document. Appropriate
certification includes, but is not limited to: Licensed, practicing Architect, Engineer, or Contractor familiar with Energy
compliance, IECC/HERS Compliance Specialist, ICC G8 Energy Code Specialist, RESNET HERS rater certified, certified
ICC Residential Energy Inspector/Plans Examiner, ICC Commercial Energy Inspector and/or Plans Examiner, ICC CALgreen
Inspector/Plans Examiner, or Green Building Residential Plan Examiner.
If an item in the checklist is deemed to be not applicable to a project, or is less than the minimum required by ordinance,
check N/A and provide an explanation or code section describing the exception.
Details on CAP ordinance requirements are available at each section by clicking on the municipal code link provided. The
project plans must show all details as stated in the applicable Carlsbad Municipal Code (CMC) and/or Energy Code and
Green Code sections.
Project Name/Building
Permit No.: JAZZERCISE
Property AddresS/APN: 2460 IMPALA DRIVE CARLSBAD CA 92010
Applicant Name/Co.: MICHELE ARNOLD-KUSH
Applicant Address: 925 FORT STOCKTON DRIVE SAN DIEGO, CA 92103
BP No.:
Contact Phone: 619-297-6153 Contact Email: MICHELE@SAFDIERABINES.COM
Contact information of person completing this checklist (if different than above):
Name: M ICHELE ARNOLD-KUSH Contact Phone: 619-297-6153
Company
name/address: SAFDIE RABINES ARCHITECTS Contact Email: MICHELE@SAFDIERABINES.COM
Applicant Signature: __ JA,_id,,_eL_e-_A_'J'V11,G-__ Ld_-_X_wA _____ Date: 01/11/2024
8-50 Page 1 of 7 Revised 04/21
...
Use the table below to determine which sections of the Ordinance checklist are applicable to your project. For
alterations and additions to existing buildings, attach a Permit Valuation breakdown on a separate sheet.
Building Permit Valuation (BPV) $ breakdown $197,504.35
A high-rise residential building is 4 or more stories, including a .. D Residential Low-rise High-rise mixed-use building in which at least ~0% 'of its conditioned floor
area is residential use
□ New construction 2A*, 3A*, 1B, 2B, *Includes detached, newly constructed ADU 4A*, 3B,4A
□ Additions and alterations:
□ BPV < $60,000 N/A N/A All residential additions and alterations
□ BPV ~ $60,000 1A, 4A 4A 1-2 family dwellings and townhouses with attached garages
□ Electrical service panel upgrade only only.
*Multi-family dwellings only where interior finishes are removed
□ BPV ~ $200,000 1A, 4A* 1B, 4A* and significant site work and upgrades to structural and
mechanical, electrical, and/or plumbing systems are proposed
[j] Nonresidential ..
I
□ New construction 1 B, 2B, 3B, 4B and 5
□ Alterations:
□ BPV ~ $200,000 or additions~ 1,000 1B, 5 square feet
□ BPV ~ $1,000,000 1B,28,5 Building alterations of~ 75% existing gross floor area
□ ~ 2,000 sq. ft. new roof addition 2B,5 1 B also applies if BPV ;;: $200,000
1. Energy Efficiency
Please refer to Carlsbad Municipal Code (CMC) 18.21.155 and 18.30.190,and the California Green Building Standards Code (CAL Green) for more
information. Appropriate details and notes must be placed on the plans according to selections chosen in the design.
