Loading...
HomeSearchMy WebLinkAbout; 6.16 Acres NW Quad of Tamarack Ave & Cay Dr; 6.16 Acres NW Quad of Tamarack Ave & Cay Dr; 1999-08-31; Carlsbad Golf Course Market Overview Economic Proj; Market Overview and Economic Projections Golf Course; 1994-08-01; Carlsbad Muni Golf Course Market & ProForma Update; Carlsbad Municipal Golf Course Market & Fin Pro-Forma; 2002-12-28; Carlsbad Municipal Golf Course Economic Evaluation; Carlsbad Municipal Golf Course Economic Evaluation; 1995-04-01; City of Carlsbad Real Estate Strategic Plan October 2017; Real Estate Strategic Plan; 2017-10-173001; LAGUNA DRIVE; DOWNTOWN PEDESTRAIN CIRCULATION STUDY; 1984-02-013079; POINSETTIA LN BRIDGE CONSTRUCTION; CERTIFICATIONS; 1984-08-143079; POINSETTIA LN BRIDGE CONSTRUCTION; CONCRETE CYLINDER DATA; 1985-02-143079; POINSETTIA LN BRIDGE CONSTRUCTION; CONCRETE PIPE CERTIFICATION; 1984-08-293079; POINSETTIA LN BRIDGE CONSTRUCTION; CONTRACT PLAN ERRORS; 1984-09-243079; POINSETTIA LN BRIDGE CONSTRUCTION; CURB GRADES AND SURVEY STAKES; 1985-06-033079; POINSETTIA LN BRIDGE CONSTRUCTION; DENSITY TEST DATA SHEETS;3079; POINSETTIA LN BRIDGE CONSTRUCTION; EROSION CONTROL; 1985-08-303079; POINSETTIA LN BRIDGE CONSTRUCTION; FOUNDATION INVESTIGATION; 1983-04-153079; POINSETTIA LN BRIDGE CONSTRUCTION; LAB RESULTS;3079; POINSETTIA LN BRIDGE CONSTRUCTION; MATERIAL TEST REPORTS; 1984-08-213079; POINSETTIA LN BRIDGE CONSTRUCTION; RECOMMENDED PAVEMENT SECTIONS; 1985-01-233079; POINSETTIA LN BRIDGE CONSTRUCTION; SHOP DRAWINGS;3079; POINSETTIA LN BRIDGE CONSTRUCTION; STRUCTURAL CALCULATIONS & SURVEYING;3079; POINSETTIA LN BRIDGE CONSTRUCTION; SUBMITTALS;3085; CENTRAL BUSINESS STORM DRAIN; SERVICE AREA HYDROLOGY & HYDRAULICS DOWNSTREAM; 1985-08-073098; CARLSBAD BOULEVARD BRIDGE; ENVIRONMENTAL ASSESSMENT; 1982-04-063098; CARLSBAD BOULEVARD BRIDGE; PRELIMINARY GEOTECHNICAL INVESTIGATION; 1981-07-313151; Palomar Airport Road Widening; Geotechnical Consulting Palomar Airport Road; 1987-04-223151; Palomar Airport Road Widening; Supplementary Geotechnical Consulting Palomar Airport Road; 1987-05-223151; PALOMAR AIRPORT ROAD; BIOLOGICAL EVALUATION; 1982-03-303151; PALOMAR AIRPORT ROAD; COMPRESSION TEST RESULTS OF CONCRETE CORES; 1989-09-293151; PALOMAR AIRPORT ROAD; FINAL ENGINEER'S REPORT; 1988-07-013151; PALOMAR AIRPORT ROAD; MODIFIED INVESTIAGATION REPORT; 1986-05-063151; Palomar Airport Road; Palomar Airport Road; 1987-03-033151; Palomar Airport Road; Palomar Airport Road; 1987-05-223151; PALOMAR AIRPORT ROAD; PAVEMENT DISTRESS EVALUATION; 1989-05-103151; PALOMAR AIRPORT ROAD; SLOPE STABILTY ANALYSIS; 1988-08-283156; JEFFERSON STREET BIKE PATH; GEOTECHNICAL INVESTIGATION; 1994-09-263156; JEFFERSON STREET BIKE PATH; IN PLACE DENSITY TESTING; 1995-05-223156; JEFFERSON STREET BIKE PATH; MULTIPLE LAB RESULTS 1995; 1995-05-173156; JEFFERSON STREET BIKE PATH; MULTIPLE MITIGATION MONITORING & REPORTING PROGRAMS 1992- 1993; 1993-08-013156; JEFFERSON STREET BIKE PATH; SOIL TEST RESULTS; 1995-05-033166; PALOMAR AIRPORT RD; ASPHALTIC CONCRETE MIX DESIGN REVIEW; 1993-06-223166; PALOMAR AIRPORT RD; COMPACTION TEST;3166; PALOMAR AIRPORT RD; GEOTECHNICAL REPORT; 1990-09-273166; PALOMAR AIRPORT RD; INDUSTRIAL ASPHALT; 1994-05-113166; PALOMAR AIRPORT RD; PHYSICAL PROPERTIES OF AGGREGATES; 1994-06-233166; PALOMAR AIRPORT RD; PHYSICAL PROPERTIES OF ASPHALTIC CONCRETE; 1994-04-083166; PALOMAR AIRPORT RD; REVISED GEOTECHNICAL REPORT; 1991-01-253166; PALOMAR AIRPORT RD; R-VALUE REPORT; 1992-07-303166; PALOMAR AIRPORT RD; TESTING OF COMPACTED FILL; 1993-08-173166; PALOMAR AIRPORT ROAD; AS-BUILT GRADING AREA 1; 1993-12-013166; PALOMAR AIRPORT ROAD; CALIFORNIA GNATCATCHER HOME RANGE MAPPING; 1993-06-073166; PALOMAR AIRPORT ROAD; DRAINAGE ANALYSIS; 1990-08-213166; PALOMAR AIRPORT ROAD; DRAINAGE STUDY; 1991-02-013166; PALOMAR AIRPORT ROAD; EARTHWORK ANALYSIS; 1994-02-233166; PALOMAR AIRPORT ROAD; HYDROLOGY REPORT; 1991-10-183166; PALOMAR AIRPORT ROAD; HYDROLOGY STUDY; 1990-08-213166; PALOMAR AIRPORT ROAD; INTERSECTION STUDY; 1990-09-133166; PALOMAR AIRPORT ROAD; PHASE 1 CONSTRAINTS ANALYSIS; 1990-05-173166; PALOMAR AIRPORT ROAD; PRELIMINARY DRAINAGE STUDY; 1990-09-253166; PALOMAR AIRPORT ROAD; RESULTS OF PHASE 2 ARCHAEOLOGICAL SITE EVALUATION AND IMPACT ANALYSIS; 1991-05-243166; PALOMAR AIRPORT ROAD; REVISED GEOTECHNICAL REPORT; 1991-01-253166; PALOMAR AIRPORT ROAD; UNCLASSIFIED EXCAVATION QUANTITIES; 1994-01-063172; Carlsbad Library Parking Lot; Carlsbad Library Parking Lot; 1986-03-243172; Carlsbad Library Parking Lot; Carlsbad Library Parking Lot; 1986-03-24 (2)3184; CANNON ROAD WEST- BRIDGE OVER MACARIO CANYON; FINAL AS GRADED REPORT OF ROUGH GRADING; 1998-02-233184; CANNON ROAD WEST; 5-YEAR BROWN-HEADED COWBIRD TRAPPING PROGRAM; 2002-11-013184; CANNON ROAD WEST; ADDENDUM TO CONCEPTUAL MITIGATION PLAN; 1998-02-203184; CANNON ROAD WEST; ADDENDUM TO FINAL REPORT OF FINE AND POST-GRADING; 1999-08-113184; CANNON ROAD WEST; ANNUAL REPORTS YEARS 1-5 WETLAND MITIGATION AREAS; 2003-09-013184; CANNON ROAD WEST; BIOLOGICAL RESOURCES REPORT AND IMPACT ASSESSMENT; 1997-06-253184; CANNON ROAD WEST; BIRD MONITORING MACARIO CANYON; 2000-09-203184; CANNON ROAD WEST; BRIDGE CONSTRUCTION MONITORING RESULTS; 1999-06-023184; CANNON ROAD WEST; COMPRESSIVE STRENGTH TEST RESULTS; 1999-05-253184; CANNON ROAD WEST; CONCEPTUAL WETLAND MITIGATION PLAN FOR TEMPORARY WETLAND IMPACTS; 2000-07-013184; CANNON ROAD WEST; CONCEPTUAL WETLANDS MITIGATION PLAN; 1997-01-013184; CANNON ROAD WEST; CONCEPTUAL WETLANDS MITIGATION PLAN; 1997-01-01 (2)3184; CANNON ROAD WEST; ENVIRONMENTAL REPORTS; 1997-08-183184; CANNON ROAD WEST; EXECUTIVE SUMMARY; 1989-04-013184; CANNON ROAD WEST; FALSEWORK REMOVAL COMPLIANCE STATEMENT; 1999-07-013184; CANNON ROAD WEST; FINAL BIOLOGICAL CONSTRUCTION MONITORING REPORT; 2003-06-163184; CANNON ROAD WEST; FINAL PALEONTOLOGICAL MITIGATION REPORT; 1998-08-013184; CANNON ROAD WEST; FINAL REPORT CANNON ROAD EXTENSION PROJECT WETLAND MITIGATION; 2006-08-013184; CANNON ROAD WEST; FINAL REPORT OF FINE AND POST-GRADING; 1999-07-223184; CANNON ROAD WEST; FORCE MAIN ALTERNATIVE ANALYSIS AND PRESENTATION OF GRAPHICS FINAL REPORT; 1989-04-143184; CANNON ROAD WEST; GEOTECHNICAL INVESTIGATION; 1997-01-233184; CANNON ROAD WEST; HYDRAULIC REPORT; 1998-02-013184; CANNON ROAD WEST; INITIAL NOISE STUDY; 1999-03-163184; CANNON ROAD WEST; INVESTIGATION REPORT; 1985-04-013184; CANNON ROAD WEST; LEAST BELL'S VIREO AND WILLOW FLYCATCHER MONITORING REPORT; 2002-11-083184; CANNON ROAD WEST; LEAST BELL'S VIREO SURVEYS OF CANNON ROAD REACH 1; 1990-10-233184; CANNON ROAD WEST; LIGHT-FOOTED CLAPPER RAIL ISSUES; 1999-09-203184; CANNON ROAD