Loading...
HomeSearchMy WebLinkAbout; ; RW970024; Permit13385; CT 88-03; ARROYA LA COSTA UNIT 1 VILLAGE I; 01-102227 CAMINO ROBLEDO; ; RW980073; Permit2893 SEGOVIA WAY; ; RW990348; PermitCT 88-03; Arroyo La Costa Calle Barcelona Stations; Final Report of Testing and Observation Services; 1999-03-01CT 88-03; Arroyo La Costa Unit 1 Lots 1 through 120; Final Report of Testing and Observation Services; 1997-11-01CT 88-03; Arroyo La Costa Unit 2 Lots 128 through 465; Geotechnical Testing and Observation; 1997-11-01CT 88-03; ARROYO LA COSTA UNIT 2 VILLAGE Q; ADDENDUM REPORT CHURCH SITE J; 1989-12-01CT 88-03; ARROYO LA COSTA UNIT 2 VILLAGE Q; ADDENDUM REPORT CHURCH SITE J; 1989-12-01 (2)CT 88-03; ARROYO LA COSTA UNIT 2 VILLAGE Q; HYDROLOGICAL DESIGN OF FLOODWATER DETENTION BASIN; 1989-01-01CT 88-03; ARROYO LA COSTA UNIT 2 VILLAGE Q; HYDROLOGICAL DESIGN OF FLOODWATER DETENTION BASIN; 1989-01-01 (2)CT 88-03; ARROYO LA COSTA UNIT 2 VILLAGE Q; SANITARY SEWER REPORT TRUNK LINES IN CALLE BARCELONA; 1991-06-10CT 88-03; ARROYO LA COSTA UNIT 2 VILLAGE Q; SANITARY SEWER REPORT TRUNK LINES IN CALLE BARCELONA; 1991-06-10 (2)CT 88-03; ARROYO LA COSTA UNIT 2 VILLAGE Q; SECOND ADDENDUM REPORT CHURCH ALTERNATIVES 4 AND 5, AREA J; 1990-01-01CT 88-03; ARROYO LA COSTA UNIT 2 VILLAGE Q; SECOND ADDENDUM REPORT CHURCH ALTERNATIVES 4 AND 5, AREA J; 1990-01-01 (2)CT 88-03; ARROYO LA COSTA UNIT 2 VILLAGE Q; STORM DRAIN LINE, TRUNK LINES IN CALLE BARCELONA; 1992-04-20CT 88-03; ARROYO LA COSTA UNIT 2 VILLAGE Q; STORM DRAIN LINE, TRUNK LINES IN CALLE BARCELONA; 1992-04-20 (2)CT 88-03; Arroyo La Costa Unit 2 Village P; Soils Report; 2000-03-30CT 88-03; Arroyo La Costa Unit 2 Village Q; Final Report of Testing and Observation Services during Construction of Site Improvements; 1999-06-01CT 88-03; ARROYO LA COSTA UNIT 2; ADDENDUM TO SUPPLEMENTAL SOIL; 1989-11-28CT 88-03; ARROYO LA COSTA UNIT 2; ENCINITAS CREEK MASTER DRAINAGE PLAN; 1988-07-28CT 88-03; Arroyo La Costa Unit 2; Hydrology Study; 1992-07-30CT 88-03; ARROYO LA COSTA UNIT 2; SUPPLEMENTAL SOIL AND GEOLOGIC INVESTIGATION; 1989-11-01CT 88-03; ARROYO LA COSTA UNIT 2; SUPPLEMENTAL SOIL AND GEOLOGIC INVESTIGATION; 1991-10-01CT 88-03; ARROYO LA COSTA UNIT 2; SUPPLEMENTAL SOIL AND GEOLOGIC INVESTIGATION; 1991-10-01 (2)CT 88-03; ARROYO LA COSTA VILLAGE 0; Substantial ConformanceCT 88-03; ARROYO LA COSTA VILLAGE B; Substantial ConformanceCT 88-03; ARROYO LA COSTA VILLAGE C; Substantial ConformanceCT 88-03; ARROYO LA COSTA VILLAGE E; Substantial ConformanceCT 88-03; ARROYO LA COSTA VILLAGE L; Substantial ConformanceCT 88-03; ARROYO LA COSTA VILLAGE M; Substantial ConformanceCT 88-03; ARROYO LA COSTA VILLAGE N; Substantial ConformanceCT 88-03; Arroyo La Costa; Discretionary Approvals; 1990-05-16CT 88-03; ARROYO LA COSTA; FINAL REPORT OF TESTING AND OBSERVATION SERVICES DURING CONTRUCTION OF SITE IMPROVEMENTS; 2002-03-19CT 88-03; ARROYO LA COSTA; NoticesCT 88-03; ARROYO LA COSTA; PAD ELEVATION VERIFICATION; 1999-11-11CT 88-03; ARROYO LA COSTA; PAVEMENT SECTIONS; 1999-03-09CT 88-03; ARROYO LA COSTA; PAVEMENT SECTIONS; 1999-03-23CT 88-03; ARROYO LA COSTA; Planning CommissionCT 88-03; ARROYO LA COSTA; Planning Commission (2)CT 88-03; ARROYO LA COSTA; PRELIMINARY FOUNDATION DESIGN; 1999-01-07CT 88-03; ARROYO LA COSTA; PRELIMINARY FOUNDATION DESIGN; 1999-01-07 (2)CT 88-03; ARROYO LA COSTA; Tentative Map (CT)CT 88-03; ARROYO LA COSTA; Tentative Map (CT) (2)CT 88-03; ARROYO LA COSTA; Tentative Map (CT) (3)CT 88-03; ARROYO LA COSTA; UPDATE