A D Residentialadditionoralteration:?$60,000buildingpermitvaluation. □ NIA _________ _
Details of selection chosen below must be placed on the plans referencing CMC □ Exception: Home energy score~ 7
18.30.190. (attach certification)
Year Built Single-family Requirements Multi-family Requirements
□ Before 1978 Select one option:
□ Ductsealing D Attic insulation □Cool roof □ Attic insulation
□ 1978 andlater Select one option:
D Lighting package D Water heating Package
I!!! Between1978and1991 Select one option:
□ Ductsealing D Attic insulation □Cool roof
□ 1992 andlater Select one option:
□ Lighting package D Water heating package
Updated 4/16/2021 3
B. D Nonresidential* new construction or alterations~ $200,000 building permit valuation,
or additions~ 1,000square feet. See CMC 18.21.155and CAL Green Appendix AS D N/A
AS.203.1.1 Choose one: D .1 Outdoorlighting D .2 Restaurant service water heating (CEC 140.5)
D .3 Warehouse dock seal doors. D .4 Daylight design PAFs D .5 Exhaustairheatrecovery □ N/A
AS.203.1 .2.1 Choose one: D .95 Energy budget (Projects with indoor lighting OR mechanical)
D .90 Energy budget (ProjectswithindoorlightingAND mechanical) □ N/A
A5.211.1** D On-site renewable energy:
D N/A
AS.211.3** □Green power: (If offered by local utility provider, 50% minimum renewable sources)
D N/A
A5.212.1 □ Elevators and escalators: (Project with more than one elevatorortwo escalators)
D N/A
A5.213.1 D Steel framing: (Provide details on plans for options 1-4 chosen)
D N/A
* Includes hotels/motels and high-rise residential buildings
----------
"* Foralterations~ $1,000,000 BPV and affecting> 75%existing grossfloorarea, OR alterationsthatadd 2, 000squarefeetof newroofaddiuon: comply
with CMC 18.30.130 (section 28 below) instead.
,2. Photovoltaic Systems • ,
A. D Residential new construction (for low-rise residential building permit applications submitted after 1/1/20). Refer to 2019 California
Energy Code section 150.1(c)14 for requirements. If project includes installation of an electric heat pump water heater pursuant to
CAP section 3B below (low-rise residential Water Heating), increase system size by .3kWdc if PV offset option is selected.
Floor Plan ID (use additional CFA #d.u. Calculated kWdc*
sheets if necessary)
Total System Size:
kWdc = (CFAx.572) / 1,000 + (1.15 x #d.u.)
*Formula calculation where CFA = conditional floor area, #du = number of dwellings per plan type
If proposed system size is less than calculated size, please explain.
kWdc
Exception
D
D
D
D
B. 0 Nonresidential new construction or alterations ~$1,000,000 BPV AND affecting ~75% existing floor area, OR addition that increases
roof area by ~.ooo square feet Please refer to CMC 18.30.130 when completing this section. *Note: This section also applies to
high-rise residential and hotel/motel buildings.
Choose one of the following methods:
□ Gross Floor Area (GFA}Method
GFA:
□ If< 1 O,OOOs.f. Enter: 5 kWdc
Min.System Size:
D If~ 1 O,OOOs.f. calculate: 15 kW de x (GFA/10,000) **
kWdc
**Round building size factor to nearest tenth, and round system size to nearest whole number.
Updated 4/16/2021 4
□ Time-Dependent Valuation Method
Annual TDV Energyuse:*** ______ x .80= Min. system size: ______ kWdc
***Attach calculation documentation using modeling software approved by the California Energy Commission.
,3. Water Heati_ng i' ! ~ 1 1
• • ,
A D Residential and hotel/motel new construction. Refer to CMC 18.30.170 when completing this section.
Provide complete details on the plans.
□ For systems serving individual dwelling units choose one system:
□ Heat pump water heater AND Compact hot water distribution AND Drain water heat recovery (low-rise
residential only) □ Heat pump water heater AND PV system .3 kWdc larger than required in CMC 18.30.130 (high rise
residential hotel/motel) or CA Energy Code section 150.1 (c) 14 (low-rise residential)
□ Heat pump water heater meeting NEEA Advanced Water Heating Specification Tier 3 or higher
□ Solar water heating system that is either .60 solar savings fraction or 40 s.f. solar collectors
□ Exception:
□ For systems serving multiple dwelling units, install a central water-heating system with ALL of thefollowing:
□ Gas or propane water heating system
□ Recirculation system per CMC 18.30.150(8) (high-rise residential, hotel/motel) or CMC 18.30.170(8) (low-
rise residential)
□ Solar water heating system that is either:
□ .20 solar savings fraction
□ .15 solar savings fraction, plus drain water heat recovery
□ Exception:
B. D Nonresidential new construction. Refer to CMC 18.30.150 when completing this section. Provide
complete details on the plans.