WEST; MILL TEST REPORTS 1998-1999; 1999-05-113184; CANNON ROAD WEST; MITIGATION MONITORING RESULTS, WEEKS 20 & 21; 1999-08-273184; CANNON ROAD WEST; MITIGATION MONITORING RESULTS; 1999-09-033184; CANNON ROAD WEST; MITIGATION MONITORING RESULTS; 2000-06-013184; CANNON ROAD WEST; MITIGATION PROJECT PROGRESS REPORT; 2001-12-223184; CANNON ROAD WEST; MONTHLY BIOLOGICAL CONSTRUCTION MONITORING REPORT; 2000-11-073184; CANNON ROAD WEST; MONTHLY BIOLOGICAL MONITORING REPORTS, MAY & JUNE; 1999-09-203184; CANNON ROAD WEST; PILE CERTS/ CONCRETE TEST REPORTS; 1999-10-023184; CANNON ROAD WEST; PILE DRIVING DATA; 1999-01-253184; CANNON ROAD WEST; PILE INSTALLATION MONITORING AGUA HEDIONDA CREEK BRIDGE; 2000-06-303184; CANNON ROAD WEST; PILE LAYOUT SHEETS 1998; 1998-12-303184; CANNON ROAD WEST; PRE-CONSTRUCTION AND PRE-CLEANING SURVEY FOR NESTING BIRDS; 1998-03-233184; CANNON ROAD WEST; PRELIMINARY REPORT AND SPREAD; 1987-06-093184; CANNON ROAD WEST; RESULTS OF 1993 CALIFORNIA GNATCATCHER SURVEYS; 1993-09-203184; CANNON ROAD WEST; RESULTS OF 1993 LEAST BELL'S VIREO SURVEYS; 1993-09-223184; CANNON ROAD WEST; RESULTS OF INSTRUMENTATION MONITORING; 1999-09-303184; CANNON ROAD WEST; SEWER SURVEYS; 2000-01-123184; CANNON ROAD WEST; SUMMARY REPORT OF MONITORING SURVEYS BIRDS; 1999-10-183184; CANNON ROAD WEST; SURVEY OF VEGETATION; 1995-08-163184; CANNON ROAD WEST; TEMPORARY WETLAND IMPACTS; 2006-04-253184; CANNON ROAD WEST; WETLAND MITIGATION AREA A NORTH AND SOUTH BIOLOGICAL CHARACTERISTICS; 2004-05-213187; KELLY DRIVE AT EL CAMINO REAL; MATERIAL LAB TEST REPORTS; 1986-02-273188; COLLEGE BLVD EXTENSTION; AGGREGATE BASE; 1987-07-023188; COLLEGE BLVD EXTENSTION; BASE THICKNESS CORRECTIONS; 1987-04-283188; COLLEGE BLVD EXTENSTION; DAILY RESULTS - IN PLACE DENSITY TESTS;3188; COLLEGE BLVD EXTENSTION; DENSITY FIELD REVIEW; 1987-05-073188; COLLEGE BLVD EXTENSTION; EXPANSIVE SUBGRADE SOIL; 1988-01-213188; COLLEGE BLVD EXTENSTION; LABORATORY REPORT; 1988-02-103188; COLLEGE BLVD EXTENSTION; LABORATORY RESULTS; 1987-05-283188; COLLEGE BLVD EXTENSTION; MATERIAL TEST RESULTS; 1987-12-073188; COLLEGE BLVD EXTENSTION; NUCLEAR DENSITY FIELD FORM;3188; COLLEGE BLVD EXTENSTION; PHYSICAL PROPERTIES OF ASPHALTIC CONCRETE; 1987-12-153188; COLLEGE BLVD EXTENSTION; PHYSICAL PROPERTIES OF SOILS & AGGREGATES; 1987-12-073188; COLLEGE BLVD EXTENSTION; REPORT ON AGGREGATE TESTS; 1987-07-233188; COLLEGE BLVD EXTENSTION; RESULTS OF COMPATION TESTS; 1987-03-313188; COLLEGE BLVD EXTENSTION; R-VALUE TEST RESULTS; 1987-04-093188; COLLEGE BLVD EXTENSTION; R-VALUE TEST RESULTS/RECOMMENDED STRUCTURAL SECTIONS; 1987-03-113188; COLLEGE BLVD EXTENSTION; SCHMIDT HAMMER TESTS ON OUTLET; 1987-01-263188; COLLEGE BLVD EXTENSTION; VISUAL INSPECTION AND CORE TEST RESULTS; 1987-04-023188; College Boulevard Extension; College Boulevard Extension Geotechnical Investigation; 1983-11-113188; College Boulevard Extension; College Boulevard Extention Geotechnical Investigation; 1988-05-183188; College Boulevard Extension; Confirmation Proposal for Geotechnical Services; 1988-05-023190; Rancho Santa Fe North Phase 2; Rancho Santa Fe North Phase 2; 2006-09-123190; Rancho Santa Fe North; Rancho Santa Fe North; 2004-06-023190; RANCHO SANTA FE RD ALIGNMENT; 2009/ 2010 STORM DAMAGE ASSESSMENT AND REPAIR RECOMMENDATIONS; 2010-02-163190; RANCHO SANTA FE RD ALIGNMENT; FINAL ENVIRONMENTAL IMPACT REPORT; 1992-01-013190; Rancho Santa Fe Rd Alignment; Rancho Santa Fe Rd Alignment - Earthwork; 1990-06-013190; Rancho Santa Fe Rd Alignment; Rancho Santa Fe Rd Alignment - Soils & Geologic; 1989-06-013190; Rancho Santa Fe Rd La Costa Meadows Dr; Rancho Santa Fe Rd La Costa Meadows Dr; 2003-04-203190; RANCHO SANTA FE RD; AS GRADED REPORT LA COSTA TOWN CENTER, RSF RD, LA COSTA AVE; 2004-04-203190; RANCHO SANTA FE RD; FINAL REPORT OF TESTING & OBSERVATIONS DURING SITE GRADING; 2003-03-113190; RANCHO SANTA FE RD; IN-PLACE DENSITY TESTS LA COSTA TOWN CENTER; 2004-01-163190; RANCHO SANTA FE RD; PRELIMINARY FINDINGS AGUA DULCE SLOPE FAILURE & BORROW PIT EVAL; 2005-07-203190; Rancho Santa Fe Road Alignment Soils; Rancho Santa Fe Road Alignment Soils; 1990-07-013190; Rancho Santa Fe Road La Costa Meadows; Rancho Santa Fe Road La Costa Meadows; 2002-09-013190; Rancho Santa Fe Road Widening; Rancho Santa Fe Road Widening; 1998-08-313190; RANCHO SANTA FE ROAD; AS-GRADED COMPACTION REPORT; 2006-10-103190; RANCHO SANTA FE ROAD; CERTIFICATION OF ROUGH GRADE; 2003-03-113190; RANCHO SANTA FE ROAD; COMPRESSION TESTING OF DRILLED CONCRETE CORES; 2003-07-013190; RANCHO SANTA FE ROAD; FINAL REPORT OF TESTING AND OBSERVATION SERVICES PERFORMED DURING IMPROVEMENTS; 2003-03-253190; RANCHO SANTA FE ROAD; FINAL REPORT OF TESTING AND OBSERVATION SERVICES PERFORMED DURING SITE GRADING; 2003-03-113190; RANCHO SANTA FE ROAD; GROUNDWATER MEASUREMENTS; 2007-05-143190; RANCHO SANTA FE ROAD; PHYSICAL PROPERTIES OF ASPHALTIC CONCRETE; 2004-03-253190; RANCHO SANTA FE ROAD; PHYSICAL PROPERTIES OF ASPHALTIC CONCRETE; 2004-05-253190; RANCHO SANTA FE ROAD; REPORT OF COMPACTION TEST DATA; 2004-10-123190; RANCHO SANTA FE ROAD; REPORT OF COMPRESSION TEST; 2003-11-113190; RANCHO SANTA FE ROAD; SUPPLEMENTAL GEOTECHNICAL TESTING; 2004-06-023190; RANCHO SANTA FE ROAD; SUPPLEMENTAL SOIL AND GEOLOGIC INVESTIGATION; 1990-01-083190; Rancho Santa Fe Road-Stage 2; Rancho Santa Fe Road-Stage 2; 1999-04-303190; Rancho Sante Fe Road Bridge; Rancho Sante Fe Road Bridge; 2000-07-013190; Rancho Sante Fe Road Realignment; Rancho Sante Fe Road Realignment; 2000-07-013190; Rancho Sante Fe Road Wetland Mitigation; Rancho Sante Fe Road Wetland Mitigation; 2005-04-013191; Stagecoach Park Storm Drain System; Stagecoach Park Storm Drain System; 1985-08-213191; STAGECOACH PARK; GEOTECHNICAL ENGINEERING EVALUATION REPORT; 2004-09-303191; Stagecoach Park; Stagecoach Park Grading Operations; 1985-12-053202; Tamarack Avenue btwn Carlsbad Blvd & Jefferson; Tamarack Avenue btwn Carlsbad Blvd & Jefferson; 1991-03-053203; TAM- CSBD TO JEFF- REDESIGN; IMPROVEMENT STUDY; 1990-01-013203; TAM- CSBD TO JEFF- REDESIGN; SOIL ANALYSIS FORMS;3203; TAM- CSBD TO JEFF- REDESIGN; SUBMITTALS;3203; TAMARACK AVE WIDENING CARLSBAD BLVD . TO JEFFERSON ST; CORNER RECORD; 1994-01-103203; TAMARACK AVE WIDENING CARLSBAD BLVD . TO JEFFERSON ST; TEST RESULTS;3205; CARLSBAD BLVD WIDENING PHASE 3; COSTAL STORM DRAIN STUDY; 1984-04-013205; CARLSBAD BLVD WIDENING PHASE 3; FINAL HYDRAULIC AND HYDROLOGY;3205; CARLSBAD BLVD WIDENING PHASE 3; MEMORANDUMS;3208; LEUCADIA 24' FORCE MAIN ON LA COSTA; TRANSMITTAL OF COPY OF THE LETTER REPORT ON VEGETATION; 1986-06-193-21; CHESTNUT HEIGHTS; SOIL COMPACTION TEST; 1964-08-253215; LA