Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
Search
My WebLink
About
2017-01-24; Municipal Water District; ; Adopt a Resolution approving out of state travel for Carlsbad Municipal Water District department staff to attend the Design Build Institute of America Water/Wastewater Conference
2017-01-24; Municipal Water District; ; Adopt a Resolution approving plans and specifications and authorizing the Secretary to the Board to advertise and receive bids for the Bolero Pressure Reducing Station Replacement, Project No 5020
2017-01-24; Municipal Water District; ; Adopt a Resolution authorizing execution of a Professional Services agreement with Kennedy/Jenks Consultants for an amount not to exceed $975,661 for the Segment 5 Recycled Water Design, Project No. 5208
2017-01-24; Municipal Water District; ; Majority Protest Public Hearing on Proposed Fixed Fire Service Charges
2017-04-25; Municipal Water District; ; Adopt a Resolution approving plans and specifications and authorizing the Secretary to the Board to advertise and receive bids for the La Costa Water Main Replacement Pro
2017-04-25; Municipal Water District; ; Adopt a Resolution authorizing execution of a Professional Services Agreement with Badger Meter, Inc dba National Meter & Automation for purchase of domestic service cold water meters
2017-05-23; Municipal Water District; ; Adopt a Resolution accepting bids and awarding a contract to Wright Construction Engineering Corp. for construction of the Bolero Pressure Reducing Station Replacement, Project No. 5020-A
2017-05-23; Municipal Water District; ; Adopt a Resolution approving plans and specifications and authorizing the secretary of the Board to advertise and receive bids for the Recycled Water Phase Ill Pipeline Expansion Segment 9, Project No. 5208
2017-05-23; Municipal Water District; ; Adopt a Resolution authorizing execution of a master sales agreement with Itron, Inc. for equipment, software and configuration services for an advanced metering infrastructure network
2017-05-23; Municipal Water District; ; Adopt a Resolution authorizing execution of an agreement with Hilts Consulting Group, Inc. for an amount not to exceed $694,440 for the Maerkle Reservoir Floating Cover Replacement Design Project No. 5036
2017-06-13; Municipal Water District; ; Adopt a Resolution to rescind the Drought Response Level 2 - Drought Alert Condition and return to a Drought Response Level 1
2017-06-13; Municipal Water District; ; Authorize the Executive Director to Execute a License Agreement with Verizon Wireless to Operate a Wireless Communication Facility at the Maerkle Reservoir Site
2017-06-13; Municipal Water District; ; TriAgencies Water Transmission Pipelines Reach 2 - Phase 1, Project No. 5008 Contract Change Order No. 4
2017-07-11; Municipal Water District; ; Adopt a Resolution accepting bids and awarding a contract to Creative Home DBA CHI Construction for the construction of the La Costa Water Main Replacement, Project No. 5
2017-08-22; Municipal Water District; ; Adopt a Resolution accepting an Easement Agreement with Cabrillo Power I, LLC for a Recycled Water Pipeline Easement for the Avenida Encinas Recycled Water Pipeline, Project No. 5027
2017-08-22; Municipal Water District; ; Adopt a Resolution approving plans and specifications and authorizing secretary to the Board of the CMWD to advertise and receive bids for the Valve Replacement: Phase I, Project No. 5019-A.
2017-08-22; Municipal Water District; ; Adopt a Resolution approving plans and specifications and authorizing the Board of the CMWD to advertise and receive bids for the C and D3 Steel Water Tanks Coating and Structural Repairs, Project No. 5024
2017-08-22; Municipal Water District; ; Adopt a Resolution authorizing an application to the California Department of Water Resources Water Desalination Grant Program Round 4, for construction of the Carlsbad 5
2017-10-24; Municipal Water District; ; Adopt a Resolution accepting bids and awarding a contract to Burtech Pipeline Incorporated for construction of the Recycled Water Phase III Pipeline Expansion Segment 9, Project No. 5208-A
2017-11-07; Municipal Water District; ; Adopt a Resolution quitclaiming a portion of a public water easement at 5420, 5430 and 5440 Grand Pacific Drive
2017-12-12; Municipal Water District; ; Adopt a Resolution accepting bids and awarding a contract to AMP United LLC for the construction of the C and D3 Steel Water Tanks Coating and Structural Repairs, Project No. 5024
2017-12-12; Municipal Water District; ; Adopt a Resolution accepting bids and awarding a contract to Capriati Construction Corp. for the construction of the Valve Replacement: Phase I, Project No. 5019-A