□ Water heating system derives at least 40% of its energy from one of the following (attach documentation):
D Solar-thermal D Photovoltaics
D Water heating system is (choose one):
□ Heat pump water heater
D Electric resistance water heater(s)
D Recovered energy
□Solar water heating system with .40 solar savings fraction
D Exception:
It may be necessary to supplement the completed checklist with supporting materials, calculations or certifications, to
demonstrate full compliance with CAP ordinance requirements. For example, projects that propose or require a
performance approach to comply with energy-related measures will need to attach to this checklist separate calculations
and documentation as specified by the ordinances.
Updated 4/ 16/2 l 5
, 4. Electric Vehicle Charging,
A D Residential New construction and major alterations*
Please refer to CMC 18.21.140 when completing this section.
D One and two-family residential dwelling or townhouse with attached garage:
D One EVSE Ready parking space required D Exception :
□ Multi-familyresidential· □ Exception •
Total Parking Spaces EVSE Spaces
Proposed EVSE (10% of total) Installed (50% of EVSE) Other "Ready'' Other "Capable"
Calculations: Total EVSEspaces = .10 x Total parking spaces proposed (rounded up to nearestwhole number) EVSE Installed= Total EVSE
Spaces x .50 (rounded up to nearest whole number) EVSE other may be "Ready" or "Capable"
*Majoralterations are: ( 1 )forone and two-family dwellings and townhouses with attached garages, alterations have a building permit
valuation2'.$60,000 or include an electrical service panel upgrade; (2) for multifamily dwellings (three units or more without attached
garages), alterations have a building permit valuation 2'. $200,000, interiorfinishes are removed and significant site work and upgrades to
structural and mechanical, electrical, and/or plumbing systems are proposed.
*ADU exceptions for EV Ready space (no EV ready space required when):
(1) The accessory dwelling unit is located within one-half mile of public transit.
(2) The accessory dwelling unit is located withi n an architecturally and historically significant historic district.
(3) The accessory dwelling unit is part of the proposed or existing primary residence or an accessory structure.
(4) When on-street parking permits are required but not offered to the occupant of the accessory dwelling unit.
(5) When there is a car share vehicle located within one block of the accessory dwelling unit.
B. D Nonresidential new construction (includes hotels/motels) □ Exception:--------------,---
Please refer to CMC 18.21.150 when completing this section
Total Parking Spaces
Proposed EVSE (10% of total) I Installed (50% of EVSE) I Other "Ready" I Other "Capable"
I I I
Calculation-Refer to the table below·
Total Number of Parking Spaces provided Number of required EV Spaces Number of required EVSE Installed Spaces
D 0-9 1 1
D 10-25 2 1
D 26-50 4 2
D 51-75 6 3
D 76-100 9 5
D 101-150 12 6
□ 151-200 17 9
□ 201 andover 10 percent of total 50 percent of Required EV Spaces
Calculations: Total EVSE spaces= .10 x Total parking spaces proposed ( rounded up to nearestwhole number) EVSE Installed = Total EVSE
Spaces x .50 (rounded up to nearest whole number) EVSE other may be "Ready" or "Capable"
Updated 4/16/2021 6
5. □Transportation Demand Managem'.e~t (TDll.:1): Nbnreside'ntia, ONLY
An approved Transportation Demand Management (TOM) Plan is required for all nonresidential projects that meet a threshold of employee-generated ADT.
City staff will usethetablebelowbased on your submitted plans to determinewhetherornoryourpermit requires a TOM plan. lfTDM is applicable to your
permit, staff will contact the applicant to develop a site-specific TD M pl an based on the permit details.
Acknowledgment:
Employee ADT Estimation for Various Commercial Uses
Use
EmpADTfor
first 1,000 s.f.
EmpADT/
1000 s.f.1
Office (all)2 20
Restaurant 11
Retaib 8
Industrial 4
Manufacturing 4
Warehousing 4
, Unless otherwise noted, rates estimated from /TE Trip
Generation Manual, 10th Edition
13
11
4.5
3.5
3
1
2 For all office uses, use SAN DAG rate of 20 ADT/1,000 sf to
calculate employee ADT •
3 Retail uses include shopping center, variety store, supermarket,
gyms, pharmacy, etc.