COSTA AVE WIDENING; COMPACTION CURVES 1998; 1998-12-303215; LA COSTA AVE WIDENING; CONCRETE TEST REPORTS 1998 & 1999; 1999-06-033215; LA COSTA AVE WIDENING; GEOTECHNICAL SERVICES PERTAINING TO WIDENING OF LA COSTA AVE; 1986-07-183215; LA COSTA AVE WIDENING; PHYSICAL PROPERTIES OF AGGREGATES 1998; 1998-12-223215; LA COSTA AVE WIDENING; PHYSICAL PROPERTIES OF ASPHALT CONCRETE 1998; 1998-12-063215; LA COSTA AVE WIDENING; PHYSICAL PROPERTIES OF ASPHALT CONCRETE; 1999-01-123215; LA COSTA AVE WIDENING; REPORT OF FIELD DENSITY TESTS 1998 & 1999; 1999-06-043215; LA COSTA AVE WIDENING; SUBMITTALS;3215; LA COSTA AVE WIDENING; TEMPORARY SLOPES IN FORMATIONAL ROCKS; 1998-06-303216|AD 86-4; PARK DRIVE ASSESSMENT DISTRICT; ASPHALTIC CONCRETE CONFORMANCE TEST; 1986-12-083243; PALOMAR AIRPORT RD EAST OF EL CAMINO REAL; GEOTECHNICAL CONSULTING; 1987-06-043243; PALOMAR AIRPORT RD EAST OF EL CAMINO REAL; SUPPLEMENTARY GEOTECHNICAL CONSULTING SERVICES; 1987-05-2232441; CARLSBAD CITY LIBRARY; GRADING CERTIFICATION; 1998-03-133268; PALOMAR AIRPORT RD/ I-5; SUBMITTALS;3286; PALOMAR AIRPORT ROAD WIDENING; COMPACTION CURVES 1999; 1999-06-023286; PALOMAR AIRPORT ROAD WIDENING; CONCRETE TEST REPORTS 1999; 1999-07-223286; PALOMAR AIRPORT ROAD WIDENING; EARTHWORK VOLUMES; 1999-05-103286; PALOMAR AIRPORT ROAD WIDENING; FIELD DENSITY SUMMARIES 1999; 1999-09-113286; PALOMAR AIRPORT ROAD WIDENING; LIMITED GEOTECHNICAL INVESTIGATION; 1998-02-233286; PALOMAR AIRPORT ROAD WIDENING; PHYSICAL PROPERITES OF ASPHALT CONCRETE 1999; 1999-09-133286; PALOMAR AIRPORT ROAD WIDENING; PHYSICAL PROPERTIES OF AGGREGATES 1999; 1999-03-173286; PALOMAR AIRPORT ROAD WIDENING; REPORTS OF FIELD DENSITY TESTS 1999; 1999-07-253286; PALOMAR AIRPORT ROAD WIDENING; REPORTS OF R-VALUE 1999; 1999-04-083288; CARLSBAD VILLAGE DR STREETSCAPE; ANCHOR BOLT CERTIFICATION; 1989-11-203288; CARLSBAD VILLAGE DR STREETSCAPE; ASPHALTIC CONCRETE AND SOIL TEST RESULTS;3288; CARLSBAD VILLAGE DR STREETSCAPE; COMPACTION REPORTS;3288; CARLSBAD VILLAGE DR STREETSCAPE; COMPACTION TEST RESULTS; 1989-09-123288; CARLSBAD VILLAGE DR STREETSCAPE; COMPRESSION TEST REPORTS; 1989-08-103288; CARLSBAD VILLAGE DR STREETSCAPE; CUT SHEETS;3288; CARLSBAD VILLAGE DR STREETSCAPE; DRY DENSITY RECORDS;3288; CARLSBAD VILLAGE DR STREETSCAPE; MEDIAN REVISIONS PLAN, STORM DRAIN, CUT SHEETS; 1989-11-293288; CARLSBAD VILLAGE DR STREETSCAPE; R-VALUE TEST RESULTS;3288; CARLSBAD VILLAGE DR STREETSCAPE; SAND TEST RESULTS; 1989-05-033288; CARLSBAD VILLAGE DR STREETSCAPE; SUBMITTALS;3288; CARLSBAD VILLAGE DR STREETSCAPE; TEST REPORTS;3299; Home Plant Lift Station; Home Plant Pump Station Alternate Sloping Plan; 1991-11-113299; Home Plant Lift Station; Pump Station North of State St & Carlsbad Blvd; 1987-04-303299; Home Plant Lift Station; Pump Station North of State St & Carlsbad Blvd; 1987-10-263303; Agua Hedionda Sewage Pump Station; Agua Hediona Sewage Pump Station Soil Conditions; 1991-03-263303; Agua Hedionda Sewage Pump Station; Agua Hedionda Sewage Pump Station; 1991-07-103303; Agua Hedionda Sewage Pump Station; Agua Hedionda Sewage Pump Station; 1997-03-263303; Agua Hedionda Sewage Pump Station; Cannon Rd, Proposed Undercrossing Carlsbad Ranch; 1995-06-133303; Agua Hedionda Sewage Pump Station; Cannon Road - Golf Cart Undercrossing; 1995-04-263303; Agua Hedionda Sewage Pump Station; Squires Reservoir-Upper Chlorination Building; 1989-07-313305; ALGA ROAD STRIPING PLAN; CONCRETE TEST RESPORTS;3305; ALGA ROAD STRIPING PLAN; PHYSICAL PROPERTIES OF AGGREGATES;3305; ALGA ROAD STRIPPING PLAN; CONFORMANCE TESTING OF CLASS 2 BASE; 1990-07-123305; ALGA ROAD STRIPPING PLAN; REPORT OF COMPRESSION TESTS;3307; CARLSBAD BLVD SHORE PROTECTION; DESIGN MEMORADUMS; 1990-10-153307; CARLSBAD BLVD SHORE PROTECTION; DETAILED PROJECT REPORT; 1996-04-013307; CARLSBAD BLVD SHORE PROTECTION; ENGINEERS CERTIFICATION; 1992-01-063307; CARLSBAD BLVD SHORE PROTECTION; EROSION CONTROL RECONNAISSANCE STUDY; 1990-05-013307; CARLSBAD BLVD SHORE PROTECTION; FEASIBILITY STUDY; 1984-11-013307; CARLSBAD BLVD SHORE PROTECTION; FEASIBILITY STUDY; 1988-08-083307; CARLSBAD BLVD SHORE PROTECTION; GEOTECHNICAL INVESTIGATION;3307; CARLSBAD BLVD SHORE PROTECTION; GEOTECHNICAL PAVEMENT EVALUATION; 1991-03-053307; CARLSBAD BLVD SHORE PROTECTION; OPERATION AND MAINTENANCE MANUAL; 1997-08-013307; CARLSBAD BLVD SHORE PROTECTION; OPERATION AND MAINTENANCE MANUALS; 1997-07-073307; CARLSBAD BLVD SHORE PROTECTION; PRELIMINARY REPORT OF SUPPLEMENTAL DESIGN STUDIES; 1991-09-113307; CARLSBAD BLVD SHORE PROTECTION; SUBMITTALS;3307; CARLSBAD BLVD SHORE PROTECTION; SUBMITTALS; (2)3307; CARLSBAD BLVD SHORE PROTECTION; WALL HEIGHT LETTER; 1991-10-233308; Monroe St & Marron Rd; Monroe St & Marron Rd Geotechnical Investigation; 1989-02-233321; JAMES DRIVE STORM DRAIN; HYDROLOGY AND FACILITY HYDRAULICS REPORT; 1986-05-073325; EL CAMINO REAL IMPROVEMENTS; ASPHALT OVERLAY; 1989-02-243325; EL CAMINO REAL IMPROVEMENTS; CONFORMANCE TESTING OF ASPHALTIC CONCRETE; 1991-04-243325; EL CAMINO REAL IMPROVEMENTS; GRADING AND PAVEMENT SECTION RECOMMENDATIONS; 1989-01-263325; EL CAMINO REAL IMPROVEMENTS; R VALUE TESTING OF IMPORT MATERIAL; 1990-04-203325; EL CAMINO REAL IMPROVEMENTS; REPORT OF COMPRESSION TESTS; 1991-04-263325; EL CAMINO REAL IMPROVEMENTS; REPORT OF IN-PLACE DENSITY TESTS; 1991-09-243338; Agua Hedionda & Calavera Creek Dredging; 57.64 Acre Land N ECR & E Tamarack Ave; 2000-08-013338; Agua Hedionda & Calavera Creek Dredging; Cannon Road and El Camino Real Bridges; 2006-11-303338; Agua Hedionda & Calavera Creek Dredging; Robertson Ranch 197.75 Acre Land ECR&Tam; 2000-04-273338; AGUA HEDIONDA & CALAVERA CREEK DREDGING; SIEVE RESULTS FOR SEDIMENT SAMPLING; 2012-09-283338; AGUA HEDIONDA & CALAVERA CREEK DREDGING; VEGETATION MAINT YEAR 2 MONITORING REPORT; 2016-02-183338; AGUA HEDIONDA CREEK CHANNEL MAINTENANCE PROJECT; HYDROLOGY AND HYDRAULICS REPORT; 2019-01-213338B; AGUA HEDIONDA & CALAVERA CREEK DREDGING; BIOLOGICAL RESOURCES & TECHNICAL DATA; 2007-02-013338B; AGUA HEDIONDA & CALAVERA CREEK DREDGING; IMPACT ANALYSIS REPORT; 2008-11-013338B; AGUA HEDIONDA & CALAVERA CREEK DREDGING; LAND MANAGEMENT PLAN; 2007-03-023338B; AGUA HEDIONDA & CALAVERA CREEK DREDGING; SAMPLING & ANALYSIS PLAN; 2001-01-013365; CARLSBAD BL & CANNON RD; ALIGNMENT STUDY OVER PORTIONS OF CARLSBAD BL AND CANNON RD; 1993-02-223375; Maerkle Upper Chlorination Building Pump; Maerkle Upper Chlorination Building Pump; 1992-11-253391; CARLSBAD BLVD CANNON RD WIDENING; EVALUATION OF EXISTING CONDITIONS AND RECOMMENDATIONS FOR PROPOSED RETAINING WALL; 2000-03-233391; CARLSBAD BLVD CANNON RD WIDENING; STREET WIDENING FEASIBILITY