REPORT - FOUNDATION DESIGN; 1999-09-16CT 88-03; ARROYO LA COSTA; VERIFICATION OF ROUGH GRADING; 1999-03-19CT 88-03; Calle Barcelona Station 9+70 thru 78+00; Final Report of Testing and Observation Services; 1999-03-01CT 88-03; Calle Barcelona; Storm Drain Report; 1991-12-03CT 88-03; Carlsbad Municipal Water District; 1999-0737834; Notice of CompletionCT 88-03; City of Carlsbad; 1999-0737833; Notice of CompletionCT 88-03; Encinitas Creek Master Drainage Plan Zn 11,12,23; Encinitas Creek Master Drainage Plan Zn 11,12,23; 1988-07-28CT 88-03; Encinitas Creek Watershed; Hydrology Report; 1988-08-19CT 88-03; Encinitas Creek; Drainage Study; 1990-09-01CT 88-03; Encinitas Creek; Drainage Study; 1991-05-01CT 88-03; Encinitas Creek; Master Drainage Plan; 1988-06-01CT 88-03; Fieldstone/La Costa Associates LP; 2003-0210189; Public Facilities Fee Agreement/ReleaseCT 88-03; Fieldstone/La Costa Associates; 1993-0599440; Public Facilities Fee Agreement/ReleaseCT 88-03; Fieldstone/La costa Associates; 2005-0381987; Public Facilities Fee Agreement/ReleaseCT 88-03; La Costa Ranch SW I & II Vol I of II; Soils Report; 1989-11-28CT 88-03; La Costa Ranch SW I & II Vol II of II; Soils Report; 1989-11-28CT 88-03; La Costa Southwest Detention Basin; La Costa Southwest Detention Basin; 1989-10-01CT 88-03; LA COSTA SOUTHWEST; Substantial ConformanceCT 88-03; LA COSTA SOUTHWEST; Tentative Map ExhibitCT 88-03; Real Estate Collateral Management Company; 1998-0152405; Future Improvement Agreement/ReleaseCT 88-03; Real Estate Collateral Management Company; 1998-0152406; Petition & WaiverCT 88-03; Real Estate Collateral Management Company; 1998-0152407; OtherCT 88-03; Real Estate Collateral Management Company; 1998-0152412; OtherCT 88-03; Real Estate Collateral Management Company; 1998-0152414; Affordable Housing Agreement/ReleaseCT 88-03; Real Estate Collateral Management Company; 2014-0145628; Pay Fair Share Refund Rancho Santa Fe Rd AgreementDWG 322-1; CT 88-03; ARROYO LA COSTA UNIT 1; 01-11DWG 322-1C; CT 88-03; ARROYO LA COSTA UNIT 1 VILLAGE I; 01-14DWG 322-1L; CT 88-03; ARROYO LA COSTA VILLAGE I; 01-65DWG 323-8; CT 88-03; ARROYO LA COSTA CALLE BARCELONA; 01-35DWG 323-8B; CT 88-03; ARROYO LA COSTA CALLE BARCELONA OVERCROSSING; 01-16DWG 323-8L; CT 88-03; ARROYO LA COSTA CALLE BARCELONA; 01-94DWG 325-1; CT 88-03; ARROYO LA COSTA UNIT 2; 01-16DWG 325-1B; CT 88-03; ARROYO LA COSTA PHASE 2; 01-07DWG 325-1C; CT 88-03; ARROYO LA COSTA UNIT 2 VILLAGE G; 01-07DWG 325-1D; CT 88-03; ARROYO LA COSTA UNIT 2 VILLAGE P; 01-08DWG 325-1E; CT 88-03; ARROYO LA COSTA UNIT 2 VILLAGE Q; 01-07DWG 325-1F; CT 88-03; ARROYO LA COSTA UNIT 2; 01-10DWG 325-1L; CT 88-03; ARROYO LA COSTA UNIT 2; 01-135DWG 329-3; CT 88-03; ARROYO LA COSTA UNIT 3; 01-31DWG 329-3B; CT 88-03; ARROYO LA COSTA UNIT 3 VILLAGE B; 01-09DWG 329-3C; CT 88-03; ARROYO LA COSTA UNIT 3 VILLAGE C; 01-06DWG 329-3D; CT 88-03; ARROYO LA COSTA UNIT 3 VILLAGE D; 01-08DWG 329-3E; CT 88-03; ARROYO LA COSTA UNIT 3 VILLAGE E; 01-08DWG 329-3F; CT 88-03; ARROYO LA COSTA UNIT 3 VILLAGE F; 01-05DWG 329-3G; CT 88-03; ARROYO LA COSTA UNIT 3 VILLAGE K; 01-07DWG 329-3H; CT 88-03; ARROYO LA COSTA UNIT 3 VILLAGE L; 01-05DWG 329-3J; CT 88-03; ARROYO LA COSTA UNIT 3 VILLAGE N; 01-08DWG 329-3K; CT 88-03; ARROYO LA COSTA UNIT 3 VILLAGE O; 01-06DWG 329-3L; CT 88-03; ARROYO LA COSTA UNIT 3; 01-97DWG 329-3N; CT 88-03; ARROYO LA COSTA UNIT 3 VILLAGE M; 01-07DWG 361-9M; CT 88-03; LA COSTA VALLEY PRESCHOOL; 01-04Villages of La Costa Sourthwest LLC; 1998-03-06;