Other commercial uses may be subject to special
consideration
Sample caicylatjons:
Office: 20,450 sf
1. 20,450 sf/ 1000 x 20 = 409 Employee ADT
Retail: 9,334 sf
1. First 1,000 sf= 8 ADT
2. 9,334 sf -1,000 sf= 8,334 sf
3. (8,334 sf / 1,000 x 4.5) + 8 = 46 Employee ADT
I acknowledge that the plans submitted may be subject to the City of Carlsbad's Transportation Demand Management Ordinance. I agree to be contacted should
my permit require a TOM plan and understand that an approved TOM plan is a condition of permit issuance.
JU&oAdQ, A ,,-vn,G-id -Xw.Jv 01/11/2024 Applicant Signature: Date: _____ _
Person other than Applicant to be contacted for TOM compliance (if applicable):
Name(Printed): ___________________ _ Phone Number. _____ _
Email Address: ____________________ _
Updated 4/16/2021 7
( City of
Carlsbad
I INSTRUCTIONS:
STORM WATER STANDARDS
QUESTIONNAIRE
E-34
Development Services
Land Development Engineering
1635 Faraday Avenue
442-339-2750
www.carlsbadca.gov
To address post-development pollutants that may be generated from development projects, the city requires that new
development and significant redevelopment priority projects incorporate Permanent Storm Water Best Management
Practices (BMPs) into the project design per Carlsbad BMP Design Manual (BMP Manual). To view the BMP Manual, refer
to the Engineering Standards (Volume 5).
This questionnaire must be completed by the applicant in advance of submitting for a development application (subdivision,
discretionary permits and/or construction permits). The results of the questionnaire determine the level of storm water
standards that must be applied to a proposed development or redevelopment project. Depending on the outcome, your
project will either be subject to 'STANDARD PROJECT' requirements, "PRIORITY DEVELOPMENT PROJECT (PDP)
requirements or not considered a development project. This questionnaire will also determine if the project is subject to
TRASH CAPTURE REQUIREMENTS.
Your responses to the questionnaire represent an initial assessment of the proposed project conditions and impacts. City
staff has responsibility for making the final assessment after submission of the development application. If staff determines
that the questionnaire was incorrectly filled out and is subject to more stringent storm water standards than initially assessed
by you, this will result in the return of the development application as incomplete. In this case, please make the changes to
the questionnaire and resubmit to the city.
If you are unsure about the meaning of a question or need help in determining how to respond to one or more of the
questions, please seek assistance from Land Development Engineering staff.
A completed and signed questionnaire must be submitted with each development project application. Only one completed
and signed questionnaire is required when multiple development applications for the same project are submitted
concurrently.
PROJECT INFORMATION
PROJECT NAME: JAZZERCISE APN: 209-041-21
ADDRESS: 2460 IMPALA DRIVE CARLSBAD, CA 92010
The project is (check one): D New Development D Redevelopment
The total proposed disturbed area is: ft2 ( ) acres
The total proposed newly created and/or replaced impervious area is: ft2 ( ) acres
If your project is covered by an approved SWQMP as part of a larger development project, provide the project ID and the
SWQMP # of the larger development project:
Project ID SWQMP#:
Then, go to Step 1 and follow the instructions. When completed, sign the form at the end and submit this with your
application to the city.
This Box for City Use Only
YES NO Date: Project ID:
City Concurrence:
□ □ By:
E-34 Page 1 of 4 REV08/22
STEP1
TO BE COMPLETED FOR ALL PROJECTS
To determine if your project is a "development project", please answer the following question:
YES NO
Is your project LIMITED TO routine maintenance activity and/or repair/improvements to an existing building
or structure that do not alter the size (See Section 1.3 of the BMP Design Manual for guidance)?
[XI □
If you answered "yes" to the above question, provide justification below then go to Step 6, mark the box stating "my project
is not a 'development project' and not subject to the requirements of the BMP manual" and complete applicant information.
Justification/discussion: (e.g. the project includes only interior remodels within an existing building):
PROJECT IS A COMMERCIAL INTERIOR TENANT IMPROVEMENT
If you answered "no" to the above question, the project is a 'development project', go to Step 2.
STEP2
TO BE COMPLETED FOR ALL DEVELOPMENT PROJECTS
To determine if your project is exempt from PDP requirements pursuant to MS4 Permit Provision E.3.b.(3), please answer
the following questions:
Is your project LIMITED to one or more of the following:
YES NO
1. Constructing new or retrofitting paved sidewalks, bicycle lanes or trails that meet the following criteria:
a) Designed and constructed to direct storm water runoff to adjacent vegetated areas, or other non-
erodible permeable areas; OR □ □
b) Designed and constructed to be hydraulically disconnected from paved streets or roads; OR
c) Designed and constructed with permeable pavements or surfaces in accordance with USEPA
Green Streets quidance?