STUDY; 1998-04-073391-2; SIDEWALK PROGRAM; REPORT OF IN-PLACE DENISTY TEST RESULTS; 1995-01-253391-2; SIDEWALK PROGRAM; SOIL ANALYSIS & RECOMMENDATION; 1994-12-153391-3; MAGNOLIA AV, VALLEY ST & PARK DR SIDEWALKS; SUBMITTALS;3391-3; MAGNOLIA AV, VALLEY ST & PARK DR SIDEWALKS; TEST RESULTS; 1997-01-073391-4; CHESTNUT & VALLEY SIDEWALK IMPROVEMENTS; COMPRESSION TEST REPORT; 1999-07-153391-4; CHESTNUT & VALLEY SIDEWALK IMPROVEMENTS; DAILY FIELD REPORT; 1999-06-153391-6; SIDEWALK PROGRAM; HYDROLOGY AND HYDRAULICS REPORT; 1998-05-283416; AVENIDA ENCINAS EXTENSION; BIOLOGICAL RESOURCES REPORT; 1993-10-013416; AVENIDA ENCINAS EXTENSION; CALCULATION OF EARTHWORK PAY QUANTITIES; 1994-11-073416; AVENIDA ENCINAS EXTENSION; HYDROLOGY & HYDRAULIC CALCULATIONS; 1994-04-223416; AVENIDA ENCINAS EXTENSION; IN PLACE DENSITY TESTING; 1995-03-133416; AVENIDA ENCINAS EXTENSION; PRELIMINARY & ADDENDUM GEOTECHNICAL INVESTIGATION; 1993-12-133416; AVENIDA ENCINAS EXTENSION; PRELIMINARY TEST RESULTS IMPORT FILL; 1994-08-023416; AVENIDA ENCINAS EXTENSION; SUBMITTALS;3416; AVENIDA ENCINAS EXTENSION; TEST RESULTS; 1994-11-153417; LA COSTA DOWNS; PRELIMINARY GEOTECHNICAL INVESTIGATION; 1993-08-033417; LA COSTA DOWNS; SUBMITTALS;3417; LA COSTA DOWNS; TEST RESULTS;3455; Coastal Rail Trail - Geotechnical Design Report; Coastal Rail Trail - Geotechnical Design Report; 2002-10-233455; COASTAL RAIL TRAIL; LABORATORY TEST REPORTS NO. 1- 5; 2005-07-223455; COASTAL RAIL TRAIL; NUCLEAR FIELD DENSITY TEST SHEET; 2005-10-263455; COASTAL RAIL TRAIL; PHYSICAL PROPERTIES OF ASPHALTIC CONCRETE 2005; 2005-08-153455; Palomar Airport Road Widening; Palomar Airport Road Widening; 1986-12-0134561-2; CARRILLO RANCH PHASE 2; ONSITE INSPECTION; 2003-01-0634561-2; CARRILLO RANCH PHASE 2; REPORT OF GROUNDWATER DISCHARGE TO SURFACE WATER; 2002-09-133466; OLIVEHAIN RD WIDENING AND REALIGNMENT; BIOTECHNICAL LETTER REPORTS; 1998-04-283466; OLIVEHAIN RD WIDENING AND REALIGNMENT; COLINA ROBLE PROJACE DESCRIPTION;3466; OLIVEHAIN RD WIDENING AND REALIGNMENT; CONCEPTUAL RIPARIAN MITIGATION DESIGN FOR HOME DEPOT; 1993-05-013466; OLIVEHAIN RD WIDENING AND REALIGNMENT; FIFTH ANNUAL MONITORING REPORT; 2000-08-013466; OLIVEHAIN RD WIDENING AND REALIGNMENT; FIFTH ANNUAL REPORT; 2003-01-013466; OLIVEHAIN RD WIDENING AND REALIGNMENT; FINAL ENVIRONMENTAL IMPACT REPORT; 1993-04-153466; OLIVEHAIN RD WIDENING AND REALIGNMENT; FINAL ENVIRONMENTAL IMPACT; 1992-01-013466; OLIVEHAIN RD WIDENING AND REALIGNMENT; FIRST ANNUAL REPORT; 1999-02-013466; OLIVEHAIN RD WIDENING AND REALIGNMENT; FLOOD CONTROL PROJECT WETLAND MITIGATION/REVEGETATION PLAN; 1995-11-013466; OLIVEHAIN RD WIDENING AND REALIGNMENT; FOURTH ANNUAL REPORT; 2002-09-013466; OLIVEHAIN RD WIDENING AND REALIGNMENT; SECOND ANNUAL REPORT; 2000-05-013466; OLIVEHAIN RD WIDENING AND REALIGNMENT; THIRD ANNUAL REPORT; 2001-02-013466; OLIVEHAIN RD WIDENING AND REALIGNMENT; WETLAND DELINEATION REPORT; 1997-05-013466; OLIVEHAIN RD WIDENING AND REALIGNMENT; YEAR SIX FINAL LETTER REPORT; 2004-01-123466; OLIVENHAIN RD WIDENING & REALIGNMENT; ASPHALT FIELD DENSITY SUMMARIES 1997 & 1998; 1998-01-223466; OLIVENHAIN RD WIDENING & REALIGNMENT; COMPACTION CURVES 1997 & 1998; 1998-03-103466; OLIVENHAIN RD WIDENING & REALIGNMENT; CONCRETE TEST REPORTS 1997; 1997-08-293466; OLIVENHAIN RD WIDENING & REALIGNMENT; DESIGN CALCULATIONS; 1995-12-013466; OLIVENHAIN RD WIDENING & REALIGNMENT; DRAINAGE STUDY FOR ENCINITAS CREEK; 1991-05-013466; OLIVENHAIN RD WIDENING & REALIGNMENT; HORTICULTURAL MONITORING REPORTS 2002- 2003; 2003-06-063466; OLIVENHAIN RD WIDENING & REALIGNMENT; INTERIM CONDITION DETENTION STUDY FOR BASIN "D" ENCINITAS CREEK; 1992-02-013466; OLIVENHAIN RD WIDENING & REALIGNMENT; PHYSICAL PROPERITES OF ASPHALT CONCRETE CORES; 1997-10-223466; OLIVENHAIN RD WIDENING & REALIGNMENT; PHYSICAL PROPERTIES OF AGGREGATES 1997; 1997-12-243466; OLIVENHAIN RD WIDENING & REALIGNMENT; PHYSICAL PROPERTIES OF ASPHALT CONCRETE 1997 & 1998; 1998-03-193466; OLIVENHAIN RD WIDENING & REALIGNMENT; REPORT OF FIELD DENSITY TESTS 1997 & 1998; 1998-01-213466; OLIVENHAIN RD WIDENING & REALIGNMENT; REPORT OF MOISTURE/ DENSITY; 1997-03-143466; OLIVENHAIN RD WIDENING & REALIGNMENT; RIPERIAN MITIGATION YEAR 6 FINAL REPORT; 2003-12-303466; OLIVENHAIN RD WIDENING & REALIGNMENT; ROUTE ADOPTION REPORT; 1990-08-163466; OLIVENHAIN RD WIDENING & REALIGNMENT; SLOPE STABILITY ANALYSIS; 1995-07-033466; OLIVENHAIN RD WIDENING & REALIGNMENT; SLOPE STABILITY ANALYSIS; 1995-07-103466; OLIVENHAIN RD WIDENING & REALIGNMENT; SOIL & GEOLOGIC INVESTIGATION; 1995-03-013466; OLIVENHAIN RD WIDENING & REALIGNMENT; STORM DRAIN REPORTS 1994- 1996; 1996-05-013466; OLIVENHAIN RD WIDENING & REALIGNMENT; SUPPLEMENTAL GEOTECHNICAL INVESTIGATION; 1996-07-013474; TRAFFIC SIGNAL - ALGA/BATIQUITOS; CONTRACTOR QC & FINAL TEST RECORD; 1996-01-303478; Park Drive Slope / Drainage Study; Geotechnical Report; 1998-05-043479; PALOMAR AIRPORT 12" WATER PIPELINE; AS-GRADED COMPACTION REPORT; 2004-09-163479; PALOMAR AIRPORT 12" WATER PIPELINE; LABORATORY TEST REPORT NO.1; 2004-08-163495; FOREST AV HDD GRAVITY SEWER PIPELINE; LABORATORY TEST REPORT NO. 1; 2005-09-193495; FOREST AV HDD GRAVITY SEWER PIPELINE; LABORATORY TEST REPORT NO. 2; 2005-11-023495; Forest Avenue Lift Station Conversion; Forest Avenue Lift Station Conversion; 2003-03-183505; STATE STREET STORM DRAIN CONNECTION CONST. PLANS; STAKE SHEET; 1999-07-083505; STATE STREET STORM DRAIN CONNECTION CONST. PLANS; SUBMITTALS;3505; STATE STREET STORM DRAIN CONNECTION CONST. PLANS; TEST RESULTS;3511; BEACH ACCESS STAIR RECONSTRUCTION; CONCRETE TEST REPORTS 1998; 1998-08-053523; PEDESTRIAN CURB RAMPS; CORNER RECORD;3523-5; PEDESTRIAN CURB RAMP IMPROVEMENTS; SUBMITTALS;3523-5; PEDESTRIAN CURB RAMP IMPROVEMENTS; TEST RESULTS;3527-O; 1997 PAVEMENT OVERLAY PROJECT; PHYSICAL PROPERTIES OF ASPHALT CONCRETE; 1997-11-033532; DAVIS AVE WATER LINE REPLACEMENT; FIELD COMPACTION AND CONSTRUCTION MONITORING REPORTS 2000; 2000-07-243551; POINSETTIA LANE OVERHEAD WIDENING; BRIDGE QUANTITY CALCULATIONS; 2001-11-203551; POINSETTIA LANE OVERHEAD WIDENING; BRIDGE QUANTITY CALCULATIONS; 2001-11-20 (2)3551; POINSETTIA LANE OVERHEAD WIDENING; COMPACTION TEST DATA (2001-2002);3551; POINSETTIA LANE OVERHEAD WIDENING; COMPACTION TEST DATA (2001-2002); (2)3551; POINSETTIA LANE OVERHEAD WIDENING; COMPLIANCE CERTIFICATIONS (2001-2002);3551; POINSETTIA LANE OVERHEAD WIDENING; COMPLIANCE CERTIFICATIONS (2001-2002); (2)3551; POINSETTIA LANE OVERHEAD WIDENING; COMPRESSION TEST REPORTS (2001-2002);3551; POINSETTIA LANE OVERHEAD WIDENING; CONCRETE MIX DESIGNS; 2002-07-193551; POINSETTIA LANE OVERHEAD WIDENING; CONCRETE MIX DESIGNS; 2002-07-19 (2)3551; POINSETTIA LANE OVERHEAD WIDENING; DESIGN CALCULATIONS;3551; POINSETTIA LANE OVERHEAD WIDENING; DESIGN CALCULATIONS; (2)3551; POINSETTIA LANE OVERHEAD WIDENING; IRRIGATION CONTROLLER OPERATING INSTRUCTIONS;3551; POINSETTIA LANE OVERHEAD WIDENING; IRRIGATION CONTROLLER OPERATING INSTRUCTIONS; (2)3551; POINSETTIA LANE OVERHEAD WIDENING; MILL TEST REPORTS (2001-2002);3551; POINSETTIA LANE OVERHEAD WIDENING; MITIGATED NEGATIVE DECLARATION; 1999-06-213551; POINSETTIA LANE OVERHEAD WIDENING; MITIGATED NEGATIVE DECLARATION; 1999-06-21 (2)3551; POINSETTIA LANE OVERHEAD WIDENING; PHYSICAL PROPERTIES OF ASPHALTIC CONCRETE; 2002-07-263551; POINSETTIA LANE OVERHEAD WIDENING; PHYSICAL PROPERTIES OF ASPHALTIC CONCRETE; 2002-07-26 (2)3551; POINSETTIA LANE OVERHEAD WIDENING; PRESTRESSED CONCRETE VOIDED DECK SLAB;3551; POINSETTIA LANE OVERHEAD WIDENING; PRESTRESSED CONCRETE VOIDED DECK SLAB; (2)3551; POINSETTIA LANE OVERHEAD WIDENING; SAND CONE DENSITY TESTS; 2002-03-253551; POINSETTIA LANE OVERHEAD WIDENING; SAND CONE DENSITY TESTS; 2002-03-25 (2)3551; POINSETTIA LANE OVERHEAD WIDENING; SOIL GRADATION TEST; 2002-08-073551; POINSETTIA LANE OVERHEAD WIDENING; SOIL GRADATION TEST; 2002-08-07 (2)3551; POINSETTIA LANE OVERHEAD WIDENING; SOIL SUBMITTAL;3551; POINSETTIA LANE OVERHEAD WIDENING; SOIL SUBMITTAL; (2)3551; POINSETTIA LANE OVERHEAD WIDENING; SPEED SURVEY; 1991-01-163551; POINSETTIA LANE OVERHEAD WIDENING; SPEED SURVEY; 1991-01-16 (2)3551; POINSETTIA LANE OVERHEAD WIDENING; STRUCTURAL FOUNDATION REPORT; 1999-05-253551; POINSETTIA LANE OVERHEAD WIDENING; STRUCTURAL FOUNDATION REPORT; 1999-05-25 (2)3551; POINSETTIA LANE OVERHEAD WIDENING; STRUCTURAL REVIEW; 2001-05-073551; POINSETTIA LANE OVERHEAD WIDENING; STRUCTURAL REVIEW; 2001-05-07 (2)3551; POINSETTIA LANE OVERHEAD WIDENING; SUBMITTALS & SHOP DRAWINGS (2001-2002);3551; POINSETTIA LANE OVERHEAD WIDENING; SUBMITTALS & SHOP DRAWINGS (2001-2002); (2)3551; POINSETTIA LANE OVERHEAD WIDENING; SUBMITTALS (1992-1994);3551; POINSETTIA LANE OVERHEAD WIDENING; SURVEY CUT SHEETS (2001-2002);3551; POINSETTIA LANE OVERHEAD WIDENING; WATER LAB REPORT; 2002-07-033551; POINSETTIA LANE OVERHEAD WIDENING; WATER LAB REPORT; 2002-07-03 (2)3551; POINSETTIA LANE OVERHEAD WIDENING; WATER LAB REPORTS (2002);3551; POINSETTIA LANE OVERHEAD WIDENING; WATER LAB REPORTS (2002); (2)3557; Calavera Hills Phase II Bridge Retaining Walls; Calavera Hills Phase II Bridge Retaining Walls; 2001-03-053557; Calavera Hills Phase II Bridge Retaining Walls; Calavera Hills Phase II Bridge Retaining Walls; 2008-02-063557; Calavera Hills Phase II Bridge Retaining Walls; Calavera Hills Phase II Bridge Retaining Walls; 2008-07-023557; Carlsbad Blvd Bridge Retaining Wall; Carlsbad Blvd Bridge Retaining Wall; 2008-02-013557; Carlsbad Blvd Bridge Retrofit; Carlsbad Blvd Bridge Retrofit; 2003-12-013557; Carlsbad Blvd Bridge Retrofit; Carlsbad Blvd Bridge Retrofit; 2003-12-01 (2)3557; Carlsbad Blvd Bridge Retrofit; Carlsbad Blvd Bridge Retrofit; 2006-04-253557; Carlsbad Blvd Bridge Retrofit; Carlsbad Blvd Bridge Retrofit; 2006-11-013557; Carlsbad Blvd Bridge Retrofit; Carlsbad Blvd Bridge Retrofit; 2008-07-033557; Carlsbad Blvd Overhead Bridge Retrofit; Carlsbad Blvd Overhead Bridge Retrofit; 1997-01-243557; Carlsbad Blvd Overhead Bridge Retrofit; Carlsbad Blvd Overhead Bridge Retrofit; 1997-06-113557; Carlsbad Blvd Phase II Bridge; Carlsbad Blvd Phase II Bridge; 2002-06-213557; Carlsbad Blvd Railroad Crossing Boulevard; Carlsbad Blvd Railroad Crossing Boulevard; 2007-12-043583A; CANNON ROAD LIFT STATION; FINAL REPORT ON GEOTECHNICAL RECOMMENDATIONS; 2002-07-303590; ARENAL ROAD RECONSTRUCTION; GEOTECHNICAL FIELD SUMMARY REPORT; 1999-10-273590; ARENAL ROAD RECONSTRUCTION; STAKE SHEET;3590; ARENAL ROAD RECONSTRUCTION; SUBMITTALS;3591; CARLSBAD BL BIKE LANE PROJECT; CUT SHEETS; 1999-07-133591; CARLSBAD BL BIKE LANE PROJECT; SUBMITTALS;3591; CARLSBAD BL BIKE LANE PROJECT; TEST RESULTS;3593; 3593; Soils Report; 1998-07-013593; Faraday Avenue - Macario Canyon Ext.; Settlement Monitoring; 2000-03-213593; Faraday Avenue Extension Station; Soils Report; 1999-11-053593; Faraday Avenue Extension, Alternate 8 Split; Geotechnical Investigation Faraday Avenue Extension; 1998-07-013593; FARADAY AVENUE EXTENSION; COASTAL SAGE SCRUB MITIGATION ANNUAL MONITORING REPORTS 2002- 2004; 2004-03-013593; FARADAY AVENUE EXTENSION; COMPACTION TEST SUMMARIES;3593; FARADAY AVENUE EXTENSION; COMPRESSION TEST DATA SHEET; 1999-10-273593; FARADAY AVENUE EXTENSION; COMPRESSION TEST REPORTS 1999; 1999-12-153593; FARADAY AVENUE EXTENSION; EARTHWORK VOLUMES; 1999-08-273593; Faraday Avenue Extension; Engineering Geology Report; 1999-11-053593; Faraday Avenue Extension; Geotechnical Reconnaissance; 1998-05-283593; FARADAY AVENUE EXTENSION; GNATCATCHER SURVEY; 2006-04-283593; FARADAY AVENUE EXTENSION; LABORATORY TESTING PROGRAM; 1999-09-213593; FARADAY AVENUE EXTENSION; REPORTS OF R VALUE 1999; 1999-09-293593; Faraday Avenue Grading and Drainage Improvements; As-Graded Report; 1999-12-093593; Faraday Avenue Improvement; In-Place Density Test Results; 2001-01-043593; Geotech Reconnaissance Faraday Avenue Extension; Geotechnical Reconnaissance; 1998-05-283593-2; FARADAY AVENUE EXTENSION; AS-GRADED REPORT; 1999-12-093593-2; FARADAY AVENUE EXTENSION; CALIFORNIA GNATCATCHER SURVEYS; 2000-02-083593-2; FARADAY AVENUE EXTENSION; ENGINEERING GEOLOGY REPORT OF ROUGH-GRADING; 1999-11-053598; MELROSE DRIVE EXTENSION; BIOLOGICAL TECHNICAL REPORT; 1999-08-123598; MELROSE DRIVE EXTENSION; GEOTECHNICAL INVESTIGATION; 1999-06-283598; MELROSE DRIVE EXTENSION; PHASE 1 ENVIRONMENTAL SITE ASSESSMENT; 1999-07-143598; MELROSE DRIVE EXTENSION; RECOMMENDATIONS TO MINIMIZE FLOODING; 1999-02-243598; MELROSE DRIVE EXTENSION; RESULTS OF CULTURAL RESOURCE SURVEY; 1999-04-123598; MELROSE DRIVE EXTENSION; RESULTS OF THE ARCHAEOLOGIAL SIGNIFICANCE ASSESSMENT; 1999-10-113598; MELROSE DRIVE EXTENSION; TRAFFIC FORECAST REPORT; 1998-09-013598; MELROSE DRIVE EXTENSION; WETLAND DELINEATION REPORT; 1999-08-173602; PALOMAR AIRPORT ROAD; GEOTECHNICAL REPORT; 1990-09-273602; PALOMAR AIRPORT ROAD; HYDROLOGY AND HYDRAULICS STUDY; 1998-06-303602; PALOMAR AIRPORT ROAD; PHYSICAL PROPERTIES OF ASPHALTIC CONCRETE; 2000-10-183602; PALOMAR AIRPORT ROAD; PHYSICAL PROPERTIES OF SOIL & AGGREGATE; 2000-09-073602; PALOMAR AIRPORT ROAD; REPORT OF LIMITED GEOTECHNICAL INVESTIGATION; 1998-07-283603; EL CAMINO REAL AND ORION STREET; PHYSICAL PROPERTIES OF ASPHALTIC CONCRETE; 2002-05-173603; EL CAMINO REAL AND ORION STREET; R VALUE PROPERTIES; 2002-04-043603; EL CAMINO REAL AND ORION STREET; REPORT OF