2. Retrofitting or redeveloping existing paved alleys, streets, or roads that are designed and constructed in □ □ accordance with the USEPA Green Streets guidance?
3. Ground Mounted Solar Array that meets the criteria provided in section 1.4.2 of the BMP manual? □ □
If you answered "yes" to one or more of the above questions, provide discussion/justification below, then go to Step 6, mark
the second box stating "my project is EXEMPT from PDP ... " and complete applicant information.
Discussion to justify exemption (e.g. the project redeveloping existing road designed and constructed in accordance with
the USEPA Green Street guidance):
If you answered "no" to the above questions, your project is not exempt from PDP, go to Step 3.
E-34 Page 2 of 4 REV 08/22
STEP3
TO BE COMPLETED FOR ALL NEW OR REDEVELOPMENT PROJECTS
To determine if your project is a PDP, please answer the following questions (MS4 Permit Provision E.3.b.(1 )):
YES NO
1. Is your project a new development that creates 10,000 square feet or more of impervious surfaces □ 00 collectively over the entire project site? This includes commercial, industrial, residential, mixed-use,
and public development projects on public or private land.
2. Is your project a redevelopment project creating and/or replacing 5,000 square feet or more of impervious
surface collectively over the entire project site on an existing site of 10,000 square feet or more of □ IXI impervious surface? This includes commercial, industrial, residential, mixed-use, and public
development projects on public or private land.
3. Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more of
impervious surface collectively over the entire project site and supports a restaurant? A restaurant is a □ IXI facility that sells prepared foods and drinks for consumption, including stationary lunch counters and
refreshment stands selling prepared foods and drinks for immediate consumption (Standard Industrial
Classification (SIC) code 5812).
4. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious □ IZl surface collectively over the entire project site and supports a hillside development project? A hillside
development project includes development on any natural slope that is twentv-five oercent or areater.
5. Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more of
impervious surface collectively over the entire project site and supports a parking lot? A parking lot is a □ IXI land area or facility for the temporary parking or storage of motor vehicles used personally for
business or for commerce.
6. Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more
of impervious street, road, highway, freeway or driveway surface collectively over the entire project □ IXI site? A street, road, highway, freeway or driveway is any paved impervious surface used for the
transportation of automobiles, trucks, motorcycles, and other vehicles.
7. Is your project a new or redevelopment project that creates and/or replaces 2,500 square feet or more of
impervious surface collectively over the entire site, and discharges directly to an Environmentally □ I}{] Sensitive Area (ESA)? "Discharging Directly to" includes flow that is conveyed overland a distance of 200
feet or less from the project to the ESA, or conveyed in a pipe or open channel any distance as an
isolated flow from the project to the ESA (i.e. not commingled with flows from adjacent lands).*
8. Is your project a new development or redevelopment project that creates and/or replaces 5,000 square
feet or more of impervious surface that supports an automotive repair shop? An automotive repair □ IXI shop is a facility that is categorized in any one of the following Standard Industrial Classification (SIC}
codes: 5013, 5014, 5541, 7532-7534, or 7536-7539.
9. Is your project a new development or redevelopment project that creates and/or replaces 5,000 square
feet or more of impervious area that supports a retail gasoline outlet (RGO)? This category includes □ IXI RGO's that meet the following criteria: (a) 5,000 square feet or more or (b) a project Average Daily
Traffic (ADT) of 100 or more vehicles per day.
1 O. Is your project a new or redevelopment project that results in the disturbance of one or more acres of land □ IX] and are expected to generate pollutants post construction?
11 . Is your project located within 200 feet of the Pacific Ocean and (1) creates 2,500 square feet or more of □ IXI impervious surface or (2) increases impervious surface on the property by more than 10%? (CMC
21.203.040)
If you answered "yes" to one or more of the above questions, your project is a PDP. If your project is a redevelopment
project, go to step 4. If your project is a new project, go to step 5, complete the trash capture question.
If you answered "no" to all of the above questions, your project is a 'STANDARD PROJECT'. Go to step 5, complete the
trash capture question.