COMPACTION TEST DATA;3603; EL CAMINO REAL AND ORION STREET; REPORT OF SAND CONE DENSITY TESTS;3607; FARADAY AVENUE AND EL CAMINO REAL; AS-GRADED COMPACTION REPORT; 2007-02-213607; FARADAY AVENUE AND EL CAMINO REAL; LABORATORY TEST REPORT NO.1; 2006-10-043607; FARADAY AVENUE AND EL CAMINO REAL; LABORATORY TEST REPORT NO.2; 2006-10-233607; FARADAY AVENUE AND EL CAMINO REAL; LABORATORY TEST REPORT NO.3; 2007-01-313607; FARADAY AVENUE AND EL CAMINO REAL; PHYSICAL PROPERTIES OF ASPHALTIC CONCRETE; 2006-12-213610; LA COSTA AVE TRAFFIC SIGNALS; SUBMITTALS;3618; CARLSBAD BL PARKING AT PONTO BEACH; SUBMITTALS;3618; CARLSBAD BL PARKING AT PONTO BEACH; TEST RESULTS;3618; PARKING CARLSBAD BLVD AT PONTO BEACH; PRELIMINARY GEOTECHNICAL INVESTIGATION; 1999-04-153618; PARKING CARLSBAD BLVD AT PONTO BEACH; RECONNAISSANCE REPORT; 1994-01-013622; FARADAY ROAD EXTENSION; AMENDMENT TO BIOLOGICAL OPINION; 2005-01-043622; FARADAY ROAD EXTENSION; CONCEPT WATER QUALITY PLAN; 2004-06-013622; FARADAY ROAD EXTENSION; FLOOD PLAIN ANAYSIS; 2000-06-143622; FARADAY ROAD EXTENSION; WATER QUALITY MONITORING PLAN; 2004-12-203622; FARADAY ROAD EXTENSION; WETLAND MITIGATION PLAN; 2004-05-013623; CHARLEEN CIRCLE; SUBMITTALS;3623; CHARLEEN CIRCLE; TEST RESULTS;3623; CHARLEEN CIRCLE; TREE RESOURCE CONSERVATION AND REFORESTATION; 1999-11-013624; CARLSBAD BL STORM DRAIN REPLACEMENT; HYDROLOGY ANALYSIS; 2008-12-013626; ACCESS EASEMENT RECONSTRUCTION PLANS; CONCRETE TEST REPORT; 1999-11-223626; ACCESS EASEMENT RECONSTRUCTION PLANS; GEOTECHNICAL FIELD SUMMARY REPORT; 1999-10-213626; ACCESS EASEMENT RECONSTRUCTION PLANS; REPORT OF FIELD DENSITY TESTS; 1999-11-093629-SF; Carlsbad Crest Corporate Centre, Airport Centre; Carlsbad Crest Corporate Centre, Airport Centre Un 2; 1997-09-023656; Foxes Landing Lift Station Upgrade; Foxes Landing Lift Station Upgrade; 1999-05-183667; PAVEMENT OVERLAY 2002; LABORATORY TEST REPORTS, FIELD COMPACTION, AND INSPECTION; 2002-03-183667-1; 1998 STREET SEAL; FIELD DENSITY SUMMARY; 1999-06-103667-1; 1998 STREET SEAL; PHYSICAL PROPERTIES OF ASPHALT CONCRETE;3667-11; 2005 PAVEMENT OVERLAY PROJECT; PHYSICAL PROPERTIES OF ASPHALTIC CONCRETE 2004- 2006; 2004-10-253667-13; 2006 PAVEMENT OVERLAY PROJECT; PHYSICAL PROPERTIES OF ASPHALTIC CONCRETE; 2006-10-183667-15; 2007 PAVEMENT OVERLAY PROJECT; LABORATORY TEST REPORT NO. 1; 2007-09-263667-15; 2007 PAVEMENT OVERLAY PROJECT; PHYSICAL PROPERTIES OF ASPHALTIC CONCRETE; 2008-04-243667-15; 2007 PAVEMENT OVERLAY PROJECT; REPORT OF TESTS; 2007-11-0736671B; LA GRAN VIA REMOVAL AND RECONSTRUCTION; FIELD DENSITY REPORTS 1999; 1999-06-0236671B; LA GRAN VIA REMOVAL AND RECONSTRUCTION; PHYSICAL PROPERTIES OF ASPHALT CONCRETE JUNE 1999; 1999-06-253667-3; STREET SEALING PROJECT 2000/01; SUBMITTALS;3667-4; 2000-2001 PAVEMENT OVERLAY; COMPACTION TEST REPORT; 2002-04-113667-4; 2000-2001 PAVEMENT OVERLAY; FIELD REPORT; 2002-04-033667-4; 2000-2001 PAVEMENT OVERLAY; PHYSICAL PROPERTIES OF ASPHALTIC CONCRETE; 2002-06-033667-5; PAVEMENT OVERLAY OF PAR, ECR & PASEO DEL NORTE; COMPACTION TESTS 2004; 2004-07-013667-5; PAVEMENT OVERLAY OF PAR, ECR & PASEO DEL NORTE; PHYSICAL PROPERTIES OF ASPHALTIC CONCRETE 2004; 2004-07-083667-9; 2004-05 PAVEMENT OVERLAY PROJECT; PHYSICAL PROPERTIES OF ASPHALTIC CONCRETE; 2004-10-253671; CANNON ROAD/ CARLSBAD BLVD SIDEWALK & STREET IMPROVEMENTS; SUBMITTALS;3671; CANNON ROAD/ CARLSBAD BLVD SIDEWALK & STREET IMPROVEMENTS; TEST RESULTS;3673; POINSETTIA LANE REACH C; COLIFORM TESTS; 2003-11-033673; POINSETTIA LANE REACH C; PHYSICAL PROPERTIES OF SOILS & AGGREGATE; 2003-11-123673; POINSETTIA LANE REACH C; PRESSURE TEST REPORT; 2003-07-283674; Poinsettia Lane Reach 3 - Hunsaker; Poinsettia Lane Reach 3; 1999-06-093675; ENCINA BASIN WATER RECLAMATION PROGRAM; AGGREGATE BASE TESTING AND REVIEW; 2004-01-153675; ENCINA BASIN WATER RECLAMATION PROGRAM; COMPACTION TEST REPORT; 2003-01-243675; ENCINA BASIN WATER RECLAMATION PROGRAM; COMPACTION TEST REPORT; 2004-01-233675; ENCINA BASIN WATER RECLAMATION PROGRAM; EXPANSION INDEX TEST; 2003-01-303675; ENCINA BASIN WATER RECLAMATION PROGRAM; PHYSICAL PROPERTIES OF ASPHALTIC CONCRETE; 2002-09-273675; ENCINA BASIN WATER RECLAMATION PROGRAM; PHYSICAL PROPERTIES OF ASPHALTIC CONCRETE; 2004-02-043675; ENCINA BASIN WATER RECLAMATION PROGRAM; PHYSICAL PROPERTIES OF ASPHALTIC CONCRETE; 2004-02-113675; ENCINA BASIN WATER RECLAMATION PROGRAM; REPORT OF COMPRESSION TESTS; 2003-08-293676; PALOMAR AIRPORT RD AND EL CAMINO REAL TURN LANES; BIOLOGICAL RESOURCES REPORT; 1999-11-243676; PALOMAR AIRPORT RD AND EL CAMINO REAL TURN LANES; CERTIFIED UTILITY REPORT; 1999-12-073676; PALOMAR AIRPORT RD AND EL CAMINO REAL TURN LANES; HISTORICAL/ARCHAEOLOGICAL SURVEY; 1999-11-013676; PALOMAR AIRPORT RD AND EL CAMINO REAL TURN LANES; HYDROLOGY AND HYDRAULICS STUDY; 2000-01-043676; PALOMAR AIRPORT RD AND EL CAMINO REAL TURN LANES; PAVEMENT DESIGN RECOMMENDATIONS; 1999-11-053676; PALOMAR AIRPORT RD AND EL CAMINO REAL TURN LANES; R-VALUE TESTING AND PAVEMENT SECTION DESIGNS; 1999-11-103699; AVIARA COMMUNITY PARK FIRE & WATER SERVICE RELOCATION; LAB TEST REPORT; 2008-01-173704; Depot Parking Lot Grand and State Streets; Grand and State Street Depot Parking Lot; 1986-06-203715; STREETSCAPE STATE ST & GRAND AV; REPORT OF IN-PLACE DENSITY TESTS; 1984-06-203811; El Camino Real Rd Widening Technical Studies; El Camino Real Rd Widening Technical Studies; 2007-09-013811; El Camino Real Widening Project Geotechnical; El Camino Real Widening Project Geotechnical; 2006-04-283811; El Camino Real Widening Project Geotechnical; El Camino Real Widening Project Geotechnical; 2008-05-093811; El Camino Real Widening Retaining Walls A & B; El Camino Real Widening Retaining Walls A & B; 2009-10-153811; El Camino Real Widening Sprague Property; El Camino Real Widening Sprague Property; 2009-12-313811; Flower Fields Mass Grading; Flower Fields Mass Grading; 1985-03-013813; TRAFFIC IMPACT FEES; CIRCULATION IMPLEMENTATION & TIF; 1991-04-013813; TRAFFIC IMPACT FEES; SUPPLEMENTAL ANALYSIS; 2009-03-053814; College Blvd Reach A & Cannon Rd Reach 4; College Blvd Reach A & Cannon Rd Reach 4; 2001-03-203821; LAKE CALAVERA IMPROVEMENTS - CIP 3821; GEOTECHNICAL EVALUATION - DAM IMPROVEMENTS; 2002-11-193821; LAKE CALAVERA REMEDIAL IMPROVEMENTS; SUBMITTALS; 2016-10-103821; LAKE CALAVERA REMEDIAL/ MITIGATION PROJECT; ANNUAL MAINT CULTURAL RESOURCES ANALYSIS; 2011-07-013821; LAKE CALAVERA REMEDIAL/ MITIGATION PROJECT; BIOLOGICAL RESOURCES REPORT; 2012-01-193821; LAKE CALAVERA REMEDIAL/ MITIGATION PROJECT; CA GNATCATCHER SURVEY RESULTS; 2010-07-143821; LAKE CALAVERA REMEDIAL/ MITIGATION PROJECT; HABITAT REVEG, MAINT & MONITORING; 2006-10-263821; LAKE CALAVERA REMEDIAL/ MITIGATION PROJECT; MONITORING NOTES 2011- 2013; 2013-03-193821; LAKE CALAVERA REMEDIAL/ MITIGATION PROJECT; OAK TREE INVENTORY; 2004-06-073837-2; ALGA NORTE COMMUNITY PARK; COMPRESSION TEST REPORTS FOR CONCRETE CYLINDERS; 2013-07-263837-2; ALGA NORTE COMMUNITY PARK; COMPRESSION TEST REPORTS FOR CORES; 2013-05-013837-2; ALGA NORTE COMMUNITY PARK; COMPRESSION TEST REPORTS FOR GROUT PRISMS; 2013-05-163837-2; ALGA NORTE COMMUNITY PARK; DAILY FIELD REPORTS; 2013-06-223837-2; ALGA NORTE COMMUNITY PARK; GRADING OBSERVATIONS; 2013-07-313837-2; ALGA NORTE COMMUNITY PARK; INSPECTION REPORTS; 2013-08-023837-2; ALGA NORTE COMMUNITY PARK; REPORT OF ASPHALT CORING TESTING; 2013-05-173843; El Camino Real Water Pipeline; El Camino Real Water Pipeline; 2002-09-1638561A; HIDDEN CANYON COMMUNITY PARK; RESULTS OF LABORATORY TESTING ON IMPORTANT MATERIAL SAMPLE; 2005-03-233862-1; TRAFFIC SIGNAL AT COLLEGE & TAMARACK; SUBMITTALS;3865; PALOMAR AIRPORT RD & LA COSTA AV DRAINAGE; COMPACTION TEST REPORT; 2003-05-223865; PALOMAR AIRPORT RD & LA COSTA AV DRAINAGE; COMPACTION TEST REPORT; 2003-06-103865; PALOMAR AIRPORT RD & LA COSTA AV DRAINAGE; REPORT OF COMPACTION TEST DATA; 2003-05-213865; PALOMAR AIRPORT RD & LA COSTA AV DRAINAGE; TELEVISION INSPECTION REPORT; 2003-05-163865; PALOMAR AIRPORT RD & LA COSTA AV DRAINAGE; TELEVISION INSPECTION REPORT; 2003-05-213865; PALOMAR AIRPORT RD & LA COSTA AV DRAINAGE; TELEVISION INSPECTION REPORT; 2003-05-223866; LAKE CALAVERA BOARDWALK & WETLAND MITIGATION; BUILDING ENERGY ANALYSIS REPORT; 2016-09-213866; LAKE CALAVERA BOARDWALK & WETLAND MITIGATION; STRUCTURAL ENGINEERING CALCULATIONS; 2016-09-213866; LAKE CALAVERA BOARDWALK & WETLAND MITIGATION; SUBMITTALS; 2016-11-213883; JEFFERSON STREET SIDEWALKS; PAVEMENT RECOMMENDATIONS; 2002-07-173883; JEFFERSON STREET SIDEWALKS; STORM WATER POLLUTION PREVENTION PLAN; 2004-06-013887C; Encina Basin Water Reclamation Program; Geotechnical Evaluation; 2002-06-073889A; Proposed Twin "D" Recycl Water Pump Station; Soils Report; 2002-09-273889B; Calavera Hills II Pump Station; Report of Rough Grading; 2004-10-113889B; Calavera Hills II Pump Station; Report of Rough Grading; 2004-10-11 (2)3889B; Calavera Hills II Pump Station; Soils Report-Bldg Lots 1-115, Rec Lots 116-117; 2004-08-04389; Cannon Road Bridge Over Macario Canyon; Cannon Road Bridge Over Macario Canyon; 1989-01-103890; Encina Basin Phase II Recycled Water; Geotechnical and Environmental Eval; 2003-10-243890; Encina Basin Phase II Recycled Water; Geotechnical and Limited Environmental Evaluation; 2003-10-243890; MAHR RESERVOIR; AS-GRADED COMPACTION REPORT; 2007-01-103890; MAHR RESERVOIR; PHYSICAL PROPERTIES OF ASPHALTIC CONCRETE; 2006-12-153893-1; TRAFFIC SIGNAL AT ALGA RD & XANA WAY; SUBMITTALS;38971; HOLIDAY PARK RESTROOM REPLACEMENT; ASBESTOS ABATEMENT AND LEAD COMPONENT REMOVAL; 2006-12-1838971; HOLIDAY PARK RESTROOM REPLACEMENT; LIMITED ASBESTOS AND LEAD-BASED PAINT SURVEY; 2003-06-2038971; HOLIDAY PARK RESTROOM REPLACEMENT; LIMITED ASBESTOS SURVEY REPORT; 2006-02-1338971; HOLIDAY PARK RESTROOM REPLACEMENT; STRUCTURAL CALCULATIONS; 2003-05-053901; FIRE STATION 6; CERTIFIED COMPLIANCE CERTIFICATES; 2008-11-123901; FIRE STATION 6; FIELD INSPECTION REPORT; 2008-01-213901; FIRE STATION 6; FIELD STRUCTURAL STEEL AND WIELDING INSPECTION REPORT; 2007-11-163901; FIRE STATION 6; FINAL INSPECTION REPORT; 2008-07-113901; FIRE STATION 6; INSPECTION AND/OR TESTING REPORTS; 2007-12-203901; FIRE STATION 6; LABORATORY REPORT; 2007-10-053901; FIRE STATION 6; MOLD INSPECTION REPORT; 2008-07-213901; FIRE STATION 6; REPORT OF COMPRESSION TEST; 2007-12-273901; FIRE STATION 6; REPORT OF ULTRASONIC TESTING OF WELDS; 2007-11-073901; FIRE STATION 6; SHOP STRUCTURAL STEEL AND WELDING FABRICATION REPORT; 2007-11-163901; FIRE STATION 6; SITE OBSERVATION REPORT; 2007-08-073901; FIRE STATION 6; SPECIAL INSPECTION REPORT; 2007-11-273905; HIGHLAND DRIVE STORM DRAIN REPLACEMENT; LABORATORY TEST REPORT NO. 1; 2005-03-253907; Rancho Santa Fe Road Swr Access Rd; Rancho Santa Fe Road Swr Access Rd; 2002-01-313907; RANCHO SANTA FE ROAD WIDENING; LIMITED GEOTECHNICAL INVESTIGATION; 2005-04-013907; RANCHO SANTA FE ROAD WIDENING; OFF SITE WETLAND MITIGATION; 2009-07-313907; RANCHO SANTA FE ROAD WIDENING; SITE OBSERVATION REPORT 5; 2009-11-093907; RANCHO SANTA FE ROAD WIDENING; SITE OBSERVATION REPORT 6; 2009-11-113907; RANCHO SANTA FE ROAD WIDENING; SITE OBSERVATION REPORT 7; 2009-11-183907; RANCHO SANTA FE ROAD WIDENING; SITE OBSERVATION REPORT; 2009-06-293916-1; TRAFFIC SIGNAL AT CAMINO DE LOS COCHES & CALLE ACERVO; SUBMITTALS;39421; COLE LIBRARY HVAC REPLACEMENT; HAZARDOUS BUILDING MATERIAL SURVEY; 2004-03-1939421; COLE LIBRARY HVAC REPLACEMENT; HVAC ASSESSMENT AND DESIGN OPTIONS; 2003-11-1139421; COLE LIBRARY HVAC REPLACEMENT; HVAC ASSESSMENT; 2004-04-013949; Agua Hedionda Lift Station & Force Main; Agua Hedionda Lift Station & Force Main; 2009-08-033949; Agua Hedionda Lift Station & Force Main; Agua Hedionda Lift Station & Force Main; 2009-09-253956; SAN MARCOS BOULEVARD TRANSMISSION MAIN; REPORT OF CONCRETE STRENGTH TEST; 2007-03-223956; SAN MARCOS BOULEVARD TRANSMISSION MAIN; SIEVE ANALYSIS OF COARSE & FINE AGGREGATE; 2006-06-223956; SAN MARCOS BOULEVARD TRANSMISSION MAIN; TEST RESULTS OF MATERIAL SAMPLES; 2006-07-063956; Water Transmission Pipeline Replacement Project; Geotechnical Evaluation; 2004-11-193957; EL CAMINO REAL ROAD WIDENING; BIOLOGICAL RESOURCES LETTER REPORT; 2004-05-243957; EL CAMINO REAL ROAD WIDENING; GEOTECHNICAL RECONNAISSANCE; 2015-09-093957; EL CAMINO REAL ROAD WIDENING; MILL TEST REPORTS;3957; EL CAMINO REAL ROAD WIDENING; PAVEMENT RECOMMENDATIONS; 2016-03-023957; EL CAMINO REAL WIDENING; SUBMITTALS;3971-2; CARLSBAD MUNICIPAL GOLF COURSE; PREGRADING/ PRELIMINARY GEOTECHNICAL; 1998-01-233972-1; CARLSBAD MUNICIPAL GOLF COURSE; GEOTECHNICAL DOCUMENTS;4080-2; BARRIO ADA/ PEDESTRIAN IMPROVEMENTS- PHASE 2; SUBMITTALS;4222; Palomar Airport Road Widening; Palomar Airport Road; 1986-12-0145051; LEO CARILLO BARN RESTORATION; INDOOR AIR SAMPLING; 2011-08-195003; El Camino Real Water System Project; Geotechnical Evaluation; 2006-04-2450081; TRI-CITIES WATER TRANSMISSION PIPELINE; MANHOLE/ SEWER INSPECTION REPORTS; 2016-07-0150081; TRI-CITIES WATER TRANSMISSION PIPELINE; PAVEMENT INVESTIGATION REPORT; 2016-01-3050081; TRI-CITIES WATER TRANSMISSION PIPELINE; SUBMITTALS; 2015-09-045009B; MAERKLE PUMP STATION UPGRADE; POWER SYSTEM STUDY REVISION 2; 2010-10-1950241; ELLERY, ELM & SKYLINE STEEL WATER TANKS; SUBMITTALS; 2013-05-075025; HYDROELECTRIC FACILITY MAERKLE RESERVOIR; DAILY FIELD REPORTS; 