• Environmentally Sensitive Areas include but are not limited to all Clean Water Act Section 303(d) impaired water bodies; areas designated as Areas of Special
Biological Significance by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); water bodies
designated with the RARE beneficial use by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments);
areas designated as preserves or their equivalent under the Multi Species Conservation Program within the Cities and County of San Diego; Habitat Management
Plan: and any other equivalent environmentally sensitive areas which have been identified by the City.
E-34 Page 3 of 4 REV 08/22
STEP4
TO BE COMPLETED FOR REDEVELOPMENT PROJECTS THAT ARE PRIORITY DEVELOPMENT PROJECTS (PDP)
ONLY
Complete the questions below regarding your redevelopment project (MS4 Permit Provision E.3.b.(2)):
YES NO
Does the redevelopment project result in the creation or replacement of impervious surface in an amount of
less than 50% of the surface area of the previously existing development? Complete the percent impervious
calculation below:
Existing impervious area (A) = sq. ft. □ □
Total proposed newly created or replaced impervious area (B) = sq. ft.
Percent impervious area created or replaced (B/A)*100 = %
If you answered "yes", the structural BMPs required for PDP apply only to the creation or replacement of impervious surface
and not the entire development. Go to step 5, complete the trash capture question.
If you answered "no," the structural BM P's required for PDP apply to the entire development. Go to step 5, complete the
trash capture question.
STEPS
TO BE COMPLETED FOR ALL DEVELOPMENT PROJECTS
Complete the question below regarding your Project (SDRWQCB Order No. 2017-0077):
YES NO
Is the Project within any of the following Priority Land Use (PLU) categories and not exempt from trash
capture requirements per section 4.4.2.2 of the BMP Manual?
R-23 (15-23 du/ac), R-30 (23-30 du/ac), Pl (Planned Industrial), CF (Community Facilities), GC (General □ □
Commercial), L (Local Shopping Center), R (Regional Commercial), V-B (Village-Barrio), VC (Visitor
Commercial), 0 (Office), VC/OS (Visitor Commercial/Open Space), Pl/O (Planned Industrial/Office), or
Public Transportation Station
If you answered "yes", the 'PROJECT' is subject to TRASH CAPTURE REQUIREMENTS. Go to step 6, check the first
box stating, "My project is subject to TRASH CAPTURE REQUIREMENTS ... " and the second or third box as
determined in step 3.
If you answered "no", Go to step 6, check the second or third box as determined in step 3. List exemption if applicable
for 'no' answer here:
STEP6
CHECK THE APPROPRIATE BOX(ES) AND COMPLETE APPLICANT INFORMATION
□ My project is subject to TRASH CAPTURE REQUIREMENTS and must comply with TRASH CAPTURE
REQUIREMENTS of the BMP Manual. I understand I must prepare a Storm Water Quality Management Plan (SWQMP).
0 My project is a 'STANDARD PROJECT' OR EXEMPT from PDP and must only comply with 'STANDARD PROJECT'
stormwater requirements of the BMP Manual. I will submit a "Standard Project Requirement Checklist Form E-36". If my
project is subject to TRASH CAPTURE REQUIREMENTS, I will submit a TRASH CAPTURE Storm Water Quality
Management Plan (TCSWQMP) per E-35A.
□ My project is a PDP and must comply with PDP stormwater requirements of the BMP Manual. I understand I must
prepare a Storm Water Quality Management Plan (SWQMP) per E-35 template for submittal at time of application.
Note: For projects that are close to meeting the PDP threshold, staff may require detailed impervious area calculations
and exhibits to verify if 'STANDARD PROJECT' stormwater requirements apply.
~ My project is NOT a 'development project' and is not subject to the requirements of the BMP Manual.
Applicant Information and Signature Box
Applicant Name: MICHELE ARNOLD-KUSH Applicant Title: DESIGNER
Applicant Signature: .AA.id,.£., .d-✓cL X«:J,, Date: 01.11 .2024
E-34 Page 4 of 4 REV 08/22
Building Permit Finaled
Revision Permit
Print Date: 08/28/2024
Job Address: 2460 IMPALA DR, CARLSBAD, CA 92010-7226
Permit No:
Status:
(city of
Carlsbad
PREV2024-0060
Closed -Finaled
Permit Type: BLDG-Permit Revision Work Class: Commercial Permit Revision
Parcel#:
Valuation:
Occupancy Group:
#of Dwelling Units:
2090412100 Track#:
$0.00 Lot#:
Project#:
Plan#:
Bedrooms: Construction Type:
Bathrooms:
Occupant Load:
Code Edition:
Sprinkled:
Project Title:
Orig. Plan Check#: CBC2024-0014
Plan Check#:
Description: JAZZERCISE: BATHROOM LAYOUT CHANGE
Applicant:
MICHELE KUSH
925 FORT STOCKTON DR
SAN DIEGO, CA 92103-1817
(619) 297-6153
FEE
BUILDING PLAN CHECK REVISION ADMIN FEE
THIRD PARTY REVIEW -Consultant Cost (BLDG)
Property Owner:
JAZZERCISE INC
2460 IMPALA DR
CARLSBAD, CA 92010-7226
(760) 476-1750
Total Fees: $275.00 Total Payments To Date:
Building Division
$275.00
Applied: 04/11/2024
Issued: 04/19/2024
Finaled Close Out: 08/28/2024
Final Inspection:
INSPECTOR:
Contractor:
SPW CONSTRUCTION OBA WHITE
CONSTRUCTION
1808 ASTON AVE, # STE 100
CARLSBAD, CA 92008-7369
(760) 931-1130
Balance Due:
AMOUNT
$35.00
$240.00
$0.00
Page 1 of 1
1635 Faraday Avenue, Carlsbad CA 92008-7314 I 442-339-2719 I 760-602-8560 f I www.carlsbadca.gov
~· ~
( City of PLAN CHECK REVISION OR Deve/ol!_ment Services
DEFERRED SUBMITTAL Building Division
Carlsbad APPLICATION 1635 Faraday Avenue
442-339-2719
8-15 www.carlsbadca.gov
Original Plan Check Number CBC2o24-oo 14 ( by City Stafil
Plan Revision Number PL/V,JOJ'l./-/£)/,0
Project Address 2460 Impala Dr. Carlsbad, CA 9201 0
General Scope of Revision/Deferred Submittal: Men's bathroom 102 layout changed to retain existing
structural column.
CONTACT INFORMATION:
Name Michele Arnold-Kush Phone 619-297-6153 _________ Fa.~----------
Address 925 Fort Stockton
Email Address michele@safdierabines.com
City San Diego Z. 92103 IP -----
Original plans prepared by an architect or engineer, revisions must be signed & stamped by that
person.
1 . Elements revised: [i] Plans D Calculations D Soils D Energy D Other
2.
Describe revisions in detail
FLOOR PLAN CHANGED AT MEN'S RESTROOM 102 TO KEEP EXISTING COLUMN AND WALL CHANGES REFLECT NEW LAYOUT.
FLOOR PLAN CHANGED AT MEN'S RESTROOM 102 TO KEEP EXISTING COLUMN AND WALL. PLANS AND ELEVATIONS CHANGED TO REFLECT NEW LAYOUT.
DETAIL 3 ROOM NAMES CHANGED TO REFLECT NEW RESTROOM LAYOUT.
MECHANICAL MOVED TO REFLECT NEW RESTROOM LAYOUT.
FLOOR PLAN CHANGED AT MEN'S RESTROOM 102. POWER MOVED TO REFLECT NEW LAYOUT.
FLOOR PLAN CHANGED AT MEN'S RESTROOM 102. PLUMBING LOCATIONS MOVED TO REFLECT NEW LAYOUT.
4. Does this revision, in any way, alter the exterior of the project?
5. Does this revision add ANY new floor area(s)?
6. Does this revision affect any fire related issues?
Oves
Oves
Oves
3.
List page(s) where each
revision is shown
GN200, A100. A200, A300, A400, A401, ID100
A700 & A701
A500
M1.0
E2.1 & 3.1
P-1 & P-2
7. Is this a full set replacement (all sheets)?
~
0ves 0No
£$'Signature ___________________ _ Date 04.10.2024
1635 Faraday Avenue, Carlsbad, CA 92008 fb: 760-602-27 19 fax: 760-602-8558 Email: building@carfsbadca.gov
www.carlsbadca.gov