2014-07-245025; HYDROELECTRIC FACILITY MAERKLE RESERVOIR; GEOTECHNICAL EVALUATION; 2011-03-085025; HYDROELECTRIC FACILITY MAERKLE RESERVOIR; PRESSURE SURGE ANALYSIS; 2014-12-295025; HYDROELECTRIC FACILITY MAERKLE RESERVOIR; TESTING AND STARTUP FINAL REPORT; 2015-04-3050311; SANTA FE II RESERVIOR DRAINAGE; AS-GRADED GEOTECHINICAL REPORT AND SUMMARY OF IN-PLACE DENSITY TESTS; 2013-04-2350311; SANTA FE II RESERVIOR DRAINAGE; FOUNDATION EXCAVATION OBSERVATION; 2013-03-1852071; LA COSTA RECYCLED WATER PIPELINE; SUBMITTALS; 2015-07-0152081; RECYCLED WATER PHASE III PIPELINE EXPANSION; DENSITY & MOISTURE TESTING; 2015-08-0752081; RECYCLED WATER PHASE III PIPELINE EXPANSION; SUBMITTALS; 2006-06-0552081; RECYCLED WATER PHASE III PIPELINE EXPANSION; SUBMITTALS; 2015-02-095210; Phase III Recycled Water , D-4 Reservoir; GEOTECHNICAL INVESTIGATION; 2019-04-245503-11; PIPELINE CIPP REHABILITATION PHASE I; SUBMITTALS; 2017-05-185503-14; POINSETTIA LIFT STATION HYDRAULIC SURGE PROTECTION; UPDATE GEOTECHNICAL EVALUATION; POINSETTIA LIFT STATION IMPROVEMENTS; 2020-01-245507-1; CALAVERA HILLS WASTEWATER TREATEMENT PLANT DEMO; TECHNICAL HAZARDOUS BUILDING MATERIAL ABATEMENT SPECS; 2011-03-305508; BUENA VISTA LIFT STATION FORCE MAIN VC-4; GEOTECHNICAL EVALUATION; 2007-04-215515; HDD SEWER EXTENSION; SEWER REPORTS (2014);5515; VANCOUVER STREET HDD SEWER EXTENSION; MCELROY JOINT REPORT/ HDPE GRAVITY SEWER REPORT; 2014-02-125525; UTILITIES ASSET MANAGEMENT PLAN; 2015 CARLSBAD CITYWIDE UTILITY ASSET MANAGEMENT PLAN; 2015-10-015525; UTILITIES ASSET MANAGEMENT PLAN; 2015 CARLSBAD CITYWIDE UTILITY ASSET MANAGEMENT PLAN; 2015-10-01 (2)5525; UTILITIES ASSET MANAGEMENT PLAN; 2015 CARLSBAD CITYWIDE UTILITY ASSET MANAGEMENT PLAN; 2015-10-01 (3)5529; POINSETTIA LIFT STATION STANDBY PUMP SYSTEM - EMERGENCY STORAGE BASIN POINSETTIA LIFT STATION; GEOTECHINICAL EVALUATION; EMERGENCY STORAGE BASIN; 2015-06-105533; SIMSBURY SEWER PIPELINE EXTENSION; SUBMITTAL; 2018-06-216001-11OL; 2011 PAVEMENT OVERLAY; ASPHALT CONCRETE IN PLACE DENSITY TESTS & FULL CONFORMANCE TESTING; 2012-01-136001-11SS; 2011 SLURRY SEAL PROJECT; SAND SLURRY LAB TEST RESULTS; 2012-07-246001-14SS; 2014 SLURRY SEAL; SUBMITTALS; 2015-01-296016; CARLSBAD BLVD OVERHEAD RAILING IMPROVEMENTS; BRIDGE INSPECTION REPORT; 2013-08-206020; MARBELLA WALL BEAUTIFICATION; LAB REPORTS; 2010-07-016020; MARBELLA WALL BEAUTIFICATION; SOILS REPORT; 2010-07-016020; MARBELLA WALL BEAUTIFICATION; SUBMITTALS;602256-001; First Responders Joint Use Training Facility; First Responders Joint Use Training Facility; 2008-07-216024-1; La Costa Avenue Slope Repair; Report of Compaction Testing; 2016-04-126028; PALOMAR AIRPORT RD & COLLEGE BLVD IMP; SUBMITTALS; 2008-03-246028; PALOMAR AIRPORT RD AND COLLEGE BLVD IMP; GNATCATCHER MONITORING REPORT; 2012-05-316028; PALOMAR AIRPORT RD AND COLLEGE BLVD IMP; HABITAT MAPPING; 2011-03-166031; Calsbad Boulevard Realignment Project; Cultural Resource Survey for Carlsbad Boulevard Realignment Project; 1998-10-016031; Carlsbad Boulevard Realignment; Calsbad Boulevard Realignment; 2001-10-056031; Carlsbad Boulevard Realignment; Carlsbad Boulevard Realignment; 1998-10-216031; Carlsbad Boulevard Realignment; Carlsbad Boulevard Realignment; 1998-10-21 (2)6031; Carlsbad Boulevard Realignment; Planning Study of Carlsbad Blvd and Cannon Rd; 1993-02-116043; PALOMAR AIRPORT ROAD WIDENING AT PASEO DEL NORTE; CALTRANS APPROVED WATER POLLUTION CONTROL PROGRAM -WPCP; 2018-01-316043; PALOMAR AIRPORT ROAD WIDENING AT PASEO DEL NORTE; GEOTECHNICAL INVESTIGATION - INFILTRATION TESTING; 2019-01-316043; PALOMAR AIRPORT ROAD WIDENING AT PASEO DEL NORTE; SUBSURFACE UTILITY REPORT; 2017-09-296043; PALOMAR AIRPORT ROAD WIDENING AT PASEO DEL NORTE; SUPPLEMENTAL GEOTECHNICAL INVESTIGATION - INFILTRATION TESTING; 2017-12-086043; PALOMAR AIRPORT ROAD WIDENING AT PASEO DEL NORTE; SWQMP GREEN STREET EXEMPTION; 2019-04-046057; OCEAN STREET BEACH ACCESS; PRIORITY DEVELOPMENT PROJECT - STORM WATER QUALITY MANAGEMENT; 2017-08-036060; TRAILS ROADWAY CROSSINGS; SUBMITTALS;6-10; EL CAMINO MESA UNIT NO. 4; COMPACTION TEST; 1966-10-2762-2; LAGUNA RIVIERA NO. 4; COMPACTION TEST RESULTS; 1970-07-0362-2; LAGUNA RIVIERA NO. 4; LOTS 81 THOUGH 138 SOIL ENGINEERING; 1969-08-0562-2; LAGUNA RIVIERA NO. 4; PAVEMENT DESIGN; 1970-01-0762-2; LAGUNA RIVIERA NO. 4; STREET BASE TESTS; 1970-07-1362-2; LAGUNA RIVIERA NO. 4; UTILTY TRENCH BACKFILL; 1970-07-016-252-201400; Maerkle Reservoir Geotechnical Services; Maerkle Reservoir Geotechnical Services; 1998-01-146310; Palomar Airport Road Connection to Carlsbad Blvd; Palomar Airport Road Connection; 1992-04-106604-1; Romeria Drainage Improvements; Report of Compaction Testing; 2016-04-126607; CAMEO RD STORM DRAIN REPAIR; GROUTING AND INSPECTION REPORTS; 2012-10-016607; CAMEO ROAD & EL CAMINO REAL STORM DRAIN & PIPELINE REPLACEMENT; COMPACTION TEST RESULTS; 2008-06-276607; CMP Replacement Program - Carlsbad Blvd. North of Island Way; HYDROLOGY AND HYDRAULICS REPORT; 2016-11-026607; CORRUGATED METAL PIPE REPLACEMENT PROGRAM - FINALIZATION EFFORT; CMP REPLACEMENT PROGRAM - REMAINING INVENTORY CONDITION ASSESSMENT; 2019-06-146607; State Street CMP Replacement Geotechnical; State Street CMP Replacement Geotechnical; 2009-04-136607-1; CAMEO RD STORM DRAIN REPAIR; DAILY FIELD REPORT WITH DENSITY TESTING; 2011-12-016607-1; Proposed Residential Development El Camino; Proposed Residential Development El Camino; 2005-06-136607-3; CMP REPLACEMENT PROGRAM; SUBMITTALS;6608; BASSWOOD AVE STORM DRAIN; POTHOLING FOR EXISTING UTILITIES; 2013-11-016608; Northwest Quadrant Drainage Improvements; Northwest Quadrant Storm Drain Crest Dr; 2008-06-306608; NORTHWEST QUADRANT STORM DRAIN IMPROVEMENT PROGRAM MONROE STREET; HYDROLOGY AND HYDRAULICS REPORT; 2017-01-016608; NW QUAD STROM DRAIN PROGRAM 2013; SUBMITTALS;6608; NW QUADRANT STORM DRAIN IMPROVEMENT; PROJECT SUMMARY; 2012-06-116608; NW QUADRANT STORM DRAIN IMPROVEMENT; WATER POLLUTION CONTROL PLAN; 2012-02-176608; NW QUADRANT STORM DRAIN PROGRAM; DAILY FIELD REPORTS; 2015-04-126608; NW QUADRANT STORM DRAIN PROGRAM; SEWER SURVEYS; 2010-12-286608; NW QUADRANT STORM DRAIN PROGRAM; SUBMITTALS & SHOP DWGS;6608; STATE STREET DRAINAGE IMPROVEMENTS; STATE STREET HYDROLOGY AND DRAINAGE IMPROVEMENTS TECHNICAL MEMORANDUM; 2019-10-236611; Park Dr @ Marina Dr Drain, Wall, Pave Impro; Park Dr @ Marina Dr Drain, Wall, Pave Impro; 2008-09-246612; RANCHO CARILLO WATER SEEPAGE; GEOTECHNICAL EVALUATION; 2008-11-046612; RANCHO CARILLO WATER SEEPAGE; SUBMITTALS; 2011-05-046620; STORM DRAIN CONDITION ASSESSMENT PROGRAM; STORM DRAIN ASSET BUSINESS RISK EXPOSURE RE CALIBRATION; 2018-09-01